JP2807587B2 - Water sheet for steel sheet pile and ground excavation method - Google Patents

Water sheet for steel sheet pile and ground excavation method

Info

Publication number
JP2807587B2
JP2807587B2 JP3326859A JP32685991A JP2807587B2 JP 2807587 B2 JP2807587 B2 JP 2807587B2 JP 3326859 A JP3326859 A JP 3326859A JP 32685991 A JP32685991 A JP 32685991A JP 2807587 B2 JP2807587 B2 JP 2807587B2
Authority
JP
Japan
Prior art keywords
ground
sheet pile
steel sheet
gap
small sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP3326859A
Other languages
Japanese (ja)
Other versions
JPH05140927A (en
Inventor
厳彦 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Kk
Original Assignee
Fujita Kk
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Kk filed Critical Fujita Kk
Priority to JP3326859A priority Critical patent/JP2807587B2/en
Publication of JPH05140927A publication Critical patent/JPH05140927A/en
Application granted granted Critical
Publication of JP2807587B2 publication Critical patent/JP2807587B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、隣接する鋼矢板同士の
接合が不確実な状況でも、鋼矢板間にあいた間隙を塞ぐ
ことができる鋼矢板用止水板、およびこの鋼矢板用止水
板を使用した地盤掘削方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a waterproof sheet for steel sheet piles which can close a gap between steel sheet piles even when the joining between adjacent steel sheet piles is uncertain, and a water waterproof sheet for steel sheet piles. The present invention relates to a ground excavation method using a plate.

【0002】[0002]

【従来の技術】従来、地盤を掘削する際、周囲の地盤が
崩壊しないように、鋼矢板を用いて山留と止水を行って
いた(山留工法)。この山留工法では、鋼矢板の打設時
に、隣接する鋼矢板相互の接合部が噛み合わない場合が
生じる。このような状態で、地盤の掘削作業を行うと、
鋼矢板相互の接合部の間隙から土砂や地下水が流出して
しまい、掘削作業が困難となる。
2. Description of the Related Art Conventionally, when excavating the ground, a steel sheet pile is used to stop and stop water in order to prevent the surrounding ground from collapsing (mounting method). In this mountain retaining method, when the steel sheet pile is driven, the joints between the adjacent steel sheet piles may not mesh with each other. When excavating the ground in such a state,
Sediment and groundwater flow out of the gap between the joints between the steel sheet piles, making excavation difficult.

【0003】そこで、従来は、事前に、鋼矢板の接合部
付近の地盤に対して薬注等を行い、地盤を改良した後
に、掘削作業を行っていた。
[0003] Therefore, conventionally, chemical injection or the like has been performed beforehand on the ground near the joint of steel sheet piles, and after the ground has been improved, excavation work has been performed.

【0004】[0004]

【発明が解決しようとする課題】上記従来の山留工法で
は、鋼矢板相互の接合部が噛み合っていない場合、事前
に、鋼矢板の接合部付近の地盤に対して薬注等を行い、
地盤を改良した後に、掘削作業を行っているので、工事
費及び作業時間がかかるという問題があった。
In the conventional mountain retaining method described above, when the joints between the steel sheet piles are not engaged with each other, a chemical injection or the like is performed in advance on the ground near the joint between the steel sheet piles,
Since the excavation work is performed after the ground has been improved, there is a problem that construction cost and work time are required.

【0005】そこで、本発明は、前記従来技術の問題点
に鑑みてなされたもので、その目的とするところは、鋼
矢板相互の接合部が噛み合っていない場合に、安価でか
つ確実に、土砂や地下水の流出を防止して、地盤の掘削
作業を行うことにある。
Accordingly, the present invention has been made in view of the above-mentioned problems of the prior art, and an object of the present invention is to provide an inexpensive and reliable earth and sand when the joints between steel sheet piles are not engaged with each other. Excavation work to prevent groundwater leakage.

【0006】[0006]

【課題を解決するための手段】上記目的を達成するため
に、本発明の鋼失板用止水板は、地中に埋められて土砂
や地下水等が流出するのを防止する複数の鋼矢板の隣接
する鋼矢板間の接合部に発生した間隙に差し込まれる小
矢板と、前記小矢板に連結され、前記接合部に噛み合っ
て前記間隙を塞ぐ可撓性の止水板とを有し、圧入力を受
ける支圧板を前記小矢板に設け、前記小矢板を地中に圧
入することにより、前記小矢板に先導されて前記間隙に
止水板を装着するようにした。
In order to achieve the above-mentioned object, the present invention provides a steel sheet-leaping waterstop plate comprising a plurality of steel sheet piles buried in the ground to prevent earth and sand, groundwater, and the like from flowing out. A small sheet pile inserted into a gap generated at a joint between adjacent steel sheet piles, and a flexible water blocking plate connected to the small sheet pile and meshing with the joint to close the gap. A supporting plate for receiving an input is provided on the small sheet pile, and the small sheet pile is pressed into the ground, so that the waterproof sheet is mounted in the gap led by the small sheet pile.

【0007】また、本発明の地盤掘削方法では、土砂や
地下水等が流出するのを防止するために地中に埋められ
た複数の鋼矢板の隣接する鋼矢板間の接合部に生じた間
隙を塞ぎながら地盤の掘削を行う地盤掘削方法であっ
て、複数の鋼矢板の隣接する鋼矢板間の接合部に形成さ
れた前記間隙に、前記接合部と噛み合う小矢板を前記接
合部に噛み合わせて差し込み、前記小矢板の上端側に可
撓性の止水板の先端側を連結し、前記小矢板に設けられ
た支圧板を打撃して上端側に前記止水板が連結された状
態で前記小矢板を前記間隙に沿って地中内に圧入し、前
記地中内に圧入された小矢板の先端側まで地盤を掘削
し、前記小矢板の圧入と前記地盤の掘削とを繰り返しな
がら前記間隙を塞ぎながら地盤を掘削するようにした。
In the ground excavation method of the present invention, a gap formed at a joint between adjacent steel sheet piles of a plurality of steel sheet piles buried in the ground in order to prevent earth and sand, groundwater and the like from flowing out. A soil excavation method for excavating the ground while closing, wherein a small sheet pile that meshes with the joint is meshed with the joint at the gap formed at a joint between adjacent steel sheet piles of a plurality of steel sheet piles. Inserting, connecting the tip end of a flexible water-stop plate to the upper end side of the small sheet pile, hitting the supporting plate provided on the small sheet pile to connect the water-stop plate to the upper end side, The small sheet pile is pressed into the ground along the gap, the ground is excavated to the tip side of the small sheet pile pressed into the ground, and the gap is repeatedly formed by press-fitting the small sheet pile and excavating the ground. And excavated the ground.

【0008】[0008]

【作用】上記鋼矢板用止水装置では、隣接する鋼矢板間
の接合部に圧入され、この接合部に形成された間隙を塞
ぐための止水板を有するので、隣接する鋼矢板の接合部
の間隙を介して、掘削地盤へ土砂や地下水が流出するこ
とを防止できる。
In the above-mentioned water shut-off device for steel sheet piles, since the water shut-off plate for press-fitting into the joint between the adjacent steel sheet piles and closing the gap formed in this joint is provided. Through the gap between the ground and the excavated ground.

【0009】さらに、この止水板の先端側には、前記接
合部と噛み合う小矢板が設けられ、この小矢板には圧入
力を受ける支圧板が設けられているので、止水板を直接
打撃することなく、小矢板の支圧板を打撃することによ
り小矢板に連結された止水板の地中内への圧入が行え
る。
[0009] Further, at the tip end of the water stop plate, there is provided a small sheet plate which meshes with the joint, and the small sheet plate is provided with a support plate for receiving a pressurized input. By hitting the supporting plate of the small sheet pile without pressing, the water stop board connected to the small sheet pile can be pressed into the ground.

【0010】また、かかる構成では止水板を直接打撃す
ることなく止水板を圧入することができるため、止水板
を可撓性に構成しても止水板の地中内への圧入が容易に
行える。
[0010] Further, since the water stop plate can be press-fitted without directly hitting the water stop plate in such a configuration, even if the water stop plate is made flexible, the water stop plate is pressed into the ground. Can be easily performed.

【0011】また、本発明の地盤掘削方法では、小矢板
の圧入と地盤の掘削とを繰り返しながら、地中の所定位
置まで掘削するので、小矢板に連結された止水板は、小
矢板に先導されるようにして掘削作業に合わせて鋼矢板
間の接合部の間隙に沿って圧入され、鋼矢板間の間隙に
止水板が装着されるので、土砂や地下水の流失を確実に
防止しつつ掘削作業を行うことができる。
Further, in the ground excavation method of the present invention, since the excavation is performed to a predetermined position in the ground while the press-fitting of the small sheet pile and the excavation of the ground are repeated, the water stop plate connected to the small sheet pile is fixed to the small sheet pile. It is press-fitted along the gap between the steel sheet piles according to the excavation work as it is led, and the water stoppage plate is installed in the gap between the steel sheet piles, so that sediment and groundwater runoff is reliably prevented. Excavation work can be performed while doing.

【0012】[0012]

【実施例】本発明の実施例を図により説明する。BRIEF DESCRIPTION OF THE DRAWINGS FIG.

【0013】図1は、鋼矢板la(1)及び鋼矢板lb
(1)が地中に埋め込まれているときの状態の平面を示
すものである。この鋼矢板1は、地盤を掘削する際、周
囲の地盤の崩落と地下水の流出を防止するために設けら
れている。この鋼矢板lの打設時に、鋼矢板laの溝部
2aと、鋼矢板1bの溝部2bとが相互に噛み合わない
場合が生じることがある。
FIG. 1 shows a steel sheet pile la (1) and a steel sheet pile lb.
(1) shows a plane in a state when it is embedded in the ground. The steel sheet pile 1 is provided to prevent collapse of the surrounding ground and outflow of groundwater when excavating the ground. When the steel sheet pile 1 is driven, there may be a case where the groove 2a of the steel sheet pile la and the groove 2b of the steel sheet pile 1b do not mesh with each other.

【0014】この場合、鋼矢板laの溝部2aと鋼矢板
1bの溝部2bとの間に間隙3が生じる。この状態のま
まで、地盤の掘削作業を行うと、土砂や地下水が流出し
てしまい、掘削作業が困難となる。そこで、図1に示す
ように、鋼矢板1aの溝部2aと鋼矢板1bの溝部2b
との間の間隙3に止水板4を設置する。これにより、土
砂や地下水の流出が防止される。
In this case, a gap 3 is formed between the groove 2a of the steel sheet pile la and the groove 2b of the steel sheet pile 1b. If soil excavation is performed in this state, earth and sand or groundwater will flow out, making excavation difficult. Therefore, as shown in FIG. 1, the groove 2a of the steel sheet pile 1a and the groove 2b of the steel sheet pile 1b.
The water stop plate 4 is installed in the gap 3 between the two. Thereby, outflow of earth and sand and groundwater is prevented.

【0015】図2に、止水板4の詳細を示す。FIG. 2 shows the details of the water stop plate 4.

【0016】この止水板4は、溝部5a、溝部5bが対
称に設けられた帯状の形状をしている。これは、鋼矢板
1a、lbの溝部2a、2bからはずれないような形状
であり、図2(a)、(b)の破線部6で示すようにあ
る程度の余裕がある。この止水板4は、可撓性のあるポ
リ塩化ビニール(PCV)もしくはクロロプレンゴム等
で成形され、噛み合っていない鋼矢板1a,1bの間隙
3に合うように自在に変形し、この間隙3に装着されて
塞ぐようになっている。このようにして、間隙3が塞が
るので、地盤の掘削作業中に土砂や地下水が流出するこ
とはない。また、この止水板4は可撓性であるため、図
2(e)に示すように、ロール状にも変形可能である。
この結果、持ち運びが容易となる。
The water blocking plate 4 has a band-like shape in which the grooves 5a and 5b are provided symmetrically. This is a shape which does not come off from the grooves 2a, 2b of the steel sheet piles 1a, lb, and has some allowance as shown by a broken line portion 6 in FIGS. 2 (a), 2 (b). The water stop plate 4 is formed of flexible polyvinyl chloride (PCV) or chloroprene rubber or the like, and is freely deformed to fit in the gap 3 between the non-meshing steel sheet piles 1a and 1b. It is fitted and closed. In this way, since the gap 3 is closed, soil and groundwater do not flow out during the excavation work of the ground. Further, since the water stop plate 4 is flexible, as shown in FIG. 2 (e), it can be deformed into a roll shape.
As a result, carrying becomes easy.

【0017】止水板4の先端には、鋼矢板1a、1bの
溝部2a、2bと噛み合うような形状をした小矢板7が
装着されている。この小矢板7のイ−イ方向の断面を図
2(c)に示す。図2(c)に示すように、小矢板7は
部材7aと部材7bとをボルト9で接合することにより
構成され、溝部12a,12bを有する。
At the front end of the water stop plate 4, a small sheet pile 7 shaped to engage with the grooves 2a, 2b of the steel sheet piles 1a, 1b is mounted. FIG. 2C shows a cross section of the small sheet pile 7 in the direction of the arrow II. As shown in FIG. 2C, the small sheet pile 7 is formed by joining members 7a and 7b with bolts 9, and has grooves 12a and 12b.

【0018】さらに、図2(d)に示すように、小矢板
7の先端は、薄肉構造11になっており、止水板4の先
端にボルト10と接着剤により装着される。この小矢板
7のボルト係合穴は、長穴となっており、ラップ長に応
じて調整可能になっている。
Further, as shown in FIG. 2D, the tip of the small sheet pile 7 has a thin structure 11, and is attached to the tip of the water stop plate 4 with a bolt 10 and an adhesive. The bolt engaging hole of the small sheet pile 7 is a long hole, and can be adjusted according to the wrap length.

【0019】さらに、この小矢板7の掘削地盤側には、
圧入力を受ける支圧板8が設けられている。この支圧板
8を油圧ジャッキーあるいはハンマーなどによって打撃
することにより、小矢板7を地中に圧入する。
Further, on the excavated ground side of the small sheet pile 7,
A support plate 8 for receiving a press input is provided. By hitting the support plate 8 with a hydraulic jack or a hammer, the small sheet pile 7 is pressed into the ground.

【0020】次に、地盤の掘削方法を図3により説明す
る。
Next, a method of excavating the ground will be described with reference to FIG.

【0021】地中には、鋼矢板lが埋め込まれており、
この鋼矢板1を境にして、左側の地盤13を掘削する場
合について説明する。
A steel sheet pile 1 is embedded in the ground,
A case where the ground 13 on the left side is excavated with the steel sheet pile 1 as a boundary will be described.

【0022】本実施例の掘削方法では、小矢板7の上端
側に止水板4の先端側を連結し、小矢板7に設けられた
支圧板8を打撃して上端側に止水板4が連結された前記
小矢板7を前記鋼矢板1a、1b間の接合部に生じた間
隙に沿って地中内に圧入し、地中内に圧入された小矢板
7の先端側まで地盤を掘削し、前記小矢板の圧入と、前
記地盤の掘削とを繰り返して前記間隙を塞ぎながら地盤
を掘削する。
In the excavation method of this embodiment, the tip end of the water stop plate 4 is connected to the upper end side of the small sheet pile 7, and the support plate 8 provided on the small sheet pile 7 is hit so as to strike the water stop plate 4 on the upper end side. Is pressed into the ground along the gap formed at the joint between the steel sheet piles 1a and 1b, and the ground is excavated to the tip side of the small sheet pile 7 pressed into the ground. Then, the ground is excavated while closing the gap by repeating the press-fitting of the small sheet pile and the excavation of the ground.

【0023】先ず、最初に、小矢板7の溝部12a、1
2bと鋼矢板lの溝部2a、2bとを噛み合わせる。こ
の小矢板7は、鋼矢板lの溝部2a、2bの接合部とほ
ぼ同型に成形されているので、噛み合わせは容易に行え
る。
First, the grooves 12a, 1
2b is engaged with the grooves 2a, 2b of the steel sheet pile l. Since the small sheet pile 7 is formed in substantially the same shape as the joint between the grooves 2a and 2b of the steel sheet pile 1, the meshing can be easily performed.

【0024】次に、この小矢板7の先端に止水板4の先
端をボルト10及び接着剤を使って連結する(図2
(a)(d)参照)。
Next, the tip of the water stop plate 4 is connected to the tip of the small sheet pile 7 using bolts 10 and an adhesive (FIG. 2).
(See (a) and (d)).

【0025】連結終了後、小矢板7を地中内に圧入す
る。小矢板7に設けられた支圧板8を油圧ジャッキーあ
るいはハンマーなどによって打撃して、小矢板7及び止
水板4を、鋼矢板1aと鋼矢板1bとの間の間隙3に沿
って地中に圧入する。
After the connection is completed, the small sheet pile 7 is pressed into the ground. The support plate 8 provided on the small sheet pile 7 is hit with a hydraulic jack or a hammer, etc., so that the small sheet pile 7 and the waterproof plate 4 are placed underground along the gap 3 between the steel sheet pile 1a and the steel sheet pile 1b. Press in.

【0026】小矢板7の圧入後は、地盤13に対する掘
削作業を開始する。掘削作業は、掘削地盤13が圧入さ
れた小矢板7の先端付近に達するまで行う。
After press-fitting the small sheet pile 7, excavation work on the ground 13 is started. The excavation work is performed until the excavated ground 13 reaches the vicinity of the tip of the small sheet pile 7 into which the excavation ground 13 is pressed.

【0027】そして、掘削した地盤13が圧入された小
矢板7の先端付近に達したとき、この掘削作業を一時中
断し、上記支圧板8を再び打撃して、小矢板7及び止水
板4を、鋼矢板laと鋼矢板1bとの間の間隙3に沿っ
て、地中のさらに深い位置に圧入する。止水板4は小矢
板7に先導されて入ってゆくこととなる。
When the excavated ground 13 reaches the vicinity of the tip of the small sheet pile 7 into which the press-fitting has been performed, the excavation operation is temporarily stopped, and the above-mentioned supporting plate 8 is again struck. Along the gap 3 between the steel sheet pile la and the steel sheet pile 1b to a deeper position in the ground. The water blocking plate 4 is led by the small sheet pile 7 and enters.

【0028】小矢板7の圧入後、上記一時中断していた
掘削作業を再開する。このようにして、小矢板7の圧入
と地盤の掘削とを繰り返しながら、すなわち掘削作業の
中断、再開を繰り返しながら、地中の所定の位置まで掘
削を行う。
After press-fitting the small sheet pile 7, the temporarily suspended excavation work is resumed. In this way, the excavation is performed to a predetermined position in the ground while the press-fitting of the small sheet pile 7 and the excavation of the ground are repeated, that is, while the excavation work is repeatedly interrupted and resumed.

【0029】このようにして、掘削作業に先行させて、
止水板4の圧入を行っているので、土砂や地下水が掘削
地盤に流出するのを確実に防止できる。
In this way, prior to the excavation work,
Since the water stop plate 4 is press-fitted, it is possible to reliably prevent earth and sand and groundwater from flowing into the excavation ground.

【0030】[0030]

【発明の効果】本発明の鋼矢板用止水板によれば、隣接
する鋼矢板間の接合部に圧入される止水板を有するの
で、隣接する鋼矢板の接合部の間隙を介して、掘削地盤
へ土砂や地下水が流出することを防止できる。
According to the water sheet for steel sheet pile of the present invention, since the water sheet is provided with a water stop plate which is press-fitted into a joint between adjacent steel sheet piles, Sediment and groundwater can be prevented from flowing into the excavated ground.

【0031】また、止水板が可撓性に構成されているの
で、例えばロール状などのように持ち運びが容易となる
ように変形させることができる。
Further, since the water stop plate is formed to be flexible, it can be deformed, for example, into a roll shape so as to be easily carried.

【0032】さらに、この止水板の先端には小矢板が設
けられ、この小矢板には圧入力を受ける支圧板が設けら
れているので、可撓性の止水板の地中への圧入は、この
支圧板を打撃することによって容易に行うことができ
る。
Further, a small sheet pile is provided at the tip of the water stop plate, and a support plate for receiving a press input is provided on the small sheet pile, so that the flexible water stop plate is pressed into the ground. Can be easily performed by hitting the support plate.

【0033】また、本発明の地盤の掘削方法によれば、
小矢板の圧入と、地盤の掘削とを繰り返しながら、地中
の所定位置まで掘削を行っているので、小矢板に連結さ
れた止水板も小矢板に先導されて鋼矢板間の間隙を塞ぐ
ように地中内に圧入され、土砂や地下水の流失を確実に
防止しつつ掘削作業を行うことができる。
Further, according to the method for excavating ground according to the present invention,
Since the excavation is performed to a predetermined position in the ground while repeating the press-fitting of the small sheet pile and the excavation of the ground, the water stop plate connected to the small sheet pile is also guided by the small sheet pile and closes the gap between the steel sheet piles. As described above, the excavation work can be performed while being surely prevented from flowing down into the earth and the groundwater by being pressed into the ground.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る止水板を鋼矢板に設置した時の状
態を示す図である。
FIG. 1 is a view showing a state when a water stoppage plate according to the present invention is installed on a steel sheet pile.

【図2】止水板及び小矢板の詳細を示す図である。FIG. 2 is a view showing details of a water stoppage plate and a small sheet pile.

【図3】本発明に係る止水板を使った地盤の掘削方法を
示す図である。
FIG. 3 is a diagram showing a method of excavating the ground using the water stoppage plate according to the present invention.

【符号の説明】[Explanation of symbols]

l 鋼矢板 2 鋼矢板の溝部 3 間隙 4 止水板 7 小矢板 8 支圧板 1 steel sheet pile 2 groove of steel sheet pile 3 gap 4 water stop plate 7 small sheet pile 8 supporting plate

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 地中に埋められて土砂や地下水等が流出
するのを防止する複数の鋼矢板の隣接する鋼矢板間の接
合部に発生した間隙に差し込まれる小矢板と、 前記小矢板に連結され、前記接合部に噛み合って前記間
隙を塞ぐ可撓性の止水板とを有し、 圧入力を受ける支圧板を前記小矢板に設け、前記小矢板
を地中に圧入することにより、前記小矢板に先導されて
前記間隙に止水板を装着するようにした ことを特徴とす
る鋼矢板用止水板。
1. Soil and groundwater are buried in the ground and flow out
Connection between adjacent steel sheet piles to prevent
A small sheet pile inserted into the gap generated at the joint, and the small sheet pile connected to the small sheet pile, meshing with the joining portion, and
A flexible water blocking plate that closes the gap, and a supporting plate that receives a pressurized input is provided on the small sheet pile,
By being pressed into the ground, led by the small sheet pile
A water sheet for steel sheet piles, wherein a water sheet is attached to the gap .
【請求項2】 土砂や地下水等が流出するのを防止する
ために地中に埋められた複数の鋼矢板の隣接する鋼矢板
間の接合部に生じた間隙を塞ぎながら地盤の掘削を行う
地盤掘削方法であって、 複数の鋼矢板の隣接する鋼矢板間の接合部に形成された
前記間隙に、前記接合部と噛み合う小矢板を前記接合部
に噛み合わせて差し込み、 前記小矢板の上端側に可撓性の止水板の先端側を連結
し、 前記小矢板に設けられた支圧板を打撃して上端側に前記
止水板が連結された状態で前記小矢板を前記間隙に沿っ
て地中内に圧入し、 前記地中内に圧入された小矢板の先端側まで地盤を掘削
し、 前記小矢板の圧入と前記地盤の掘削とを繰り返しながら
前記間隙を塞ぎながら地盤を掘削することを特徴とする
地盤掘削方法。
2. Prevent outflow of earth and sand, groundwater, etc.
Adjacent steel sheet piles buried in the ground for
Excavation while closing the gap created at the joint between
A method of excavating ground , comprising forming a joint between adjacent steel sheet piles of a plurality of steel sheet piles.
In the gap, a small sheet pile meshing with the joint is inserted into the joint.
And connect the leading end of a flexible water stop plate to the upper end of the small sheet pile.
Then, hit the supporting plate provided on the small sheet pile to the upper end side
In the state where the water stop plate is connected, the small sheet pile is moved along the gap.
It was pressed into the ground Te, excavating ground to the tip side of the small sheet pile press-fitted in said ground
And, while repeating the excavation of the ground and press-fitting of the small sheet pile
Excavating the ground while closing the gap
Ground excavation method.
JP3326859A 1991-11-15 1991-11-15 Water sheet for steel sheet pile and ground excavation method Expired - Fee Related JP2807587B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3326859A JP2807587B2 (en) 1991-11-15 1991-11-15 Water sheet for steel sheet pile and ground excavation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3326859A JP2807587B2 (en) 1991-11-15 1991-11-15 Water sheet for steel sheet pile and ground excavation method

Publications (2)

Publication Number Publication Date
JPH05140927A JPH05140927A (en) 1993-06-08
JP2807587B2 true JP2807587B2 (en) 1998-10-08

Family

ID=18192524

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3326859A Expired - Fee Related JP2807587B2 (en) 1991-11-15 1991-11-15 Water sheet for steel sheet pile and ground excavation method

Country Status (1)

Country Link
JP (1) JP2807587B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006060811A1 (en) * 2006-12-21 2008-06-26 Pilepro Llc Connecting profile for interconnecting sheet piles
JP5612520B2 (en) * 2011-03-24 2014-10-22 株式会社熊谷組 Method for installing roll-shaped water stop plate above concrete placement planned part in concrete dam construction, and roll-shaped water stop plate support member used in the method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5249887A (en) * 1975-10-17 1977-04-21 Matsushita Electric Ind Co Ltd Combustible gas sensor

Also Published As

Publication number Publication date
JPH05140927A (en) 1993-06-08

Similar Documents

Publication Publication Date Title
JP2002047676A (en) Buoyancy preventing structure and its construction method
JP2807587B2 (en) Water sheet for steel sheet pile and ground excavation method
JP3860143B2 (en) Excavator for pipe roof and pipe roof construction method using them
KR102493747B1 (en) Sheet Pile Construction Method
JP2860535B2 (en) Construction method of joining a mounting pipe to a buried sewage main pipe using a double sheath pipe
JP2003020640A (en) Steel pipe column soil retaining wall, method of constructing the retaining wall, and water cut-off member used for the method
JP3520358B2 (en) Connection structure between horizontal shaft structure and vertical shaft structure
KR100401330B1 (en) A method of construction for earth-protection walls of building
JP2820247B2 (en) Pile pull-out method and device
JP3056461B2 (en) Pile removal method and pile removal casing
JP3059051B2 (en) Construction method of water stop wall by steel tube column
JPH0613770B2 (en) Method of constructing mountain retaining wall with parent pile
JP2004197519A (en) Underground impervious wall and construction method for the same
KR20040099714A (en) Sheet Pile and Construction Method thereof
JP3311961B2 (en) Continuous wall permeation method using water permeation pipe
JP4394804B2 (en) Construction method of underground continuous impermeable walls
JP3082054B2 (en) Large-scale, deep steel continuous basement wall and method of constructing the same
JP2989573B2 (en) Grouting method for concrete sheet pile
JPH0489915A (en) Water cutoff member and sheet pile using this cutoff structure and executing method for sheet pile
JPS6136416A (en) Method of landslide-protecting joint for underground continuous wall
JPH1113062A (en) Simplified pneumatic caisson earth retaining construction method
JPS61250229A (en) Method and apparatus for penetration of steel sheet pile
JP2966287B2 (en) Construction method of steel tube column wall
JPH0995943A (en) Earth anchor execution method in steel pipe column line earth retaining wall
JP3923482B2 (en) Underground conduit construction method

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees