JPH06167067A - Deck plate construction method - Google Patents

Deck plate construction method

Info

Publication number
JPH06167067A
JPH06167067A JP32040392A JP32040392A JPH06167067A JP H06167067 A JPH06167067 A JP H06167067A JP 32040392 A JP32040392 A JP 32040392A JP 32040392 A JP32040392 A JP 32040392A JP H06167067 A JPH06167067 A JP H06167067A
Authority
JP
Japan
Prior art keywords
deck plate
reinforcing
construction method
floor
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP32040392A
Other languages
Japanese (ja)
Inventor
Kazuma Chino
一磨 千野
Koji Kudo
康二 工藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP32040392A priority Critical patent/JPH06167067A/en
Publication of JPH06167067A publication Critical patent/JPH06167067A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

PURPOSE:To shorten the process of attaching a hanging tool to a deck plate, and facilitate the attaching work. CONSTITUTION:A reinforcing hardware 13 is fixed and set to a stainless steel deck plate 1 by welding. The reinforcing hardware 13 consists of reinforcing parts 14 whose shape is formed to be fitted in the recessed parts of the deck plate 1. After the reinforcing hardware 13 is set to the deck plate 1, floor reinforcements 5 are arranged, and floor concrete 6 is placed. After the floor concrete 6 is cured, a hanging tool 15 is fixed to the lower face of the deck plate 1 at the position to which the reinforcing parts 14 are fitted, and then work for piping 16 is performed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は原子力発電所等において
建屋内のデッキプレートに吊り具を取着する建屋建設時
のデッキプレート工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a deck plate construction method for constructing a building in which a hanging tool is attached to a deck plate in a building in a nuclear power plant or the like.

【0002】[0002]

【従来の技術】例えば原子力発電所等における建屋内に
は種々の配管,配線,ダクト等が天井,壁面,床などに
吊り具を介して支持されている。これらの吊り具は建屋
建設時のデッキプレート工法によって取着されるのが一
般的である。従来の吊り具を取着した建屋建設時のデッ
キプレート工法の第1の例を図7から図9に、第2の例
を図10から図13について説明する。
2. Description of the Related Art In a building such as a nuclear power plant, various pipes, wirings, ducts, etc. are supported on ceilings, wall surfaces, floors and the like via suspenders. These hoists are generally attached by the deck plate construction method at the time of building construction. A first example of a deck plate construction method at the time of building a building in which a conventional suspender is attached will be described with reference to FIGS. 7 to 9, and a second example will be described with reference to FIGS. 10 to 13.

【0003】第1の例は図7から図9に示した順序によ
って行われる。すなわち、各図とも符号1はデッキプレ
ートを部分的に示している。図7は従来の埋込金物3を
デッキプレート1に設定する場合を説明するためのもの
で、デッキプレート1に埋込金物3が設定された状態を
示している。
The first example is carried out in the order shown in FIGS. That is, in each drawing, reference numeral 1 partially shows the deck plate. FIG. 7 is for explaining the case of setting the conventional embedded hardware 3 on the deck plate 1, and shows a state in which the embedded hardware 3 is set on the deck plate 1.

【0004】すなわち、デッキプレート1を受けるデッ
キプレート受ビーム2を設定し、そのデッキプレート受
ビーム2上に凹凸状に形成された波形デッキプレート1
を据付ける。
That is, the deck plate receiving beam 2 for receiving the deck plate 1 is set, and the corrugated deck plate 1 is formed on the deck plate receiving beam 2 in an uneven shape.
Install.

【0005】デッキプレート1の据付けが完了すると、
埋込金物3を設定する位置を芯出しした後、埋込金物3
を設定し、溶接によりデッキプレート1の凸面に固定す
る。埋込金物3にはあらかじめ4本のスタッド4が取着
されている。なお、埋込金物3は1個のみ示している
が、実際には多数個ある。
When the installation of the deck plate 1 is completed,
After centering the position where the embedded hardware 3 is set, the embedded hardware 3 is set.
Is set and fixed to the convex surface of the deck plate 1 by welding. Four studs 4 are attached to the embedded metal piece 3 in advance. Although only one embedded hardware 3 is shown, there are actually many.

【0006】次に埋込金物3が設定されると図8に示し
たようにデッキプレート1上に床配筋5の工事を行い、
床コンクリート6を打設する。図8は図7の状態から床
配筋5を施し床コンクリート6が打設され、デッキプレ
ート1に埋込金物3が設定された状態を示している。
Next, when the embedded hardware 3 is set, the floor bar 5 is constructed on the deck plate 1 as shown in FIG.
Floor concrete 6 is placed. FIG. 8 shows a state in which the floor reinforcement 5 is applied from the state of FIG. 7 and the floor concrete 6 is placed and the embedded hardware 3 is set on the deck plate 1.

【0007】床コンクリート6の養生期間後、図9に示
したように埋込金物3の下面に位置するデッキプレート
1の下部1a(点線で示した部分)を切断しかつコンク
リートを除去して埋込金物3の下面を露出し、切断部の
コンクリート,埋込金物3の本体となっているプレート
部の手入れを行い、作業が完了したところで、引続き配
管等の吊り具の取着、つまりサポート工事が開始され
る。
After the curing period of the floor concrete 6, as shown in FIG. 9, the lower portion 1a (the portion indicated by the dotted line) of the deck plate 1 located on the lower surface of the embedded hardware 3 is cut and the concrete is removed to be buried. The bottom surface of the insert 3 is exposed, the concrete of the cut part and the plate part that is the main body of the insert 3 are cleaned, and when the work is completed, the attachment of hangings such as pipes, that is, support work is continued. Is started.

【0008】サポート工事は埋込金物3の下面に付着し
ている余分のコンクリートを除去して埋込金物3のプレ
ート部下面の金属面を露出し、その金属面に吊り具(図
示せず)を溶接等で取着している。
In the support work, excess concrete adhering to the lower surface of the embedded metal 3 is removed to expose the metal surface of the lower surface of the plate of the embedded metal 3, and a hanging tool (not shown) is attached to the metal surface. Are attached by welding or the like.

【0009】次に、第2の例を説明する。すなわち、図
10においてデッキプレート1の上面に埋込金物3を設定
し、点付溶接7によって埋込金物3をデッキプレート1
に仮付け固定する。図11は埋込金物3を示しており、こ
の埋込金物3にはあらかじめ上面に複数本のスタッド4
が取着されている。
Next, a second example will be described. That is, the figure
In 10, the embedded metal 3 is set on the upper surface of the deck plate 1, and the embedded metal 3 is attached to the deck plate 1 by spot welding 7.
Temporarily fix to. FIG. 11 shows the embedded metal 3. The embedded metal 3 has a plurality of studs 4 on its upper surface in advance.
Has been attached.

【0010】埋込金物3の設定が完了したところで床面
コンクリート打設(図示せず)を行い、強度をもたせる
ため、約1ヵ月間の養生期間をとり、強度が保持できた
ところで図12に示したように足場8を組み、作業員9に
より図13に示すようにデッキプレート1の凹所下面(破
線で示す部分)を切り欠いて、その切り欠き部10にU字
状吊り具11を下方から挿入し埋込金物3の下面に当接し
溶接12して取着する。
When the setting of the embedded product 3 is completed, floor concrete is placed (not shown) to give strength, so that a curing period of about one month is taken and the strength can be maintained. The scaffold 8 is assembled as shown, and the worker 9 cuts out the lower surface (the portion indicated by the broken line) of the recess of the deck plate 1 as shown in FIG. 13, and the U-shaped suspension 11 is provided in the cutout 10. It is inserted from below, abuts against the lower surface of the embedded metal 3, and is welded 12 for attachment.

【0011】[0011]

【発明が解決しようとする課題】第1の例ではデッキプ
レート1に炭素鋼を使用しているため、床コンクリート
6を打設し養生後、デッキプレート1をガスで容易に切
断して切り欠き部10を形成できる。しかしながら、核燃
料再処理施設のセル内は耐食性をもたせるためにデッキ
プレート1にステンレス鋼を使用している。
In the first example, since carbon steel is used for the deck plate 1, after the floor concrete 6 is cast and cured, the deck plate 1 is easily cut with gas to make a notch. The part 10 can be formed. However, the inside of the cell of the nuclear fuel reprocessing facility uses stainless steel for the deck plate 1 in order to have corrosion resistance.

【0012】したがって、ステンレス鋼製デッキプレー
ト1はガス切断で切り欠き部10を形成することは非常に
困難であり、デッキプレート1を切り欠くために長時間
費やすことになり、建設工期に与える影響が非常に大き
くなる課題がある。
Therefore, it is very difficult to form the cutout portion 10 in the stainless steel deck plate 1 by gas cutting, and it takes a long time to cut out the deck plate 1, which affects the construction period. There is a problem that becomes very large.

【0013】第2の例では吊り具11を使用できるのは足
場8の組立を行ったのち、吊り具を溶接するまで使用す
ることができないこと、および吊り具11は何千個とあっ
て非常な工数を必要とし工程短縮することが大きな課題
となっていた。
In the second example, the suspension 11 can be used only after the scaffold 8 is assembled and then the suspension is welded, and there are thousands of suspensions 11. It requires a great number of man-hours and shortens the process.

【0014】本発明は上記課題を解決するためになされ
たもので、ステンレス鋼製デッキプレートを使用した場
合、従来例のような埋込金物を不要とし、デッキプレー
トに切り欠き部を形成する必要がなく、容易に吊り具を
デッキプレートに取着でき建設工期の短縮および経費削
減を図ることができるデッキプレート工法を提供するこ
とにある。
The present invention has been made to solve the above problems. When a stainless steel deck plate is used, it is not necessary to use an embedded metal as in the conventional example, and it is necessary to form a notch in the deck plate. The purpose of the present invention is to provide a deck plate construction method that can easily attach a hanging tool to a deck plate and can shorten the construction period and reduce costs.

【0015】また、原子力発電所等の建設工数の低減を
通じて建設工期を短縮させるとともに建設作業の安全性
や作業能率を向上させたデッキプレート工法を提供する
ことにある。
Another object of the present invention is to provide a deck plate construction method in which the construction period is shortened by reducing the construction man-hours of a nuclear power plant and the construction work safety and work efficiency are improved.

【0016】[0016]

【課題を解決するための手段】第1の発明はデッキプレ
ート上に複数本のスタッドを有する補強金物と床配筋を
施して床コンクリート打設する建屋建設時のデッキプレ
ート工法において、前記デッキプレートはステンレス鋼
製で、デッキプレートの凹所内に上面に複数本のスタッ
ドが立設され、下面に補強部が形成された補強金物を嵌
合して設定し、床配筋および床コンクリート打設し養生
したのち、前記補強部が嵌合された部位のデッキプレー
トの外面に前記吊り具を取着することを特徴とする。
According to a first aspect of the present invention, there is provided a deck plate construction method at the time of building a building in which a reinforcing metal having a plurality of studs on the deck plate and a floor reinforcement are provided for floor concrete placement. Is made of stainless steel, and a plurality of studs are erected on the upper surface in the recess of the deck plate, and a reinforcing metal member with a reinforcing portion is formed on the lower surface is fitted and set, and floor reinforcement and floor concrete are placed. After the curing, the suspending device is attached to the outer surface of the deck plate at the portion where the reinforcing portion is fitted.

【0017】第2の発明はデッキプレート内の埋込金物
を介して吊り具が取着され、前記デッキプレートに床配
筋および埋込金物を施してコンクリート打設する建屋建
設時のデッキプレート工法において、前記デッキプレー
トの凹所底面のみを切欠して開口を設け、あらかじめ吊
り具が取着された埋込金物を前記デッキプレートに設定
し、かつ前記開口から前記吊り具のフック部が露出した
状態で、コンクリート打設することを特徴とする。
A second aspect of the present invention is a deck plate construction method at the time of building a building, in which a suspender is attached through an embedded metal object in the deck plate, and the deck plate is provided with floor reinforcement and the embedded metal object and concrete is placed. In the above, an opening is provided by notching only the bottom surface of the recess of the deck plate, and an embedded metal object to which a suspender is attached in advance is set on the deck plate, and the hook portion of the suspender is exposed from the opening. Characterized by placing concrete in the state.

【0018】[0018]

【作用】第1の発明においてはステンレス鋼製デッキプ
レートに従来の埋込金物と同様に作用する補強金物を準
備する。この補強金物はデッキプレートと同材質で、下
面にデッキプレートの凹所に嵌合する補強部を有し、上
面にスタッドが立設している。この補強金物をデッキプ
レートに設定して据付け補強金物の補強部が位置する部
位のデッキプレートの下面に直接吊り具を取着する。
In the first aspect of the present invention, a stainless steel deck plate is provided with a reinforcing metal member that operates similarly to a conventional embedded metal member. This reinforcing metal is made of the same material as the deck plate, has a reinforcing portion on the lower surface that fits into the recess of the deck plate, and has studs standing on the upper surface. This reinforcing metal fitting is set as a deck plate, and a hanging tool is directly attached to the lower surface of the deck plate at the site where the reinforcing portion of the installation reinforcing metal fitting is located.

【0019】第2の発明においては埋込金物の下面にあ
らかじめ吊り具を取着しておく。デッキプレートに切り
欠き部を設け、この切り欠き部内を吊り具が通り抜けて
吊り具がデッキプレートの下面に露出する。切り欠き部
と埋込金物との間にコンクリート挿入防止材を設けたの
ち、デッキプレートの上面と埋込金物の両端とを溶接し
て固定し、床配筋,コンクリート打設を行う。床配筋前
から吊り具は使用できる状態になっている。
According to the second aspect of the invention, the hanger is attached to the lower surface of the embedded metal article in advance. A notch is provided in the deck plate, and the suspender passes through the notch so that the suspender is exposed on the lower surface of the deck plate. After providing a concrete insertion prevention material between the notch and the embedded material, the upper surface of the deck plate and both ends of the embedded material are welded and fixed, and floor reinforcement and concrete placement are performed. The hanger is ready to use even before the floor reinforcement.

【0020】[0020]

【実施例】図1から図4を参照しながら本発明に係るデ
ッキプレート工法の第1の実施例を説明する。なお、各
図とも従来例と同一部分には同一符号を付して重複する
部分の説明は省略する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A first embodiment of the deck plate construction method according to the present invention will be described with reference to FIGS. In each drawing, the same parts as those in the conventional example are designated by the same reference numerals, and the description of the overlapping parts will be omitted.

【0021】図1は第1の実施例で使用する補強金物13
を斜視図で示している。この補強金物13は上面に9本の
スタッド4が溶接により取着され、下面にはデッキプレ
ート1の凹所に嵌合し得る形状の細長い条状補強部14が
形成されている。
FIG. 1 shows a reinforcing metal member 13 used in the first embodiment.
Is shown in a perspective view. Nine studs 4 are attached to the upper surface of the reinforcing metal piece 13 by welding, and an elongated strip-shaped reinforcing portion 14 having a shape that can be fitted into the recess of the deck plate 1 is formed on the lower surface.

【0022】この補強金物13は図2に示したようにステ
ンレス鋼製デッキプレート1上に補強部14が凹所内に嵌
め込まれた状態で設定される。
As shown in FIG. 2, the reinforcing hardware 13 is set on the stainless steel deck plate 1 with the reinforcing portion 14 fitted in the recess.

【0023】補強金物13はデッキプレート1に設定前に
あらかじめデッキプレート1の凹凸部の凹所に合わせて
同一材質で隙間のないように補強部14を形成し、デッキ
プレート1に設定した後は全周を溶接で固定する。
Before the setting of the reinforcing metal 13 to the deck plate 1, the reinforcing portion 14 is formed in advance so as to have no gap with the concave and convex portions of the deck plate 1 with the same material, and after setting to the deck plate 1. Fix the entire circumference by welding.

【0024】本実施例におけるデッキプレート工法で
は、まず壁のコンクリート打設(図示せず)および養生
後、図3に示したようにデッキプレート受ビーム2を設
定する。その後、あらかじめ補強金物13を取着したデッ
キプレート1を据付ける。据付が完了した後、床配筋5
を行い、床コンクリート6を打設する。
In the deck plate construction method of this embodiment, first, after placing concrete (not shown) and curing the wall, the deck plate receiving beam 2 is set as shown in FIG. After that, the deck plate 1 to which the reinforcing metal 13 is previously attached is installed. After installation is complete, floor reinforcement 5
Then, the floor concrete 6 is placed.

【0025】床コンクリート6の養生後に建屋内の部屋
が明渡され、図4に示したようにサポートなどの角形状
吊り具15が補強部14の背面のデッキプレート1に直接溶
接または機械的手段で取着固定され、吊り具15に配管16
の工事が開始される。
After the floor concrete 6 is cured, the room in the building is passed over, and as shown in FIG. 4, the rectangular suspension 15 such as a support is directly welded to the deck plate 1 on the back side of the reinforcing portion 14 or mechanical means. It is attached and fixed with the
Construction begins.

【0026】天井部に吊り具15を取着する場合にはあら
かじめデッキプレートに補強金物13が取着されているた
め、デッキプレート1の切り欠きおよび仕上げを施すこ
となく、直接デッキプレート1から吊り具15を吊り下げ
ることができる。
When attaching the hanging device 15 to the ceiling portion, since the reinforcing metal member 13 is attached to the deck plate in advance, the hanging member 15 is directly attached to the deck plate 1 without cutting or finishing the deck plate 1. The tool 15 can be suspended.

【0027】本実施例によればデッキプレート1はステ
ンレス鋼であるが、従来困難とされていた切り欠きを設
ける必要がないため、吊り具15をデッキプレート1に直
接取着でき、建設工期の短縮および経費の削減が図れ
る。
According to the present embodiment, the deck plate 1 is made of stainless steel, but since it is not necessary to provide a notch which has been difficult in the past, the suspending tool 15 can be directly attached to the deck plate 1 and the construction period can be reduced. Shortening and cost reduction can be achieved.

【0028】次に図5および図6を参照しながら本発明
に係るデッキプレート工法の第2の実施例を説明する。
この第2の実施例が図13に示した従来例と異なる点は埋
込金物3にあらかじめフック状吊り具11を取着しかつデ
ッキプレート1と一体化されていることにある。
Next, a second embodiment of the deck plate construction method according to the present invention will be described with reference to FIGS.
This second embodiment differs from the conventional example shown in FIG. 13 in that the hook-shaped suspending tool 11 is previously attached to the embedded metal article 3 and is integrated with the deck plate 1.

【0029】すなわち、まず、デッキプレート1を設定
する時点であらかじめ吊り具11が取着された埋込金物3
をデッキプレート1に設定しようとする箇所のデッキプ
レート1の凹所底面を切り欠いて切り欠き部10を形成し
ておく。
That is, first, at the time of setting the deck plate 1, the embedded hardware 3 to which the suspending tool 11 is attached in advance.
The notch portion 10 is formed by notching the bottom surface of the recess of the deck plate 1 at the place where the above is set to the deck plate 1.

