JPS6023522A - Construction work of concrete pile - Google Patents

Construction work of concrete pile

Info

Publication number
JPS6023522A
JPS6023522A JP12938183A JP12938183A JPS6023522A JP S6023522 A JPS6023522 A JP S6023522A JP 12938183 A JP12938183 A JP 12938183A JP 12938183 A JP12938183 A JP 12938183A JP S6023522 A JPS6023522 A JP S6023522A
Authority
JP
Japan
Prior art keywords
pile
vibrator
applying
auger
sludge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP12938183A
Other languages
Japanese (ja)
Inventor
Shinichi Yamato
Original Assignee
Asahi Chem Ind Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Chem Ind Co Ltd filed Critical Asahi Chem Ind Co Ltd
Priority to JP12938183A priority Critical patent/JPS6023522A/en
Publication of JPS6023522A publication Critical patent/JPS6023522A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/18Placing by vibrating

Abstract

PURPOSE:To permit the settlement of a concrete pile without causing any damage to the pile by a method in which the pile is settle into the sludged portion of an excavated pit while applying a downward load through a buffer to a vibrator set on the head of the pile and also while applying a vertical vibration to the pile. CONSTITUTION:The ground 1 is excavated by an earth auger 2, and the soil is made sludgy with ground water, etc., by stirring it by a non-spiral blade 3. When the tip of the auger 2 reaches the bearing subsoil, cement milk is jetted from the tip of the auger 2 to form the mixed lump 5 of the cement milk and the sludge 4 near the bottom of the pit. The pile 6 is penetrated into the sludge while applying a downward pressing force under reaction of the construction machine through a buffer 8 to the vibrator 7 set on the top of the pile and also while giving a vertical vibration to the pile 6 by the vibrator 7.
JP12938183A 1983-07-18 1983-07-18 Construction work of concrete pile Pending JPS6023522A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12938183A JPS6023522A (en) 1983-07-18 1983-07-18 Construction work of concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12938183A JPS6023522A (en) 1983-07-18 1983-07-18 Construction work of concrete pile

Publications (1)

Publication Number Publication Date
JPS6023522A true JPS6023522A (en) 1985-02-06

Family

ID=15008169

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12938183A Pending JPS6023522A (en) 1983-07-18 1983-07-18 Construction work of concrete pile

Country Status (1)

Country Link
JP (1) JPS6023522A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0224418A (en) * 1988-07-11 1990-01-26 Aichi Sharyo Kk Erection method of pole in poor subsoil
JP2016217022A (en) * 2015-05-21 2016-12-22 光明 新井 Pile installation method
JP2021530634A (en) * 2018-07-30 2021-11-11 サイペム エス.アー.SAIPEM s.a. How to install a tubular metal pile on rocky ground

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0224418A (en) * 1988-07-11 1990-01-26 Aichi Sharyo Kk Erection method of pole in poor subsoil
JP2016217022A (en) * 2015-05-21 2016-12-22 光明 新井 Pile installation method
JP2021530634A (en) * 2018-07-30 2021-11-11 サイペム エス.アー.SAIPEM s.a. How to install a tubular metal pile on rocky ground

Similar Documents

Publication Publication Date Title
JPS60242219A (en) Formation of offshore seabed mound
JPS6023522A (en) Construction work of concrete pile
JPH01290824A (en) High horizontal bearing force foundation method using solidification process
JPS62242011A (en) Method and apparatus for constructing shallow ground-improving pile
JPS59228519A (en) Stirrer for ground improvement
JPS6023521A (en) Construction work of concrete pile
JPS61158528A (en) Foundation structure in soft ground and building thereof
JPS59192125A (en) Settlement work of concrete pile with screw
JPS6363816A (en) Improving work of surface soil of ground for building
JPS61126219A (en) Ground stabilizing processing method and ground stabilizing processor
JPH0336318A (en) Method of construction for stopping natural ground
JPS58218513A (en) Excavation work for pedestal pile
JPS59199920A (en) Anchoring device
JPS6160921A (en) Method of constructing impervious wall
JPS6153915A (en) Method of driving down sheathing material
JPS6187016A (en) Sheathing work by steel sheet pile
JPS62202118A (en) Burying work of pile
JPS6164911A (en) Steel plate cell type revetment
JPS6010014A (en) On-site piling work
JPS626021A (en) Burying work for custom-made concrete pile
JPS62148714A (en) Improving work of seabed soft ground
JPS61109820A (en) Soft ground improver
JPS641826A (en) Lay-out method of wide-headed pile
JPS6164920A (en) Mixing method of excavating mud water with self-curable mud water
JPS63176530A (en) Construction of foundation of underground continuous wall