CN102359385A - Tunnel waterproof board spreading and hanging device - Google Patents

Tunnel waterproof board spreading and hanging device Download PDF

Info

Publication number
CN102359385A
CN102359385A CN2011102863308A CN201110286330A CN102359385A CN 102359385 A CN102359385 A CN 102359385A CN 2011102863308 A CN2011102863308 A CN 2011102863308A CN 201110286330 A CN201110286330 A CN 201110286330A CN 102359385 A CN102359385 A CN 102359385A
Authority
CN
China
Prior art keywords
gone
wheel
arc
guide rail
shop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102863308A
Other languages
Chinese (zh)
Other versions
CN102359385B (en
Inventor
林存友
张浚厚
孙甲友
张广宪
刘振
杨希祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 14th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Original Assignee
China Railway 14th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 14th Bureau Group Co Ltd filed Critical China Railway 14th Bureau Group Co Ltd
Priority to CN 201110286330 priority Critical patent/CN102359385B/en
Publication of CN102359385A publication Critical patent/CN102359385A/en
Application granted granted Critical
Publication of CN102359385B publication Critical patent/CN102359385B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention provides a tunnel waterproof board spreading and hanging device, which comprises a substrate 1, a longitudinal moving device 2, an upper bracket 7, an arc-shaped guide rail 4 and a spreading and hanging trolley 5. The tunnel waterproof board spreading and hanging device is characterized in that the bottom of the substrate 1 is provided with the longitudinal moving device 2; the substrate 1 is provided with a lateral guide rail 6; the lateral guide rail 6 is provided with a lateral moving trolley 3 which can slide along the lateral guide rail 6; the lateral moving trolley 3 is fixedly provided with an upper bracket 7; the upper bracket 7 is provided with two arc-shaped guide rails 4; and the two arc-shaped guide rails 4 are provided with the spreading and hanging trolley 5 which can slide along the arc-shaped guide rails 4. The arc-shaped guide rails can move left and right and up and down along the lateral guide rail to regulate distance between the spreading and hanging trolley and the inner wall of the tunnel, the tunnel waterproof board spreading and hanging device can be flexibly regulated according to the shape of the inner outline of the tunnel and does not need to be redesigned according to the shape of each tunnel, and the requirement of water-proof plate laying in different tunnels can be satisfied.

Description

Tunnel water proofing plate shop mounts puts
Technical field
The present invention relates to a kind of tunnel construction device, exactly is that a kind of tunnel water proofing plate shop mounts and puts.
Background technology
In the constructing tunnel process,, need establish waterproofing materialss such as splash guard in the inwall upper berth in the tunnel for preventing to leak in the tunnel.At present, mostly the construction of laying splash guard is to be employed in sets up scaffold in the tunnel, working platform is set on scaffold, and the workman lays the enterprising pedestrian worker of working platform.Because splash guard is heavier, artificial laying labour intensity is big, and laying efficient is lower.Those skilled in the art are provided with arc-shaped guide rail for overcoming above-mentioned shortcoming on scaffold, the shop is set on arc-shaped guide rail hangs dolly, hang dolly through the shop and lay splash guard.But, this technical scheme can only according to the shape in each tunnel carry out independent design and installation, particularly arc-shaped guide rail must with the tunnel inner surface contour always, therefore, can not satisfy the construction requirement in different tunnels.
Summary of the invention
For overcoming above-mentioned deficiency of the prior art, the present invention provides a kind of tunnel water proofing plate flexible and convenient to use shop and mounts and put.
The present invention is for realizing above-mentioned purpose; Realize through following technical scheme: comprise that pedestal, longitudinal moving device, upper bracket, arc-shaped guide rail and shop hang dolly; It is characterized in that: base bottom is installed longitudinal moving device, and cross slide way is installed on the pedestal, and installing on the cross slide way can be along the horizontal travelling car of cross slide way slip; Laterally fixedly mount upper bracket on the travelling car; Two arc-shaped guide rails are installed on the upper bracket, the shop are installed on two arc-shaped guide rails hang dolly, the shop hangs dolly and can slide along arc-shaped guide rail.
In order further to realize to adopt following technical scheme by the object of the invention: spread to mount according to the described tunnel water proofing plate of claim and put, it is characterized in that: several hydraulic jack are installed between described pedestal and the cross slide way.Several chain wheel supports are installed on the pedestal, on each chain wheel support sprocket wheel are installed, mounting crank on the sprocket wheel, crank upper hinge connecting rod, slide block is installed in the connecting rod lower end; On the described hydraulic jack spanner is set, through hole is offered in the spanner outer end, and slide block matches with through hole; Chain wheel drive device supporting seat is installed on the pedestal, the chain wheel drive device is installed on the chain wheel drive device supporting seat, the output shaft of chain wheel drive device is connected with the chain driving wheel, and the chain driving wheel is connected with sprocket wheel through chain; Electromagnetic cage is installed on the pedestal, and electromagnetic cage outside mounting guide sleeve is provided with electromagnet in the guide pin bushing, mounting spring on the electromagnet, and magnet is installed in the spring outer end, and magnet is corresponding with pressure relief press button on the hydraulic jack.Described arc-shaped guide rail is " worker " font; Described shop hangs dolly and comprises vehicle frame; Mounting axles, splash guard axle and driving-chain seat are installed wheel on the vehicle frame on the axletree, and wheel matches with arc-shaped guide rail; The “ Xi is installed in the axletree outside " font screens piece, the groove of screens piece matches with the arc-shaped guide rail upper edge; Described upper bracket bottom left end installing drive device; Connect drive sprocket on the drive unit; Upper bracket bottom surface merchant installs several upper bracket driven sprockets, and several guide rail driven sprockets are installed on the arc-shaped guide rail, and drive sprocket, guide rail driven sprocket and upper bracket driven sprocket are provided with driving-chain; The driving-chain seat is installed on the driving-chain.Described vehicle frame is installed stapling apparatus; Described stapling apparatus comprises hinge seat; Hinge seat is fixedly mounted on the vehicle frame, and the hinge seat upper hinge is installed hinge-rod, and the hinge-rod front end is installed pinch roller; The wheel shaft of pinch roller is parallel with the splash guard axle, and the both sides of hinge-rod swaying direction respectively and extension spring is installed between the vehicle frame.Described upper bracket bottom left end is installed the material lifting appliance, and described material loading lifting appliance comprises lifting drive unit and pillar, promotes drive unit and is made up of motor, reducer and hoist engine; The rotation of pillar top drives dress,, rotating driving device is made up of motor and reduction box; Reduction gearbox output shaft is arranged on the top and rotating seat is installed; Turning arm is installed on rotating seat top, and turning arm top and bottom are installed pulley respectively, and stay cord is set on the pulley; Stay cord one end connects the material loading lifting appliance, and suspension hook is set on the other end.Described longitudinal moving device comprises lower carriage, lower carriage top mounting base, and vertical movable driving equipment is installed in the lower carriage bottom surface, and vertical movable driving equipment is made up of motor and wheel, and wheel cooperates with the track of laying in the tunnel; Lower platform is installed in the lower carriage outside.Described lower platform comprises fixed platform and sliding platform; Fixed platform is an inner hollow; Port is offered in the outer end, and sliding platform inserts in the fixed platform through port, and several first bolts hole are set on the fixed platform; Offer second bolt hole on the sliding platform, fixed platform is connected through fastening bolt with sliding platform.On the described horizontal travelling car lateral driver device is installed, lateral driver device is by being made up of motor and wheel, and wheel matches with cross track.Described horizontal travelling car is installed lift platform.
The invention has the advantages that: arc-shaped guide rail can and move up and down along the cross slide way move left and right; The distance that the adjustment shop hangs dolly and tunnel inwall; The function that realization is adjusted according to the shape of profile in the tunnel flexibly; Need not shape otherwise designed, can satisfy the requirement that splash guard is laid in different tunnels to each tunnel.The present invention also has compactness simple for structure, advantage cheap for manufacturing cost and easy to use.
Description of drawings
Fig. 1 is a structural representation of the present invention; Fig. 2 is the local structure for amplifying sketch map of the I of Fig. 1; Fig. 3 is the local structure for amplifying sketch map of the II of Fig. 1; Fig. 4 is the local structure for amplifying sketch map of the III of Fig. 1; Fig. 5 is that the A of Fig. 1 is to looking the structure for amplifying sketch map; Fig. 6 is the local structure for amplifying sketch map of the IV of Fig. 5; Fig. 7 is material loading lifting appliance 17 structural representations among Fig. 1; Fig. 8 is the local structure for amplifying sketch map of the V of Fig. 1; Fig. 9 analyses and observe the structure for amplifying sketch map along B-B line among Fig. 1.
Numerals: a base? 2 longitudinal movement device? 3 lateral movement trolley? 4 curved rails? 5 Shop hanging car? Six horizontal rails? 7 upper bracket? Eight drives? 9 rails driven sprocket? 10 active links round? 11 driven sprocket? 12 drive chain? 13 rotating seats? 14 next platform? 15 lifting platform? 16 platform? 17 feeding lifting device? 18 scissor device? 19 longitudinal movement drives? 20 down the ladder? 21 transverse drive? 22 tracks? 23 waterproof board shaft? 24 anastomotic device? 26 fixed platforms? 27 card bit block? 28 wheels? 30 drive chain seat? 31 frame? 32 hinge base? 33 hook? 34 rotary drive? 35 lower bracket? 36 rotating arm? 37 rope? 38 pillars? 39 upgrade drive? 40 hydraulic jacks? 41 axles? 42 hinge base? 43 hinged lever? 44 roller? 45 Lahuang? 46 sliding platform? 47 first bolt hole? 48 port? 49 second bolt hole? 50 fastening bolts? 51 intermediate guide wheels? 52 side guide wheel? 54 sprocket? 55 sliders? 56 crank? 57 rod? 58 wrench? 59 hole? 60 sprocket bracket? 61 chain? 62 chain capstan? 63 sprocket drive? 64 sprocket drive support base? 65 pressure relief button? 66 magnet? 68 bushing? 69 spring? 70 electromagnet? 71 solenoid box? 72 pulley bracket ? 73 side rails? 74 escalators? 75 escalators.
The specific embodiment
A kind of tunnel water proofing plate of the present invention shop mounts puts; As shown in Figure 1, comprise that pedestal 1, longitudinal moving device 2, upper bracket 7, arc-shaped guide rail 4 and shop hang dolly 5, longitudinal moving device 2 is installed in pedestal 1 bottom; Cross slide way 6 is installed on the pedestal 1; Installing on the cross slide way 6 can be along the horizontal travelling car 3 of cross slide way 6 slips, and laterally fixed installation upper bracket 7 on the travelling car 3 is installed two arc-shaped guide rails 4 on the upper bracket 7; Article two, the shop is installed on the arc-shaped guide rail 4 hangs dolly 5, the shop hangs dolly 5 and can slide along arc-shaped guide rail 4.During use, at first through longitudinal moving device 2 the present invention is moved in the tunnel that needs construction, be moved to the left horizontal travelling car 3 and make the shop hang dolly 5 applying tunnel inner left wall, the shop hangs dolly 5 and slides along arc-shaped guide rail 4, and inner left wall is laid splash guard in the tunnel; When pawnshop extension dolly 5 moved to the top of arc-shaped guide rail 4, the horizontal travelling car 3 that moves right made the shop hang right side, dolly 5 applying tunnel inwall, and the shop hangs dolly 5 continuation operations, lays right side, tunnel inwall and lays splash guard.Compared with prior art, the present invention can adapt to the construction of laying splash guard in the different tunnels, adjusts flexibly according to the shape of tunnel inwall, need not to design again to each tunnel.
In order to adapt to the constructing tunnel requirement of differing heights, as shown in Figure 1, several hydraulic jack 40 are installed between described pedestal 1 and the cross slide way 6.For the high height tunnel, when pawnshop extension dolly 5 runs to the top of arc-shaped guide rail 4,, make the shop hang dolly 5 tunnel upper inside wall and coincide through hydraulic jack lifting cross slide way 6.
In order to realize the synchronous working of each hydraulic jack 40,, several chain wheel supports 60 are installed on the pedestal 1 like Fig. 1 and shown in Figure 8; Sprocket wheel 54 is installed on each chain wheel support 60; Mounting crank 56 on the sprocket wheel 54, crank 56 upper hinge connecting rods 57, and slide block 55 is installed in connecting rod 57 lower ends; On the described hydraulic jack 40 spanner 58 is set, through hole 59 is offered in spanner 58 outer ends, and slide block 55 matches with through hole 59; Chain wheel drive device supporting seat 64 is installed on the pedestal 1, chain wheel drive device 63 is installed on the chain wheel drive device supporting seat 64, the output shaft of chain wheel drive device 63 is connected with chain driving wheel 62, and chain driving wheel 62 is connected with sprocket wheel 54 through chain 61.During lifting cross track 6, chain wheel drive device 63 drives sprocket wheel 54, moves back and forth thereby drive spanner 58, makes each hydraulic jack 40 hold up cross slide way 6 synchronously through chain 61.As shown in Figure 9, electromagnetic cage 71 is installed on the pedestal 1, electromagnetic cage 71 outside mounting guide sleeve 68 are provided with electromagnet 70 in the guide pin bushing 68, and mounting spring 69 on the electromagnet 70, and magnet 66 is installed in spring 69 outer ends, and magnet 66 is corresponding with pressure relief press button 65 on the hydraulic jack 40.When reducing hydraulic jack 40, switch on simultaneously through electromagnet 70, make magnet 66 pin pressure relief press button 65, realize the decline of hydraulic jack 40; After the outage, under the effect of spring 69, magnet 66 is pulled.Conventional hydraulic oil circuit control hydraulic jack need break off oil circuit when withstanding on maintenance, keeps in repair again; In case oil pipe is damaged, hydraulic pressure is revealed, and causes interior drops, and all hydraulic jack all can descend, and impacts for the laying of splash guard.Hydraulic jack 40 among the present invention is simple and mechanical connection, and installation and removal are convenient and swift, only connects through chain 61 each other, and is comparatively independent, is convenient to the maintenance of single hydraulic jack; Because each hydraulic jack 40 is separate work, timely one is caused decline because of internal drop is low, also can not have influence on the load-bearing work of other hydraulic jack 40.
As shown in Figure 5, described arc-shaped guide rail 4 is " worker " font, and described shop hangs dolly 5 and comprises vehicle frame 31; Mounting axles 41, splash guard axle 23 and driving-chain seat 30 on the vehicle frame 31; Wheel 28 is installed on the axletree 41, and wheel 28 matches with arc-shaped guide rail 4, and the “ Xi is installed in axletree 41 outsides " font screens piece 27; groove of screens piece 27 matches with arc-shaped guide rail 4 upper edges, and screens piece 27 can prevent that the shop from hanging dolly 5 and being fixed on the arc-shaped guide rail 4; Described upper bracket 7 bottom left end installing drive devices 8; Connect drive sprocket 10 on the drive unit 8; Upper bracket 7 bottom surface merchants install several upper bracket driven sprockets 11; As shown in Figure 2, several guide rail driven sprockets 9 are installed on the arc-shaped guide rail 4, drive sprocket 10, guide rail driven sprocket 9 and upper bracket driven sprocket 11 are provided with driving-chain 12; Driving-chain seat 30 is installed on the driving-chain 12.Splash guard is placed on the splash guard axle 23; Splash guard one end shop is fixedly on the tunnel inwall; The shop hangs dolly 4, and arc-shaped guide rail 4 slides in the drive lower edge of drive unit 8 through driving-chain 12, and splash guard is laid on the tunnel inwall, is being fixed on the tunnel inwall through modes such as nail catchers.Be fixed on the arc-shaped guide rail 4 in order further to spread extension dolly 5; As shown in Figure 6, arc-shaped guide rail 4 inboards are provided with wood side-guide 73, and the shop hangs dolly 5 both sides pulley bracket 72 is installed; Directive wheel 51 in the middle of being provided with on the pulley bracket 72; Side directive wheel 52 is set respectively up and down, and middle directive wheel 51 is along the inner slide of arc-shaped guide rail 4, and side directive wheel 52 slides on side guide 73.This structure can prevent that the shop from hanging dolly 5 and dropping, and makes on its more firm fixedly arc-shaped guide rail 4.
