JPH0443122B2 - - Google Patents
Info
- Publication number
- JPH0443122B2 JPH0443122B2 JP29798385A JP29798385A JPH0443122B2 JP H0443122 B2 JPH0443122 B2 JP H0443122B2 JP 29798385 A JP29798385 A JP 29798385A JP 29798385 A JP29798385 A JP 29798385A JP H0443122 B2 JPH0443122 B2 JP H0443122B2
- Authority
- JP
- Japan
- Prior art keywords
- slime
- hole
- concrete
- cement milk
- excavator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000004568 cement Substances 0.000 claims description 16
- 235000013336 milk Nutrition 0.000 claims description 13
- 239000008267 milk Substances 0.000 claims description 13
- 210000004080 milk Anatomy 0.000 claims description 13
- 238000000034 method Methods 0.000 claims description 12
- 239000003795 chemical substances by application Substances 0.000 claims description 8
- 235000019353 potassium silicate Nutrition 0.000 claims description 6
- NTHWMYGWWRZVTN-UHFFFAOYSA-N sodium silicate Chemical compound [Na+].[Na+].[O-][Si]([O-])=O NTHWMYGWWRZVTN-UHFFFAOYSA-N 0.000 claims description 6
- 238000009412 basement excavation Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 238000005553 drilling Methods 0.000 description 3
- VTYYLEPIZMXCLO-UHFFFAOYSA-L Calcium carbonate Chemical compound [Ca+2].[O-]C([O-])=O VTYYLEPIZMXCLO-UHFFFAOYSA-L 0.000 description 2
- NBIIXXVUZAFLBC-UHFFFAOYSA-N Phosphoric acid Chemical compound OP(O)(O)=O NBIIXXVUZAFLBC-UHFFFAOYSA-N 0.000 description 2
- UIIMBOGNXHQVGW-UHFFFAOYSA-M Sodium bicarbonate Chemical compound [Na+].OC([O-])=O UIIMBOGNXHQVGW-UHFFFAOYSA-M 0.000 description 2
- QAOWNCQODCNURD-UHFFFAOYSA-N Sulfuric acid Chemical compound OS(O)(=O)=O QAOWNCQODCNURD-UHFFFAOYSA-N 0.000 description 2
- 238000003756 stirring Methods 0.000 description 2
- 235000008733 Citrus aurantifolia Nutrition 0.000 description 1
- 229920002125 Sokalan® Polymers 0.000 description 1
- 229920002472 Starch Polymers 0.000 description 1
- 235000011941 Tilia x europaea Nutrition 0.000 description 1
- 239000002253 acid Substances 0.000 description 1
- 239000003513 alkali Substances 0.000 description 1
- 229910000147 aluminium phosphate Inorganic materials 0.000 description 1
- 229910000019 calcium carbonate Inorganic materials 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000010440 gypsum Substances 0.000 description 1
- 229910052602 gypsum Inorganic materials 0.000 description 1
- 239000008235 industrial water Substances 0.000 description 1
- 239000004571 lime Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 239000004584 polyacrylic acid Substances 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 229910000030 sodium bicarbonate Inorganic materials 0.000 description 1
- 235000017557 sodium bicarbonate Nutrition 0.000 description 1
- 239000003516 soil conditioner Substances 0.000 description 1
- 239000008107 starch Substances 0.000 description 1
- 235000019698 starch Nutrition 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
- Underground Or Underwater Handling Of Building Materials (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
【発明の詳細な説明】
〔産業上の利用分野〕
この発明は掘削孔内に根固めコンクリートを打
設してその中に杭を挿入する杭の埋込み工法に関
するものである。DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a pile embedding method in which foot protection concrete is poured into an excavated hole and piles are inserted into the concrete.
現在低公害工法として削孔内にセメントミルク
を注入して既製杭を建込むプレボーリング工法が
種々開発、実施されているが何れも打撃工法のよ
うに杭のもつ耐力に見合う程度の支持力が発揮で
きず、比較的小さい支持力しか認められていな
い。出願人は先端の拡大部に生コンクリートを使
用するプレボーリング工法を提案している(特開
昭56−6822号公報参照)。
Currently, various pre-boring methods have been developed and implemented as low-pollution construction methods, in which cement milk is injected into the borehole and ready-made piles are erected. However, only a relatively small supporting capacity is recognized. The applicant has proposed a pre-boring method in which ready-mixed concrete is used for the expanded portion at the tip (see Japanese Patent Laid-Open No. 56-6822).
ところで掘削機にオーガーを使用し、泥水工法
によつて削孔する場合削孔底にスライムが生ずる
場合が多い。 By the way, when an auger is used as an excavator and a hole is drilled by the muddy water method, slime often forms at the bottom of the hole.
この発明は前記スライムを処理するとともに根
固めコンクリートを底部に打設し、そのコンクリ
ート中に既製杭を挿入することにより打撃工法な
みの先端支端支持力係数を期待すべく開発したも
のである。 This invention was developed in order to treat the slime, cast foot protection concrete at the bottom, and insert ready-made piles into the concrete, thereby achieving a tip bearing capacity coefficient comparable to that of the impact method.
この発明は泥水工法を利用して掘削機により地
盤を削孔し、次いで孔底部に溜るスライムが水ガ
ラスまたはセメントミルクからなるスライム処理
剤を注入・攪拌して軟固化させ、次いでスライム
軟固化物の下側にセメントミルクを圧入し、かつ
掘削ヘツドにスライム軟固化物を乗せた状態にし
て掘削機を引き上げ、次いで孔内にコンクリート
を打設し、そのコンクリート中に先端が定着する
ように既製杭を建込む工法である。
This invention uses the muddy water method to drill a hole in the ground with an excavator, and then the slime that collects at the bottom of the hole is softened by injecting and stirring a slime treatment agent made of water glass or cement milk, and then the slime is softened. Cement milk is press-fitted into the bottom of the hole, the softened slime is placed on the drilling head, and the excavator is pulled up. Concrete is poured into the hole, and a ready-made mold is placed so that the tip is fixed in the concrete. This is a method of erecting piles.
この工法の施工の概要は第1図乃至第6図に示
す通りであり、先端部を拡大した実施例を示す。
そして先ず泥水工法を利用して掘削機1により地
盤を削孔Aし(第1図参照)、次いで拡大ヘツド
2により拡大孔Bの掘削を行い(第2図参照)、
次いで拡大孔Bの底部のスライムSを処理し(第
3図参照)、次いでスライム軟固化物の下側にセ
メントミルクを注入し、続いてコンクリート3を
掘削機1のロツドを通じて打設し(第4図参照)、
次いで掘削機1を引上げ(第5図参照)、次いで
既製杭Cをコンクリート3中に挿入する。
The construction outline of this construction method is as shown in Figs. 1 to 6, which show an example in which the tip portion is enlarged.
First, using the muddy water method, a hole A is drilled in the ground with an excavator 1 (see Figure 1), and then an enlarged hole B is excavated with an enlarged head 2 (see Figure 2).
Next, the slime S at the bottom of the enlarged hole B is treated (see Figure 3), and then cement milk is poured into the underside of the softened slime, and then concrete 3 is poured through the rod of the excavator 1 (see Figure 3). (see figure 4),
Next, the excavator 1 is pulled up (see FIG. 5), and the ready-made pile C is then inserted into the concrete 3.
スライム処理の詳細が第7図〜第9図に示して
ある。スライム処理剤として水ガラスを使用する
場合には、主剤に工業用水ガラスJIS−3号規格
品を硬化剤として重曹、リン酸、希硫酸等のアル
カリ、酸類の溶液あるいはセメント、石膏、炭酸
カルシウム等の懸濁液を使用する。また水ガラス
と硬化剤の量及びスライム軟固化強度は掘削ビツ
トの形状スライム粒度分布、含水比等によつて変
化させる。スライム処理剤としてセメントミルク
を使用する場合、セメント、石灰あるいは市販の
セメント系軟弱土改良剤等を使用する。施工に際
しては前記水ガラスまたはセメントミルクをビツ
ト先端よりスライム中に注入し、スライムと攪拌
後ロツドの回転を停止してスライムを軟硬化させ
る。次いでスライムの軟硬化物S′の下にセメント
ミルクを圧入し、かつ掘削ヘツドにスライム硬化
物を乗せる形でロツド、すなわち掘削機1を引上
げる。その引上げ速度はセメントミルク圧入量に
見合うようにする。次いでスライム処理のセメン
トミルクを生コンクリートに切り替え、所定の高
さ、すなわち拡大孔B内に充填しうる量とし、必
要によりその上に杭周固定液を注入しながら拡大
ヘツド2を縮小し、掘削機1を引き上げ、次いで
既製杭Cを挿入する。 Details of slime processing are shown in FIGS. 7-9. When using water glass as a slime treatment agent, the main agent is industrial water glass JIS-3 standard product, and the curing agent is a solution of alkali or acid such as baking soda, phosphoric acid, dilute sulfuric acid, or cement, gypsum, calcium carbonate, etc. Use a suspension of The amounts of water glass and hardening agent and the softening strength of the slime are changed depending on the shape of the drilling bit, the slime particle size distribution, the water content ratio, etc. When using cement milk as a slime treatment agent, use cement, lime, or a commercially available cement-based soft soil conditioner. During construction, the water glass or cement milk is poured into the slime from the tip of the bit, and after stirring with the slime, the rotation of the rod is stopped to soften and harden the slime. Next, cement milk is forced under the soft hardened slime S', and the rod, that is, the excavator 1 is pulled up with the hardened slime placed on the excavation head. The pulling speed is set to match the amount of cement milk injected. Next, the cement milk used in the slime treatment is changed to ready-mixed concrete, and the amount is set to a predetermined height, that is, the amount that can be filled into the enlarged hole B. If necessary, the enlarged head 2 is reduced while injecting the pile circumference fixing liquid over it, and the excavation is started. The machine 1 is pulled up, and then the ready-made pile C is inserted.
なお拡大孔部Bは底部のみならず、中間部にも
拡大ヘツドを操作することにより数箇所設けてコ
ンクリートを充填して球根または節状部を形成す
ることができる。またスライム処理剤として、で
んぷんとポリアクリル酸の重合物の高級水性合成
樹脂、例えばサンヨー化成工業「サンウエツト」
等を使用し、あるいは前記したものを兼用する場
合もある。 The enlarged holes B can be provided at several locations not only at the bottom but also at the middle by operating the enlarged head and filled with concrete to form bulbs or knots. Also, as a slime treatment agent, high-grade water-based synthetic resins made from polymers of starch and polyacrylic acid, such as Sanyo Kasei Kogyo's "Sunwet", are used.
etc., or the above-mentioned ones may also be used.
この発明は以上の構成からなり拡大孔の底部の
スライムを軟固化させ、この下にセメントミルク
を注入して掘削ヘツドに乗せる形で排除するた
め、孔壁面の凹凸や拡底掘削のように変断面のも
のでもスライム除去は確実に行なわれる。次いで
コンクリートを充填し、そのコンクリート中に既
製杭を挿入するので、場所打ち杭の部分が十分な
支持力をもたらし、従来のセメントミルク工法よ
りも高い支持力が期待できる。
This invention has the above-mentioned structure, and the slime at the bottom of the enlarged hole is softened, cement milk is injected into the bottom of the slime, and the slime is removed by placing it on the drilling head. Even slime removal can be done reliably. Next, concrete is filled and ready-made piles are inserted into the concrete, so the cast-in-place piles provide sufficient bearing capacity, and higher bearing capacity can be expected than in the conventional cement milk method.
第1図、第2図、第3図、第4図、第5図およ
び第6図はこの発明の施工過程の断面図、第7
図、第8図および第9図はスライム処理の説明図
である。
A……削孔、B……拡大孔、C……既製杭、1
……掘削機、2……拡大ヘツド、3……コンクリ
ート。
Figures 1, 2, 3, 4, 5 and 6 are cross-sectional views of the construction process of this invention;
8 and 9 are explanatory diagrams of slime processing. A...Drilling, B...Enlarged hole, C...Ready-made pile, 1
...excavator, 2...expansion head, 3...concrete.
Claims (1)
し、次いで孔底部に溜るスライムに水ガラスまた
はセメントミルクからなるスライム処理剤を注
入・攪拌して軟固化させ、次いでスライム軟固化
物の下側にセメントミルクを圧入し、かつ掘削ヘ
ツドにスライム軟固化物を乗せた状態にして掘削
機を引き上げ、次いで孔内にコンクリートを打設
し、そのコンクリート中に先端が定着するように
既製杭を建込むことを特徴とする杭の埋込み工
法。1 Using the muddy method, a hole is drilled in the ground with an excavator, then a slime treatment agent made of water glass or cement milk is injected into the slime that collects at the bottom of the hole and stirred to soften it, and then the slime is poured under the softened slime. Cement milk is pressed into the side, and the excavator is pulled up with the softened slime placed on the excavation head. Next, concrete is poured into the hole, and ready-made piles are placed so that the tips are fixed in the concrete. A method of embedding piles.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP29798385A JPS62160316A (en) | 1985-12-30 | 1985-12-30 | Burying work of pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP29798385A JPS62160316A (en) | 1985-12-30 | 1985-12-30 | Burying work of pile |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS62160316A JPS62160316A (en) | 1987-07-16 |
JPH0443122B2 true JPH0443122B2 (en) | 1992-07-15 |
Family
ID=17853617
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP29798385A Granted JPS62160316A (en) | 1985-12-30 | 1985-12-30 | Burying work of pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS62160316A (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63125728A (en) * | 1986-11-13 | 1988-05-28 | Mitani Sekisan Kk | Takeout of slime from pile pit |
JP4623574B2 (en) * | 2005-02-21 | 2011-02-02 | ジャパンパイル株式会社 | How to build a pile |
-
1985
- 1985-12-30 JP JP29798385A patent/JPS62160316A/en active Granted
Also Published As
Publication number | Publication date |
---|---|
JPS62160316A (en) | 1987-07-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5378085A (en) | Methods for in situ construction of deep soil-cement structures | |
CA1229736A (en) | Method of hardening soft ground | |
JPH0443122B2 (en) | ||
JP3676441B2 (en) | Pit and construction method of basement using it | |
JPS5634823A (en) | Concrete pile injection constructing method | |
JPH0841870A (en) | Method of connection precast concrete pile | |
JPS63315724A (en) | Execution work of cast-in-place concrete pile with high yield strength | |
JPS566822A (en) | Base pile making method | |
JPS5817849B2 (en) | Foundation pile construction method | |
JPS5924026A (en) | Pile formation work | |
JPH08296240A (en) | Construction method for earthquake-resisting reinforcement of existing foundation | |
JPS6327618A (en) | Setting work of concrete pile by preboring | |
JP2824327B2 (en) | Mortar material and kneading-free method using it | |
JPS6347415A (en) | Construction of cast-in-place concrete pile | |
JPS63197718A (en) | Construction work of in-situ pile | |
JPS58210211A (en) | Treatment of extra-banking concrete in head of on-site concrete pile | |
JP3182674B2 (en) | Construction method of agitated mixing reinforcement | |
JPS62178620A (en) | Formation of improved angular ground | |
JPH0351422A (en) | Natural-deterioration constructing method for temporary concrete pole | |
JPS59224721A (en) | Embedding work of concrete pile | |
JPS58189410A (en) | Forcibly controlled injection work | |
JP2005054437A (en) | Construction method for foundation pile | |
JPH0626036A (en) | Concrete pile installation method by inner excavation | |
SU1731904A1 (en) | Method of hole making for posts and pile foundations | |
JPS62211419A (en) | Treatment of head of in-situ concrete pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |