JPH08209696A - Pile burying method for foundation pile and burying attachment and pile burying device - Google Patents

Pile burying method for foundation pile and burying attachment and pile burying device

Info

Publication number
JPH08209696A
JPH08209696A JP3909195A JP3909195A JPH08209696A JP H08209696 A JPH08209696 A JP H08209696A JP 3909195 A JP3909195 A JP 3909195A JP 3909195 A JP3909195 A JP 3909195A JP H08209696 A JPH08209696 A JP H08209696A
Authority
JP
Japan
Prior art keywords
pile
embedding
guide hole
boring
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3909195A
Other languages
Japanese (ja)
Other versions
JP2814356B2 (en
Inventor
Fumio Kinoshita
文男 木下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=12543414&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JPH08209696(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Individual filed Critical Individual
Priority to JP7039091A priority Critical patent/JP2814356B2/en
Publication of JPH08209696A publication Critical patent/JPH08209696A/en
Application granted granted Critical
Publication of JP2814356B2 publication Critical patent/JP2814356B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE: To enhance the working efficiency by boring a guide hole by a boring device arranged in a movable operation part of a work machine, removing the boring device from the movable operation part, putting a fitting part arranged in the movable operation part on an upper part of a pile, and burying the pile along the guide hole by a vibrating device. CONSTITUTION: An arm 91 of a pile burying device 9 is operated, and a boring rod 44 is erected in a boring place of the ground 8 of a construction part. A hydraulic motor 21 of a boring device is actuated, and the arm 91 is operated, and a guide hole is bored in a necessary depth. The boring device is removed together with a relay member 31 from a fitting part 15. An oil line is switched, and the hydraulic motor 21 of a vibrating device 2 is actuated. A pile is erected in a guide hole, and the arm 91 is operated, and the fitting part 15 is put on an upper part of the pile. The vibrating device 2 is actuated, and while vibrating a frame 1, the arm 91 is operated, and the pile is pressed, and is buried along the guide hole.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、建物などの施工の際に
地盤を補強するために埋め込む基礎用杭の埋込方法及び
埋込用アタッチメント及び杭埋込装置に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for embedding foundation piles, which is embedded to reinforce the ground during construction of a building, an attachment for embedding, and a pile embedding device.

【0002】[0002]

【従来技術】一般家屋など建物の施工においては、建物
の土台となる基礎の施工が重要である。基礎は地盤の上
に設けられるので、十分な強度を有する基礎を施工する
には地盤をまず強化する必要がある。地盤強化の一般的
な方法としては、地盤を撹拌してセメントなどの改良剤
を混入して固化させる方法の他、地盤に多数の杭を埋め
込む方法がある。このうち、後者の方法は施工費も比較
的安価であるため、特に広く利用されている。
2. Description of the Related Art In constructing a building such as a general house, it is important to construct a foundation as a foundation of the building. Since the foundation is provided on the ground, it is necessary to strengthen the ground first in order to construct a foundation having sufficient strength. As a general method for strengthening the ground, there are a method of stirring the ground and mixing an improving agent such as cement to solidify the ground, and a method of embedding a large number of piles in the ground. Of these, the latter method is particularly widely used because the construction cost is relatively low.

【0003】この方法の施工は、まず、地盤の所要の位
置に専用機械である建柱車などの穿孔装置いわゆるオー
ガー装置によって所要の深さの穴を設け、次に、油圧ハ
ンマーや油圧バイブロ類を備えた杭埋め装置によって木
杭またはコンクリート杭を叩いたり振動をかけながら埋
め込むことにより行われている。
In the construction of this method, first, a hole of a required depth is formed at a required position of the ground by a so-called auger device such as a boring machine which is a dedicated machine, and then a hydraulic hammer or a hydraulic vibro. It is carried out by tapping a wooden pile or a concrete pile or embedding it while applying vibration with a pile filling device equipped with.

【0004】[0004]

【発明が解決しようとする課題】しかし、上記したよう
な従来の方法には、次のような課題があった。すなわ
ち、杭の埋め込み作業を行なうには、穿孔用の作業機械
と杭埋め込み用の作業機械を必要とする。従って、例え
ば施工箇所が住宅地域の狭い場所である場合は、まず、
穿孔用の作業機械を現場に乗り入れて穿孔作業を行な
い、次に作業機械を杭埋め込み用のものと入替えて杭埋
め作業を行なう。このように、杭の埋め込み作業におい
ては、上記二種類の作業機械が必要であるばかりか、場
所によっては作業機械の入替え作業も必要となり、作業
効率も悪くなる。
However, the above-mentioned conventional method has the following problems. That is, in order to perform the pile embedding work, a work machine for boring and a work machine for embedding the pile are required. Therefore, for example, if the construction site is a small area in a residential area, first,
The work machine for drilling is brought into the field to perform the drilling work, and then the work machine is replaced with the one for embedding the pile to perform the pile filling work. As described above, in the work of embedding the piles, not only the above-mentioned two types of work machines are required, but also work of replacing the work machines is required depending on the location, resulting in poor work efficiency.

