JPH05125761A - Constructing method of composite structure - Google Patents
Constructing method of composite structureInfo
- Publication number
- JPH05125761A JPH05125761A JP31132491A JP31132491A JPH05125761A JP H05125761 A JPH05125761 A JP H05125761A JP 31132491 A JP31132491 A JP 31132491A JP 31132491 A JP31132491 A JP 31132491A JP H05125761 A JPH05125761 A JP H05125761A
- Authority
- JP
- Japan
- Prior art keywords
- column
- plate
- steel frame
- steel
- composite structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、鉄筋コンクリート造柱
と鉄骨造梁とで構成される複合構造体の構築方法に関す
るものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a composite structure composed of reinforced concrete columns and steel beams.
【0002】[0002]
【従来の技術】従来のこの種の複合構造体の構築は、柱
主筋を基礎上に立設してその外周にフープ筋を固定し、
該フープ筋付の柱主筋の外周に型枠を取付け、柱主筋の
上部に鉄骨造梁を固定し、その接合部であるパネルゾー
ン内にはフープ筋を設置し、しかる後、型枠内にコンク
リートを打設することにより行っていた。2. Description of the Related Art In the construction of a conventional composite structure of this type, a column main bar is erected on a foundation and a hoop line is fixed to the outer periphery thereof
A formwork is attached to the outer periphery of the column main bar with the hoop reinforcement, a steel frame beam is fixed to the upper part of the column main reinforcement, and the hoop reinforcement is installed in the panel zone which is the joint, and then in the formwork. It was done by pouring concrete.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、このよ
うな構築方法では、現場での型枠の作製に多くの労務と
時間を要し、施工の合理化の妨げとなっていた。また、
その型枠を支えるサポート等の仮設材の類が作業の安全
性を妨げる問題点があった。However, in such a construction method, a lot of labor and time are required for producing the formwork on site, which is an obstacle to streamlining the construction. Also,
There has been a problem that temporary materials such as supports that support the formwork hinder the safety of work.
【0004】一方、鉄骨造梁と柱主筋との接合部である
パネルゾーンでは、取り合いが複雑となり、施工の合理
化を最も妨げる箇所となっていた。例えば、パネルゾー
ン内の柱主筋の補強筋であるフープの施工が難しく、鉄
骨造梁があると更に施工が困難になる問題点があった。On the other hand, in the panel zone, which is the joint between the steel-framed beam and the main reinforcement of the column, the connection is complicated and it is the most difficult place to rationalize the construction. For example, there is a problem that it is difficult to construct a hoop, which is a reinforcing bar of a column main reinforcement in a panel zone, and the construction becomes more difficult when there is a steel frame beam.
【0005】また、鉄骨造梁と柱型枠の接合箇所からは
コンクリートが漏れ易く、この複合構造体の施工の弱点
になっている。Further, concrete easily leaks from the joint between the steel frame beam and the column form, which is a weak point in the construction of this composite structure.
【0006】本発明の目的は、従来より簡便に構築でき
る複合構造体の構築方法を提供することにある。An object of the present invention is to provide a method for constructing a composite structure which can be constructed more easily than ever before.
【0007】[0007]
【課題を解決するための手段】上記の目的を達成する本
発明の手段を説明すると、本発明は鉄筋コンクリート造
柱と鉄骨造梁とで構成される複合構造体の構築方法にお
いて、鋼製プレートで柱の型枠をボックス状に作製し、
パネルゾーン内の所要のフープ筋をプレートフープに代
替して溶接したプレートカラムとその先端に溶接固定さ
れた鉄骨造梁とで構成されたユニットを用い、所定の箇
所に立設された柱主筋の外周に前記ユニットの前記プレ
ートカラムを嵌合してセットし、隣り合う前記ユニット
の前記鉄骨造梁の間に別の鉄骨造梁をかけ渡して、その
上にハーフPC床材を敷き込み、前記プレートカラム内
と前記ハーフPC床材の上とにコンクリートを打設して
一体化することを特徴とする。Means for Solving the Problems To explain the means of the present invention for achieving the above object, the present invention provides a method for constructing a composite structure comprising a reinforced concrete column and a steel frame beam, in which a steel plate is used. Make the pillar formwork into a box shape,
By using a unit composed of a plate column welded by replacing the required hoop muscle in the panel zone with a plate hoop and a steel frame beam welded and fixed to the tip of the plate column, The plate column of the unit is fitted and set on the outer periphery, another steel frame beam is spanned between the steel frame beams of the adjacent units, and a half PC flooring is laid on it. It is characterized in that concrete is poured into the plate column and above the half PC flooring to be integrated.
【0008】[0008]
【作用】このようにパネルゾーン内にフープ筋を溶接し
たプレートカラムを用いると、該プレートカラムは型枠
を兼ねているので、現場での型枠の作製作業及びフープ
筋の設置作業を省略できる。また、このプレートカラム
は柱の一部となるので、柱の強度を上げることができ、
また型枠の取り外し作業が不要になる。By using a plate column in which hoop muscles are welded in the panel zone as described above, the plate column also serves as a mold, so that the work of forming the mold and the work of installing the hoop muscle on site can be omitted. .. Also, since this plate column becomes a part of the pillar, it is possible to increase the strength of the pillar,
Also, the work of removing the formwork becomes unnecessary.
【0009】鉄骨造梁はプレートカラムに溶接固定し
て、両者を一体化したユニットを使用するので、両者の
取り合い部の構造を簡略化することができる。Since the steel frame beam is welded and fixed to the plate column and a unit in which both are integrated is used, the structure of the connecting portion between the both can be simplified.
【0010】[0010]
【実施例】以下、本発明の実施例を図を参照して詳細に
説明する。本実施例では、図1に示すように鋼製プレー
トでプレートカラム1を作製し、図2に示すように、十
字状の鉄骨造梁2を作製する。Embodiments of the present invention will now be described in detail with reference to the drawings. In this embodiment, a plate column 1 is made of a steel plate as shown in FIG. 1, and a cross-shaped steel beam 2 is made as shown in FIG.
【0011】次に、図3に示すようにプレートカラム1
の先端に鉄骨造梁2を溶接して一体化し、ユニット3を
作製する。また、図4に示すようにパネルゾーン内のプ
レートカラム1にプレートフープ4を溶接する。Next, as shown in FIG. 3, the plate column 1
A steel-framed beam 2 is welded to the tip of the unit to be integrated with each other to produce a unit 3. Further, as shown in FIG. 4, the plate hoop 4 is welded to the plate column 1 in the panel zone.
【0012】次に図5及び図10に示すように、床5上
に立設された柱主筋6に、先組の別の柱主筋7を機械式
継手8で接合する。該柱主筋7には、予めフープ9を取
付けておく。Next, as shown in FIGS. 5 and 10, another main column reinforcing bar 7 of the previous set is joined to a main column reinforcing bar 6 erected on the floor 5 by a mechanical joint 8. A hoop 9 is attached to the column main bar 7 in advance.
【0013】次に、図6に示すように、柱主筋7の上部
よりユニット3を降ろして該柱主筋7の外周にプレート
カラム1をセットし、斜めサポート10で該ユニット3
を床5上に固定する。Next, as shown in FIG. 6, the unit 3 is lowered from the upper part of the column main bar 7 and the plate column 1 is set on the outer periphery of the column main bar 7, and the unit 3 is set by the diagonal support 10.
Is fixed on the floor 5.
【0014】次に、図7及び図9,図10に示すよう
に、柱間の鉄骨造梁11をユニット3間にセットし、ガ
セットプレート12で接合するか、或いは溶接接合す
る。次いで、図7に示すように、該鉄骨造梁11上にハ
ーフPC床部材13を敷き込む。次に、柱主筋7の上端
を、治具等を用いて精度良く固定する。Next, as shown in FIG. 7, FIG. 9 and FIG. 10, the steel beam 11 between the columns is set between the units 3 and joined by the gusset plate 12 or welded. Next, as shown in FIG. 7, a half PC floor member 13 is laid on the steel beam 11. Next, the upper end of the column main bar 7 is accurately fixed using a jig or the like.
【0015】しかる後、図8に示すように、ユニット3
のプレートカラム1内にコンクリート14を打設して鉄
筋コンクリート造柱15を形成し、且つハーフPC床部
材11上にもコンクリート14を打設して合成床16を
形成し、柱、梁、床を一体化して架構を完成させる。コ
ンクリート14の硬化後、サポート10を撤去する。Then, as shown in FIG. 8, the unit 3
Concrete 14 is placed in the plate column 1 of 1 to form reinforced concrete pillars 15, and concrete 14 is also placed on the half PC floor member 11 to form a composite floor 16, and the columns, beams, and floors are formed. Complete and complete the frame. After hardening the concrete 14, the support 10 is removed.
【0016】[0016]
【発明の効果】プレートカラムに鉄骨造梁を一体化した
ユニットを用いるので、鉄筋コンクリート造柱と鉄骨造
梁による複合構造を容易に実現できる。Since the unit in which the steel frame beam is integrated into the plate column is used, the composite structure of the reinforced concrete column and the steel beam can be easily realized.
【0017】柱主筋はプレートカラム内に配置する関係
で自由度があり、このため躯体の精度確保が容易にでき
る。Since the column main bars are arranged in the plate column, there is a degree of freedom, and therefore the accuracy of the frame can be easily ensured.
【0018】型枠を兼ねたパネルゾーン内にプレートフ
ープを予め溶接したプレートカラムを用いるので、生産
性の向上を図ることができる。Since the plate column in which the plate hoop is pre-welded in the panel zone which also serves as the mold is used, the productivity can be improved.
【0019】プレートカラムによる拘束効果が大きく、
躯体の耐震性能を向上させることができる。The plate column has a large restraining effect,
It is possible to improve the seismic performance of the body.
【0020】プレートカラムに塗装による耐火被覆を施
すことが可能になり、耐火性能を確保することができ
る。The plate column can be coated with a fireproof coating, and the fireproof performance can be secured.
【図1】本発明で用いるプレートカラムの一例を示す平
面図である。FIG. 1 is a plan view showing an example of a plate column used in the present invention.
【図2】本発明で用いる鉄骨造梁の一例を示す平面図で
ある。FIG. 2 is a plan view showing an example of a steel frame beam used in the present invention.
【図3】プレートカラムに鉄骨造梁を接合してユニット
を形成した状態を示す平面図である。FIG. 3 is a plan view showing a state in which a steel frame beam is joined to a plate column to form a unit.
【図4】ユニットにプレートフープを溶接した状態を示
す平面図である。FIG. 4 is a plan view showing a state in which a plate hoop is welded to a unit.
【図5】柱主筋の連結工程を示す側面図である。FIG. 5 is a side view showing a step of connecting pillar main bars.
【図6】柱主筋にユニットをセットする工程を示す縦断
面図である。FIG. 6 is a vertical cross-sectional view showing a step of setting a unit on a column main bar.
【図7】セットしたユニット間に鉄骨造梁をかけ渡して
ハーフPC床部材を敷き込む工程を示す縦断面図であ
る。FIG. 7 is a vertical cross-sectional view showing a step of laying a half-PC floor member by spanning a steel frame beam between the set units.
【図8】ユニット内とハーフPC床部材上にコンクリー
トを打設する工程を示す縦断面図である。FIG. 8 is a vertical sectional view showing a step of placing concrete in the unit and on the half PC floor member.
【図9】隣接するユニット間に鉄骨造梁をかけ渡した状
態を示す平面図である。FIG. 9 is a plan view showing a state in which a steel beam is bridged between adjacent units.
【図10】図9の縦断面図である。10 is a vertical cross-sectional view of FIG.
1 プレートカラム 2 鉄骨造梁 3 ユニット 4 プレートフープ 5 床 6,7 柱主筋 8 機械式継手 9 フープ 10 斜めサポート 11 鉄骨造梁 12 ガセットプレート 13 ハーフPC床部材 14 コンクリート 15 鉄筋コンクリート造柱 16 合成床 1 Plate Column 2 Steel Beam 3 Unit 4 Plate Hoop 5 Floor 6, 7 Column Main Bar 8 Mechanical Joint 9 Hoop 10 Diagonal Support 11 Steel Beam 12 Gusset Plate 13 Half PC Floor Member 14 Concrete 15 Reinforced Concrete Column 16 Composite Floor
Claims (1)
成される複合構造体の構築方法において、鋼製プレート
で柱の型枠をボックス状に作製し、パネルゾーン内の所
要のフープ筋をプレートフープに代替して溶接したプレ
ートカラムとその先端に溶接固定された鉄骨造梁とで構
成されたユニットを用い、所定の箇所に立設された柱主
筋の外周に前記ユニットの前記プレートカラムを嵌合し
てセットし、隣り合う前記ユニットの前記鉄骨造梁の間
に別の鉄骨造梁をかけ渡して、その上にハーフPC床材
を敷き込み、前記プレートカラム内と前記ハーフPC床
材の上とにコンクリートを打設して一体化することを特
徴とする複合構造体の構築方法。1. A method of constructing a composite structure comprising a reinforced concrete column and a steel frame beam, wherein the column frame is made of a steel plate in a box shape, and the required hoop reinforcement in the panel zone is plate-formed. A unit composed of a plate column welded in place of a hoop and a steel frame beam welded and fixed to the tip of the hoop is used, and the plate column of the unit is fitted to the outer periphery of a column main bar erected at a predetermined position. Set together, span another steel-framed beam between the steel-framed beams of the adjoining units, and lay a half-PC flooring on it, and then, in the plate column and the half-PC flooring A method for constructing a composite structure, comprising placing concrete on the top and integrating the concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP31132491A JP2635872B2 (en) | 1991-10-31 | 1991-10-31 | How to build a composite structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP31132491A JP2635872B2 (en) | 1991-10-31 | 1991-10-31 | How to build a composite structure |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH05125761A true JPH05125761A (en) | 1993-05-21 |
JP2635872B2 JP2635872B2 (en) | 1997-07-30 |
Family
ID=18015768
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP31132491A Expired - Fee Related JP2635872B2 (en) | 1991-10-31 | 1991-10-31 | How to build a composite structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2635872B2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2016050377A (en) * | 2014-08-28 | 2016-04-11 | 株式会社竹中工務店 | Joint structure between column base part and steel beam |
CN113668706A (en) * | 2021-08-25 | 2021-11-19 | 中建八局第三建设有限公司 | Installation and construction method for connecting node area of steel reinforced concrete column and steel beam |
-
1991
- 1991-10-31 JP JP31132491A patent/JP2635872B2/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2016050377A (en) * | 2014-08-28 | 2016-04-11 | 株式会社竹中工務店 | Joint structure between column base part and steel beam |
CN113668706A (en) * | 2021-08-25 | 2021-11-19 | 中建八局第三建设有限公司 | Installation and construction method for connecting node area of steel reinforced concrete column and steel beam |
Also Published As
Publication number | Publication date |
---|---|
JP2635872B2 (en) | 1997-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH09209451A (en) | Joint construction of up and down columns with beam and joint method | |
JP2915897B1 (en) | Building construction method | |
JPH0711710A (en) | Reinforced concrete column and steel frame beam jointing structure and building constructing method | |
JPH04261934A (en) | Building frame construction method using form member made of pre-cast concrete | |
JPH05125761A (en) | Constructing method of composite structure | |
JP3586121B2 (en) | Mixed structure of reinforced concrete column and steel beam and its construction method | |
JP2614000B2 (en) | Basics of steel frame | |
JP2643641B2 (en) | Building method using PC members | |
JPS6043547A (en) | Mold frame and reinforcement iron integral assembling and constructing method | |
JP2763488B2 (en) | Prefabricated pillar and inverted ramen prefabricated construction method | |
JPH0749681B2 (en) | Steel frame / reinforced concrete composite construction method | |
JPH0598653A (en) | Steel pipe concrete pillar in underground inverter construction method | |
JPH05311748A (en) | Connecting execution method of pole and beam | |
JPH02282538A (en) | Construction method of reinforced concrete-made building frame | |
JPH0868115A (en) | Connecting structure for column/beam and construction method for underground skeleton using it | |
JP2813816B2 (en) | Lift-up method using synthetic steel beams | |
JPH04237731A (en) | Constructing method for rc pillar with core reinforcement bar | |
JP3052009B2 (en) | Column and beam joining structure and joining method | |
JPH0765339B2 (en) | Concrete pillar construction method | |
JPH1181694A (en) | Aseismatic reinforcing construction method for structure | |
JPH0588331B2 (en) | ||
JPH03187436A (en) | Supporting member for construction pillar of reinforced concrete building | |
JPH06322821A (en) | Construction of column-beam connecting part | |
JP2001329544A (en) | Bar arrangement method for foundation and bar arrangement structure of foundation | |
JPH093914A (en) | Structure of underground beam and underground beam construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |