JPH06167200A - Rail construction device of shield tunnel - Google Patents

Rail construction device of shield tunnel

Info

Publication number
JPH06167200A
JPH06167200A JP34544892A JP34544892A JPH06167200A JP H06167200 A JPH06167200 A JP H06167200A JP 34544892 A JP34544892 A JP 34544892A JP 34544892 A JP34544892 A JP 34544892A JP H06167200 A JPH06167200 A JP H06167200A
Authority
JP
Japan
Prior art keywords
rail
rail unit
unit
existing
width direction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP34544892A
Other languages
Japanese (ja)
Other versions
JP3052630B2 (en
Inventor
Takashi Wakechigai
隆志 輪違
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP4345448A priority Critical patent/JP3052630B2/en
Publication of JPH06167200A publication Critical patent/JPH06167200A/en
Application granted granted Critical
Publication of JP3052630B2 publication Critical patent/JP3052630B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE:To reduce a construction period and to promote safety by assembling a rail unit capable of bending widthwise at the outside of a tunnel in advance, and conveying the rail unit in a state to fold it in two parts to the inside of the tunnel. CONSTITUTION:A plurality of rail materials 7 are fixed to sleepers 8 to assemble a rail unit formed of foldable units 10a and 10b at the outside of a tunnel. After that, the rail unit 10 is folded in an angle-shape and is mounted on a conveying truck 3, and the conveying truck 3 is ran to the rear of a shield excavator along a conveying existing rail 4. Then, the units 10a and 10b are clamped by lifting hooks 41 and 42 of a developing device 25 to lift them from the conveying truck 3, and an extension holder 24 is moved in the direction of the excavator along guide rails 23 and is positioned at a specific position. Horizontal platforms 27 and 28 are separated from each other to develop the rail unit 10 in the shape of a straight line, and after it is positioned, the hooks 41 and 42 are lowered to suspend the rail unit 10 on the front sides of the ends of the existing rails 4 and 6 to install.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明はシールド掘進トンネル内
のレール敷設装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a rail laying device in a shield tunnel.

【0002】[0002]

【従来の技術】従来より、シールドトンネルを掘進構築
する場合には、シールド掘進機の後部に連結されて移動
する制御器機等の後続台車を走行させるための作業用レ
ール、及び該後続台車を避けてセグメントをシールド掘
進機後部のセグメント組立装置位置まで搬送する搬送台
車を走行させるための搬送用レール等を、トンネルの掘
進に合わせて順次継ぎ足して敷設して行く必要がある。
2. Description of the Related Art Conventionally, when constructing a shield tunnel by excavation, a work rail for running a trailing truck such as a controller connected to a rear portion of the shield machine and moving, and avoiding the trailing truck. It is necessary to lay the transportation rails and the like for traveling the transportation vehicle for transporting the segment to the position of the segment assembly device at the rear of the shield machine in accordance with the tunnel excavation.

【0003】従来においてシールド掘進トンネル内にレ
ールを敷設する際には、搬送用既設レール上を走行する
セグメント搬送用の搬送台車を利用して複数のレール
材、枕木、締結ボルト等をシールド掘進機後部まで搬送
し、シールド掘進機の後部に備えられたセグメント搬送
用のホイスト等を使って前記搬送台車上の枕木を吊り上
げて既設レールの端部前側に配置し、同様にしてレール
材を枕木上に配置した後、作業者が締結装置を用いて締
結ボルトによる締結を行うようにしている。
Conventionally, when laying a rail in a shield tunnel, a plurality of rail materials, sleepers, fastening bolts, etc. are shielded by using a carrier truck for segment transportation that runs on an existing rail for transportation. Carry it to the rear part and use a segment transfer hoist provided at the rear part of the shield machine to hang the sleepers on the carrier truck and place it on the front side of the end of the existing rail. After that, the worker uses the fastening device to fasten with the fastening bolts.

【0004】[0004]

【発明が解決しようとする課題】しかし、前記従来のシ
ールド掘進トンネル内のレール敷設方法においては、既
設レールの端部前側への枕木の配置、該枕木上へのレー
ル材の配置、及び締結ボルトによる締結等の作業の総て
を、シールド掘進機後部の狭い空間で行うようにしてい
るために、作業性が悪く、しかも出水等の危険が伴う場
所での長時間の作業を強いられることになって安全性に
問題を有し、更にレールの敷設作業に長時間を要して工
期が延長されてしまう問題を有していた。
However, in the conventional rail laying method in the shield tunneling tunnel described above, the sleepers are arranged in front of the ends of the existing rails, the rail members are arranged on the sleepers, and the fastening bolts are used. Since all the work such as fastening by the work is done in a narrow space at the rear of the shield machine, the workability is poor and it is forced to work for a long time in a place where there is a danger such as flooding. Therefore, there is a problem in safety, and further, there is a problem that it takes a long time to lay the rail and the construction period is extended.

【0005】本発明は、上記従来の問題点に鑑みてなし
たもので、シールドトンネル内でのレールの敷設作業を
簡略化して工期の短縮、安全性の向上を図ることを目的
とする。
The present invention has been made in view of the above-mentioned conventional problems, and an object of the present invention is to simplify the work of laying a rail in a shield tunnel to shorten the construction period and improve the safety.

【0006】[0006]

【課題を解決するための手段】本発明は、所要長さの複
数のレール材を枕木により固定し且つ機材搬入空間を通
してシールド掘進機後部まで搬送し得る大きさに幅方向
に2つ折りに折畳み可能なユニット部からなるレールユ
ニットを、折畳んだ状態で載置し搬送用既設レール上を
走行する搬送台車と、前記搬送用既設レールに並設され
た作業用既設レール上を走行するよう設けられたレール
延設台車と、該レール延設台車にシールド掘進機方向に
移動可能に支持された延設架台と、該延設架台に幅方向
の位置を別個に調節可能な一対の横行台を配設し該横行
台の夫々に前記レールユニットのユニット部を別々にク
ランプし得る昇降可能な吊り上げフックを取付けた展開
装置とを備えたことを特徴とするシールドトンネルのレ
ール敷設装置、及びレールユニットのレール材長手方向
一端部に、他のレールユニットの敷設時における幅方向
の位置決めを行うガイド部材を備えたことを特徴とする
シールドトンネルのレール敷設装置、に係るものであ
る。
According to the present invention, a plurality of rail members having a required length are fixed by sleepers and can be folded in two in the width direction so that they can be transported to the rear part of the shield machine through the equipment loading space. A rail unit consisting of various unit parts, mounted in a folded state and traveling on an existing transportation rail, and a transportation vehicle provided on the existing transportation rail arranged in parallel with the transportation existing rail. A rail extension carriage, an extension mount supported by the rail extension carriage so as to be movable in the shield machine direction, and a pair of traverses on the extension mount whose position in the width direction can be adjusted separately. A rail tunnel laying device for a shield tunnel, wherein each of the traverses is provided with a deploying device having a lifting hook capable of lifting and lowering to separately clamp the unit parts of the rail unit, and The rail member one longitudinal end of the rail unit, in which according to the rail-system, of the shield tunnel, characterized in that it comprises a guide member for positioning in the width direction at the time of laying of the other rail unit.

【0007】[0007]

【作用】請求項1の発明では、幅方向に折畳み可能な2
つのユニット部からなるレールユニットをトンネル外部
の作業性の良い場所において予め組立て、このようにし
て組立てたレールユニットを多数用意しておき、該レー
ルユニットをトンネルの後方において2つ折りに折畳ん
だ状態で搬送台車上に載置し、搬送台車をシールド掘進
機後部まで走行させる。
According to the first aspect of the invention, it is possible to fold in the width direction.
A rail unit composed of two unit parts is pre-assembled in a place with good workability outside the tunnel, a large number of rail units thus assembled are prepared, and the rail unit is folded in two behind the tunnel. Place it on the carrier truck and run the carrier truck to the rear of the shield machine.

【0008】搬送台車がレール延設台車下部に移動して
きたら走行を停止し、展開装置の吊り上げフックにより
レールユニットの両ユニット部をクランプして搬送台車
から持上げ、延設架台をシールド掘進機方向に移動させ
てレールユニットを敷設する位置の上側に位置決めす
る。
When the carrier truck moves to the lower part of the rail extension carriage, the traveling is stopped, both unit portions of the rail unit are clamped by the lifting hook of the expansion device and lifted from the carriage carriage, and the extension rack is directed toward the shield machine. Move and position the rail unit above the laying position.

【0009】続いて展開装置の横行台を離反させる方向
に移動することにより吊り上げフックに支持されたレー
ルユニットを一直線状に展開すると共に、レールユニッ
トの幅方向の位置決めを行った後、吊り上げフックを下
降させることにより、レールユニットを既設レールの端
部前側に吊り降ろして据え付ける。
Subsequently, the rail unit supported by the lifting hooks is linearly expanded by moving the traverse stand of the expansion device away from each other, and after the rail units are positioned in the width direction, the lifting hooks are moved. By lowering, the rail unit is hung and installed in front of the end of the existing rail.

【0010】請求項2の発明では、レールユニットのレ
ール材長手方向一端部に、他のレールユニットの敷設時
における幅方向の位置決めを行うガイド部材を備えてい
るので、前記レールユニットを下降して既設レールの端
部前側に吊り降ろして据え付ける際の幅方向の位置決め
が容易にしかも精度良く実施できる。
According to the second aspect of the present invention, since one end of the rail unit in the longitudinal direction of the rail member is provided with a guide member for positioning the other rail unit in the width direction, the rail unit is lowered. Positioning in the width direction at the time of suspending and installing on the front side of the end of the existing rail can be performed easily and accurately.

【0011】[0011]

【実施例】以下本発明の実施例を図面を参照しつつ説明
する。
Embodiments of the present invention will be described below with reference to the drawings.

【0012】図1〜図6はシールドトンネル内の既設レ
ールの端部前側にレールを継ぎ足して敷設する請求項1
の発明の一実施例を示すもので、シールド掘進機1の後
部には、セグメント2の搬送台車3が走行する2本の搬
送用既設レール4、及び前記搬送用既設レール4を跨ぐ
ように一方に1本、他方に2本配置され制御器機等の後
続台車5を走行させるようにした3本の作業用既設レー
ル6が備えられている。
1 to 6 show that a rail is added to a front side of an end of an existing rail in a shield tunnel to install the rail.
FIG. 2 shows an embodiment of the invention of FIG. 1 in which two existing transportation rails 4 on which a transportation vehicle 3 of a segment 2 travels, and one of the existing transportation rails 4 are provided at the rear portion of the shield machine 1. There are three existing rails 6 for work, one of which is arranged on the other side and two of which are arranged on the other side so that the succeeding dolly 5 such as a controller may travel.

【0013】前記既設レール4,6は、図3、図4及び
図7に示すように、所要の長さとした複数のレール材7
を所要の間隔で配置した枕木8に締結ボルト9により固
定することにより予め組立てられたレールユニット10
を順次継ぎ足すことによって構成される。
As shown in FIGS. 3, 4 and 7, the existing rails 4 and 6 have a plurality of rail members 7 each having a required length.
The rail unit 10 preassembled by fixing the rails to the sleepers 8 arranged at required intervals with the fastening bolts 9.
It is constructed by sequentially adding.

【0014】前記レールユニット10は、搬送可能な長
さを有し、且つ後続台車を避けた機材搬入空間11(図
3参照)を通してシールド掘進機1後部まで搬送し得る
ように、幅方向中間部で枕木8をピンジョイント12を
介して2つ折りに折り曲げ可能に連結したユニット部1
0a,10bから構成されている。更に、各ユニット部
10a,10bの幅方向中間位置にはアングル材或いは
ロッド材等からなる吊り上げのためのクランプ材13が
設けられており、又ユニット部10a,10bの下面に
は折畳み時の形状保持のためのストッパ14が取付けて
ある。
The rail unit 10 has a transportable length and a widthwise intermediate portion so that the rail unit 10 can be transported to a rear portion of the shield machine 1 through an equipment loading space 11 (see FIG. 3) avoiding a trailing carriage. The unit part 1 in which the sleepers 8 are foldably connected to each other through the pin joints 12
It is composed of 0a and 10b. Further, a clamp member 13 made of an angle member or a rod member for lifting is provided at an intermediate position in the width direction of each unit 10a, 10b, and the lower surface of each unit 10a, 10b has a shape when folded. A stopper 14 for holding is attached.

【0015】前記搬送用既設レール4上を走行する搬送
台車3には、レールユニット10を山型に折畳んだ状態
で位置決めして載置するための位置決め具15を設けて
いる。この搬送台車3はセグメント搬送台車をそのまま
利用することができるが、レール搬送のための新たな台
車を備えても良いことは勿論である。
The carrier truck 3 traveling on the existing carrier rails 4 is provided with a positioning tool 15 for positioning and mounting the rail unit 10 in a mountain-shaped folded state. Although the segment carriage can be used as it is as the carriage 3 as a matter of course, a new carriage for rail transport may be provided.

【0016】又、シールド掘進機1の後部(例えばシー
ルド掘進機1と後続台車5との間)に、後続台車5が走
行する最外側の作業用既設レール6上を兼用して走行し
得る門型のレール延設台車18を設ける。レール延設台
車18は、門型を有した後部脚19と前部脚20とを有
しており、更に、後部脚19と前部脚20の上部には、
レール延設台車18からシールド掘進機1方向に向けて
セグメント2によって組立られたトンネル16上まで延
びた案内ビーム21が設けられている。図2の場合、前
記案内ビーム21の上面にはセグメント搬送コンベア1
7が設けられて、後方からエレクター22方向へセグメ
ント2を搬送できるようになっている。
Further, at the rear portion of the shield machine 1 (for example, between the shield machine 1 and the succeeding carriage 5), a gate which can also serve as the outermost existing work rail 6 on which the succeeding carriage 5 travels can be used. A rail extension cart 18 of a mold is provided. The rail extension cart 18 has a rear leg 19 and a front leg 20 having a gate shape, and further, on the upper portions of the rear leg 19 and the front leg 20,
A guide beam 21 is provided extending from the rail-extended carriage 18 toward the shield machine 1 and onto the tunnel 16 assembled by the segment 2. In the case of FIG. 2, the segment conveyor 1 is provided on the upper surface of the guide beam 21.
7 is provided so that the segment 2 can be conveyed from the rear toward the erector 22.

【0017】前記レール延設台車18の該案内ビーム2
1には、案内レール23を介して延設架台24が前後方
向Aに移動可能に設置されている。延設架台24には図
3〜図6に示す展開装置25が備えられている。
The guide beam 2 of the rail extension cart 18
1, an extension frame 24 is installed via a guide rail 23 so as to be movable in the front-rear direction A. The extension base 24 is provided with a deployment device 25 shown in FIGS.

【0018】展開装置25は、延設架台24下面の前後
に間隔をおいて幅方向(左右方向)に延びて設けてある
リニヤガイド等の横行レール26に、前後の横行レール
26に跨がって幅方向Bに移動する一対の横行台27,
28を備えている。該横行台27,28は、図5に示す
ごとく、前後の横行レール26の夫々と平行に配設され
且つ横行モータ29によって別個に回転駆動されるよう
にした横行駆動軸30にナット31を介して係合してお
り、前記横行モータ29の作動により幅方向Bの位置を
別個に調節することができるようになっている。
The unfolding device 25 straddles a traverse rail 26 such as a linear guide which is provided to extend in the width direction (horizontal direction) at the front and rear of the lower surface of the extension frame 24 and to extend across the front and rear traverse rails 26. And a pair of pedestals 27 that move in the width direction B,
Equipped with 28. As shown in FIG. 5, the traverse bases 27 and 28 are arranged in parallel with the front and rear traverse rails 26 and are separately driven to rotate by a traverse motor 29. Are engaged with each other, and the position in the width direction B can be separately adjusted by the operation of the traverse motor 29.

【0019】前記横行台27,28の夫々の下側には、
垂直下方に延びたリニヤガイト等の昇降案内ガイド32
が前後に固設されており、該前後の昇降案内ガイド32
に跨がって昇降可能な昇降台33,34が設けられてい
る。各昇降台33,34は、前後の昇降案内ガイド32
と平行に配設され且つ図6に示すごとく昇降モータ35
の作動によってスプロケット36及びチェーン37を介
して同時に回転駆動される昇降駆動軸38にナット39
を介して係合されており、昇降モータ35の作動により
昇降Cが行われるようになっている。
Below the traverses 27 and 28,
Vertically extending guide guide 32 such as linear guide
Are fixed to the front and rear, and the up-and-down guide guides 32 at the front and rear
Elevating stands 33, 34 are provided so as to be able to move up and down. Each of the lifts 33, 34 has a front and rear lift guide 32.
And a lifting motor 35 arranged in parallel with
Of the nut 39 on the lifting drive shaft 38 that is simultaneously driven to rotate by the operation of the
, And the up-and-down movement C is performed by the operation of the up-and-down motor 35.

【0020】前記左右の昇降台33,34の夫々には、
前後に係合部40を有し、前記レールユニット10のユ
ニット部10a,10bのクランプ材13を別々にクラ
ンプし得るようにした吊り上げフック41,42が昇降
シリンダ43により上下動可能に設けられている。ま
た、前記吊り上げフック41,42は、前記クランプ材
13をクランプした際に外れることが無いように、係合
部の係合深さを深くしたり、或いは図8に示すように外
れ止め44を有したダブルフック等を用いることがで
き、また吊り上げフック41,42に駆動装置45を備
えてクランプ材13の外れ止めのためのストッパを自動
的に開閉させるようにしても良い。図1中46はレール
延設台車18のパワーユニットを示す。
Each of the left and right lifts 33, 34 has
Lifting hooks 41, 42 having engaging portions 40 on the front and rear sides and capable of separately clamping the clamp members 13 of the unit portions 10a, 10b of the rail unit 10 are provided by an elevating cylinder 43 so as to be vertically movable. There is. Further, the lifting hooks 41 and 42 have a deeper engagement depth of the engaging portion so that they do not come off when the clamp member 13 is clamped, or a retaining stopper 44 is provided as shown in FIG. A double hook or the like may be used, and the lifting hooks 41 and 42 may be provided with a drive device 45 to automatically open and close a stopper for preventing the clamp member 13 from coming off. Reference numeral 46 in FIG. 1 denotes a power unit of the rail extension cart 18.

【0021】次に、既設レール4,6の端部前側にレー
ルユニット10を敷設する手順について説明する。
Next, the procedure for laying the rail unit 10 on the front side of the ends of the existing rails 4 and 6 will be described.

【0022】レールユニット10は、トンネル16外部
の作業性の良い場所において図7に示すように所要の長
さを有した搬送用及び作業用等の複数のレール材7を、
ピンジョイント12を有した枕木8に締結ボルト9を介
して固定することにより組立て、このようにして組立て
られたレールユニット10を多数用意しておく。
The rail unit 10 has a plurality of rail members 7 having a required length as shown in FIG.
The rail unit 10 is assembled by fixing it to the sleeper 8 having the pin joint 12 through the fastening bolts 9, and a large number of the rail units 10 thus assembled are prepared.

【0023】前記レールユニット10を、トンネル16
の後方において図3に示すようにピンジョイント12に
より山形に折曲がった形状に折畳んで搬送台車3上に載
置し、この状態で搬送台車3を搬送用既設レール4に沿
ってシールド掘進機1後部まで搬送する。この時、レー
ルユニット10は折畳まれていることにより、機材搬入
空間11を通って容易に搬送することができる。またこ
の時、図3に示すように、レール延設台車18の延設架
台24に備えた展開装置25の吊り上げフック41,3
1が、搬送台車3に載置されて進入してくるレールユニ
ット10と干渉しないように左右に離した位置に待機さ
せておく。
The rail unit 10 is connected to the tunnel 16
As shown in FIG. 3, it is folded into a mountain shape by a pin joint 12 and placed on the carrier 3 in this state, and in this state, the carrier 3 is shielded along the existing rail 4 for transportation. 1 Transport to the rear. At this time, since the rail unit 10 is folded, it can be easily transported through the equipment loading space 11. Further, at this time, as shown in FIG. 3, the lifting hooks 41, 3 of the expansion device 25 provided on the extension base 24 of the rail extension carriage 18 are provided.
1 is placed on the left and right positions in standby so as not to interfere with the rail unit 10 which is placed on the carriage 3 and enters.

【0024】搬送台車3が展開装置25の下部に移動し
てきたら走行を停止し、吊り上げフック41,42の昇
降と横行台27,28の横行を行って吊り上げフック4
1,42によりレールユニット10のクランプ材13を
クランプし、続いて図9に示すように吊り上げフック4
1,42を上昇させてレールユニット10を搬送台車3
上から持上げる。
When the carriage 3 moves to the lower part of the unfolding device 25, the traveling is stopped, and the lifting hooks 41 and 42 are moved up and down and the traverse stands 27 and 28 are traversed to lift the hoisting hook 4.
1, 42 to clamp the clamp member 13 of the rail unit 10, and subsequently, as shown in FIG.
1, 42 are lifted and the rail unit 10 is moved by the carriage 3
Lift from above.

【0025】続いて、延設架台24をシールド掘進機1
方向に移動させて、レールユニット10が敷設する位置
の直上になるように前後方向位置を決める。
Subsequently, the extension mount 24 is attached to the shield machine 1
The rail unit 10 is moved in the direction, and the front-rear direction position is determined so as to be directly above the position where the rail unit 10 is laid.

【0026】次に、吊り上げフック41,42の幅方向
位置を調節しながら該吊り上げフック41,42を互い
に離反させる方向に横行台27,28を移動させる。こ
れにより、吊り上げフック41,42に支持されたレー
ルユニット10は各ユニット部10a,10bのクラン
プ材13が引離されるように引張られることにより図1
0のように一直線状に展開されると同時に、幅方向の位
置が決められる。この時、レールユニット10の各ユニ
ット部10a,10bに備えられるクランプ材13の取
付け位置が、各ユニット部10a,10bの重心位置或
いはそれより外側(反ピンジョイント12側)に位置す
るようにしておけば、前記展開を小さな力で容易に行わ
せることができる。
Next, while adjusting the position of the lifting hooks 41, 42 in the width direction, the traverse stands 27, 28 are moved in a direction in which the lifting hooks 41, 42 are separated from each other. As a result, the rail unit 10 supported by the lifting hooks 41 and 42 is pulled so that the clamp members 13 of the unit portions 10a and 10b are separated from each other.
The position in the width direction is determined at the same time as being developed in a straight line like 0. At this time, the mounting position of the clamp member 13 provided on each of the unit portions 10a and 10b of the rail unit 10 is set to be located at the position of the center of gravity of each of the unit portions 10a and 10b or outside (on the side opposite the pin joint 12). In this case, the expansion can be easily performed with a small force.

【0027】続いて前記吊り上げフック41,42を昇
降駆動軸38を介して下降し、更に昇降シリンダ43を
伸張して下降させることにより、レールユニット10を
既設レール4,6の端部前側に吊り降ろし、その後吊り
上げフック41,42のクランプを解除することにより
トンネル16内面に据え付けられる。この時、前記昇降
駆動軸38による移動ストロークの不足分を補うために
昇降シリンダ43を備えるようにしているが、昇降駆動
軸38のストロークが充分な場合には昇降シリンダ43
を省略することもできる。
Subsequently, the lifting hooks 41, 42 are lowered via the lifting drive shaft 38, and the lifting cylinder 43 is further extended to lower the rail unit 10 to the front side of the ends of the existing rails 4, 6. It is installed on the inner surface of the tunnel 16 by unloading and then releasing the clamps of the lifting hooks 41 and 42. At this time, an elevating cylinder 43 is provided to make up for the shortage of the movement stroke of the elevating drive shaft 38. However, when the stroke of the elevating drive shaft 38 is sufficient, the elevating cylinder 43 is provided.
Can be omitted.

【0028】図11及び図12は請求項2の発明の一実
施例を示したもので、レールユニット10のレール材7
長手方向一端部(シールド掘進機1側端部)に、他のレ
ールユニット10の敷設時における幅方向の位置案内を
行うガイド部材47を取付けている。
FIG. 11 and FIG. 12 show an embodiment of the invention of claim 2, which is the rail member 7 of the rail unit 10.
A guide member 47 that guides the position in the width direction when the other rail unit 10 is laid is attached to one end portion in the longitudinal direction (end portion on the shield machine 1 side).

【0029】上記請求項2の実施例によれば、レールユ
ニット10のレール材7長手方向一端部に、他のレール
ユニット10の敷設時における幅方向の位置案内を行う
ガイド部材を備えているので、前記レールユニット10
を下降して既設レール4,6の端部前側に吊り降ろして
据え付ける際の幅方向の位置決めが容易になると共に、
据え付け精度を容易に高めることができる。また前記ガ
イド部材47によってレールユニット10のレール材7
同士の連結を不要にしたり或いはガイド部材47を連結
材として利用することもできる。
According to the second aspect of the present invention, one end of the rail unit 10 in the longitudinal direction of the rail member 7 is provided with a guide member for guiding the position in the width direction when the other rail unit 10 is laid. , The rail unit 10
Is lowered to the front of the ends of the existing rails 4 and 6 to facilitate positioning in the width direction when installing and
Installation accuracy can be easily increased. In addition, the rail member 7 of the rail unit 10 is guided by the guide member 47.
It is also possible to eliminate the need to connect the members together or use the guide member 47 as a connecting member.

【0030】また、前記実施例においては、レール延設
台車18をシールド掘進機1の直後に備えるようにした
が、後続台車5等をタイヤにより走行させるようにし
て、レール延設台車18を後続台車5の後部に備え、後
続台車5の後部においてレールユニット10の敷設を行
うようにすることもできる。
Further, in the above-described embodiment, the rail extension carriage 18 is provided immediately after the shield machine 1, but the rail extension carriage 18 is made to follow the trailing carriage 5 and the like by running the tires. The rail unit 10 may be installed in the rear part of the trolley 5 in the rear part of the trolley 5.

【0031】[0031]

【発明の効果】請求項1の発明によれば、幅方向に2つ
折りに折畳み可能としたレールユニットを折畳んだ状態
でシールド掘進機後部まで搬送する搬送台車と、シール
ド掘進機後部に設けたレール延設台車に沿ってシールド
掘進機方向に移動可能に備えた延設架台と、該架設台車
に取付けた一対の横行台の夫々に昇降可能に吊り上げフ
ックを備えた展開装置とを備えているので、左右の吊り
上げフックを上下左右に移動して、前記搬送台車によっ
てシールド掘進機後部まで搬送されてきたレールユニッ
トを吊り上げて展開し、据付位置に位置決めして据え付
けすることが容易に可能となり、よってレールの敷設作
業を簡略化して工期を短縮することができ、更に敷設作
業の安全性を向上できる優れた効果を奏し得る。
According to the first aspect of the present invention, the rail unit that can be folded in two in the width direction is provided in the rear portion of the shield machine and the transport carriage that conveys the folded rail unit to the rear portion of the shield machine. An extension platform provided so as to be movable in the shield machine direction along the rail extension vehicle, and a deployment device provided with a lifting hook capable of ascending and descending to each of a pair of traverses attached to the installation vehicle Therefore, by moving the left and right lifting hooks up and down and left and right, it is possible to easily lift and deploy the rail unit that has been transported to the rear part of the shield machine by the transport carriage, and position it at the installation position to easily install it. Therefore, the laying work of the rail can be simplified and the construction period can be shortened, and the excellent effect of improving the safety of the laying work can be obtained.

【0032】請求項2の発明によれば、レールユニット
のレール材長手方向一端部に、他のレールユニットの敷
設時における幅方向の位置案内を行うガイド部材を備え
ているので、前記レールユニットを下降して既設レール
の端部前側に吊り降ろして据え付ける際の幅方向の位置
決めが容易になると共に、据え付け精度を容易に高める
ことができる。
According to the invention of claim 2, a guide member for guiding the position in the width direction when another rail unit is laid is provided at one end of the rail unit in the longitudinal direction of the rail member. The positioning in the width direction at the time of descending and suspending to the front side of the end of the existing rail for installation can be facilitated, and the installation accuracy can be easily enhanced.

【図面の簡単な説明】[Brief description of drawings]

【図1】請求項1の発明の一実施例を示す側面図であ
る。
FIG. 1 is a side view showing an embodiment of the invention of claim 1;

【図2】図1のレール延設台車部の詳細図である。FIG. 2 is a detailed view of the rail-extending carriage portion of FIG.

【図3】図2のIII−III方向矢視図である。FIG. 3 is a view taken along the line III-III in FIG.

【図4】図3のIV−IV方向矢視図である。FIG. 4 is a view taken along the line IV-IV in FIG.

【図5】図3のV−V方向矢視図である。5 is a view taken in the direction of the arrows VV in FIG.

【図6】図5のVI部分の詳細平面図である。FIG. 6 is a detailed plan view of a VI portion of FIG.

【図7】レールユニットの平面図である。FIG. 7 is a plan view of a rail unit.

【図8】吊り上げフックの詳細例を示す側面図である。FIG. 8 is a side view showing a detailed example of a lifting hook.

【図9】レールユニットの展開途中を示す正面図であ
る。
FIG. 9 is a front view showing the rail unit in the middle of development.

【図10】レールユニットを展開して据え付ける状態を
示す正面図である。
FIG. 10 is a front view showing a state in which the rail unit is unfolded and installed.

【図11】請求項2の発明の一実施例を示す平面図であ
る。
FIG. 11 is a plan view showing an embodiment of the invention of claim 2;

【図12】図11のXII−XII方向矢視図である。12 is a view taken in the direction of arrow XII-XII in FIG.

【符号の説明】[Explanation of symbols]

1 シールド掘進機 3 搬送台車 4 搬送用既設レール 6 作業用既設レール 7 レール材 8 枕木 10a ユニット部 10b ユニット部 10 レールユニット 11 機材搬入空間 18 レール延設台車 24 延設架台 25 展開装置 27 横行台 28 横行台 41 吊り上げフック 42 吊り上げフック 47 ガイド部材 1 shield machine 3 carrier truck 4 existing rail for transport 6 existing rail for work 7 rail material 8 sleepers 10a unit part 10b unit part 10 rail unit 11 equipment carry-in space 18 rail extension trolley 24 extension mount 25 deployment device 27 traverse stand 28 Traverse stand 41 Lifting hook 42 Lifting hook 47 Guide member

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 所要長さの複数のレール材を枕木により
固定し且つ機材搬入空間を通してシールド掘進機後部ま
で搬送し得る大きさに幅方向に2つ折りに折畳み可能な
ユニット部からなるレールユニットを、折畳んだ状態で
載置し搬送用既設レール上を走行する搬送台車と、前記
搬送用既設レールに並設された作業用既設レール上を走
行するよう設けられたレール延設台車と、該レール延設
台車にシールド掘進機方向に移動可能に支持された延設
架台と、該延設架台に幅方向の位置を別個に調節可能な
一対の横行台を配設し該横行台の夫々に前記レールユニ
ットのユニット部を別々にクランプし得る昇降可能な吊
り上げフックを取付けた展開装置とを備えたことを特徴
とするシールドトンネルのレール敷設装置。
1. A rail unit comprising a plurality of rail members each having a required length fixed by a sleeper and comprising a unit portion capable of being folded in half in a width direction so as to be transported to a rear portion of a shield machine through an equipment loading space. A transportation carriage that is placed in a folded state and travels on an existing transportation rail, and a rail extension carriage that is provided so as to travel on the existing transportation rail that is installed in parallel with the transportation existing rail, An extension pedestal supported by a rail extension trolley so as to be movable in the shield machine direction, and a pair of traverses whose position in the width direction can be separately adjusted are arranged on each of the traverses. A rail laying device for a shield tunnel, comprising: a deploying device having a lifting hook capable of lifting and lowering, which can separately clamp the unit parts of the rail unit.
【請求項2】 レールユニットのレール材長手方向一端
部に、他のレールユニットの敷設時における幅方向の位
置決めを行うガイド部材を備えたことを特徴とする請求
項1記載のシールドトンネルのレール敷設装置。
2. The rail laying of the shield tunnel according to claim 1, wherein a guide member for positioning in the width direction when laying another rail unit is provided at one end of the rail unit in the longitudinal direction of the rail material. apparatus.
JP4345448A 1992-12-01 1992-12-01 Rail tunneling equipment for shield tunnel Expired - Fee Related JP3052630B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4345448A JP3052630B2 (en) 1992-12-01 1992-12-01 Rail tunneling equipment for shield tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4345448A JP3052630B2 (en) 1992-12-01 1992-12-01 Rail tunneling equipment for shield tunnel

Publications (2)

Publication Number Publication Date
JPH06167200A true JPH06167200A (en) 1994-06-14
JP3052630B2 JP3052630B2 (en) 2000-06-19

Family

ID=18376665

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4345448A Expired - Fee Related JP3052630B2 (en) 1992-12-01 1992-12-01 Rail tunneling equipment for shield tunnel

Country Status (1)

Country Link
JP (1) JP3052630B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0495104A1 (en) * 1989-10-02 1992-07-22 Kabushiki Kaisha Komatsu Seisakusho Management system for construction machines
CN107031663A (en) * 2017-05-25 2017-08-11 中铁工程装备集团有限公司 Supporting trailer after shield machine marshaling travelling platform, traveling method and shield machine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0495104A1 (en) * 1989-10-02 1992-07-22 Kabushiki Kaisha Komatsu Seisakusho Management system for construction machines
EP0495104B1 (en) * 1989-10-02 1996-09-11 Kabushiki Kaisha Komatsu Seisakusho Management system for construction machines
CN107031663A (en) * 2017-05-25 2017-08-11 中铁工程装备集团有限公司 Supporting trailer after shield machine marshaling travelling platform, traveling method and shield machine
CN107031663B (en) * 2017-05-25 2023-04-25 中铁工程装备集团有限公司 Walking platform and walking method of shield machine marshalling train and matched trailer behind shield machine

Also Published As

Publication number Publication date
JP3052630B2 (en) 2000-06-19

Similar Documents

Publication Publication Date Title
CN102359385A (en) Tunnel waterproof board spreading and hanging device
CN211547116U (en) A operation car for railway switch is spread and is traded
US3970200A (en) Gantry
JP5407665B2 (en) Method for extending tailpiece carriage and continuous belt conveyor
CN112252099A (en) Operating vehicle for railway turnout replacement and operating method thereof
JP3052630B2 (en) Rail tunneling equipment for shield tunnel
JPH0812262A (en) Installing method for overhead traveller and its device
JPH06108403A (en) Method and device for laying rail in shielded tunnel
JP3372618B2 (en) Mobile transport equipment for tunnel construction materials
JP3413760B2 (en) Passenger conveyor installation equipment
JP4612283B2 (en) Segment assembling apparatus and segment assembling method
JP2927731B2 (en) PC girder transfer device
JP2003193799A (en) Conveying apparatus and method of conveying subject to be conveyed
JP3132919B2 (en) Conveying equipment for installation process
JP4804676B2 (en) Piping installation method and apparatus in tunnel
JP4552102B2 (en) Work cart
JP3395063B2 (en) Installation machine for concrete products
JPH0465960B2 (en)
JPH08100599A (en) Method and equipment for transferring segment piece in shield driving method
JP3413761B2 (en) Passenger conveyor installation equipment
JPH0430227Y2 (en)
JP3009384B2 (en) Transport trolley
JP2004175250A (en) Device and method for installing under-floor parts of body
JPH10131700A (en) Pipe laying truck for tunnel and pipe laying method into tunnel
JPH05118200A (en) Setter of sleeper and rail in shield tunneling work

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees