JPH05140927A - Water stop plate for steel sheet pile and excavation method for ground using such plate - Google Patents
Water stop plate for steel sheet pile and excavation method for ground using such plateInfo
- Publication number
- JPH05140927A JPH05140927A JP32685991A JP32685991A JPH05140927A JP H05140927 A JPH05140927 A JP H05140927A JP 32685991 A JP32685991 A JP 32685991A JP 32685991 A JP32685991 A JP 32685991A JP H05140927 A JPH05140927 A JP H05140927A
- Authority
- JP
- Japan
- Prior art keywords
- ground
- water stop
- steel sheet
- stop plate
- sheet pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、鋼矢板用止水板及び止
水板を使った地盤の掘削方法に関し、特に、隣接する鋼
矢板同士の接合が不確実な状況でも、地盤の掘削作業が
行える鋼矢板用止水板及び止水板を使った地盤の掘削方
法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a water stop plate for steel sheet piles and a method for excavating the ground using the water stop sheet. In particular, even when the joining of adjacent steel sheet piles is uncertain, ground excavation work is performed. The present invention relates to a water stop plate for steel sheet piles and a method for excavating the ground using the water stop plate.
【0002】[0002]
【従来の技術】従来、地盤を掘削する際、周囲の地盤が
崩壊しないように、鋼矢板を用いて山留と止水を行って
いた(山留工法)。この山留工法では、鋼矢板の打設時
に、隣接する鋼矢板相互の接合部が噛み合わない場合が
生じる。このような状態で、地盤の掘削作業を行うと、
鋼矢板相互の接合部の間隙から土砂や地下水が流出して
しまい、掘削作業が困難となる。そこで、従来は、事前
に、鋼矢板の接合部付近の地盤に対して薬注等を行い、
地盤を改良した後に、掘削作業を行っていた。2. Description of the Related Art Conventionally, when excavating the ground, steel sheet piles have been used for retaining the water and stopping water to prevent the surrounding ground from collapsing (mounting method). In this mountain retaining method, when the steel sheet piles are driven, the joint portions between the adjacent steel sheet piles may not mesh with each other. When excavating the ground in such a state,
Sediment and groundwater flow out from the gap between the joints of steel sheet piles, making it difficult to perform excavation work. Therefore, conventionally, in advance, chemical injection or the like is performed on the ground near the joint portion of the steel sheet pile,
Excavation work was carried out after the ground was improved.
【0003】[0003]
【発明が解決しようとする課題】上記従来の山留工法で
は、鋼矢板相互の接合部が噛み合っていない場合、事前
に、鋼矢板の接合部付近の地盤に対して薬注等を行い、
地盤を改良した後に、掘削作業を行っているので、工事
費及び作業時間がかかるという問題があった。In the above-mentioned conventional mountain retaining method, when the joints of the steel sheet piles do not mesh with each other, chemical injection or the like is performed on the ground in the vicinity of the joints of the steel sheet piles in advance,
Since excavation work is performed after the ground is improved, there is a problem that construction cost and work time are required.
【0004】そこで、本発明は、前記従来技術の問題点
に鑑みてなされたもので、その目的とするところは、鋼
矢板相互の接合部が噛み合っていない場合でも、安価で
かつ確実に、土砂や地下水の流出を防止して、地盤の掘
削作業を行うことにある。Therefore, the present invention has been made in view of the above-mentioned problems of the prior art, and an object thereof is to reliably and inexpensively deposit earth and sand even when the joint portions of steel sheet piles are not meshed with each other. This is to prevent groundwater from flowing out and to excavate the ground.
【0005】[0005]
【課題を解決するための手段】上記目的を達成するため
に、本発明の鋼矢板用止水板では、地中に埋め込まれ、
土砂や地下水等が流出するのを防止する複数の鋼矢板
と、隣接する鋼矢板間の接合部に圧入され、この接合部
に形成された間隙を塞ぐための止水板とを有する。さら
に、前記止水板の先端には、前記接合部と噛み合う形状
に形成されると共に、前記止水板を地中に圧入するため
の支圧板を有する小矢板が装着されている。また、本発
明の止水板を使った地盤の掘削方法では、複数の鋼矢板
を地中に埋めることにより、土砂や地下水等の流出を防
止して、地盤の掘削を行う地盤の掘削方法において、隣
接する鋼矢板の接合部に、この接合部に形成された間隙
を塞ぐための止水板を圧入し、その後、地盤の掘削作業
を開始し、掘削地盤が所定の深さに達したとき、この掘
削作業を中断し、上記止水板をさらに地中深くに圧入
し、その後、上記掘削作業を再開し、この掘削作業の中
断、再開を繰り返しながら、地中の所定の位置まで掘削
を行う。In order to achieve the above object, the steel sheet pile water stop plate of the present invention is embedded in the ground,
It has a plurality of steel sheet piles that prevent outflow of earth and sand, groundwater, and the like, and a water stop plate that is press-fitted into a joint portion between adjacent steel sheet piles and closes a gap formed in the joint portion. Further, at the tip of the water stop plate, a small sheet pile having a pressure plate for engaging the joint portion and press-fitting the water stop plate into the ground is mounted. Further, in the method of excavating the ground using the water stop plate of the present invention, by embedding a plurality of steel sheet piles in the ground, to prevent the outflow of earth and sand, groundwater, etc., in the method of excavating the ground When a water stop plate for closing the gap formed in this joint is press-fitted into the joint of adjacent steel sheet piles, and then the ground excavation work is started, and when the excavated ground reaches a predetermined depth. , This excavation work is interrupted, the water stop plate is press-fitted further deeply into the ground, and then the excavation work is restarted. To do.
【0006】[0006]
【作用】上記本発明の鋼矢板用止水板によれば、隣接す
る鋼矢板間の接合部に圧入され、この接合部に形成され
た間隙を塞ぐための止水板を有するので、隣接する鋼矢
板の接合部の間隙を介して、掘削地盤へ土砂や地下水が
流出することを防止できる。さらに、この止水板の先端
には、前記接合部と噛み合う形状に形成された小矢板が
装着されているので、前記接合部への止水板の圧入が容
易となる。さらに、この小矢板には、支圧板が設けられ
ているので、止水板の地中への圧入は、この支圧板を打
撃することによって容易に行える。また、本発明の止水
板を使った地中の掘削方法によれば、掘削作業の中断、
止水板の地中への圧入、掘削作業の再開を繰り返しなが
ら、地中の所定の位置まで掘削を行っているので、土砂
や地下水の流失を確実に防止しつつ掘削作業を行うこと
ができる。According to the above-mentioned water stop plate for steel sheet piles of the present invention, since the water stop plate is press-fitted into the joint between the adjacent steel sheet piles and has a water stop plate for closing the gap formed in this joint, it is adjacent. It is possible to prevent soil and groundwater from flowing out to the excavated ground through the gap between the joints of the steel sheet piles. Furthermore, since a small sheet pile formed in a shape that meshes with the joint portion is attached to the tip of the water stop plate, it is easy to press fit the water stop plate into the joint portion. Further, since the pressure supporting plate is provided on the small sheet pile, the water blocking plate can be easily press-fitted into the ground by hitting the pressure supporting plate. Further, according to the underground excavation method using the water stop plate of the present invention, the interruption of the excavation work,
Since the excavation is carried out to a predetermined position in the ground while repeatedly pressing the water stop plate into the ground and resuming the excavation work, it is possible to perform the excavation work while surely preventing the drainage of sediment and groundwater. ..
【0007】[0007]
【実施例】本発明の実施例を図により説明する。図1
は、鋼矢板1a及び鋼矢板1bが地中に埋め込まれてい
るときの状態の平面を示すものである。この鋼矢板1
は、地盤を掘削する際、周囲の地盤の崩落と地下水の流
出を防止するために設けられている。この鋼矢板1の打
設時に、鋼矢板1aの溝部2aと,鋼矢板1bの溝部2
bとが相互に噛み合わない場合が生じることがある。Embodiments of the present invention will be described with reference to the drawings. Figure 1
Shows a plane in a state where the steel sheet pile 1a and the steel sheet pile 1b are embedded in the ground. This steel sheet pile 1
Is provided to prevent the collapse of the surrounding ground and the outflow of groundwater when excavating the ground. At the time of driving the steel sheet pile 1, the groove portion 2a of the steel sheet pile 1a and the groove portion 2 of the steel sheet pile 1b.
In some cases, b may not mesh with each other.
【0008】この場合、鋼矢板1aの溝部2aと鋼矢板
1bの溝部2bとの間に間隙3が生じる。この状態のま
まで、地盤の掘削作業を行うと、土砂や地下水が流出し
てしまい、掘削作業が困難となる。そこで、図1に示す
ように、鋼矢板1aの溝部2aと鋼矢板1bの溝部2b
との間の間隙3に止水板4を設置する。これにより、土
砂や地下水の流出が防止される。In this case, a gap 3 is created between the groove 2a of the steel sheet pile 1a and the groove 2b of the steel sheet pile 1b. If the ground is excavated in this state, soil and groundwater will flow out, making the excavation difficult. Therefore, as shown in FIG. 1, the groove portion 2a of the steel sheet pile 1a and the groove portion 2b of the steel sheet pile 1b.
A water blocking plate 4 is installed in a gap 3 between This prevents outflow of sediment and groundwater.
【0009】図2に、止水板4の詳細を示す。この止水
板4は、溝部5a,溝部5bが対称に設けられた帯状の
形状をしている。これは、鋼矢板1a,1bの溝部2
a,2bからはずれないような形状であり、図2(a)
(b)の破線部6で示すようにある程度の余裕がある。
この止水板4は、可撓性のあるポリ塩化ビニール(PC
V)もしくはクロロブレーンゴム等で成形され、噛み合
っていない鋼矢板1a,1bの間隙3に合うように自在
に変形し、この間隙3を塞ぐようになっている。このよ
うにして、間隙3が塞がるので、地盤の掘削作業中に土
砂や地下水が流出することはない。また、この止水板4
は、図2(e)に示すように、ロール状にも変形可能で
ある。この結果、持ち運びが容易となる。FIG. 2 shows the details of the water blocking plate 4. The water stop plate 4 has a band-like shape in which the groove portions 5a and 5b are symmetrically provided. This is the groove 2 of the steel sheet pile 1a, 1b.
2 (a) has a shape that does not deviate from a and 2b.
There is some margin as shown by the broken line portion 6 in (b).
This water stop plate 4 is made of flexible polyvinyl chloride (PC
V) or chlorobrane rubber or the like, and is freely deformed to fit the gap 3 between the non-engaged steel sheet piles 1a and 1b, and the gap 3 is closed. Since the gap 3 is closed in this way, earth and sand and groundwater do not flow out during the ground excavation work. Also, this water stop plate 4
Can be deformed into a roll shape as shown in FIG. As a result, it is easy to carry.
【0010】止水板4の先端には、鋼矢板1a,1bの
溝部2a,2bと噛み合うような形状をした小矢板7が
装着されている。この小矢板7のイ−イ方向の断面を図
2(c)に示す。図2(c)に示すように、小矢板7は
部材7aと部材7bとをボルト9で接合することにより
構成され、溝部12a,12bを有する。さらに、図2
(d)に示すように、小矢板7の先端は、薄肉構造11
になっており、止水板4の先端にボルト10と接着剤に
より装着される。この小矢板7のボルト係合穴は、長穴
となっており、ラップ長に応じて調整可能になってい
る。さらに、この小矢板7の掘削地盤側には、支圧板8
が設けられている。この支圧板8を油圧ジャッキーある
いはハンマーなどによって打撃することにより、小矢板
7を地中に圧入する。At the tip of the water stop plate 4, a small sheet pile 7 having a shape that meshes with the groove portions 2a, 2b of the steel sheet piles 1a, 1b is mounted. The cross section of the sheet pile 7 in the EE direction is shown in FIG. As shown in FIG. 2C, the small sheet pile 7 is configured by joining the member 7a and the member 7b with the bolt 9 and has the groove portions 12a and 12b. Furthermore, FIG.
As shown in (d), the tip of the sheet pile 7 has a thin structure 11
The bolt 10 and the adhesive are attached to the tip of the water stop plate 4. The bolt engaging hole of the sheet pile 7 is an elongated hole and can be adjusted according to the lap length. Further, on the excavated ground side of the small sheet pile 7, a bearing plate 8 is provided.
Is provided. By hitting the bearing plate 8 with a hydraulic jackie or a hammer, the sheet pile 7 is pressed into the ground.
【0011】次に、地盤の掘削方法を図3により説明す
る。地中には、鋼矢板1が埋め込まれており、この鋼矢
板1を境にして、左側の地盤13を掘削する場合につい
て説明する。最初に、小矢板7の溝部12a,12bと
鋼矢板1の溝部2a,2bとを噛み合わせる。この小矢
板7は、鋼矢板1の溝部2a,2bの接合部とほぼ同型
に成形されているので、噛み合わせは容易に行える。Next, a method of excavating the ground will be described with reference to FIG. A steel sheet pile 1 is embedded in the ground, and a case where the left ground 13 is excavated with the steel sheet pile 1 as a boundary will be described. First, the groove portions 12a and 12b of the small sheet pile 7 and the groove portions 2a and 2b of the steel sheet pile 1 are engaged with each other. Since the small sheet pile 7 is formed in substantially the same shape as the joint between the groove portions 2a and 2b of the steel sheet pile 1, the engagement can be easily performed.
【0012】次に、この小矢板7の先端に止水板4の先
端をボルト10及び接着剤を使って連結する(図2
(a)(d)参照)。そして、小矢板7に設けられた支
圧板8を油圧ジャッキーあるいはハンマーなどによって
打撃して、小矢板7及び止水板4を、鋼矢板1aと鋼矢
板1bとの間の間隙3に沿って地中に圧入する。その
後、地盤13に対する掘削作業を開始する。そして、地
盤13が圧入された小矢板7の先端付近に達したとき、
この掘削作業を一時中断し、上記支圧板8を打撃して、
小矢板7及び止水板4を、鋼矢板1aと鋼矢板1bとの
間の間隙3に沿って、地中のさらに深い位置に圧入す
る。Next, the tip of the water stop plate 4 is connected to the tip of the sheet pile 7 by using a bolt 10 and an adhesive (see FIG. 2).
(See (a) and (d)). Then, the bearing plate 8 provided on the small sheet pile 7 is struck by a hydraulic jackie or a hammer to move the small sheet pile 7 and the water stop plate 4 along the gap 3 between the steel sheet pile 1a and the steel sheet pile 1b. Press in. Then, excavation work for the ground 13 is started. Then, when the ground 13 reaches the vicinity of the tip of the press-fitted sheet pile 7,
This excavation work is interrupted temporarily, and the bearing plate 8 is hit,
The small sheet pile 7 and the water stop plate 4 are pressed into a deeper position in the ground along the gap 3 between the steel sheet pile 1a and the steel sheet pile 1b.
【0013】その後、上記一時中断していた掘削作業を
再開する。このようにして、掘削作業の中断、再開を繰
り返しながら、地中の所定の位置まで掘削を行う。この
ように、掘削作業に先行させて、止水板4の圧入を行っ
ているので、土砂や地下水が掘削地盤に流出するのを確
実に防止できる。After that, the excavation work which has been temporarily suspended is restarted. In this way, excavation is performed up to a predetermined position in the ground while repeatedly suspending and resuming the excavation work. In this way, since the water stop plate 4 is press-fitted prior to the excavation work, it is possible to reliably prevent the sediment and groundwater from flowing out to the excavated ground.
【0014】[0014]
【発明の効果】本発明の鋼矢板用止水板によれば、隣接
する鋼矢板間の接合部に圧入された止水板を有するの
で、隣接する鋼矢板の接合部の間隙を介して、掘削地盤
へ土砂や地下水が流出することを防止できる。さらに、
この止水板の先端には、小矢板が装着されているので、
前記接合部への止水板の圧入が容易となる。さらに、こ
の小矢板には、支圧板が設けられているので、止水板の
地中への圧入は、この支圧板を打撃することによって容
易に行える。また、本発明の止水板を使った地盤の掘削
方法によれば、掘削作業の中断、止水板の地中への圧
入、掘削作業の再開を繰り返しながら、地中の所定の位
置まで掘削を行っているので、土砂や地下水の流失を確
実に防止しつつ掘削作業を行うことができる。According to the water shutoff plate for steel sheet piles of the present invention, since the water shutoff plate is press-fitted into the joining portion between the adjacent steel sheet piles, the gap between the joining portions of the adjacent steel sheet piles is It is possible to prevent sediment and groundwater from flowing out to the excavated ground. further,
Since a small sheet pile is attached to the tip of this water stop plate,
It becomes easy to press the water stop plate into the joint portion. Further, since the pressure supporting plate is provided on the small sheet pile, the water blocking plate can be easily press-fitted into the ground by hitting the pressure supporting plate. Further, according to the ground excavation method using the water stop plate of the present invention, excavation to a predetermined position in the ground is repeated while repeatedly interrupting the excavation work, press-fitting the water stop plate into the ground, and restarting the excavation work. Therefore, excavation work can be performed while reliably preventing the loss of sediment and groundwater.
【図1】本発明に係る止水板を鋼矢板に設置した時の状
態を示す図である。FIG. 1 is a view showing a state in which a water blocking plate according to the present invention is installed on a steel sheet pile.
【図2】止水板及び小矢板の詳細を示す図である。FIG. 2 is a diagram showing details of a water stop plate and a small sheet pile.
【図3】本発明に係る止水板を使った地盤の掘削方法を
示す図である。FIG. 3 is a diagram showing a method of excavating the ground using the water blocking plate according to the present invention.
1 鋼矢板 2 鋼矢板の溝部 3 間隙 4 止水板 7 小矢板 8 支圧板 1 Steel sheet pile 2 Groove part of steel sheet pile 3 Gap 4 Water stop plate 7 Small sheet pile 8 Bearing plate
Claims (3)
出するのを防止する複数の鋼矢板と、隣接する鋼矢板間
の接合部に圧入され、この接合部に形成された間隙を塞
ぐための止水板とを有することを特徴とする鋼矢板用止
水板。1. A plurality of steel sheet piles that are buried in the ground to prevent outflow of earth and sand, groundwater, etc., and are press-fitted into a joint portion between adjacent steel sheet piles to close a gap formed in the joint portion. A water stop plate for a steel sheet pile.
み合う形状に形成されると共に、前記止水板を地中に圧
入するための支圧板を有する小矢板が装着されているこ
とを特徴とする請求項1の鋼矢板用止水板。2. A small sheet pile that is formed in a shape that meshes with the joint portion and that has a bearing plate for press-fitting the water stop plate into the ground is attached to the tip of the water stop plate. The water stop plate for steel sheet piles according to claim 1.
り、土砂や地下水等の流出を防止して、地盤の掘削を行
う地盤の掘削方法において、隣接する鋼矢板の接合部
に、この接合部に形成された間隙を塞ぐための止水板を
圧入し、その後、地盤の掘削作業を開始し、掘削地盤が
所定の深さに達したとき、この掘削作業を中断し、上記
止水板をさらに地中深くに圧入し、その後、上記掘削作
業を再開し、この掘削作業の中断、再開を繰り返しなが
ら、地中の所定の位置まで掘削を行うことを特徴とする
止水板を使った地盤の掘削方法。3. A method of excavating the ground by embedding a plurality of steel sheet piles in the ground to prevent the outflow of earth and sand, groundwater, etc., and to join the adjacent steel sheet piles to the joint portion. Press the water stop plate to close the gap formed in the section, then start the excavation work of the ground, when the excavated ground reaches a predetermined depth, interrupt the excavation work, the water stop plate Was further pressed deep into the ground, and then the excavation work was restarted, and while stopping and restarting the excavation work, excavating to a predetermined position in the ground was used. How to excavate the ground.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3326859A JP2807587B2 (en) | 1991-11-15 | 1991-11-15 | Water sheet for steel sheet pile and ground excavation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3326859A JP2807587B2 (en) | 1991-11-15 | 1991-11-15 | Water sheet for steel sheet pile and ground excavation method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH05140927A true JPH05140927A (en) | 1993-06-08 |
JP2807587B2 JP2807587B2 (en) | 1998-10-08 |
Family
ID=18192524
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP3326859A Expired - Fee Related JP2807587B2 (en) | 1991-11-15 | 1991-11-15 | Water sheet for steel sheet pile and ground excavation method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2807587B2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008169689A (en) * | 2006-12-21 | 2008-07-24 | Pilepro Llc | Connecting section for mutually connecting sheet pile |
JP2012202064A (en) * | 2011-03-24 | 2012-10-22 | Kumagai Gumi Co Ltd | Method of installing roll-like water stop to upper part of concrete placing scheduled part in concrete dam construction, and roll-like water stop support member used in the method |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5249887A (en) * | 1975-10-17 | 1977-04-21 | Matsushita Electric Ind Co Ltd | Combustible gas sensor |
-
1991
- 1991-11-15 JP JP3326859A patent/JP2807587B2/en not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5249887A (en) * | 1975-10-17 | 1977-04-21 | Matsushita Electric Ind Co Ltd | Combustible gas sensor |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008169689A (en) * | 2006-12-21 | 2008-07-24 | Pilepro Llc | Connecting section for mutually connecting sheet pile |
JP2012202064A (en) * | 2011-03-24 | 2012-10-22 | Kumagai Gumi Co Ltd | Method of installing roll-like water stop to upper part of concrete placing scheduled part in concrete dam construction, and roll-like water stop support member used in the method |
Also Published As
Publication number | Publication date |
---|---|
JP2807587B2 (en) | 1998-10-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2002047676A (en) | Buoyancy preventing structure and its construction method | |
JPH05140927A (en) | Water stop plate for steel sheet pile and excavation method for ground using such plate | |
JP5133625B2 (en) | Steel pipe pile | |
KR100529726B1 (en) | Sheet Pile and Construction Method thereof | |
JPH07113229A (en) | Cast-in-place concrete pile method | |
JPH0613770B2 (en) | Method of constructing mountain retaining wall with parent pile | |
JP3056461B2 (en) | Pile removal method and pile removal casing | |
JPH09316986A (en) | Construction method for joining mounting pipe with buried sewage main pipe using double sheath pipe | |
KR100401330B1 (en) | A method of construction for earth-protection walls of building | |
JP4086400B2 (en) | Propulsion shaft, its construction method and propulsion method | |
JP3520358B2 (en) | Connection structure between horizontal shaft structure and vertical shaft structure | |
JPH06240670A (en) | Method and device for pulling pile | |
JPH0551926A (en) | Constructing method for steel pipe sheet pile wall | |
JP3944005B2 (en) | Chemical injection method to press-fit shaft and its excavation ground | |
JPH0995943A (en) | Earth anchor execution method in steel pipe column line earth retaining wall | |
JP3552925B2 (en) | Opening method of groundwater holes in steel pipe column retaining wall | |
JP2000017677A (en) | Ground stabilizing construction method | |
JP3311961B2 (en) | Continuous wall permeation method using water permeation pipe | |
JP3229934B2 (en) | Non-widening steel pipe drilling method | |
KR100442723B1 (en) | The method and equipment of preceding pile insertion using with connecting prominence , the inhalation hole and exhalation one of earth and sand | |
KR101498710B1 (en) | Construction method for wall structure of underground | |
JPH0328416A (en) | Construction method to build up pile | |
JPH10168917A (en) | Caisson prefabricated manhole and execution method thereof | |
JPS60175628A (en) | Burying method for pipe | |
JP2000226982A (en) | Grouting reinforcing method in tunnel excavation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |