JP3115908B2 - How to build steel stairs - Google Patents

How to build steel stairs

Info

Publication number
JP3115908B2
JP3115908B2 JP03177483A JP17748391A JP3115908B2 JP 3115908 B2 JP3115908 B2 JP 3115908B2 JP 03177483 A JP03177483 A JP 03177483A JP 17748391 A JP17748391 A JP 17748391A JP 3115908 B2 JP3115908 B2 JP 3115908B2
Authority
JP
Japan
Prior art keywords
steel
landing
staircase
floor slab
stairs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP03177483A
Other languages
Japanese (ja)
Other versions
JPH04371649A (en
Inventor
弘昭 大伴
山本  茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP03177483A priority Critical patent/JP3115908B2/en
Publication of JPH04371649A publication Critical patent/JPH04371649A/en
Application granted granted Critical
Publication of JP3115908B2 publication Critical patent/JP3115908B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Steps, Ramps, And Handrails (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、鉄骨階段の建て込み方
法に関し、詳しくは、床スラブをコンクリートの現場打
ちによって構築する建物に、段床部分の上下両側に夫々
踊り場部分を有する半階高分の鉄骨階段によって構成さ
れる中間踊り場を備えた折り返し式の鉄骨階段を建て込
む方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of building a steel staircase, and more particularly, to a half-story building in which a floor slab is constructed by cast-in-place of concrete, and a landing portion is provided on each of the upper and lower sides of a step floor portion. The present invention relates to a method of building a folded-type steel staircase having an intermediate landing composed of minute steel stairs.

【0002】[0002]

【従来の技術】床スラブをコンクリートの現場打ちによ
るRC造とした建物において、中間踊り場を備えた折り
返し式の鉄骨階段を建て込む場合、従来では、次のよう
な施工手順が採られていた。
2. Description of the Related Art In a building in which a floor slab is made of RC by cast-in-place of concrete, a folding steel staircase having an intermediate landing is built in the following construction procedure.

【0003】即ち、予め、階段用開口を形成するように
床スラブの型枠を組んでコンクリートを打設し、それよ
って上側の床スラブを構築した後、下側の床スラブに組
み付ける下側の半階高分の鉄骨階段をクレーンで吊り下
げて上側の床スラブの階段用開口を通して挿入し、その
下側の鉄骨階段の下側踊り場部分をアンカーボルトによ
って下側の床スラブに組み付ける。
[0003] That is, concrete is cast in advance by assembling a floor slab form so as to form an opening for stairs, thereby constructing an upper floor slab, and then attaching a lower floor slab to the lower floor slab. A half-height steel staircase is hung by a crane and inserted through the stair opening of the upper floor slab, and the lower landing portion of the lower steel staircase is assembled to the lower floor slab by anchor bolts.

【0004】しかる後、上側の床スラブに組み付ける上
側の半階高分の鉄骨階段をクレーンで吊り下げて前記階
段用開口を通して挿入し、その上側の鉄骨階段の下側踊
り場部分を下側の鉄骨階段の上側踊り場部分と連接して
中間踊り場を構成すると共に、上側の鉄骨階段の上側踊
り場部分をアンカーボルトによって上側の床スラブに組
み付け、これらを順に繰り返すことにより鉄骨階段を建
て込んでいた。
[0004] Thereafter, a steel stair at the height of the upper half floor to be assembled to the upper floor slab is hung by a crane and inserted through the stair opening, and the lower landing portion of the upper steel stair is lowered to the lower steel frame. The intermediate landing was formed by connecting to the upper landing portion of the stairs, and the upper landing portion of the upper steel stairs was assembled to the upper floor slab by anchor bolts, and these steps were repeated in order to build the steel stairs.

【0005】しかしながら、上記の建て込み方法による
場合は、建物の周囲に外部足場を設けておかないと、床
スラブの型枠工事が完了した時点で、型枠上に昇り降り
するための作業通路がなくなることになり、外部足場が
必要不可欠とされていた。しかも、この場合、外部足場
に設けられた狭い作業通路を通って型枠上に昇り降りす
ることになるため、資材の運搬等に不便であった。
[0005] However, in the case of the above-described building method, if an external scaffold is not provided around the building, a work passage for ascending and descending on the formwork when the formwork of the floor slab is completed. And external scaffolds were indispensable. In addition, in this case, it is inconvenient to transport the material, because it is required to go up and down on the formwork through a narrow work passage provided on the external scaffold.

【0006】更に、上記の方法では、段床部分とその上
下両側に設けれた踊り場部分とから構成された鉄骨階段
を上側の床スラブに形成した狭い階段用開口を通して挿
入しなければならないため、挿入しづらくて作業に手間
を要する欠点があり、また、挿入の際に鉄骨階段を開口
の周囲に衝突させ、鉄骨階段や躯体を傷付ける虞があっ
た。
Further, in the above-mentioned method, a steel staircase composed of a stepped floor portion and landing portions provided on both upper and lower sides thereof must be inserted through a narrow staircase opening formed in an upper floor slab. There is a drawback that it is difficult to insert it and it takes time and effort to work, and there is a risk that the steel stairs may collide around the opening at the time of insertion and damage the steel stairs and the frame.

【0007】尚、RC造の建物において、階段室だけを
S造とすることにより、床スラブの型枠工事に先行して
鉄骨階段を建て込み、鉄骨階段を作業通路として利用す
ることが可能であるが、これによる場合は、低コスト化
を意図して建物をRC造としているにもかかわらず、鉄
骨使用量が多くなって、工費が高く付くことになる。
In a RC building, only the staircase room is made of S, so that a steel stair can be built in advance of the floor slab formwork, and the steel stair can be used as a work passage. However, in this case, despite the fact that the building is made of RC for the purpose of cost reduction, the amount of steel frame used increases and the construction cost increases.

【0008】[0008]

【発明が解決しようとする課題】本発明は、上記の点に
留意してなされたもので、その目的とするところは、鉄
骨階段を容易かつ安全に建て込むことができ、しかも、
鉄骨階段を床スラブの配筋やコンクリート打設等に際し
て作業通路として利用できるようにした工期の短縮、工
費の低減をも図り得る鉄骨階段の建て込み方法を提供す
ることにある。
SUMMARY OF THE INVENTION The present invention has been made in consideration of the above points, and an object of the present invention is to make it possible to easily and safely build a steel staircase.
It is an object of the present invention to provide a method of installing a steel stair that can be used as a work passage when the steel stairs are used as a work passage when arranging floor slabs or placing concrete.

【0009】[0009]

【課題を解決するための手段】上記の課題を解決するた
めに、本発明が講じた技術的手段は次の通りである。即
ち、本発明による鉄骨階段の建て込み方法は、床スラブ
の型枠工事に先立って、既に構築された下階の床スラブ
に組み付けた第1の鉄骨階段の上側踊り場部分に第2の
鉄骨階段の下側踊り場部分を連接して中間踊り場を構成
し、前記中間踊り場A 1 を階段室のうちの一側部にのみ
立設された鉄骨柱5で支持すると共に、第2の鉄骨階段
の上側踊り場部分と当該上側踊り場部分に連ねる第3の
鉄骨階段の下側踊り場部分とを前記床スラブに連なる下
階踊り場に立設した仮設支持体で支持し、しかる後、前
記第2の鉄骨階段の上側踊り場部分と第3の鉄骨階段の
下側踊り場部分とで構成された上階踊り場に連なる床ス
ラブの型枠工事を行うことを特徴としている。
The technical means taken by the present invention to solve the above problems are as follows. That is, the method of installing the steel frame stairs according to the present invention includes, prior to the formwork of the floor slab, the second steel frame staircase on the upper landing portion of the first steel frame staircase assembled to the already constructed lower floor slab. The middle landing is constructed by connecting the lower landings
And, wherein the intermediate landings A 1 on one side of the staircase only
While being supported by the standing steel columns 5, the upper landing portion of the second steel staircase and the lower landing portion of the third steel staircase connected to the upper landing portion are set up on a lower floor landing connected to the floor slab. After that, it is supported by the temporary support provided, and after that, the floor slab formwork connected to the upper floor landing composed of the upper landing part of the second steel staircase and the lower landing part of the third steel staircase is carried out. It is characterized by performing.

【0010】[0010]

【0011】[0011]

【作用】上記の構成によれば、コンクリートを打設しよ
うとする最上階部分において、既にコンクリートを打設
して構築された床スラブに組み付けられた第1の鉄骨階
段に第2の鉄骨階段を先組みし、その先組みした第2の
鉄骨階段、および、それに連なる第3の鉄骨階段を仮設
支持体によって支持し、しかる後、床スラブの型枠工
事、配筋作業、コンクリート打設を行い、先組みした第
2および第3の鉄骨階段を床スラブと一体化することに
なる。
According to the above construction, at the top floor where concrete is to be cast, the second steel staircase is attached to the first steel staircase assembled to the floor slab already constructed by casting concrete. The pre-assembled, the pre-assembled second steel frame stairs, and the third steel frame staircase connected thereto are supported by the temporary support, and then the formwork of the floor slab, the rebar arrangement work, and the concrete casting are performed. The pre-assembled second and third steel stairs will be integrated with the floor slab.

【0012】[0012]

【実施例】図1および図2は本発明に係る鉄骨階段の建
て込み方法の一実施例を示す施工手順の説明図、図3は
要部の一部切欠拡大側面図、図4は要部の斜視図であ
る。先ず、これらの図を用いて鉄骨階段の建て込み方法
の一例を説明する。
1 and 2 are explanatory views of a construction procedure showing an embodiment of a method of building a steel staircase according to the present invention, FIG. 3 is a partially cutaway enlarged side view of a main part, and FIG. 4 is a main part. It is a perspective view of. First, an example of a method of building a steel frame stair will be described with reference to these drawings.

【0013】図1の(a)に示すように、既に構築され
たRC造の床スラブ1のうちの最上階の床スラブ1aに
は、段床部分とその上下両側に設けられた踊り場部分と
から構成された半階高分の第1の鉄骨階段2が、その下
側の踊り場部分2aを前記床スラブ1aの階段室B側端
部に位置するRC造の梁3にアンカーボルト4により固
定された状態で組み付けられている。第1の鉄骨階段2
の上側の踊り場部分2bは、下方から2層分ずつ順次継
ぎ足して延ばされている鉄骨柱5に連結されて支持され
ている。
As shown in FIG. 1A, the floor slab 1a on the top floor among the RC floor slabs 1 already constructed has a corrugated floor portion and landing portions provided on both upper and lower sides thereof. A first steel frame staircase 2 having a half-story height is fixed to an RC beam 3 located at the end of the floor slab 1a on the side of the staircase B by an anchor bolt 4. It is assembled in the state that was done. First steel frame stairs 2
The landing portion 2b on the upper side is connected to and supported by a steel column 5 which is sequentially extended by extending two layers from below.

【0014】その第1の鉄骨階段2の横側上方に、図1
の(b)、図3、図4に示すように、同様な構成よりな
る半階分の第2の鉄骨階段6をクレーン等(図示せず)
により吊り下げて搬入すると共に、その下側の踊り場部
分6aを、第1の鉄骨階段2の上側の踊り場部分2bの
横側に位置させる状態で鉄骨柱5に連結し、この鉄骨柱
5を介して、第2の鉄骨階段6の下側の踊り場部分6a
を第1の鉄骨階段2の上側の踊り場部分2bに連接し
て、中間踊り場A1 を構成する。
At the upper side of the first steel frame stair 2, FIG.
(B), as shown in FIGS. 3 and 4, a half-story second steel frame staircase 6 having a similar configuration is connected to a crane or the like (not shown).
And the lower landing portion 6a is connected to the steel column 5 in a state of being positioned on the side of the upper landing portion 2b of the first steel staircase 2, and the lower landing portion 6a is connected through the steel column 5. And the landing 6a below the second steel staircase 6
The by concatenating the first upper landing portion 2b of the steel stair 2, constituting the intermediate landing A 1.

【0015】図において、24は鉄骨柱5,5間に架設
された鉄骨梁、25…は鉄骨梁24に取り付けられたA
LC版であり、階段室BとエレベーターシャフトCとを
区画する耐火壁を構成している。26…は鉄骨柱5や鉄
骨梁24に溶接されたガセットプレートであり、前記鉄
骨階段2や鉄骨階段6は、これらのガセットプレート2
6…に両側のささら桁15…をボルト・ナット27…で
連結するように構成されている。
In the drawing, reference numeral 24 denotes a steel beam erected between the steel columns 5, 5, and 25 ... A attached to the steel beam 24.
It is an LC version and constitutes a fire-resistant wall that partitions the staircase room B and the elevator shaft C. 26 are gusset plates welded to the steel columns 5 and the steel beams 24. The steel stairs 2 and the steel stairs 6
6 are connected to the opposite side girders 15 by bolts and nuts 27.

【0016】一方、図1の(c)に示すように、最上階
の床スラブ1aに連なる下階踊り場F1 に仮設支持体7
を立設し、この仮設支持体7で第2の鉄骨階段6の上側
の踊り場部分6bを支持する。
[0016] On the other hand, as shown in (c) of FIG. 1, the temporary support 7 on the lower floor landing F 1 leading to the top floor of the floor slab 1a
The temporary support 7 supports the landing portion 6b above the second steel staircase 6.

【0017】更に、図2の(a)に示すように、鉄骨柱
5に延長用の鉄骨柱5aを継ぎ足し、そこに同様な構成
よりなる半階高分の第3の鉄骨階段8をクレーン等(図
示せず)で吊り下げて搬入し、その下側の踊り場部分8
aを前記仮設支持体7に支持させると共に、上側の踊り
場部分8bを延長用の鉄骨柱5aに連結し、第3の鉄骨
階段8の下側踊り場部分8aと第2の鉄骨階段6の上側
踊り場部分6bとを互いに連接して上階踊り場F2 を構
成する。
Further, as shown in FIG. 2 (a), a steel column 5 is extended with a steel column 5a for extension, and a third steel stair 8 having a similar structure and having a half-story height is provided with a crane or the like. (Not shown) and carried in, and the landing area 8 below it
a is supported by the temporary support member 7 and the upper landing section 8b is connected to the steel column 5a for extension, and the lower landing section 8a of the third steel frame stair 8 and the upper landing section of the second steel frame stair 6 are connected. constituting the upper floor landing F 2 and a portion 6b mutually connected to.

【0018】そして、これらの上側踊り場部分6bおよ
び下側踊り場部分8aにそれぞれアンカーボルト9…を
取り付けておくと共に、前記上階踊り場F2 (上側踊り
場部分6bおよび下側踊り場部分8a)に連なる床スラ
ブ用型枠および梁用型枠(図示せず)を組み付け、これ
らの型枠内に配筋およびコンクリート打設を行って、図
2の(b)に示すように、床スラブ10および梁30を
構築する。床スラブ10の構築後には、仮設支持体7は
撤去し、上階へと転用していく。
An anchor bolt 9 is attached to each of the upper landing portion 6b and the lower landing portion 8a, and a floor connected to the upper landing F 2 (the upper landing portion 6b and the lower landing portion 8a). A slab formwork and a beam formwork (not shown) are assembled, and reinforcement and concrete casting are performed in these formworks, and as shown in FIG. To build. After the construction of the floor slab 10, the temporary support 7 is removed and diverted to the upper floor.

【0019】次いで、構築した床スラブ10を最上階の
床スラブ1aとすると共に、第3の鉄骨階段8を第1の
鉄骨階段2として、前述同様の手順を繰り返し、順次、
鉄骨階段を上方に建て込んでいくのである。
Next, while the constructed floor slab 10 is used as the top floor slab 1a and the third steel frame stair 8 is used as the first steel frame stair 2, the same procedure as described above is repeated.
The steel stairs are built upward.

【0020】次に、上述した鉄骨階段の建て込み方法に
用いた仮設支持体7について説明しておく。図3および
図5〜図7に示すように、(但し、分かりやすくするた
めに、図4では、第2および第3の鉄骨階段6,8それ
ぞれの段床部分を図面上省略している。)仮設支持体7
は、一対の仮設支柱11,11の上部に仮設梁12をピ
ン13で連結すると共に、一対のターンバックル式のブ
レース14,14をX字状に取り付けて構成され、第2
および第3の鉄骨階段6,8それぞれの踊り場部分6
a,8aの両側のささら桁15…の下向き端面を仮設梁
12に当接させて支持させるようになっている。
Next, a description will be given of the temporary support 7 used in the above-described method of building a steel staircase. As shown in FIG. 3 and FIG. 5 to FIG. 7 (however, for the sake of simplicity, FIG. 4 omits the step floor portions of the second and third steel frame stairs 6, 8). ) Temporary support 7
Is constructed by connecting a temporary beam 12 to the upper part of a pair of temporary columns 11, 11 with pins 13 and attaching a pair of turnbuckle-type braces 14, 14 in an X-shape.
And the landing part 6 of each of the third steel stairs 6, 8
The downward facing end faces of the slab girder 15 on both sides of a and 8a abut on the temporary beam 12 to be supported.

【0021】仮設梁12上には、補助支柱16,16を
介してチャンネル状の当て板17,17が設けられ、こ
の当て板17,17で踊り場部分6a,8aの裏面に設
けられた複数の補強リブ18,18の下向き端面を支持
するようになっている。チャンネル状の当て板17とし
ては、中央の水平板部を補強リブ18,18の下向き端
面に当接させるものでも、両側の立ち上がり板部の端面
を補強リブ18,18の下向き端面に当接させるもので
もよい。
On the temporary beam 12, there are provided channel-shaped backing plates 17, 17 via auxiliary columns 16, 16, and a plurality of backing portions 6a, 8a provided by the backing plates 17, 17 on the back surfaces of the landing portions 6a, 8a. The reinforcing ribs 18 support the downward end faces. As the channel-shaped backing plate 17, even if the central horizontal plate portion is in contact with the downward end surfaces of the reinforcing ribs 18, 18, the end surfaces of the rising plate portions on both sides are in contact with the downward end surfaces of the reinforcing ribs 18, 18. It may be something.

【0022】仮設支柱11,11それぞれは、下側支柱
19と上側支柱20とを、図7に示すように、4本のア
ジャストボルト21…により長さを調節可能に連結して
構成されている。下側支柱19の下部は、床スラブ1a
側に設けられたプレート22上に載置支持されている。
このプレート22を下側支柱19に一体連接しておいて
もよい。上側支柱20の上部の横一側面に溶接によりブ
ラケット23が突設され、このブラケット23に仮設梁
12を前記ピン13で連結するようになっている。
As shown in FIG. 7, each of the temporary supports 11, 11 is constituted by connecting a lower support 19 and an upper support 20 with four adjusting bolts 21 so as to be adjustable in length. . The lower part of the lower support 19 is a floor slab 1a.
It is placed and supported on a plate 22 provided on the side.
The plate 22 may be integrally connected to the lower support 19. A bracket 23 is provided by welding on one lateral side of the upper part of the upper support 20 by welding, and the temporary beam 12 is connected to the bracket 23 by the pin 13.

【0023】[0023]

【0024】[0024]

【0025】[0025]

【0026】[0026]

【発明の効果】以上のように、本発明によれば、床スラ
ブの型枠工事に先行して鉄骨階段を建て込むため、型枠
上での配筋作業やコンクリート打設等に際して鉄骨階段
を作業通路として利用することができ、建物周囲の外部
足場を省略することが可能であり、しかも、従来のよう
な床スラブに形成した狭い階段用開口を通じて鉄骨階段
を挿入する場合に比して、鉄骨階段の建て込みを広い作
業空間で容易かつ安全に行え、鉄骨階段の衝突による躯
体の損傷もなくなり、工期の短縮、工費の低減を図る上
でも非常に有効である。
As described above, according to the present invention, since the steel stairs are erected prior to the floor slab formwork, the steel stairs are required for the reinforcing work on the formwork, concrete placement, and the like. It can be used as a work passage, it is possible to omit the external scaffold around the building, and moreover, compared to the case of inserting a steel frame staircase through a narrow staircase opening formed in a conventional floor slab, The steel stairs can be built easily and safely in a large work space, and there is no damage to the skeleton due to the collision of the steel stairs, which is very effective in shortening the construction period and reducing construction costs.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る鉄骨階段の建て込み方法の一実施
例を示す施工手順の説明図である。
FIG. 1 is an explanatory view of a construction procedure showing one embodiment of a method of building a steel staircase according to the present invention.

【図2】図1に続く施工手順の説明図である。FIG. 2 is an explanatory diagram of a construction procedure following FIG. 1;

【図3】要部の一部切欠拡大側面図である。FIG. 3 is a partially cutaway enlarged side view of a main part.

【図4】要部の斜視図である。FIG. 4 is a perspective view of a main part.

【図5】要部の正面図である。FIG. 5 is a front view of a main part.

【図6】要部の平面図である。FIG. 6 is a plan view of a main part.

【図7】要部の横断平面図である。FIG. 7 is a cross-sectional plan view of a main part.

【符号の説明】[Explanation of symbols]

1a…床スラブ、2…第1の鉄骨階段、2a…下側踊り
場部分、6…第2の鉄骨階段、6a…下側踊り場部分、
6b…上側踊り場部分、7…仮設支持体、8…第3の鉄
骨階段、8a…下側踊り場部分、F1 …下階踊り場、F
2 …上階踊り場、A1 …中間踊り場。
1a: floor slab, 2: first steel staircase, 2a: lower landing part, 6: second steel staircase, 6a: lower landing part,
6b: Upper landing, 7: Temporary support, 8: Third steel staircase, 8a: Lower landing, F 1 : Lower landing, F
2 ... Upper floor landing, A 1 ... Intermediate landing.

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平4−202956(JP,A) 特開 昭62−160352(JP,A) 特開 昭63−277357(JP,A) 特公 昭48−5287(JP,B1) (58)調査した分野(Int.Cl.7,DB名) E04F 11/00 - 11/116 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-4-202295 (JP, A) JP-A-62-160352 (JP, A) JP-A-63-277357 (JP, A) 5287 (JP, B1) (58) Field surveyed (Int. Cl. 7 , DB name) E04F 11/00-11/116

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 床スラブの型枠工事に先立って、既に構
築された下階の床スラブ1aに組み付けた第1の鉄骨階
段2の上側踊り場部分2bに第2の鉄骨階段6の下側踊
り場部分6aを連接して中間踊り場A1 を構成し、前記
中間踊り場A 1 を階段室のうちの一側部にのみ立設され
た鉄骨柱5で支持すると共に、第2の鉄骨階段6の上側
踊り場部分6bと当該上側踊り場部分6bに連ねる第3
の鉄骨階段8の下側踊り場部分8aとを前記床スラブ1
aに連なる下階踊り場F1 に立設した仮設支持体7で支
持し、しかる後、前記第2の鉄骨階段6の上側踊り場部
分6bと第3の鉄骨階段8の下側踊り場部分8aとで構
成された上階踊り場F2に連なる床スラブの型枠工事を
行うことを特徴とする鉄骨階段の建て込み方法。
1. Prior to floor slab formwork, a lower landing on a second steel staircase 6 is provided on an upper landing portion 2b of a first steel staircase 2 assembled on a lower floor slab 1a already constructed. and connecting portions 6a constitutes an intermediate landing a 1, wherein
It is erected only intermediate landings A 1 on one side of the staircase
And while supporting at steel column 5, third to Tsuraneru the second upper landing portion 6b and the upper landing portion 6b of the steel staircase 6
The lower landing portion 8a of the steel frame stair 8 and the floor slab 1
supported by temporary support 7 which is erected on the lower floor landing F 1 leading to a, thereafter, at a lower landing section 8a of the second upper landing portion 6b and the third steel staircase 8 Steel staircase 6 like an anchor method steel stairs and performing formwork construction of the floor slab continuous upstairs landing F 2 configured.
JP03177483A 1991-06-21 1991-06-21 How to build steel stairs Expired - Fee Related JP3115908B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP03177483A JP3115908B2 (en) 1991-06-21 1991-06-21 How to build steel stairs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP03177483A JP3115908B2 (en) 1991-06-21 1991-06-21 How to build steel stairs

Publications (2)

Publication Number Publication Date
JPH04371649A JPH04371649A (en) 1992-12-24
JP3115908B2 true JP3115908B2 (en) 2000-12-11

Family

ID=16031699

Family Applications (1)

Application Number Title Priority Date Filing Date
JP03177483A Expired - Fee Related JP3115908B2 (en) 1991-06-21 1991-06-21 How to build steel stairs

Country Status (1)

Country Link
JP (1) JP3115908B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200050642A (en) * 2018-11-02 2020-05-12 (주)연우피씨엔지니어링 A Construction Method for Pre-Constructing Staircase and Constructing Materials Used therein

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100487893B1 (en) * 2002-08-10 2005-05-03 대림산업 주식회사 System and method of precasted concrete staircase

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200050642A (en) * 2018-11-02 2020-05-12 (주)연우피씨엔지니어링 A Construction Method for Pre-Constructing Staircase and Constructing Materials Used therein
KR102211218B1 (en) * 2018-11-02 2021-02-03 (주)연우피씨엔지니어링 A Construction Method for Pre-Constructing Staircase and Constructing Materials Used therein

Also Published As

Publication number Publication date
JPH04371649A (en) 1992-12-24

Similar Documents

Publication Publication Date Title
US5491939A (en) Prefabricated staircase unit
JP3569861B2 (en) Construction method of stairs and staircase, staircase support device, and staircase structure
JP3115908B2 (en) How to build steel stairs
JPH05287901A (en) Construction of stairs
JP2706742B2 (en) Construction method of reinforced concrete stairs, stair handrail precast concrete slab and stair step formwork used for it
JP2874576B2 (en) Moving scaffold for retaining wall construction
JP2611882B2 (en) Construction method of stairs
JP2987469B2 (en) Staircase structure
JP2938829B2 (en) Temporary stairs and how to assemble them
JP3241896B2 (en) Steel frame stair hang down method
JPH0681463A (en) Building method for stair
JP3087196B2 (en) How to build stairs
JP3116135B2 (en) Preceding construction method of PC stairs
JPH07279418A (en) Temporary structure
JP2916585B2 (en) Construction method of building
JP2649057B2 (en) How to build stairs in buildings
JP2811211B2 (en) Flat slab construction method
JPH07102717A (en) Construction method of stairs used for prefabricated scaf-folding
JPS6286270A (en) Slab construction method
JP3944870B2 (en) Method for constructing staircase with staircase and unit staircase used in this construction method
JP2683878B2 (en) Precast staircase structure
JP2844096B2 (en) How to build stairs in buildings
JP2001032376A (en) Floor slab frame and construction method for skeleton
JP2681160B2 (en) E-shaped element of steel frame and its construction
JP3729607B2 (en) Roof structure of outdoor assembly stairs and its construction method

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees