JPH06193163A - Wall panel working method and wall panel support bearer and wall panel fixing jig thereof - Google Patents

Wall panel working method and wall panel support bearer and wall panel fixing jig thereof

Info

Publication number
JPH06193163A
JPH06193163A JP34949192A JP34949192A JPH06193163A JP H06193163 A JPH06193163 A JP H06193163A JP 34949192 A JP34949192 A JP 34949192A JP 34949192 A JP34949192 A JP 34949192A JP H06193163 A JPH06193163 A JP H06193163A
Authority
JP
Japan
Prior art keywords
wall panel
fixed
alc
fixing
hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP34949192A
Other languages
Japanese (ja)
Inventor
Nobuya Ichihashi
延也 市橋
Masayoshi Yanagawa
正義 柳川
Hidetoshi Maeda
英俊 前田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ONODA ALC KK
Shimizu Construction Co Ltd
Onoda Autoclaved Light Weight Concrete Co Ltd
Shimizu Corp
Original Assignee
ONODA ALC KK
Shimizu Construction Co Ltd
Onoda Autoclaved Light Weight Concrete Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ONODA ALC KK, Shimizu Construction Co Ltd, Onoda Autoclaved Light Weight Concrete Co Ltd, Shimizu Corp filed Critical ONODA ALC KK
Priority to JP34949192A priority Critical patent/JPH06193163A/en
Publication of JPH06193163A publication Critical patent/JPH06193163A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To greatly facilitate the working for ALC boards and enhance the working efficiency. CONSTITUTION:A plurality of ALC boards 4 are joined and fixed in a parallel state by means of a fixing jig A. The fixed ALC boards 4 are delivered to a construction site and then a lifting device is used to lift up the fixing jig A. A plurality of ALC boards 4 fixed with the fixing jig A are delivered into a structure where the ALC boards 4 are mounted to the structure.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、壁体に、例えばALC
(軽量気泡コンクリート)板などの壁パネルを用いて構
造物を構築する際に、この壁パネルの取付施工を行うの
に好適な壁パネルの施工方法ならびにそれに用いる壁パ
ネルの支持具および壁パネルの固定治具に関するもので
ある。
BACKGROUND OF THE INVENTION The present invention relates to a wall body, for example, an ALC.
When constructing a structure using a wall panel such as a (lightweight cellular concrete) plate, a wall panel construction method suitable for mounting the wall panel, and a wall panel support tool and a wall panel used therefor. It relates to a fixing jig.

【0002】[0002]

【従来の技術】一般に、ALC板等の壁パネルを構造物
に取付施工する際には、ユニット化された所定寸法の壁
パネルを構築現場に搬入し、この壁パネルを1枚ずつ構
造物に取付けている。
2. Description of the Related Art Generally, when mounting wall panels such as ALC plates on a structure, the unitized wall panels of a predetermined size are carried into a construction site, and the wall panels are formed one by one into the structure. It is installed.

【0003】また、このような壁パネルの構造物への取
付けは、構造物側に、取付けすべき壁パネルの上部と下
部とに対応する位置に、それぞれ水平方向に延在する固
定金具を配設し、壁パネルの上部と下部とをそれぞれの
固定金具により支持・固定する構造となっている。
Further, when mounting such a wall panel on a structure, fixing metal fittings extending in the horizontal direction are arranged on the structure side at positions corresponding to the upper part and the lower part of the wall panel to be mounted. It has a structure in which the upper and lower parts of the wall panel are supported and fixed by respective fixing fittings.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上述し
たような従来の壁パネルの施工方法においては、トラッ
クなどで構築現場に搬入した所定寸法の壁パネルを、構
造物の外部から1枚ずつ、ゴンドラ,クレーン等の揚重
装置で吊り上げて搬入した後、所定の位置に位置決めし
て取付けなければならないため、その施工作業が煩雑で
作業効率が悪いという問題があった。本発明は、以上の
ような点を考慮してなされたもので、壁パネルの施工作
業を容易にして作業効率を向上させる壁パネルの施工方
法ならびにそれに用いる壁パネルの支持具および壁パネ
ルの固定治具を提供することを目的とする。
However, in the conventional method for constructing a wall panel as described above, the wall panels of a predetermined size brought into the construction site by a truck or the like are taken from the outside of the structure one by one. However, since it has to be positioned and mounted at a predetermined position after being lifted by a lifting device such as a crane and carried in, there is a problem that the construction work is complicated and work efficiency is poor. The present invention has been made in view of the above points, and is a method of constructing a wall panel that facilitates the construction work of the wall panel and improves the work efficiency, a support tool of the wall panel used for the method, and a fixing of the wall panel. The purpose is to provide a jig.

【0005】[0005]

【課題を解決するための手段】請求項1に係る発明は、
複数枚の壁パネルを固定手段により並列状態に接合して
固定しておき、該固定した壁パネルを構築現場に搬入し
た後、揚重装置により該壁パネルを吊り上げて構造物に
搬入し、この壁パネルを構造物に取付けることを特徴と
している。
The invention according to claim 1 is
A plurality of wall panels are joined and fixed in parallel by a fixing means, and the fixed wall panels are carried into a construction site, and then the wall panels are lifted by a lifting device and carried into a structure. The feature is that the wall panel is attached to the structure.

【0006】請求項2に係る発明は、複数枚の短冊状の
壁パネルを並列状態に接合して固定する支持具であっ
て、固定すべき複数の壁パネルを並列状態で、その上部
を固定する上部固定バーと、その下部を固定する下部固
定バーと、前記上部固定バーと下部固定バーとを連結す
る連結部とから構成され、前記上部固定バーには、揚重
装置で吊り上げるための吊り上げ部が設けられているこ
とを特徴としている。
According to a second aspect of the present invention, there is provided a support tool for joining and fixing a plurality of strip-shaped wall panels in a parallel state, wherein a plurality of wall panels to be fixed are arranged in a parallel state and an upper portion thereof is fixed. Upper fixing bar, a lower fixing bar for fixing the lower part thereof, and a connecting portion for connecting the upper fixing bar and the lower fixing bar, and the upper fixing bar is lifted for lifting with a lifting device. It is characterized in that a section is provided.

【0007】請求項3に係る発明は、壁パネルを構造物
に取付ける固定治具であって、前記壁パネルの取付面に
設けたフック部と、前記構造物の梁部に設けた掛止部
と、床部に設けられ、該壁パネルの下部を支持固定する
支持部とから構成されていることを特徴としている。
According to a third aspect of the present invention, there is provided a fixing jig for mounting a wall panel on a structure, wherein a hook portion provided on a mounting surface of the wall panel and a hook portion provided on a beam portion of the structure. And a support portion that is provided on the floor portion and supports and fixes the lower portion of the wall panel.

【0008】[0008]

【作用】請求項1記載の発明では、複数枚の壁パネルを
固定手段により並列状態に接合して固定しておき、該固
定した壁パネルを構築現場に搬入した後、揚重装置によ
り該壁パネルを吊り上げて構造物に搬入し、この壁パネ
ルを構造物に取付けるので、複数枚の壁パネルが同時に
構造物に取付けられる。
According to the first aspect of the present invention, a plurality of wall panels are joined and fixed in parallel by fixing means, and the fixed wall panels are carried into a construction site, and then the wall is lifted by a lifting device. Since the panels are lifted up and carried into the structure and the wall panels are attached to the structure, a plurality of wall panels can be attached to the structure at the same time.

【0009】請求項2記載の発明では、複数の壁パネル
を上部固定バーと下部固定バーとにより並列状態で固定
して支持し、この支持具を、吊り上げ部の揚重装置によ
り吊り上げることにより、複数枚の壁パネルを同時に搬
入する。
According to the second aspect of the present invention, the plurality of wall panels are fixed and supported in parallel by the upper fixing bar and the lower fixing bar, and the supporting device is hoisted by the hoisting device of the hoisting section. Bring in multiple wall panels at the same time.

【0010】請求項3記載の発明では、壁パネルの取付
面に設けたフック部を構造物の梁部に設けた掛止部とに
掛止させ、壁パネルの下部を支持部で支持することによ
り、壁パネルを構造物に取付ける。
According to the third aspect of the present invention, the hook portion provided on the mounting surface of the wall panel is hooked to the hook portion provided on the beam portion of the structure, and the lower portion of the wall panel is supported by the support portion. Attach the wall panel to the structure.

【0011】[0011]

【実施例】以下、本発明を図1ないし図3に示す一実施
例を参照して説明する。ここでは、壁パネルとして、例
えばALC板を用いる場合の実施例を用いて説明する。
図1に示す構築中の構造物において、符号1は大梁、2
は小梁、3は床板、4は壁体を構成するALC板(壁パ
ネル)である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to an embodiment shown in FIGS. Here, an example will be described in which an ALC plate is used as the wall panel.
In the structure under construction shown in FIG. 1, reference numeral 1 is a girder, 2
Is a beam, 3 is a floor plate, and 4 is an ALC plate (wall panel) that constitutes a wall body.

【0012】ALC板4,4,…は、それぞれユニット
化された所定寸法の短冊状の形状とされ、大梁1と小梁
2との仕口部においては切り欠き部4aが形成されてい
る。
The ALC plates 4, 4, ... Are each formed into a strip shape having a predetermined size as a unit, and a cutout portion 4a is formed at a joint portion between the large beam 1 and the small beam 2.

【0013】図2に示すように、ALC板4は、その上
端部4bを掛止金具(掛止部)8と掛止フック(フック
部)9とにより固定され、下端部4cを支持レール(支
持部)10で固定された構造とされている。
As shown in FIG. 2, the ALC plate 4 has its upper end 4b fixed by a hook metal fitting (hooking portion) 8 and a hook (hook portion) 9 and its lower end 4c supported by a support rail ( The structure is fixed by a supporting portion) 10.

【0014】掛止金具8は、断面視L字状で、大梁1の
フランジ部の下面1aに、ブラケット7を介して水平方
向に延びるように配設されている。掛止フック9は、A
LC板4の取付面の掛止金具に対応する位置に設けられ
ている。この掛止金具8と掛止フック9は、ブラケット
7と掛止金具8との間に形成された凹部11に掛止フッ
ク9の先端部を挿入して、掛止フック9を掛止金具8に
掛止する構造とされている。
The hook 8 is L-shaped in cross section, and is arranged on the lower surface 1a of the flange of the girder 1 so as to extend horizontally through the bracket 7. The hook 9 is A
It is provided at a position on the mounting surface of the LC plate 4 corresponding to the hook metal fitting. The hook metal 8 and the hook 9 are inserted into a recess 11 formed between the bracket 7 and the metal hook 8 to insert the tip of the hook 9 into the recess 11. It is designed to hang on.

【0015】一方、前記支持レール10は、断面視C字
状で、床板3上のALC板4を取付けるべき位置に固定
されている。上記の掛止金具8,掛止フック9,および
支持レール10とから構成される固定治具(固定手段)
Aにより、ALC板4は、その下端部4cを支持レール
10に嵌合させ、かつ上端部4bを掛止金具8に掛止フ
ック9の先端部を掛止させることにより、構造物に固定
される構造とされている。
On the other hand, the support rail 10 is C-shaped in cross section and is fixed to the floor plate 3 at a position where the ALC plate 4 is to be attached. A fixing jig (fixing means) composed of the above-mentioned latch metal 8, latch hook 9, and support rail 10.
By A, the ALC plate 4 is fixed to the structure by fitting the lower end portion 4c of the ALC plate 4 to the support rail 10 and the upper end portion 4b of the hanging metal fitting 8 to the leading end portion of the hanging hook 9. It is said to have a structure.

【0016】上記のALC板4を構造物に搬入するため
には、図1に示した支持具Bを用いる。支持具Bは、3
枚のALC板4を並列状態でその上部を固定するため水
平方向に延びる上部固定バー13と、ALC板4,4,
…の下部を固定するため水平方向に延びる下部固定バー
14と、この上部固定バー13と下部固定バー14との
それぞれの両端部を連結する連結部15,15とが矩形
に組み合わされ、さらに、連結部15,15間に、補強
バー16が固定された構造とされている。上部固定バー
13,下部固定バー14は、ボルト等によりALC板
4,4,…を固定する構造とされている。さらに、上部
固定バー13の両端部には、クレーン等の揚重装置で吊
り上げるため、揚重装置のワイヤーWを係止するフック
(吊り上げ部)17,17が設けられている。
In order to carry the ALC plate 4 into the structure, the support tool B shown in FIG. 1 is used. Support tool B is 3
An upper fixing bar 13 extending in the horizontal direction for fixing the upper portions of the ALC plates 4 in parallel and the ALC plates 4, 4,
The lower fixing bar 14 extending in the horizontal direction for fixing the lower part of the ... And the connecting portions 15 and 15 connecting both ends of the upper fixing bar 13 and the lower fixing bar 14 are combined in a rectangular shape, and further, A reinforcing bar 16 is fixed between the connecting portions 15 and 15. The upper fixing bar 13 and the lower fixing bar 14 are structured to fix the ALC plates 4, 4, ... With bolts or the like. Further, hooks (lifting portions) 17, 17 for locking the wire W of the lifting device for lifting by a lifting device such as a crane are provided at both ends of the upper fixed bar 13.

【0017】次に、上記の固定治具Aおよび支持具Bを
用いたALC板4,4,…の取付施工方法について図1
ないし図3を用いて説明する。まず、工場において、図
3に示すように、3枚のALC板4を並列状態に接合さ
せ、これら3枚のALC板4を支持具Bで固定する。こ
のとき、設計上、ALC板4が、例えば大梁1と小梁2
との仕口部に取付けられる場合には、小梁2と干渉しな
いよう切り欠き部4aを形成する。このように、工場で
不要部分を切断しておくことにより、構築現場での切断
作業を廃することができ、かつ構築現場での廃材の処理
を行う必要がなくなる。また、各ALC板4の上面に
は、ロックウール等の防火材18を取付けておく。これ
により、従来、構築現場においてALC板4を設置した
後、この上部に床板3aを取付けてからこのALC板4
と床板3aとの間に詰め込んで行っていた防火材18の
取付作業が簡略化できる。
Next, a method of mounting the ALC plates 4, 4, ... Using the fixing jig A and the supporting tool B will be described with reference to FIG.
Through FIG. 3 will be described. First, in a factory, as shown in FIG. 3, three ALC plates 4 are joined in parallel, and these three ALC plates 4 are fixed by a support tool B. At this time, by design, the ALC plate 4 is, for example, a girder 1 and a girder 2.
When it is attached to the joint part, the notch 4a is formed so as not to interfere with the beam 2. By cutting unnecessary parts in the factory in this way, it is possible to eliminate the cutting work at the construction site and eliminate the need to process the waste material at the construction site. Further, a fireproof material 18 such as rock wool is attached to the upper surface of each ALC plate 4. Thus, conventionally, after the ALC plate 4 is installed at the construction site, the floor plate 3a is attached to the upper part of the ALC plate 4 and then the ALC plate 4 is installed.
It is possible to simplify the work of mounting the fireproofing material 18 that is carried out between the floor plate 3a and the floor plate 3a.

【0018】次いで、支持具Bで固定したALC板4,
4,…をトラック等で、水平状態に重畳して構築現場に
搬入する。そして、図1に示したように、支持具Bの上
部固定バー13にフック17,17を取付ける。また、
各ALC板4の取付け面には掛止フック9を取付ける。
Next, the ALC plate 4, which is fixed by the support B,
Place 4, ... on a truck etc. in a horizontal state and carry it to the construction site. Then, as shown in FIG. 1, the hooks 17, 17 are attached to the upper fixing bar 13 of the support tool B. Also,
A hook 9 is attached to the mounting surface of each ALC plate 4.

【0019】一方、構築すべき構造物の所定の位置に大
梁1,小梁2,図示しない柱,床板3等の部材を建造す
る。そして、図2に示したように、構築階において大梁
1にブラケット7,掛止金具8を取付け、床板3上には
支持レール10を固定する。
On the other hand, members such as a girder 1, a girder 2, a pillar (not shown), and a floor plate 3 are constructed at predetermined positions of the structure to be constructed. Then, as shown in FIG. 2, on the construction floor, the bracket 7 and the hook metal 8 are attached to the girder 1, and the support rail 10 is fixed on the floor plate 3.

【0020】次いで、支持具Bのフック17,17にワ
イヤーWを通し、揚重装置のフックHで吊り上げて、並
列状態に接合された3枚のALC板4を取付けすべき位
置に移動させる。このとき支持具Bのフック17,17
が、3枚のALC板4の上部に位置しているので、水平
状態に重畳された3枚のALC板4を吊り上げると、こ
れら3枚のALC板4が略鉛直に吊下される状態とな
る。
Then, the wire W is passed through the hooks 17 of the support tool B, and is lifted by the hook H of the lifting device to move the three ALC plates 4 joined in parallel to the position where they should be attached. At this time, the hooks 17, 17 of the support tool B
However, since the three ALC plates 4 are located above the three ALC plates 4, when the three ALC plates 4 that are horizontally stacked are lifted, the three ALC plates 4 are suspended substantially vertically. Become.

【0021】そして、吊下した3枚のALC板4を支持
レール10の略鉛直上方から下降させ、ALC板4の下
端部4cを固定治具Aの支持レール10に嵌合させると
ともに、これらのALC板4の上端部4bを、掛止フッ
ク9の先端部を凹部11に挿入して掛止金具8に掛止さ
せて、図1および図2に示したように、構造物に固定す
る。なお、図1に示したように、切り欠き部4aが形成
されている場合には、3枚のALC板4を、いったん小
梁2の側方に下降させて上記と同様に取付けた後、これ
ら3枚のALC板4を水平方向にずらすことにより、所
定の位置に取付けることができる。
Then, the three suspended ALC plates 4 are lowered from above the support rail 10 substantially vertically, and the lower end portion 4c of the ALC plate 4 is fitted to the support rail 10 of the fixing jig A. The upper end portion 4b of the ALC plate 4 is inserted into the recess 11 with the tip portion of the hooking hook 9 to be hooked on the hooking metal 8, and is fixed to the structure as shown in FIGS. 1 and 2. As shown in FIG. 1, when the cutout portion 4a is formed, after the three ALC plates 4 are once lowered to the side of the beam 2 and attached in the same manner as above, By horizontally shifting these three ALC plates 4, they can be attached at predetermined positions.

【0022】次いで、支持具Bのフック17,17を取
り外すとともに、揚重装置のフックを元の位置に復帰さ
せる。そして支持具Bを3枚のALC板4から取り外
す。構築階においてこのALC板4,4,…の取付作業
を繰り返し、全てのALC板4,4,…を取付ける。
Next, the hooks 17 of the support B are removed, and the hooks of the lifting device are returned to their original positions. Then, the support tool B is removed from the three ALC plates 4. On the construction floor, the work of attaching the ALC plates 4, 4, ... Is repeated to attach all the ALC plates 4, 4 ,.

【0023】次いで、上層階の床板3aを、大梁1およ
び取付けたALC板4,4,…の上面に載置する。この
とき、前述したように、各ALC板4の上面には防火材
18があらかじめ取付けられているので、従来の様に構
築現場での防火材18の取付作業を行う必要がない。上
記の作業を各構築階において繰り返すことにより、構造
物が構築される。
Next, the floor plate 3a of the upper floor is placed on the upper surfaces of the girder 1 and the attached ALC plates 4, 4, .... At this time, as described above, since the fireproof material 18 is previously attached to the upper surface of each ALC plate 4, it is not necessary to perform the work of attaching the fireproof material 18 at the construction site as in the conventional case. A structure is constructed by repeating the above-mentioned work at each construction floor.

【0024】以上、上述したように、3枚のALC板4
を支持具Bで並列状態に接合して固定しておき、これら
のALC板4を構築現場に搬入した後、揚重装置により
これらのALC板4を吊り上げて構造物に搬入し、構造
物に取付けるので、3枚のALC板4を同時に構造物に
取付けることができる。これにより、ALC板4の施工
作業が大幅に容易になり、作業効率を向上させることが
できる。
As described above, the three ALC plates 4 are used as described above.
Are joined and fixed in a parallel state by the support tool B, and these ALC plates 4 are carried into the construction site, and then the ALC plates 4 are lifted by a lifting device and carried into the structure to form a structure. Since it is attached, the three ALC plates 4 can be attached to the structure at the same time. As a result, the work of constructing the ALC plate 4 is significantly facilitated and the work efficiency can be improved.

【0025】また、支持具Bは、3枚のALC板4を上
部固定バー13と下部固定バー14とにより並列状態で
固定して支持し、この支持具Bを、揚重装置により上部
固定バー13に設けたフック17,17で吊り上げる構
造とされている。これにより、3枚のALC板4を、略
鉛直状態で同時に搬入することができる。これにより、
トラックに水平状態に重畳されたALC板4の積み卸し
作業,構造物への搬入・取付作業が大幅に容易になり、
作業効率を向上させることができる。
In addition, the support tool B supports and fixes the three ALC plates 4 in parallel with each other by the upper fixing bar 13 and the lower fixing bar 14, and the supporting tool B is supported by the lifting device with the upper fixing bar. It is structured to be lifted by the hooks 17 provided on the No. 13. Accordingly, the three ALC plates 4 can be simultaneously loaded in a substantially vertical state. This allows
The loading and unloading work of the ALC plate 4 horizontally superposed on the truck and the loading and mounting work to the structure are greatly facilitated.
Work efficiency can be improved.

【0026】また、掛止金具8,掛止フック9,および
支持レール10とから構成される固定治具Aにより、こ
れらのALC板4を、その下端部4cを支持レール10
に嵌合させ、かつ上端部4bを掛止金具8に掛止フック
9を掛止させて、構造物に固定する。これにより、AL
C板4を構造物にワンタッチで取付けることができ、A
LC板4の取付作業が大幅に容易になる。
Further, the ALC plate 4 and the lower end portion 4c of the ALC plate 4 are fixed to the support rail 10 by the fixing jig A composed of the hook metal 8, the hook 9 and the support rail 10.
, And the upper end 4b is hooked on the hooking metal 8 and the hooking hook 9 is fixed to the structure. This allows AL
C plate 4 can be attached to the structure with one touch,
The work of attaching the LC plate 4 is greatly facilitated.

【0027】さらには、ALC板4が、例えば大梁1と
小梁2との仕口部に取付けられる場合には、小梁2と干
渉しないよう、あらかじめ工場で不要部分を切断してお
くので、構築現場での切断作業を廃することができ、か
つ構築現場での廃材の処理を行う必要がなくなる。
Further, when the ALC plate 4 is attached to the joint between the girder 1 and the girder 2, for example, unnecessary parts are cut beforehand in the factory so as not to interfere with the girder 2. The cutting work at the construction site can be eliminated, and it is not necessary to process the waste material at the construction site.

【0028】なお、固定治具Aは、図2に示した構造に
限るものではなく、例えば、図4に示すように、断面視
L字状の掛止金具20を、大梁1の下面1aに、その立
ち上がり部20aを下方にむけて取付け、この掛止金具
20にフック21を掛止するなど、他の構造としてもよ
い。また、上記実施例において、支持具Bにより、3枚
のALC板4を並列状態に接合して固定したが、支持具
Bで固定するALC板4の枚数は、これに限るものでな
く、その幅方向の寸法がトラックで搬送できる所定寸法
内であればよい。
The fixing jig A is not limited to the structure shown in FIG. 2, but for example, as shown in FIG. 4, a hook 20 having an L-shaped cross section is provided on the lower surface 1a of the girder 1. Other structures may be adopted such that the rising portion 20a is attached downward and the hook 21 is hooked to the hook 20. Further, in the above-mentioned embodiment, the three BLC plates 4 are joined and fixed in parallel by the support tool B, but the number of ALC plates 4 fixed by the support tool B is not limited to this. The dimension in the width direction may be within a predetermined dimension that can be transported by a truck.

【0029】[0029]

【発明の効果】以上説明したように、請求項1に係る壁
パネルの施工方法によれば、複数枚の壁パネルを固定手
段により並列状態に接合して固定しておき、これらの壁
パネルを、構築現場に搬入した後、揚重装置により吊り
上げて構造物に搬入し、これらの壁パネルを構造物に取
付けるので、複数枚の壁パネルを同時に構造物に取付け
ることができる。これにより、壁パネルの施工作業が大
幅に容易になり、作業効率を向上させることができる。
As described above, according to the wall panel construction method of the first aspect, a plurality of wall panels are joined and fixed in parallel by the fixing means, and the wall panels are fixed. After being carried into the construction site, it is hoisted by the lifting device and carried into the structure, and these wall panels are attached to the structure, so that a plurality of wall panels can be attached to the structure at the same time. As a result, the work of constructing the wall panel is greatly facilitated and the work efficiency can be improved.

【0030】請求項2に係る壁パネルの支持具によれ
ば、請求項1の方法を実現し得、かつ、壁パネルを上部
固定バーと下部固定バーとで並列状態で固定して支持
し、これを、揚重装置により上部固定バーに設けた吊り
上げ部で吊り上げる構造としたので、複数枚の壁パネル
を、略鉛直状態で同時に搬入することができる。これに
より、トラックへの壁パネルの積み卸し作業,構造物へ
の搬入・取付作業が大幅に容易になり、作業効率を向上
させることができる。
According to the support for the wall panel according to the second aspect, the method of the first aspect can be realized, and the wall panel is fixed and supported in parallel by the upper fixing bar and the lower fixing bar, Since this has a structure in which it is hoisted by the hoisting unit provided on the upper fixed bar by the hoisting device, a plurality of wall panels can be simultaneously carried in in a substantially vertical state. As a result, the loading and unloading work of the wall panels on the truck and the loading and mounting work on the structure are significantly facilitated, and the work efficiency can be improved.

【0031】請求項3に係る壁パネルの固定治具によれ
ば、請求項1の方法を実現し得、かつ、壁パネルを掛止
部と支持部とで支持固定することにより構造物に固定す
る構造であるので、壁パネルの構造物への取付作業が大
幅に容易になる。
According to the wall panel fixing jig of the third aspect, the method of the first aspect can be realized, and the wall panel is fixed to the structure by supporting and fixing the wall panel with the hooking portion and the supporting portion. Because of the structure, the work of attaching the wall panel to the structure is significantly facilitated.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の壁パネルの施工方法の一実施例を示す
斜視図である。
FIG. 1 is a perspective view showing an embodiment of a wall panel construction method of the present invention.

【図2】同実施例を適用して形成した壁パネルの取付構
造の側断面図である。
FIG. 2 is a side sectional view of a wall panel mounting structure formed by applying the embodiment.

【図3】同実施例における壁パネルの搬送時の状態を示
す斜視図である。
FIG. 3 is a perspective view showing a state when the wall panel is being conveyed in the embodiment.

【図4】本発明の壁パネルの施工方法の別の実施例によ
り形成した壁パネルの取付構造の側断面図である。
FIG. 4 is a side sectional view of a wall panel mounting structure formed according to another embodiment of the wall panel construction method of the present invention.

【符号の説明】[Explanation of symbols]

4 ALC板(壁パネル) 8 掛止金具(掛止部) 9 掛止フック(フック部) 10 支持レール(支持部) 13 上部固定バー 14 下部固定バー 15 連結部 17 フック(吊り上げ部) A 固定治具(固定手段) B 支持具 4 ALC plate (wall panel) 8 Hook metal fitting (Hook part) 9 Hook hook (hook part) 10 Support rail (support part) 13 Upper fixing bar 14 Lower fixing bar 15 Connecting part 17 Hook (lifting part) A fixing Jig (fixing means) B Support