【0030】次に、その切り欠き部10内に吊り具11を貫
挿して吊り具11を下方に突出し、埋込金物3のプレート
部をデッキプレート1の凸部に載置し、埋込金物3を点
付溶接7してデッキプレート1上に設定する。点付溶接
7が完了したところでその周囲にコンクリート挿入防止
材17を設け、床コンクリートを打設してコンクリートの
侵入を防止する。これによりデッキプレート1と埋込金
物3が一体となる。
Next, the hanging tool 11 is inserted into the cutout portion 10 to project the hanging tool 11 downward, and the plate portion of the embedded hardware 3 is placed on the convex portion of the deck plate 1 to mount the embedded hardware. 3 is welded with dots 7 and set on the deck plate 1. When the spot welding 7 is completed, a concrete insertion preventing material 17 is provided around the spot welding 7 and floor concrete is placed to prevent the concrete from entering. As a result, the deck plate 1 and the embedded hardware 3 are integrated.

【0031】このような吊り具11の設定方法では床コン
クリート打設後、強度を保持するための養生期間が完了
すれば直ちに吊り具11を使用することができ、しかも品
質的にも向上することとなる。
According to such a method of setting the hanging tool 11, after the floor concrete is cast, the hanging tool 11 can be used immediately after the curing period for maintaining the strength is completed, and the quality is improved. Becomes

【0032】したがって、工程的にクリテカルな工事工
程の削減となるとともに吊り具取付け上の作業性および
安全性が著しく向上する。その結果、原子力発電所等の
建設工期の大幅な短縮化とその建設に伴う費用の低減が
図れることとなる。
Therefore, it is possible to reduce the number of process steps that are critical in terms of work, and to significantly improve workability and safety in attaching the hanger. As a result, the construction period for nuclear power plants and the like can be greatly shortened and the costs associated with the construction can be reduced.

【0033】なお、本発明は図示の実施例に限定される
ものではなく、例えば吊り具および埋込金物の据付け順
序はとくにこだわるものではなく、またデッキプレート
と吊り具および埋込金物とを一体構造にした場合にはそ
の形状は任意選択でき、さらにスタッドの本数について
もこだわるものではない。
The present invention is not limited to the illustrated embodiment, for example, the installation order of the hanger and the embedded product is not particularly limited, and the deck plate and the hanger and the embedded product are integrated. In the case of the structure, the shape can be arbitrarily selected, and the number of studs is not limited.

【0034】[0034]

【発明の効果】本発明によれば、デッキプレートの設定
段階で吊り具が設定されるため、従来例のように床コン
クリート打設後に吊り具を取着する必要がないため、足
場組み、デッキプレートの切り欠き、吊り具取付けのた
めの溶接作業が不要となる。
According to the present invention, since the suspending tool is set at the stage of setting the deck plate, it is not necessary to attach the suspending tool after placing the floor concrete as in the conventional example. There is no need for plate cutouts or welding work for attaching lifting equipment.

【0035】したがって、原子力発電所等の建設工数を
低減でき、その建設工期の短縮化、その建設に伴う費用
の低減が図れる。また、従来の床面打設後の作業が不要
となるため、作業環境が改善され、建設作業の安全性や
作業能率を向上させることができる。
Therefore, the number of man-hours for constructing a nuclear power plant or the like can be reduced, the construction period can be shortened, and the cost associated with the construction can be reduced. Moreover, since the work after the conventional floor placing is unnecessary, the working environment is improved, and the safety and work efficiency of the construction work can be improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係るデッキプレート工法の第1の実施
例における補強金物を示す斜視図。
FIG. 1 is a perspective view showing a reinforcing metal member in a first embodiment of a deck plate construction method according to the present invention.

【図2】図1における補強金物をデッキプレート上に設
定した状態を示す斜視図。
FIG. 2 is a perspective view showing a state where the reinforcing metal member in FIG. 1 is set on a deck plate.

【図3】図2におけるデッキプレートに床配筋を施して
床コンクリートを打設した状態を示す縦断面図。
FIG. 3 is a longitudinal sectional view showing a state in which floor deck reinforcement is applied to the deck plate in FIG. 2 and floor concrete is placed.

【図4】図3の状態から補強金物の下方のデッキプレー
トに吊り具および配管を施工した状態を示す縦断面図。
FIG. 4 is a vertical cross-sectional view showing a state in which suspenders and pipes are installed on the deck plate below the reinforcing metal from the state of FIG.

【図5】本発明に係るデッキプレート工法の第2の実施
例を示す縦断面図。
FIG. 5 is a longitudinal sectional view showing a second embodiment of the deck plate construction method according to the present invention.

【図6】図5を下方向から見たデッキプレートの下面
図。
FIG. 6 is a bottom view of the deck plate seen from below in FIG. 5;

【図7】従来のデッキプレート工法の第1の例における
デッキプレートに埋込金物を設定した状態を示す斜視
図。
FIG. 7 is a perspective view showing a state in which an embedded metal object is set on the deck plate in the first example of the conventional deck plate construction method.

【図8】図7の状態から床配筋を施して床コンクリート
打設した状態を示す縦断面図。
FIG. 8 is a vertical cross-sectional view showing a state where floor reinforcement is applied from the state of FIG. 7 and floor concrete is placed.

【図9】図8の状態から埋込金物の背面のデッキプレー
トの凹所を削除した状態を示す縦断面図。
9 is a vertical cross-sectional view showing a state in which the recess of the deck plate on the back surface of the embedded hardware is removed from the state of FIG.

【図10】従来のデッキプレート工法の第2の例におけ
るデッキプレート上に埋込金物を点付溶接した状態を示
す縦断面図。
FIG. 10 is a longitudinal sectional view showing a state in which an embedded metal object is spot-welded on a deck plate in a second example of the conventional deck plate construction method.

【図11】図10における埋込金物を示す正面図。FIG. 11 is a front view showing the embedded hardware in FIG.

【図12】図10の状態から吊り具を埋込金物の下面に取
着する作業状態を示す概念図。
FIG. 12 is a conceptual diagram showing a work state in which the hanging tool is attached to the lower surface of the embedded metal article from the state of FIG.

【図13】図12における吊り具部を拡大して示す縦断面
図。
FIG. 13 is a vertical cross-sectional view showing, in an enlarged manner, the hanging part in FIG.

【符号の説明】[Explanation of symbols]

1…デッキプレート、2…デッキプレート受ビーム、3
…埋込金物、4…スタド、5…床配筋、6…床コンクリ
ート、7…点付溶接、8…足場、9…作業員、10…切り
欠き部、11…吊り具、12…溶接、13…補強金物、14…補
強部、15…吊り具、16…配管、17…コンクリート挿入防
止材。
1 ... deck plate, 2 ... deck plate receiving beam, 3
… Built-in metal fittings, 4… studs, 5… floor reinforcement, 6… floor concrete, 7… dot welding, 8… scaffolding, 9… workers, 10… notches, 11… hangers, 12… welding, 13 ... Reinforcing hardware, 14 ... Reinforcing part, 15 ... Hanging tool, 16 ... Piping, 17 ... Concrete insertion prevention material.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 デッキプレート上に複数本のスタッドを
有する補強金物と床配筋を施して床コンクリート打設す
る建屋建設時のデッキプレート工法において、前記デッ
キプレートはステンレス鋼製で、デッキプレートの凹所
内に上面に複数本のスタッドが立設され、下面に補強部
が形成された補強金物を嵌合して設定し、床配筋および
床コンクリート打設し養生したのち、前記補強部が嵌合
された部位のデッキプレートの外面に前記吊り具を取着
することを特徴とするデッキプレート工法。
1. A deck plate construction method at the time of building a building in which a reinforcing metal having a plurality of studs on the deck plate and floor reinforcement are applied and floor concrete is laid, wherein the deck plate is made of stainless steel, and A plurality of studs are erected on the upper surface in the recess, and a reinforcing metal member with a reinforcing portion is formed on the lower surface is set by fitting, floor reinforcement and floor concrete are placed and cured, and then the reinforcing portion is fitted. A deck plate construction method, characterized in that the hanging device is attached to the outer surface of the deck plate at the combined portion.
【請求項2】 デッキプレート内の埋込金物を介して吊
り具が取着され、前記デッキプレートに床配筋および埋
込金物を施してコンクリート打設する建屋建設時のデッ
キプレート工法において、前記デッキプレートの凹所底
面のみを切欠して開口を設け、あらかじめ吊り具が取着
された埋込金物を前記デッキプレートに設定し、かつ前
記開口から前記吊り具のフック部が露出した状態で、コ
ンクリート打設することを特徴とするデッキプレート工
法。
2. A deck plate construction method at the time of building a building, in which a hanging tool is attached via an embedded metal object in a deck plate, and the deck plate is provided with floor reinforcement and an embedded metal object and concrete-casting, An opening is provided by notching only the bottom surface of the recess of the deck plate, and the embedded hardware to which the hanging tool is attached is set in the deck plate in advance, and the hook portion of the hanging tool is exposed from the opening, Deck plate construction method characterized by placing concrete.
JP32040392A 1992-11-30 1992-11-30 Deck plate construction method Pending JPH06167067A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP32040392A JPH06167067A (en) 1992-11-30 1992-11-30 Deck plate construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP32040392A JPH06167067A (en) 1992-11-30 1992-11-30 Deck plate construction method

Publications (1)

Publication Number Publication Date
JPH06167067A true JPH06167067A (en) 1994-06-14

Family

ID=18121078

Family Applications (1)

Application Number Title Priority Date Filing Date
JP32040392A Pending JPH06167067A (en) 1992-11-30 1992-11-30 Deck plate construction method

Country Status (1)

Country Link
JP (1) JPH06167067A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11140922A (en) * 1997-11-05 1999-05-25 Sekisui House Ltd Pipe support
JP2014223638A (en) * 2013-05-15 2014-12-04 五洋建設株式会社 Fitting structure and fitting method of stud
JP2018109307A (en) * 2017-01-04 2018-07-12 鹿島建設株式会社 Ceiling structure and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11140922A (en) * 1997-11-05 1999-05-25 Sekisui House Ltd Pipe support
JP2014223638A (en) * 2013-05-15 2014-12-04 五洋建設株式会社 Fitting structure and fitting method of stud
JP2018109307A (en) * 2017-01-04 2018-07-12 鹿島建設株式会社 Ceiling structure and construction method

Similar Documents

Publication Publication Date Title
US20050188638A1 (en) Apparatus and method for composite concrete and steel floor construction
KR19980080404A (en) Method of construction of plant buildings and modular structures used in the construction thereof
US20030233801A1 (en) Apparatus and method for composite concrete and steel floor construction
JPH06167067A (en) Deck plate construction method
JPH07317188A (en) Constructing method of reinforced concrete structure
JP2714763B2 (en) Construction method of reinforced concrete structure
JPS6055168A (en) Anchoring of embedded metal article
JPH1162077A (en) Installation of wall panel and fixture therefor
JP3439958B2 (en) Floor structure of nuclear facilities and construction method
JP3084325U (en) Concrete pole reinforcement
JP2533047Y2 (en) Unit scaffold
JPH0412296Y2 (en)
JP2001227094A (en) Floor structure of steel framed building
JP2004169290A (en) Pre-piping construction method
JP3009298B2 (en) Method of manufacturing PCa slab
JPH08262175A (en) Structure of building
JPH0884783A (en) Method for construction of sprinkler
JP2649376B2 (en) Metal plate form method
JPH0882089A (en) Unit scaffold and connected structure of same
JPS6210370A (en) Construction of curtain wall using pc beam in building
JPH0649944A (en) Ceiling panel
JP2997022B2 (en) Plumbing method and plumbing equipment structure
JPH0874381A (en) Reinforcement unit and construction method of reinforced concrete-made building using the same
JPH0447107B2 (en)
JPH06308286A (en) Support structure for concrete structure