【0005】[0005]

【発明の目的】本発明は、上記課題を解消するもので、
建物の基礎を施工する際の基礎用杭の埋め込みにおける
穿孔作業と杭埋め込み作業を一台の作業機械でできるよ
うにして、例えば施工箇所が住宅地域の狭い場所である
場合でも、従来のような各作業専用の作業機械を入替え
る作業を不要にし、作業効率を向上させることを目的と
する。
The object of the present invention is to solve the above problems.
Allows one work machine to perform drilling work and pile embedding work for embedding foundation piles when constructing building foundations, for example, even when the construction site is a narrow place in a residential area. The purpose is to improve work efficiency by eliminating the need to replace work machines dedicated to each work.

【0006】[0006]

【目的を達成するための手段】上記目的を達成するため
に講じた本発明の手段は次のとおりである。第1の手段
にあっては、基礎用杭を地盤に埋め込む方法であって、
この方法は、作業機の可動操作部に着脱可能に設けてあ
る穿孔装置によりガイド孔を穿孔するステップ、可動操
作部から穿孔装置を取り外すステップ、可動操作部に設
けてある嵌合部を杭上部に被せ、振動装置により振動を
かけてガイド孔に沿って杭を埋め込むステップ、を含
む、基礎用杭の埋込方法である。
[Means for Achieving the Object] The means of the present invention for achieving the above object are as follows. The first means is a method of embedding foundation piles in the ground,
This method comprises the steps of drilling a guide hole with a drilling device that is removably provided in the movable operation part of the work machine, removing the punching device from the movable operation part, and fitting the fitting part provided in the movable operation part to the top of the pile. And embedding the pile along the guide hole by vibrating it with a vibrating device, and embedding the foundation pile.

【0007】第2の手段にあっては、基礎用杭を地盤に
埋め込む方法であって、この方法は、作業機の可動操作
部に着脱可能に設けてある穿孔装置によりガイド孔を穿
孔するステップ、このガイド孔の内部に土を固化する土
質改良剤を入れるステップ、可動操作部から穿孔装置を
取り外すステップ、可動操作部に設けてある嵌合部を杭
上部に被せ、振動装置により振動をかけてガイド孔に沿
って杭を埋め込むステップ、を含む、基礎用杭の埋込方
法である。
A second means is a method of embedding a foundation pile in the ground, which comprises a step of punching a guide hole by a punching device detachably provided in a movable operating portion of a working machine. , The step of putting soil improvement agent to solidify the soil inside this guide hole, the step of removing the punching device from the movable operation part, the fitting part provided in the movable operation part is put on the upper part of the pile, and vibration is applied by the vibration device. And embedding the pile along the guide hole.

【0008】第3の手段にあっては、基礎用杭を地盤に
埋め込むためのアタッチメントであって、このアタッチ
メントは、作業機械の可動操作部に取り付け可能なフレ
ームと、このフレームに設けられた振動装置と、上記フ
レームに設けられた、杭上部に被せるための嵌合部と、
上記フレームに自在継手を介して着脱可能に設けてある
穿孔装置と、を備え、上記穿孔装置と嵌合部は選択的に
使用される、基礎用杭の埋込用アタッチメントである。
The third means is an attachment for embedding a foundation pile in the ground, the attachment being a frame attachable to a movable operating portion of a working machine, and a vibration provided in the frame. A device, and a fitting portion provided on the frame for covering the upper part of the pile,
A piercing device detachably provided on the frame via a universal joint, wherein the piercing device and the fitting portion are selectively used to embed a foundation pile.