───────────────────────────────────────────────────── フロントページの続き (72)発明者 前田 英俊 愛知県名古屋市中区錦一丁目13番26号 小 野田エー・エル・シー株式会社本社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Hidetoshi Maeda 1-1326 Nishiki 1-chome, Naka-ku, Nagoya, Aichi Onoda ALC Co., Ltd.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 複数枚の壁パネルを固定手段により並列
状態に接合して固定しておき、該固定した壁パネルを構
築現場に搬入した後、揚重装置により該壁パネルを吊り
上げて構造物に搬入し、この壁パネルを構造物に取付け
ることを特徴とする壁パネルの施工方法。
1. A structure in which a plurality of wall panels are joined and fixed in parallel by a fixing means, the fixed wall panels are carried into a construction site, and then the wall panels are lifted by a lifting device. A method of constructing a wall panel, which comprises loading the wall panel into a structure and attaching the wall panel to a structure.
【請求項2】 複数枚の短冊状の壁パネルを並列状態に
接合して固定する支持具であって、固定すべき複数の壁
パネルを並列状態で、その上部を固定する上部固定バー
と、その下部を固定する下部固定バーと、前記上部固定
バーと下部固定バーとを連結する連結部とから構成さ
れ、前記上部固定バーには、揚重装置で吊り上げるため
の吊り上げ部が設けられていることを特徴とする壁パネ
ルの支持具。
2. A support tool for joining and fixing a plurality of strip-shaped wall panels in a parallel state, and an upper fixing bar for fixing the upper portions of the plurality of wall panels to be fixed in a parallel state, It is composed of a lower fixing bar that fixes the lower portion thereof and a connecting portion that connects the upper fixing bar and the lower fixing bar, and the upper fixing bar is provided with a lifting portion for lifting with a lifting device. A support for a wall panel, which is characterized in that
【請求項3】 壁パネルを構造物に取付ける固定治具で
あって、前記壁パネルの取付面に設けたフック部と、前
記構造物の梁部に設けた掛止部と、床部に設けられ、該
壁パネルの下部を支持固定する支持部とから構成されて
いることを特徴とする壁パネルの固定治具。
3. A fixing jig for attaching a wall panel to a structure, comprising a hook portion provided on an attachment surface of the wall panel, a hook portion provided on a beam portion of the structure, and a floor portion. And a supporting part for supporting and fixing the lower part of the wall panel.
JP34949192A 1992-12-28 1992-12-28 Wall panel working method and wall panel support bearer and wall panel fixing jig thereof Pending JPH06193163A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP34949192A JPH06193163A (en) 1992-12-28 1992-12-28 Wall panel working method and wall panel support bearer and wall panel fixing jig thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP34949192A JPH06193163A (en) 1992-12-28 1992-12-28 Wall panel working method and wall panel support bearer and wall panel fixing jig thereof

Publications (1)

Publication Number Publication Date
JPH06193163A true JPH06193163A (en) 1994-07-12

Family

ID=18404109

Family Applications (1)

Application Number Title Priority Date Filing Date
JP34949192A Pending JPH06193163A (en) 1992-12-28 1992-12-28 Wall panel working method and wall panel support bearer and wall panel fixing jig thereof

Country Status (1)

Country Link
JP (1) JPH06193163A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015094157A (en) * 2013-11-13 2015-05-18 トヨタホーム株式会社 Wall structure of building
JP2015108225A (en) * 2013-12-03 2015-06-11 株式会社竹中工務店 Exterior panel vertical-extension unit
CN113062609A (en) * 2021-03-30 2021-07-02 山西宏厚装配式建筑科技发展有限公司 Maintenance structure assembling type process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015094157A (en) * 2013-11-13 2015-05-18 トヨタホーム株式会社 Wall structure of building
JP2015108225A (en) * 2013-12-03 2015-06-11 株式会社竹中工務店 Exterior panel vertical-extension unit
CN113062609A (en) * 2021-03-30 2021-07-02 山西宏厚装配式建筑科技发展有限公司 Maintenance structure assembling type process

Similar Documents

Publication Publication Date Title
EP0960244A1 (en) Mounting plate for a partition system
JPH06193163A (en) Wall panel working method and wall panel support bearer and wall panel fixing jig thereof
JP2714763B2 (en) Construction method of reinforced concrete structure
JPH0932298A (en) Work execution method and device for wall panel and wall panel
JPH1162077A (en) Installation of wall panel and fixture therefor
JP3877420B2 (en) Wall panels and reinforcing plates for wall panels
JP7388861B2 (en) Panel loading rack and panel construction method
JPH10250976A (en) Transportation device for plate type material
JP2004346601A (en) Hanger for unit panel, and unit panel construction method
JPH08114302A (en) Boiler installing method and boiler installation structural body
JP2724337B2 (en) Panel mounting rack
CN210598201U (en) Lower support structure and prefabricated part fine tuning tool
JPS6113645Y2 (en)
JP7025972B2 (en) Building construction method
JP2533047Y2 (en) Unit scaffold
JPH05311760A (en) Panel mounting method
JP3018528U (en) Temporary stage
JP3221782B2 (en) Fireproof structure and fireproof panel unit of prefabricated building
JP2849355B2 (en) Exterior wall construction method and preset exterior wall used for it
JP3077559B2 (en) Supporting mechanism of jumping scaffold for building construction
JPH06167067A (en) Deck plate construction method
JPH0546425B2 (en)
JP2004036178A (en) Method for assembling deck unit
JP2977459B2 (en) Curtain wall construction method and panel unit
JPS5965161A (en) Suspension scaffold method