JPH0347320A - Base structure by inverted placing method - Google Patents

Base structure by inverted placing method

Info

Publication number
JPH0347320A
JPH0347320A JP9236889A JP9236889A JPH0347320A JP H0347320 A JPH0347320 A JP H0347320A JP 9236889 A JP9236889 A JP 9236889A JP 9236889 A JP9236889 A JP 9236889A JP H0347320 A JPH0347320 A JP H0347320A
Authority
JP
Japan
Prior art keywords
concrete
columns
packed
wall
strut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9236889A
Other languages
Japanese (ja)
Inventor
Tomio Arii
有居 東海男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Construction Co Ltd
Original Assignee
Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Construction Co Ltd filed Critical Mitsui Construction Co Ltd
Priority to JP9236889A priority Critical patent/JPH0347320A/en
Publication of JPH0347320A publication Critical patent/JPH0347320A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PURPOSE:To make formwork assembling, bar-arranging operation, and soil- discharging operation easier by a method in which a shore strut receiving earth pressure from sheathing wall is formed of steel frames packed with concrete, and the steel frame-concrete beam is used as the main beam. CONSTITUTION:A sheathing wall 1 such as continuous wall, sheet pile, etc., is formed in the surrounding, and a given number of structural straight columns 3 packed with concrete 7 are set in an excavating area 2 surrounded by the wall 1. The ground is excavated and in parallel with the excavation waling parts 4 and shore struts 5 packed with concrete 7 are orderly constructed from upper stair to lower stair. The columns 3 are joined with the struts 5 by integrally fixing paired gusset plates 8 to the corresponding positions of the columns 3 and also by connecting the plates 8 with the end of the strut 5 by bolts 9. Since the excavating space can be widened and also the lower excavated soil can be carried out effectively as well as the needs for formwork assembling and bar-arranging operation during excavation can be eliminated, the construction period can be shortened.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、地下逆打ち工法に関する。[Detailed description of the invention] (Industrial application field) The present invention relates to an underground inversion construction method.

(従来の技術発明が解決しようとする課題)従来の地下
掘削工法において、一般とは逆に上階から下階にむけて
地下部分の構築を進めてゆく逆打ち工法が採用されるこ
とがある。
(Problems to be solved by conventional technical inventions) In conventional underground excavation construction methods, a reverse construction method is sometimes adopted, in which construction of the underground section proceeds from the upper floor to the lower floor, contrary to the general practice. .

この工法は、周囲に山留め壁専があらかじめ形成された
掘削部分に構真柱を所定本数埋設後、この構真柱で荷重
を受けながら地下階の本設の鉄骨鉄筋コンクリート製の
柱、梁及び床を掘削と並行して上から下に向けて順次構
築してゆくものである。
This construction method involves burying a predetermined number of structural pillars in an excavated area with retaining walls pre-formed around them, and then restoring the permanent steel-framed reinforced concrete columns, beams, and floors of the underground floor while receiving the load from the structural pillars. In parallel with the excavation, they are constructed sequentially from top to bottom.

しかしながら、従来の逆打ち工法の場合、山留め壁から
の土圧を受けるには鉄骨製の柱、梁のみでは不可能か、
もしくは柱、梁の断面を不必要に大きくする必要がある
ため、どうしても掘削と)t!。
However, in the case of the conventional reverse construction method, it is impossible to receive the earth pressure from the retaining wall using only steel columns and beams.
Or, it is necessary to make the cross section of the column or beam unnecessarily large, so excavation is necessary) t! .

行して柱、梁、床のコンクリートを打設しなければなら
ない。このコンクリート工事を行うため、柱、梁、床の
型枠組や配筋作業が煩雑かつ時間もかかり、さらに床コ
ンクリートを打設して行くため下方の掘削土砂の搬出が
困難となるなどの欠点があった。
Concrete for columns, beams, and floors must be poured. In order to perform this concrete work, the formwork and reinforcing work for columns, beams, and floors is complicated and time-consuming.Furthermore, since the floor concrete is poured, it is difficult to remove excavated soil from below. there were.

本発明は、かかる従来の課題を解決しつる逆打ち工法に
よる地下構造を提供することを目的とするものである。
It is an object of the present invention to solve such conventional problems and provide an underground structure using the vine reverse construction method.

(課題を解決するための手段) 上記目的を達成するため本発明に係る逆打ち工法による
地下構造においては、山留め壁からの土圧を受ける切梁
として、内部にコンクリートを充填した鉄骨材で形成し
、この鉄骨コンクリート梁を本設の梁として使用しつる
ようにしだとを特徴とするものである。
(Means for Solving the Problems) In order to achieve the above object, in the underground structure using the reverse pouring method according to the present invention, a steel frame material filled with concrete is used as a strut to receive earth pressure from a retaining wall. However, this steel-framed concrete beam is used as the main beam, and is characterized by a hanging structure.

(実施例) 以下、本発明の好適な実施例を図面により説明する。(Example) Hereinafter, preferred embodiments of the present invention will be described with reference to the drawings.

第1図乃至第4図は本発明の一実施例を示すものであり
、第1図に示すように本実施例に係る地下逆打ち掘削工
法においては、山止めの施工手順としては従来と同様に
、周囲に連続壁、矢板等の土止め壁lをあらかじめ形成
しておき、当該上止め壁1で囲まれた掘削部分2に構真
柱3を所定本数埋設後、土砂を掘削してゆき、該掘削作
業に並行して腹起し部材4.切梁5を順次上階から下階
にかけて構築してゆくものである。
Figures 1 to 4 show one embodiment of the present invention, and as shown in Figure 1, in the underground reverse excavation method according to this embodiment, the construction procedure for the heap stop is the same as the conventional method. A retaining wall l such as a continuous wall or a sheet pile is formed in advance around the top retaining wall 1, and after burying a predetermined number of structural pillars 3 in the excavated part 2 surrounded by the upper retaining wall 1, earth and sand are excavated. , in parallel with the excavation work, the raising member 4. The struts 5 are constructed sequentially from the upper floor to the lower floor.

ここで、本実施例に係る切梁5は、第2図に示すように
内部に中空部6を有する鉄骨材で形成されており、構真
柱3間、あるいは構真柱3と11」記腹起し材4間の所
定位置に配置後に前記中空部6にコンクリート7を打設
して本設の鉄骨コンクリート梁として利用しうるように
断面設定したものである。なお、切梁5はあらかじめ鉄
骨コンクリート梁として形成してから現場に搬入するよ
うにしてもよい。
Here, the strut 5 according to this embodiment is formed of a steel frame material having a hollow part 6 inside as shown in FIG. After placing concrete 7 in the hollow part 6 at a predetermined position between the raised members 4, the cross section is set so that it can be used as a permanent steel concrete beam. Note that the strut 5 may be formed as a steel concrete beam in advance and then transported to the site.

また、前記構真柱3も第3図に示すように通常の単一鉄
骨材ではなく、内部にコンクリート7が充填された鋼管
コンクリート柱として形成されており、本構真柱3も本
設の柱として利用しつるような断面設定がなされている
In addition, as shown in Fig. 3, the main structure pillar 3 is also formed as a steel pipe concrete column with concrete 7 filled inside, instead of the usual single steel frame. The cross section has been set so that it can be used as a pillar.

しかして、構真柱3と切梁5との接合は、第3図に示す
ように構真柱3の対応位置に一対のガセットプレート8
を一体に固着し、該ガセットプレート8と切梁5の端部
とをボルト9で接合するようになっている。なお、第3
図では一方向の切梁5との接合部のみを示し、他の3方
向からの切梁5との接合部を便宜上省略しているが、こ
れらの接合部も同様の構成となる。
As shown in FIG.
are fixed together, and the gusset plate 8 and the end of the strut 5 are joined with bolts 9. In addition, the third
In the figure, only the joint with the strut 5 in one direction is shown, and the joints with the strut 5 from the other three directions are omitted for convenience, but these joints also have the same configuration.

また1本実施例における上記腹起し材4は、本設の梁と
して使用してもよい。
Further, the above-mentioned raised member 4 in this embodiment may be used as a permanent beam.

かかる構成からなる本実施例においては、従来仮設材と
してのみ使用されていた構真柱3及び切梁5を各々鉄骨
コンクリート製のものとして、本設の柱、梁として利用
しつるように断面設計がなされているため、これらの柱
、梁のみで土圧に抵抗可能となり、コンクリートの床梁
な形成することなく0立しつるから、開放空間が大きく
、下方の掘削土砂の搬出が非常に効率良く行なえる。
In this embodiment with such a configuration, the structural pillars 3 and struts 5, which were conventionally used only as temporary construction materials, are made of steel-framed concrete, and the cross-sectional design is designed so that they can be used as permanent columns and beams. Because of this structure, the earth pressure can be resisted only by these pillars and beams, and since they can stand at zero without forming concrete floor beams, the open space is large and the removal of excavated earth and sand from below is very efficient. I can do it well.

また、同様に従来のように逆打ち工法のため梁や床の型
枠組や配筋作業が煩雑となる問題も解消し、さらに、掘
削の時間が短くなる。
In addition, the conventional problem of complicated construction of formwork and reinforcing for beams and floors due to the reverse construction method is solved, and the excavation time is also shortened.

なお、切梁5の断面構成については、上記実施例の他に
、例えば第5図に示すような適宜断面構成とすることが
可能であり、また、構真柱3についても、例えば第6図
に示すように、円形鋼管、あるいはll形鋼などを利用
することができ、この場合の切梁5との接合も図示の如
(上記実施例に準じて行なえばよい等、本発明は上記実
施例に限定されるものではなく本発明の要旨を逸脱しな
い範囲内で種々の変形例が可能なことは言うまでもない
In addition to the above-mentioned embodiments, the cross-sectional configuration of the strut 5 can be appropriately changed as shown in FIG. 5, and the structural pillar 3 can also be configured as shown in FIG. As shown in the figure, a circular steel pipe or a 11-shaped steel can be used, and in this case, the connection with the strut 5 can be made as shown in the figure (e.g., it can be done according to the above embodiment, etc.). It goes without saying that the present invention is not limited to the examples, and that various modifications are possible without departing from the gist of the present invention.

(発明の効果) 本発明は上述した如く構成されており、床コンクリート
を打設することなく、本設の鉄骨コンクリート梁を切梁
として利用できるため、掘削空間を大きくとれ、下方の
掘削土砂の搬出が非常に効率良く行うことができる。
(Effects of the Invention) The present invention is constructed as described above, and the steel concrete beams installed can be used as struts without placing floor concrete. Therefore, a large excavation space can be secured, and the excavated earth and sand below can be removed. Unloading can be carried out very efficiently.

さらに、従来のように掘削中の梁や床の型枠組や配筋作
業が無くなるため、工期も早く、かつ煩雑さも解消でき
る。
Furthermore, since there is no need to construct formwork for beams and floors during excavation, or to arrange reinforcement, unlike in the past, the construction period can be shortened and complexity can be eliminated.

【図面の簡単な説明】[Brief explanation of drawings]

第1図乃至第4図は本発明の一実施例を示し、第1図は
本実施例に係る逆打ち工法による山止めの構成を示す概
念図、第2図は切梁の構成を示す断面図、第3図(a)
及び第3図(b)は各々構真柱と切梁との接合部を示す
説明図、第4図は第1図の概念的平面図、第5図(a)
及び第5図(b)は各々切梁の他の実施例を示す断面図
、第6図(a)及び第6図(b)は各々構真柱の他の実
施例を示す説明図である。 l・・・土止め壁、   3・・・構真柱、4・・・腹
起し材、 5・・・切梁、      6−・・中空部、7・・・
コンクリート。 図面の浄書 第1図 第 図 第 図 第6図 (0) 第 図 第 図 (b) 手 続 補 正 1丁 、y許庁長官官 殿 平成2年8月29日 事件の表示 一ゴ 平成 1年特許願第92368号 発明の名称 逆打ち工法による基礎構造 3、補正をする者 事件との関係 特 許 出 願 人 住 所
Figures 1 to 4 show one embodiment of the present invention, Figure 1 is a conceptual diagram showing the configuration of a heap using the reverse construction method according to this embodiment, and Figure 2 is a cross-sectional diagram showing the configuration of the strut. Figure, Figure 3(a)
and Fig. 3(b) are explanatory diagrams showing the joints of the structural pillars and struts, Fig. 4 is a conceptual plan view of Fig. 1, and Fig. 5(a)
and FIG. 5(b) are sectional views showing other embodiments of the strut, and FIGS. 6(a) and 6(b) are explanatory views showing other embodiments of the structural pillar. . l... Earth retaining wall, 3... Structural pillar, 4... Raising material, 5... Strut beam, 6-... Hollow part, 7...
concrete. Engraving of the drawings Figure 1 Figure 6 Figure 6 (0) Figure Figure 6 (0) Figure 1 (b) 1 procedural amendment, y Indication of the case dated August 29, 1990 by the Director-General of the License Agency Igo 1999 patent Application No. 92368 Name of the invention Foundation structure by reverse construction method 3, Person making the amendment Relationship to the case Patent applicant address

Claims (1)

【特許請求の範囲】[Claims] 本設の鉄骨コンクリート梁を切梁として利用したことを
特徴とする逆打ち工法による地下構造。
This is an underground structure using the reverse pouring method, which is characterized by using the existing steel-framed concrete beams as struts.
JP9236889A 1989-04-11 1989-04-11 Base structure by inverted placing method Pending JPH0347320A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9236889A JPH0347320A (en) 1989-04-11 1989-04-11 Base structure by inverted placing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9236889A JPH0347320A (en) 1989-04-11 1989-04-11 Base structure by inverted placing method

Publications (1)

Publication Number Publication Date
JPH0347320A true JPH0347320A (en) 1991-02-28

Family

ID=14052481

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9236889A Pending JPH0347320A (en) 1989-04-11 1989-04-11 Base structure by inverted placing method

Country Status (1)

Country Link
JP (1) JPH0347320A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6093474B1 (en) * 2016-09-13 2017-03-08 ヒロセ株式会社 Cut beam material and beam support
CN110409511A (en) * 2019-07-24 2019-11-05 中铁二十局集团第四工程有限公司 A kind of interlocking pile and ground-connecting-wall seam crossing water-stopping method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5141213A (en) * 1974-10-03 1976-04-07 Takenaka Komuten Co KOZOPPONTAINOKUROSUKOBARIOBUNRISEKOSURU CHIKAYAMA DOMEKOHO

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5141213A (en) * 1974-10-03 1976-04-07 Takenaka Komuten Co KOZOPPONTAINOKUROSUKOBARIOBUNRISEKOSURU CHIKAYAMA DOMEKOHO

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6093474B1 (en) * 2016-09-13 2017-03-08 ヒロセ株式会社 Cut beam material and beam support
CN110409511A (en) * 2019-07-24 2019-11-05 中铁二十局集团第四工程有限公司 A kind of interlocking pile and ground-connecting-wall seam crossing water-stopping method

Similar Documents

Publication Publication Date Title
JP2004027609A (en) Construction method for subterranean structure and subterranean structure
JPH0684690B2 (en) Building basement extension method
JPH0347320A (en) Base structure by inverted placing method
JPS6137692Y2 (en)
KR20000058239A (en) Multi-phased underground construction method for wide excavation using permanent structural members as temporary struts
JPH06264453A (en) Precast concrete-made permanent form for foundation, and foundation practice using its form
JPS63280153A (en) Underground inverted lining method
JPH11140892A (en) Method for excavating ground and method for constructing underground structure using the same
JPH07138972A (en) Construction method for underground skeleton
JP2572680B2 (en) Underground structure by reverse strike method
JP2763488B2 (en) Prefabricated pillar and inverted ramen prefabricated construction method
JP2894217B2 (en) Building structural frame
JP3406370B2 (en) Horizontal shaft construction method
JPS6286242A (en) Reverse casting consttructin method
JPH04293824A (en) Construction method for large span underground structure
JPS63277342A (en) Reverse execution of underground story
JPH0759813B2 (en) Underground construction method
JPH0347321A (en) Shore strut and underground construction work by composite steel beam
JP4045623B2 (en) Construction method of reinforced concrete underground floor and underground structure constructed by this method
JP2603307B2 (en) Retaining method for the upper part of the continuous underground wall
JPH03147927A (en) Basement construction method
JPH07119465B2 (en) Underground excavation construction method
JPS6217233A (en) Foundation base column
JP2023150213A (en) Earth retaining structure and ground open-cut method
JPH04360908A (en) Construction of underground continuous wall and formwork therefor