Pile head treatment method for cast-in-place concrete pileInfo
- Publication number
- JPH0621454B2 JPH0621454B2 JP61143783A JP14378386A JPH0621454B2 JP H0621454 B2 JPH0621454 B2 JP H0621454B2 JP 61143783 A JP61143783 A JP 61143783A JP 14378386 A JP14378386 A JP 14378386A JP H0621454 B2 JPH0621454 B2 JP H0621454B2
- Authority
- JP
- Japan
- Prior art keywords
- pile
- reinforcing bar
- concrete
- pile head
- cast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Description
【発明の詳細な説明】 (産業上の利用分野) 本発明は、場所打ちコンクリート杭の杭頭部分を除去す
る杭頭処理方法に関するものである。TECHNICAL FIELD The present invention relates to a pile head treatment method for removing a pile head portion of a cast-in-place concrete pile.
(従来技術及びその問題点) 従来から、この種の場所打ち(現場施工)のコンクリー
ト杭では、杭の上端部にコンクリートとスライムとの混
合物が浮上るので、この杭頭部分を除去することは周知
である。(Prior art and its problems) Conventionally, in this type of cast-in-place (site construction) concrete pile, since the mixture of concrete and slime floats on the upper end of the pile, it is not possible to remove this pile head portion. It is well known.
また、杭頭処理に関して特開昭60−62331号、特
開昭59−192124号も知られているが、第1の先
行例では油圧シリンダを有する破砕装置が必要であり、
第2の先行例ではシース管に膨張する破砕剤を封入する
必要があり、杭頭処理の工数低減、コスト低減の面で未
だ不十分である。Further, JP-A-60-62331 and JP-A-59-192124 are also known for the pile head treatment, but the first prior art example requires a crushing device having a hydraulic cylinder,
In the second prior art example, it is necessary to fill the sheath tube with a crushing agent that expands, which is still insufficient in terms of reduction of man-hours for pile head treatment and cost reduction.
(発明の目的) 本発明は、杭頭処理の工数を低減でき、コストを低減す
ることができる場所打ちコンクリート杭の杭頭処理方法
を提供することを目的としている。(Object of the Invention) An object of the present invention is to provide a method for treating a pile head of a cast-in-place concrete pile that can reduce the man-hours for the pile head treatment and reduce the cost.
(発明の構成) (1)技術的手段 本発明は、場所打ちコンクリート杭の杭頭部分を除去す
る杭頭処理方法であって、掘削した穴に鉄筋かごを配置
し、該鉄筋かごの上端部分であって、各鉄筋の杭頭長さ
に相当する部分に、ビニールパイプを嵌着すると共に、
中抜部材として、コンクリート打設用のトレミー管通過
用中心孔を有すると共に各鉄筋挿通用の鉄筋孔を有する
厚肉環状板状の発泡スチロール製リングを、複数個積層
状に嵌め込み、この工程の後に、コンクリートを打設
し、養生期間経過後に前記中抜部材を囲むように固化し
たコンクリートの杭頭部分と発泡スチロール製リングを
粉砕しながら除去し、場所打ちコンクリート杭の杭頭部
分を処理することを特徴とする場所打ちコンクリート杭
の杭頭処理方法である。(Structure of the Invention) (1) Technical Means The present invention is a pile head treatment method for removing a pile head portion of a cast-in-place concrete pile, in which a reinforcing bar cage is arranged in an excavated hole and an upper end portion of the reinforcing bar cage is arranged. And, while fitting the vinyl pipe in the part corresponding to the pile head length of each rebar,
As a hollowing member, a styrofoam ring having a thick annular plate shape having a central hole for passing a tremie pipe for concrete pouring and having a reinforcing bar hole for inserting each reinforcing bar is fitted in a plurality of laminated layers, and after this step , After pouring concrete, after removing the pile head part of concrete solidified so as to surround the hollowed-out member and the polystyrene foam ring while crushing, removing the pile head part of cast-in-place concrete pile It is a characteristic method of treating pile heads of cast-in-place concrete piles.
(2)作用 粉砕容易な発泡スチロール製リングで中抜部材を構成し
ているので、中抜部材と共にその周囲のコンクリートを
容易に粉砕でき、しかも複数の発泡スチロール製リング
を積層状に嵌め込んで中抜部材を構成しているので、各
リング毎に粉砕でき、作業がさらに容易になる。(2) Action Since the hollowing out member is composed of a styrofoam ring that can be easily crushed, it is possible to easily crush concrete around the hollowing out member together with the hollowing out member, and moreover, a plurality of styrofoam rings are fitted in a laminated shape to hollow out Since the members are configured, each ring can be crushed and the work becomes easier.
厚肉環状板状の発泡スチロール製のリングを、複数個積
層状に嵌め込むようにしているので、その装着個数を調
整することにより、杭頭処理長さを所定の長さに簡単に
設定できる。Since a plurality of rings made of Styrofoam having a thick annular plate shape are fitted in a laminated manner, the pile head treatment length can be easily set to a predetermined length by adjusting the number of rings to be mounted.
コンクリート打設前に、鉄筋にビニールパイプを嵌着し
ていることにより、コンクリート打設時の各鉄筋へのコ
ンクリートの付着が防止できる。Since the vinyl pipe is fitted to the reinforcing bar before the concrete is placed, it is possible to prevent the concrete from adhering to each reinforcing bar when placing the concrete.
(実施例) 本発明を採用した場所打ちコンクリート杭の施工工程を
示す第1図において、工程(1)で杭芯をセットした
後、工程(2)で先行掘りを行ない、工程(3)でケー
シング建込みとベントナイト液の注入を行なう。更に工
程(4)で所定の深さにまで掘削を完了する。工程
(5)で穴の深さを検尺するが、穴の底には工程(6)
のように崩れた土砂がスライムとなって滞積する。そこ
で、工程(7)でバケットを挿入してスライムを処理し
た後に、工程(8)で再度検尺する。以上でコンクリー
ト杭の穴が完成する。(Example) In FIG. 1 which shows the construction process of the cast-in-place concrete pile which employ | adopted this invention, after setting a pile core in a process (1), preceding digging is performed in a process (2), and it is a process (3). Install the casing and inject bentonite liquid. Further, in step (4), excavation is completed to a predetermined depth. The depth of the hole is measured in the step (5), but the step (6) is measured at the bottom of the hole.
The collapsed earth and sand becomes slime and accumulates. Therefore, after the bucket is inserted in step (7) to process the slime, the scale is measured again in step (8). This completes the holes for concrete piles.
次に、工程(9)で鉄筋かご20を挿入した後に、工程
(10)で中抜部材22を鉄筋かご20の上端部に取付
け、トレミー管24を挿入する。この後に、工程(1
1)でコンクリートを打設し、工程(12)でケーシン
グを引抜いた後に、本発明の要旨である鉄筋かご20の
上端部を杭頭処理する。Next, after inserting the reinforcing bar cage 20 in step (9), the hollow member 22 is attached to the upper end of the reinforcing bar cage 20 in step (10), and the tremie pipe 24 is inserted. After this, the step (1
After the concrete is poured in 1) and the casing is pulled out in the step (12), the upper end portion of the reinforcing bar cage 20 which is the gist of the present invention is subjected to pile head treatment.
この杭頭部分の構造は第2図に示すように、鉄筋かご2
0を中抜部材22で囲んである。中抜部材22は第3
図、第4図に示すように、中心部にトレミー管24を通
す中心孔26が穿孔された略環状の発泡スチロール(発
泡プラスチック)製リングに放射状の鉄筋孔28が穿孔
されている。As shown in Fig. 2, the structure of this pile head part is as follows:
0 is surrounded by a hollow member 22. The hollow member 22 is the third
As shown in FIG. 4 and FIG. 4, a radial reinforcing bar hole 28 is formed in a substantially annular styrofoam (foam plastic) ring having a central hole 26 through which the tremie tube 24 is inserted.
この中抜部材22は第2図に示すように例えば10個積
み重ねた状態で、鉄筋孔28に鉄筋かご20の縦筋30
を貫通させて、鉄筋かご20を全周にわたって囲むよう
になっている。更に縦筋30の外周面にはビニールパイ
プ32が装着され、ビニールパイプ32の上下端部はテ
ープ34で封入されている。中抜部材22の周囲を囲む
ケーシング36と中抜部材22の外周面の間には空間3
8が形成されている。ケーシング36の上縁にはアング
ル材40が井桁状に溶接されており、地表面GLとの間
には受桁42が挟まれている。更に、中抜部材22の上
縁には押え板44が載せられ、押え板44は受桁46で
押えられている。As shown in FIG. 2, for example, 10 of the hollow members 22 are stacked and the vertical bars 30 of the reinforcing bar cage 20 are inserted into the reinforcing bar holes 28.
To surround the rebar cage 20 over the entire circumference. Further, a vinyl pipe 32 is attached to the outer peripheral surface of the vertical streak 30, and the upper and lower ends of the vinyl pipe 32 are sealed with tape 34. A space 3 is provided between the casing 36 surrounding the hollow member 22 and the outer peripheral surface of the hollow member 22.
8 is formed. An angle member 40 is welded to the upper edge of the casing 36 in a cross beam shape, and a receiving beam 42 is sandwiched between the angle member 40 and the ground surface GL. Further, a pressing plate 44 is placed on the upper edge of the hollow member 22, and the pressing plate 44 is pressed by a receiving girder 46.
以上のような杭頭部分に充填されるコンクリートには、
ベントナイト液や土砂等の混合がコンクリートに混入し
ており、この部分のコンクリートは除去する必要があ
る。For the concrete filled in the pile head part as described above,
Mixing of bentonite liquid, earth and sand, etc. is mixed in the concrete, and it is necessary to remove the concrete in this part.
杭等処理工程は第5図に示すように、工程(13)で養
生期間経過後に根切掘削を行ない、工程(14)で空間
68(第2図)に充填されたコンクリートの外側部分4
8を除去する。次に、工程(15)で中抜部材22を粉
砕して除去する。更に、工程(16)で縦筋30を外側
に屈曲した後に、50の基端部にせり矢挿入孔を穿孔
し、せり矢を使用してクラックを発生させ、中心部分5
0を分離してロープ52で吊りあげる。なお、前記せり
矢挿入孔の代りに中抜部材22に凸部を設け、この凸部
で形成される中心部分50の凹部にダルダ等を挿入して
中心部分50を分離してもよい。As shown in FIG. 5, in the step of treating piles, etc., root cutting excavation is performed after the curing period has passed in step (13), and the outer portion 4 of the concrete filled in the space 68 (FIG. 2) in step (14).
Remove 8. Next, in step (15), the hollow member 22 is crushed and removed. Further, after bending the vertical streak 30 outward in the step (16), a barrage insertion hole is bored in the base end portion of 50, and a crack is generated by using the barrage, and the central portion 5
Separate 0 and hang it with rope 52. The center portion 50 may be separated by providing a convex portion on the hollow member 22 instead of the arrowhead insertion hole and inserting a duller or the like into the concave portion of the central portion 50 formed by the convex portion.
最後に、工程(17)で縦筋30を修正した後に、上面
54を仕上げはつりして杭等処理が完了する。Finally, after the vertical streak 30 is corrected in the step (17), the upper surface 54 is finished and suspended, and the processing such as piles is completed.
以上のように杭等処理方法では、第5図の工程(14)
で外側部分48を除去する際に、外側部分48は柔かい
中抜部材22の外周面に固化しているので、従来と比較
して容易に粉砕されやすい。したがって粉砕作業時に大
きな騒音を発生する例えばブレーカー等の空気力機械を
使用することが減少したり、或は全く使用する必要がな
い。As described above, in the method for treating piles, etc., the step (14) in FIG.
Since the outer portion 48 is solidified on the outer peripheral surface of the soft cored member 22 when the outer portion 48 is removed by, it is more easily crushed than in the conventional case. Therefore, the use of pneumatic machines, such as breakers, which generate a lot of noise during the grinding operation, is reduced or even eliminated at all.
中心部分50についても、中心部分50と縦筋30は予
め分離しているので、前述のようにブレーカーを使用せ
ずに、除去する。As for the central portion 50, since the central portion 50 and the vertical streak 30 are separated beforehand, they are removed without using the breaker as described above.
(発明の効果) 以上説明したように本発明は、場所打ちコンクリート杭
の杭頭部分を除去する杭頭処理方法であって、掘削した
穴に鉄筋かご20を配置し、該鉄筋かご20の上端部分
であって、各鉄筋(縦筋30)の杭頭長さに相当する部
分に、ビニールパイプ32を嵌着し、かつ、中抜部材2
2として、コンクリート打設用のトレミー管通過用中心
孔26を有すると共に各鉄筋挿通用の鉄筋孔28を有す
る厚肉環状板状の発泡スチロール製リングを、複数個積
層状に嵌め込み、この工程の後に、コンクリートを打設
し、養生期間経過後に前記中抜部材22を囲むように固
化したコンクリートの杭頭部分と発泡スチロールリング
を粉砕しながら除去し、場所打ちコンクリート杭の杭頭
部分を処理するので、次のような利点がある。(Effect of the invention) As described above, the present invention is a pile head treatment method for removing a pile head portion of a cast-in-place concrete pile, in which the reinforcing bar cage 20 is arranged in an excavated hole, and the upper end of the reinforcing bar cage 20 is arranged. A vinyl pipe 32 is fitted to the portion corresponding to the pile head length of each reinforcing bar (vertical bar 30), and the hollow member 2
As 2, a plurality of thick annular plate-shaped styrofoam rings having a central hole 26 for passing a tremie pipe for concrete pouring and a reinforcing bar hole 28 for inserting each reinforcing bar are fitted in a laminated form, and after this step , Pour concrete, after the curing period, the pile head portion of the concrete solidified to surround the hollow member 22 and the styrofoam ring are crushed and removed, and the pile head portion of the cast-in-place concrete pile is treated. It has the following advantages.
(1)養生後、外側部分48を除去する際に、外側部分
48は柔かい発泡スチロール製リングの外周面に固化し
ており、従来と比較して容易に粉砕することができる。
したがって粉砕作業時に大きな騒音を発生する例えばブ
レーカー等の空気力機械を使用することを減少でき、或
は全く使用する必要をなくすことができる。(1) When the outer portion 48 is removed after curing, the outer portion 48 is solidified on the outer peripheral surface of the soft Styrofoam ring, and can be crushed more easily than in the conventional case.
It is therefore possible to reduce the use of pneumatic machines, such as breakers, which generate loud noises during the grinding operation, or to eliminate the need to use them at all.
中心部分50についても、中心部分50と縦筋30は予
め分離しているので、前述のようにブレーカーを使用せ
ずに、中心部分50を除去することができる。Also regarding the central portion 50, since the central portion 50 and the vertical streak 30 are separated beforehand, the central portion 50 can be removed without using a breaker as described above.
このため、杭頭作業時に問題となるブレーカーによる騒
音を大幅に低減できるとともに、杭頭部分のコンクリー
トの粉砕作業が容易になるので、作業時間を短縮でき、
安全性も向上する。For this reason, it is possible to significantly reduce the noise caused by the breaker, which is a problem during pile head work, and it becomes easier to crush concrete on the pile head part, so the work time can be shortened,
Safety is also improved.
(2)厚肉環状板状の発泡スチロール製リングを、複数
個積層状に嵌め込むようにしているので、その装着個数
を調整することにより、杭頭処理長さを所望の長さに簡
単に設定できる。(2) Since a plurality of thick circular plate-shaped styrofoam rings are fitted in a laminated manner, the pile head treatment length can be easily set to a desired length by adjusting the number of attachments.
しかも、従来のように一体物で中抜部材を構成している
場合に比べて、各リング毎に、コンクリートと共に粉砕
し、撤去できるので、撤去作業が一層容易になる。Moreover, as compared with the conventional case where the hollow member is made of a single piece, each ring can be crushed and removed together with the concrete, so that the removal work becomes easier.
(3)コンクリート打設前に、鉄きにビニールパイプ3
2を嵌着していることにより、コンクリート打設時の各
鉄筋へのコンクリートの付着が防止でき、鉄筋の杭頭処
理部分の仕上げ作業が不要になる。(3) Before placing concrete, iron pipes and vinyl pipes 3
By fitting 2 in, it is possible to prevent concrete from adhering to each reinforcing bar during concrete pouring, and it is not necessary to finish the pile head processing part of the reinforcing bar.
(別の実施例) 中抜部材22の外周面をケーシング36に密着させて、
空間38をなくすようにしてもよい。(Another Example) The outer peripheral surface of the hollow member 22 is brought into close contact with the casing 36,
The space 38 may be eliminated.
第1図は本発明によるコンクリート杭の場所打ち作業を
示す構造略図、第2図は杭頭部分を示す縦断面図、第3
図は中抜部材の平面図、第4図は中抜部材の側面図、第
5図は杭頭処理工程を示す構造略図である。20……鉄
筋かご、22……中抜部材、24……トレミー管、26
……中心孔、28……鉄筋孔、30……縦筋、32……
ビニールパイプFIG. 1 is a schematic structural view showing a cast-in-place operation of a concrete pile according to the present invention, FIG. 2 is a vertical sectional view showing a pile head portion, and FIG.
The drawing is a plan view of the hollow member, FIG. 4 is a side view of the hollow member, and FIG. 5 is a structural schematic diagram showing a pile head treatment step. 20 ... Reinforcing cage, 22 ... Hollow-out member, 24 ... Tremy tube, 26
…… Center hole, 28 …… Reinforcing bar hole, 30 …… Vertical streak, 32 ……
Vinyl pipe
───────────────────────────────────────────────────── フロントページの続き (72)発明者 中村 明久 大阪府大阪市大淀区本庄東3丁目9番3号 関西電力株式会社大阪北支店内 (72)発明者 山根 昇 大阪府大阪市大淀区本庄東3丁目9番3号 関西電力株式会社大阪北支店内 (72)発明者 松井 勝 大阪府大阪市大淀区本庄東3丁目9番3号 関西電力株式会社大阪北支店内 (72)発明者 榎 保男 大阪府大阪市城東区野江2丁目12番12号 関西電力株式会社野江電力所内 (72)発明者 藤森 真弥 大阪府大阪市城東区野江2丁目12番12号 関西電力株式会社野江電力所内 (72)発明者 竹原 寿一 大阪府大阪市西淀川区千舟3丁目1番7号 大日電設株式会社内 (72)発明者 友定 孝司 大阪府大阪市西淀川区千舟3丁目1番7号 大日電設株式会社内 (56)参考文献 特開 昭54−81609(JP,A) 特開 昭58−80020(JP,A) ─────────────────────────────────────────────────── ─── Continued Front Page (72) Inventor Akihisa Nakamura 3-9-3 Honjo Higashi, Oyodo-ku, Osaka City, Osaka Prefecture Kansai Electric Power Co., Inc., Osaka North Branch (72) Inventor Noboru Yamane Honjo, Oyodo-ku, Osaka City, Osaka Prefecture 3-9-3 Higashi Kansai Electric Power Co., Inc. Osaka Kita Branch (72) Inventor Masaru Matsui 3-9-3 Honjo Higashi Honjo East, Oyodo-ku, Osaka City, Osaka Prefecture (72) Inventor Enoki Yasuo 2-12-12 Noe, Joto-ku, Osaka-shi, Osaka Prefecture Kansai Electric Power Co., Inc. Noe Electric Power Station (72) Inventor Shinya Fujimori 2-12-12, Noe, Joto-ku, Osaka City Osaka Prefecture Kansai Electric Power Co., Inc. (72) ) Inventor Juichi Takehara 3-17 Chisen, Nishiyodogawa-ku, Osaka City, Osaka Prefecture Dainichi Densen Co., Ltd. (72) Inventor Takashi Tomojo 3 Chifune, Nishiyodogawa-ku, Osaka City, Osaka Eyes No. 1 No. 7 Dainichi electric facility in Co., Ltd. (56) Reference Patent Sho 54-81609 (JP, A) JP Akira 58-80020 (JP, A)
Claims (1)
する杭頭処理方法であって、掘削した穴に鉄筋かごを配
置し、該鉄筋かごの上端部分であって、各鉄筋の杭頭長
さに相当する部分に、ビニールパイプを嵌着すると共
に、中抜部材として、コンクリート打設用のトレミー管
通過用中心孔を有すると共に各鉄筋挿通用の鉄筋孔を有
する厚肉環状板状の発泡スチロール製リングを、複数個
積層状に嵌め込み、この工程の後に、コンクリートを打
設し、養生期間経過後に前記中抜部材を囲むように固化
したコンクリートの杭頭部分と発泡スチロール製リング
を粉砕しながら除去し、場所打ちコンクリート杭の杭頭
部分を処理することを特徴とする場所打ちコンクリート
杭の杭頭処理方法。1. A pile head treatment method for removing a pile head portion of a cast-in-place concrete pile, wherein a reinforcing bar cage is arranged in an excavated hole, and the upper end portion of the reinforcing bar cage is a pile head length of each reinforcing bar. In a portion corresponding to the height, a vinyl pipe is fitted, and as a hollowing member, a thick circular plate-shaped styrofoam having a central hole for passing a tremie pipe for concrete placement and a reinforcing bar hole for inserting each reinforcing bar. Plural rings are fitted in a laminated form, after this step, concrete is placed, and after the curing period, the pile head part of the concrete solidified to surround the hollowed-out member and the Styrofoam ring are removed while crushing. And a method for treating a cast-in-place concrete pile, which comprises treating the pile-head portion of the cast-in-place concrete pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP61143783A JPH0621454B2 (en) | 1986-06-19 | 1986-06-19 | Pile head treatment method for cast-in-place concrete pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP61143783A JPH0621454B2 (en) | 1986-06-19 | 1986-06-19 | Pile head treatment method for cast-in-place concrete pile |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS63523A JPS63523A (en) | 1988-01-05 |
JPH0621454B2 true JPH0621454B2 (en) | 1994-03-23 |
Family
ID=15346899
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP61143783A Expired - Fee Related JPH0621454B2 (en) | 1986-06-19 | 1986-06-19 | Pile head treatment method for cast-in-place concrete pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0621454B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0762399B2 (en) * | 1988-11-12 | 1995-07-05 | 三井建設株式会社 | Method for constructing columns with steel pipe-filled concrete structure and formwork for surplus concrete |
JP2006299535A (en) * | 2005-04-15 | 2006-11-02 | Kumagai Gumi Co Ltd | Cap for treating pile head of cast-in-place pile |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5481609A (en) * | 1977-12-12 | 1979-06-29 | Furukawa Electric Co Ltd | Method of crushing concrete of location piled pile head portion |
JPS5880020A (en) * | 1981-11-02 | 1983-05-14 | Hasegawa Komuten Co Ltd | Treating method for head of in-place pile |
-
1986
- 1986-06-19 JP JP61143783A patent/JPH0621454B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPS63523A (en) | 1988-01-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100428018B1 (en) | File head treatment of concrete mortar, file head treatment method, and mortar concrete mortar method | |
JP3453664B2 (en) | Shaft construction method | |
JPH0621454B2 (en) | Pile head treatment method for cast-in-place concrete pile | |
JPH09328748A (en) | Pile cap of reinforced concrete pile, base plate of pile cap, and construction method for reinforced concrete pile | |
JPH08209686A (en) | Pile head processing tool and pile head processing construction method for cast-in-place pile | |
JPH05287745A (en) | Mounting method for wale in column aligning method | |
JP2726241B2 (en) | Pile head treatment method of cast-in-place foundation pile and tool for performing this treatment | |
JPH04124317A (en) | Improvement of foundation ground for building | |
JP2004108078A (en) | Construction method for underwater shaft, underwater shaft, connection method for shaft and adit, and pit structure | |
JP2880348B2 (en) | Pile head treatment method for cast-in-place concrete pile | |
JPS59118926A (en) | Improving work of ground under water pressure and iron-bar setter to be used therein | |
JPS5927026A (en) | On-site pile head treatment work | |
JP2693028B2 (en) | Construction method of human hole in middle of pipeline | |
JP3084498B2 (en) | Steel pipe pile head treatment method | |
JP2745146B2 (en) | Earth retaining method using gravity type retaining wall-shaped soil structure | |
JPS5880020A (en) | Treating method for head of in-place pile | |
JP2693027B2 (en) | Pile head treatment method for cast-in-place concrete pile | |
JP4248716B2 (en) | Caisson top end construction method | |
JP3124704B2 (en) | How to build a shaft | |
JPH0718675A (en) | Sc pile and executing method thereof | |
JP3898929B2 (en) | Liquefaction prevention structure | |
JPH01322020A (en) | Pile head processing cap for in-situ pile | |
JP2593248B2 (en) | How to remove the excess part of cast-in-place pile | |
JPH0387415A (en) | Construction method for bagging cast-in-place pile | |
JP2000178983A (en) | Foundation construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |