JPH06144761A - Intermediate frame setting method for moving footpath - Google Patents

Intermediate frame setting method for moving footpath

Info

Publication number
JPH06144761A
JPH06144761A JP32245992A JP32245992A JPH06144761A JP H06144761 A JPH06144761 A JP H06144761A JP 32245992 A JP32245992 A JP 32245992A JP 32245992 A JP32245992 A JP 32245992A JP H06144761 A JPH06144761 A JP H06144761A
Authority
JP
Japan
Prior art keywords
intermediate frame
girder
guide roller
caster
basic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP32245992A
Other languages
Japanese (ja)
Other versions
JP2761828B2 (en
Inventor
Masaaki Etsuno
雅昭 越野
Hideto Umeyama
秀人 梅山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Heavy Industries Ltd
Original Assignee
Sumitomo Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Heavy Industries Ltd filed Critical Sumitomo Heavy Industries Ltd
Priority to JP4322459A priority Critical patent/JP2761828B2/en
Publication of JPH06144761A publication Critical patent/JPH06144761A/en
Application granted granted Critical
Publication of JP2761828B2 publication Critical patent/JP2761828B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Escalators And Moving Walkways (AREA)

Abstract

PURPOSE:To enhance workability, safety assurance and labor saving in works for setting a plurality of intermediate frames over base girders. CONSTITUTION:In the method, a plurality of intermediate frames 2 are set in order over base girders 1 in a form of paired rails disposed in parallel with each other. Each caster 10 rolling over the base girders 1 and each guide roller 11 coming in contact with each side surface of the base girders 1 are fitted on the lower sections of the four corners of each intermediate frame 2, each intermediate frame 2 is then run over the base girders 1 so as to be moved to a set position, and each caster 10 and each guide roller 11 are removed at the aforesaid position, so that setting each intermediate frame 2 over the base girders 1 is thus kept on.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は動く歩道の中間フレーム
設置方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for installing an intermediate frame on a moving walkway.

【0002】[0002]

【従来の技術】従来、動く歩道の設置工事において、傾
斜したフロア上に基礎ガーダを設置し、その上に複数個
(例えば、20〜30個)の中間フレームを取りつける場
合、まず天井に吊ピースを多数取りつけ、それらにチェ
ンブロックを掛け、そして中間フレームをチェンブロッ
クで吊り上げて、つぎつぎと隣のチェンブロックに掛け
かえながら空中移動させ、定位置に設置するようにして
いる。一方、水平のフロア上に動く歩道を設置する場合
は、ハンドリフタで中間フレームを搬送する場合もあ
る。また建物内での使用が可能な場合は、レッカー車や
クレーン車を建物内に乗り入れて中間フレームを吊り下
げて移送することも行なわれている。
2. Description of the Related Art Conventionally, in the construction work of a moving walkway, when installing a basic girder on a sloping floor and mounting a plurality of (for example, 20 to 30) intermediate frames on the foundation girder, first suspend the piece on the ceiling. A large number of are attached, the chain blocks are hung on them, the intermediate frame is hung up by the chain block, and the chain is moved to the next adjacent chain block, moved in the air, and set in a fixed position. On the other hand, when a moving sidewalk is installed on a horizontal floor, the intermediate frame may be transported by a hand lifter. Further, when it can be used in a building, a wrecker or a crane vehicle is loaded into the building and an intermediate frame is hung and transferred.

【0003】[0003]

【発明が解決しようとする課題】中間フレームは1 個当
り400 〜500kg もの重量があり、前記チェンブロックに
よる空中移動は作業性が悪く、きわめて煩雑である。ま
た高所作業や空中作業を伴なうため、安全面でも問題が
ある。さらに天井全面に吊りピースを取りつけるので手
間がかかり、工期が長期化する問題がある。一方、ハン
ドリフタを用いる方法は、1個の中間フレームに対して
2台ないし4台のハンドリフタを用いる必要があり、走
行にあたって作業人数が多くなり、しかも、水平なフロ
アでしか作業ができない問題がある。またレッカー車な
どを用いる方法も、建物内でのレッカー車の移動が規制
されるので、充分に活用できず、使用できる場合も限ら
れる。
Since each intermediate frame has a weight of 400 to 500 kg, moving in the air by means of the chain block has a poor workability and is extremely complicated. In addition, since it involves work in high places and work in the air, there is a problem in terms of safety. Furthermore, since the hanging piece is attached to the entire ceiling, it takes time and labor, and there is a problem that the construction period becomes long. On the other hand, in the method using the hand lifter, it is necessary to use two to four hand lifters for one intermediate frame, which requires a large number of workers to travel, and there is a problem that the work can be performed only on a horizontal floor. . In addition, the method using a tow truck cannot be used sufficiently because the movement of the tow truck in a building is restricted, and the case where it can be used is also limited.

【0004】本発明は前記従来の方法の問題に鑑みてな
されたものであり、とくに建物内で緩く傾斜しているフ
ロア上に設けた基礎ガーダ上に多数の中間フレームを設
置する工事において、作業性の向上、安全性の確
保、省力化を図ることを目的とする。
The present invention has been made in view of the above-mentioned problems of the conventional method, and particularly in the construction work in which a large number of intermediate frames are installed on a foundation girder provided on a floor that is gently inclined in a building. The purpose of this is to improve safety, ensure safety, and save labor.

【0005】[0005]

【課題を解決するための手段】本発明の動く歩道の中間
フレーム設置方法は、動く歩道の設置方向に沿って、互
いに平行に配置された一対のレール状の基礎ガーダ上に
複数個の中間フレームを順に設置していく方法であっ
て、個々の中間フレームの4隅の下部に、基礎ガーダ上
を転動するキャスターと基礎ガーダの側面と当接する案
内部材とを取り付け、ついで中間フレームを基礎ガーダ
上を走らせて設置位置まで移動させ、その位置で少くと
も前記キャスターを取り外して中間フレームを基礎ガー
ダ上に設置していくことを特徴としている。
A method of installing an intermediate frame for a moving walkway according to the present invention comprises a plurality of intermediate frames on a pair of rail-shaped foundation girders arranged parallel to each other along the moving walkway installation direction. The casters rolling on the foundation girders and the guide members contacting the side surfaces of the foundation girders are attached to the lower parts of the four corners of each intermediate frame, and then the intermediate frames are attached to the foundation girders. It is characterized by running over and moving to the installation position, at least removing the caster at that position and installing the intermediate frame on the foundation girder.

【0006】なお、前記案内部材はガイドローラとする
のが好ましい。また、動く歩道を傾斜面に設置する場合
においては、前記中間フレームを基礎ガーダの下端側に
載置すると共にロープの一端を取り付け、該ロープを基
礎ガーダの上端に設けたウインチで巻き上げることによ
り中間フレームを走行させるのが好ましい。
The guide member is preferably a guide roller. Further, when a moving walkway is installed on an inclined surface, the intermediate frame is placed on the lower end side of the basic girder, one end of the rope is attached, and the rope is wound by a winch provided on the upper end of the basic girder. It is preferable to run the frame.

【0007】[0007]

【作用】基礎ガーダは本来はレールの役目をするもので
はないが動く歩道の設置ラインに沿って延設されている
ので、レールとして活用しうる。本発明の方法ではこの
点に着目し、中間フレームの前後左右にキャスターを取
りつけることにより、一時的に中間フレームを台車のご
とく構成し、案内部材で基礎ガーダからの脱落を防止し
つつ、レールに見たてた基礎ガーダ上を順に走行させ
る。それにより作業効率を大幅に向上させうる。案内部
材をガイドローラとするときは走行抵抗が減少し、搬送
作業が容易になるので好ましい。また中間フレームはウ
インチを利用して走行させることにより省力化がはかれ
る。
[Function] The basic girder does not originally function as a rail, but since it extends along the moving sidewalk installation line, it can be used as a rail. Focusing on this point in the method of the present invention, by attaching casters to the front, rear, left, and right of the intermediate frame, the intermediate frame is temporarily configured like a trolley, and the guide member prevents the rail from falling off from the basic girder, Run on the basic girder that you just saw. As a result, work efficiency can be significantly improved. When the guide member is a guide roller, running resistance is reduced and the carrying operation is facilitated, which is preferable. In addition, labor can be saved by running the intermediate frame using a winch.

【0008】[0008]

【実施例】つぎに本発明の方法を図面を参照しながら説
明する。図1は本発明の方法の一実施例を示す要部斜視
図、図2は本発明の方法の一実施例を示す全体側面図、
図3は本発明の方法の適用対象である動く歩道の一例を
示す要部側面図、図4および図5はそれぞれその要部拡
大側面図および要部拡大平面図、図6は図5のVI−VI線
断面図、図7および図8はそれぞれ本発明にかかわるキ
ャスターおよびガイドローラの一例を示す斜視図であ
る。
The method of the present invention will be described below with reference to the drawings. 1 is a perspective view of an essential part showing an embodiment of the method of the present invention, FIG. 2 is an overall side view showing an embodiment of the method of the present invention,
3 is a side view of an essential part showing an example of a moving walkway to which the method of the present invention is applied, FIGS. 4 and 5 are an enlarged side view of the essential part and an enlarged plan view of the essential part, and FIG. 6 is a VI of FIG. 7 is a perspective view showing an example of a caster and a guide roller according to the present invention, respectively.

【0009】初めに、図3〜図6を参照して本発明の方
法が適用される動く歩道の構成を説明する。図3に示す
動く歩道Mは屋内スキー場のゲレンデ等に設置されるも
のであり、スキーヤーコンベアとして用いられる。この
歩道は傾斜したグランドG上に設置した2本で一対の基
礎ガーダ1と、この基礎ガーダ1の上に多数連続するよ
うに取りつけられる中間フレーム2とを有する。基礎ガ
ーダ1はたとえば溝型鋼から構成され(図6参照)、グ
ランドGから離れている部分では支持脚3上に設置され
る。前記中間フレーム2は、図6に示すように、ほぼ断
面U字形の構造物であり、具体的には図4、図5および
図1に示すように、四角形の底枠4と、その底枠4の両
側から立ち上がる手摺り状の側枠5とから構成される。
中間フレーム2の幅は、図5に示すように基礎ガーダ1
の幅よりも広く、全体はたとえば角パイプ(図7〜8参
照)を溶接して構成される。
First, the construction of a moving walkway to which the method of the present invention is applied will be described with reference to FIGS. The moving walkway M shown in FIG. 3 is installed on a slope or the like of an indoor ski resort, and is used as a skier conveyor. This sidewalk has a pair of two basic girders 1 installed on an inclined ground G and a plurality of intermediate frames 2 mounted on the basic girder 1 so as to be continuous. The base girder 1 is made of, for example, channel steel (see FIG. 6), and is installed on the support leg 3 in a portion apart from the ground G. The intermediate frame 2 is a structure having a substantially U-shaped cross section as shown in FIG. 6, and specifically, as shown in FIGS. 4, 5 and 1, a rectangular bottom frame 4 and its bottom frame. 4 and a handrail-shaped side frame 5 standing up from both sides.
The width of the intermediate frame 2 is as shown in FIG.
Is wider than the width of, and the whole is constructed by welding square pipes (see FIGS. 7 to 8).

【0010】中間フレーム2は図3および図6に示すよ
うに、基礎ガーダ1上に連続して設置され、断面U字状
の連続フレームを構成し、その中に人を載せるためのル
ープ状にした踏板ベルト6およびそれを支えるローラ7
などの機構部分を収容する。なお図3〜4および図6に
おいて8は側壁であり、側壁8の上面には踏板ベルト6
と一緒に動く手摺りベルト9が設けられている。
As shown in FIGS. 3 and 6, the intermediate frame 2 is continuously installed on the basic girder 1 to form a continuous frame having a U-shaped cross section, and is formed into a loop for placing a person therein. Tread belt 6 and rollers 7 supporting it
It houses the mechanical parts such as. 3 to 4 and 6, 8 is a side wall, and the tread belt 6 is provided on the upper surface of the side wall 8.
There is provided a handrail belt 9 that moves with the.

【0011】つぎに図1〜2を参照して本発明の中間フ
レームの設置方法を説明する。本発明の方法は上記動く
歩道Mの設置工事の初期段階において、レール状に配置
した基礎ガーダ1の上に中間フレーム2を順に設置して
いく方法に関するものであり、以下のように進行する。
Next, a method of installing the intermediate frame according to the present invention will be described with reference to FIGS. The method of the present invention relates to a method of sequentially installing the intermediate frame 2 on the basic girder 1 arranged in a rail shape in the initial stage of the installation work of the moving walkway M, and proceeds as follows.

【0012】まず図2に示すように長尺状の基礎ガーダ
1を傾斜グランドGなどに設置しておく。この手順は従
来公知の方法によればよく、たとえば短くした基礎ガー
ダ1を現場で継ぎ合わせ、アンカーボルトなどでグラン
ドGに固定すればよい。つぎに、傾斜したグランドGの
下方に中間フレーム2を搬入し、その位置で図1に示す
ように各中間フレーム2の底枠4の前後左右の4個所
(図5参照)にキャスター10およびガイドローラ11を取
りつける。さらに図1に示すように、キャスター10が基
礎ガーダ1の上に載るように、かつガイドローラ11が基
礎ガーダ1の側縁1aと当接するように設置する。なお、
図4の下方の想像線は、基礎ガーダ1上に載せた状態を
示している。
First, as shown in FIG. 2, a long basic girder 1 is installed on an inclined gland G or the like. This procedure may be performed by a conventionally known method, for example, by shortening the basic girder 1 to be spliced on site and fixed to the gland G by an anchor bolt or the like. Next, the intermediate frame 2 is carried in below the inclined ground G, and at that position, the casters 10 and the guides are provided at four positions (see FIG. 5) on the front, rear, left and right of the bottom frame 4 of each intermediate frame 2 as shown in FIG. Install the roller 11. Further, as shown in FIG. 1, the caster 10 is installed so as to rest on the basic girder 1, and the guide roller 11 is placed so as to abut the side edge 1a of the basic girder 1. In addition,
The lower phantom line in FIG. 4 shows a state of being placed on the basic girder 1.

【0013】ついで図1の想像線で示すように、中間フ
レーム2の前端にワイヤないしロープ12の一端を掛け、
そのロープ12の他端を図2の上手平坦部などに設置した
ウインチ13によって巻き上げる。それによりキャスタ10
が基礎ガーダ1の上面を転動し、ガイドローラ11が基礎
ガーダ1の側縁1aによって案内されながら中間フレーム
2は基礎ガーダ1の上端まで引き上げられる。なお、図
2の符号14は屋内スキー場の屋根である。
Then, as shown by an imaginary line in FIG. 1, one end of a wire or rope 12 is hung on the front end of the intermediate frame 2,
The other end of the rope 12 is wound up by a winch 13 installed on the upper flat part of FIG. That caster 10
Rolls on the upper surface of the basic girder 1, and the intermediate frame 2 is pulled up to the upper end of the basic girder 1 while the guide roller 11 is guided by the side edge 1a of the basic girder 1. Reference numeral 14 in FIG. 2 is the roof of an indoor ski resort.

【0014】1個目の中間フレーム2が基礎ガーダ1の
上端の所定位置に達すると、キャスター10およびガイド
ローラ11を取り外し、その中間フレーム2を基礎ガーダ
1上に固定する。ついで2個目の中間フレーム2bを同じ
要領で引き上げ、1個目の中間フレーム2aに隣接して基
礎ガーダ1上に固定する。このように順次所定個数の中
間フレーム2を配列固定していく。なおキャスター10お
よびガイドローラ11はそれぞれ4個を1組として2〜3
組、あるいは中間フレーム2の数だけ準備しておき、1
個の中間フレーム2を引き上げているときにつぎの中間
フレーム2に取りつけるようにすれば効率的である。
When the first intermediate frame 2 reaches a predetermined position on the upper end of the basic girder 1, the casters 10 and the guide rollers 11 are removed, and the intermediate frame 2 is fixed on the basic girder 1. Then, the second intermediate frame 2b is pulled up in the same manner and fixed on the basic girder 1 adjacent to the first intermediate frame 2a. In this way, the predetermined number of intermediate frames 2 are sequentially arranged and fixed. It should be noted that the caster 10 and the guide roller 11 are each set as a set of 4 to 2 to 3
Prepare as many sets or intermediate frames 2 as possible
It is efficient to attach one intermediate frame 2 to the next intermediate frame 2 while pulling it up.

【0015】すべての中間フレーム2を基礎ガーダ1上
に設置し、固定した後、従来公知の手順で中間フレーム
2内にローラ7や踏板ベルト6、側壁8、手摺りベルト
9などを組み立てていけばよい。なお、前記実施例で
は、中間フレーム2をウインチ13で引き上げるようにし
ているが、グランドGが平坦な場合、あるいは傾斜が緩
い場合には、作業者が直接中間フレーム2を押し上げる
ようにしてもよく、他の動力装置を利用するようにして
もよい。また、最初に中間フレーム2を傾斜したグラン
ドGの上端に搬入しておき、順に1個ずつウインチなど
を用いて下方に降ろしていくようにしてもよい。
After installing and fixing all the intermediate frames 2 on the basic girder 1, assemble the rollers 7, the tread belts 6, the side walls 8, the handrail belts 9 and the like in the intermediate frame 2 by a conventionally known procedure. Good. Although the intermediate frame 2 is pulled up by the winch 13 in the above-described embodiment, the operator may directly push up the intermediate frame 2 when the ground G is flat or the inclination is gentle. Alternatively, another power unit may be used. Alternatively, the intermediate frame 2 may be first carried in to the upper end of the slanted ground G, and sequentially lowered one by one using a winch or the like.

【0016】つぎに図7および図8を参照して前記キャ
スター10およびガイドローラ11の具体例を説明する。図
7に示すキャスター10は市販されているものであり、ブ
ラケット15およびロックボルト16によって中間フレーム
2の底枠4に固定するユニットにされている。ブラケッ
ト15は底板17と、その底板17の中心より立ち上がる立壁
18と、立壁18の上端から側方に突出する上板19とを有す
る。すなわち底板17の片側部分17a、立壁18および上板
19は断面コ字状に構成されている。さらに図7の実施例
では、前記底板17の片側部分17aの先端側にリブ20が突
設されており、底枠4を構成する角パイプ21を受けるよ
うにしている。
Next, specific examples of the caster 10 and the guide roller 11 will be described with reference to FIGS. 7 and 8. The caster 10 shown in FIG. 7 is commercially available, and is a unit fixed to the bottom frame 4 of the intermediate frame 2 by the bracket 15 and the lock bolt 16. The bracket 15 is a bottom plate 17 and a standing wall that rises from the center of the bottom plate 17.
18 and an upper plate 19 protruding laterally from the upper end of the standing wall 18. That is, one side portion 17a of the bottom plate 17, the standing wall 18 and the upper plate
19 has a U-shaped cross section. Further, in the embodiment shown in FIG. 7, a rib 20 is projectingly provided on the tip side of the one side portion 17a of the bottom plate 17 so as to receive the square pipe 21 constituting the bottom frame 4.

【0017】なお上板19と底板17の間隔は角パイプ21の
高さよりも大きくして、角パイプ21の側方からブラケッ
ト15を挿入できるようにしている。そして底板17の反対
側の片側部分17b の下面にキャスター10が固定されてい
る。該片側部分17b と立壁18の間には補強リブ22が設け
られている。そして、前記上板19の中央部にはネジ孔23
が形成されており、そのネジ孔22に対して前記ロックボ
ルト16が螺合される。
The distance between the top plate 19 and the bottom plate 17 is larger than the height of the square pipe 21 so that the bracket 15 can be inserted from the side of the square pipe 21. The caster 10 is fixed to the lower surface of the one side portion 17b on the opposite side of the bottom plate 17. A reinforcing rib 22 is provided between the one side portion 17b and the standing wall 18. A screw hole 23 is formed in the center of the upper plate 19.
The lock bolt 16 is screwed into the screw hole 22.

【0018】上記のごとく構成されるキャスター10のユ
ニットは、ブラケット15を角パイプ21の側方から挿入
し、底板17を角パイプ21の底面に当接させ、ロックボル
ト16の先端を各パイプ21の上面に押し当てて固定する。
それによりキャスター10の車輪が受ける上下方向の力お
よびそれに基づく捻り方向の力はブラケット15によって
確実に角パイプ21に伝えられる。
In the unit of the caster 10 constructed as described above, the bracket 15 is inserted from the side of the square pipe 21, the bottom plate 17 is brought into contact with the bottom surface of the square pipe 21, and the tip of the lock bolt 16 is attached to each pipe 21. Press on the upper surface of the to secure.
Thereby, the vertical force received by the wheels of the caster 10 and the twisting force based on the vertical force are reliably transmitted to the square pipe 21 by the bracket 15.

【0019】図8に示すガイドローラ11は、角パイプ21
に側方から挿入できるように断面コ字状にしたブラケッ
ト24と、その下面中心から下方に延びるロッド25と、ロ
ッド25の外周に回転自在に設けられるパイプ26とから構
成されている。なおロッド25の上下2個所にパイプ26を
保持するリング27,28が固着されており、ロッド25とブ
ラケット24の底板の間には補強リブ29が設けられてい
る。
The guide roller 11 shown in FIG. 8 is a square pipe 21.
It includes a bracket 24 having a U-shaped cross section so that it can be inserted from the side, a rod 25 extending downward from the center of the lower surface thereof, and a pipe 26 rotatably provided on the outer periphery of the rod 25. Rings 27 and 28 for holding the pipe 26 are fixed to the upper and lower portions of the rod 25, and a reinforcing rib 29 is provided between the rod 25 and the bottom plate of the bracket 24.

【0020】上記のガイドローラ11のユニットは角パイ
プ21の側方から挿入し、クランプ30などで強固に、しか
し容易に外せるように角パイプ21に取りつけられる。ク
ランプ30を用いて横方向の取りつけ強度を確実にするの
は、中間フレームを基礎ガーダ1上を走行させるとき、
横方向の力を受けるからである。
The above-mentioned unit of the guide roller 11 is inserted from the side of the square pipe 21 and firmly attached to the square pipe 21 by a clamp 30 or the like so that it can be easily removed. Using the clamp 30 to ensure lateral mounting strength is important when the intermediate frame is run on the foundation girder 1.
This is because it receives a lateral force.

【0021】なお、図7のキャスター10およびブラケッ
ト15、ならびに図8のガイドローラ11およびブラケット
24はいずれも好ましい実施例であり、本発明の方法には
これら以外のキャスター、ガイドローラを用いることが
できる。またキャスターとガイドローラとを1個のユニ
ットにしたものも用いることができる。ただしキャスタ
ーは上下方向の力を受け、ガイドローラは側方の力を受
けるので、取りつけ易さも考えて別個のユニットにする
のが好ましい。また、前記ガイドローラに代えて、摺接
する固定ガイドを案内部材として設けてもよい。更に、
案内部材となるガイドローラあるいは固定ガイドは、中
間フレームを基礎ガーダ上に設置する上で支障とならな
いならば底枠4に固着されたものでもよい。
The caster 10 and the bracket 15 shown in FIG. 7, and the guide roller 11 and the bracket shown in FIG.
24 is a preferred embodiment, and casters and guide rollers other than these can be used in the method of the present invention. Further, it is also possible to use a unit in which the caster and the guide roller are one unit. However, since the caster receives a vertical force and the guide roller receives a lateral force, it is preferable to use separate units in consideration of ease of mounting. Further, instead of the guide roller, a fixed guide in sliding contact may be provided as a guide member. Furthermore,
The guide roller serving as a guide member or the fixed guide may be fixed to the bottom frame 4 as long as it does not hinder the installation of the intermediate frame on the basic girder.

【0022】[0022]

【発明の効果】本発明の方法によれば、重量のある中間
フレームを効率よく、かつ安全に基礎ガーダ上に設置す
ることができる。
According to the method of the present invention, a heavy intermediate frame can be efficiently and safely installed on the foundation girder.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の方法の一実施例を示す要部斜視図であ
る。
FIG. 1 is a perspective view of essential parts showing an embodiment of a method of the present invention.

【図2】本発明の方法の一実施例を示す全体側面図であ
る。
FIG. 2 is an overall side view showing an embodiment of the method of the present invention.

【図3】本発明の方法を適用対象である動く歩道の一例
を示す要部側面図である。
FIG. 3 is a side view of an essential part showing an example of a moving walkway to which the method of the present invention is applied.

【図4】図3の動く歩道の要部拡大側面図である。FIG. 4 is an enlarged side view of the main part of the moving walkway shown in FIG.

【図5】図3の動く歩道の要部拡大平面図である。5 is an enlarged plan view of an essential part of the moving walkway in FIG. 3. FIG.

【図6】図4のVI−VI線断面図である。6 is a sectional view taken along line VI-VI of FIG.

【図7】本発明にかかわるキャスターの一例を示す斜視
図である。
FIG. 7 is a perspective view showing an example of a caster according to the present invention.

【図8】本発明にかかわるガイドローラの一例を示す斜
視図である。
FIG. 8 is a perspective view showing an example of a guide roller according to the present invention.

【符号の説明】[Explanation of symbols]

M 動く歩道 11 ガイドロ
ーラ 1 基礎ガーダ 12 ロープ 2 中間フレーム 13 ウインチ 10 キャスター
M Moving walkway 11 Guide roller 1 Foundation girder 12 Rope 2 Intermediate frame 13 Winch 10 Caster

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】動く歩道の設置方向に沿って、互いに平行
に配置された一対のレール状の基礎ガーダ上に複数個の
中間フレームを順に設置していく方法であって、個々の
中間フレームの4隅の下部に、基礎ガーダ上を転動する
キャスターと基礎ガーダの側面と当接する案内部材とを
取り付け、ついで中間フレームを基礎ガーダ上を走らせ
て設置位置まで移動させ、その位置で少くとも前記キャ
スターを取り外して中間フレームを基礎ガーダ上に設置
していくことを特徴とする動く歩道の中間フレーム設置
方法。
1. A method of sequentially installing a plurality of intermediate frames on a pair of rail-shaped foundation girders arranged in parallel with each other along the installation direction of a moving walkway. At the lower part of the four corners, casters rolling on the basic girder and guide members that come into contact with the side surfaces of the basic girder are attached, and then the intermediate frame is run on the basic girder to move to the installation position, and at that position, at least the above. An intermediate frame installation method for moving walkways, characterized by removing the casters and installing the intermediate frame on the foundation girder.
【請求項2】前記案内部材がガイドローラである請求項
1記載の中間フレーム設置方法
2. The intermediate frame installation method according to claim 1, wherein the guide member is a guide roller.
【請求項3】動く歩道を傾斜面に設置する場合におい
て、前記中間フレームを基礎ガーダの下端に載置すると
共にロープの一端を取り付け、該ロープを基礎ガーダの
上端に設置したウインチで巻き上げることにより、中間
フレームを走行させることを特徴とする請求項1記載の
中間フレーム設置方法。
3. When a moving walkway is installed on an inclined surface, the intermediate frame is placed on the lower end of the foundation girder, one end of the rope is attached, and the rope is wound up by a winch installed on the upper end of the foundation girder. The intermediate frame installation method according to claim 1, wherein the intermediate frame is run.
JP4322459A 1992-11-07 1992-11-07 How to install an intermediate frame on a moving sidewalk Expired - Fee Related JP2761828B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4322459A JP2761828B2 (en) 1992-11-07 1992-11-07 How to install an intermediate frame on a moving sidewalk

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4322459A JP2761828B2 (en) 1992-11-07 1992-11-07 How to install an intermediate frame on a moving sidewalk

Publications (2)

Publication Number Publication Date
JPH06144761A true JPH06144761A (en) 1994-05-24
JP2761828B2 JP2761828B2 (en) 1998-06-04

Family

ID=18143895

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4322459A Expired - Fee Related JP2761828B2 (en) 1992-11-07 1992-11-07 How to install an intermediate frame on a moving sidewalk

Country Status (1)

Country Link
JP (1) JP2761828B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008179435A (en) * 2007-01-23 2008-08-07 Mitsubishi Electric Building Techno Service Co Ltd Temporary material for installation of escalator framework, and installation method using the same
JP2008230727A (en) * 2007-03-16 2008-10-02 Hitachi Building Systems Co Ltd Passenger conveyor remodeling method and traveling roller unit used for the same
JP2010070313A (en) * 2008-09-18 2010-04-02 Hitachi Building Systems Co Ltd Modification method of passenger conveyor
KR101138058B1 (en) * 2009-12-16 2012-04-23 두산디에스티주식회사 Carrier transfer apparatus using conveyor belt
JP2012144338A (en) * 2011-01-12 2012-08-02 Toshiba Elevator Co Ltd Passenger conveyor
CN104291201A (en) * 2014-09-23 2015-01-21 西尼电梯(杭州)有限公司 Moving pavement moving positioning device
JP2016088706A (en) * 2014-11-06 2016-05-23 株式会社竹中工務店 escalator

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03138294A (en) * 1989-10-25 1991-06-12 Hitachi Elevator Eng & Service Co Ltd Passenger conveyor reconstructing method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03138294A (en) * 1989-10-25 1991-06-12 Hitachi Elevator Eng & Service Co Ltd Passenger conveyor reconstructing method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008179435A (en) * 2007-01-23 2008-08-07 Mitsubishi Electric Building Techno Service Co Ltd Temporary material for installation of escalator framework, and installation method using the same
JP2008230727A (en) * 2007-03-16 2008-10-02 Hitachi Building Systems Co Ltd Passenger conveyor remodeling method and traveling roller unit used for the same
JP2010070313A (en) * 2008-09-18 2010-04-02 Hitachi Building Systems Co Ltd Modification method of passenger conveyor
KR101138058B1 (en) * 2009-12-16 2012-04-23 두산디에스티주식회사 Carrier transfer apparatus using conveyor belt
JP2012144338A (en) * 2011-01-12 2012-08-02 Toshiba Elevator Co Ltd Passenger conveyor
CN104291201A (en) * 2014-09-23 2015-01-21 西尼电梯(杭州)有限公司 Moving pavement moving positioning device
JP2016088706A (en) * 2014-11-06 2016-05-23 株式会社竹中工務店 escalator

Also Published As

Publication number Publication date
JP2761828B2 (en) 1998-06-04

Similar Documents

Publication Publication Date Title
US4828073A (en) Mobile suspended scaffold
JPH06144761A (en) Intermediate frame setting method for moving footpath
EP1111135A2 (en) Method of building viaducts
JP4284225B2 (en) Mobile scaffolding system
CN215055466U (en) Discharging platform for high-rise building
JPH06272389A (en) Temporary unloading stage
JP2670947B2 (en) Piping method and device in a tunnel
JPH076295B2 (en) Floor slab construction method
CN219952743U (en) Continuous beam stretching auxiliary tool
JPH0978842A (en) Crane for scaffold
JP3413760B2 (en) Passenger conveyor installation equipment
JPH08231161A (en) Down type working elevator and method of extending elevator mast in downward direction
JP2945793B2 (en) How to suspend a moving wall
JPH026906B2 (en)
JPH07304582A (en) Carrying-in and carrying-out method for escalator truss and device therefor
JPH0530009Y2 (en)
JP2526955Y2 (en) Gate type transport installation device
JP3084789U (en) Hanging trolley for leaf tobacco drying room
JP3380788B2 (en) Mobile trolley used for box culvert transfer
JP3304600B2 (en) Escalator step transporter
JPH048196Y2 (en)
CN115107840A (en) Be applied to carrier of renewal type automatic escalator
JPH028098B2 (en)
JP3948545B2 (en) Mechanical underground parking equipment installation equipment and installation method
CN117023415A (en) Inverted-inclined-plane large-plate glass lifting device and construction method thereof

Legal Events

Date Code Title Description
S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080327

Year of fee payment: 10

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090327

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20090327

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100327

Year of fee payment: 12

LAPS Cancellation because of no payment of annual fees