JPS6023522A - Construction work of concrete pile - Google Patents

Construction work of concrete pile

Info

Publication number
JPS6023522A
JPS6023522A JP12938183A JP12938183A JPS6023522A JP S6023522 A JPS6023522 A JP S6023522A JP 12938183 A JP12938183 A JP 12938183A JP 12938183 A JP12938183 A JP 12938183A JP S6023522 A JPS6023522 A JP S6023522A
Authority
JP
Japan
Prior art keywords
pile
vibrator
auger
applying
excavated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP12938183A
Other languages
Japanese (ja)
Inventor
Shinichi Yamato
真一 大和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Kasei Corp
Asahi Chemical Industry Co Ltd
Original Assignee
Asahi Chemical Industry Co Ltd
Asahi Kasei Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Chemical Industry Co Ltd, Asahi Kasei Kogyo KK filed Critical Asahi Chemical Industry Co Ltd
Priority to JP12938183A priority Critical patent/JPS6023522A/en
Publication of JPS6023522A publication Critical patent/JPS6023522A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/18Placing by vibrating

Abstract

PURPOSE:To permit the settlement of a concrete pile without causing any damage to the pile by a method in which the pile is settle into the sludged portion of an excavated pit while applying a downward load through a buffer to a vibrator set on the head of the pile and also while applying a vertical vibration to the pile. CONSTITUTION:The ground 1 is excavated by an earth auger 2, and the soil is made sludgy with ground water, etc., by stirring it by a non-spiral blade 3. When the tip of the auger 2 reaches the bearing subsoil, cement milk is jetted from the tip of the auger 2 to form the mixed lump 5 of the cement milk and the sludge 4 near the bottom of the pit. The pile 6 is penetrated into the sludge while applying a downward pressing force under reaction of the construction machine through a buffer 8 to the vibrator 7 set on the top of the pile and also while giving a vertical vibration to the pile 6 by the vibrator 7.

Description

【発明の詳細な説明】 本発明はコンクリート杭の施工方法に関し、更に詳しく
は予め掘削し泥土化された掘削孔内にくいを沈設するく
いの施工方法に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for constructing concrete piles, and more particularly to a method for constructing concrete piles, in which a pile is placed in an excavated hole that has been previously excavated and turned into mud.

従来、プレオー゛ガー等で掘削し、泥土化された掘削孔
内にくいを沈設ツーる工法は提案されていたが、いずれ
の工法においても孔内の泥土がくいの貫入により締め固
まりその結果くいが貫入不能となったり、くいが破断し
たシしてくい沈設が不可能なことが多かった。
Conventionally, a method has been proposed in which the mud in the hole is excavated with a pre-auger and then the mud is deposited in the hole, but in both methods, the mud in the hole becomes compacted due to the penetration of the pile, resulting in the pile being crushed. In many cases, the piles were impenetrable or the piles were broken, making it impossible to sink the piles.

本発明社予め掘削攪拌し泥土化された掘削孔内にくいを
沈設するときに生じていた従来のこれ等の欠点を解消し
たものであり、上下動の振動を与えながらくいを沈設す
ると驚くべきことに従来の工法の如きくいの貫入による
泥土の締め固まり現象やくいの破断現象が発生しないこ
とを見出し、本発明を完成したのである。即ち、本発明
は、予め掘削攪拌し泥土された掘削孔内にくいを沈設す
るにあたシ、くい頂部に振動機を設置し、くいに振動を
与えると同時に振動機を下方に引き込みながらくいを振
動圧入する施工方法である。
This invention solves these conventional drawbacks that occurred when sinking piles in a drilled hole that has been previously excavated and agitated to become muddy soil, and it is surprising to find that it is possible to sink piles while giving vertical vibrations. They discovered that the phenomenon of compaction of mud and the phenomenon of fracture of piles due to the penetration of piles as in conventional construction methods did not occur, and the present invention was completed. That is, the present invention installs a vibrator at the top of the pile when depositing a pile in an excavated hole that has been excavated and stirred in advance, and at the same time vibrates the pile while pulling the vibrator downward. This is a construction method that uses vibration press-fitting.

本発明によるくいの沈設すべき孔の掘削およびその攪拌
による泥土化にあたっては、例えば第1図に示す様にア
ースオーガー2により予め地盤1を掘削し、アースオー
ガー2につけられた非ラセン状の翼3で一土を攪拌し、
地盤中の地下水などにより泥土化する。この際水分が不
足するときなどは必要に応じオーガー先端よシ水やベン
トナイト液等を噴射しながら地盤1を掘削することが好
ましく、また、第2図に示すように掘削時には泥土4を
ほとんど孔外に排出しないことが好ましい。
When excavating a hole in which a pile is to be deposited according to the present invention and turning the soil into mud by stirring, for example, as shown in FIG. Stir the soil with step 3,
It turns into mud due to groundwater in the ground. At this time, if there is a lack of moisture, it is preferable to excavate the ground 1 while spraying water or bentonite liquid from the tip of the auger as necessary.Also, as shown in Fig. It is preferable not to discharge it outside.

この様にしてオーガー先端が支持地盤に達するまで掘削
する。また、この様に泥土化された孔内にくいを沈設す
る前にオーガー先端よりセメントミルクを噴出して掘削
孔内の先端部付近をセメントミルクと泥土4との混合体
5とするとともに、オーガー引き上げ時にできる限り排
出を少くする。
Excavate in this manner until the auger tip reaches the supporting ground. In addition, before sinking the mud in the hole that has been turned into mud in this way, cement milk is spouted from the tip of the auger to make the area near the tip of the hole into a mixture 5 of cement milk and mud 4, and the auger is pulled up. Reduce emissions as much as possible.

第2図はオーガーを引き上げた状態を示すものである。Figure 2 shows the auger in a raised state.

第3図はコンクリートくい6を掘削孔内に沈設している
状態を示すもので、くい頂部に設置した振動機7に緩衝
装置8を介して施工機械を反力とした下方へのくい押込
力を与え、かつ振動機7による上下の振動をくい6に与
えることによりくいを振動圧入する。
Figure 3 shows a concrete pile 6 being sunk into an excavated hole, where a vibration device 7 installed at the top of the pile receives a downward pushing force from the construction machine as a reaction force via a shock absorber 8. The stake is vibrated and press-fitted by applying vertical vibration to the stake 6 by the vibrator 7.

緩衝装置8は振動機7の上下動によシワイヤロープに発
生する過大な引張力の発生を抑えると同時にそのときの
エネルギーを内部に貯え、くい下方時に放出してくいの
押込力として効果的に作用する機能を有している。
The shock absorber 8 suppresses the excessive tensile force generated on the shear wire rope due to the vertical movement of the vibrator 7, and at the same time stores the energy at that time internally, and effectively acts as a force for pushing the peg when the peg is lowered. It has the function of

また、くいの押込み力を更に強化する場合は、第3図に
示すように振動機7に荷重板9を設置する0 くいの沈設を更に効果的にするには、第5図(2)。
In addition, to further strengthen the pushing force of the pile, install a load plate 9 on the vibrator 7 as shown in Figure 3.To make the pile sinking more effective, see Figure 5 (2).

(3)に示すようにくい先端を開放にしfc、シ、くい
先端部を第5図(1)に示す様な錐状にするとよい。
It is best to leave the difficult tip open as shown in (3) and make the tip of the nail cone-shaped as shown in Figure 5 (1).

くい先端が支持地盤に達しfcならは、十分支持地盤に
くいを貫入させて沈設を終了し、くい頂部に設置した振
動機7をとりはずし第4図に示す様に施工を完了する。
When the tip of the pile reaches the supporting ground (fc), the pile is sufficiently penetrated into the supporting ground to complete the sinking, and the vibrator 7 installed at the top of the pile is removed to complete the construction as shown in Fig. 4.

本発明おいて、振動機7とくい6とは固着されていない
ので、振動機による主として下向きの圧縮力のみくいに
付与し、引張力は伝達されないので効果的に振動を与え
ることができるものであると同時に、くいの長さが長く
なった場合に生じる引張力によるひび割れを防止するこ
とも可能である。
In the present invention, since the vibrator 7 and the peg 6 are not fixed to each other, only the downward compressive force by the vibrator is applied to the peg, and the tensile force is not transmitted, so that vibration can be effectively applied. At the same time, it is also possible to prevent cracks caused by tensile forces that occur when the length of the stakes becomes longer.

施工方法によれは、くい長さao7.Hの地盤に10本
のくいを施工した結果はいずれも30m tでくいを沈
設することができ、またコンクリート杭には何らのひび
割れ等は生じなかった。
Depending on the construction method, the pile length may be ao7. As a result of constructing 10 piles in the ground of H, it was possible to sink all of the piles in 30 mt, and no cracks occurred in the concrete piles.

本発明においてはこの様にくい回転装置などの大規模な
一装置は必要とせず、くいを破損するとともなく、また
従来工法では不可能と考えられていたくいの貫入による
泥土の締め固まりがなく、くいをトラブルなく沈設でき
る方法を提供するものである。
The present invention does not require large-scale equipment such as difficult rotating equipment, does not damage piles, and does not cause compaction of mud due to pile penetration, which was thought to be impossible with conventional construction methods. To provide a method for sinking piles without any trouble.

【図面の簡単な説明】[Brief explanation of drawings]

M1図はオーガーによる掘削泥土化を示す掘削孔断面図
。 第2図は掘削泥土化された掘削孔の断面図。 第3図は振動機によるくいの振動圧入状態を示す正面略
図。。 第4図はくいを沈設の終了した掘削孔の断面図。 第5図(1)はくい先端部の正面図、(2) 、 (3
)はくい先端の開放断面図。 1・・・・・・・・・地 盤 2・・・・・・・・・ アースオーカー3・・・・・・
・・・ 非ラセン状の翼4・・・・・・・・・泥 工 5・・・・・・・・・ セメントミル々と泥土の混合体
6・・・・・・・・・ コンクIJ −) 杭7・・・
・・・・・・上下動の振動機 8・・・・・・・・・緩衝装置 特許出願人 旭化成工業株式会社 第4図 第5図 (2) (3) 手続補正書彷■ 昭和58年1り月々日 特許庁長官 若杉 和 夫 殿 1、事件の表示 昭和58年特許願第129381 号
2、発明の名称 コンクリート杭の施工方法 3、補正をする者 事件との関係 特許出願人 4、補正命令の日付 8i1158年10月 1日(発送日5B、 10.2
5)5、補正の対象 図 面 6、補正の内容 第3図を別紙の通り補正する。 m−−4−一− 第3図
Diagram M1 is a cross-sectional view of a drilled hole showing mud being turned into mud by an auger. Figure 2 is a cross-sectional view of a drilled hole that has been turned into mud. FIG. 3 is a schematic front view showing the state of vibration press-fitting of piles by a vibrator. . Figure 4 is a cross-sectional view of the excavation hole after the pile has been placed. Figure 5 (1) Front view of the tip of the pile, (2), (3
) Open cross-sectional view of the tip of the pile. 1・・・・・・・・・Ground 2・・・・・・ Earth Oaker 3・・・・・・
...Non-helical blade 4...Mud work 5...Cement mill and mud mixture 6...Conc IJ -) Pile 7...
... Vertical vibration vibrator 8 ... Shocking device Patent applicant Asahi Kasei Kogyo Co., Ltd. Figure 4 Figure 5 (2) (3) Procedural amendment document ■ 1988 1. Mr. Kazuo Wakasugi, Commissioner of the Japan Patent Office 1. Indication of the case: Patent Application No. 129381 of 1988 2. Name of the invention: Concrete pile construction method 3. Person making the amendment. Relationship with the case. Patent applicant 4. Amendment. Date of Order 8i October 1, 1158 (Delivery Date 5B, 10.2
5) 5. Correction target drawing 6, correction details Figure 3 will be corrected as shown in the attached sheet. m--4-1- Figure 3

Claims (1)

【特許請求の範囲】[Claims] 予め掘削攪拌し泥土化された掘削孔内に、くいに上下動
の振動を与えつつ沈設するくい施工方法において、くい
頭に設置した振動機に緩衝装置を介して下向きの荷重を
加えることを特徴とするコンクリート杭の施工方法
A pile construction method in which the pile is sunk while applying vertical vibration to the pile in an excavated hole that has been excavated and stirred to become muddy soil, and is characterized by applying a downward load to the vibrator installed on the pile head via a shock absorber. Construction method of concrete piles
JP12938183A 1983-07-18 1983-07-18 Construction work of concrete pile Pending JPS6023522A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12938183A JPS6023522A (en) 1983-07-18 1983-07-18 Construction work of concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12938183A JPS6023522A (en) 1983-07-18 1983-07-18 Construction work of concrete pile

Publications (1)

Publication Number Publication Date
JPS6023522A true JPS6023522A (en) 1985-02-06

Family

ID=15008169

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12938183A Pending JPS6023522A (en) 1983-07-18 1983-07-18 Construction work of concrete pile

Country Status (1)

Country Link
JP (1) JPS6023522A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0224418A (en) * 1988-07-11 1990-01-26 Aichi Sharyo Kk Erection method of pole in poor subsoil
JP2016217022A (en) * 2015-05-21 2016-12-22 光明 新井 Pile installation method
JP2021530634A (en) * 2018-07-30 2021-11-11 サイペム エス.アー.SAIPEM s.a. How to install a tubular metal pile on rocky ground

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0224418A (en) * 1988-07-11 1990-01-26 Aichi Sharyo Kk Erection method of pole in poor subsoil
JP2016217022A (en) * 2015-05-21 2016-12-22 光明 新井 Pile installation method
JP2021530634A (en) * 2018-07-30 2021-11-11 サイペム エス.アー.SAIPEM s.a. How to install a tubular metal pile on rocky ground
US11603639B2 (en) * 2018-07-30 2023-03-14 Saipem S.A. Method for installing a tubular metal pile in rocky soil

Similar Documents

Publication Publication Date Title
KR100762991B1 (en) Precast piling method injected with high-strength mortar
JP2003268767A (en) Construction method for double tube digging small diameter pile using hole excavating rod
JP2952324B2 (en) Dynamic injection method of ground improvement
JPH10168880A (en) Removing device for obstacle to underground structure and removing method for the obstacle
JPS6023522A (en) Construction work of concrete pile
CN1687535A (en) Method for constructing composite foundation of piles and ground interactive slurry bonded dispersed body material
CN212656235U (en) Double-row steel pipe pile supporting structure for foundation pit supporting
JP3702435B2 (en) How to build the foundation
CN102619218B (en) Rear slotting reinforcing cage CFG and piling method thereof
GB2132667A (en) Method of installing precast concrete piles
JP7160297B1 (en) Pile foundation with soil improvement and its construction method
JP2610518B2 (en) Method of forming crushed stone column by falling weight
JPH02108722A (en) Weak ground improving technique
JP2601702B2 (en) Soft ground improvement method
JPH0796776B2 (en) Yamadome method
JPS6327618A (en) Setting work of concrete pile by preboring
JPH0470422A (en) Open caisson method
JP2958426B2 (en) Differential settlement correction method
JP2000230232A (en) Tenacity improving method for prestressed reinforced concrete pile
JP2009133202A (en) Mat foundation construction method and mat foundation
JP2807538B2 (en) Cast-in-place concrete pile method
JPS63315721A (en) Foundation pile driving method as well as ground compaction
JPH03208908A (en) Liquefaction preventing method for sand subsoil and excavation tamping device
JPS6122089B2 (en)
JPH0216815B2 (en)