US20050188638A1 - Apparatus and method for composite concrete and steel floor construction - Google Patents

Apparatus and method for composite concrete and steel floor construction Download PDF

Info

Publication number
US20050188638A1
US20050188638A1 US11/116,652 US11665205A US2005188638A1 US 20050188638 A1 US20050188638 A1 US 20050188638A1 US 11665205 A US11665205 A US 11665205A US 2005188638 A1 US2005188638 A1 US 2005188638A1
Authority
US
United States
Prior art keywords
joists
concrete
floor construction
composite steel
body portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/116,652
Inventor
Malcolm Pace
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US10/177,070 external-priority patent/US20030233801A1/en
Application filed by Individual filed Critical Individual
Priority to US11/116,652 priority Critical patent/US20050188638A1/en
Publication of US20050188638A1 publication Critical patent/US20050188638A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/23Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
    • E04B5/29Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated the prefabricated parts of the beams consisting wholly of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/22Connection of slabs, panels, sheets or the like to the supporting construction
    • E04B9/24Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like positioned on the upperside of, or held against the underside of the horizontal flanges of the supporting construction or accessory means connected thereto
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C3/08Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with apertured web, e.g. with a web consisting of bar-like components; Honeycomb girders
    • E04C3/09Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with apertured web, e.g. with a web consisting of bar-like components; Honeycomb girders at least partly of bent or otherwise deformed strip- or sheet-like material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/293Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
    • E04C3/294Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete of concrete combined with a girder-like structure extending laterally outside the element
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/40Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for coffered or ribbed ceilings
    • E04G11/44Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for coffered or ribbed ceilings with supporting beams for the shuttering used simultaneously as permanent reinforcement of the ribs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2415Brackets, gussets, joining plates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2448Connections between open section profiles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2457Beam to beam connections
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C2003/026Braces
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C2003/0404Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects
    • E04C2003/0443Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects characterised by substantial shape of the cross-section
    • E04C2003/0473U- or C-shaped
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C2003/0404Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects
    • E04C2003/0443Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects characterised by substantial shape of the cross-section
    • E04C2003/0482Z- or S-shaped

Definitions

  • the present invention relates to the construction of buildings such as large open span buildings.
  • the present invention more particularly relates to composite floor systems and a novel design for joists used in such a floor system and installation of such joists.
  • the composite floor system of the present invention comprises a plurality of joists at least partially embedded in the concrete slab of the floor system.
  • each of the joists is formed from a single piece of cold rolled sheet metal and, in at least one orientation, exhibits a substantially “Z-shaped” or “C-shaped” cross section along a longitudinal axis.
  • a novel mounting bracket may be affixed to each end of the joists to provide for an underslung installation.
  • FIG. 1 is a partial perspective cut-away view of a composite floor system in accordance with a preferred embodiment of the present invention
  • FIG. 2 is a vertical section view of a composite floor system in accordance with a preferred embodiment of the present invention
  • FIG. 3 is a vertical section view of a composite floor system in accordance with an alternative preferred embodiment of the present invention.
  • FIG. 4 is a flowchart depicting a method of constructing a composite floor system in accordance with a preferred embodiment of the present invention
  • FIG. 5 is a perspective view of a mounting bracket used in constructing a composite floor system in accordance with a preferred embodiment of the present invention
  • FIG. 6 is a perspective view of a joist used in constructing a composite floor system in accordance with a preferred embodiment of the present invention.
  • FIG. 8 is a side view of a joist in accordance with an alternative preferred embodiment of the present invention.
  • the present invention relates to a composite floor system and parts and formwork therefore and erecting method for use in the construction of buildings such as large open span commercial or residential buildings.
  • the present invention is particularly concerned with composite floor systems made from steel and concrete with a novel method of attaching joists used in such a floor system.
  • Composite floor system 100 comprises: a first support structure 105 ; a second support structure 115 ; a plurality of joists 160 suspended in place by a plurality of mounting brackets 150 , with joists 160 extending between support structures 105 and 115 ; a plurality of removable spanner bars 170 selectively inserted into slots 135 of joists 160 ; a support platform 140 placed over and resting on spanner bars 170 ; a concrete slab 110 poured in place and supported by support platform 140 ; and a reinforcing material 190 embedded in concrete slab 110 .
  • support structures 110 and 115 are depicted as a block wall and an I-beam respectively, it should be understood that these are merely representative of the types of support structures that may be utilized in conjunction with the present invention.
  • support structures 105 and 115 may be any type of structure capable of supporting the load of composite floor system 100 , including columns, load-bearing interior walls, etc.
  • Apertures 165 are provided for the installation of various utilities such as electrical lines, plumbing pipes and other similar purposes.
  • removable spanner bars 170 are inserted into the body portion of joists 160 by inserting the ends of spanner bars 170 into apertures 135 .
  • Apertures 135 are most preferably spaced equidistant along the body portion of joists 160 so that cooperating pairs of apertures 135 can be aligned to receive alternate ends of removable spanner bars 170 .
  • the location and number of removable spanner bars 170 used for supporting a given concrete slab 110 can be determined by performing load analysis calculations for composite floor system 100 .
  • support platform 140 With the appropriate number of removable spanner bars 170 in place, support platform 140 can be installed. Support platform 140 rests on and is supported by removable spanner bars 170 . Support platform 140 provides a form for defining the bottom of concrete slab 110 and also provides stability to the overall structure prior to the pouring of concrete slab 110 .
  • each joist 160 is suspended slightly above the top edge of support structures 105 and 115 .
  • at least a portion of each joist 160 is located between support structures 105 and 115 . This is in contrast to typical floor construction methods where the lower chord of joists 160 are commonly resting on top of support structures 105 and 115 . This allows a composite floor to be constructed using less blocking or bracing than typical with other methods.
  • joists 160 are depicted as being “underslung” in this particular exemplary embodiment, it should be noted that in at least one alternative preferred embodiment of the present invention, joists 160 may be installed so that the lower chord of each joist 160 is resting on top of support structures 105 and 115 .
  • Composite floor system 200 comprises a concrete slab 210 ; a plurality of joists 230 ; a reinforcing material 220 ; a plurality of spanner bars 270 ; a plurality of handles 240 attached to spanner bars 270 ; a support platform 260 ; a hat channel 250 ; and a ceiling 280 .
  • Reinforcing material 220 is a welded wire fabric or rebar mat placed over the upper chords of joists 230 , prior to the pouring of concrete slab 210 .
  • reinforcing material 220 is a welded wire fabric with a mesh-like appearance.
  • Reinforcing material 220 is typically draped over the upper chords of joists 230 and hangs in a catenary-like shape between the joists to provide the most effective reinforcement.
  • Reinforcing material 220 is completely encased with the boundaries of concrete slab 210 .
  • Composite floor system 300 is similar to composite floor system 200 as shown in FIG. 2 above, but the cross section of the joists used in composite floor system 300 is different than joists 230 used in composite floor system 200 .
  • Composite floor system 300 comprises a concrete slab 310 ; a plurality of joists 330 ; a reinforcing material 320 ; a plurality of handles 340 attached to spanner bars 370 ; a support platform 360 ; a hat channel 350 ; and a ceiling 380 .
  • Reinforcing material 320 is a welded wire fabric or rebar mat placed over the upper chords of joists 330 , prior to the pouring of concrete slab 310 .
  • reinforcing material 320 is a welded wire fabric with a mesh-like appearance.
  • Reinforcing material 320 is typically draped over the upper chords of joists 330 and hangs in a catenary-like shape between the joists to provide the most effective reinforcement.
  • Reinforcing material 320 is completely encased with the boundaries of concrete slab 310 .
  • Body portion 510 is shaped similar to a piece of steel angle with a 90° bend at the midpoint.
  • Horizontal bearing plate 520 is attached to body portion 510 by welding or other suitable attachment methods.
  • Horizontal bearing plate 520 serves to distribute the load of any joists attached to mounting bracket 500 over a larger surface area, thereby minimizing any undesirable load concentrations that may result in structural failure.
  • Horizontal bearing plate 520 typically rests on a load bearing structure such as a wall.
  • Wall or beam attachment apertures 530 are used to securely attach mounting bracket 500 to the top of a supporting or load-bearing structure, such as a wall or a beam, if required. While bolts or screws may be inserted through apertures wall or beam attachment apertures 530 , thereby attaching mounting bracket 500 to a wall or beam, in certain applications mounting bracket 500 will be welded in place and apertures 530 will not be used.
  • Upper chord attachment apertures 540 are used to securely attach the upper chord of a joist to mounting bracket 500 .
  • bolts or screws may be inserted through upper chord apertures 530 , thereby securely attaching mounting bracket 500 to the upper chord of a joist. It is anticipated that the upper chord of the joist may be welded to mounting bracket 500 in certain applications.
  • Web attachment apertures 560 are used to secure the body of a joist to mounting bracket 500 .
  • bolts or screws may be inserted through web apertures 560 , thereby attaching the body portion of a joist to mounting bracket 500 .
  • mounting bracket 500 will be welded directly to the joist for certain applications. Mounting bracket is connected to a joist and the joist is then positioned as shown and described in FIG. 1 .
  • Joist 600 used in constructing a composite floor system in accordance with a preferred embodiment of the present invention is shown.
  • Joist 600 comprises a body portion 620 an upper chord 630 and a lower chord 660 .
  • Upper chord 630 and lower chord 660 are substantially parallel to each other and substantially perpendicular to body portion 620 .
  • Upper chord 630 has a flange 635 that is extends outwardly from body portion 620 and forms approximately a 50° angle with the plane defined by body portion 620 .
  • lower chord 660 has a flange 665 that extends outwardly away from body portion 620 in a like fashion.
  • Body portion 620 defines a plurality of body apertures 650 .
  • Body apertures 650 are used to support spanner bars that, in turn, are used to support the decking material that will form the surface for the concrete slab when the concrete is poured in place.
  • the spanner bars may be inserted to support the plywood or other material suspended between a plurality of joists 600 and to stabilize the plurality of joists 600 prior to the pouring of the concrete slab.
  • Optional aperture 695 may be used to provide for the installation of utilities such as electrical and plumbing lines.
  • Upper chord 630 defines a plurality of apertures 640 spaced along the length of upper chord 630 .
  • Apertures 640 are positioned horizontally in upper chord 630 and allow the portion of the concrete above upper chord 630 to be connected with the portion of the concrete slab beneath upper chord 630 .
  • Apertures 640 are concrete-engaging mechanisms that act as an additional shear transfer mechanism. Much of the interface shear is accomplished by the combination of the concrete and steel reinforcement gripping and adhering to the embedded portion of upper chord 630 , upper flange 635 , and the upper portion of body 620 .
  • Lower chord 660 may also have apertures 640 formed therein.
  • upper chord 630 is entirely encased within the concrete slab during the pouring of the concrete slab.
  • Optional apertures 695 are provided for the installation of various utilities such as electrical lines, plumbing pipes and other similar purposes.
  • joist 600 has a cross section that is substantially “Z-shaped,” or reverse “Z-shaped, depending on the orientation of joist 600 . Further, joist 600 exhibits rotational symmetry around a longitudinal axis of symmetry 610 of body 620 . Rotational symmetry means that when joist 600 is rotated 180° around axis of symmetry 610 , the cross sectional shape of joist 600 will remain substantially, if not exactly, the same. The length of joist 600 will be determined by the specific application. Although not shown in FIG. 6 , it should be noted that “stiffening” of joist 600 may be included for additional strength. Stiffening is a process of providing a corrugated-type body portion for joist 600 and is well known to those skilled in the art.
  • joist 600 is completely formed of a single piece of cold rolled sheet metal, but may be fabricated in many other ways and additionally reinforced, if necessary.
  • Apertures 640 and 650 , along with optional aperture 695 can be created as part of the overall manufacturing process and any of the various methods for creating apertures known to those skilled in the art may be used.
  • upper chord 630 may be fabricated with other concrete-engaging mechanisms such as a series of “dimples” or other protrusions that would further assist in firmly fixing upper chord 630 into a concrete slab.
  • Joist 700 used in constructing a composite floor system in accordance with an alternative preferred embodiment of the present invention is shown.
  • Joist 700 comprises a body portion 720 an upper chord 730 and a lower chord 760 .
  • Upper chord 730 and lower chord 760 are substantially parallel to each other and substantially perpendicular to body portion 720 .
  • Upper chord 730 has a flange 735 that is substantially parallel to body portion 720 .
  • lower chord 760 has a flange 765 that is substantially parallel to body portion 720 .
  • Body portion 720 defines a plurality of apertures 750 .
  • Upper chord 730 defines a plurality of apertures 740 equally spaced along upper chord 730 .
  • Apertures 740 allow the portion of the concrete above upper chord 730 to be connected with the portion of the concrete slab beneath upper chord 730 .
  • Apertures 740 are concrete-engaging mechanisms that act as an additional shear transfer mechanism.
  • Lower chord 760 may also have apertures 740 formed therein.
  • upper chord 730 is entirely encased within the concrete slab during the pouring of the concrete slab.
  • Optional apertures 795 are provided for the installation of various utilities such as electrical lines, plumbing pipes and other similar purposes.
  • joist 700 has a cross section that is substantially “C-shaped,” or “reverse C-shaped,” depending on the orientation of joist 700 . Further, joist 700 exhibits reflective symmetry around a longitudinal axis of symmetry 710 of body 720 . Reflective symmetry means that the upper portion of the cross section of joist 700 is substantially “reflected” beneath axis of symmetry 710 . Further discussion of the symmetry associated with the joists of the present invention is presented in conjunction with FIG. 8 and FIG. 9 . The length of joist 700 will be determined by the specific application. Although not shown in FIG. 7 , it should be noted that “stiffening” of joist 700 may be included for additional strength. Stiffening is a process of providing a corrugated-type body portion for joist 700 and is well known to those skilled in the art.
  • joist 700 is completely formed of a single piece of cold rolled sheet metal, but may be fabricated in other ways and additional reinforcement may be added as needed.
  • Apertures 740 , 750 and 795 can be created as part of the overall manufacturing process and any of the various methods for creating apertures known to those skilled in the art may be used.
  • upper chord 730 may be fabricated with other concrete-engaging mechanisms such as a series of “dimples” or other protrusions that would further assist in firmly fixing upper chord 730 into a concrete slab.
  • FIG. 8 a side view of a joist 800 according to an alternative preferred exemplary embodiment of the present invention is depicted.
  • the cross-sectional profile of joist 800 is substantially “C-shaped.”
  • distance 810 is measurably smaller than distance 820 .
  • Joist 800 will display a rough reflective symmetry about its midpoint.
  • FIG. 9 a side view of a joist 900 according to an alternative preferred exemplary embodiment of the present invention is depicted.
  • the cross-sectional profile of joist 900 is substantially “Z-shaped.”
  • distance 910 is measurably smaller than distance 920 .
  • Joist 900 will display a rough rotational symmetry about its midpoint.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Mechanical Engineering (AREA)
  • Floor Finish (AREA)

Abstract

The composite floor system of the present invention comprises a plurality of joists at least partially embedded in the concrete slab of the floor system. In the most preferred embodiments of the present invention, each of the joists is formed from a single piece of cold rolled sheet metal and, in at least one orientation, exhibits a substantially “Z-shaped” or “C-shaped” cross section along a longitudinal axis. In addition, for certain applications, a novel mounting bracket may be affixed to each end of the joists to provide for an underslung installation.

Description

    RELATED APPLICATIONS
  • This application is a continuation-in-part of U.S. patent application Ser. No. 10/177,070, now pending, which application is incorporated herein by reference.
  • TECHNICAL FIELD
  • The present invention relates to the construction of buildings such as large open span buildings. The present invention more particularly relates to composite floor systems and a novel design for joists used in such a floor system and installation of such joists.
  • BACKGROUND OF THE INVENTION
  • Many multi-story commercial buildings and some multi-story residential buildings are constructed primarily of steel and concrete. In many instances, the floors in these multi-story buildings may be constructed by spanning steel joists between structural walls or beams and laying a supporting material such as plywood, metal pan or other type of decking material along or near the top portions of such joists. This supporting material forms a support structure or surface onto which concrete is poured. Generally, the lower chords of the joists form the framework from which ceilings are hung.
  • Composite floor systems have been employed in multi-story building construction for many years and improvements are constantly being sought, both in the materials used in the composite floor systems and the methodologies used to erect the buildings that incorporate composite floor systems. The development and sophistication of these structural systems has gradually extended to encompass many varieties of steel and concrete floor construction, the result of which has been to measurably reduce the cost of steel framing for multi-story buildings in the industry.
  • It will also be appreciated that the purposes of composite floor construction are to save considerable steel weight and cost, as well as to reduce depth and deflection. In view of the foregoing, it should be appreciated that it would be desirable to provide additional methodologies for constructing various types of composite floor systems that are simpler and less expensive to install, using existing materials and components to the extent possible.
  • SUMMARY OF THE INVENTION
  • The composite floor system of the present invention comprises a plurality of joists at least partially embedded in the concrete slab of the floor system. In the most preferred embodiments of the present invention, each of the joists is formed from a single piece of cold rolled sheet metal and, in at least one orientation, exhibits a substantially “Z-shaped” or “C-shaped” cross section along a longitudinal axis. In addition, for certain applications, a novel mounting bracket may be affixed to each end of the joists to provide for an underslung installation.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The present invention will hereinafter be described in conjunction with the appended drawing figures, wherein like numerals denote like elements, and:
  • FIG. 1 is a partial perspective cut-away view of a composite floor system in accordance with a preferred embodiment of the present invention;
  • FIG. 2 is a vertical section view of a composite floor system in accordance with a preferred embodiment of the present invention;
  • FIG. 3 is a vertical section view of a composite floor system in accordance with an alternative preferred embodiment of the present invention;
  • FIG. 4 is a flowchart depicting a method of constructing a composite floor system in accordance with a preferred embodiment of the present invention;
  • FIG. 5 is a perspective view of a mounting bracket used in constructing a composite floor system in accordance with a preferred embodiment of the present invention;
  • FIG. 6 is a perspective view of a joist used in constructing a composite floor system in accordance with a preferred embodiment of the present invention;
  • FIG. 7 is a perspective view of a joist in accordance with an alternative preferred embodiment of the present invention;
  • FIG. 8 is a side view of a joist in accordance with an alternative preferred embodiment of the present invention; and
  • FIG. 9 is a side view of a joist in accordance with an alternative preferred embodiment of the present invention.
  • DETAILED DESCRIPTION OF THE DRAWINGS
  • The present invention relates to a composite floor system and parts and formwork therefore and erecting method for use in the construction of buildings such as large open span commercial or residential buildings. The present invention is particularly concerned with composite floor systems made from steel and concrete with a novel method of attaching joists used in such a floor system.
  • Referring now to FIG. 1, a partial cut-away view of a composite floor system 100 in accordance with a preferred embodiment of the present invention is shown. Composite floor system 100 comprises: a first support structure 105; a second support structure 115; a plurality of joists 160 suspended in place by a plurality of mounting brackets 150, with joists 160 extending between support structures 105 and 115; a plurality of removable spanner bars 170 selectively inserted into slots 135 of joists 160; a support platform 140 placed over and resting on spanner bars 170; a concrete slab 110 poured in place and supported by support platform 140; and a reinforcing material 190 embedded in concrete slab 110. In the most preferred embodiments of the present invention, mounting brackets 150 have a plurality of apertures formed in the body thereof and the apertures are designed to provide a means for attaching mounting brackets 150 to joists 160. Mounting brackets 150 may be attached to joists 160 by screws, bolts, welding, or other appropriate attaching means, with one mounting bracket 150 being attached to either end of each joist 160. Once mounting brackets 150 are in place, joists 160 can be positioned between support structures 110 and 115.
  • While support structures 110 and 115 are depicted as a block wall and an I-beam respectively, it should be understood that these are merely representative of the types of support structures that may be utilized in conjunction with the present invention. In practice, support structures 105 and 115 may be any type of structure capable of supporting the load of composite floor system 100, including columns, load-bearing interior walls, etc. Apertures 165 are provided for the installation of various utilities such as electrical lines, plumbing pipes and other similar purposes.
  • Once joists 160 are in place, removable spanner bars 170 are inserted into the body portion of joists 160 by inserting the ends of spanner bars 170 into apertures 135. Apertures 135 are most preferably spaced equidistant along the body portion of joists 160 so that cooperating pairs of apertures 135 can be aligned to receive alternate ends of removable spanner bars 170. The location and number of removable spanner bars 170 used for supporting a given concrete slab 110 can be determined by performing load analysis calculations for composite floor system 100.
  • With the appropriate number of removable spanner bars 170 in place, support platform 140 can be installed. Support platform 140 rests on and is supported by removable spanner bars 170. Support platform 140 provides a form for defining the bottom of concrete slab 110 and also provides stability to the overall structure prior to the pouring of concrete slab 110.
  • After support platform 140 has been completed, reinforcing material 190 is placed over the top of joists 160. Reinforcing material 190 is typically a welded wire mesh and is provided to add additional strength and stability to concrete slab 110 and will be embedded within concrete slab 110. Finally, concrete slab 110 can be poured in place over support platform 140 and reinforcing material 190. Support platform 140, in concert with joists 160, removable spanner bars 170 and support structures 105 and 115, support concrete slab 110 while it hardens and cures. After an appropriate period of time, such as approximately one or two days, spanner bars 170 and support platform 140 can be stripped from joists 160. Concrete slab 110 may be further reinforced in the usual way to carry all loads between any vertical walls and columns.
  • It should be noted that, after positioning joists 160 as shown in FIG. 1, the top chord of each joist 160 is suspended slightly above the top edge of support structures 105 and 115. However, at least a portion of each joist 160, including the lower chord of each joist 160, is located between support structures 105 and 115. This is in contrast to typical floor construction methods where the lower chord of joists 160 are commonly resting on top of support structures 105 and 115. This allows a composite floor to be constructed using less blocking or bracing than typical with other methods. Additionally, although joists 160 are depicted as being “underslung” in this particular exemplary embodiment, it should be noted that in at least one alternative preferred embodiment of the present invention, joists 160 may be installed so that the lower chord of each joist 160 is resting on top of support structures 105 and 115.
  • Referring now to FIG. 2, a composite floor system 200 in accordance with a preferred embodiment of the present invention is shown. Composite floor system 200 comprises a concrete slab 210; a plurality of joists 230; a reinforcing material 220; a plurality of spanner bars 270; a plurality of handles 240 attached to spanner bars 270; a support platform 260; a hat channel 250; and a ceiling 280.
  • Reinforcing material 220 is a welded wire fabric or rebar mat placed over the upper chords of joists 230, prior to the pouring of concrete slab 210. In the most preferred embodiments of the present invention, reinforcing material 220 is a welded wire fabric with a mesh-like appearance. However, it should be noted that any other reinforcing material capable of developing the required structural capacity may be used as well. Reinforcing material 220 is typically draped over the upper chords of joists 230 and hangs in a catenary-like shape between the joists to provide the most effective reinforcement. Reinforcing material 220 is completely encased with the boundaries of concrete slab 210.
  • Support platform 260 is suspended on spanner bars 270 prior to the pouring of concrete slab 210. Support platform 260 is used as a form for defining the bottom surface of concrete slab 210. Support platform 260 also provides a degree of lateral stability to the structure of composite floor system before concrete slab 210 is poured. After concrete slab 210 has been poured and allowed to cure for an appropriate amount of time, spanner bars 270 are removed by using handles 240 and support platform 260 may be stripped from concrete slab 210 and may be reused in subsequent concrete pouring operations. Hat channel 250 is attached to joists 230 and ceiling 280 is attached to hat channel 250.
  • With the composite floor system of the present invention, it is possible to utilize standard-sized materials to form the support structure for the concrete slab. For example, the spacing of joists 230 may be advantageously fixed at approximately four-foot centers, thereby enabling the use of readily available and inexpensive standard 4′ by 8′ sheets of plywood for support platform 260. It should also be recognized that, in accordance with contemporary construction practice, such plywood panels would be treated with a release coating, such as oil, to avoid adherence of concrete slab 210 to plywood used in support platform 260. Such a release coating enables the ready stripping of support platform 260 beneath concrete slab 210 with a minimum loss of formwork due to accidental destruction. Alternatively, support platform 260 may be constructed from typical steel pan formwork or some other material known to those skilled in the art that provides sufficient strength to support concrete slab 210.
  • Referring now to FIG. 3, a composite floor system 300 in accordance with an alternative preferred embodiment of the present invention is shown. Composite floor system 300 is similar to composite floor system 200 as shown in FIG. 2 above, but the cross section of the joists used in composite floor system 300 is different than joists 230 used in composite floor system 200. Composite floor system 300 comprises a concrete slab 310; a plurality of joists 330; a reinforcing material 320; a plurality of handles 340 attached to spanner bars 370; a support platform 360; a hat channel 350; and a ceiling 380.
  • Reinforcing material 320 is a welded wire fabric or rebar mat placed over the upper chords of joists 330, prior to the pouring of concrete slab 310. In the most preferred embodiments of the present invention, reinforcing material 320 is a welded wire fabric with a mesh-like appearance. However, it should be noted that any other reinforcing material capable of developing the required structural capacity may be used as well. Reinforcing material 320 is typically draped over the upper chords of joists 330 and hangs in a catenary-like shape between the joists to provide the most effective reinforcement. Reinforcing material 320 is completely encased with the boundaries of concrete slab 310.
  • Support platform 360 is suspended on spanner bars 370 prior to the pouring of concrete slab 310. Support platform 360 is used as a form for defining the bottom surface of concrete slab 310. Support platform 360 also provides a degree of lateral stability to the structure of composite floor system before concrete slab 310 is poured. After concrete slab 310 has been poured and allowed to cure for an appropriate amount of time, spanner bars 370 are removed by using handles 340 and support platform 360 may be stripped from concrete slab 310 and may be reused in subsequent concrete pouring operations.
  • Referring now to FIG. 4, a flowchart depicting a method 400 of constructing a composite floor system in accordance with a preferred embodiment of the present invention is shown. First, a mounting bracket may be attached to each end of each joist (step 410). It should be noted that this is an optional step because the joists may be placed on top of supporting walls or beams. In underslung installations, the mounting brackets will be installed and the joist will be suspended between the support structures instead of resting on top of the support structures. Next, the joists are positioned on the supporting structures by placing the bearing plate (shown in FIG. 5) of each joist on top of the supporting structures (step 420). If the mounting brackets are not used, then the bottom chord of the joists may be placed directly onto the supporting structures.
  • Next, a plurality of removable spanner bars are positioned between each pair of joists (step 430). Then, the support platform for the concrete slab is positioned on top of the removable spanner bars (step 440). As previously mentioned, the support platform may be any material capable of supporting the load of the concrete slab. After the support platform is in place, the reinforcing material is positioned by draping it over the upper chords of each of the joists (step 450). The reinforcing material is typically a welded wire mesh material well known to those skilled in the art. Once the reinforcing material has been positioned, the concrete slab can be poured over the support platform and allowed to cure (step 460). Finally, after the concrete slab has been allowed to sufficiently cure, the removable spanner bars and the support platform can be stripped from the underside of the concrete slab (step 470).
  • Referring now to FIG. 5, a mounting bracket 500 used in constructing a composite floor system in accordance with a preferred embodiment of the present invention is shown. Mounting bracket 500 comprises a body portion 510; a horizontal mounting or bearing plate 520; a plurality of wall or beam attachment apertures 530; a plurality of upper chord attachment apertures 540; and a plurality of web attachment apertures 560. In a typical application, one mounting bracket 500 will be used on each end of a joist and mounting brackets 500 are used to support the joist over the span between the structural support elements such as walls or beams. Mounting brackets 500 may be adapted for either end of a joist (i.e., left and right-handed mounting brackets).
  • Body portion 510 is shaped similar to a piece of steel angle with a 90° bend at the midpoint. Horizontal bearing plate 520 is attached to body portion 510 by welding or other suitable attachment methods. Horizontal bearing plate 520 serves to distribute the load of any joists attached to mounting bracket 500 over a larger surface area, thereby minimizing any undesirable load concentrations that may result in structural failure. Horizontal bearing plate 520 typically rests on a load bearing structure such as a wall.
  • Wall or beam attachment apertures 530 are used to securely attach mounting bracket 500 to the top of a supporting or load-bearing structure, such as a wall or a beam, if required. While bolts or screws may be inserted through apertures wall or beam attachment apertures 530, thereby attaching mounting bracket 500 to a wall or beam, in certain applications mounting bracket 500 will be welded in place and apertures 530 will not be used.
  • Upper chord attachment apertures 540 are used to securely attach the upper chord of a joist to mounting bracket 500. As with wall or beam attachment apertures 530, bolts or screws may be inserted through upper chord apertures 530, thereby securely attaching mounting bracket 500 to the upper chord of a joist. It is anticipated that the upper chord of the joist may be welded to mounting bracket 500 in certain applications.
  • Web attachment apertures 560 are used to secure the body of a joist to mounting bracket 500. As previously explained in conjunction with upper chord attachment apertures 540 and wall or beam attachment apertures 530, bolts or screws may be inserted through web apertures 560, thereby attaching the body portion of a joist to mounting bracket 500. Once again, it is anticipated that mounting bracket 500 will be welded directly to the joist for certain applications. Mounting bracket is connected to a joist and the joist is then positioned as shown and described in FIG. 1.
  • Referring now to FIG. 6, a joist 600 used in constructing a composite floor system in accordance with a preferred embodiment of the present invention is shown. Joist 600 comprises a body portion 620 an upper chord 630 and a lower chord 660. Upper chord 630 and lower chord 660 are substantially parallel to each other and substantially perpendicular to body portion 620. Upper chord 630 has a flange 635 that is extends outwardly from body portion 620 and forms approximately a 50° angle with the plane defined by body portion 620. Similarly, lower chord 660 has a flange 665 that extends outwardly away from body portion 620 in a like fashion.
  • Body portion 620 defines a plurality of body apertures 650. Body apertures 650 are used to support spanner bars that, in turn, are used to support the decking material that will form the surface for the concrete slab when the concrete is poured in place. The spanner bars may be inserted to support the plywood or other material suspended between a plurality of joists 600 and to stabilize the plurality of joists 600 prior to the pouring of the concrete slab. Optional aperture 695 may be used to provide for the installation of utilities such as electrical and plumbing lines.
  • Upper chord 630 defines a plurality of apertures 640 spaced along the length of upper chord 630. Apertures 640 are positioned horizontally in upper chord 630 and allow the portion of the concrete above upper chord 630 to be connected with the portion of the concrete slab beneath upper chord 630. Apertures 640 are concrete-engaging mechanisms that act as an additional shear transfer mechanism. Much of the interface shear is accomplished by the combination of the concrete and steel reinforcement gripping and adhering to the embedded portion of upper chord 630, upper flange 635, and the upper portion of body 620. Lower chord 660 may also have apertures 640 formed therein. In the most preferred embodiments of the present invention, upper chord 630 is entirely encased within the concrete slab during the pouring of the concrete slab. Optional apertures 695 are provided for the installation of various utilities such as electrical lines, plumbing pipes and other similar purposes.
  • As shown in FIG. 6, joist 600 has a cross section that is substantially “Z-shaped,” or reverse “Z-shaped, depending on the orientation of joist 600. Further, joist 600 exhibits rotational symmetry around a longitudinal axis of symmetry 610 of body 620. Rotational symmetry means that when joist 600 is rotated 180° around axis of symmetry 610, the cross sectional shape of joist 600 will remain substantially, if not exactly, the same. The length of joist 600 will be determined by the specific application. Although not shown in FIG. 6, it should be noted that “stiffening” of joist 600 may be included for additional strength. Stiffening is a process of providing a corrugated-type body portion for joist 600 and is well known to those skilled in the art.
  • In the most preferred embodiments of the present invention, joist 600 is completely formed of a single piece of cold rolled sheet metal, but may be fabricated in many other ways and additionally reinforced, if necessary. Apertures 640 and 650, along with optional aperture 695 can be created as part of the overall manufacturing process and any of the various methods for creating apertures known to those skilled in the art may be used. Alternatively, instead of apertures 640, upper chord 630 may be fabricated with other concrete-engaging mechanisms such as a series of “dimples” or other protrusions that would further assist in firmly fixing upper chord 630 into a concrete slab.
  • Referring now to FIG. 7, a joist 700 used in constructing a composite floor system in accordance with an alternative preferred embodiment of the present invention is shown. Joist 700 comprises a body portion 720 an upper chord 730 and a lower chord 760. Upper chord 730 and lower chord 760 are substantially parallel to each other and substantially perpendicular to body portion 720. Upper chord 730 has a flange 735 that is substantially parallel to body portion 720. Similarly, lower chord 760 has a flange 765 that is substantially parallel to body portion 720. Body portion 720 defines a plurality of apertures 750. Apertures 750 are used to support spanner bars that, in turn, are used to support the decking material that will form the surface for the concrete slab when the concrete is poured in place. Optional apertures 795 are provided for the installation of various utilities such as electrical lines, plumbing pipes and other similar purposes.
  • Upper chord 730 defines a plurality of apertures 740 equally spaced along upper chord 730. Apertures 740 allow the portion of the concrete above upper chord 730 to be connected with the portion of the concrete slab beneath upper chord 730. Apertures 740 are concrete-engaging mechanisms that act as an additional shear transfer mechanism. Lower chord 760 may also have apertures 740 formed therein. In the most preferred embodiments of the present invention, upper chord 730 is entirely encased within the concrete slab during the pouring of the concrete slab. Optional apertures 795 are provided for the installation of various utilities such as electrical lines, plumbing pipes and other similar purposes.
  • As shown in FIG. 7, joist 700 has a cross section that is substantially “C-shaped,” or “reverse C-shaped,” depending on the orientation of joist 700. Further, joist 700 exhibits reflective symmetry around a longitudinal axis of symmetry 710 of body 720. Reflective symmetry means that the upper portion of the cross section of joist 700 is substantially “reflected” beneath axis of symmetry 710. Further discussion of the symmetry associated with the joists of the present invention is presented in conjunction with FIG. 8 and FIG. 9. The length of joist 700 will be determined by the specific application. Although not shown in FIG. 7, it should be noted that “stiffening” of joist 700 may be included for additional strength. Stiffening is a process of providing a corrugated-type body portion for joist 700 and is well known to those skilled in the art.
  • In the most preferred embodiments of the present invention, joist 700 is completely formed of a single piece of cold rolled sheet metal, but may be fabricated in other ways and additional reinforcement may be added as needed. Apertures 740, 750 and 795 can be created as part of the overall manufacturing process and any of the various methods for creating apertures known to those skilled in the art may be used. Alternatively, instead of apertures 740, upper chord 730 may be fabricated with other concrete-engaging mechanisms such as a series of “dimples” or other protrusions that would further assist in firmly fixing upper chord 730 into a concrete slab.
  • Referring now to FIG. 8, a side view of a joist 800 according to an alternative preferred exemplary embodiment of the present invention is depicted. As shown in FIG. 8, the cross-sectional profile of joist 800 is substantially “C-shaped.” However, distance 810 is measurably smaller than distance 820. Joist 800 will display a rough reflective symmetry about its midpoint.
  • Referring now to FIG. 9, a side view of a joist 900 according to an alternative preferred exemplary embodiment of the present invention is depicted. As shown in FIG. 9, the cross-sectional profile of joist 900 is substantially “Z-shaped.” However, distance 910 is measurably smaller than distance 920. Joist 900 will display a rough rotational symmetry about its midpoint.
  • While certain preferred exemplary embodiments have been presented in the foregoing detailed description, it should be appreciated that a vast number of variations exist. It should also be appreciated that these preferred embodiments are only examples and are not intended to limit the scope, applicability, or configuration of the invention in any way. Rather, the foregoing detailed description provides those skilled in the art with a convenient roadmap for implementing the preferred exemplary embodiments of the invention. It should be understood that various changes may be made in the function and arrangement of elements described in the exemplary preferred embodiments without departing from the spirit and scope of the invention as set forth in the appended claims.

Claims (24)

1. A composite steel and concrete floor construction comprising:
a poured concrete slab;
a plurality of individual laterally placed, parallel disposed, and supported joists, wherein each of said plurality of joists comprises an upper chord and a lower chord joined by a body portion, and each upper chord and each lower chord is substantially perpendicular to said body portion, wherein at least a portion of said upper chord is embedded in said concrete slab, each of said plurality of joists having a first end and a second end;
a plurality of mounting brackets, one of said plurality of mounting brackets being attached to each of said plurality of joists, each of said plurality of mounting brackets comprising:
a body portion; and
a horizontal mounting plate affixed to said body portion, each of said horizontal mounting plates resting on a load-bearing structure, said horizontal mounting plate being at least partially embedded in said concrete slab;
wherein each of said plurality of joists comprises a substantially Z-shaped or C-shaped cross section about a longitudinal axis of said plurality of joists.
2. The composite steel and concrete floor construction of claim 1 wherein said upper chord comprises a plurality of concrete-engaging mechanisms.
3. The composite steel and concrete floor construction of claim one wherein said upper chord defines a plurality of apertures and wherein each of said plurality of apertures provides a connection between a first portion of said concrete slab and a second portion of said concrete slab; and
a reinforcing mesh at least partially supported upon said upper chords of said plurality of joists and hanging generally in a catenary shape therebetween and being fully embedded in said slab.
4. The composite steel and concrete floor construction of claim 3 wherein said plurality of concrete-engaging mechanisms comprises a plurality of dimples.
5. The composite steel and concrete floor construction of claim 1 further comprising a reinforcing mesh at least partially supported upon said upper chords of said plurality of joists and hanging generally in a catenary shape therebetween and being fully embedded in said slab.
6. The composite steel and concrete floor construction of claim 1 wherein each of said joists is completely formed of a single piece of cold rolled sheet metal.
7. The composite steel and concrete floor construction of claim 1 wherein said connection between a first portion of said concrete slab and a second portion of said concrete slab comprises an additional shear transfer mechanism.
8. The composite steel and concrete floor construction of claim 1 further comprising a plurality of support structures supporting each of said plurality of joists.
9. The composite steel and concrete floor construction of claim 1 wherein each of said upper chord and said lower chord of each of said plurality of joists further comprise a flange extending away from each body portion of each said plurality of joists.
10. The composite steel and concrete floor construction of claim 9 wherein said body portion of each of said plurality of joists is substantially suspended between said plurality of support structures by at least two mounting brackets.
11. The composite steel and concrete floor construction of claim 1 wherein each of said plurality of joists exhibits rotational symmetry about said longitudinal axis.
12. The composite steel and concrete floor construction of claim 1 wherein each of said plurality of joists exhibits reflective symmetry about said longitudinal axis.
13. A composite steel and concrete floor construction comprising:
a concrete slab;
a plurality of individual laterally placed, parallel disposed joists, wherein each of said plurality of joists comprises a upper chord and a lower chord joined by a body portion, and each upper chord and each lower chord is substantially perpendicular to said body portion, wherein each of said plurality of joists comprises a substantially Z-shaped or C-shaped cross section about a longitudinal axis of said plurality of joists, wherein said upper chord comprises a plurality of concrete-engaging mechanisms, wherein at least a portion of said upper chord of each of said plurality of joists is embedded in said slab;
a plurality of mounting brackets, one of said plurality of mounting brackets being attached to each of said plurality of joists, each of said plurality of mounting brackets comprising:
a body portion; and
a horizontal mounting plate affixed to said body portion, each of said horizontal mounting plates resting on a load-bearing structure, said horizontal mounting plate being at least partially embedded in said concrete slab; and
a reinforcing mesh at least partially supported upon said upper chords of said plurality of joists and hanging generally in a catenary shape therebetween and being fully embedded in said slab.
14. The composite steel and concrete floor construction of claim 13 wherein said plurality of concrete-engaging mechanisms comprises a plurality of dimples.
15. The composite steel and concrete floor construction of claim 13 wherein each of said joists is completely formed of a single piece of cold rolled sheet metal.
16. The composite steel and concrete floor construction of claim 13 wherein each of said plurality of joists exhibits rotational symmetry about said longitudinal axis.
17. The composite steel and concrete floor construction of claim 13 wherein each of said plurality of joists exhibits reflective symmetry about said longitudinal axis.
18. The composite steel and concrete floor construction of claim 13 wherein said body portion of each of said plurality of joists is substantially suspended between said plurality of support structures by at least two mounting brackets.
19. A method comprising the steps of:
placing a plurality of mounting brackets on a load-bearing structure, each of said plurality of mounting brackets comprising:
a body portion; and
a horizontal mounting plate affixed to said body portion, each of said horizontal mounting plates resting on a load-bearing structure;
affixing a plurality of individual laterally placed, parallel disposed joists between said plurality of mounting brackets, thereby supporting each of said plurality of joists, each of said plurality of joists comprising a substantially “Z-shaped” or “C-shaped” cross section along a longitudinal axis;
placing a plurality of removable spanner bars extending between said plurality of joists;
placing a support platform over said plurality of removable spanner bars; and
pouring a concrete over said support platform, thereby embedding at least a portion of each of said plurality of joists and a least a portion of each of said plurality of horizontal mounting plates in said concrete.
20. The method of claim 19 further comprising the steps of:
waiting for said concrete slab to cure;
removing said plurality of removable spanner bars; and
removing said support platform.
21. The method of claim 19 wherein said support platform comprises a plurality of plywood sheets.
22. The method of claim 19 wherein said step of supporting said plurality of joists between a plurality of support structures comprises the steps of:
affixing a first mounting bracket to a first end of each of said plurality of joists;
affixing a second mounting bracket to a second end of each of said plurality of joists; and
affixing each of said first and second mounting brackets for each of said plurality of joists to said plurality of support structures, thereby suspending each of said plurality of joists between said plurality of support structures.
23. The method of claim 19 further comprising the step of suspending a reinforcing mesh at least partially upon said upper chords of said plurality of joists prior to pouring said concrete slab, said reinforcing mesh hanging generally in a catenary shape therebetween and being fully embedded in said concrete slab.
24. The method of claim 19 further comprising the step of engaging at least a portion of said concrete slab with a plurality of concrete-engaging mechanisms, said plurality of concrete-engaging mechanisms being formed in an upper chord of each of said plurality of joists.
US11/116,652 2002-06-22 2005-04-27 Apparatus and method for composite concrete and steel floor construction Abandoned US20050188638A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US11/116,652 US20050188638A1 (en) 2002-06-22 2005-04-27 Apparatus and method for composite concrete and steel floor construction

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US10/177,070 US20030233801A1 (en) 2002-06-22 2002-06-22 Apparatus and method for composite concrete and steel floor construction
US11/116,652 US20050188638A1 (en) 2002-06-22 2005-04-27 Apparatus and method for composite concrete and steel floor construction

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US10/177,070 Continuation-In-Part US20030233801A1 (en) 2002-06-22 2002-06-22 Apparatus and method for composite concrete and steel floor construction

Publications (1)

Publication Number Publication Date
US20050188638A1 true US20050188638A1 (en) 2005-09-01

Family

ID=46304443

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/116,652 Abandoned US20050188638A1 (en) 2002-06-22 2005-04-27 Apparatus and method for composite concrete and steel floor construction

Country Status (1)

Country Link
US (1) US20050188638A1 (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030024205A1 (en) * 2001-08-01 2003-02-06 Michael Strickland Modular joist shoe
US20090064634A1 (en) * 2007-01-04 2009-03-12 Koji Hanya Floor Structure
US20090188193A1 (en) * 2008-01-24 2009-07-30 Nucor Corporation Flush joist seat
US7730692B1 (en) * 2006-04-05 2010-06-08 Alliance Trutrus, Llc Truss bearing
US20100192507A1 (en) * 2008-01-24 2010-08-05 Nucor Corporation Flush joist seat
US8056291B1 (en) * 2007-10-12 2011-11-15 The Steel Networks, Inc. Concrete and light gauge cold formed steel building structure with beam and floor extending over a load bearing stud wall and method of forming
CN102747800A (en) * 2012-06-21 2012-10-24 朱威 Z-shaped keel floorslab hanger
US8529178B2 (en) 2010-02-19 2013-09-10 Nucor Corporation Weldless building structures
US8950143B2 (en) 2008-01-24 2015-02-10 Nucor Corporation Composite joist floor system
US9004835B2 (en) 2010-02-19 2015-04-14 Nucor Corporation Weldless building structures
US20150101280A1 (en) * 2012-07-11 2015-04-16 Metroll Technology Pty Ltd Structural Element
US9986863B2 (en) 2009-02-13 2018-06-05 Koninklijke Philips N.V. Floor construction with variable grade of resilience
EP3480376A1 (en) * 2017-11-03 2019-05-08 Akhnaton Stephen Imhotep Saint Rose Flooring system
US20190360202A1 (en) * 2018-05-25 2019-11-28 Fortress Iron, Lp Deck frame with integral attachment tabs
AU2015202788B2 (en) * 2014-05-23 2019-12-19 Bluescope Steel Limited Steel decking panel formwork edge overlay
US10550570B2 (en) 2016-10-05 2020-02-04 Fortress Iron, Lp Deck framing system
US10788066B2 (en) 2016-05-02 2020-09-29 Nucor Corporation Double threaded standoff fastener

Citations (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1623917A (en) * 1924-12-10 1927-04-05 William F Gaudian Wall construction
US1883376A (en) * 1927-10-20 1932-10-18 Hilpert Meier George Building construction
US2270672A (en) * 1938-10-06 1942-01-20 United States Gypsum Co Building slab
US2284898A (en) * 1939-11-29 1942-06-02 Rudolph B Hartman Structural system
US2392232A (en) * 1944-09-09 1946-01-01 Robertson Co H H Building construction
US3362121A (en) * 1965-03-03 1968-01-09 Laclede Steel Company Floor and roof constructions
US3363371A (en) * 1964-01-10 1968-01-16 Villalobos Roberto Fajardo Erection of prefabricated houses
US3392499A (en) * 1966-05-02 1968-07-16 Ira J. Mcmanus Steel joist connection
US3470598A (en) * 1964-04-29 1969-10-07 Viggo Berthelsen Method of making structural elements
US3945168A (en) * 1968-11-04 1976-03-23 Hambro Structural Systems Limited Reusable spanner bar
US3979868A (en) * 1968-11-04 1976-09-14 Hambro Structural Systems Ltd. Composite concrete and steel floor construction
US4015396A (en) * 1974-06-11 1977-04-05 Hambro Structural Systems Ltd. Joist
US4120131A (en) * 1976-09-03 1978-10-17 Carroll Research, Inc. Building structure
US4151694A (en) * 1977-06-22 1979-05-01 Roll Form Products, Inc. Floor system
US4432178A (en) * 1982-06-01 1984-02-21 Steel Research Incorporated Composite steel and concrete floor construction
US4454695A (en) * 1982-01-25 1984-06-19 Person Joel I Composite floor system
US4472913A (en) * 1980-09-29 1984-09-25 W. P. Hickman Company Nailerless roof edge
US4592184A (en) * 1984-07-16 1986-06-03 Joel I. Person Composite floor system
US4602467A (en) * 1984-07-02 1986-07-29 Schilger Herbert K Thin shell concrete wall panel
US4602497A (en) * 1984-01-27 1986-07-29 Wallis Bernard J Die clamping arrangement
US4628654A (en) * 1982-09-20 1986-12-16 Wesmer Konstruksie (Eiedoms) Beperk Composite floor structures
US4651487A (en) * 1984-09-04 1987-03-24 Plibrico Japan Co., Ltd. Wear-resistant refractory lining anchor
US4653237A (en) * 1984-02-29 1987-03-31 Steel Research Incorporated Composite steel and concrete truss floor construction
US4660341A (en) * 1986-02-18 1987-04-28 Neal Holtz Composite structure
US4700957A (en) * 1985-08-06 1987-10-20 Paul Forkardt GmbH & Co. Power-operated chuck
US4700519A (en) * 1984-07-16 1987-10-20 Joel I. Person Composite floor system
US4720957A (en) * 1983-05-23 1988-01-26 Madray Herbert R Structural component
US4785600A (en) * 1988-02-16 1988-11-22 Ting Raymond M L Buildup composite beam structure
US4894967A (en) * 1988-10-28 1990-01-23 Verco Manufacturing Co. Fluted deck diaphragm and shear resisting member therefor
US4930278A (en) * 1988-06-02 1990-06-05 In-Ve-Nit International Inc. Composite cementitious building panels
US5079890A (en) * 1989-01-11 1992-01-14 Kubik Marian L Space frame structure and method of constructing a space frame structure
US5544464A (en) * 1994-04-05 1996-08-13 Canam Hambro Composite steel and concrete floor system
US5561957A (en) * 1993-03-03 1996-10-08 Gauthier; Daniel Composite wood-concrete building member
US5704170A (en) * 1979-11-13 1998-01-06 Harold Simpson, Inc. Apparatus for roof support
US5761873A (en) * 1991-04-05 1998-06-09 Slater; Jack Web, beam and frame system for a building structure
US5857292A (en) * 1979-11-13 1999-01-12 Harold Simpson, Inc. Roof support apparatus
US5893248A (en) * 1996-09-19 1999-04-13 Beliveau; Jean-Louis Insulating panel and method for building and insulating a ceiling structure
US5941035A (en) * 1997-09-03 1999-08-24 Mega Building System Ltd. Steel joist and concrete floor system
US6112482A (en) * 1996-02-15 2000-09-05 British Steel Plc. Floor and ceiling structures
US6151858A (en) * 1999-04-06 2000-11-28 Simple Building Systems Building construction system
US6298622B1 (en) * 1996-10-15 2001-10-09 Plastedil, S.A. Self-supporting construction element of expanded plastics, in particular for manufacturing floor elements and walls of buildings in general
US6484464B1 (en) * 1997-01-22 2002-11-26 Icom Engineering Corporation Floor and roof structures for buildings
US6708459B2 (en) * 2001-07-18 2004-03-23 Gcg Holdings Ltd. Sheet metal stud and composite construction panel and method

Patent Citations (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1623917A (en) * 1924-12-10 1927-04-05 William F Gaudian Wall construction
US1883376A (en) * 1927-10-20 1932-10-18 Hilpert Meier George Building construction
US2270672A (en) * 1938-10-06 1942-01-20 United States Gypsum Co Building slab
US2284898A (en) * 1939-11-29 1942-06-02 Rudolph B Hartman Structural system
US2392232A (en) * 1944-09-09 1946-01-01 Robertson Co H H Building construction
US3363371A (en) * 1964-01-10 1968-01-16 Villalobos Roberto Fajardo Erection of prefabricated houses
US3470598A (en) * 1964-04-29 1969-10-07 Viggo Berthelsen Method of making structural elements
US3362121A (en) * 1965-03-03 1968-01-09 Laclede Steel Company Floor and roof constructions
US3392499A (en) * 1966-05-02 1968-07-16 Ira J. Mcmanus Steel joist connection
US3945168A (en) * 1968-11-04 1976-03-23 Hambro Structural Systems Limited Reusable spanner bar
US3979868A (en) * 1968-11-04 1976-09-14 Hambro Structural Systems Ltd. Composite concrete and steel floor construction
US4015396A (en) * 1974-06-11 1977-04-05 Hambro Structural Systems Ltd. Joist
US4120131A (en) * 1976-09-03 1978-10-17 Carroll Research, Inc. Building structure
US4151694A (en) * 1977-06-22 1979-05-01 Roll Form Products, Inc. Floor system
US5857292A (en) * 1979-11-13 1999-01-12 Harold Simpson, Inc. Roof support apparatus
US5704170A (en) * 1979-11-13 1998-01-06 Harold Simpson, Inc. Apparatus for roof support
US4472913A (en) * 1980-09-29 1984-09-25 W. P. Hickman Company Nailerless roof edge
US4454695A (en) * 1982-01-25 1984-06-19 Person Joel I Composite floor system
US4432178A (en) * 1982-06-01 1984-02-21 Steel Research Incorporated Composite steel and concrete floor construction
US4628654A (en) * 1982-09-20 1986-12-16 Wesmer Konstruksie (Eiedoms) Beperk Composite floor structures
US4720957A (en) * 1983-05-23 1988-01-26 Madray Herbert R Structural component
US4602497A (en) * 1984-01-27 1986-07-29 Wallis Bernard J Die clamping arrangement
US4653237A (en) * 1984-02-29 1987-03-31 Steel Research Incorporated Composite steel and concrete truss floor construction
US4602467A (en) * 1984-07-02 1986-07-29 Schilger Herbert K Thin shell concrete wall panel
US4592184A (en) * 1984-07-16 1986-06-03 Joel I. Person Composite floor system
US4700519A (en) * 1984-07-16 1987-10-20 Joel I. Person Composite floor system
US4651487A (en) * 1984-09-04 1987-03-24 Plibrico Japan Co., Ltd. Wear-resistant refractory lining anchor
US4700957A (en) * 1985-08-06 1987-10-20 Paul Forkardt GmbH & Co. Power-operated chuck
US4660341A (en) * 1986-02-18 1987-04-28 Neal Holtz Composite structure
US4785600A (en) * 1988-02-16 1988-11-22 Ting Raymond M L Buildup composite beam structure
US4930278A (en) * 1988-06-02 1990-06-05 In-Ve-Nit International Inc. Composite cementitious building panels
US4894967A (en) * 1988-10-28 1990-01-23 Verco Manufacturing Co. Fluted deck diaphragm and shear resisting member therefor
US5079890A (en) * 1989-01-11 1992-01-14 Kubik Marian L Space frame structure and method of constructing a space frame structure
US5761873A (en) * 1991-04-05 1998-06-09 Slater; Jack Web, beam and frame system for a building structure
US5561957A (en) * 1993-03-03 1996-10-08 Gauthier; Daniel Composite wood-concrete building member
US5544464A (en) * 1994-04-05 1996-08-13 Canam Hambro Composite steel and concrete floor system
US6112482A (en) * 1996-02-15 2000-09-05 British Steel Plc. Floor and ceiling structures
US5893248A (en) * 1996-09-19 1999-04-13 Beliveau; Jean-Louis Insulating panel and method for building and insulating a ceiling structure
US6298622B1 (en) * 1996-10-15 2001-10-09 Plastedil, S.A. Self-supporting construction element of expanded plastics, in particular for manufacturing floor elements and walls of buildings in general
US6484464B1 (en) * 1997-01-22 2002-11-26 Icom Engineering Corporation Floor and roof structures for buildings
US5941035A (en) * 1997-09-03 1999-08-24 Mega Building System Ltd. Steel joist and concrete floor system
US6151858A (en) * 1999-04-06 2000-11-28 Simple Building Systems Building construction system
US6708459B2 (en) * 2001-07-18 2004-03-23 Gcg Holdings Ltd. Sheet metal stud and composite construction panel and method

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030024205A1 (en) * 2001-08-01 2003-02-06 Michael Strickland Modular joist shoe
US7730692B1 (en) * 2006-04-05 2010-06-08 Alliance Trutrus, Llc Truss bearing
US8037655B2 (en) * 2007-01-04 2011-10-18 Nippon Steel Corporation Floor structure including plate-shaped supporting portion
US20090064634A1 (en) * 2007-01-04 2009-03-12 Koji Hanya Floor Structure
US20100269435A1 (en) * 2007-01-04 2010-10-28 Koji Hanya Floor structure including plate-shaped supporting portion
US8037654B2 (en) * 2007-01-04 2011-10-18 Nippon Steel Corporation Floor structure including plate-shaped supporting portion
US8056291B1 (en) * 2007-10-12 2011-11-15 The Steel Networks, Inc. Concrete and light gauge cold formed steel building structure with beam and floor extending over a load bearing stud wall and method of forming
US8950143B2 (en) 2008-01-24 2015-02-10 Nucor Corporation Composite joist floor system
US9243404B2 (en) 2008-01-24 2016-01-26 Nucor Corporation Composite joist floor system
US8186122B2 (en) * 2008-01-24 2012-05-29 Glenn Wayne Studebaker Flush joist seat
US8245480B2 (en) 2008-01-24 2012-08-21 Nucor Corporation Flush joist seat
US9677263B2 (en) 2008-01-24 2017-06-13 Nucor Corporation Composite joist floor system
US20100192507A1 (en) * 2008-01-24 2010-08-05 Nucor Corporation Flush joist seat
US20090188193A1 (en) * 2008-01-24 2009-07-30 Nucor Corporation Flush joist seat
US9986863B2 (en) 2009-02-13 2018-06-05 Koninklijke Philips N.V. Floor construction with variable grade of resilience
US9267527B2 (en) 2010-02-19 2016-02-23 Nucor Corporation Weldless building structures
US9004835B2 (en) 2010-02-19 2015-04-14 Nucor Corporation Weldless building structures
US8636456B2 (en) 2010-02-19 2014-01-28 Nucor Corporation Weldless building structures
US8529178B2 (en) 2010-02-19 2013-09-10 Nucor Corporation Weldless building structures
CN102747800A (en) * 2012-06-21 2012-10-24 朱威 Z-shaped keel floorslab hanger
US20150101280A1 (en) * 2012-07-11 2015-04-16 Metroll Technology Pty Ltd Structural Element
AU2015202788B2 (en) * 2014-05-23 2019-12-19 Bluescope Steel Limited Steel decking panel formwork edge overlay
US10788066B2 (en) 2016-05-02 2020-09-29 Nucor Corporation Double threaded standoff fastener
US11815123B2 (en) 2016-05-02 2023-11-14 Nucor Corporation Double threaded standoff fastener
US10550570B2 (en) 2016-10-05 2020-02-04 Fortress Iron, Lp Deck framing system
US11066830B2 (en) 2016-10-05 2021-07-20 Fortress Iron, Lp Deck framing system
US11598090B2 (en) 2016-10-05 2023-03-07 Fortress Iron, Lp Deck framing system
EP3480376A1 (en) * 2017-11-03 2019-05-08 Akhnaton Stephen Imhotep Saint Rose Flooring system
US20190360202A1 (en) * 2018-05-25 2019-11-28 Fortress Iron, Lp Deck frame with integral attachment tabs
US11028580B2 (en) * 2018-05-25 2021-06-08 Fortress Iron, Lp Deck frame with integral attachment tabs

Similar Documents

Publication Publication Date Title
US20050188638A1 (en) Apparatus and method for composite concrete and steel floor construction
US8234827B1 (en) Express framing building construction system
CA2358747C (en) Ring beam/lintel system
US7017314B2 (en) Apparatus and method for composite concrete and steel floor construction
AU2008232318B2 (en) Composite and support structures
US20040139674A1 (en) Concrete panel construction system
US20170051498A1 (en) Pour Stop Anchor Apparatus And System
JP3866284B2 (en) How to construct a suspended floor
US20030233801A1 (en) Apparatus and method for composite concrete and steel floor construction
JP6748470B2 (en) A suspending structure for mounting an insert on a deck plate with a reinforcing bar truss and suspending and supporting ceiling equipment on a lower floor under the deck, and a method for mounting ceiling equipment on a lower portion of a deck plate with a reinforcing bar truss using the insert.
JPS6348753Y2 (en)
US8495846B2 (en) Formwork assembly for fabricating composite structures including floor and roof structures
US7721497B2 (en) Apparatus and method for composite concrete and steel floor construction
EP0790364A1 (en) Reinforced or prestressed semi-precast concrete structure for building
JPH07317188A (en) Constructing method of reinforced concrete structure
JPS6253660B2 (en)
JP2003003603A (en) Precast concrete beam
KR200296952Y1 (en) Deck panel for reinforced concrete slab
JPH0827934A (en) Construction method of reinforced concrete structure
RU2368742C1 (en) Method for manufacturing of wall-ceiling structure in reinforced concrete version
JPH0115799Y2 (en)
US1699697A (en) Building construction
KR20040017560A (en) Deck panel for reinforced concrete slab
JP2642101B2 (en) Structure of mounting part of cantilever floor panel
RU2130106C1 (en) Methods for embodying structural system of fully prefabricated civic building

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION