CN201884037U - Tunnel waterproof material layering device - Google Patents

Tunnel waterproof material layering device Download PDF

Info

Publication number
CN201884037U
CN201884037U CN 201020652830 CN201020652830U CN201884037U CN 201884037 U CN201884037 U CN 201884037U CN 201020652830 CN201020652830 CN 201020652830 CN 201020652830 U CN201020652830 U CN 201020652830U CN 201884037 U CN201884037 U CN 201884037U
Authority
CN
China
Prior art keywords
laying
vehicle frame
chassis
track
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201020652830
Other languages
Chinese (zh)
Inventor
洪开荣
张少华
王伟
张宁川
李建斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunneling Equipment Co Ltd
China Railway Tunnel Group Co Ltd CRTG
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN 201020652830 priority Critical patent/CN201884037U/en
Application granted granted Critical
Publication of CN201884037U publication Critical patent/CN201884037U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a tunnel waterproof material layering device, which substitutes manual laying and supporting operation of waterproof materials in tunnel waterproof construction. The tunnel waterproof material layering device comprises a trolley traveling device, a waterproof material mounting device, a laying device, a supporting device, a laying track and a layering trolley. The tunnel waterproof material layering device is convenient in disassembly and assembly, and labor intensity and manual cost in layering of large-width tunnel waterproof materials are reduced while laying efficiency and quality are enhanced. The laying device is mainly applied to mechanical layering of waterproof materials such as geotextiles and waterproof boards in tunnel waterproof works, such as national defense/civil air defense works, railway/ submarine tunnel, urban subway/hydroelectricity, highway communication and the like.

Description

Tunnel water proofing material-paving device
Technical field
The utility model relates to tunnel special mechanical equipment technical field, is specifically related to a kind of device of tunnel recombination lining cutting waterproofing course waterproof material laying construction.
Background technology
In the tunnel waterproofing engineering in modern times, the composite lining waterproof technique has obtained widespread usage; Need on the section in tunnel, successively lay waterproofing materialss such as geotextiles and splash guard in its work progress, to reach the purpose that prevents percolating water in the tunnel.At present, the laying of domestic tunnel water proofing material adopts the artificial club jacking of traditional scaffold to lay.This kind job practices labour intensity is big, laying efficient is low, the overlap joint scale error is big, is difficult to satisfy the requirement of construction speed and construction quality.
Therefore, how can find and a kind ofly can either improve laying efficient, can improve the laying apparatus of the tunnel water proofing material of laying quality and then accelerating construction progress again, be a problem of needing solution badly.
Summary of the invention
In order to overcome above-mentioned deficiency of the prior art, the utility model provides a kind of laying apparatus that is used for the construction of tunnel water proofing material-paving that can accelerating construction progress can improve efficiency of construction and quality again.
The purpose of this utility model is achieved in that
Tunnel water proofing material-paving device comprises: trolley running device, waterproofing materials erecting device, laying apparatus, bracing or strutting arrangement, laying track, laying chassis;
The trolley running device comprises the trolley running device of both sides, and the trolley running device is installed in lays the chassis bottom of frame, realizes the walking of chassis;
The waterproofing materials erecting device comprises waterproofing materials installation dolly, and waterproofing materials is installed dolly and is installed in the left and right sides sidepiece of laying the chassis vehicle frame;
Laying apparatus comprises lays dolly, wire rope, two-way hoist engine, assembly pulley; Assembly pulley and two-way hoist engine are arranged on to be laid on the chassis vehicle frame, and wire rope is wrapped on the two-way hoist engine by assembly pulley, and the two ends of wire rope are hinged on the both sides of laying dolly, and two-way hoist engine work drives lays dolly along laying orbital motion;
Bracing or strutting arrangement comprises support cylinder and hydraulic control device, and support cylinder is circle-shaped and is hingedly mounted on the track, the expanding-contracting action of hydraulic control device control support cylinder;
Lay track and comprise track and rail supported, track is fixed on by the rail supported bolt and lays chassis vehicle frame top;
Laying chassis comprises laying chassis vehicle frame, lays job platform, chassis lifting gear, lay the job platform bolt and be fixed on the both sides of laying the chassis vehicle frame, chassis lifting gear bolt is installed in the bottom of chassis vehicle frame, and the bottom of chassis lifting gear and trolley running device are articulated and connected.
Lay the conformal laying track equidistant with tunnel contour is installed on the chassis vehicle frame.
Lay dolly and comprise trailing arm, adjust leading screw, lay the radius adjusting device, vehicle frame, screw-button; Trailing arm one end is hinged on the vehicle frame, and middle part and adjustment leading screw one end are hinged; The other end and the vehicle frame of adjusting leading screw are hinged; Lay radius adjusting device bottom and vehicle frame welding; Screw-button is installed in trailing arm other end end.
Owing to adopted technique scheme, the utlity model has following beneficial effect:
Disassembly and assembly are convenient, for laying the big fabric width waterproofing materials in tunnel, improved laying work efficiency and quality again when reducing labour intensity and cost of labor; This novel laying apparatus can be applicable in the tunnel waterproofing engineerings such as national defence/civil air defense constructions and installations, railway/seabed tunnel, city underground/water power and highway communication; This novel laying apparatus can be used for the mechanization of waterproofing materials such as geotextiles, splash guard and lays.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the special-purpose structural representation of laying dolly and support cylinder;
Among the figure:
1, trolley running device;
2-1, waterproofing materials are installed dolly; 2-2, waterproofing materials are installed dolly;
3-1, waterproofing materials; 3-2, waterproofing materials;
4-1, support cylinder; 4-2, support cylinder; 4-3, support cylinder; 4-4, support cylinder; 4-5, support cylinder; 4-6, support cylinder; 4-7, support cylinder; 4-8, support cylinder; 4-9, support cylinder; 4-10, support cylinder; 4-11, support cylinder; 4-12, support cylinder;
5, lay dolly; 6, track; 7, lay job platform; 8, lay the chassis vehicle frame; 9, two-way hoist engine; 10, rail supported; 11, wire rope; 12, assembly pulley; 13, hydraulic control device; 14, chassis lifting gear; 15, trailing arm; 16, adjust leading screw; 17, lay the radius adjusting device; 18, vehicle frame; 19, screw-button; 20, lay cylinder.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is further described:
In conjunction with Fig. 1, Fig. 2, tunnel water proofing material-paving device comprises: trolley running device, waterproofing materials erecting device, laying apparatus, bracing or strutting arrangement, laying track, laying chassis;
The trolley running device comprises the trolley running device 1 of both sides, and both sides trolley running device 1 is installed in respectively lays chassis vehicle frame 8 bottoms, realizes the walking of chassis;
The waterproofing materials erecting device comprises that waterproofing materials is installed dolly 2-1 and waterproofing materials is installed dolly 2-2, and waterproofing materials is installed dolly and is installed in the left and right sides sidepiece of laying chassis vehicle frame 8;
Laying apparatus comprises lays dolly 5, wire rope 11, two-way hoist engine 9, assembly pulley 12; Assembly pulley 12 and two-way hoist engine 9 are arranged on to be laid on the chassis vehicle frame 8, and two-way hoist engine 9 is positioned at the upper middle position of laying chassis vehicle frame 8, and assembly pulley 12 is symmetricly set on the both sides of two-way hoist engine 9; Wire rope 11 is wrapped on the two-way hoist engine 9 by assembly pulley 12, and the two ends of wire rope 11 are hinged on lays dolly 5 both sides, and two-way hoist engine 9 work drive laying dolly 5 by wire rope 11 and move along laying track 6;
Bracing or strutting arrangement comprises support cylinder 4 and hydraulic control device 13, and support cylinder 4 is circle-shaped and is hingedly mounted on the track 6, the expanding-contracting action of hydraulic control device 13 control support cylinders 4;
Lay track and comprise track 6 and rail supported 10, track 6 is fixed on by rail supported 10 bolts and lays chassis vehicle frame 8 tops;
Laying chassis comprises laying chassis vehicle frame 8, lays job platform 7, chassis lifting gear 14, lay job platform 7 bolts and be fixed on the both sides of laying chassis vehicle frame 8, chassis lifting gear 14 bolts are installed in the bottom of chassis vehicle frame 8, and the bottom of chassis lifting gear 14 and trolley running device 1 are articulated and connected;
Lay the conformal laying track 6 equidistant with tunnel contour is installed on the chassis vehicle frame 8, two-way hoist engine 9 drives laying dolly 5 and lays along laying tracks 6, then circle-shaped support cylinder 4 supports, thereby the mechanization that realizes waterproofing materials is laid automatically and supported.
Comprise trailing arm 15 in conjunction with Fig. 3, laying dolly 5, adjust leading screw 16, lay radius adjusting device 17, vehicle frame 18, screw-button 19; Trailing arm 15 1 ends are hinged on the vehicle frame 18, and middle part and adjustment leading screw 16 1 ends are hinged; The other end and the vehicle frame 18 of adjusting leading screw 16 are hinged; Lay radius adjusting device 17 bottoms and vehicle frame 18 welding; Screw-button 19 is installed in trailing arm 15 other end ends.
The utility model has been realized the laying and the support of mechanization in the construction of tunnel water proofing material, artificial auxiliary welding is fixing; Concrete laying method step is as follows:
(1) firing platform garage walking apparatus 1, and stops to correct position, adjusts chassis lifting gear 14 to proper height;
(2) the waterproofing materials 3-1 of rolling is placed on waterproofing materials in the A side and the mobile suitable distance in back is installed on the dolly 2-1 to laying dolly 5, and be fixed on the trailing arm 15 with screw-button 19;
(3) start two-way hoist engine 9, lay dolly 5 and do to move, wait to move to the B rear flank and the whole waterproofing materials 3-2 that rolls up is installed, for two-way laying needs by waterproofing materials installation dolly 2-2 by A--B along conformal laying track 6;
(4) manually pull waterproofing materials 3-1 freely the section of hanging it is supported on lay on the cylinder 20, fine setting is adjusted leading screw 16 and is laid radius adjusting device 17 to suitable laying radius;
(5) the primer fluid pressure control device 13, make B side support cylinder 4-12 stretch out the freely section of hanging that compresses waterproofing materials 3-1;
(6) start two-way hoist engine 9 once more, lay dolly 5 and lay track 6 along conformal and do by the moving of B-A direction, the waterproofing materials 3-1 of whole volume launches along the tunnel cross-section circumference gradually;
(7) support cylinder 4-11~support cylinder 4-1 stretches out in proper order subsequently and supports and compress the splash guard of having laid, until having spread the tunnel cross-section that needs;
(8) independent as required or every group of support cylinder 4-12~support cylinder 4-1 of interlock control carries out fixing or welding of waterproofing materials on laying job platform 7;
(9) the fixing end, withdrawal support cylinder 4-12~support cylinder 4-1;
(10) after the A side is installed waterproofing materials once more, begin to carry out next circulation from step (4) and lay operation.
For the first time laying operation is to need execution in step 1,2,3, need not this step later on.
The utility model disassembly and assembly are convenient, improved laying work efficiency and quality again when laying big fabric width waterproofing materials in the tunnel when reducing labour intensity and cost of labor; This novel laying apparatus is mainly used in the mechanization of waterproofing materials in the tunnel waterproofing engineerings such as national defence/civil air defense constructions and installations, railway/seabed tunnel, city underground/water power and highway communication such as geotextiles, splash guard and lays.
Above embodiment only is used to illustrate preferred implementation of the present utility model; but the utility model is not limited to above-mentioned embodiment; in the ken that described field those of ordinary skill is possessed; any modification of being done within spirit of the present utility model and the principle, be equal to and substitute and improvement etc., it all should be encompassed within the technical scheme scope that the utility model asks for protection.

Claims (3)

1. tunnel water proofing material-paving device comprises: trolley running device, waterproofing materials erecting device, laying apparatus, bracing or strutting arrangement, laying track, laying chassis; It is characterized in that:
The trolley running device comprises the trolley running device (1) of both sides, and both sides trolley running devices (1) are installed in lays chassis vehicle frame (8) bottom, realizes the walking of chassis;
The waterproofing materials erecting device comprises waterproofing materials installation dolly (2), and waterproofing materials is installed dolly (2) and is installed in the left and right sides sidepiece of laying chassis vehicle frame (8);
Laying apparatus comprises lays dolly (5), wire rope (11), two-way hoist engine (9), assembly pulley (12); Assembly pulley (12) and two-way hoist engine (9) are arranged on to be laid on the chassis vehicle frame (8), wire rope (11) is wrapped on the two-way hoist engine (9) by assembly pulley (12), the two ends of wire rope (11) are hinged on the both sides of laying dolly (5), and two-way hoist engine (9) work drives lays dolly (5) along laying track (6) motion;
Bracing or strutting arrangement comprises support cylinder (4) and hydraulic control device (13), and support cylinder (4) is circle-shaped and is hingedly mounted on the track (6), the expanding-contracting action of hydraulic control device (13) control support cylinder (4);
Lay track and comprise track (6) and rail supported (10), track (6) is fixed on by rail supported (10) bolt and lays chassis vehicle frame (8) top;
Laying chassis comprises laying chassis vehicle frame (8), lays job platform (7), chassis lifting gear (14), lay job platform (7) bolt and be fixed on the both sides of laying chassis vehicle frame (8), chassis lifting gear (14) bolt is installed in the bottom of chassis vehicle frame (8), and the bottom of chassis lifting gear (14) and trolley running device (1) are articulated and connected.
2. tunnel water proofing material-paving device according to claim 1 is characterized in that: lay chassis vehicle frame (8) and go up the installation conformal laying track (6) equidistant with tunnel contour.
3. tunnel water proofing material-paving device according to claim 1 is characterized in that: lay dolly (5) and comprise trailing arm (15), adjust leading screw (16), lay radius adjusting device (17), vehicle frame (18), screw-button (19); Trailing arm (15) one ends are hinged on the vehicle frame (18), and middle part and adjustment leading screw (16) one ends are hinged; The other end and the vehicle frame (18) of adjusting leading screw (16) are hinged; Lay radius adjusting device (17) bottom and vehicle frame (18) welding; Screw-button (19) is installed in trailing arm (15) other end end.
CN 201020652830 2010-12-10 2010-12-10 Tunnel waterproof material layering device Expired - Lifetime CN201884037U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201020652830 CN201884037U (en) 2010-12-10 2010-12-10 Tunnel waterproof material layering device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201020652830 CN201884037U (en) 2010-12-10 2010-12-10 Tunnel waterproof material layering device

Publications (1)

Publication Number Publication Date
CN201884037U true CN201884037U (en) 2011-06-29

Family

ID=44181577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201020652830 Expired - Lifetime CN201884037U (en) 2010-12-10 2010-12-10 Tunnel waterproof material layering device

Country Status (1)

Country Link
CN (1) CN201884037U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102061927A (en) * 2010-12-10 2011-05-18 中铁隧道集团有限公司 Tunnel waterproof material laying equipment and method
CN102359383A (en) * 2011-11-10 2012-02-22 川荣重工机械常州有限公司 Waterproof cloth laying trolley
CN102359385A (en) * 2011-09-25 2012-02-22 中铁十四局集团有限公司 Tunnel waterproof board spreading and hanging device
CN108468557A (en) * 2018-05-09 2018-08-31 云南省建设投资控股集团有限公司 Constructing tunnel waterproof cloth cloth hanging device
CN108868836A (en) * 2018-07-06 2018-11-23 中铁二院工程集团有限责任公司 A kind of tunnel lining trolley splash guard supporting member with illumination functions
CN109026081A (en) * 2018-09-03 2018-12-18 湖南五新隧道智能装备股份有限公司 A kind of device for waterproof roll
CN109356624A (en) * 2018-10-09 2019-02-19 福建省三明鑫隆工程机械有限公司 Anchor bar of waterproof plate in tunnels dossal trolley
CN109458198A (en) * 2018-12-29 2019-03-12 贵州大学 A kind of constructing tunnel waterproof material laying trolley
CN109899094A (en) * 2019-04-04 2019-06-18 涪特智能装备(重庆)有限公司 A kind of geotextiles and splash guard are laid with comprehensive trolley and mechanical laying method

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102061927A (en) * 2010-12-10 2011-05-18 中铁隧道集团有限公司 Tunnel waterproof material laying equipment and method
CN102061927B (en) * 2010-12-10 2012-07-18 中铁隧道集团有限公司 Tunnel waterproof material laying equipment and method
CN102359385A (en) * 2011-09-25 2012-02-22 中铁十四局集团有限公司 Tunnel waterproof board spreading and hanging device
CN102359385B (en) * 2011-09-25 2013-08-21 中铁十四局集团有限公司 Tunnel waterproof board spreading and hanging device
CN102359383A (en) * 2011-11-10 2012-02-22 川荣重工机械常州有限公司 Waterproof cloth laying trolley
CN108468557A (en) * 2018-05-09 2018-08-31 云南省建设投资控股集团有限公司 Constructing tunnel waterproof cloth cloth hanging device
CN108868836A (en) * 2018-07-06 2018-11-23 中铁二院工程集团有限责任公司 A kind of tunnel lining trolley splash guard supporting member with illumination functions
CN109026081A (en) * 2018-09-03 2018-12-18 湖南五新隧道智能装备股份有限公司 A kind of device for waterproof roll
CN109026081B (en) * 2018-09-03 2023-07-04 湖南五新隧道智能装备股份有限公司 A device for waterproofing membrane
CN109356624A (en) * 2018-10-09 2019-02-19 福建省三明鑫隆工程机械有限公司 Anchor bar of waterproof plate in tunnels dossal trolley
CN109356624B (en) * 2018-10-09 2023-12-22 福建省三明鑫隆工程机械有限公司 Cloth hanging trolley for tunnel waterproof board
CN109458198A (en) * 2018-12-29 2019-03-12 贵州大学 A kind of constructing tunnel waterproof material laying trolley
CN109899094A (en) * 2019-04-04 2019-06-18 涪特智能装备(重庆)有限公司 A kind of geotextiles and splash guard are laid with comprehensive trolley and mechanical laying method
CN109899094B (en) * 2019-04-04 2024-02-27 涪特智能装备(重庆)有限公司 Comprehensive trolley for laying geotextile and waterproof board and mechanical laying method

Similar Documents

Publication Publication Date Title
CN102061927B (en) Tunnel waterproof material laying equipment and method
CN201884037U (en) Tunnel waterproof material layering device
CN204457802U (en) Formed by integrally casting formula formwork jumbo
CN104632251A (en) Integrally cast type mould plate trolley and construction method of concrete pouring of underground passage
CN106013233B (en) Sliding system and its construction method for underground pipe gallery cast-in-place construction
CN102226402B (en) Auxiliary device and method used for laying tunnel waterproofing plates
CN202733170U (en) Pipeline mounting machine
CN107988861B (en) Subway work complete set of equipments and method of laying a railway track
CN103758541A (en) Trolley and method for laying tunnel waterproof plate
CN110510527A (en) A kind of installation system and its construction method of high slope variable cross-section side slope prefabricated section
CN102094412B (en) Mud-water amphibious plate-inserting device for soft foundation
CN102359383A (en) Waterproof cloth laying trolley
CN110894793A (en) Integrated intelligent trolley for operation in limited space
CN216000894U (en) Template equipment with multi-functional short T type roof beam is prefabricated
CN107964841B (en) A kind of rubber-tyred subway changes paving machine and method for automatically leveling
CN207569332U (en) Mud tube take over auxiliary device after a kind of slurry shield trolley
CN108894802A (en) A kind of waterproof material is laid with trolley and its laying method
CN110439004B (en) Movable inner supporting device for foundation pit support and application method thereof
CN108221512A (en) Adjustable track laying machine
CN216342231U (en) Simple platform for installing tunnel lining structure
CN208684247U (en) A kind of prefabricated subsection hanging apparatus
WO2023025325A1 (en) Construction method for corrugated pipe to pass through pipeline by means of rail sliders in small underground space
CN107587853B (en) Full-rotation full-casing drilling machine
CN202391434U (en) Water-proof cloth laying trolley
CN201924338U (en) Mud-water amphibious soft foundation spile device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY TUNNELING EQUIPMENT CO., LTD.

Effective date: 20111207

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20111207

Address after: Zhuangyuanhong road Luoyang City, Henan province 471009 No. 3 China Railway Tunnel Group Chief Engineer Office

Co-patentee after: China Railway Tunneling Equipment Co., Ltd.

Patentee after: Zhongtie Tunnel Group Co., Ltd.

Address before: Zhuangyuanhong road Luoyang City, Henan province 471009 No. 3 China Railway Tunnel Group Chief Engineer Office

Patentee before: Zhongtie Tunnel Group Co., Ltd.

AV01 Patent right actively abandoned

Granted publication date: 20110629

Effective date of abandoning: 20120718