JPH0530930B2 - - Google Patents

Info

Publication number
JPH0530930B2
JPH0530930B2 JP3403688A JP3403688A JPH0530930B2 JP H0530930 B2 JPH0530930 B2 JP H0530930B2 JP 3403688 A JP3403688 A JP 3403688A JP 3403688 A JP3403688 A JP 3403688A JP H0530930 B2 JPH0530930 B2 JP H0530930B2
Authority
JP
Japan
Prior art keywords
reinforcing bar
reinforcing bars
reinforcing
hanging
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP3403688A
Other languages
Japanese (ja)
Other versions
JPH01210520A (en
Inventor
Tadashi Kaneko
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP3403688A priority Critical patent/JPH01210520A/en
Publication of JPH01210520A publication Critical patent/JPH01210520A/en
Publication of JPH0530930B2 publication Critical patent/JPH0530930B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】 ≪産業上の利用分野≫ 本発明は鉄筋の仮受け装置に関し、例えば鉄筋
カゴの天端が地面下にあるような鉄筋コンクリー
ト杭を現場で構築する場合や地下連続壁を構築す
る場合等に、鉄筋カゴの吊下げ等に使用する鉄筋
の仮受け装置に関する。
[Detailed Description of the Invention] <<Industrial Application Field>> The present invention relates to a temporary support device for reinforcing bars, and is useful, for example, when building reinforced concrete piles with the tops of reinforcing bar baskets below the ground on site, or when constructing underground continuous walls. This invention relates to a temporary reinforcing bar support device used for hanging reinforcing bar cages during construction, etc.

≪従来の技術≫ 一般に、鉄筋コンクリート杭(以下、RC杭)
を構築する場合や、地下連続壁を構築する場合に
は、予め孔を掘削し、この孔内に別途組立てた鉄
筋カゴを挿入した後、コンクリート打設を行つて
いる。
<<Conventional technology>> Generally, reinforced concrete piles (hereinafter referred to as RC piles)
When constructing a wall or an underground continuous wall, a hole is excavated in advance, a separately assembled reinforcing cage is inserted into the hole, and then concrete is poured.

このような言わゆる場所打ちRC杭工事や、地
下連続壁の構築工事において、鉄筋カゴの天端が
地面より低い位置にある場合は、従来、第5図に
示すような手段にて工事が行なわれていた。
In such so-called cast-in-place RC pile work or construction work for underground continuous walls, if the top of the reinforcing bar cage is located at a lower position than the ground, construction work has traditionally been carried out using the method shown in Figure 5. It was

すなわち、第5図において、鉄筋カゴ1を構成
する複数本の主筋2の内、所要本の主筋2の天端
に吊り鉄筋3を溶接4で取付け、この吊り鉄筋3
により鉄筋カゴ1を吊下げ、地面G.L.より下方に
掘削された孔5内に挿入する。そして、同図に示
すように、鉄筋カゴ1を吊り鉄筋3で吊つた状態
のままで、孔5内の所要位置までコンクリートを
打設する。
That is, in FIG. 5, hanging reinforcing bars 3 are attached by welding 4 to the tops of required main reinforcing bars 2 among the plurality of main reinforcing bars 2 constituting the reinforcing bar cage 1.
The reinforcing bar cage 1 is suspended and inserted into the hole 5 drilled below the ground GL. Then, as shown in the figure, with the reinforcing bar cage 1 suspended by the hanging reinforcing bars 3, concrete is poured into the hole 5 to a required position.

なお、場所打ちRC杭の場合には、上記のよう
にして工事が完了した後に、ビル、鉄塔、その他
各種構築物の地下部分を建造するための地盤の掘
削(すなわち根切り)が行われる。
In the case of cast-in-place RC piles, after the construction is completed as described above, the ground is excavated (i.e., root cutting) to construct the underground parts of buildings, steel towers, and other various structures.

≪発明が解決しようとする課題≫ 上記のように、鉄筋カゴ1の天端が地面G.L.よ
り低い位置にある場合の従来の場所打ちRC杭や
地下連続壁の工事においては、鉄筋カゴ1の主筋
2に吊り鉄筋3を溶接4で取付けていたため、次
のような問題があつた。
≪Problem to be solved by the invention≫ As mentioned above, in the conventional cast-in-place RC pile or underground continuous wall construction when the top of the reinforcing bar cage 1 is located at a position lower than the ground GL, the main reinforcement of the reinforcing bar cage 1 The following problems arose because the hanging reinforcing bars 3 were attached to 2 by welding 4.

(1) 主筋2への吊り鉄筋3の溶接のために手間と
時間がかかる。
(1) It takes time and effort to weld the hanging reinforcing bars 3 to the main bars 2.

(2) 鉄筋カゴ1の主筋2と吊り鉄筋3との溶接部
4は溝5内の地面G.L.下にあるため、コンクリ
ート打設後に、この溶接部4を切断して吊り鉄
筋3を回収することは不可能である。
(2) Since the welded part 4 between the main reinforcement 2 of the reinforcing bar cage 1 and the hanging reinforcing bar 3 is below the ground GL in the groove 5, this welded part 4 should be cut and the hanging reinforcing bar 3 should be recovered after concrete is poured. is not possible.

(3) 上記(2)のため、根切りの際に、吊り鉄筋3が
露出し、根切り作業を困難にする。
(3) Due to (2) above, the hanging reinforcing bars 3 are exposed during root cutting, making root cutting work difficult.

(4) また地下連続壁を構築する場合等のように吊
り鉄筋3が回収できないときは、経済的な不利
益が大きい。
(4) Furthermore, when the hanging reinforcing bars 3 cannot be recovered, such as when constructing an underground continuous wall, there is a great economic disadvantage.

(5) 吊り鉄筋3を鉄筋カゴ1の主筋2に溶接で固
定してしまうため、鉄筋カゴ1の高さ方向にお
ける設置位置の微妙な調整ができない。
(5) Since the hanging reinforcing bars 3 are fixed to the main reinforcing bars 2 of the reinforcing bar cage 1 by welding, the installation position of the reinforcing bar cage 1 cannot be finely adjusted in the height direction.

(6) 吊り鉄筋3の溶接作業時に、鉄筋カゴ1の主
筋2を傷つける虞れがある。
(6) When welding the hanging reinforcing bars 3, there is a risk of damaging the main reinforcing bars 2 of the reinforcing bar cage 1.

(7) 吊り鉄筋3や溶接部4の除去ができない場合
には、吊り鉄筋3や溶接部4の材質によつて
は、長年月の間に鉄筋カゴ1を腐触させる等の
おそれがあり、これらの材質の選定が困難とな
る。
(7) If the hanging reinforcing bars 3 and welded parts 4 cannot be removed, depending on the material of the hanging reinforcing bars 3 and welded parts 4, there is a risk that the reinforcing bar cage 1 will corrode over many years. Selection of these materials becomes difficult.

本発明は、以上の諸点に鑑みてなされたもの
で、その目的とするところは、例えば場所打ち
RC杭や地下連続等の工事において鉄筋カゴ天端
が地面下にある場合等に、その鉄筋カゴの溝内へ
の挿入作業を容易に行うことができると共に、コ
ンクリート打設後に上記の従来のような吊り鉄筋
を残すことがなく、しかも鉄筋カゴの高さ方向に
おける設置位置の微妙な調整等を行うことのでき
る鉄筋の仮受け装置を提供するにある。
The present invention has been made in view of the above points, and its purpose is, for example, to
When the top of the reinforcing bar cage is below the ground in construction work such as RC piles or underground continuity, it is easy to insert the reinforcing bar cage into the groove, and it is possible to easily insert the reinforcing bar cage into the groove after concrete is placed. To provide a reinforcing bar temporary receiving device which does not leave any suspended reinforcing bars and allows delicate adjustment of the installation position of a reinforcing bar cage in the height direction.

≪課題を解決するための手段≫ 上記目的を達成するために、本発明に係る鉄筋
の仮受け装置では、一端を吊り治具に固定し他端
にワイヤロープの一端を取付けたネジ鉄筋を該ネ
ジ鉄筋用固定体に挿通させ、前記ワイヤロープの
他端に鉄筋吊り用クランプを取付けてなり、該鉄
筋吊り用クランプは遠隔操作で掛け外し可能な被
吊り鉄筋用ロツクを備えさせた。
<<Means for Solving the Problem>> In order to achieve the above object, the temporary reinforcing bar support device according to the present invention uses a threaded reinforcing bar with one end fixed to a hanging jig and one end of a wire rope attached to the other end. The wire rope is inserted through a fixed body for reinforcing bars, and a clamp for suspending reinforcing bars is attached to the other end of the wire rope, and the clamp for suspending reinforcing bars is provided with a lock for suspended reinforcing bars that can be hooked and removed by remote control.

≪作用≫ 本発明に係る装置においては、まず例えば鉄筋
カゴの主筋の天端近傍部を鉄筋吊り用クランプに
装着させ、このクランプに具備されている被吊り
鉄筋用ロツクを直接操作して上記の主筋にロツク
を掛け、クランプに鉄筋カゴを固定する。
<<Operation>> In the apparatus according to the present invention, first, for example, the vicinity of the top of the main bar of a reinforcing bar cage is attached to a clamp for suspending reinforcing bars, and the lock for suspended reinforcing bars provided on this clamp is directly operated to perform the above-mentioned operation. Lock the main reinforcement and secure the reinforcing bar basket to the clamp.

この状態で、吊り治具を、例えばクレーン等に
て吊り上げると、吊り治具に固定されたネジ鉄筋
と、ネジ鉄筋に取付けられたワイヤロープとを介
して、上記のクランプに固定された鉄筋カゴが吊
下げられる。
In this state, when the lifting jig is lifted with a crane or the like, the reinforcing bar cage fixed to the clamp is connected to the threaded reinforcing bar fixed to the lifting jig and the wire rope attached to the threaded reinforcing bar. is suspended.

引続きクレーンを操作して鉄筋カゴを例えば
RC杭埋込用溝内の所定の高さまで挿入し、ネジ
鉄筋用固定体が地面に接したなら、ナツトを締め
てネジ鉄筋を固定体に固定すれば、鉄筋カゴが上
記溝内の所定位置にセツトされる。
Continue to operate the crane to move the rebar cage, for example.
Insert the RC pile into the groove for embedding it up to the specified height, and once the screw reinforcing bar fixing body touches the ground, tighten the nut to fix the screw reinforcing bar to the fixing body, and the reinforcing bar basket will be at the specified position in the groove. is set to

このとき、ナツトの締め具合を調整すれば、鉄
筋カゴの高さ微調整することができる。
At this time, the height of the reinforcing bar cage can be finely adjusted by adjusting the tightness of the nuts.

次いで、溝内の鉄筋カゴ天端より上方の位置ま
でコンクリート打設を行い、このコンクリートが
固化する前に、地上でロープを操作して鉄筋吊り
用クランプのロツクを外し、そのクランプを鉄筋
カゴから外す。
Next, concrete is placed in the trench above the top of the reinforcing bar cage, and before the concrete hardens, a rope is operated on the ground to unlock the reinforcing bar suspension clamp, and the clamp is removed from the reinforcing bar cage. remove.

しかる後、クレーンを操作して吊り治具を吊上
げると、ネジ鉄筋とワイヤロープとを介して鉄筋
吊り用クランプが吊上げられ、本発明に係る装置
が回収される。
Thereafter, when the crane is operated to lift the lifting jig, the reinforcing bar lifting clamp is lifted up via the threaded reinforcing bar and the wire rope, and the device according to the present invention is recovered.

また、回収された本発明に係る装置に用いて他
のRC杭の構築を行うには、以上の操作を繰返せ
ばよい。
Further, in order to construct another RC pile using the recovered device according to the present invention, the above-described operation may be repeated.

以上は、場所打ちRC杭工事に使用する際の本
発明に係る装置の作用であるが、この工事に限ら
ず類似の各種工事に本発明に係る装置を使用する
場合も以上と同様の作用による。
The above is the effect of the device according to the present invention when used in cast-in-place RC pile construction, but the same effect as described above also applies when the device according to the present invention is used not only in this construction but in various similar constructions. .

≪実施例≫ 第1図は本発明に係る装置の一実施例を示し、
吊り治具10に一端が固定され他端にワイヤロー
プ12が取付けられたネジ鉄筋11を、ネジ鉄筋
用固定体(以下、固定体)13に挿通させ、ワイ
ヤロープ12の他端に鉄筋吊り用クランプ(以
下、クランプ)14が取付けられている。
<<Example>> FIG. 1 shows an example of the apparatus according to the present invention,
A threaded reinforcing bar 11 with one end fixed to a hanging jig 10 and a wire rope 12 attached to the other end is inserted through a threaded reinforcing bar fixing body (hereinafter referred to as a fixing body) 13, and the other end of the wire rope 12 is attached to a threaded reinforcing bar 11 for hanging the reinforcing bar. A clamp (hereinafter referred to as clamp) 14 is attached.

上記のネジ鉄筋11は、ナツト15の締付けに
よりワツシヤ16を介して固定体13に固定され
るものあり、またネジ鉄筋11のワイヤロープ1
2側端にシヤツクル17を具備している。
The above-mentioned threaded reinforcing bar 11 is fixed to the fixed body 13 via a washer 16 by tightening a nut 15, and the wire rope 1 of the threaded reinforcing bar 11 is
A shackle 17 is provided at the two side ends.

また、上記のワイヤロープ12は、両端にシン
ブル12′,12″を有する掛けワイヤで、この一
方のシンプル12′により上記のシヤツクル17
を介してネジ鉄筋11に取付けられている。また
他方のシンプル12″によりクランプ14上部に
具備されたシヤツクル18を介してクランプ14
を取付けている。
Further, the above-mentioned wire rope 12 is a hanging wire having thimble 12', 12'' at both ends, and the above-mentioned shackle 17
It is attached to the threaded reinforcing bar 11 via. In addition, the other simple 12'' connects the clamp 14 through the shackle 18 provided on the upper part of the clamp 14.
is installed.

このクランプ14は、鉄筋を強固に把握できる
各種のものが使用されるが、鉄筋を安全に咬持す
るための被吊り鉄筋用ロツク(以下、ロツク)の
掛け外しを遠隔操作できるものに限られ、例えば
ロープ19による遠隔操作が可能なレンフローク
ランプ(レンフロージヤパン社製商品名DHK)
や実開昭58−95971号のクランプ、あるいは電気
の入、切等により遠隔操作ができるクランプ等が
好ましくは使用できる。
This clamp 14 can be of various types that can firmly grasp the reinforcing bars, but it is limited to clamps that can remotely control the locks for suspended reinforcing bars (hereinafter referred to as locks) to securely clamp the reinforcing bars. For example, Renfroe clamp (product name: DHK, manufactured by Renfroe Japan Co., Ltd.) that can be remotely controlled using a rope 19.
It is preferable to use the clamp disclosed in Japanese Utility Model Application Publication No. 58-95971, or a clamp that can be remotely controlled by turning on or off electricity.

次に本例に示す本発明に係る装置を現場打ち
RC杭工事に使用する操作態様を、各ステツプ毎
に第2図A〜F、並びに第3図、第4図を参照し
て説明する。
Next, the device according to the present invention shown in this example was installed on site.
The operation mode used in RC pile construction will be explained for each step with reference to FIGS. 2A to 2F, as well as FIGS. 3 and 4.

先ず、第2図Aのステツプにおいて、第1図の
吊り治具10をシヤツクル20が介して図示省略
のクレーンに取付け、この吊り治具10をクレー
ンにより吊下げ、クランプ14の鉄筋支持部14
aが、RC杭の鉄筋カゴ(図示省略)の主筋22
の上部へ位置するように操作する。
First, in the step shown in FIG. 2A, the lifting jig 10 shown in FIG.
a is the main bar 22 of the reinforcing bar basket (not shown) of the RC pile
Move it to the top of the screen.

次いで、第2図Bのステツプにおいて、鉄筋支
持部14aに主筋22を装着する。
Next, in the step shown in FIG. 2B, the main reinforcing bars 22 are attached to the reinforcing bar support portion 14a.

そして、第2図Cのステツプにおいて、ロープ
19を矢印α方向へ弛緩させると、このロープ1
9に連結されたレバー14bが矢印β方向へ回動
し、続いてこのレバー14bとリンクされたレバ
ー14cが矢印γ方向へ回動して、ロツク14d
が主筋22を強固に固定する。
Then, in step C of FIG. 2, when the rope 19 is relaxed in the direction of arrow α, this rope 1
The lever 14b connected to the lock 14b rotates in the direction of the arrow β, and then the lever 14c linked to the lever 14b rotates in the direction of the arrow γ to lock the lock 14d.
firmly fixes the main reinforcement 22.

しかる後、第2図Dのステツプにおいて、クレ
ーンを操作し、本発明に係る装置全体を矢印δ方
向へ吊下げ、鉄筋カゴをRC杭用溝に挿入する。
Thereafter, in the step shown in FIG. 2D, the crane is operated to suspend the entire apparatus according to the present invention in the direction of arrow δ, and insert the reinforcing bar basket into the RC pile groove.

この時の状態を第3図に示す。ここで第3図
中、第1,2図と同一符号は、第1,2図と同義
である。
The state at this time is shown in FIG. Here, in FIG. 3, the same symbols as in FIGS. 1 and 2 have the same meanings as in FIGS. 1 and 2.

鉄筋カゴ1がRC杭用溝5内の所定の位置まで
挿入されると、第1図の固定体13が地面G.L.に
接し、本発明に係る装置は上記位置に鉄筋カゴ1
を吊下げた状態で、この固定体13により地面
G.L.に固定される。この後、第1図の吊り治具1
0をクレーンから外す。
When the reinforcing bar cage 1 is inserted into the RC pile groove 5 to a predetermined position, the fixed body 13 shown in FIG.
When suspended, this fixed body 13
Fixed to GL. After this, hang the hanging jig 1 in Figure 1.
Remove 0 from the crane.

この時の状態を第4図に示す。ここで第4図
中、第1図〜第3図と同一符号は第1図〜第3図
と同義である。
The state at this time is shown in FIG. Here, in FIG. 4, the same symbols as in FIGS. 1 to 3 have the same meanings as in FIGS. 1 to 3.

そして、鉄筋カゴ1の高さ方向の位置の微調整
は、第4図の状態の時に、ネジ鉄筋11へのナツ
ト15の締付け程度を微調整することにより行わ
れる。
Fine adjustment of the position of the reinforcing bar cage 1 in the height direction is performed by finely adjusting the degree of tightening of the nut 15 to the threaded reinforcing bar 11 in the state shown in FIG.

次いでこの状態のまま、RC杭用孔5内の所定
位置(鉄筋カゴ1の天端より若干上方の位置)ま
でコンクリート打設を行う。
Next, in this state, concrete is poured to a predetermined position within the RC pile hole 5 (a position slightly above the top of the reinforcing bar basket 1).

このコンクリートが固化する前、ナツト15を
緩めてワイヤロープ12に係る荷重をなくした
後、第2図Eのステツプにおいて、地上にてロー
プ19を矢印α′の方向へ引き上げると、レバー1
4bとレバー14cがそれぞれ矢印β′,γ′方向へ
回動し、ロツク14dが外れる。
Before this concrete hardens, after loosening the nut 15 to eliminate the load on the wire rope 12, in the step shown in FIG.
4b and lever 14c rotate in the directions of arrows β' and γ', respectively, and lock 14d is released.

最後に、第2図Fのステツプにおいて、第1図
の吊り治具10を再度クレーンに取付け、本発明
に係る装置全体を吊上げると、主筋22は鉄筋カ
ゴがコンクリートにより拘束されているため孔内
に残り、この主筋22からクランプ14が外れて
本発明に係る装置が地上へ吊上げられる。
Finally, in step F of FIG. 2, the lifting jig 10 of FIG. 1 is reattached to the crane and the entire device according to the present invention is lifted. The clamp 14 is removed from this main reinforcement 22 and the device according to the present invention is lifted to the ground.

なお、現場打ちRC杭工事以外の、例えば地下
連続壁において鉄筋カゴ天端が地面より下方にあ
る場合の工事、その他各種の類似の工事において
も、上記と略同様にして本発明に係る装置を使用
することができる。
In addition, the device according to the present invention can be used in substantially the same manner as described above in works other than cast-in-place RC pile work, such as work in which the top of the reinforcing bar cage is below the ground level in an underground continuous wall, and various other similar works. can be used.

また、鉄筋カゴの底部を溝等の底面上に載置し
てよい場合にはコンクリート打設する前に本発明
による装置を鉄筋から取り外すようにしてもよ
い。
Furthermore, if the bottom of the reinforcing bar basket can be placed on the bottom surface of a groove or the like, the device according to the invention may be removed from the reinforcing bars before concrete is poured.

≪発明の効果≫ 以上説明した本発明に係る装置によれば、次の
ような効果を奏することができる。
<<Effects of the Invention>> According to the apparatus according to the present invention described above, the following effects can be achieved.

(1) クランプへの主筋の掛け外しのみでよく、従
来のような溶接作業が不要であるため、手間と
作業時間が大幅に低減し、かつ鉄筋を傷付ける
おそれもない。
(1) Only the main reinforcing bars need to be attached to and removed from the clamps, and the conventional welding work is not required, so labor and work time are significantly reduced, and there is no risk of damaging the reinforcing bars.

(2) 例えばRC杭構築後の根切り作業時に、従来
のように吊り鉄筋が残るということはなく、こ
の根切り作業を容易にする。
(2) For example, when cutting roots after constructing RC piles, there are no hanging reinforcing bars left behind as in the past, making this root cutting work easier.

(3) また、工事完了後に吊り鉄筋が回収できない
といつた事態は生ぜず、経済的不利益や、吊り
鉄筋材質選定上も問題も解消する。
(3) In addition, there will be no situation where the suspended reinforcing bars cannot be recovered after construction is completed, eliminating economic disadvantage and problems in selecting the material of the suspended reinforcing bars.

(4) ネジ鉄筋とナツトとにより、例えば鉄筋カゴ
の高さ方向の設置位置の微妙な調整を容易に行
うことができる。
(4) By using the threaded reinforcing bars and nuts, for example, the installation position of the reinforcing bar cage in the height direction can be easily adjusted.

(5) 繰返し使用することができ経済的である。(5) It can be used repeatedly and is economical.

(6) 現場打ちRC杭工事、地下連続壁工事、その
他広範囲の工事に使用でき、工業上有益であ
る。
(6) It can be used for cast-in-place RC pile construction, underground continuous wall construction, and a wide range of other construction projects, making it industrially useful.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明に係る装置の一実施例を示す説
明図、第2図A〜Fは、第1図に示す本発明に係
る装置の操作態様例を各ステツプ毎に示す図、第
3図は第1図に示す本発明に係る装置を用いて鉄
筋カゴを溝内に挿入している状態を示す図、第4
図は鉄筋カゴが溝内所定位置にセツトされた状態
を示す図、第5図は従来の工事態様を示す図であ
る。 10……吊り治具、11……ネジ鉄筋、12…
…ワイヤロープ、13……ネジ鉄筋用固定体、1
4……鉄筋吊り用クランプ、14d……被吊り鉄
筋用ロツク。
FIG. 1 is an explanatory diagram showing one embodiment of the apparatus according to the present invention, FIGS. The figures show a state in which a reinforcing bar cage is inserted into a groove using the device according to the present invention shown in Fig.
The figure shows a reinforcing bar basket set in a predetermined position in a groove, and FIG. 5 shows a conventional construction situation. 10... Hanging jig, 11... Screw reinforcing bar, 12...
... Wire rope, 13 ... Screw reinforcing bar fixing body, 1
4... Clamp for suspending reinforcing bars, 14d... Lock for suspended reinforcing bars.

Claims (1)

【特許請求の範囲】[Claims] 1 一端を吊り治具に固定し他端にワイヤロープ
の一端を取付けたネジ鉄筋を、ネジ鉄筋用固定体
に挿通させ、前記ワイヤロープの他端に鉄筋吊り
用クランプを取付けてなり、該鉄筋吊り用クラン
プは遠隔操作で掛け外し可能な被吊り鉄筋用ロツ
クを備えていることを特徴とする鉄筋の仮受け装
置。
1 A threaded reinforcing bar with one end fixed to a hanging jig and one end of a wire rope attached to the other end is inserted through a threaded reinforcing bar fixing body, a reinforcing bar hanging clamp is attached to the other end of the wire rope, and the reinforcing bar is A temporary reinforcing bar receiving device characterized in that the hanging clamp is equipped with a lock for suspended reinforcing bars that can be hooked and removed by remote control.
JP3403688A 1988-02-18 1988-02-18 Temporary tightening of reinforcement Granted JPH01210520A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3403688A JPH01210520A (en) 1988-02-18 1988-02-18 Temporary tightening of reinforcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3403688A JPH01210520A (en) 1988-02-18 1988-02-18 Temporary tightening of reinforcement

Publications (2)

Publication Number Publication Date
JPH01210520A JPH01210520A (en) 1989-08-24
JPH0530930B2 true JPH0530930B2 (en) 1993-05-11

Family

ID=12403104

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3403688A Granted JPH01210520A (en) 1988-02-18 1988-02-18 Temporary tightening of reinforcement

Country Status (1)

Country Link
JP (1) JPH01210520A (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2858206B2 (en) * 1994-01-27 1999-02-17 三井建設株式会社 Rebar hanging jig
JP4712510B2 (en) * 2005-10-11 2011-06-29 学校法人関東学院 How to install ready-made piles for heat exchange, how to build ready-made piles for heat exchange, and ready-made piles for bottom
JP6261290B2 (en) * 2013-01-23 2018-01-17 辻 八郎 Vertical pile construction method
JP6431232B1 (en) * 2018-04-25 2018-11-28 辻 ふうな Rebar assembly method

Also Published As

Publication number Publication date
JPH01210520A (en) 1989-08-24

Similar Documents

Publication Publication Date Title
US4684287A (en) Retaining wall construction and method for erection
JP2016118027A (en) Anti-lifting assembly of rebar cage, rebar cage and construction method of cast-in-place pile
JPH0530930B2 (en)
JP3753170B2 (en) How to build structures useful as roads and construction scaffolds on slopes
JPH0960498A (en) Structure and execution method for timbering wall
JPH01178610A (en) Setting method for stress member
JP2671765B2 (en) Prefabricated reinforced concrete structure of reinforced concrete stepped beams
JPH08277514A (en) Suspension supporting device and construction of pier
JPS63280153A (en) Underground inverted lining method
JPS59192145A (en) Fixing of iron pillar
JPH05214813A (en) Suspension jig for reinforcing cage
JP2594833Y2 (en) Concrete floor slab
JP3608829B2 (en) Anchor device
JP3415528B2 (en) Slope reinforcement method
JPH0730564B2 (en) Construction method of underground structure
JP2649887B2 (en) Construction method of mat slab
JPH061581Y2 (en) Crane lifting equipment
JP3243161B2 (en) Suspension mechanism and suspension method for reinforced cage
JPS6319648B2 (en)
JPH0612054Y2 (en) Concrete block for manhole
JPS63277342A (en) Reverse execution of underground story
JPH09255276A (en) Segment lifting tool
JP3622385B2 (en) Pile structure
JPH07133667A (en) Method of completely constructing beam reinforcement for building made of wall-type rahmen reinforced concrete or rahmen reinforced concrete
JPH0960492A (en) Structure and execution method for timbering wall