JPH04119053U - Steel pipe column filling concrete placement equipment - Google Patents

Steel pipe column filling concrete placement equipment

Info

Publication number
JPH04119053U
JPH04119053U JP2271991U JP2271991U JPH04119053U JP H04119053 U JPH04119053 U JP H04119053U JP 2271991 U JP2271991 U JP 2271991U JP 2271991 U JP2271991 U JP 2271991U JP H04119053 U JPH04119053 U JP H04119053U
Authority
JP
Japan
Prior art keywords
tip
discharge port
tremie
steel pipe
pipe column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2271991U
Other languages
Japanese (ja)
Inventor
宏太郎 田中
文男 穐山
Original Assignee
株式会社フジタ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社フジタ filed Critical 株式会社フジタ
Priority to JP2271991U priority Critical patent/JPH04119053U/en
Publication of JPH04119053U publication Critical patent/JPH04119053U/en
Pending legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

(57)【要約】 【目的】 鋼管柱充填コンクリート打設装置のトレミー
管先端部の吐出口が速やかに鋼管柱の下部までセツトさ
れるようにする。 【構成】 トレミー管1の先端に、先端が丸型に形成さ
れた格子状の吐出口2を装着するとともに、前記トレミ
ー管に添接されたコンクリート締め固め用バイブレータ
ー4の先端部4aを、前記吐出口2内に挿入、固定し
た。
(57) [Summary] [Purpose] To enable the discharge port at the tip of the tremie tube of the steel pipe column filling concrete placing device to be quickly set to the bottom of the steel pipe column. [Structure] A lattice-shaped discharge port 2 with a round tip is attached to the tip of a tremie tube 1, and a tip 4a of a concrete compaction vibrator 4 attached to the tremie tube is connected to the tip of the tremie tube 1. It was inserted into the discharge port 2 and fixed.

Description

【考案の詳細な説明】[Detailed explanation of the idea]

【0001】0001

【産業上の利用分野】[Industrial application field]

本考案は鋼管柱内に充填するコンクリート打設装置に係るものである。 The present invention relates to a concrete placing device for filling steel pipe columns.

【0002】0002

【従来の技術】[Conventional technology]

高層SRC構造建物においては、鋼管柱を使用することが多い。この際、柱の 軸力強度を高めるためにコンクリートが打設される。而してコンクリート打設の 際、柱下部から順次、上部へコンクリートを緻密に打設するため、トレミー管を 介して行なう。 Steel pipe columns are often used in high-rise SRC structures. At this time, the pillar Concrete is poured to increase the axial strength. Therefore, concrete pouring During this process, tremie pipes are used to precisely place concrete from the bottom of the column to the top. Do it through

【0003】 図9及び図10は従来のコンクリート打設装置を示し、トレミー管aの先端に 丸鋼とプレートで加工したトレミー管aと同径の吐出口bを取付け、コンクリー ト締め固め用バイブレーターCはトレミー管aに添接、固定され、トレミー管a はコンクリートバケツトdとフレキシブルホースeで接続され、コンクリートの 入ったコンクリートバケツトdをクレーンで吊上げ、トレミー管aとバイブレー ターCとを同時に懸吊したまま鋼管柱内に挿入し、同柱下部より上層に順次コン クリートを打設していた。0003 Figures 9 and 10 show a conventional concrete placing device, in which the tip of the tremie pipe a is Install a discharge port b of the same diameter as the tremie pipe a made of round steel and a plate, and A compaction vibrator C is attached and fixed to the tremie tube a, and the tremie tube a is connected with concrete bucket d and flexible hose e, and the concrete Lift the filled concrete bucket d with a crane and attach it to the tremie pipe a and the vibrator. Insert the cylinder C and C into the steel pipe column while suspended at the same time, and then sequentially connect from the bottom of the column to the upper layer. Cleats were being installed.

【0004】 図中fはコンクリートバケツト開閉装置、gはバイブレーターモーター部、h はトレミー管ジヨイント金物である。0004 In the figure, f is the concrete bucket opening/closing device, g is the vibrator motor, and h is a tremie tube joint hardware.

【0005】[0005]

【考案が解決しようとする課題】[Problem that the idea aims to solve]

前記トレミー管及びバイブレーターを柱iの内部に吊り下ろす場合、常に揺れ ていて、図11に示す如く途中で柱iと梁jとの接合部において柱内に設けられ たダイヤフラムkにひっかかり、柱下部までの吊下ろしが非常に困難で、時間を 要し、またこのように時間を要するため練り上がったコンクリートに対する悪影 響が懸念される。 When suspending the tremie tube and vibrator inside pillar i, there will be constant shaking. As shown in FIG. It got caught on the diaphragm k, which made it very difficult to lower it to the bottom of the column, and it took a lot of time. In addition, since it takes such a long time, it has a negative impact on the concrete that has been mixed. There are concerns about the sound.

【0006】 本考案は前記従来技術の有する問題点に鑑みて提案されたもので、その目的と する処は、トレミー管先端部の吐出口が速やかに柱下部までセツトされる鋼管柱 充填コンクリート打設装置を提供する点にある。[0006] The present invention was proposed in view of the problems of the above-mentioned prior art, and its purpose is The place where this is done is a steel pipe column where the discharge port at the tip of the tremie tube is quickly set to the bottom of the column. The present invention provides a filling concrete placing device.

【0007】[0007]

【課題を解決するための手段】[Means to solve the problem]

前記の目的を達成するため、本考案に係る鋼管柱充填コンクリート打設装置は 、トレミー管の先端に、先端が丸型に形成された格子状の吐出口を装着するとと もに、前記トレミー管に添接されたコンクリート締め固め用バイブレーターの先 端部を、前記格子状吐出口の内側に挿入、固定して構成されている。 In order to achieve the above object, the steel pipe column filling concrete placing device according to the present invention is , if a lattice-shaped outlet with a round tip is attached to the tip of the tremie tube. Also, the tip of the concrete compaction vibrator attached to the tremie pipe. The end portion is inserted and fixed inside the lattice-shaped discharge port.

【0008】[0008]

【作用】[Effect]

本考案によれば前記したように、トレミー管の先端に、先端が丸型に形成され た格子状の吐出口が装着され、且つ同格子状の吐出口内にバイブレーターの先端 部が挿入され、同吐出口の内側部に固定されているので、トレミー管先端部が柱 内に挿入される途中でダイヤフラムにひっかかることなく、速やかに柱下部まで トレミー管がセツトされるとともに、吐出口が格子状に形成されているので、コ ンクリートが円滑にトレミー管外に吐出される。 According to the present invention, as mentioned above, the tip of the tremie tube is formed into a round shape. A lattice-shaped outlet is installed, and the tip of the vibrator is installed inside the lattice-shaped outlet. is inserted and fixed to the inside of the same discharge port, so the tip of the tremie tube is aligned with the column. It quickly reaches the bottom of the column without getting caught on the diaphragm during insertion. Since the tremie tube is set and the discharge port is formed in a grid pattern, the The concrete is smoothly discharged out of the tremie tube.

【0009】[0009]

【実施例】【Example】

図1及び図2は本考案の第1の実施例を示し、コンクリート打設用のトレミー 管1の下端部に、同トレミー管1と同径で、先端が丸型に形成された格子状の防 錐形吐出口2がジヨイント金物3を介して取付けられている。4は前記トレミー 管1に添接され、ジヨイント金物5によって結合されたバイブレーターで、同バ イブレーター4の先端部4aが、前記格子状の吐出口2内に挿入され、固定金物 6を介して固定されている。 1 and 2 show a first embodiment of the present invention, in which a tremie for concrete pouring is shown. At the lower end of the tube 1, there is a lattice-shaped barrier with the same diameter as the tremie tube 1 and a round tip. A conical discharge port 2 is attached via a joint metal fitting 3. 4 is the tremie mentioned above A vibrator attached to the tube 1 and connected by a joint metal fitting 5. The tip 4a of the iblator 4 is inserted into the grid-shaped discharge port 2, and the fixed metal fitting It is fixed via 6.

【0010】 図示の実施例は前記したように構成されているので、図7に示す如く、トレミ ー管1を鉄骨柱7内に挿入する際、同トレミー管1の先端吐出口2が格子状の紡 錐形に形成され、しかも同格子状吐出口2部内にバイブレーター4の先端部4a が挿入、固定されているので下降の途中でダイヤフラム8にひっかかることなく 、容易に且つ速やかに柱下部までトレミー管1とバイブレーター4とをセツトす ることができる。0010 Since the illustrated embodiment is constructed as described above, a tremor is provided as shown in FIG. - When inserting the tube 1 into the steel column 7, the tip discharge port 2 of the tremie tube 1 has a lattice-like spindle. The tip 4a of the vibrator 4 is formed in a conical shape, and the distal end 4a of the vibrator 4 is located within the same lattice-shaped discharge port 2. is inserted and fixed, so it will not get caught on the diaphragm 8 during the descent. , easily and quickly set the tremie tube 1 and vibrator 4 to the bottom of the column. can be done.

【0011】 図中9は梁、10は柱筋である。 図3及び図4は本考案の第2の実施例を示し、前記格子状吐出口2を構成する 条片が、前記第1実施例においてトレミー管1の外周面に固着されているのに反 して、同トレミー管1の内周面に固着されたものである。 図中、前記実施例と均等部分には、同一符号が付されている。[0011] In the figure, 9 is a beam, and 10 is a column reinforcement. 3 and 4 show a second embodiment of the present invention, in which the lattice-shaped outlet 2 is configured. Contrary to the fact that the strip is fixed to the outer peripheral surface of the tremie tube 1 in the first embodiment, This is fixed to the inner peripheral surface of the tremie tube 1. In the figure, parts equivalent to those in the above embodiment are given the same reference numerals.

【0012】 図5及び図6は本考案の第3の実施例を示し、トレミー管1にバイブレーター 4の振動が伝達され、打設コンクリートに骨材分離等の悪影響がある場合、トレ ミー管1と吐出口2とを分離し、フレキシブル管11で接合したものである。 図中、前記各実施例と均等部分には同一符号が付されている。0012 5 and 6 show a third embodiment of the present invention, in which a vibrator is attached to the tremie tube 1. If the vibrations described in 4 are transmitted and have an adverse effect on the poured concrete, such as aggregate separation, The Mie tube 1 and the discharge port 2 are separated and joined by a flexible tube 11. In the figure, parts equivalent to those of each of the above embodiments are given the same reference numerals.

【0013】[0013]

【考案の効果】[Effect of the idea]

本考案に係る鋼管柱充填コンクリート打設装置は前記したように、トレミー管 の吐出口が先端が丸型で格子状に形成され、バイブレーター先端部が格子状の吐 出口内に挿入、固定されているので、速やかに柱下部までトレミー管とバイブレ ーターをセツトすることができ、このように前記打設装置のセツトに要する時間 が短縮されることによって、コンクリートに悪影響を与えることがなく、特に夏 季等の気温の高い時期におけるコンクリート打設に有利である。 As mentioned above, the steel pipe column filling concrete placing device according to the present invention The discharge port of the vibrator has a round tip and is shaped like a lattice, and the tip of the vibrator has a lattice-shaped discharge port. Since it is inserted and fixed inside the outlet, the tremie tube and vibrator can be quickly removed to the bottom of the column. The time required for setting the said pouring equipment can thus be reduced. By shortening the time, there is no negative impact on the concrete, especially in summer. It is advantageous for concrete pouring during periods of high temperature such as during the winter.

【0014】 請求項2の考案は前記トレミー管と吐出口とを分割して、フレキシブル管で接 合したことによって、トレミー管にバイブレーターの振動が伝達され、打設コン クリートに骨材分離等の悪影響が及ぼされることのないようにしうるものである 。[0014] According to the second aspect of the invention, the tremie tube and the discharge port are separated and connected by a flexible tube. As a result, the vibration of the vibrator is transmitted to the tremie pipe, and the pouring controller It is possible to prevent negative effects such as aggregate separation on the cleat. .

【図面の簡単な説明】[Brief explanation of drawings]

【図1】本考案に係る鋼管柱充填コンクリート打設装置
の第1の実施例を示す正面図である。
FIG. 1 is a front view showing a first embodiment of a steel pipe column filling concrete placing device according to the present invention.

【図2】図1の平面図である。FIG. 2 is a plan view of FIG. 1;

【図3】本考案に係る鋼管柱充填コンクリート打設装置
の第2の実施例を示す正面図である。
FIG. 3 is a front view showing a second embodiment of the steel pipe column filling concrete placing device according to the present invention.

【図4】図3の平面図である。FIG. 4 is a plan view of FIG. 3;

【図5】本考案に係る鋼管柱充填コンクリート打設装置
の第3の実施例を示す正面図である。
FIG. 5 is a front view showing a third embodiment of the steel pipe column filling concrete placing device according to the present invention.

【図6】図5の平面図である。FIG. 6 is a plan view of FIG. 5;

【図7】本考案の装置の使用状況を示す縦断面図であ
る。
FIG. 7 is a longitudinal sectional view showing the usage of the device of the present invention.

【図8】図7の横断平面図である。FIG. 8 is a cross-sectional plan view of FIG. 7;

【図9】従来の装置の正面図である。FIG. 9 is a front view of a conventional device.

【図10】図9の部分イの拡大図である。FIG. 10 is an enlarged view of part A of FIG. 9;

【図11】従来の装置の使用状態を示す縦断面図であ
る。
FIG. 11 is a longitudinal cross-sectional view showing a conventional device in use.

【符号の説明】[Explanation of symbols]

1 トレミー管 2 吐出口 4 バイブレーター 4a バイブレーターの先端部 11 フレキシブル管 1 tremie tube 2 Discharge port 4 Vibrator 4a Tip of vibrator 11 Flexible tube

Claims (2)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 トレミー管の先端に、先端が丸型に形成
された格子状の吐出口を装着するとともに、前記トレミ
ー管に添接されたコンクリート締め固め用バイブレータ
ーの先端部を、前記格子状吐出口の内側に挿入、固定し
てなることを特徴とする鋼管柱充填コンクリート打設装
置。
1. A lattice-shaped discharge port with a round tip is attached to the tip of the tremie pipe, and the tip of a concrete compaction vibrator attached to the tremie tube is attached to the lattice-shaped discharge port. A steel pipe column filling concrete placing device characterized by being inserted and fixed inside a discharge port.
【請求項2】 前記トレミー管と吐出口とを分割すると
ともに、フレキシブル管で接合してなる請求項1記載の
鋼管柱充填コンクリート打設装置。
2. The steel pipe column filled concrete placing apparatus according to claim 1, wherein the tremie pipe and the discharge port are separated and joined by a flexible pipe.
JP2271991U 1991-04-08 1991-04-08 Steel pipe column filling concrete placement equipment Pending JPH04119053U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2271991U JPH04119053U (en) 1991-04-08 1991-04-08 Steel pipe column filling concrete placement equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2271991U JPH04119053U (en) 1991-04-08 1991-04-08 Steel pipe column filling concrete placement equipment

Publications (1)

Publication Number Publication Date
JPH04119053U true JPH04119053U (en) 1992-10-23

Family

ID=31908163

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2271991U Pending JPH04119053U (en) 1991-04-08 1991-04-08 Steel pipe column filling concrete placement equipment

Country Status (1)

Country Link
JP (1) JPH04119053U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011029519A1 (en) * 2009-09-11 2011-03-17 Mooser-Schwingungstechnik Gmbh Method and process for laying concrete or similar substances
JP2015101821A (en) * 2013-11-21 2015-06-04 大成建設株式会社 Concrete placing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011029519A1 (en) * 2009-09-11 2011-03-17 Mooser-Schwingungstechnik Gmbh Method and process for laying concrete or similar substances
JP2015101821A (en) * 2013-11-21 2015-06-04 大成建設株式会社 Concrete placing method

Similar Documents

Publication Publication Date Title
US4084780A (en) Cavity forming plug for coil insert in concrete product
JPH04119053U (en) Steel pipe column filling concrete placement equipment
CN108457275A (en) Cast-in-place pile concrete tamping equipment and its construction method
CN110306790A (en) After pour reserved opening closure and hang die worker's tool and its hang mould method
JP2690818B2 (en) Placing device and placing method for steel tube concrete columns
JPH06146410A (en) Construction method of steel pipe concrete
JP3445979B2 (en) Ptolemy tube, its connecting structure, and its attaching and detaching method
JPS6278359A (en) Method and apparatus for vertically casting concrete
JPH0447102B2 (en)
CN208870386U (en) A kind of constructional column pours mold
JP3891316B2 (en) Connection structure and connection method of different diameter steel pipes
CA1262640A (en) Method of placing concrete into a steel encasement
JP2532575Y2 (en) Construction jig for stress material
CN114960936B (en) Prefabricated frame beam column assembly type node connecting device
CN218149744U (en) Square concrete structure integral lifting template
JPS6235697Y2 (en)
JPH0560018B2 (en)
JPH03262875A (en) Method for casting concrete in steel-pipe column and opening therefor
JPH0439545B2 (en)
JPH0452375A (en) Method for constructing subsequent placing member in construction method of reverse placing
JPH0562171B2 (en)
JP2769672B2 (en) Perforated concrete casting pipe
CN206457939U (en) A kind of multi-functional drawknot pre-embedded bolt
JPH10110530A (en) Draining method and device in steel pipe concrete column