JPH055983B2 - - Google Patents

Info

Publication number
JPH055983B2
JPH055983B2 JP22272387A JP22272387A JPH055983B2 JP H055983 B2 JPH055983 B2 JP H055983B2 JP 22272387 A JP22272387 A JP 22272387A JP 22272387 A JP22272387 A JP 22272387A JP H055983 B2 JPH055983 B2 JP H055983B2
Authority
JP
Japan
Prior art keywords
frame
building
horizontal
scaffolding
building site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP22272387A
Other languages
Japanese (ja)
Other versions
JPS6466365A (en
Inventor
Shigeyuki Nakatani
Shoji Shibuya
Shinji Yoshida
Akira Kenjo
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumikin Kozai Kogyo KK
Original Assignee
Sumikin Kozai Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumikin Kozai Kogyo KK filed Critical Sumikin Kozai Kogyo KK
Priority to JP22272387A priority Critical patent/JPS6466365A/en
Publication of JPS6466365A publication Critical patent/JPS6466365A/en
Publication of JPH055983B2 publication Critical patent/JPH055983B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Description

【発明の詳細な説明】[Detailed description of the invention]

〔産業上の利用分野〕 この発明は、建造物等の外壁面に沿つて仮設さ
れる枠組足場に係り、とくに階段の設置に伴う作
業スペースの圧迫をなくすることが出来る枠組足
場における階段支持枠に関する。 〔従来の技術〕 この種の枠組足場としては、現在第5図のよう
なものが汎用されている。すなわち、図のものは
鳥居型の建枠90が所定の間隔で複数並置される
とともに、上下方向に所要数が連結され、相隣れ
る建枠と建枠との間に交叉筋違91が取付けられ
る。そしてその隣り合う建枠の横地90a,90
a間には足場板2がかけ渡され、作業床A1,A2
…が確保される。最上段の建枠90には支柱92
を立てて手摺93がセツトされる。 また、最近では建枠として、H型のものを使用
することも検討されている。H型の建枠は、建地
の略々中ほどの高さ位置に横地を設けたもので、
この横地に足場板が架け渡されるが、これを使用
して足場の組立、解体時の安全性を高めようとい
うものである。 〔発明が解決しようとする問題点〕 ところが、上記公知の枠組足場には次のような
問題がある。 足場板2が形成する作業床A1,A2…各段間に
は階段を設けることが必要である。枠組足場の階
段は、第5図に示す如く各段間においてはすかい
に位置する横地90a,90a間に架設される。 ところが、こうして階段7を取付けると、その
部位の作業床Aの巾が階段巾の分だけ狭められる
ことになる。 このため建枠90としては、階段7取付部位に
おいて作業上必要な巾の作業床を確保し得る巾の
ものを使用することが必要となる。一般に階段巾
は約500mmあり、作業のためには少なくとも600mm
ほど必要であるから、建枠の巾Wとしては実際
上、1100mm以上必要となつてくるのである。 建枠は現在、610mm巾、762mm巾の簡易枠と、
914mm巾、1219mm巾の標準枠に分類されている。
足場としては一般に簡易枠が使用されるが、1100
mm以上の巾を確保しようとすると、標準枠が必要
となる。 このような広巾の建枠は、階段取付部位以外の
一般部においては必要以上に広い作業床をつくり
出し、不合理かつ不経済であるのみならず、運
搬、保管の他、取回しにも不便である。また、足
場の巾が大きなものとなるので、狭小地での使用
に都合が悪い。 本発明は、上記従来の足場の問題点を解決する
ことを目的とする。 〔問題点を解決するための手段〕 本発明の第1は、第1図に示す如く、1本の建
地60とその片側に片持ちで水平に持ち出された
横地61とを基本構成部材とし、建地60上端に
は枠どうしを上下に嵌合連結するための連結ピン
13が設けられるとともに、横地61の先端には
足場の建枠1の建地10と取合う取合プレート6
3が付設されていて、足場建枠1の外側面側に配
置展開し、その横地61…に足場用階段7および
足場板2を架け渡すようになつていることを特徴
とする枠組足場における階段支持枠を要旨とす
る。 本発明の第2は、第2図に示す如く、1本の建
地60とそのほぼ中間点から片側に片持ちで水平
に持ち出された横地61とを基本構成部材とする
階段用支持枠6であつて、建地60上端には他の
枠6の建地60下端と嵌合し、枠6どうしを上下
に連結するための連結ピン13が設けられるとと
もに、横地61の先端には足場を形成するH型建
枠1の建地10の横地11取付け位置直下に設け
られた貫通孔100との間でボルトナツト64連
結するためのボルト孔66aを有する取合プレー
ト66が付設されていて、足場建枠1の外側面側
に配置展開しその横地61…に足場用階段7およ
び足場板2を架け渡すようになつていることを特
徴とする枠組足場における階段支持枠を要旨とす
る。 〔作用〕 本発明の第1および第2の支持枠6は、いずれ
も第3図に示す如く、作業床A1,A2…を確保す
る足場部分(作業床ユニツト)U1の外側面側に、
その並列建枠1…と同じ間隔で配置されるととも
に、建地60の連結によつて上下に所要段数組上
げられ、各横地61は建枠建地10に連結手段に
よつてつなぎ止められる。そして、その上下のは
すかいに位置する横地61,61間に足場用階段
7が取付けられる。またその階段7の上下端に接
続して隣接横地61,61間に足場板2をかけ渡
し、作業床ユニツトU1の作業床A1,A2…へつな
がる踊場B1,B2…を形成するのである。 このようにすれば、従来作業床を形成する部分
に作業床の一部を置き換える形で組み込まれてい
た階段が、作業床ユニツトU1とは別の隣接ユニ
ツト(階段ユニツト)U2として独立したものと
なり、階段取付部位においても作業床Aの巾が圧
迫されることがなく、建枠1の巾いつぱいを作業
床にとることができる。このため、従来のように
必要以上に大きな巾の建枠(標準枠)を使用する
必要がなく、経済的で運搬や保管にも有利で、組
払しの作業も容易な小巾建枠(簡易枠)の使用が
可能となる。また、この場合支持枠6は作業床ユ
ニツトU1の外側面の任意の一部に設ければよい
から、狭い場所においても部分的に広くなつてい
るところなどを利用して設けることができ、狭小
地への適用上都合がよい。 〔実施例〕 前出第1図および第2図は本発明の一実施例を
示している。 第1図は一般に鳥居型建枠を対象としたもので
ある。 第1図イによると、支持枠6は一本の建地60
と、その上端部から片側に片持ち状に持出された
横地61と、横地61の下側に配された四分円状
の補強材62とが枠体の基本となつている。構成
部材は丸鋼管である。 建地60の上端には、枠どおしを連結するため
の連結ピン13が付設されている。また建地60
には、バネ式止片150付の係合ピン15が上下
2個所に設けられている。アームロツクや交叉筋
違を係止するための係合ピン15は、すべて枠自
身の内部側(横地持出側)に突き出す形になつて
いる。 補強材62は、一端側が建地60の内側に固定
され、円弧を描いて他端側が横地61の直下まで
伸び、ここで連係プレート120を介して横地6
1につながれた形であり、端部は横地61と揃え
てある。 横地61と補強材62の端部には、それらにま
たがつてプレート65が固着され、これに鳥居型
の建枠建地10との係合手段である周知の単管ク
ランプ63が取付けられている。単管クランプ6
3の詳細を第1図ロに平面図で示しておく。 第2図はH型の建枠を対象とした支持枠を示し
ている。 この支持枠も第1図の支持枠と同様、丸鋼管か
らなる建地60、横地61および補強材62を構
成部材とし、横地61は建地60の上下2分割点
から片側に片持ち状に持出されている。 建地60の上端に付設された連結ピン13には
それに嵌合した建地下端部を、同部の側孔にスプ
リング付ロツクピン140を差し込んで抜止めす
るロツク機構14が装備されている。これはアー
ムロツクに代わるロツク手段である。また、バネ
式抜止片150付の係合ピン15は建地60上端
および下端付近、横地61取付位置を挟んでその
直上、直下の計4個所に設けられている。 建地60の横地61取付位置直下の部位には、
横地長手方向の貫通孔100が設けられている。
これはアサガオ等の足場付帯設備を設けるときな
どに利用される。 建地60と補強材62とをつなぐ連結プレート
120には透孔120aがあけられているが、こ
れは上記貫通孔100を使つてアサガオ等を取付
けるときに、支持補強のためのタイロツドをとる
場合などに利用される。 横地61と補強材62の端部には、それらにま
たがつて前記建枠建地10との結合手段である取
合プレート66が付設されている。単管クランプ
に代わるこの取合プレート66は、ロ図に明らか
なように建枠建地10外面に沿う形をしており、
上下中央部にはボルト孔66aを有している。こ
れは、建枠建地10の横地取付位置直下の貫通孔
100にボルト孔66aを合せてボルト・ナツト
64でつなぐものである。 第1図および第2図に示された支持枠6の巾
は、足場用階段7をかけるだけのものがあればよ
い。具体的には、600mmほどもあれば十分である。
高さは、適用対象としての足場の建枠1に合せ
る。 次に、上記構成になる支持枠の使用態様の一例
に係る枠組足場を、第2図の支持枠について第3
図により説明する。 本足場は、全体としては複数段の作業床A1
A2…を形成する作業床ユニツトU1とその作業床
各段間をつなぐ階段を与える階段ユニツトU2
からなつている。図では、表現の都合上、両ユニ
ツトU1,U2が分けて描かれているが、実際には
両者は矢印で示される関係において一体のもので
ある。 作業床ユニツトU1の基本構成要素は、建枠1
と足場板2と側枠3であり、作業ユニツトU1
付設された形の階段ユニツトU2は、前記した支
持枠6、足場用階段7、足場板2、側枠3が基本
構成要素となつている。支持枠6は先に説明済で
あるので、支持枠6を除く各々の構成要素を説明
する。 ○ 建枠1 第4図に正面図を示す。 同図によると、建枠1はH型の枠であり、一対
の建地10,10と、その上下2分割点で両建地
間をつなぐ横地11と、該横地11の下側、両建
地10,10間に配された逆U字形の補強材12
とで基本の部分が構成されている。構成部材はす
べて丸鋼管である。 各建地10には、前記支持枠建地60と同様連
結ピン13、ロツク機構14、係合ピン15…が
取付けてある。これらの付属品については、支持
枠建地60と全く同じであるため、詳しく説明は
省略する。 各建地10の横地11取付位置直下の部位に設
けられた横地長手方向の貫通孔100は、既に述
べたとおり支持枠6の取合プレート66との連結
用である。ただしこの貫通孔100もアサガオ等
の足場付帯設備を設けるときなどにも利用され
る。 両建地10,10間にまたがる補強材12は、
その中央部において連結プレート120により横
地11につなぎ止められている。連結プレート1
20には透孔120aがあけられているが、これ
も支持枠6と同様で、上記貫通孔100を使つて
アサガオ等を取付けるときに、支持補強のための
タイロツドをとる場合などに利用する。 なお、建枠巾としては、仮設対象を建築物一般
とするなら、610mm、762mmの簡易枠で十分で、
900mmを超えるような標準枠は作業上必要なく、
設置スペースの観点から好ましくない。高さH1
については、人の背丈を基準に作業上必要なスペ
ースを確保する立場から、1700〜2000mm程度が適
当である。 ○ 足場板2 足場板2は、通常使用されるもので、両端に建
枠横地11に対する係合爪20,20を具備す
る。 ○ 側枠3 建枠1、支持枠6の外側面側、内側面側におい
て、建地10,60の隣接し合うものどおしの間
に取り付けられる強度部材である。 この強度部材として鳥居型建枠では交叉筋違が
使用されるが、H型建枠では交叉筋違の他、手摺
兼用の方形枠、三角形状の手摺枠、手摺と斜材の
組合せ等が用いられる。 第3図では内側面側には図示されていないが三
角形状の手摺枠を使用し、外側面側には養生ネツ
トを着脱可能に装着した方形枠を使用するものと
した。 ○ 足場用階段7 足場板同様、一般に使用されているもので、上
端および下端には横地に対する係合爪70,70
を備えている。 各要素の構成は以上のとおりであるが、次にこ
れらの配置組合せ状態を説明する。 まず作業床ユニツトU1において、H型の建枠
1は、その所要数が所定間隔lをおいて並列状に
配置され、かつ上下方向に所要段数継ぎ足し設置
されている。最下段の建枠建地10下端にはジヤ
ツキベース8が装着されている。配置間隔lはイ
ンチサイズの場合1829mm、1524mm、1219mm、914
mm程度に設定される。上下方向の連結は、前記し
た建地10上端の連結ピン13による。 足場板2は、このような建枠1…各段の、互い
に隣り合う横地11,11間に接続してかけ渡さ
れ、建枠の組上げ段数分の作業床A1,A2…を形
成している。 横地11との取合は、足場板2両端の係合爪2
0,20による。 側枠3は、上記建枠1…の各段において、外側
面側および内側面側の各隣接建地10,10間に
設けられている。側枠3の高さH2はH型建枠一
つの高さH1(第4図参照)の略々半分であり、側
枠3は各段において、外側面側については作業床
Aレベルを境にその上方側と下方側に一枚ずつ、
また内側面側については作業床Aレベルの上方側
に一枚ずつ建込まれ、その結果、外側面側につい
ては後述する段階ユニツトU2の各階踊場Bに対
応する部位を開口部Sとして残して側面全体を覆
うものとなる。踊場Bに対応する部位の開口部S
は、作業床階高部の側枠2枚分を取付けずに外し
た状態に残したものである。建枠1…の外側面側
に側枠3があることで、階段用手摺の別途取付が
不要となる。 側枠3の固定は、側枠の両側に設けた複数の取
合片を建地10,10の抜止片付係合ピン15…
に嵌着させることによる。 なお、図の例では最下段の作業床A1の下側に
ついては、斜材5が側枠に代えて取付けられてい
る。 次に階段ユニツトU2は、前記作業床ユニツト
U1の5スパン分(建枠6枚分)に対応して設け
られ、支持枠6が並列に6枚使用されている。す
なわち、作業床ユニツトU1の外側面側において、
建枠1と同じ間隔lで対応位置に6枚が設置さ
れ、かつ上下方向には建枠1の組上げ段数と同じ
だけ組上げられている。そして、支持枠6はそれ
ぞれ横地61端部の取合プレート66のボルト・
ナツト64による固定によつて対応建枠1の外側
建地10につなぎ止められている。この状態で支
持枠6の横地61は、作業床ユニツトU1のH型
建枠の横地11と高さレベルが一致する。最下段
の支持枠の6の下端にはジヤツキベース8が装着
されている。 足場用階段7は、このような支持枠の5スパン
分の中央スパン部を挟む両側のスパン部におい
て、上下方向に千鳥の形で配置され、支持枠6各
段間に1つずつ設けられている。各階段7は、対
応スパン部の両きわに立つ支持枠列間において、
隣接階の支持枠横地61,61間にはすかいにか
け渡されているのである。横地61との取合は、
足場用階段7両端の係合爪70,70による。 次に足場板2は、上記各階段7の通過のための
吹抜空間が必要な部分を除き、全隣接横地61,
61間に配設されている。このうち、各階段7の
上下端に接続するものが、踊場Bを形成する。各
踊場Bは、隣の作業床Aと同じレベルであり、各
階作業床の側方に並ぶ形となる。そして各階にお
いて、作業床Aと踊場Bは作業床ユニツト外側面
に残された開口部Sによつて連絡されることな
る。作業者はこの開口部Sを通つて作業床Aと踊
場B間を往来し、階段7…を使つて昇降する。昇
降の方式は全体としては、作業床A1,A2…を仲
立ちとした螺旋型になる。 なお、上記足場板2のうち、踊場とならないも
のは、足場の組払しの面から必要とされるもの
で、強度上の意味もある。 側枠3は、上記支持枠6…の各段において、外
側面側の隣接建地10,10間に取付けられてい
る。設置、取付の仕方は、作業床ユニツトU1
建枠1に対する場合と全く同様である。 また、最下段の下側についてのみ、斜材5が使
われていることも、先の場合と同じである。 次に、上記足場の組払しは以下のように行われ
る。 まず、作業床ユニツトU1の最下段の建枠1…
を設置し、その各建枠間の下方側に斜材5をセツ
トするとともに、隣接横地11,11間に足場板
2をかけ渡す。一方、この外側の所要の場所に、
階段ユニツトU2の最下段の支持枠6…を立て、
先に設置されている建枠1…の建地10にその横
地61をつなぎ止める。そしてその各横地間に足
場板2をかける。このようにしたのち、両ユニツ
トU1,U2の足場板2上にあがつて外側面側、内
側面側とも最下段上側の側枠3を取付ける。 こうして最下段ができれば、この上に第2段目
の建枠1…および支持枠6…を継ぎ足し、支持枠
6を建枠1に固定するとともに、外側面側には2
段目の下側側枠3を取付けて、足場板2をかけ
る。支持枠6の方は、所定のスパンのところへ足
場用階段7をかける。このような要領で作業ユニ
ツトU1、階段ユニツトU2を並行して下方から一
段ずつ順に組上げてゆく。解体するときは、これ
と全く逆の手順を踏んで最上段から順次下方へ作
業を進める。 なお、以上は作業床用建枠がH型枠であるケー
スについて述べたが、作業床用建枠が一般の鳥居
型建枠の場合は、第1図に示した支持枠を使用す
ることにより同様に適用可能である。 〔発明の効果〕 以上に説明した本発明の階段支持枠は、次のよ
うな特徴・利点を有している。 ○ 作業床A1,A2…各段間をつなぐ階段が、階
段ユニツトU1として作業床形成部分から分け
て設けられることになるから、階段取付部位に
おいても作業床Aの巾が圧迫されることがな
く、つねに建枠1の巾いつぱいを作業床に利用
できる。 このため建枠1としては、従来のように階段
設置による圧迫を見込んで必要以上に大きな巾
のものを使用する必要がなく、経済性、運搬や
保管、組払し作業の面でも大きなメリツトが期
待できる。 ○ またこの場合、階段ユニツトU2は作業床ユ
ニツトU1に対しその一部にのみ設ければよい
ので、仮設スペースが十分でない場合でも、一
部に多少の余裕があればそこを利用して設置す
ることができ、狭小地への適用の面でもメリツ
トがある。
[Industrial Application Field] This invention relates to a frame scaffold that is temporarily installed along the outer wall surface of a building, etc., and in particular to a stair support frame in a frame scaffold that can eliminate pressure on the work space due to the installation of stairs. Regarding. [Prior Art] As this type of framework scaffold, the one shown in FIG. 5 is currently in general use. That is, in the figure, a plurality of torii-shaped building frames 90 are arranged side by side at predetermined intervals, and the required number are connected in the vertical direction, and intersecting braces 91 are installed between adjacent building frames. It will be done. And the horizontal land 90a, 90 of the adjacent building frame
Scaffolding board 2 is spanned between a and work floors A 1 and A 2
... will be ensured. Supports 92 are installed on the top building frame 90.
is erected and the handrail 93 is set. Recently, the use of H-shaped building frames has also been considered. The H-shaped building frame has a horizontal lot at approximately the middle height of the building site.
Scaffolding boards will be erected on this horizontal land, with the intention of increasing safety when assembling and dismantling the scaffolding. [Problems to be Solved by the Invention] However, the above-mentioned known framework scaffolds have the following problems. Work floors A 1 , A 2 formed by the scaffolding boards 2 ...It is necessary to provide stairs between each step. As shown in FIG. 5, the framework scaffolding staircase is constructed between horizontal areas 90a and 90a located between each step. However, when the stairs 7 are installed in this way, the width of the work floor A at that location is reduced by the width of the stairs. Therefore, it is necessary to use the building frame 90 with a width that can secure a working floor of the width necessary for the work at the part where the stairs 7 are attached. Generally the staircase width is about 500mm, and for working purposes it is at least 600mm.
Therefore, the width W of the building frame actually needs to be 1100 mm or more. Currently, the building frames are simple frames with a width of 610 mm and a width of 762 mm.
It is classified into standard frames of 914mm width and 1219mm width.
A simple frame is generally used as a scaffold, but 1100
If you want to secure a width of mm or more, you will need a standard frame. Such a wide building frame creates an unnecessarily wide working floor in the general area other than the area where the stairs are attached, which is not only unreasonable and uneconomical, but also inconvenient for transportation, storage, and handling. It is. Furthermore, the width of the scaffold is large, making it inconvenient for use in narrow spaces. The present invention aims to solve the above problems of conventional scaffolding. [Means for Solving the Problems] The first aspect of the present invention, as shown in FIG. A connecting pin 13 is provided at the upper end of the building site 60 to vertically fit and connect the frames, and a connecting plate 6 is provided at the tip of the horizontal site 61 to engage with the building site 10 of the scaffolding frame 1.
3 is attached to the scaffolding frame 1, and is arranged and expanded on the outer surface side of the scaffolding frame 1, and the scaffolding staircase 7 and the scaffold board 2 are spanned over the horizontal ground 61... The supporting frame is the gist. The second aspect of the present invention is, as shown in FIG. 2, a stair support frame 6 whose basic constituent members are a single building site 60 and a horizontal site 61 that is cantilevered horizontally from approximately the midpoint of the building site 60 to one side. A connecting pin 13 is provided at the upper end of the building site 60 to fit with the lower end of the building site 60 of another frame 6 and connect the frames 6 vertically, and a scaffold is provided at the tip of the horizontal site 61. A connecting plate 66 having bolt holes 66a for connecting bolts and nuts 64 to a through hole 100 provided directly below the installation position of the horizontal lot 11 of the building site 10 of the H-shaped building frame 1 to be formed is attached, and the scaffolding The gist is a stair support frame in a framework scaffold, which is arranged and developed on the outer surface side of a building frame 1 and is designed to span the horizontal ground 61 of the scaffolding stairs 7 and scaffold boards 2. [Function] As shown in FIG. 3, both the first and second support frames 6 of the present invention are attached to the outer side of the scaffolding portion (work floor unit) U 1 that secures the work floors A 1 , A 2 . To,
The horizontal lots 61 are arranged at the same intervals as the parallel building frames 1 . Then, a scaffolding staircase 7 is installed between the horizontal areas 61 and 61 located above and below. In addition, scaffolding boards 2 are connected to the upper and lower ends of the stairs 7 and spanned between the adjacent horizontal lots 61, 61 to form landings B1 , B2, etc., which connect to the working floors A1 , A2, ... of the working floor unit U1 . That's what I do. In this way, the stairs, which were conventionally incorporated into the part forming the work floor to replace part of the work floor, can now become independent as an adjacent unit (stair unit) U2 , separate from the work floor unit U1 . Therefore, the width of the work floor A is not compressed even at the stairway attachment site, and the width of the building frame 1 can be taken up on the work floor. For this reason, there is no need to use an unnecessarily wide building frame (standard frame) as in the past, and the narrow width building frame (standard frame) is economical, convenient for transportation and storage, and easy to assemble. Simple frame) can be used. In addition, in this case, the support frame 6 can be provided on any part of the outer surface of the work floor unit U1 , so it can be provided in a narrow place by using a partially wide area. Convenient for application to narrow spaces. [Embodiment] FIGS. 1 and 2 described above show an embodiment of the present invention. Figure 1 generally targets torii-type building frames. According to FIG. 1A, the support frame 6 has one building block 60.
, a horizontal strip 61 extending in a cantilevered manner from its upper end to one side, and a quadrant-shaped reinforcing member 62 placed below the horizontal strip 61 form the basis of the frame. The structural members are round steel tubes. A connecting pin 13 for connecting the frames is attached to the upper end of the building lot 60. Also, the building site is 60
Engagement pins 15 with spring-type stoppers 150 are provided at two locations, upper and lower. The engaging pins 15 for locking the arm locks and cross braces are all shaped to protrude into the interior of the frame itself (towards the side where the horizontal ground is brought out). One end of the reinforcing material 62 is fixed to the inside of the building site 60, and the other end extends in an arc to just below the horizontal area 61, where it is attached to the horizontal area 61 via the linking plate 120.
1, and the ends are aligned with the horizontal area 61. A plate 65 is fixed to the ends of the horizontal lot 61 and the reinforcing material 62 so as to straddle them, and a well-known single pipe clamp 63 is attached to this as a means for engaging with the torii-shaped building frame building 10. There is. Single tube clamp 6
3 is shown in detail in a plan view in FIG. Figure 2 shows a support frame for an H-shaped building frame. This support frame, like the support frame shown in FIG. It has been taken out. The connecting pin 13 attached to the upper end of the building site 60 is equipped with a locking mechanism 14 that locks the end portion of the building site fitted therein by inserting a spring-loaded lock pin 140 into a side hole of the same portion. This is an alternative locking method to arm locking. Further, the engagement pins 15 with spring-type retaining pieces 150 are provided at a total of four locations near the upper and lower ends of the building lot 60, directly above and directly below the mounting position of the horizontal lot 61. In the area directly below the installation position of the horizontal lot 61 of the building site 60,
A through hole 100 is provided in the longitudinal direction of the lateral land.
This is used when setting up scaffolding equipment such as morning glory. A through hole 120a is drilled in the connecting plate 120 that connects the building site 60 and the reinforcing material 62, but this is used when attaching tie rods for support and reinforcement when installing morning glories etc. using the through hole 100. It is used for such things. At the ends of the horizontal lot 61 and the reinforcing material 62, a connecting plate 66, which is a means for connecting to the building frame building site 10, is attached so as to straddle them. This joining plate 66, which replaces the single pipe clamp, has a shape that follows the outer surface of the building frame building site 10, as shown in the figure.
A bolt hole 66a is provided in the upper and lower center portions. In this case, the bolt holes 66a are aligned with the through holes 100 directly below the horizontal land attachment position of the building frame building site 10, and the bolt holes 66a are connected with bolts and nuts 64. The width of the support frame 6 shown in FIGS. 1 and 2 only needs to be wide enough to accommodate the scaffolding stairs 7. Specifically, about 600 mm is sufficient.
The height should match the building frame 1 of the scaffolding to which it is applied. Next, the framework scaffolding according to an example of the usage mode of the support frame having the above-mentioned configuration will be explained as follows.
This will be explained using figures. This scaffold as a whole consists of a multi-level work floor A 1 ,
It consists of a work floor unit U 1 forming A 2 ... and a stair unit U 2 providing stairs connecting each step of the work floor. In the figure, both units U 1 and U 2 are drawn separately for convenience of expression, but in reality they are one unit in the relationship indicated by the arrows. The basic components of the work floor unit U 1 are the building frame 1
, a scaffold board 2 and a side frame 3, and the stair unit U2 attached to the work unit U1 has the above-mentioned support frame 6, scaffolding stairs 7, scaffold board 2, and side frame 3 as its basic components. It's summery. Since the support frame 6 has been explained previously, each component except for the support frame 6 will be explained. ○ Building frame 1 Figure 4 shows the front view. According to the figure, the building frame 1 is an H-shaped frame, and includes a pair of building lots 10, 10, a horizontal lot 11 that connects the two building lots at the upper and lower division points, and a horizontal lot 11 on the lower side of the horizontal lot 11, Inverted U-shaped reinforcing material 12 placed between the bases 10 and 10
The basic parts are made up of. All structural members are round steel tubes. Each building site 10 is provided with a connecting pin 13, a locking mechanism 14, an engaging pin 15, etc., similar to the support frame building site 60. Since these accessories are exactly the same as those for the support frame construction site 60, detailed explanations will be omitted. The through holes 100 in the longitudinal direction of the horizontal lot provided in the portion directly below the attachment position of the horizontal lot 11 of each building site 10 are for connection with the joining plate 66 of the support frame 6, as already described. However, this through hole 100 is also used when installing scaffolding equipment such as morning glory. The reinforcing material 12 spanning both building lots 10, 10 is
It is connected to the horizontal floor 11 by a connecting plate 120 at its center. Connection plate 1
20 has a through hole 120a, which is similar to the support frame 6, and is used when attaching a tie rod for supporting reinforcement when attaching a morning glory or the like using the through hole 100. Regarding the frame width, if the temporary construction is for general buildings, a simple frame of 610 mm or 762 mm is sufficient.
Standard frames exceeding 900mm are not required for work purposes.
This is not desirable from the standpoint of installation space. height H 1
From the standpoint of securing the necessary space for work based on the height of the person, a suitable width is approximately 1700 to 2000 mm. Scaffolding board 2 The scaffolding board 2 is normally used, and is provided with engagement claws 20, 20 at both ends for engagement with the building frame horizontal area 11. ○ Side frame 3 This is a strength member installed between adjacent building sites 10 and 60 on the outside and inside sides of the building frame 1 and the support frame 6. As this strength member, cross braces are used in torii-type building frames, but in addition to cross braces, in H-type building frames, square frames that also serve as handrails, triangular handrail frames, combinations of handrails and diagonal members, etc. are used. It will be done. In FIG. 3, a triangular handrail frame (not shown) is used on the inner side, and a rectangular frame to which a curing net is removably attached is used on the outer side. ○ Scaffolding stairs 7 Like the scaffolding board, it is commonly used, and the upper and lower ends have claws 70, 70 for engaging the horizontal ground.
It is equipped with The configuration of each element is as described above, and next, the arrangement and combination state of these elements will be explained. First, in the work floor unit U1 , the required number of H-shaped building frames 1 are arranged in parallel at a predetermined interval 1, and the required number of stages are added in the vertical direction. A jack base 8 is attached to the lower end of the building frame building site 10 at the lowest level. Arrangement spacing l is 1829mm, 1524mm, 1219mm, 914mm for inch size
It is set to about mm. The connection in the vertical direction is via the connection pin 13 at the upper end of the building site 10 described above. Scaffolding boards 2 are connected and spanned between adjacent horizontal lots 11, 11 of each tier of such a building frame 1, forming working floors A1 , A2 ... for the number of erected tiers of the building frame. ing. The connection to the horizontal area 11 is made using the engaging claws 2 on both ends of the scaffold board 2.
According to 0.20. The side frames 3 are provided between adjacent buildings 10, 10 on the outer side and the inner side in each stage of the building frames 1. The height H 2 of the side frame 3 is approximately half the height H 1 of one H-shaped building frame (see Fig. 4), and the side frame 3 has a height of 100 mm at each level, and the outer side of the side frame 3 is connected to the working floor A level. At the border, one on the upper side and one on the lower side,
In addition, for the inner side, one piece is built above the level of the work floor A, and as a result, for the outer side, the parts corresponding to the landings B on each floor of stage unit U2 , which will be described later, are left as openings S. It will cover the entire side. Opening S in the area corresponding to landing B
The two side frames of the elevated part of the work floor were left unattached and left in place. Since the side frame 3 is located on the outside side of the building frame 1, it is not necessary to separately install a stair handrail. The side frame 3 is fixed by connecting a plurality of connecting pieces provided on both sides of the side frame to the engagement pins 15 with retaining pieces of the building site 10, 10...
By fitting the In the illustrated example, a diagonal member 5 is attached to the lower side of the lowermost work floor A1 instead of the side frame. Next, the stair unit U 2 is connected to the working floor unit.
It is provided corresponding to 5 spans of U1 (6 building frames), and 6 supporting frames 6 are used in parallel. That is, on the outer side of the work floor unit U1 ,
Six sheets are installed at corresponding positions at the same intervals l as the building frame 1, and the same number of stages as the building frame 1 are assembled in the vertical direction. The support frame 6 is connected to the bolts of the connecting plate 66 at the end of the horizontal ground 61, respectively.
It is connected to the outer building site 10 of the corresponding building frame 1 by fixing with nuts 64. In this state, the horizontal area 61 of the support frame 6 is at the same level as the horizontal area 11 of the H-shaped building frame of the work floor unit U1 . A jack base 8 is attached to the lower end of the support frame 6 at the lowest stage. The scaffolding stairs 7 are arranged in a staggered manner in the vertical direction at the span sections on both sides of the five-span center span section of such a support frame, and one is provided between each step of the support frame 6. There is. Each staircase 7 has a structure between the support frame rows standing on both sides of the corresponding span section.
It spans the gap between the support frame horizontal areas 61 and 61 on the adjacent floors. The deal with Yokochi 61 is
By engaging claws 70, 70 at both ends of the scaffolding staircase 7. Next, the scaffolding board 2 is constructed of all adjacent horizontal land 61,
It is located between 61 and 61. Among these, those connected to the upper and lower ends of each staircase 7 form a landing B. Each landing B is at the same level as the adjacent work floor A, and is arranged on the side of each floor work floor. On each floor, the work floor A and the landing B are connected through an opening S left on the outer surface of the work floor unit. Workers go back and forth between the work floor A and the landing B through this opening S, and go up and down using the stairs 7. The overall method of lifting and lowering is a spiral type with work floors A 1 , A 2 , . . . as intermediates. It should be noted that among the scaffold boards 2, those that do not serve as landings are necessary for the purpose of assembling the scaffold, and are also important in terms of strength. The side frame 3 is attached between adjacent building lots 10, 10 on the outer surface side in each stage of the support frames 6. The installation and attachment methods are exactly the same as those for the work floor unit U1 on the building frame 1. Also, as in the previous case, the diagonal member 5 is used only on the lower side of the lowest stage. Next, the scaffolding is removed as follows. First, the lowest building frame 1 of work floor unit U 1 ...
are installed, diagonal members 5 are set on the lower side between each building frame, and scaffolding boards 2 are stretched between adjacent horizontal lots 11, 11. On the other hand, at the required location outside this,
Erect the bottom support frame 6 of stair unit U 2 ,
The horizontal lot 61 is tied to the building site 10 of the building frame 1 that has been installed previously. Scaffolding boards 2 are then placed between each of the horizontal lots. After doing this, go up onto the scaffolding board 2 of both units U 1 and U 2 and attach the lowermost upper side frame 3 on both the outer and inner surfaces. Once the bottom tier is completed in this way, the second tier building frame 1... and support frame 6... are added on top of this, and the support frame 6 is fixed to the building frame 1, and the outer side has two tiers.
Attach the lower side frame 3 of the step and hang the scaffold board 2. On the support frame 6, a scaffolding staircase 7 is placed at a predetermined span. In this manner, the work unit U 1 and the stair unit U 2 are assembled one step at a time from the bottom in parallel. When dismantling, follow the exact opposite procedure and work your way down from the top. In addition, although the case where the building frame for the work floor is an H-shaped frame has been described above, if the building frame for the work floor is a general torii-type building frame, by using the support frame shown in Figure 1. Similarly applicable. [Effects of the Invention] The stair support frame of the present invention described above has the following features and advantages. ○ Work floor A 1 , A 2 ...Since the stairs connecting each step will be installed separately from the work floor forming part as stair unit U 1 , the width of work floor A will be compressed also at the stair installation part. The entire width of building frame 1 can always be used as a work floor. Therefore, there is no need to use a building frame 1 that is wider than necessary in anticipation of the pressure caused by the installation of stairs, as was the case in the past, and there are great advantages in terms of economy, transportation, storage, and assembly work. You can expect it. ○ In this case, the stair unit U 2 only needs to be installed in a part of the work floor unit U 1 , so even if there is not enough temporary space, if there is some free space in one part, you can use it. It has the advantage of being able to be installed in small spaces.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図イおよび第2図イは本発明の支持枠の一
例を示す正面図、両図ロは部分断面図、第3図は
同上支持枠を適用した枠組足場の一例を示す斜視
図、第4図は同上枠組足場に使用する建枠を示す
正面図、第5図は従来の枠組足場を示す模式説明
図である。 図中、1……建枠、2……足場板、3……側
枠、6……支持枠、7……足場用階段。
1A and 2A are front views showing an example of the support frame of the present invention, both figures B are partial sectional views, and FIG. 3 is a perspective view showing an example of a framework scaffold to which the same support frame is applied. Fig. 4 is a front view showing a building frame used for the above-mentioned frame scaffold, and Fig. 5 is a schematic explanatory diagram showing a conventional frame scaffold. In the figure, 1... Building frame, 2... Scaffolding board, 3... Side frame, 6... Support frame, 7... Scaffolding stairs.

Claims (1)

【特許請求の範囲】 1 1本の建地60とその上端部から片側に片持
ちで水平に持ち出された横地61とを基本構成部
材とする階段用支持枠6であつて、建地60上端
には他の枠6の建地60下端と嵌合し、枠6どう
しを上下に連結するための連結ピン13が設けら
れるとともに、横地61の先端には足場を形成す
る鳥居型建枠1の建地10に連結するための単管
クランプ63が付設されていて、足場建枠1の外
側面側に配置展開しその横地61…に足場用階段
7および足場板2を架け渡すようになつているこ
とを特徴とする枠組足場における階段支持枠。 2 1本の建地60とそのほぼ中間点から片側に
片持ちで水平に持ち出された横地61とを基本構
成部材とする階段用支持枠6であつて、建地60
上端には他の枠6の建地60下端と嵌合し、枠6
どうしを上下に連結するための連結ピン13が設
けられるとともに、横地61の先端には足場を形
成するH型建枠1の建地10の横地11取付け位
置直下に設けられた貫通孔100との間でボルト
ナツト64連結するためのボルト孔66aを有す
る取合プレート66が付設されていて、足場建枠
1の外側面側に配置展開しその横地61…に足場
用階段7および足場板2を架け渡すようになつて
いることを特徴とする枠組足場における階段支持
枠。
[Scope of Claims] 1. A stair support frame 6 whose basic constituent members are one building site 60 and a horizontal area 61 that is cantilevered horizontally from the upper end of the building site 60 to one side, the upper end of the building site 60 is provided with a connecting pin 13 that fits with the lower end of the building site 60 of another frame 6 and connects the frames 6 vertically, and at the tip of the horizontal area 61 is provided a connecting pin 13 of the torii-shaped building frame 1 that forms a scaffold. A single pipe clamp 63 is attached for connecting to the building site 10, and is arranged and expanded on the outer side of the scaffold building frame 1 so that the scaffold stairs 7 and the scaffold board 2 can be spanned over the horizontal site 61. A stair support frame in a framework scaffold characterized by: 2. A stair support frame 6 whose basic constituent members are a single building site 60 and a horizontal site 61 that is cantilevered horizontally from approximately the midpoint of the building site 60 to one side.
The upper end fits with the lower end of the building site 60 of another frame 6, and the frame 6
A connecting pin 13 is provided for vertically connecting the two parts, and a through hole 100 is provided at the tip of the horizontal area 61, which is provided directly below the installation position of the horizontal area 11 of the building site 10 of the H-shaped building frame 1 that forms the scaffolding. A connecting plate 66 having bolt holes 66a for connecting bolts and nuts 64 between them is attached, and is arranged and expanded on the outer side of the scaffolding frame 1, and the scaffolding stairs 7 and the scaffolding board 2 are mounted on the horizontal ground 61. A stair support frame in a framework scaffold, characterized in that it is adapted to pass.
JP22272387A 1987-09-04 1987-09-04 Staircase support frame in framework scaffold Granted JPS6466365A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22272387A JPS6466365A (en) 1987-09-04 1987-09-04 Staircase support frame in framework scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22272387A JPS6466365A (en) 1987-09-04 1987-09-04 Staircase support frame in framework scaffold

Publications (2)

Publication Number Publication Date
JPS6466365A JPS6466365A (en) 1989-03-13
JPH055983B2 true JPH055983B2 (en) 1993-01-25

Family

ID=16786895

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22272387A Granted JPS6466365A (en) 1987-09-04 1987-09-04 Staircase support frame in framework scaffold

Country Status (1)

Country Link
JP (1) JPS6466365A (en)

Also Published As

Publication number Publication date
JPS6466365A (en) 1989-03-13

Similar Documents

Publication Publication Date Title
JPH10280669A (en) Scaffolding unit
JPH0458866B2 (en)
JP3568167B2 (en) Temporary hanging stairs
JPH055983B2 (en)
JPH0593448A (en) Standardized step module
JP2723431B2 (en) Construction method of steel framed house
JP3732888B2 (en) Temporary staircase with landing
JP2938829B2 (en) Temporary stairs and how to assemble them
JP2996385B2 (en) Assembling scaffold
JP3626242B2 (en) Multi-stage construction method of temporary staircase with landing in shaft
JP3241896B2 (en) Steel frame stair hang down method
JPH047317Y2 (en)
JP3984247B2 (en) Temporary staircase with landing
JP3115908B2 (en) How to build steel stairs
JPH0118753Y2 (en)
JPH07279418A (en) Temporary structure
JP3892240B2 (en) Working scaffold and assembly method thereof
JPH0425877Y2 (en)
JPH0748872Y2 (en) H type adjustable building frame
JPH0528285Y2 (en)
JP3944870B2 (en) Method for constructing staircase with staircase and unit staircase used in this construction method
JPH047318Y2 (en)
JPH0514392U (en) Work scaffolding for stairs
JP3729607B2 (en) Roof structure of outdoor assembly stairs and its construction method
JP2575796Y2 (en) External curing frame

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees
S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350