JPS6210370A - Construction of curtain wall using pc beam in building - Google Patents
Construction of curtain wall using pc beam in buildingInfo
- Publication number
- JPS6210370A JPS6210370A JP14917785A JP14917785A JPS6210370A JP S6210370 A JPS6210370 A JP S6210370A JP 14917785 A JP14917785 A JP 14917785A JP 14917785 A JP14917785 A JP 14917785A JP S6210370 A JPS6210370 A JP S6210370A
- Authority
- JP
- Japan
- Prior art keywords
- curtain wall
- steel
- construction
- building
- installing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims description 22
- 229910000831 Steel Inorganic materials 0.000 claims description 31
- 239000010959 steel Substances 0.000 claims description 31
- 238000009434 installation Methods 0.000 claims description 12
- 239000004567 concrete Substances 0.000 claims description 11
- 238000009415 formwork Methods 0.000 claims description 11
- 238000005304 joining Methods 0.000 claims description 7
- 238000000034 method Methods 0.000 claims description 2
- 239000011178 precast concrete Substances 0.000 description 30
- 230000002265 prevention Effects 0.000 description 8
- 230000003014 reinforcing effect Effects 0.000 description 7
- 239000002184 metal Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 238000011900 installation process Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
Landscapes
- Load-Bearing And Curtain Walls (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
〔産業上の利用分野〕
この発明は、S造あるいはSRC造の建築物において、
力・−テンウオールを取付ける部分の梁をPC(ブレキ
ャストコンクリート)梁とし、建築物の躯体の施工に先
行してカーテンウオールを取付けることができるカーテ
ンウオール先付は工法に関するものである。[Detailed Description of the Invention] [Industrial Application Field] This invention is applicable to S construction or SRC construction buildings.
Curtain wall pre-installation is a construction method in which the beam of the part where the tensile wall is attached is made of a precast concrete (PC) beam, and the curtain wall can be attached prior to construction of the building frame.
従来、カーテンウオールを外壁とするRC造あるいはS
RC造の建築物を施工する場合は、(1)建築物躯体の
型枠組立および配筋作業を行なう前に、建築物外周の落
下防止養生すなわち落下防止ネットの架設を行ない、(
2)次に躯体コンクリート打設前に、カーテンウオール
取付用一次ファスナーのセクトを行ない、(3)次に躯
体コンクリートを打設したのち、前記落下防止養生を撤
去したのち、カーテンウオールを取付けている。Conventionally, RC construction or S
When constructing an RC building, (1) Before assembling the formwork and reinforcing work for the building frame, perform fall prevention curing around the building's outer periphery, that is, erect a fall prevention net.
2) Next, before pouring concrete for the frame, the primary fasteners for installing the curtain wall are sectioned. (3) Next, after pouring concrete for the frame, the fall prevention curing mentioned above is removed, and then the curtain wall is installed. .
しかるに、前記従来の施工手順の場合は、カーテンウオ
ールを取付けるまでは、建築物外周の作業を行なう際の
足場および落下防止ネット等の落下防止養生を必要とし
、また鉄骨梁を使用する場合は、鉄骨加工工場において
、鉄骨梁にカーテンウオール取付用の一次ファスナーを
取付けてから、その鉄骨梁を施工現場に搬入することが
できるが、鉄骨梁を使用しない場合は、一次ファスナー
の取付けを施工現場で行なわねばならないので、施工精
度が悪くなシ、カーテンウオールの取付けに支障を来た
すことがある。さらにまた、カーテンウオールを取付け
る直前に、前記(1)の工程で取付けた足場あるいは落
下防止ネットを取外さねばならないので、煩雑な作業を
必要とする。However, in the case of the above-mentioned conventional construction procedure, until the curtain wall is installed, fall prevention measures such as scaffolding and fall prevention nets are required when working on the outer periphery of the building, and when steel beams are used, At a steel processing factory, primary fasteners for installing curtain walls can be installed on steel beams and then the steel beams can be transported to the construction site, but if steel beams are not used, the primary fasteners must be installed at the construction site. Since the installation process has to be carried out, the accuracy of the installation may be poor and the installation of the curtain wall may be hindered. Furthermore, immediately before installing the curtain wall, the scaffolding or fall prevention net installed in step (1) must be removed, which requires complicated work.
この発明は前述の問題を有利に解決できる建築物におけ
るPC梁を使用したカーテンウオール先付は工法を提供
することを目的とするものであって、この発明の要旨と
するところは、カーテンウオール取付用一次ファスナー
1と梁の両端から突出している鉄骨接合用鋼材2とを備
えているカーテンウォール取付用PC梁6を、建築物に
おけるN+1階の鉄骨梁4に架設固定し、かつN階の躯
体コンクリート施工用型枠5を組立てたのち、前記カー
テンウォール取付用PC梁6にN+1階のカーテンウオ
ール6を取付け、次に前記型枠5内に躯体コンクリート
を打設することを特徴とする建築物におけるPC梁を使
用したカーテンウオール先付は工法にある。The purpose of this invention is to provide a construction method for installing curtain walls using PC beams in buildings that can advantageously solve the above-mentioned problems. A PC beam 6 for curtain wall installation, which is equipped with primary fasteners 1 and steel beams 2 for joining steel frames protruding from both ends of the beam, is erected and fixed to the steel beam 4 on the N+1 floor of the building, and A building characterized in that after assembling a formwork 5 for concrete construction, the curtain wall 6 of the N+1 floor is attached to the PC beam 6 for installing the curtain wall, and then concrete for the frame is poured into the formwork 5. Curtain wall prefixing using PC beams is included in the construction method.
次にこの発明を図示の例によって詳細に説明する。 Next, the present invention will be explained in detail using illustrated examples.
第6図ないし第8図はこの発明の実施例において用いら
れるカーテンウォール取付用PC梁6を示すものであっ
て、工場においてPC梁を製造する際に、PC梁7の両
端側に、そのPC梁の両端から突出するH形鋼製鉄骨接
合用鋼材2が埋設されると共に、両側の鉄骨接合用鋼材
2にアンカー鉄筋8が固着され、そのアンカー鉄筋8は
梁主筋12よυも内側に配置され、前記鉄骨接合用鋼材
2の突出部にはボルト孔9が穿設され、かつアンカー鉄
筋10を固着したL形金具11の水平板にアンカルポル
トからなるカーテンウオール取付用一次ファスナー1が
挿通されて溶接によシ固着され、前記り形金具11はP
C梁7の長手方向に間隔をおいて配置され、そのL形金
具11がPC梁7の表面部に埋設されると共に、L形金
具11の裏側から突出している一次ファスナー1の部分
およびアンカー鉄筋10がPC梁7に埋設されている。6 to 8 show a PC beam 6 for installing a curtain wall used in an embodiment of the present invention. When manufacturing a PC beam in a factory, PC beams 7 are attached to both ends of the PC beam 7. H-beam steel frame joining steel members 2 protruding from both ends of the beam are buried, and anchor reinforcing bars 8 are fixed to the steel frame joining steel members 2 on both sides, and the anchor reinforcing bars 8 are placed υ inside the beam main reinforcements 12. A bolt hole 9 is drilled in the protrusion of the steel material 2 for joining the steel frame, and a primary fastener 1 for installing a curtain wall made of anchor port is inserted into the horizontal plate of the L-shaped fitting 11 to which the anchor reinforcing bar 10 is fixed. and is fixed by welding, and the bent metal fitting 11 is attached to P.
The L-shaped metal fittings 11 are arranged at intervals in the longitudinal direction of the C-beam 7 and are embedded in the surface of the PC beam 7, and the parts of the primary fasteners 1 and anchor reinforcing bars protrude from the back side of the L-shaped metal fittings 11. 10 is buried in the PC beam 7.
第1図ないし第5図はこの発明のPC梁を使用したカー
テンウオール先付は工法の実施例を示すものであって、
第1図におけるN+1階において鉄骨柱13に鉄骨梁(
鉄骨キャンティ梁)4の基端部がボルトまたは溶接によ
り取付けられたのち、前述のように構成されたカーテン
ウォール取付用PC梁6の両端の鉄骨接合用鋼材2が、
N+1階の鉄骨梁4の先端部に対し鋼製継手板14およ
びボルト15によシ固定され、次にN階の躯体コンク+
J −ト施工用型枠5を組立てたのち、前記カーテンウ
ォール取付用PC梁6にN+1階のカーテンウオール6
を前記一次ファスナー1と二次ファスナー16とにより
取付ける。Figures 1 to 5 show examples of the construction method for installing curtain walls using PC beams according to the present invention.
On the N+1 floor in Figure 1, the steel beams (
After the base ends of the steel Chianti beams 4 are attached by bolts or welding, the steel members 2 for joining the steel frames at both ends of the curtain wall mounting PC beams 6 configured as described above are attached.
It is fixed to the tip of the steel beam 4 on the N+1 floor with a steel joint plate 14 and bolts 15, and then the N+
After assembling the formwork 5 for J-G construction, the curtain wall 6 of the N+1 floor is attached to the PC beam 6 for installing the curtain wall.
is attached by the primary fastener 1 and the secondary fastener 16.
この二次ファスナー16は、前記一次ファスナー1に挿
通されてナツト17によシPC梁6に同定されるコ字状
断面の取付金具18と、カーテンウオール乙の上部に埋
設されて取付金具18の下部フランツに挿通されたアン
カーボルト19と、そのアンカーボルト19に螺合され
たナツト20とにより構成されている。This secondary fastener 16 is inserted into the primary fastener 1 and attached to the PC beam 6 by a nut 17, and has a U-shaped cross-section mounting fitting 18, which is embedded in the upper part of the curtain wall B. It is composed of an anchor bolt 19 inserted through the lower flange and a nut 20 screwed onto the anchor bolt 19.
次に前記躯体コンクリート施工用型枠5内に躯体コンク
リートを打設し、以下同様の作業を反復して行なって、
建築物を下階から上階に向かってカーテンウオール先付
工法により順次施工していく。Next, concrete for the skeleton is poured into the formwork 5 for concrete construction, and the same operations are repeated.
The building will be constructed sequentially from the lower floors to the upper floors using the curtain wall construction method.
第5図はカーテンウオール乙の上部および下部の支持構
造を示すものであって、前記取付金具18の上部7ラン
ノに固定されたナツト21に、荷重支持用ボルト22が
螺合され、カーテンウオール乙の裏側に設けられた荷重
支持用突出部26は前記ボルト22に載置され、かつ取
付金具18の上部フランジにL形取付金具24の水平板
が載置されてボルト25により固定され、カーテンウオ
ール乙の下部に埋設されてL形取付金具24の垂直板の
長孔に挿通されたアンカーボルト26にナツト27が螺
合されている。FIG. 5 shows the support structure for the upper and lower parts of the curtain wall B. A load supporting bolt 22 is screwed into the nut 21 fixed to the upper seven runs of the mounting bracket 18. The load supporting protrusion 26 provided on the back side of the curtain wall is placed on the bolt 22, and the horizontal plate of the L-shaped mounting bracket 24 is placed on the upper flange of the mounting bracket 18 and fixed with the bolt 25. A nut 27 is screwed into an anchor bolt 26 that is buried in the lower part of the L-shaped mounting bracket 24 and inserted into a long hole in a vertical plate of the L-shaped mounting bracket 24.
なお、第1図において、28は完成した躯体、29は型
枠支柱、ろ0はフープ筋、ろ1はスターラップ筋である
。In addition, in FIG. 1, 28 is a completed frame, 29 is a form support, 0 is a hoop bar, and 1 is a stirrup bar.
この発明を実施する場合、一次ファスナー1および二次
ファスナー16としては図示以外の任意構造のものを採
用してもよい。また前記PC梁7はRC造またはSRC
造の何れであってもよい。When carrying out this invention, the primary fastener 1 and the secondary fastener 16 may have any structure other than those shown in the drawings. Further, the PC beam 7 is made of RC or SRC.
It can be of any construction.
この発明によれば、カーテンウォール取付用PC梁3を
建築物におけるN+1階の鉄骨梁4に架設固定し、かつ
N階の躯体コンクリート施工、用型枠5を組立てたのち
、前記カーテンウォール取付用PC梁3にN+1階のカ
ーテンウオール6を取付け、次に前記型枠5内に躯体コ
ンクリートを打設するので、建築物の躯体の施工に先行
してカーテンウオール6を取付けることになシ、そのた
め建築物外周の落下防止ネット等の落下防止対策を省略
することができ、かつ工場においてカーテンウォール取
付用PC梁6を製作する際に、カーテンウオール取付用
一次ファスナー1をPCC10搏込固定することにより
、前記一次ファスナー1の取付精度を向上させることが
でき、さらにカーテンウオール取付部より上方には梁等
の障害物がないので、カーテンウオール6の取付作業を
容易に行なうことができ、しかも施工現場におけるカー
テンウオール取付用梁の配筋、型枠組立用外部足場が不
要であシ、またカーテンウォール取付用PC梁3はカー
テンウオール取付用鉄骨梁に比べて剛性が大きいので、
カーテンウオールの調整時の誤差が少ない等の効果が得
られる。According to this invention, after the PC beam 3 for installing the curtain wall is erected and fixed to the steel beam 4 of the N+1 floor of the building, and the formwork 5 for concrete construction of the N floor is assembled, the PC beam 3 for installing the curtain wall is assembled. Since the curtain wall 6 of the N+1 floor is attached to the PC beam 3 and then the concrete structure is poured into the formwork 5, it is necessary to install the curtain wall 6 before constructing the building frame. It is possible to omit fall prevention measures such as a fall prevention net around the outer periphery of the building, and by fixing the primary fastener 1 for curtain wall attachment by punching the PCC 10 when manufacturing the PC beam 6 for curtain wall attachment at the factory. , the installation accuracy of the primary fastener 1 can be improved, and since there are no obstacles such as beams above the curtain wall installation part, the installation work of the curtain wall 6 can be easily carried out, and moreover, it can be done at the construction site. There is no need for external scaffolding for reinforcing beams for installing curtain walls or assembling formwork, and the PC beams 3 for installing curtain walls have greater rigidity than steel beams for installing curtain walls.
Effects such as fewer errors when adjusting the curtain wall can be obtained.
図面はこの発明の実施例を示すものであって、第1図は
この発明のPC梁を使用したカーテンウオール先付工法
により建築物を構築している状態を示す概略側面図、第
2図はカーテンウォール取付用PC梁と鉄骨梁との接合
部を示す平面図、第3図はその正面図、第4図はカーテ
ンウォール取付用PC梁に対するカーテンウオールの取
付部を示す縦断側面図、M5図はカーテンウォール取付
用PC梁に対する上下のカーテンウオールの取付部を示
す縦断側面図、第6図はカーテンウォール取付用PC梁
の斜視図、第7図はその縦断側面図、第8図はカーテン
ウォール取付用PC梁における一次ファスナーの部分の
断面図である。
図において、1はカーテンウオー“ル取付用一次ファス
ナー、2は鉄骨接合用鋼材、6はカーテンウォール取付
用PC梁、4は鉄骨梁、5は躯体コンクリート施工用型
枠、6はカーテンウオール、7はpc梁、8は鉄筋、1
1はL形金具、12は柱主筋、 、16は鉄骨柱、14
は鋼製継手板、15はボルト、16は二次ファスナー、
17はナツト、1日は取付金具、19はアンカーボルト
、20はナンドである。The drawings show an embodiment of the present invention, and FIG. 1 is a schematic side view showing a building being constructed by the curtain wall construction method using the PC beams of the present invention, and FIG. A plan view showing the joint between the PC beam for installing the curtain wall and the steel beam, Fig. 3 is a front view thereof, and Fig. 4 is a longitudinal side view showing the part where the curtain wall is attached to the PC beam for installing the curtain wall, M5 view. 6 is a perspective view of the PC beam for curtain wall installation. FIG. 7 is a vertical side view of the PC beam for curtain wall installation. FIG. 8 is a side view of the curtain wall. It is a sectional view of the primary fastener part in the PC beam for attachment. In the figure, 1 is a primary fastener for installing a curtain wall, 2 is a steel material for joining a steel frame, 6 is a PC beam for installing a curtain wall, 4 is a steel beam, 5 is a formwork for concrete construction, 6 is a curtain wall, 7 is PC beam, 8 is reinforcing bar, 1
1 is an L-shaped metal fitting, 12 is a column main reinforcement, , 16 is a steel column, 14
is a steel joint plate, 15 is a bolt, 16 is a secondary fastener,
17 is a nut, 1st is a mounting bracket, 19 is an anchor bolt, and 20 is a nand.
Claims (1)
ら突出している鉄骨接合用鋼材2とを備えているカーテ
ンウォール取付用PC梁3を、建築物におけるN+1階
の鉄骨梁4に架設固定し、かつN階の躯体コンクリート
施工用型枠5を組立てたのち、前記カーテンウォール取
付用PC梁3にN+1階のカーテンウォール6を取付け
、次に前記型枠5内に躯体コンクリートを打設すること
を特徴とする建築物におけるPC梁を使用したカーテン
ウォール先付け工法。A PC beam 3 for curtain wall installation, which is equipped with a primary fastener 1 for curtain wall installation and steel members 2 for joining steel frames protruding from both ends of the beam, is erected and fixed to a steel beam 4 on the N+1 floor of the building, and After assembling the formwork 5 for constructing the concrete structure of the floor, the curtain wall 6 of the N+1 floor is attached to the PC beam 3 for installing the curtain wall, and then the concrete structure is poured into the formwork 5. Curtain wall pre-installation method using PC beams in buildings where construction is carried out.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14917785A JPS6210370A (en) | 1985-07-09 | 1985-07-09 | Construction of curtain wall using pc beam in building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14917785A JPS6210370A (en) | 1985-07-09 | 1985-07-09 | Construction of curtain wall using pc beam in building |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS6210370A true JPS6210370A (en) | 1987-01-19 |
JPH0558112B2 JPH0558112B2 (en) | 1993-08-25 |
Family
ID=15469477
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP14917785A Granted JPS6210370A (en) | 1985-07-09 | 1985-07-09 | Construction of curtain wall using pc beam in building |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6210370A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006144405A (en) * | 2004-11-19 | 2006-06-08 | Taisei Corp | Exterior wall panel construction method and exterior wall panel mounting structure |
JP2014025263A (en) * | 2012-07-26 | 2014-02-06 | Asahi Kasei Construction Materials Co Ltd | Wall panel mounting structure |
-
1985
- 1985-07-09 JP JP14917785A patent/JPS6210370A/en active Granted
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006144405A (en) * | 2004-11-19 | 2006-06-08 | Taisei Corp | Exterior wall panel construction method and exterior wall panel mounting structure |
JP4520830B2 (en) * | 2004-11-19 | 2010-08-11 | 大成建設株式会社 | Exterior wall panel construction method and exterior wall panel mounting structure |
JP2014025263A (en) * | 2012-07-26 | 2014-02-06 | Asahi Kasei Construction Materials Co Ltd | Wall panel mounting structure |
Also Published As
Publication number | Publication date |
---|---|
JPH0558112B2 (en) | 1993-08-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3682588B2 (en) | Building member connection structure of H-shaped steel continuous foundation beam | |
JPH10176378A (en) | Installation structure of earthquakeproofing wall | |
JP3959517B2 (en) | Steel frame mounting hardware and mounting method | |
JPS6210370A (en) | Construction of curtain wall using pc beam in building | |
JP2000345719A (en) | Reinforcing method of through opening in existing bearing wall | |
JP2003034997A (en) | Steel plate shear wall and method of constructing the same | |
JP4072274B2 (en) | Building unit | |
JPH0881918A (en) | Pipe and construction method thereof | |
JPH01182460A (en) | Beam mold frame | |
JP3159799B2 (en) | Frame construction method of prestressed steel tube concrete structure | |
JPS5918023Y2 (en) | Hanging scaffold mounting parts | |
JP2614000B2 (en) | Basics of steel frame | |
JP3284383B2 (en) | Support hardware for SRC beam construction | |
JPH025213B2 (en) | ||
JP2709155B2 (en) | ALC floor panel mounting method | |
JPH02167937A (en) | Joining method for steel plate concrete structures | |
JPH0726520Y2 (en) | Steel frame structure | |
JP2002364139A (en) | Steel stair mounting hardware, mounting device and mounting method | |
JPS628246Y2 (en) | ||
JP2910551B2 (en) | Lap joint method of main reinforcement of SRC column | |
JP2782111B2 (en) | Steel framing construction method | |
JP3015106U (en) | Safety belt mounting jig | |
JP2536250Y2 (en) | Steel foundation beam | |
JPH04128429A (en) | Reinforced concrete foundation | |
JPS6343281Y2 (en) |