JPS6327618A - Setting work of concrete pile by preboring - Google Patents

Setting work of concrete pile by preboring

Info

Publication number
JPS6327618A
JPS6327618A JP16920186A JP16920186A JPS6327618A JP S6327618 A JPS6327618 A JP S6327618A JP 16920186 A JP16920186 A JP 16920186A JP 16920186 A JP16920186 A JP 16920186A JP S6327618 A JPS6327618 A JP S6327618A
Authority
JP
Japan
Prior art keywords
pile
hole
concrete
pit
concrete pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP16920186A
Other languages
Japanese (ja)
Inventor
Shigeru Sato
茂 佐藤
Shinobu Maeda
忍 前田
Chikao Watabe
渡部 愛雄
Sadao Nishikawa
西川 貞雄
Shingo Iwamoto
岩本 伸吾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitani Sekisan Co Ltd
Original Assignee
Mitani Sekisan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitani Sekisan Co Ltd filed Critical Mitani Sekisan Co Ltd
Priority to JP16920186A priority Critical patent/JPS6327618A/en
Publication of JPS6327618A publication Critical patent/JPS6327618A/en
Pending legal-status Critical Current

Links

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE:To exactly fix a concrete pile with lesser noise by reducing the number of striking times by a method in which excavation is made while injecting cement milk from slightly before a given depth of a pit, and rotation and pressure are applied in the latter period of pile penetration. CONSTITUTION:A pile pit 3 is excavated in the ground 1 where a foundation pile is to be set, and a precast concrete pile 7 is penetrated into the pit 3 for setting. During the excavation period, excavation is made while injecting cement milk through the tip of an excavating head from slightly before a given depth of the pit 3 to complete the pile pit 3. In the latter period of penetrating the pile 7, the pile 7 is turned and penetrated while applying a given pressure to the pile 7, and the head of the pile 7 is slightly struck and set on the bearing ground. The concrete pile 7 can thus be exactly fix to the bearing ground by a comparatively smaller number of strikes.

Description

【発明の詳細な説明】 (産業上の利用分野) この発明は、プレボーリングにより基礎りいを設置する
工法に関するもので、基礎くい設置関係の産業分野に属
する。
DETAILED DESCRIPTION OF THE INVENTION (Industrial Application Field) The present invention relates to a construction method for installing foundation piles by pre-boring, and belongs to the industrial field related to foundation pile installation.

(従来の技術) 従来基礎くい工法としては、色々の工法が提案されてい
る。
(Prior Art) Various methods have been proposed as conventional foundation pile construction methods.

例えば、予めくい穴を掘削して、このくい穴に既製くい
を挿入し、くいの下gH:がくい穴底に達した時にくい
頭をモンケンで打撃する工法が知られていた。
For example, there is a known method in which a stake hole is drilled in advance, a ready-made stake is inserted into the hole, and when the stake reaches the bottom of the hole, the hard head is hit with a hammer.

また他の例どしては、くい穴底部付近の直径を若干大径
にし、法部へセメントミルクを注入すると共に、前記セ
メントミルクをくい穴内の残留土砂と撹拌混合し、前記
拡底部へくいの下端を挿入して、前記混合物の硬化に伴
ってくいを支持させた工法がある。
In another example, the diameter near the bottom of the pile hole is made slightly larger, cement milk is injected into the slope, and the cement milk is stirred and mixed with the remaining earth and sand in the pile hole, and the pile is poured into the expanded bottom part. There is a construction method in which the lower end of the peg is inserted to support the peg as the mixture hardens.

(発明により解決すべき問題点) 前記従来工法中、モンケン打撃工法においては、くいの
先端をくい穴底に到達させ、更に所定の支持力を得る為
にモンケン打撃を相当多数回行わなければならないので
、騒音公害を発生するおそれがあり、打撃回数に制約を
受け、ひいてはくいの定着が不十分になるおそれがあっ
た。
(Problems to be Solved by the Invention) Among the conventional construction methods mentioned above, in the Monken hammering method, Monken hammering must be performed quite a number of times in order to make the tip of the pile reach the bottom of the pile hole and further obtain a predetermined supporting force. Therefore, there is a risk of generating noise pollution, and there is a restriction on the number of times of impact, which may lead to insufficient anchoring of the pile.

一方拡底根囚め工法においては、多重のセメントミルク
を要し、経済性を圧迫するのみならず、支持力の不安定
性が残る問題点があった。
On the other hand, the expanded root trapping method requires multiple layers of cement milk, which not only puts pressure on economic efficiency, but also has the problem of unstable supporting capacity.

(問題点を解決する為の手段) この発明はくい挿入作業の終期にくいを回転しつつ圧入
操作し、くいの下端がくい底に達した後、モンケン打撃
を行うので、モンケン打撃回数を著しく少なくすること
ができると共に、支持を確実にしたのである。
(Means for Solving the Problems) This invention performs a press-fitting operation while rotating the pile at the end of the pile insertion work, and performs a swinging strike after the lower end of the pile reaches the bottom of the pile, so the number of swinging strikes is significantly reduced. In addition to being able to do so, it also ensured support.

即ちこの発明は、基礎くいの設置予定地にくい穴を掘削
し、このくい穴に既製コンクリートくいを挿入設置する
工法において、前記くい穴掘削時に、くい穴の所定深度
の若干手前から掘削ヘッドの先端よりセメントミルクを
注入し乍ら掘削し、ついでくい穴完成後、くいを挿入し
、くい挿入の後期には、くいを回転すると共に、くい頭
に所定の圧力をかけて圧入し、最終時にくい頭を軽打し
てくいを支持地盤に設置することを特徴とするものであ
る。この発明におけるセメントミルク注入開始深さは、
予定くい穴底に達する子前数mとし、くい頭にかける圧
力は20トン〜40トン前後とする。また支持地盤はN
値50以上の層が数m連続するような層をいう。
That is, this invention provides a construction method in which a difficult hole is excavated at a site where a foundation pile is to be installed, and a ready-made concrete pile is inserted and installed into the hole. After injecting more cement milk, excavation is completed, and after the hole is completed, a pile is inserted, and in the latter stages of the pile insertion, the pile is rotated and the pile head is press-fitted by applying a predetermined pressure. It is characterized by installing a peg on the supporting ground. The cement milk injection start depth in this invention is
The height of the pile shall be several meters before reaching the bottom of the planned pile, and the pressure applied to the head of the pile shall be approximately 20 to 40 tons. Also, the supporting ground is N
It refers to a layer in which several meters of continuous layers have a value of 50 or more.

(発明の作用) 前記のようにこの発明によれば、くい穴掘削の終期にセ
メントミルクを注入するので、砂その他の脆弱地盤であ
っても、掘削くい穴の崩壊を未然に防止するこ−とがで
きる。
(Operation of the Invention) As described above, according to the present invention, since cement milk is injected at the final stage of the pile hole excavation, collapse of the excavated pile hole can be prevented even in sand or other weak ground. I can do it.

またくいを圧入した後モンケン軽打を行うので、くいの
下端は、(い穴底へ確実に支持される。
Also, after press-fitting the stake, a light tap is performed, so the lower end of the stake is securely supported at the bottom of the hole.

(実施例) 次にこの発明の実施例を図面に基づいて説明する。先づ
第1図のようにくい穴子定地1へ、ポーリング機械13
をセットし、オーガーロッド2を垂直に保持する。次に
オーガーロッド2を回転して、くい穴3の掘削を開始す
る。前記オーガーロッド2には、ドラム4と、撹拌片5
とが所定間隔に固着しであるので、オーガー6で掘削さ
れた土は、殆んど外界に取り出されることな(、撹拌片
5で破砕され、ドラム4でくい穴3へ練りつけられる。
(Example) Next, an example of the present invention will be described based on the drawings. First, go to the difficult conger eel ground 1 as shown in Figure 1, and use the polling machine 13.
and hold the auger rod 2 vertically. Next, the auger rod 2 is rotated to start drilling the borehole 3. The auger rod 2 includes a drum 4 and a stirring piece 5.
Since the soil is fixed at predetermined intervals, the soil excavated by the auger 6 is hardly taken out to the outside world (it is crushed by the stirring piece 5 and kneaded into the pile hole 3 by the drum 4.

このようにしてくい穴3が予定くい穴底3aの上方5m
位に達したならば(第3図)、オーガー6の先端からセ
メントミルクを放出し乍ら掘削を継続する。そこで掘削
された土砂とセメントミルクとが混合してくい穴底に残
留し、くい穴底部の崩壊を防止し乍ら所定深さのくい穴
を掘削する。次にオーガーロッド2を引き上げ、ついで
既製のコンクリートくい7を吊り下げて、自重により挿
入する。くい穴が深い時にはく例えば20m〜50m)
、当該くい穴の深さに対応する数の既製のコンクリート
くい7.7aを順次挿入する。
In this way, the drill hole 3 is 5 m above the planned drill hole bottom 3a.
When this point is reached (FIG. 3), excavation continues while cement milk is discharged from the tip of the auger 6. The excavated soil and cement milk mix and remain at the bottom of the hole, preventing the bottom of the hole from collapsing while digging the hole to a predetermined depth. Next, the auger rod 2 is pulled up, and then a ready-made concrete pile 7 is suspended and inserted by its own weight. (For example, 20m to 50m) when the hole is deep.
, a number of ready-made concrete piles 7.7a corresponding to the depth of the pile holes are successively inserted.

下部コンクリートくい7の下端が、前記掘削土とセメン
トミルクとの混合物中へ突入する付近(くい穴底からほ
ぼ5m位)になった時に(又は自重挿入が困難になった
時、第5図)、コンクリートくいの上端部へ下圧力を加
えると共に、くいを回転し乍ら更に圧入し、コンクリー
トくい7の下端をくい穴底へ到達させる(第6図)。つ
いでコンクリート頭部をモンケン8で軽打すれば、コン
クリートくいは設置される。
When the lower end of the lower concrete pile 7 reaches the point where it plunges into the mixture of excavated soil and cement milk (approximately 5 m from the bottom of the pile hole) (or when it becomes difficult to insert its own weight, Fig. 5) Then, while applying downward pressure to the upper end of the concrete pile, the pile is further pressed while rotating, and the lower end of the concrete pile 7 reaches the bottom of the pile hole (Fig. 6). Next, tap the concrete head with Monken 8 and the concrete pile will be installed.

前記における圧入力は、例えばコンクリートくい7の上
端に嵌着したキャップ9に伝導軸10を介して固定した
駆動装置のハウジング11にシーブ12を取付け、ポー
リング機械13のシーブ14および巻取器15を介して
付与する。例えばワイヤー16を巻取ることによって、
シーブ12.14を近付けることにより、ワイヤーの引
張力が下圧力に変換され、コンクリートくい7.7aを
第6図中矢示17の方向へ加圧することができる。
The pressing force in the above can be applied, for example, by attaching the sheave 12 to the housing 11 of the drive device, which is fixed via the transmission shaft 10 to the cap 9 fitted to the upper end of the concrete pile 7, and by connecting the sheave 14 of the polling machine 13 and the winder 15. Grant via. For example, by winding the wire 16,
By bringing the sheave 12.14 closer, the tensile force of the wire is converted into a downward pressure, making it possible to pressurize the concrete pile 7.7a in the direction of arrow 17 in FIG.

尚モンケン8による打撃は、第7図々示の状態により、
モンケン8を上下して打撃する。前記実施例におけるく
い穴3の掘削又はくいの挿入については、必ずしも実施
例に限定されることなく、従来公知の技術を用いること
ができる。
Furthermore, the blow by Monken 8 is caused by the condition shown in Figure 7.
Strike Monken 8 up and down. Excavation of the stake hole 3 or insertion of the stake in the embodiment is not necessarily limited to the embodiment, and conventionally known techniques can be used.

(発明の効果) この発明は、コンクリートくいの挿入最終段階で、コン
クリートくい頭を加圧してくいを圧入し、コンクリート
くいの下端がくい穴底に達したならば、モンケンで軽打
するので、比較的少ない打撃数によりコンクリートくい
を支持地盤へ確実に定着さぼることができる効果がある
(Effect of the invention) In this invention, at the final stage of inserting a concrete pile, the head of the concrete pile is pressurized and the pile is press-fitted, and when the lower end of the concrete pile reaches the bottom of the pile hole, it is lightly struck with a Monken. The relatively small number of blows has the effect of reliably anchoring the concrete pile to the supporting ground.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はくい打子定地へポーリング機械をセットした図
、第2図はこの発明の実施に際し、くい穴掘削中途の図
、第3図は同じくくい穴掘削が進行し、セメントミルク
注入開始時の図、第4図は同じくくい穴掘削終了時の図
、第5図は同じく圧入開始位置まで挿入した図、第6図
は同じくコンクリートくい圧入終了時の図、第7図は同
じくくい頭をモンケンで打撃する時の図、第8図は同じ
くくい打終了時の図である。 1・・・くい穴子定地   2・・・オーガーロッド3
・・べい穴      6・・・Δ−ガー7・・・コン
クリートくい 8・・・モンケン13・・・ポーリング
機械
Figure 1 is a diagram showing the poling machine set on a fixed ground for stakes, Figure 2 is a diagram showing the drilling of a stake hole in the middle of the implementation of this invention, and Figure 3 is a diagram of the drilling of a stake hole in progress and the cement milk injection has begun. Figure 4 is the same diagram when the pile hole is finished being excavated, Figure 5 is the same diagram when the concrete pile has been inserted to the starting position, Figure 6 is the same diagram when the concrete pile is finished being press-fitted, and Figure 7 is the same diagram when the pile head is inserted. Figure 8 is a diagram when hitting with a Monken, and Figure 8 is a diagram when the stake is finished. 1... Conger eel fixed place 2... Auger rod 3
... Pier 6 ... Δ-Gar 7 ... Concrete pile 8 ... Monken 13 ... Polling machine

Claims (1)

【特許請求の範囲】 1 基礎くいの設置予定地にくい穴を掘削し、このくい
穴に既製コンクリートくいを挿入設置する工法において
、前記くい穴掘削時に、くい穴の所定深度の若干手前か
ら掘削ヘッドの先端よりセメントミルクを注入し乍ら掘
削し、ついでくい穴完成後、くいを挿入し、くい挿入の
後期には、くいを回転すると共にくいに所定の圧力をか
けて圧入し、然る後くい頭を軽打してくいを支持地盤に
設置することを特徴としたプレボーリングによるコンク
リートくい設置工法 2 セメントミルク注入開始深さは、予定くい穴底の手
前数mとした特許請求の範囲第1項記載のプレボーリン
グによるコンクリートくいの設置工法3 くい頭にかけ
る圧力は20トン〜40トンとした特許請求の範囲第1
項記載のプレボーリングによるコンクリート杭の設置工
法 4 支持地盤はN値50以上の層が数m連続するものと
した特許請求の範囲第1項記載のプレボーリングによる
コンクリートくいの設置工法
[Scope of Claims] 1. In a construction method in which a difficult hole is excavated at a site where foundation piles are planned to be installed, and a ready-made concrete pile is inserted and installed into this pile hole, when excavating the pile hole, the excavation head is inserted from slightly before the predetermined depth of the pile hole. Cement milk is injected from the tip of the hole while drilling, and after the hole is completed, a peg is inserted.In the latter stage of inserting the peg, the peg is rotated and press-fitted into the peg by applying a predetermined pressure. Concrete pile installation method 2 by pre-boring characterized by lightly tapping the pile head and installing the pile on the supporting ground Claim No. Method 3 for installing concrete piles by pre-boring according to claim 1. Claim 1: The pressure applied to the pile head is 20 tons to 40 tons.
4. Method for installing concrete piles by pre-boring as described in Claim 4. The method for installing concrete piles by pre-boring as described in Claim 1, wherein the supporting ground is a continuous layer of several meters with an N value of 50 or more.
JP16920186A 1986-07-18 1986-07-18 Setting work of concrete pile by preboring Pending JPS6327618A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16920186A JPS6327618A (en) 1986-07-18 1986-07-18 Setting work of concrete pile by preboring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16920186A JPS6327618A (en) 1986-07-18 1986-07-18 Setting work of concrete pile by preboring

Publications (1)

Publication Number Publication Date
JPS6327618A true JPS6327618A (en) 1988-02-05

Family

ID=15882081

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16920186A Pending JPS6327618A (en) 1986-07-18 1986-07-18 Setting work of concrete pile by preboring

Country Status (1)

Country Link
JP (1) JPS6327618A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01196454A (en) * 1988-01-29 1989-08-08 Rinnai Corp Warm air flow discharging device
JPH06272251A (en) * 1993-03-24 1994-09-27 Kajima Corp Burying construction method for concrete pile
JPH08199572A (en) * 1995-01-25 1996-08-06 Fumio Kinoshita Embedding method of foundation pile and embedding attachment and pile embedding device
JPH08209696A (en) * 1995-02-03 1996-08-13 Fumio Kinoshita Pile burying method for foundation pile and burying attachment and pile burying device
CN106337417A (en) * 2016-08-30 2017-01-18 十四冶建设云南勘察设计有限公司 Post-grouting method for pile end of rotary excavation pile

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60219321A (en) * 1984-04-16 1985-11-02 Shiroyama Hideji Pile driving method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60219321A (en) * 1984-04-16 1985-11-02 Shiroyama Hideji Pile driving method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01196454A (en) * 1988-01-29 1989-08-08 Rinnai Corp Warm air flow discharging device
JPH06272251A (en) * 1993-03-24 1994-09-27 Kajima Corp Burying construction method for concrete pile
JPH08199572A (en) * 1995-01-25 1996-08-06 Fumio Kinoshita Embedding method of foundation pile and embedding attachment and pile embedding device
JPH08209696A (en) * 1995-02-03 1996-08-13 Fumio Kinoshita Pile burying method for foundation pile and burying attachment and pile burying device
CN106337417A (en) * 2016-08-30 2017-01-18 十四冶建设云南勘察设计有限公司 Post-grouting method for pile end of rotary excavation pile
CN106337417B (en) * 2016-08-30 2019-05-24 云南建投第一勘察设计有限公司 A kind of rotary digging stake pile-end post-grouting method

Similar Documents

Publication Publication Date Title
CN105604001B (en) Drilling tool is stirred in the stake of stiff-core cement soil cylinder and the rotation of construction method and tubular
CN107023002A (en) Down-the-hole impacts churning composite pile pile making method
JP2002155530A (en) Embedding method and tip metal fitting of existing pile
JPS5985028A (en) Steel pipe pile and laying work thereof
JPS6327618A (en) Setting work of concrete pile by preboring
GB2132667A (en) Method of installing precast concrete piles
KR101440470B1 (en) Pile with slime removing device in the bottom end and piling method using the same
JP4360745B2 (en) Construction method of ready-made piles
KR101299643B1 (en) Apparatus for drilling a pile hole
JPH06316927A (en) Installation of open section pile in large diameter
CN215211008U (en) Pile foundation construction device for treating waste air-raid shelter and pile foundation thereof
KR101304877B1 (en) Pile construction structure
JP3005741B2 (en) Ground improvement method
KR900005913B1 (en) Base stake inflated in bump state at lower end there of and its construction
CN112459051A (en) Construction method for solving problem of excessive irrigation and sediment of pile foundation in karst area
JPH01226935A (en) Transmission line tower foundation and its construction
RU2204656C1 (en) Process of erection of enclosing wall in ground
JP2001073367A (en) Embedding construction method for steel pipe pile
JPH0137530B2 (en)
KR20130080072A (en) Pile reinforcing structure
JPH0559726A (en) Method of driving precast pile into ground
JPS6252088B2 (en)
JPH06158670A (en) Method for constructing foundation of building and the like using aggregate
JPS6023522A (en) Construction work of concrete pile