For the ease of the laying of splash guard, as shown in Figure 3, described vehicle frame 31 is installed stapling apparatus 24; Described stapling apparatus 24 comprises hinge seat 42; Hinge seat 42 is fixedly mounted on the vehicle frame 31, and hinge seat 32 upper hinges are installed hinge-rod 43, and hinge-rod 43 front ends are installed pinch roller 44; The wheel shaft of pinch roller 44 is parallel with splash guard axle 23, and the both sides of hinge-rod 43 swaying directions are installed extension spring 45 respectively and between the vehicle frame 31.Pinch roller 44 compresses the splash guard of having laid under the effect of extension spring 45 and hinge-rod 43, hang moving of dolly 5 through the shop, and splash guard is pressed on the tunnel inwall by pinch roller 44, thereby accomplishes shop extension process.This structure compresses splash guard with conventional artificial and changes mechanical compaction into, not only uses manpower and material resources sparingly, and compresses more evenly in a down-to-earth manner, has improved the efficient that the shop hangs splash guard.
Promote for ease and splash guard is transported to and is installed in the shop hang on the dolly 5, like Fig. 1 and shown in Figure 7, described upper bracket 7 bottom left ends are installed material lifting appliance 17; Described material loading lifting appliance 17 comprises lifting drive unit 39 and pillar 38; Promote drive unit 39 and form by motor, reducer and hoist engine, pillar 38 top rotating driving devices 34, rotating driving device 34 is made up of motor and reduction box; Reduction gearbox output shaft is arranged on the top and rotating seat 13 is installed; Turning arm 36 is installed on rotating seat 13 tops, and turning arm 36 tops and bottom are installed pulley 32 respectively, and stay cord 37 is set on the pulley 32; Stay cord 37 1 ends connect material loading lifting appliance 17, and suspension hook 33 is set on the other end.Select turning arms 36 through rotating seat 13, suspension hook 33 is put down, splash guard is hung on the suspension hook 33, splash guard is transported to the shop hangs near the dolly 5, splash guard is seated on the splash guard axle 23 through promoting drive unit 39.Because splash guard is heavier, installation process meets accident easily, through 17 transportations of material loading lifting appliance and installation, can reduce labour intensity, strengthens construction safety, and is quick and easy for installation, increases efficient.
Described longitudinal moving device 2 comprises lower carriage 35; As shown in Figure 1, lower carriage 35 top mounting bases 1, vertical movable driving equipment 19 is installed in lower carriage 35 bottom surfaces; Vertical movable driving equipment 19 is made up of motor and wheel, and wheel cooperates with the track 22 of laying in the tunnel; Lower platform 14 is installed in lower carriage 35 outsides.Described lower platform 14 comprises fixed platform 26 and sliding platform 46; As shown in Figure 4, fixed platform 26 is an inner hollow, and port 48 is offered in the outer end; Sliding platform 46 inserts in the fixed platform 26 through port 48; Several first bolts hole 47 are set on the fixed platform 26, offer second bolt hole 49 on the sliding platform 46, fixed platform 26 is connected through fastening bolt 50 with sliding platform 46.Staircase 20 down is installed on the longitudinal moving device 2, and lower platform 14 can be adjusted according to the width of tunnel bottom, makes things convenient for workman's operation on lower platform 14, need not to be fond of in addition operation platform, ensures the completion of middle and lower part, tunnel work.
Lateral driver device 21 is installed on the described horizontal travelling car 3, and as shown in Figure 1, lateral driver device is by being made up of motor and wheel, and wheel matches with cross track 6.Described horizontal travelling car 3 is installed lift platform 15.The up-down of lift platform 15 realizes through cutting fork device 18.Install staircase 75 between lift platform 15 and the upper bracket 7.Lift platform 15 goes up and down can assist the workman of different heights to lay the splash guard of tunnel top.
For making things convenient for workman's differing heights construction in the tunnel, as shown in Figure 1, platform 16 in several is set on upper bracket 7, connect through middle staircase 74 between the middle up and down platform 16.
Technical scheme of the present invention is not restricted in the scope of embodiment of the present invention.The present invention not technology contents of detailed description is known technology.

Claims (10)

1. tunnel water proofing plate shop mounts and puts; Comprise that pedestal (1), longitudinal moving device (2), upper bracket (7), arc-shaped guide rail (4) and shop hang dolly (5); It is characterized in that: longitudinal moving device (2) is installed bottom the pedestal (1), and pedestal (1) is gone up cross slide way (6) is installed, and cross slide way (6) is gone up installation can be along the horizontal travelling car (3) of cross slide way (6) slip; Laterally travelling car (3) is gone up fixed installation upper bracket (7); Upper bracket (7) is gone up two arc-shaped guide rails (4) is installed, and two arc-shaped guide rails (4) are gone up to install to spread and hung dolly (5), and the shop hangs dolly (5) and can slide along arc-shaped guide rail (4).
2. tunnel water proofing plate according to claim 1 shop mounts puts, and it is characterized in that: several hydraulic jack (40) are installed between described pedestal (1) and the cross slide way (6).
3. tunnel water proofing plate according to claim 2 shop mounts puts; It is characterized in that: pedestal (1) is gone up several chain wheel supports (60) is installed; Each chain wheel support (60) is gone up sprocket wheel (54) is installed; Sprocket wheel (54) is gone up mounting crank (56), crank (56) upper hinge connecting rod (57), and slide block (55) is installed in connecting rod (57) lower end; Spanner (58) is set on the described hydraulic jack (40), and through hole (59) is offered in spanner (58) outer end, and slide block (55) matches with through hole (59); Pedestal (1) is gone up chain wheel drive device supporting seat (64) is installed; Chain wheel drive device supporting seat (64) is gone up chain wheel drive device (63) is installed; The output shaft of chain wheel drive device (63) is connected with chain driving wheel (62), and chain driving wheel (62) is connected with sprocket wheel (54) through chain (61); Pedestal (1) is gone up electromagnetic cage (71) is installed; Electromagnetic cage (71) outside mounting guide sleeve (68); Electromagnet (70) is set in the guide pin bushing (68); Electromagnet (70) is gone up mounting spring (69), and magnet (66) is installed in spring (69) outer end, and magnet (66) is corresponding with pressure relief press button (65) on the hydraulic jack (40).
4. tunnel water proofing plate according to claim 1 shop mounts puts; It is characterized in that: described arc-shaped guide rail (4) is " worker " font; Described shop hangs dolly (5) and comprises vehicle frame (31); Vehicle frame (31) is gone up mounting axles (41), splash guard axle (23) and driving-chain seat (30), and axletree (41) is gone up wheel (28) is installed, and wheel (28) matches with arc-shaped guide rail (4); The “ Xi is installed in axletree (41) outside " font screens piece (27), the groove of screens piece (27) matches with arc-shaped guide rail (4) upper edge; Described upper bracket (7) bottom left end installing drive device (8); Drive unit (8) is gone up and is connected drive sprocket (10); Upper bracket (7) bottom surface merchant installs several upper bracket driven sprockets (11); Arc-shaped guide rail (4) is gone up several guide rail driven sprockets (9) is installed, and drive sprocket (10), guide rail driven sprocket (9) and upper bracket driven sprocket (11) are provided with driving-chain (12); Driving-chain seat (30) is installed on the driving-chain (12).
5. tunnel water proofing plate according to claim 4 shop mounts puts; It is characterized in that: described vehicle frame (31) is installed stapling apparatus (24); Described stapling apparatus (24) comprises hinge seat (42); Hinge seat (42) is fixedly mounted on the vehicle frame (31), and hinge seat (32) upper hinge is installed hinge-rod (43), and hinge-rod (43) front end is installed pinch roller (44); The wheel shaft of pinch roller (44) is parallel with splash guard axle (23), and the both sides of hinge-rod (43) swaying direction respectively and extension spring (45) is installed between the vehicle frame (31).
6. tunnel water proofing plate according to claim 1 shop mounts puts; It is characterized in that: described upper bracket (7) bottom left end is installed material lifting appliance (17); Described material loading lifting appliance (17) comprises lifting drive unit (39) and pillar (38); Promote drive unit (39) and form by motor, reducer and hoist engine, pillar (38) top rotating driving device (34), rotating driving device (34) is made up of motor and reduction box; Reduction gearbox output shaft is arranged on the top and rotating seat (13) is installed; Turning arm (36) is installed on rotating seat (13) top, and turning arm (36) top and bottom are installed pulley (32) respectively, and stay cord (37) is set on the pulley (32); Stay cord (37) one ends connect material loading lifting appliance (17), and suspension hook (33) is set on the other end.
7. tunnel water proofing plate according to claim 1 shop mounts puts; It is characterized in that: described longitudinal moving device (2) comprises lower carriage (35); Lower carriage (35) top mounting base (1); Vertical movable driving equipment (19) is installed in lower carriage (35) bottom surface, and vertical movable driving equipment (19) is made up of motor and wheel, and wheel cooperates with the track (22) of laying in the tunnel; Lower platform (14) is installed in lower carriage (35) outside.
8. tunnel water proofing plate according to claim 7 shop mounts puts; It is characterized in that: described lower platform (14) comprises fixed platform (26) and sliding platform (46); Fixed platform (26) is an inner hollow; Port (48) is offered in the outer end, and sliding platform (46) inserts in the fixed platform (26) through port (48), and several first bolts hole (47) are set on the fixed platform (26); Offer second bolt hole (49) on the sliding platform (46), fixed platform (26) is connected through fastening bolt (50) with sliding platform (46).
9. tunnel water proofing plate according to claim 1 shop mounts puts; It is characterized in that: described horizontal travelling car (3) is gone up lateral driver device (21) is installed; Lateral driver device is by being made up of motor and wheel, and wheel matches with cross track (6).
10. tunnel water proofing plate according to claim 1 shop mounts puts, and it is characterized in that: described horizontal travelling car (3) is installed lift platform (15).
CN 201110286330 2011-09-25 2011-09-25 Tunnel waterproof board spreading and hanging device Expired - Fee Related CN102359385B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110286330 CN102359385B (en) 2011-09-25 2011-09-25 Tunnel waterproof board spreading and hanging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110286330 CN102359385B (en) 2011-09-25 2011-09-25 Tunnel waterproof board spreading and hanging device

Publications (2)

Publication Number Publication Date
CN102359385A true CN102359385A (en) 2012-02-22
CN102359385B CN102359385B (en) 2013-08-21

Family

ID=45584757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110286330 Expired - Fee Related CN102359385B (en) 2011-09-25 2011-09-25 Tunnel waterproof board spreading and hanging device

Country Status (1)

Country Link
CN (1) CN102359385B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103216249A (en) * 2013-04-02 2013-07-24 中国矿业大学 Waterproof support method of water sump of water-swellable soft rock of underground coal mine
CN103334579A (en) * 2013-06-08 2013-10-02 武汉武船重型装备工程有限责任公司 Slipping platform used for mounting arched roof truss with steel structure
CN103835727A (en) * 2014-03-31 2014-06-04 中铁西南科学研究院有限公司 Extended type multi-platform railway tunnel operation trolley
CN105178988A (en) * 2015-09-30 2015-12-23 中铁工程装备集团有限公司 Tunnel waterproof plate paving and hanging clamping device
CN106194220A (en) * 2016-08-29 2016-12-07 石家庄铁道大学 Tunnel splash guard installs chassis
CN106988770A (en) * 2017-05-19 2017-07-28 龚岗 Geotextiles waterproof cloth and two lined steel muscle are plated in integrated bogie hearth
CN107327309A (en) * 2017-09-01 2017-11-07 中铁局集团有限公司 A kind of anchor bar of waterproof plate in tunnels lays chassis
CN107401148A (en) * 2017-06-14 2017-11-28 中国水利水电第四工程局有限公司 A kind of ultra-deep buries the waterproof method and water proof equipment of seepage tunnel
CN107575251A (en) * 2017-10-13 2018-01-12 湖南五新隧道智能装备股份有限公司 Waterproof construction chassis of the waterproof construction with moveable arm group and comprising this arm group
CN107654242A (en) * 2017-10-13 2018-02-02 湖南五新隧道智能装备股份有限公司 A kind of waterproof construction arm group
CN107905822A (en) * 2017-09-13 2018-04-13 北京建工土木工程有限公司 A kind of large cross-section tunnel moves adjustable waterproof construction trolley
CN108468558A (en) * 2018-05-31 2018-08-31 中铁隧道集团二处有限公司 A kind of anchor bar of waterproof plate in tunnels laying trolley with multiple degrees of freedom regulatory function
CN108917694A (en) * 2018-07-16 2018-11-30 三峡大学 Deformation monitoring and the device and method of supporting after a kind of tunnel Rock And Soil excavates
CN109458198A (en) * 2018-12-29 2019-03-12 贵州大学 A kind of constructing tunnel waterproof material laying trolley
CN109467028A (en) * 2018-12-26 2019-03-15 中铁八局集团电务工程有限公司 A kind of installation exercise device of tunnel cable
CN113958335A (en) * 2021-10-14 2022-01-21 成都大学 Hydraulic lifting rack for construction of multi-variable-section connecting channel of tunnel and construction method
CN116220731A (en) * 2023-03-14 2023-06-06 广东威恒输变电工程有限公司 Method for installing tunnel pipe joint arc-shaped support

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003239697A (en) * 2002-02-13 2003-08-27 Kensan Lease Kk Tunnel interior-finish working device
CN201627587U (en) * 2010-03-25 2010-11-10 中国建筑第八工程局有限公司 Overhang operating platform fixedly connected onto complete sectional hydraulic trolley
CN201884037U (en) * 2010-12-10 2011-06-29 中铁隧道集团有限公司 Tunnel waterproof material layering device
CN102135001A (en) * 2011-03-25 2011-07-27 中铁三局集团有限公司 Device for paving tunnel waterproof boards
CN202273689U (en) * 2011-09-25 2012-06-13 中铁十四局集团有限公司 Pave hanging device for tunnel waterproof plate

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003239697A (en) * 2002-02-13 2003-08-27 Kensan Lease Kk Tunnel interior-finish working device
CN201627587U (en) * 2010-03-25 2010-11-10 中国建筑第八工程局有限公司 Overhang operating platform fixedly connected onto complete sectional hydraulic trolley
CN201884037U (en) * 2010-12-10 2011-06-29 中铁隧道集团有限公司 Tunnel waterproof material layering device
CN102135001A (en) * 2011-03-25 2011-07-27 中铁三局集团有限公司 Device for paving tunnel waterproof boards
CN202273689U (en) * 2011-09-25 2012-06-13 中铁十四局集团有限公司 Pave hanging device for tunnel waterproof plate

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103216249A (en) * 2013-04-02 2013-07-24 中国矿业大学 Waterproof support method of water sump of water-swellable soft rock of underground coal mine
CN103216249B (en) * 2013-04-02 2014-12-10 中国矿业大学 Waterproof support method of water sump of water-swellable soft rock of underground coal mine
CN103334579A (en) * 2013-06-08 2013-10-02 武汉武船重型装备工程有限责任公司 Slipping platform used for mounting arched roof truss with steel structure
CN103835727A (en) * 2014-03-31 2014-06-04 中铁西南科学研究院有限公司 Extended type multi-platform railway tunnel operation trolley
CN105178988A (en) * 2015-09-30 2015-12-23 中铁工程装备集团有限公司 Tunnel waterproof plate paving and hanging clamping device
CN106194220A (en) * 2016-08-29 2016-12-07 石家庄铁道大学 Tunnel splash guard installs chassis
CN106988770A (en) * 2017-05-19 2017-07-28 龚岗 Geotextiles waterproof cloth and two lined steel muscle are plated in integrated bogie hearth
CN106988770B (en) * 2017-05-19 2023-04-14 龚岗 Geotextile waterproof cloth and two-lining reinforcing steel bar laying and laying integrated trolley
CN107401148A (en) * 2017-06-14 2017-11-28 中国水利水电第四工程局有限公司 A kind of ultra-deep buries the waterproof method and water proof equipment of seepage tunnel
CN107401148B (en) * 2017-06-14 2019-08-13 中国水利水电第四工程局有限公司 A kind of ultra-deep buries the waterproof method and water proof equipment of seepage tunnel
CN107327309A (en) * 2017-09-01 2017-11-07 中铁局集团有限公司 A kind of anchor bar of waterproof plate in tunnels lays chassis
CN107905822A (en) * 2017-09-13 2018-04-13 北京建工土木工程有限公司 A kind of large cross-section tunnel moves adjustable waterproof construction trolley
CN107575251A (en) * 2017-10-13 2018-01-12 湖南五新隧道智能装备股份有限公司 Waterproof construction chassis of the waterproof construction with moveable arm group and comprising this arm group
CN107654242A (en) * 2017-10-13 2018-02-02 湖南五新隧道智能装备股份有限公司 A kind of waterproof construction arm group
CN108468558A (en) * 2018-05-31 2018-08-31 中铁隧道集团二处有限公司 A kind of anchor bar of waterproof plate in tunnels laying trolley with multiple degrees of freedom regulatory function
CN108917694B (en) * 2018-07-16 2020-04-24 三峡大学 Device and method for monitoring and supporting deformation of tunnel rock-soil body after excavation
CN108917694A (en) * 2018-07-16 2018-11-30 三峡大学 Deformation monitoring and the device and method of supporting after a kind of tunnel Rock And Soil excavates
CN109467028A (en) * 2018-12-26 2019-03-15 中铁八局集团电务工程有限公司 A kind of installation exercise device of tunnel cable
CN109467028B (en) * 2018-12-26 2023-12-22 中铁八局集团电务工程有限公司 Installation operation device for tunnel cable
CN109458198A (en) * 2018-12-29 2019-03-12 贵州大学 A kind of constructing tunnel waterproof material laying trolley
CN113958335A (en) * 2021-10-14 2022-01-21 成都大学 Hydraulic lifting rack for construction of multi-variable-section connecting channel of tunnel and construction method
CN113958335B (en) * 2021-10-14 2024-03-26 成都大学 Hydraulic lifting rack for tunnel variable cross-section connecting channel construction and construction method
CN116220731A (en) * 2023-03-14 2023-06-06 广东威恒输变电工程有限公司 Method for installing tunnel pipe joint arc-shaped support
CN116220731B (en) * 2023-03-14 2023-11-10 广东威恒输变电工程有限公司 Method for installing tunnel pipe joint arc-shaped support

Also Published As

Publication number Publication date
CN102359385B (en) 2013-08-21

Similar Documents

Publication Publication Date Title
CN102359385B (en) Tunnel waterproof board spreading and hanging device
CN101809248B (en) Inland rig
CN202273689U (en) Pave hanging device for tunnel waterproof plate
CN202148909U (en) Operation vehicle for mounting tunnel arch trusses
CN103726421B (en) Height and span adjustable track paver for metro construction
CN104632088B (en) Oil-well rig derrick set assembly/installation method
CN105003082A (en) Glass curtain wall mounting equipment and glass curtain mounting method
CN106523002A (en) Double-track-set type waterproof cloth trolley
CN204400479U (en) Mining hydraulic lifting appliance
CN115596463A (en) Arch frame installation device for repairing operated tunnel defects
CN202808301U (en) Equipment moving machine for moving adhesive tape conveying equipment
CN105152097A (en) Sliding-plug door installation lifting device
CN204571885U (en) A kind of telescopic derrick formula coiled tubing work vehicle
CN203684019U (en) Height and span adjustable track laying machine for subway construction
CN112049584A (en) Elevated catwalk
CN204113341U (en) A kind of levelling is from moving device train
KR20140003820U (en) Apparatus for installing a pipe
CN104234748A (en) Self-moving type equipment train capable of realizing leveling
CN101537982B (en) Underground orbital transfer hydraulic crane truck
CN104481417B (en) Linear guide rail type speed apparatus for feeding for vehicle-mounted drilling machine for coal bed gas
CN103128528A (en) Fully-mechanized coal mining equipment hoisting installation car
CN207513573U (en) Blowout preventer transfer device
CN105731311B (en) Rectangular co-ordinate rail carry loads and unloads robot
CN219910864U (en) Electric control hydraulic type ladder stand device
CN217708641U (en) Track slab replacing device and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160620

Address after: 250014 Heping Road, Shandong, Ji'nan, No. 1

Patentee after: CHINA RAILWAY SHISIJU Group Corp.

Patentee after: THE SECOND ENGINEERING CO., LTD. OF CHINA RAILWAY 14TH BUREAU GROUP Co.,Ltd.

Address before: 250014 Heping Road, Shandong, Ji'nan, No. 1

Patentee before: CHINA RAILWAY SHISIJU Group Corp.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130821

CF01 Termination of patent right due to non-payment of annual fee