【0009】第4の手段にあっては、基礎用杭を地盤に
埋め込むための杭埋込装置であって、この装置は、作業
機械と、この作業機械の可動操作部に設けてある振動装
置と、上記可動操作部に設けてある、杭上部に被せるた
めの嵌合部と、上記可動操作部に自在継手を介して着脱
可能に設けてある穿孔装置と、を備え、上記穿孔装置と
嵌合部は選択的に使用される、基礎用杭の杭埋込装置で
ある。
The fourth means is a pile embedding device for embedding a foundation pile in the ground, which is a vibrating device provided on a working machine and a movable operating portion of the working machine. And a fitting portion provided on the movable operation portion for covering the upper part of the pile, and a punching device detachably provided on the movable operation portion via a universal joint, and fitted with the punching device. The joint is a pile embedding device for foundation piles that is selectively used.

【0010】土質改良剤は土を固化するもので、例えば
セメント、石灰などであるが、これらに限定するもので
はない。作業機械は特に限定はしないが、例えばバック
ホウなどの油圧式ショベル系掘削機、各種ボーリング機
械などである。
The soil conditioner is a substance which solidifies the soil, and examples thereof include, but are not limited to, cement and lime. The working machine is not particularly limited, but examples thereof include hydraulic excavator-based excavators such as backhoes and various boring machines.

【0011】[0011]

【作用】埋込用アタッチメントを作業機械のアームな
ど、可動操作部に取り付ける。可動操作部を操作して、
埋込用アタッチメントを施工箇所に位置させる。施工箇
所の地盤に穿孔装置によりガイド孔を所要深さに穿孔す
る。なお、穿孔装置は自在継手を介して取り付けてある
ので、軸方向を任意に設定することができる。また、穿
孔する際、例えば穿孔装置の穿孔ロッドなどが地中の石
やコンクリート片などの障害物に接触したときには、自
在継手の作用により穿孔ロッドの軸方向が変わり、逃げ
ることができるので、穿孔装置各部の損傷を防止でき
る。
[Operation] The embedded attachment is attached to the movable operation unit such as the arm of the work machine. Operate the movable operation part,
Position the mounting attachment at the construction site. A guide hole is drilled to the required depth in the ground at the construction site with a drilling device. Since the punching device is attached via the universal joint, the axial direction can be set arbitrarily. Further, when drilling, for example, when the drilling rod of the drilling device comes into contact with an obstacle such as a stone or concrete piece in the ground, the axial direction of the drilling rod is changed by the action of the universal joint so that the drilling device can escape. It is possible to prevent damage to each part of the device.

【0012】次に、フレームから穿孔装置を取り外す。
穿孔したガイド孔に杭を立て、作業機械の可動操作部を
操作して杭の上部に嵌合部を嵌め込む。そして、振動装
置を作動させながら、可動操作部によって杭を下方へ押
圧する。これにより、杭はガイド孔に沿って地盤に埋込
まれる。なお、杭埋込装置は、作業機械に上記アタッチ
メントとほぼ同様の要件をあらかじめ備えてある構造で
あるので、アタッチメントを取り付けた作業機械とほぼ
同様に作用する。
Next, the punching device is removed from the frame.
The pile is erected in the drilled guide hole and the movable operating part of the work machine is operated to fit the fitting part on the upper part of the pile. Then, while operating the vibrating device, the movable operation portion pushes the pile downward. As a result, the pile is embedded in the ground along the guide hole. Since the pile embedding device has a structure in which the working machine is provided with substantially the same requirements as the above-mentioned attachment in advance, the pile embedding device acts almost similarly to the working machine to which the attachment is attached.

【0013】[0013]

【実施例】本発明を図面に示した実施例に基づき更に詳
細に説明する。図1は本発明に係る杭埋込装置の一実施
例を示す説明図、図2は埋込用アタッチメントの要部分
解斜視図である。符号Bは杭埋込装置で、作業機械9を
備えている。作業機械9の可動操作部であるアーム91
の先端部には埋込用アタッチメントAが取り付けてあ
る。また、アーム91に設けてあるリンク94には、先
端部にフック93を取り付けた吊りワイヤー92の基端
部が取り付けてある。なお、フック93は抜け止め防止
機構を有するものである。
The present invention will be described in more detail based on the embodiments shown in the drawings. FIG. 1 is an explanatory view showing an embodiment of a pile embedding device according to the present invention, and FIG. 2 is an exploded perspective view of a main part of an embedding attachment. Reference numeral B is a pile embedding device, which is equipped with a work machine 9. An arm 91 that is a movable operation unit of the work machine 9.
An attachment A for embedding is attached to the tip of the. Further, a link 94 provided on the arm 91 is attached with a base end portion of a suspension wire 92 having a hook 93 attached to a tip end portion thereof. The hook 93 has a retaining mechanism.

【0014】埋込用アタッチメントAはフレーム1を備
えている。フレーム1の上面板11の上部には、アーム
91の先端部に取り付けるためのブラケット12、12
が設けてある。ブラケット12、12には各々ピン挿着
孔13、13が設けてある。フレーム1の下部には四角
形の台板14が設けてある。台板14の上部には振動装
置2が設けてある。振動装置2は、油圧モーター21に
よっておもりを回転させて振動させる一般的な構造のも
のである。
The mounting attachment A includes a frame 1. On the upper part of the upper plate 11 of the frame 1, brackets 12, 12 for attaching to the tip of the arm 91 are attached.
Is provided. The brackets 12 and 12 are provided with pin insertion holes 13 and 13, respectively. A rectangular base plate 14 is provided below the frame 1. The vibrating device 2 is provided above the base plate 14. The vibration device 2 has a general structure in which a weight is rotated by a hydraulic motor 21 to vibrate.

【0015】台板14の下面中央部には杭の上部に嵌め
込むための円筒状の嵌合部15が設けてある。嵌合部1
5の側部には直径線上に相対向してピン孔16、16が
設けてある。嵌合部15には、自在継手を構成する中継
部材31が取り付けてある。中継部材31は、ほぼY状
で、上端部には円筒状の挿通管32、32が設けてあ
る。中継部材31の下端部にはボルト孔33が設けてあ
る。中継部材31は、ピン孔16と挿通管32を合わ
せ、ピン34を挿通し、これをボルト35とナット36
で一方の挿通管32に固定して取り付けてある。
At the center of the lower surface of the base plate 14, there is provided a cylindrical fitting portion 15 for fitting into the upper portion of the pile. Mating part 1
Pin holes 16 and 16 are provided on the side of 5 so as to face each other on the diameter line. A relay member 31 forming a universal joint is attached to the fitting portion 15. The relay member 31 is substantially Y-shaped, and cylindrical insertion tubes 32, 32 are provided at the upper end portion. A bolt hole 33 is provided at the lower end of the relay member 31. In the relay member 31, the pin hole 16 and the insertion tube 32 are aligned, the pin 34 is inserted, and the pin 35 is inserted into the bolt 35 and the nut 36.
Is fixedly attached to one of the insertion tubes 32.

【0016】また、中継部材31の下部には穿孔装置4
が取り付けてある。穿孔装置4は基体ブラケット41を
備えている。基体ブラケット41の上部にはボルト孔4
2、42が設けてある。基体ブラケット41は、ボルト
孔42をボルト孔33に合わせ、ボルト47を挿通し、
ナット48を螺着することにより中継部材31に取り付
けてある。
A punching device 4 is provided below the relay member 31.
Is attached. The punching device 4 includes a base bracket 41. A bolt hole 4 is provided on the base bracket 41.
2, 42 are provided. In the base bracket 41, the bolt hole 42 is aligned with the bolt hole 33, and the bolt 47 is inserted,
It is attached to the relay member 31 by screwing a nut 48.

【0017】基体ブラケット41の下部には油圧モータ
ー43が内蔵してある。油圧モーター43の回転軸には
穿孔ロッド44が取り付けてある。穿孔ロッド44の下
部にはスクリュー45が設けてあり、スクリュー45の
上方には地面に接触することにより穿孔ロッド44の穿
孔深さを一定にするための停止部46が設けてある。な
お、穿孔装置4の油圧モーター43と振動装置2の油圧
モーター21は、作業において同時に運転されることは
ないので、作業機械9のオイルラインの一系統を切り替
えて使用するようにしている。
A hydraulic motor 43 is built in the lower portion of the base bracket 41. A drilling rod 44 is attached to the rotary shaft of the hydraulic motor 43. A screw 45 is provided below the piercing rod 44, and a stop portion 46 is provided above the screw 45 for keeping the piercing depth of the piercing rod 44 constant by contacting the ground. Since the hydraulic motor 43 of the punching device 4 and the hydraulic motor 21 of the vibrating device 2 are not simultaneously operated during work, one system of the oil line of the working machine 9 is switched and used.

【0018】(作 用)図3はガイド孔を穿孔している
状態を示す説明図、図4は杭を埋め込んでいる状態を示
す説明図である。図1ないし図4を参照して本実施例の
作用を説明する。 杭埋込装置9のアーム91を操作し、施工部の地盤
8の穿孔箇所に穿孔ロッド44を立てる。穿孔装置4の
油圧モーター21を作動させてアーム91を操作し、所
要深さにガイド孔81を穿孔する。なお、自在継手を構
成する中継部材31などの作用により、穿孔装置4の穿
孔ロッド44は任意方向に傾斜させて地盤8に穿孔する
こともできる。また、穿孔する際、例えば穿孔ロッド4
4が石やコンクリート破片などの障害物に接触したとき
には、穿孔ロッド44の方向が変わり逃げることができ
るので、穿孔ロッド44の損傷を防止できる。
(Operation) FIG. 3 is an explanatory view showing a state where a guide hole is drilled, and FIG. 4 is an explanatory view showing a state where a pile is embedded. The operation of this embodiment will be described with reference to FIGS. The arm 91 of the pile embedding device 9 is operated to stand the drilling rod 44 at the drilling location of the ground 8 of the construction section. The hydraulic motor 21 of the punching device 4 is operated to operate the arm 91 to punch the guide hole 81 to a required depth. The boring rod 44 of the boring device 4 can be tilted in an arbitrary direction to perforate the ground 8 by the action of the relay member 31 forming the universal joint. Further, when drilling, for example, the drill rod 4
When 4 contacts an obstacle such as a stone or a concrete shard, the direction of the piercing rod 44 changes and can escape, so that the piercing rod 44 can be prevented from being damaged.

【0019】 嵌合部15から中継部材31と共に穿
孔装置4を取り外す。そして、オイルラインを切り替え
て、振動装置2の油圧モーター21が作動するようにす
る。 必要に応じて、穿孔したガイド孔81の内部に適量
の水とセメントなどの土質改良剤を入れる。 杭7をガイド孔81に立て、アーム91を操作し
て、杭7の上部に嵌合部15を被せる。 振動装置2を作動させ、フレーム1を振動させなが
ら、アーム91を操作して杭7を押圧してガイド孔81
に沿って埋め込む。
The punching device 4 is removed from the fitting portion 15 together with the relay member 31. Then, the oil line is switched so that the hydraulic motor 21 of the vibration device 2 operates. If necessary, an appropriate amount of water and a soil improvement agent such as cement are put inside the perforated guide hole 81. The pile 7 is erected in the guide hole 81, and the arm 91 is operated to cover the fitting portion 15 on the upper portion of the pile 7. While operating the vibrating device 2 to vibrate the frame 1, the arm 91 is operated to press the pile 7 to guide the guide hole 81.
Embed along.

【0020】 杭7を所定の深さまで埋込んだら、吊
りワイヤー92のフック93を、杭7上部にあらかじめ
取り付けてある引掛けワイヤー(図示省略)に引っ掛け
て吊り上げる。このとき、地盤8が軟弱で杭7が容易に
抜ける場合は、杭7を抜いた孔の内部に再度土質改良剤
を入れて、杭7を埋め込む。
After the pile 7 is embedded to a predetermined depth, the hook 93 of the hanging wire 92 is hooked on a hooking wire (not shown) that is attached to the upper part of the pile 7 in advance to lift it. At this time, when the ground 8 is soft and the pile 7 can be easily removed, the soil improvement agent is again put in the hole where the pile 7 is removed, and the pile 7 is embedded.

【0021】 上記杭7の抜き差し及び土質改良剤の
充填を必要なだけ繰り返し、杭7が抜けにくくなったと
ころで最終的に差込む。また、ガイド孔81にはセメン
トなどの土質改良剤を入れて杭7を埋め込むので、施工
後、杭7の周りには土質改良剤により固化した土が付着
し、杭7の強度がより強くなり腐食しにくくなると共に
抜けにくくなる。
The above-mentioned piles 7 are inserted and removed and the soil conditioner is repeatedly filled as necessary, and finally inserted when it becomes difficult for the piles 7 to come off. Further, since the soil improvement agent such as cement is put in the guide hole 81 and the pile 7 is embedded, after the construction, the soil solidified by the soil improvement agent adheres to the periphery of the pile 7 and the strength of the pile 7 becomes stronger. It becomes difficult to corrode and come off easily.

【0022】なお、杭がコンクリート杭である場合、上
部角部は欠けやすいので、有底四角筒状の保護キャップ
(図示省略)を上部に装着し、その保護キャップに嵌合
部15を被せるようにすることもできる。なお、本発明
は図示の実施例に限定されるものではなく、特許請求の
範囲の記載内において種々の変形が可能である。
When the pile is a concrete pile, the upper corner is easily chipped, so a square-bottomed rectangular protective cap (not shown) is attached to the upper part, and the fitting part 15 is put on the protective cap. You can also The present invention is not limited to the illustrated embodiments, and various modifications can be made within the scope of the claims.

【0023】[0023]

【発明の効果】本発明は上記構成を備え、次の効果を有
する。 (a)本発明に係る基礎用杭の埋込方法及び埋込用アタ
ッチメント及び杭埋込装置によれば、杭を地盤に埋め込
む際の穿孔作業と埋め込み作業を一台の作業機械で行な
うことができる。従って、施工箇所が住宅地域などの狭
い場所である場合でも、従来のような各作業専用の作業
機械を入替える作業が不要となり、作業効率が向上す
る。
The present invention having the above-mentioned structure has the following effects. (A) According to the embedding method of the foundation pile, the embedding attachment, and the pile embedding apparatus according to the present invention, it is possible to perform the boring work and the embedding work when embedding the pile in the ground with one work machine. it can. Therefore, even when the construction site is a narrow place such as a residential area, it is not necessary to replace the conventional working machine for each work, and the work efficiency is improved.

【0024】(b)穿孔したガイド孔に土質改良剤を入
れるようにした埋込方法にあっては、施工後、杭の周り
には土質改良剤により固化した土が付着し、杭の強度が
より強くなると共に抜けにくくなるので、基礎としての
強度をより向上させることができる。
(B) In the embedding method in which the soil-improving agent is put in the perforated guide hole, after the construction, the soil solidified by the soil-improving agent adheres to the periphery of the pile, and the strength of the pile is increased. Since it becomes stronger and more difficult to come off, the strength as a foundation can be further improved.

【0025】(c)穿孔装置はフレームに自在継手を介
して取り付けてある。これにより、穿孔装置は任意方向
に傾斜させて地盤に穿孔することもできる。また、穿孔
中に穿孔装置が石やコンクリート破片などの障害物に接
触したときには、穿孔装置の方向が変わり逃げることが
できるので、穿孔装置の損傷を防止できる。
(C) The punching device is attached to the frame through a universal joint. Accordingly, the punching device can be tilted in any direction to punch the ground. Further, when the punching device comes into contact with an obstacle such as a stone or a concrete fragment during drilling, the direction of the punching device changes and can escape, so that damage to the punching device can be prevented.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る杭埋込装置の一実施例を示す説明
図。
FIG. 1 is an explanatory view showing an embodiment of a pile embedding device according to the present invention.

【図2】埋込用アタッチメントの要部分解斜視図。FIG. 2 is an exploded perspective view of a main part of an embedded attachment.

【図3】ガイド孔を穿孔している状態を示す説明図。FIG. 3 is an explanatory view showing a state in which guide holes are punched.

【図4】杭を埋め込んでいる状態を示す説明図。FIG. 4 is an explanatory view showing a state in which a pile is embedded.

【符号の説明】[Explanation of symbols]

B 杭埋込装置 9 作業機械 91 アーム 92 吊りワイヤー 93 フック 94 リンク A 埋込用アタッチメント 1 フレーム 11 上面板 12 ブラケット 13 ピン挿着孔 14 台板 15 嵌合部 16 ピン孔 2 振動装置 21 油圧モーター 31 中継部材 32 挿通管 33 ボルト孔 34 ピン 35 ボルト 36 ナット 4 穿孔装置 41 基体ブラケット 42 ボルト孔 43 油圧モーター 44 穿孔ロッド 45 スクリュー 46 停止部 47 ボルト 48 ナット B Pile embedding device 9 Working machine 91 Arm 92 Suspending wire 93 Hook 94 Link A Embedding attachment 1 Frame 11 Top plate 12 Bracket 13 Pin insertion hole 14 Base plate 15 Fitting part 16 Pin hole 2 Vibration device 21 Hydraulic motor 31 relay member 32 insertion pipe 33 bolt hole 34 pin 35 bolt 36 nut 4 punching device 41 base bracket 42 bolt hole 43 hydraulic motor 44 drilling rod 45 screw 46 stop portion 47 bolt 48 nut

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 基礎用杭を地盤に埋め込む方法であっ
て、この方法は、 作業機の可動操作部に着脱可能に設けてある穿孔装置に
よりガイド孔を穿孔するステップ、 可動操作部から穿孔装置を取り外すステップ、 可動操作部に設けてある嵌合部を杭上部に被せ、振動装
置により振動をかけてガイド孔に沿って杭を埋め込むス
テップ、 を含むことを特徴とする、 基礎用杭の埋込方法。
1. A method of embedding a foundation pile in the ground, the method comprising the step of boring a guide hole with a boring device detachably provided in a movable operating part of a working machine, the boring device from the movable operating part. Burying the piles along the guide holes by vibrating with a vibrating device to cover the fitting part provided in the movable operation part on the pile upper part, and embedding the pile for the foundation. Included method.
【請求項2】 基礎用杭を地盤に埋め込む方法であっ
て、この方法は、 作業機の可動操作部に着脱可能に設けてある穿孔装置に
よりガイド孔を穿孔するステップ、 このガイド孔の内部に土を固化する土質改良剤を入れる
ステップ、 可動操作部から穿孔装置を取り外すステップ、 可動操作部に設けてある嵌合部を杭上部に被せ、振動装
置により振動をかけてガイド孔に沿って杭を埋め込むス
テップ、 を含むことを特徴とする、 基礎用杭の埋込方法。
2. A method of embedding a foundation pile in the ground, the method comprising the step of boring a guide hole with a boring device detachably provided in a movable operation part of a working machine, wherein the guide hole is provided inside the guide hole. Step of adding soil improvement agent to solidify the soil, step of removing the punching device from the movable operation part, cover the fitting part provided in the movable operation part on the upper part of the pile, and vibrate it with the vibration device to guide the pile along the guide hole. The method for embedding a pile for a foundation, comprising:
【請求項3】 基礎用杭を地盤に埋め込むためのアタッ
チメントであって、このアタッチメントは、 作業機械の可動操作部に取り付け可能なフレームと、 このフレームに設けられた振動装置と、 上記フレームに設けられた、杭上部に被せるための嵌合
部と、 上記フレームに自在継手を介して着脱可能に設けてある
穿孔装置と、を備え、 上記穿孔装置と嵌合部は選択的に使用されることを特徴
とする、 基礎用杭の埋込用アタッチメント。
3. An attachment for embedding a foundation pile in the ground, the attachment comprising a frame attachable to a movable operation part of a working machine, a vibration device provided on the frame, and the frame. A fitting part for covering the upper part of the pile, and a punching device detachably provided on the frame via a universal joint, wherein the punching device and the fitting part are selectively used. An attachment for embedding foundation piles.
【請求項4】 基礎用杭を地盤に埋め込むための杭埋込
装置であって、この装置は、 作業機械と、 この作業機械の可動操作部に設けてある振動装置と、 上記可動操作部に設けてある、杭上部に被せるための嵌
合部と、 上記可動操作部に自在継手を介して着脱可能に設けてあ
る穿孔装置と、を備え、 上記穿孔装置と嵌合部は選択的に使用されることを特徴
とする、 基礎用杭の杭埋込装置。
4. A pile embedding device for embedding a foundation pile in the ground, which comprises a working machine, a vibration device provided in a movable operating part of the working machine, and the movable operating part. A fitting part for covering the upper part of the pile, which is provided, and a perforating device that is removably provided to the movable operating part via a universal joint, are provided. The perforating device and the fitting part are selectively used. A pile embedding device for foundation piles, which is characterized in that
JP7039091A 1995-02-03 1995-02-03 Pile embedding device and method of embedding pile for foundation Expired - Lifetime JP2814356B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7039091A JP2814356B2 (en) 1995-02-03 1995-02-03 Pile embedding device and method of embedding pile for foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7039091A JP2814356B2 (en) 1995-02-03 1995-02-03 Pile embedding device and method of embedding pile for foundation

Publications (2)

Publication Number Publication Date
JPH08209696A true JPH08209696A (en) 1996-08-13
JP2814356B2 JP2814356B2 (en) 1998-10-22

Family

ID=12543414

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7039091A Expired - Lifetime JP2814356B2 (en) 1995-02-03 1995-02-03 Pile embedding device and method of embedding pile for foundation

Country Status (1)

Country Link
JP (1) JP2814356B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007186862A (en) * 2006-01-11 2007-07-26 Foa-Saito:Kk Construction method for driving steel pipe pile
KR101454813B1 (en) * 2013-04-02 2014-11-03 주식회사 대산시빌테크날러지 Helix composite pile connecting device and the construction method therefor
JP2015034429A (en) * 2013-08-09 2015-02-19 藤井 俊彦 Pile driving machine
CN105780775A (en) * 2016-02-29 2016-07-20 济南轨道交通集团有限公司 Anti-draft precast pile conveying device capable of being reused and construction method
JP2016217021A (en) * 2015-05-21 2016-12-22 ネクストエナジー・アンド・リソース株式会社 Pile driving device, and pile driving method using the same
JP6192085B1 (en) * 2017-06-05 2017-09-06 Ogata住宅基盤株式会社 Pile driver and pile driving method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51140306A (en) * 1975-05-29 1976-12-03 Kensetsu Kikai Chiyousa Kk Pile driving method and apparatus therefor
JPS5712034U (en) * 1980-10-02 1982-01-21
JPS6023521A (en) * 1983-07-18 1985-02-06 Asahi Chem Ind Co Ltd Construction work of concrete pile
JPS6327618A (en) * 1986-07-18 1988-02-05 Mitani Sekisan Kk Setting work of concrete pile by preboring
JPH0533340A (en) * 1991-07-30 1993-02-09 Tone Corp Reverse type in-casing boring

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51140306A (en) * 1975-05-29 1976-12-03 Kensetsu Kikai Chiyousa Kk Pile driving method and apparatus therefor
JPS5712034U (en) * 1980-10-02 1982-01-21
JPS6023521A (en) * 1983-07-18 1985-02-06 Asahi Chem Ind Co Ltd Construction work of concrete pile
JPS6327618A (en) * 1986-07-18 1988-02-05 Mitani Sekisan Kk Setting work of concrete pile by preboring
JPH0533340A (en) * 1991-07-30 1993-02-09 Tone Corp Reverse type in-casing boring

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007186862A (en) * 2006-01-11 2007-07-26 Foa-Saito:Kk Construction method for driving steel pipe pile
KR101454813B1 (en) * 2013-04-02 2014-11-03 주식회사 대산시빌테크날러지 Helix composite pile connecting device and the construction method therefor
JP2015034429A (en) * 2013-08-09 2015-02-19 藤井 俊彦 Pile driving machine
JP2016217021A (en) * 2015-05-21 2016-12-22 ネクストエナジー・アンド・リソース株式会社 Pile driving device, and pile driving method using the same
CN105780775A (en) * 2016-02-29 2016-07-20 济南轨道交通集团有限公司 Anti-draft precast pile conveying device capable of being reused and construction method
CN105780775B (en) * 2016-02-29 2017-07-25 济南轨道交通集团有限公司 Reusable anti-offset prefabricated pile Pile feeder and construction method
JP6192085B1 (en) * 2017-06-05 2017-09-06 Ogata住宅基盤株式会社 Pile driver and pile driving method

Also Published As

Publication number Publication date
JP2814356B2 (en) 1998-10-22

Similar Documents

Publication Publication Date Title
JPH0791930B2 (en) Underground drilling machine cement soil equipment
JPH08209696A (en) Pile burying method for foundation pile and burying attachment and pile burying device
JP2814355B2 (en) Pile embedding device and method of embedding pile for foundation
JP2001336149A (en) Taper pile for civil engineering and building work foundation construction, foundation construction equipment therefor, and embedding method therefor
JP4544774B2 (en) Pre-made pile core misalignment prevention device and pre-made pile core misalignment prevention construction method
JPS6137411B2 (en)
KR0148437B1 (en) Pile construction method in underground boulder zone
JP3013172B1 (en) Pipe embedding equipment
JP2726241B2 (en) Pile head treatment method of cast-in-place foundation pile and tool for performing this treatment
JP2992915B2 (en) Supporting method for underground continuous wall
JP4014030B2 (en) Pile press-fitting device
JP2003155756A (en) Footing pile construction method and footing pile constructed by the method
JPH02274992A (en) Method and device for excavating pile hole
JP2592257B2 (en) Rotary press-in type pile driving device
JP2706894B2 (en) Hydraulic jack press-fitting method and equipment
JPH0640665Y2 (en) An embedding device for vertically embedded soil
JP2000017658A (en) Pitching-of-pile method of ready-made pile and its device
JP2679569B2 (en) Concrete pile embedding method
JPH0321903Y2 (en)
JP2002070009A (en) Upper-section extension pile in driving under groundwater level of pine pile
GB2094380A (en) Forming pile holes through foundations
JPH11229400A (en) Structure foundation reinforced by pipe-shaped pile
CN114657987A (en) Construction method for inserting steel pipe into cement soil pile without vibration sense
JPH07331666A (en) Slope cutting method
JP2000282468A (en) Pile driving device

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313532

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070814

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080814

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080814

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080814

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090814

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090814

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090814

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090814

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100814

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110814

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110814

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110814

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110814

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120814

Year of fee payment: 14

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130814

Year of fee payment: 15

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term