JPS60175628A - Burying method for pipe - Google Patents

Burying method for pipe

Info

Publication number
JPS60175628A
JPS60175628A JP59031784A JP3178484A JPS60175628A JP S60175628 A JPS60175628 A JP S60175628A JP 59031784 A JP59031784 A JP 59031784A JP 3178484 A JP3178484 A JP 3178484A JP S60175628 A JPS60175628 A JP S60175628A
Authority
JP
Japan
Prior art keywords
sheet pile
pipe
sheet
earth
excavated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP59031784A
Other languages
Japanese (ja)
Inventor
Seiji Isaka
井坂 征史
Koichi Kishiya
志喜屋 孝市
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP59031784A priority Critical patent/JPS60175628A/en
Publication of JPS60175628A publication Critical patent/JPS60175628A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing

Abstract

PURPOSE:To prevent exposure of soil and sinking of buried earth due to pulling- off of a sheet pile, by a method wherein a ground between driven sheet piles is excavated, an earth scraping-off tool adapted to the inner surface of the sheet pile is fitted in the inner surface of the sheet pile, and an excavated groove is back-filled. CONSTITUTION:Sheet piles 2 are driven on both sides of a position where a pipe 5 is intended to be buried, earth between the sheet piles 2 is excavated to form an excavated groove, and before or after the piston 5 is installed, scraping-off members 7 are attached to the lower ends of the two sheet piles 2. The scraping-off members 7 is provided at one side edge 8 of a beltform plate body with a projection 9, conforming to the shape of the inner surface of the sheet pile 2, and the excavated groove is back-filled with earth 11. When the sheet pile 2 is pull off, earth adhered to a recessed part 10 in the inner surface of the sheet pile 2 is scraped off. This reduces earth, adhered to the recessed part in the sheet pile and pulled off togetherwith the sheet pile, and permits decrease of sinking of a line.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は管の埋設施工方法に関するものである。[Detailed description of the invention] (Industrial application field) The present invention relates to a method for burying a pipe.

(従来技術) 一般に管理設工事において地面に管を埋める埋設溝を掘
削する際には、土砂がくずれるのを防ぐために、予め設
定した管路予定地を挾んで両側に矢板を打ち込み、しか
る後この矢板間を掘削して埋設溝を形成し、この埋設溝
内に管を設置し、土砂を埋め戻して埋設工事を完了する
。ところで。
(Prior art) Generally, when excavating a trench in the ground to bury a pipe in maintenance construction work, in order to prevent the earth and sand from collapsing, sheet piles are inserted between the pre-set planned pipe site and driven on both sides. A burial trench is formed by excavating between the sheet piles, a pipe is installed in this trench, and the burial work is completed by backfilling with earth and sand. by the way.

この埋設工事に使用される矢板は1強度、施工性等の点
から帯状板体を端面fλ形に形成し長手方向に沿って凹
部が形成されたものが使用される。
The sheet piles used for this burial work are those in which a band-shaped plate body is formed with an end face fλ shape and a recessed portion is formed along the longitudinal direction from the viewpoint of strength, workability, etc.

しかるにこのように形成された矢板を管路の両側に打ち
込み、土砂を埋め戻した後引き抜くと、矢板の凹部内に
土が付着したまま引き抜かれ5その結果矢板を引き抜い
た跡に空隙が生じ、この空隙に管の底部の土砂、管の周
囲の土砂が流れ込み。
However, when the sheet piles formed in this way are driven into both sides of the pipeline, backfilled with earth and sand, and then pulled out, the soil is still attached to the recesses of the sheet piles, and as a result, a gap is created where the sheet piles are pulled out. Sediment from the bottom of the pipe and around the pipe flows into this gap.

管路の沈下、あるいは管の異常偏平化が起るおそれがあ
る。
There is a risk of subsidence of the pipe or abnormal flattening of the pipe.

(発明の目的) この発明は、矢板を引き抜いた跡の空隙を小さくシ、管
路の沈下あるいは管の異常偏平化の起るおそれをなくす
ることを目的きする。
(Objective of the Invention) The object of the present invention is to reduce the gap left after the sheet pile has been pulled out, thereby eliminating the possibility of subsidence of the pipe or abnormal flattening of the pipe.

(発明の構成) この発明は、管を埋設する位置の両側部に矢板を打込み
、該矢板間の土を掘削して掘削溝を形成し、該掘削溝内
に管を設置して埋め戻した後、矢板を引き抜く管の埋設
施工において、側縁が矢板の内面に適合する掻き落し具
を形成し、掘削溝を埋め戻す際、掘削溝の底部に前記掻
き落し具を。
(Structure of the Invention) This invention involves driving sheet piles on both sides of the position where the pipe is to be buried, excavating the soil between the sheet piles to form an excavated groove, and installing the pipe in the excavated groove and backfilling. Afterwards, in the burying of the pipe from which the sheet pile is pulled out, a scraping tool is formed whose side edge fits the inner surface of the sheet pile, and when backfilling the excavated trench, the scraping tool is placed at the bottom of the excavated trench.

側縁が矢板の内面に適合するようにして埋め込むことを
特徴とする管の埋設施工方法である。
This is a method for embedding a pipe, which is characterized by embedding the pipe so that the side edge matches the inner surface of the sheet pile.

(実施例) この発明の実施例を施工手順に沿い図面に基いて説明す
ると、第1図乃至第4図は一連の施工手順を示しており
、第1図は管路予定地1の両側に矢板2を打ち込んだ状
態を示している。第2図は矢板2間の土砂を掘削して埋
設溝3を形成した状態を示している。このとき矢板2の
下端部4は依然として土中に打ち込まれており、矢板2
が倒れないよう保持している。第3図は埋設溝3内に管
5を設置した状態を示しており、このとき、管5を設置
するに先立ち、もしくは管を設置した後に。
(Example) An example of the present invention will be explained based on the drawings according to the construction procedure. Figures 1 to 4 show a series of construction procedures, and Figure 1 shows the A state in which sheet pile 2 has been driven is shown. FIG. 2 shows a state in which the earth and sand between the sheet piles 2 are excavated to form a burial trench 3. At this time, the lower end 4 of the sheet pile 2 is still driven into the soil, and the sheet pile 2
is held so that it does not fall. FIG. 3 shows the pipe 5 installed in the buried trench 3, either before or after installing the pipe 5.

埋設i41!3内の底部における。雨下隅6に掻き落し
部材7を設置する。掻き落し部材7は第5図に示す如(
帯状板体の一側縁8に、矢板2の内面形状に適合する凸
部9を形成したもので、第6図に示す如く、この凸部9
を矢板2の凹部10に合わせ。
At the bottom in buried i41!3. A scraping member 7 is installed in the corner 6 under the rain. The scraping member 7 is as shown in FIG.
A convex portion 9 that matches the inner surface shape of the sheet pile 2 is formed on one side edge 8 of the band-shaped plate body, and as shown in FIG. 6, this convex portion 9
Align it with the recess 10 of the sheet pile 2.

掻き落し部材の凸部9を形成した一側縁8をやや士向き
に傾斜させて設置する。第4図は管5と掻き落し部材7
を設置した後土砂11を埋め戻した状態を示しており、
このように埋め戻しをした後。
The scraping member is installed with one side edge 8 on which the convex part 9 is formed inclined slightly toward the opposite direction. Figure 4 shows the pipe 5 and the scraping member 7.
It shows the state of backfilling with earth and sand 11 after installing the
After backfilling like this.

矢板2を引き抜く。矢板2を引き抜くときの状態を第7
図によって説明すると、矢板2には掻き落し部材7が当
接して設置されており、掻き落とし部材7は埋め戻しの
土砂11によって押えられているので、矢板2を上方に
引き抜くと矢板2の内面凹部10に付着した土は、掻き
落し部材7の凸部9によって掻き落され、矢板2と共に
引き抜かれるおそれはない。
Pull out sheet pile 2. The state when pulling out the sheet pile 2 is shown in the seventh figure.
To explain with a diagram, a scraping member 7 is installed in contact with the sheet pile 2, and since the scraping member 7 is held down by backfilling earth and sand 11, when the sheet pile 2 is pulled upward, the inner surface of the sheet pile 2 is removed. The soil adhering to the recessed portion 10 is scraped off by the convex portion 9 of the scraping member 7, and there is no fear that it will be pulled out together with the sheet pile 2.

(発明の効果) この発明は以上説明したとおり管を埋設する位置の両側
部に矢板を打込み、該矢板間の土を掘削して掘削溝を形
成し、該掘削溝内に管を設置して埋め戻した後、矢板を
引き抜く管の埋設施工において、側縁が矢板の内面に適
合する掻き落し具を形成し、掘削溝を埋め戻す際、掘削
溝の底部に前記掻き落し具を、側縁が矢板の内面に適合
するようにして埋め込む管の埋設施工方法であるので。
(Effects of the Invention) As explained above, this invention drives sheet piles on both sides of the position where the pipe is to be buried, excavates the soil between the sheet piles to form an excavated groove, and installs the pipe within the excavated groove. After backfilling, when burying the pipe to pull out the sheet pile, a scraping tool is formed whose side edge fits the inner surface of the sheet pile, and when backfilling an excavated trench, the scraping tool is placed at the bottom of the excavated trench along the side edge. This is a method of embedding pipes that fit into the inner surface of the sheet pile.

矢板の凹部に付着して矢板と共に引き抜かれる土砂が少
な(なり、矢板引抜き跡の空隙が極めて小さくなるので
、管路の沈下および管の異常偏平化のおそれがなくなっ
た。
Less earth and sand adheres to the recesses of the sheet piles and is pulled out along with the sheet piles, and the voids left behind by the sheet piles become extremely small, eliminating the risk of subsidence of the pipes and abnormal flattening of the pipes.

【図面の簡単な説明】[Brief explanation of drawings]

第1図乃至第4図は管を埋設する手順を示す断面図、第
5図は掻き落し部材の斜視図、第6図は掻き落し部材と
矢板との当接状態を示す斜視図。 第7図は掻き落し部材の設置状態を示す断面図である。 1・・・管路予定地 2・・・矢板 3・・・埋設溝 5・・・管 7・・・掻き落し部材 9・・・凸部 10・・・凹部 出願人 積水化学工業株式会社 代表者 藤沼 暴利 第1図 第2図 第31 第4図
1 to 4 are cross-sectional views showing the procedure for burying a pipe, FIG. 5 is a perspective view of a scraping member, and FIG. 6 is a perspective view showing a state in which the scraping member and the sheet pile are in contact. FIG. 7 is a sectional view showing the installed state of the scraping member. 1... Pipeline planned site 2... Sheet pile 3... Buried trench 5... Pipe 7... Scraping member 9... Protrusion 10... Concave Applicant Representative of Sekisui Chemical Co., Ltd. Person: Fujinuma, profiteer Figure 1 Figure 2 Figure 31 Figure 4

Claims (1)

【特許請求の範囲】 1)管を埋設する位置の両側部に矢板を打込み。 該矢板間の土を掘削して掘削溝を形成し、該掘削溝内に
管を設置して埋め戻した後、矢板を引き抜く管の埋設施
工において、側縁が矢板−の内面に適合する掻き落し具
を形成し、掘削溝を埋め戻す際、掘削溝の底部に前記掻
き落し具を、側縁が矢板の内面に適合するようにして埋
め込むことを特徴とする管の埋設施工方法。
[Claims] 1) Driving sheet piles on both sides of the location where the pipe is to be buried. In the construction of burying a pipe by excavating the soil between the sheet piles to form an excavated groove, installing a pipe in the excavated groove and backfilling the excavated groove, and then pulling out the sheet pile, a scraper whose side edge conforms to the inner surface of the sheet pile is used. A method for burying a pipe, characterized in that when forming a scraping tool and backfilling an excavated trench, the scraping tool is embedded in the bottom of the excavated trench so that the side edge matches the inner surface of the sheet pile.
JP59031784A 1984-02-21 1984-02-21 Burying method for pipe Pending JPS60175628A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP59031784A JPS60175628A (en) 1984-02-21 1984-02-21 Burying method for pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP59031784A JPS60175628A (en) 1984-02-21 1984-02-21 Burying method for pipe

Publications (1)

Publication Number Publication Date
JPS60175628A true JPS60175628A (en) 1985-09-09

Family

ID=12340679

Family Applications (1)

Application Number Title Priority Date Filing Date
JP59031784A Pending JPS60175628A (en) 1984-02-21 1984-02-21 Burying method for pipe

Country Status (1)

Country Link
JP (1) JPS60175628A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0439482A (en) * 1990-06-05 1992-02-10 Kubota Corp Construction method for preventing sinking of pipe line
CN105672450A (en) * 2016-02-16 2016-06-15 上海市城市建设设计研究总院 Laying method for large-aperture water draining pipeline parallel to upper part of existing metro tunnel structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0439482A (en) * 1990-06-05 1992-02-10 Kubota Corp Construction method for preventing sinking of pipe line
CN105672450A (en) * 2016-02-16 2016-06-15 上海市城市建设设计研究总院 Laying method for large-aperture water draining pipeline parallel to upper part of existing metro tunnel structure

Similar Documents

Publication Publication Date Title
JPS60175628A (en) Burying method for pipe
EP1803853B1 (en) Method for creation underground diaphragm walls carried out with control and adjustment of the vertical positions and diaphragm wall so manufactured
JP3470576B2 (en) Construction method of retaining wall and retaining wall structure
US4643613A (en) Underwater trenching and pipe-laying devices
JP3761173B2 (en) Connecting device for pipes in excavation grooves
JP2807587B2 (en) Water sheet for steel sheet pile and ground excavation method
JP2004232285A (en) Waterproof device and waterproof method of continuous wall
JP3520358B2 (en) Connection structure between horizontal shaft structure and vertical shaft structure
JP3402437B2 (en) Burial method of pipe
JPS61191725A (en) Stress material drawing work
JPS6358975B2 (en)
JP3473915B2 (en) Small diameter pipe burial method
JPH03244711A (en) Preventing ground sinking due to extraction of earth holding member
JP2953843B2 (en) Pipe line laying method by non-cutting propulsion method
JP3633604B2 (en) Steel wall manufacturing method
JP4685296B2 (en) The tip of the box used for the drain construction method
JPH10168917A (en) Caisson prefabricated manhole and execution method thereof
JP2003027885A (en) Construction method for underground tunnel and underground tunnel
JPS5840072B2 (en) How to lay pipes
JPH058299B2 (en)
JPH09268876A (en) Element
JPH0931952A (en) Piping structure
JPH0640096U (en) Open shield machine
JP2009013626A (en) Structure of earth retaining wall, and face cutting method for earth retaining wall
JPH0868097A (en) Sheathing method in connection construction to existing pipe