JPH0480424A - Foundation construction of building - Google Patents
Foundation construction of buildingInfo
- Publication number
- JPH0480424A JPH0480424A JP19461090A JP19461090A JPH0480424A JP H0480424 A JPH0480424 A JP H0480424A JP 19461090 A JP19461090 A JP 19461090A JP 19461090 A JP19461090 A JP 19461090A JP H0480424 A JPH0480424 A JP H0480424A
- Authority
- JP
- Japan
- Prior art keywords
- foundation
- fixed body
- unit
- support pile
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title abstract description 9
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 9
- 239000010959 steel Substances 0.000 claims abstract description 9
- 239000004567 concrete Substances 0.000 abstract description 6
- 230000003014 reinforcing effect Effects 0.000 abstract description 5
- 230000032683 aging Effects 0.000 abstract 1
- 239000011440 grout Substances 0.000 description 7
- 238000000034 method Methods 0.000 description 5
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 238000005034 decoration Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 238000010079 rubber tapping Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
Description
【発明の詳細な説明】 〔産業上の利用分野〕 この発明は建物の基礎構造に関するものである。[Detailed description of the invention] [Industrial application field] This invention relates to the foundation structure of a building.
一般に建物の基礎は現場打ちコンクリートによって施工
されている。Building foundations are generally constructed using cast-in-place concrete.
したがって、この種の基礎工事には鉄筋の加工及び配筋
、型枠の組み立て及び解体、さらにコンクリートの打設
及び養住等といった現場作業が多く、しかもこれらの作
業が複雑に錯綜する為、現場施工が煩雑になり易く、且
つ工期の長期化が免れないものであった。Therefore, this type of foundation work requires a lot of on-site work, such as processing and arranging reinforcing bars, assembling and dismantling formwork, and placing and curing concrete, and these tasks are complex and intertwined. Construction tends to be complicated and the construction period is unavoidably prolonged.
また、殆どの基礎工事には基礎の構築に先たって地盤面
以下の部分を掘削する、いわゆる根切り工事があり、当
該根切り工事に費やす手間・暇も多大なものであった。In addition, most foundation works involve excavating a portion below the ground level prior to construction of the foundation, so-called root cutting work, which requires a great deal of time and effort.
この発明はこのような前記従来の課題を解消する為に提
案されたもので、現場施工の簡略化・省略化、さらに工
期の大幅短縮化を可能にした建物の基礎構造を提供する
ことを目的とするものである。This invention was proposed in order to solve the above-mentioned conventional problems, and the purpose is to provide a building foundation structure that makes it possible to simplify and omit on-site construction and to significantly shorten the construction period. That is.
前記目的を達成するため、この発明に於ける建物の基礎
構造は、地盤中に支持杭を設置し、当該支持杭の上端部
にPC製基礎固定体を前記支持杭と一体的に設置し、且
つ当該PC製基礎固定体の上に■形鋼等からなる基礎鉄
骨梁を前記PC製基礎固定体と一体的に設置してなる。In order to achieve the above object, the foundation structure of the building according to the present invention includes a support pile installed in the ground, a PC foundation fixing body installed at the upper end of the support pile integrally with the support pile, Moreover, on the PC foundation fixing body, a foundation steel beam made of section steel or the like is installed integrally with the PC foundation fixing body.
以下、この発明を図示する一実施例に基づいて説明する
。The present invention will be described below based on an illustrated embodiment.
図はこの発明に係る布基礎の構造を示したもので、図中
番号1は支持杭、2は基礎固定体、そして、番号3は基
礎である。The figure shows the structure of a cloth foundation according to the present invention. In the figure, number 1 is a support pile, 2 is a foundation fixing body, and number 3 is a foundation.
支持杭1には鋼管杭やPC杭等が使用され、当該支持杭
1は地盤中に一定間隔おきに設置されている。Steel pipe piles, PC piles, etc. are used as the support piles 1, and the support piles 1 are installed in the ground at regular intervals.
支持杭1を地盤中に設置するには、回転埋設式若しくは
埋め込み式、或いは打ち込み式等といった従来一般に行
われている杭打ち工法によって行い、かかる場合の支持
杭1の上端は地盤面以下の高さとする。The support pile 1 is installed in the ground by a commonly used pile driving method such as a rotary burying method, an embedded method, or a driving method. Satoru.
なお、支持杭1の径、設置間隔及び本数は構築しようと
する建物の規模や地盤の支持強度等により適当に決めら
れている。Note that the diameter, installation interval, and number of support piles 1 are appropriately determined depending on the scale of the building to be constructed, the support strength of the ground, etc.
当該支持杭1の上端部の側部に鉄骨材等からなるシアコ
ツター4,4とアンカー鉄筋5.5が略水平に突設され
ている。On the side of the upper end of the support pile 1, shear rods 4, 4 made of steel frames or the like and anchor reinforcing bars 5.5 are provided to project approximately horizontally.
基礎固定体2はプレキャストコンクリ−トヨり矩形断面
若しくは円形断面の短い柱状に形成され、その下端部に
は支持杭1の上端部をシアコツター4.4と共に挿入で
きるような凹部6か形成されている。The foundation fixing body 2 is formed of precast concrete in the shape of a short column with a rectangular or circular cross section, and a recess 6 is formed at the lower end thereof into which the upper end of the support pile 1 can be inserted together with the cylinder blocker 4.4. .
また、基礎固定体2の略中央部には上端より前記凹部6
に通じるグラウト注入孔7が略鉛直に形成されている。Further, the recess 6 is provided at the substantially central portion of the foundation fixed body 2 from the upper end.
A grout injection hole 7 communicating with is formed substantially vertically.
なお、基礎固定体2の径は構築しようとする建物の規模
等により適当に決められている。Note that the diameter of the foundation fixing body 2 is appropriately determined depending on the scale of the building to be constructed.
このように形成された基礎固定体2は各支持杭lの上端
部に支持杭1の上端部を凹部6に挿入した状態に設置さ
れている。The foundation fixed body 2 thus formed is installed at the upper end of each support pile l with the upper end of the support pile 1 inserted into the recess 6.
また、グラウト注入孔7より凹部6内及び支持杭1上端
の中空部にグラウト材8が充填され、かかる構成により
、基礎固定体2は支持杭1の上端部に一体的に固定され
ている。In addition, grout material 8 is filled into the recess 6 and the hollow part at the upper end of the support pile 1 through the grout injection hole 7, and with this configuration, the foundation fixing body 2 is integrally fixed to the upper end of the support pile 1.
図中、番号9は支持杭1上端部の中空部に充填されたグ
ラウト材8がこれより下側に流れ込まないように取り付
けられた底蓋である。In the figure, number 9 is a bottom cover attached to prevent the grout 8 filled in the hollow part of the upper end of the support pile 1 from flowing below.
また、番号10は基礎固定体2の座りを良くする為に根
切り底に設けられた地業であり、割栗石11の上にドラ
イモルタル(捨てコンクリート)12を打設することに
より行われている。In addition, number 10 is a groundwork provided at the bottom of the root cut to improve the seating of the foundation fixing body 2, and this is done by pouring dry mortar (saved concrete) 12 on top of the split stone 11. There is.
基礎3には■形鋼等が使用され、当該基礎3は基礎固定
体2の上に複数本の埋込みポル) 13゜13或いは雄
ねじアンカー、雌ねじアンカー、タッピングアンカー、
その他の固定金具によって固定されている。■Shaped steel etc. are used for the foundation 3, and the foundation 3 has multiple embedded poles on the foundation fixing body 2) 13° 13 or male threaded anchor, female threaded anchor, tapping anchor,
Fixed by other fixing hardware.
基礎3のコーナ部等、基礎3の仕口部には、接合ブラケ
ット14が溶接することにより取り付けられ、他方の基
(ait15はその端部を接合ブラケット14に複数本
の接合ポル) 16.16によってボルト止めすること
により基礎3に一体的に接合されている。A joining bracket 14 is attached to the joint part of the foundation 3, such as a corner part of the foundation 3, by welding, and the other base (ait 15 is a plurality of joining poles whose ends are connected to the joining bracket 14) 16.16 It is integrally joined to the foundation 3 by bolting.
なお、図中、番号17は基礎3及び15の室外側を覆う
PC板からなる化粧パネルである。In addition, in the figure, number 17 is a decorative panel made of a PC board that covers the outdoor side of the foundations 3 and 15.
この発明は以上の構成からなるので以下の効果を有する
。Since the present invention has the above configuration, it has the following effects.
4゜
鉄筋の加工及び配筋、型枠の組み立て解体、さらに、コ
ンクリートの打設及び養生がない為、現場施工の簡略化
・省略化及び工期の大幅な短縮化が図れる。Because there is no processing and arrangement of 4° reinforcing bars, assembly and disassembly of formwork, and no need for concrete pouring and curing, on-site construction can be simplified and omitted, and the construction period can be significantly shortened.
また、支持杭と基礎固定体とは、支持杭上端部をこの部
分に突設されたシアコツター及びアンカー鉄筋と共に基
礎固定体の凹部に挿入し、且つ当該凹部にグラウト材を
充填することにより一体化されている為、完璧な一体化
が可能であり、また係る方法によれば支持杭がPC抗で
なく鋼杭でも一体化可能である。In addition, the support pile and the foundation fixing body are integrated by inserting the upper end of the support pile into the recess of the foundation fixing body together with the shearcotter and anchor reinforcing bars protruding from this part, and filling the recess with grout material. Therefore, perfect integration is possible, and according to this method, even if the support pile is a steel pile instead of a PC shaft, it can be integrated.
図はこの発明に係る建物の基礎の構造を示す一実施例の
断面図である。
1・・・支持杭、2・・・基礎固定体、3・・・基礎、
4・・・シアコツター 5・・・アンカーU、6・・・
凹部、7・・・グラウト注入孔、8・・・グラウト材、
9・・・底蓋、10・・・地業、11・・・割栗石、
12・・・ドライモルタル(捨てコンクリート)、13
・・・アンカ
ボルト、
14・・・接合ブラケット、
15・・・基礎、
16・・・接合ボルト、
17・・・化粧パネル。
!5願人
飢化成工業株式会社The figure is a sectional view of an embodiment showing the structure of a building foundation according to the present invention. 1...Support pile, 2...Foundation fixing body, 3...Foundation,
4... Sheaco star 5... Anchor U, 6...
recess, 7... grout injection hole, 8... grout material,
9...Bottom cover, 10...Jigyo, 11...Warikuri stone, 12...Dry mortar (discarded concrete), 13
...Anchor bolt, 14...Joining bracket, 15...Foundation, 16...Joining bolt, 17...Decoration panel. ! 5 Ganjinki Kasei Kogyo Co., Ltd.
Claims (1)
PC製基礎固定体を前記支持杭と一体的に設置し、且つ
当該PC製基礎固定体の上に基礎鉄骨梁を前記PC固定
体と一体的に設置してなることを特徴とする建物の基礎
構造。(1) A support pile is installed in the ground, a PC foundation fixing body is installed integrally with the support pile at the upper end of the support pile, and a foundation steel beam is installed on top of the PC foundation fixing body. A building foundation structure characterized by being installed integrally with a PC fixing body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP19461090A JPH0480424A (en) | 1990-07-23 | 1990-07-23 | Foundation construction of building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP19461090A JPH0480424A (en) | 1990-07-23 | 1990-07-23 | Foundation construction of building |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH0480424A true JPH0480424A (en) | 1992-03-13 |
Family
ID=16327404
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP19461090A Pending JPH0480424A (en) | 1990-07-23 | 1990-07-23 | Foundation construction of building |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0480424A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015030996A (en) * | 2013-07-31 | 2015-02-16 | 積水ハウス株式会社 | Foundation structure of building |
JP2016070028A (en) * | 2014-10-01 | 2016-05-09 | 株式会社竹中工務店 | Substructure |
JP2019007192A (en) * | 2017-06-22 | 2019-01-17 | 大和ハウス工業株式会社 | Joint structure of foundation pile and steel foundation beam and joint method of the same |
-
1990
- 1990-07-23 JP JP19461090A patent/JPH0480424A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015030996A (en) * | 2013-07-31 | 2015-02-16 | 積水ハウス株式会社 | Foundation structure of building |
JP2016070028A (en) * | 2014-10-01 | 2016-05-09 | 株式会社竹中工務店 | Substructure |
JP2019007192A (en) * | 2017-06-22 | 2019-01-17 | 大和ハウス工業株式会社 | Joint structure of foundation pile and steel foundation beam and joint method of the same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3690437B2 (en) | Seismic reinforcement structure for existing buildings | |
JP2004100157A (en) | Retaining wall structure and its construction method | |
JPH0480424A (en) | Foundation construction of building | |
JP3800535B2 (en) | Pile-column connection structure and method | |
JPH0892981A (en) | Earth retaining wall | |
JP3612600B2 (en) | Unit anchor and structural steel foundation beam | |
JPH0586630A (en) | Construction for jointing steel pipe pile filled with concrete and steel pipe column filled up with concrete | |
JPH06185111A (en) | Precast concrete beam and column and construction method of earthquake-proof wall using them | |
JPH02164930A (en) | Foundation structure for building | |
JP2000144907A (en) | Joint structure between inverted construction post and beam | |
JPS61233131A (en) | Foundation structure of pole | |
JP2000129668A (en) | Soil-cement composite wall and execution method thereof | |
JP3025638B2 (en) | Formwork equipment for fabric foundation | |
JP3678695B2 (en) | Fixing method of column to concrete foundation | |
JP2000319904A (en) | Foundation of structure | |
JPH0598653A (en) | Steel pipe concrete pillar in underground inverter construction method | |
JP2006009258A (en) | Column-beam joining structure, construction method of column-beam joining structure, construction method of underground structure and building | |
JP2812641B2 (en) | Precast concrete fabric base member and method of construction | |
JPH05112947A (en) | Execution method of foundation | |
JP2000178985A (en) | Basement | |
JP2578671B2 (en) | Column and beam construction method | |
JP2642598B2 (en) | PC foundation for wall columns of assembly stairs | |
JPH0480425A (en) | Foundation construction of building | |
JPH0868057A (en) | Method for constructing composite permanent substructural column | |
JPH116162A (en) | Construction method for reinforced concrete underground external wall |