JPH0339515A - Soil improvement method employing sand pile construction barge - Google Patents
Soil improvement method employing sand pile construction bargeInfo
- Publication number
- JPH0339515A JPH0339515A JP17318989A JP17318989A JPH0339515A JP H0339515 A JPH0339515 A JP H0339515A JP 17318989 A JP17318989 A JP 17318989A JP 17318989 A JP17318989 A JP 17318989A JP H0339515 A JPH0339515 A JP H0339515A
- Authority
- JP
- Japan
- Prior art keywords
- sand
- sand pile
- hollow pipe
- mound
- pile construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004576 sand Substances 0.000 title claims abstract description 53
- 238000010276 construction Methods 0.000 title claims abstract description 34
- 238000000034 method Methods 0.000 title claims abstract description 22
- 239000002689 soil Substances 0.000 title description 3
- 239000000463 material Substances 0.000 claims abstract description 14
- 238000005056 compaction Methods 0.000 claims abstract description 12
- 239000004575 stone Substances 0.000 claims abstract description 3
- 238000007599 discharging Methods 0.000 claims 2
- 239000004035 construction material Substances 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 241000256766 Lophodermium medium Species 0.000 description 1
- 239000002253 acid Substances 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
Description
【発明の詳細な説明】
(イ)技術分野
本発明は、海底地盤の地盤改良工法に関し、詳しくは砂
杭は勿論のこと、砂杭造成船を使用してマウンドの造成
やその締固め均し作業をも行なう高能率な方法を提供す
るものである。[Detailed Description of the Invention] (a) Technical field The present invention relates to a method for improving seabed soil, and more specifically, it involves not only sand piles, but also sand pile construction vessels that are used to create mounds and compact and level them. It provides a highly efficient method for performing tasks.
(ロ)従来技術
社年、海洋室間の高度利用の見地から1港湾構造物は沖
合へ展開し、大水深、大規模化の傾向にあり、その施工
条件は益々厳しいものとなっており、従来からの潜水夫
による作業では能率や安全性、経済性などの点から問題
が多く、各種の水中作業機械の開発や効果的な工法の開
発が望まれている。(b) Prior Art In 2007, from the standpoint of advanced utilization of marine rooms, port structures tend to be deployed offshore, with greater depth and larger scale, and their construction conditions are becoming increasingly severe. The conventional work carried out by divers has many problems in terms of efficiency, safety, economy, etc., and there is a desire for the development of various underwater working machines and effective construction methods.
一般に、港湾構造物等を軟弱地盤ヒに構築する場合、海
底地盤にあらかじめ砂杭を造成して軟弱地盤を強化した
一ヒ、マウンドを造成して荷重を分散させる方法が採ら
れる。Generally, when building port structures on soft ground, sand piles are built in advance on the seabed to strengthen the soft ground, and mounds are created to distribute the load.
この場合、マウンドはコンクリートブロックや重錘等を
クレーン船で吊−にげ自然落下させて締固めていたが、
1@水抵抗や浮力及び着底時のウォータークツション等
によりエネルギーが大幅に減少してしまい、更には位置
ずれなどを起して充分な効果が得られない。In this case, the mound was compacted by hanging concrete blocks, weights, etc. on a crane ship and letting them fall naturally.
1@Energy is significantly reduced due to water resistance, buoyancy, and water cushion when landing on the bottom, and furthermore, positional deviation occurs, making it impossible to obtain sufficient effects.
また、例えば特開昭58−26109号公報のような軟
弱地盤の締固め工法等も提案されているが、該法はロン
ドの一端を海面上に露出させクレーン船等に設置したハ
ンマーで打撃又は振動を与えて海底の軟弱地盤を締固め
る方法であり、締固め材料の運搬・投入等を別個に行な
わなければならなず、非常に非能率的である。In addition, a compaction method for soft ground has been proposed, as disclosed in Japanese Patent Application Laid-Open No. 58-26109, but this method involves exposing one end of the rondo above the sea surface and hitting it with a hammer installed on a crane ship or the like. This is a method of compacting soft ground on the ocean floor by applying vibrations, and it is extremely inefficient as the compaction material must be transported and put in separately.
(ハ)発明の開示
本発明は上記のような従来の問題点に鑑み、砂杭造成船
を使用して、必要な材料を砂杭造成用中空管を介して投
入し、砂杭の造成からマウンドの築造ならびにその締固
め均し作業を同一の機械で連続して施工でき、かつ高能
率、高精度の施工が可能な地盤改良工法を提案するもの
である。(C) Disclosure of the Invention In view of the above-mentioned conventional problems, the present invention provides a method for constructing sand piles by using a sand pile construction vessel and introducing necessary materials through a hollow pipe for sand pile construction. This paper proposes a ground improvement method that allows the construction of mounds, their compaction, and leveling work to be carried out continuously using the same machine, and that allows for highly efficient and highly accurate construction.
本発明工法の第1の特徴は、従来もっばら砂杭造成のた
めに使用されて来た作業船を使用し、砂杭造成用の中空
管下端に海底地盤を締固めて均すためのタンパ−(突固
め板)を着脱自在に取付け、該中空管E部に設けられた
ホッパーから締固め均し材ネ4を該中空管内へ投入して
上記中空管下端から海底へ排出散布し、中空管頭部に取
付けられたバイブロハンマーの振動によって均し材料を
締因め均すことにある。The first feature of the construction method of the present invention is that it uses a work boat, which has conventionally been used extensively for sand pile construction, to compact and level the seabed soil at the lower end of the hollow pipe for sand pile construction. A tamper (tamping plate) is removably attached, and a compacting and leveling material 4 is introduced into the hollow tube from a hopper provided at the E section of the hollow tube, and discharged and distributed from the lower end of the hollow tube to the seabed. The purpose of this method is to tighten and level the leveling material using the vibration of a vibrohammer attached to the hollow tube head.
また、第2の特徴は、この砂杭造成船により海底の軟弱
地盤に通常の砂杭を@威した後、更に杖地盤上に強固な
マウンドを造成するもので、この場合に砂杭造成用中空
管の下端部にマウンドを締固め均すためのタンパ−を装
着し、上記中空管の4部に取付けたホッパーからマウン
ド造成並びに締因め均し材料を中空管内へ投入し、これ
を中を管下端から地盤上に排出してマウンドを造成する
と共に、該マウンドを中空管頭部に取付けられたバイブ
ロハンマーの振動により締固め均すことである。The second feature is that this sand pile construction ship deposits regular sand piles into the soft ground on the seabed, and then creates a strong mound on top of the cane ground. A tamper for compacting and leveling the mound is attached to the lower end of the hollow tube, and mound-creating, compacting and leveling material is introduced into the hollow tube from the hopper attached to the 4th part of the hollow tube. The contents are discharged onto the ground from the lower end of the tube to create a mound, and the mound is compacted and leveled by vibrations of a vibrohammer attached to the head of the hollow tube.
次に、本発明法の一実施例を図画により説明する。Next, one embodiment of the method of the present invention will be explained using drawings.
(ニ)実施例
第1図は本発明法を実施する装置全体の一例を示すもの
で、砂杭造成船lには上部にホッパー3を設けた砂杭造
成用中空管4が船l上に立設したリーダー6に沿って昇
降白花に吊下げられており、更に船l上には該中空管4
を昇降させるためのウィンチ7やワイヤーロープ8と共
に、サンドと79.ベルトコンベヤ10.グランドホッ
パー11、パケット12等の搬送装置類が装備されてい
る。(D) Embodiment Figure 1 shows an example of the entire apparatus for carrying out the method of the present invention, in which a sand pile construction ship 1 has a sand pile construction hollow pipe 4 with a hopper 3 installed on the top. The hollow tube 4 is suspended along the upright leader 6, and the hollow tube 4 is suspended above the ship.
Along with the winch 7 and wire rope 8 for raising and lowering the sand and 79. Belt conveyor 10. It is equipped with conveyance devices such as a ground hopper 11 and a packet 12.
E記中空管4の頭部にはバイブロハンマー2が取付けら
れており、該中空管4は滑車13を介してワイヤーロー
プ8に懸吊され、ウィンチ7の駆動により昇降するよう
に構成されている。A vibrohammer 2 is attached to the head of the hollow tube 4 described in E. The hollow tube 4 is suspended from a wire rope 8 via a pulley 13, and is configured to be raised and lowered by the drive of a winch 7. ing.
そして、中空管4下端外周にはタンパ−5(突因め板)
が着脱自在に取付けられる。Then, a tamper 5 (protruding plate) is provided on the outer periphery of the lower end of the hollow tube 4.
is removably attached.
次に、本発明法の一例として、砂杭の造成とマウンドの
築造ならびにその締固め均しの一連の作業を行なう工程
を第3図により説明する。Next, as an example of the method of the present invention, the steps of creating a sand pile, building a mound, and compacting and leveling the sand pile will be explained with reference to FIG.
まず、この砂杭造成船1を使用し、中空v4内に砂を供
給しながら頭部のバイブロハンマー2等を用いて通常の
方法により所定の海底軟弱地盤16中に砂杭(サンドコ
ンパクションパイル)17を造成する(第3図(イ))
。First, using this sand pile building vessel 1, sand piles (sand compaction piles) are built into a predetermined soft seabed ground 16 by a normal method using a vibro hammer 2 or the like on the head while supplying sand into the hollow v4. 17 (Figure 3 (a))
.
次に、この砂杭17により地盤強化された場所に、この
砂杭造成船lを使用してマウンド18を築造する。この
場合中?管4をいったん引ヒげてその下端に前記したタ
ンパ−5をボルト止め等により装着する。Next, a mound 18 is constructed at a place where the ground has been strengthened by the sand piles 17 using the sand pile construction ship l. Medium in this case? Once the tube 4 is pulled out, the tamper 5 described above is attached to the lower end thereof by bolting or the like.
砂、砂利、砕石等のマウンド築造用材料は先に砂杭17
造成の際に使用したサンドビン9にいったんストックさ
れ、ベルトコンベヤ10でグランドホッパー11に運ば
れ、ウィンチ15により昇降する/ヘケット12に所定
推移し変えられて中空管4上部のホッパー3に投入され
る。中空W4内の該材料は中空管4下端から排出散布さ
れ、マウンド18の原形を造成する(第3図(ロ))。Materials for mound construction such as sand, gravel, crushed stone etc. should be placed on sand piles 17 first.
Once stocked in the sand bin 9 used during construction, it is transported to the ground hopper 11 by a belt conveyor 10, raised and lowered by a winch 15, transferred to a hecket 12 at a predetermined time, and thrown into the hopper 3 above the hollow tube 4. Ru. The material in the hollow W4 is discharged and scattered from the lower end of the hollow tube 4 to form the original shape of the mound 18 (FIG. 3 (b)).
このとき、L記バイブロハンマー2を使用してその振・
肋により上記タンパ−5でマウンド18の造成とその締
固めを同時に行ってもよい。At this time, use the vibrohammer 2 listed in L to shake it.
The creation of the mound 18 and its compaction may be performed simultaneously with the tamper 5 using the ribs.
最後に、パブロハンマー2によりマウンド18の締固め
と均し作業行なう(第3図(ロ)〜(ハ))、このとき
に、はじめて上記タンパ−5を中空管4下端に装着する
ようにしてもよい。Finally, the mound 18 is compacted and leveled using the Pablo hammer 2 (Fig. 3 (B) to (C)). At this time, the tamper 5 is attached to the lower end of the hollow tube 4 for the first time. You can.
この締固め施工時には、中空管4の巻上げと巻下げ操作
を繰返してタンパ−5による突固め力を高めてマウンド
18をより強固に締固めることもできる。また、マウン
ド18の均し作業の際には、マウンド18の高さを調整
するために中空管4は所定レベルまで引上げ、マウンド
18.1−、面の凹凸は中空管4からのマウンド築造用
材料の補給とバイブロハンマー2の振動により補整して
行く。During this compaction work, the mound 18 can be compacted more firmly by repeating the hoisting and unwinding operations of the hollow tube 4 to increase the compacting force by the tamper 5. In addition, when leveling the mound 18, the hollow tube 4 is pulled up to a predetermined level in order to adjust the height of the mound 18. We will compensate by replenishing building materials and vibrating the vibrohammer 2.
なお、この実施例では地ai>良として砂杭造成個所に
マウンドを築造する例を説明したが、砂杭を造成する必
要はないが、地盤やマウンドを更に強化するために砂、
砂利等を使用して締固め均し施工を行なう必要がある場
所でも、この砂杭造戚船を使用する本発明法を適用する
ことができるのは勿論である。In addition, in this example, an example was explained in which a mound is constructed at a place where sand piles are to be constructed, assuming that the ground ai is good. However, although it is not necessary to construct sand piles, sand, etc.
Of course, the method of the present invention using the sand pile construction vessel can also be applied to places where it is necessary to perform compaction and leveling work using gravel or the like.
また、築かれたマウンド法面を1締固めるために1」;
記タンパー5を中空管4下端に該法面の角度に合せ傾斜
させて取付けたり、法面の角度の合うタンパ−を使用す
ることもできる。Also, 1 to compact the built mound slope;
It is also possible to attach the tamper 5 to the lower end of the hollow tube 4 so as to be inclined to match the angle of the slope, or to use a tamper whose angle matches the slope.
(ホ)発明の効果
本発明は上述のようにしてなり1砂杭造威船に装備した
砂杭造成用中空管下端にタンパ−を取付るだけで、該船
の材料供給装置やバイブロハンマー等をそのまま利用す
ることができ、また該船の施工管理装置である中空管の
上下移動を計測する深度計や中空管内部の材料高さを測
定する砂面計ならびに船体位2t111定システム等を
利用して高精度な改良地盤の品質管理を行なうことがで
きる。(E) Effects of the Invention The present invention can be achieved as described above by simply attaching a tamper to the lower end of the hollow pipe for sand pile construction installed on a sand pile construction ship, and then using the material supply device of the ship or the vibrohammer. etc., can be used as is, and the ship's construction management equipment is a depth gauge that measures the vertical movement of the hollow tube, a sand level meter that measures the height of the material inside the hollow tube, and a 2t111 ship positioning system. etc. can be used to perform highly accurate quality control of improved ground.
しかも1本発明法は同一の砂杭造成船で砂杭造成は勿論
のこと、マウンドの造成やその締固め均し作業まで能率
よく行うことができるので、作業船の回航費や躇装費が
不用となって極めて経済的である等多くの利点を有する
。Moreover, with the method of the present invention, not only sand pile construction but also mound construction, compaction and leveling work can be carried out efficiently using the same sand pile construction ship, so the turning costs of the work ship and the hardware costs are reduced. It has many advantages such as being extremely economical as it becomes unnecessary.
第1図は1本発明法を実施する装置全体の一例を示す説
明図、第2図は本発明法における締固め均し時の要領を
示す説明図1w43図(イ)〜(ハ)は本発明法により
砂杭とマウンドを造成する場合のT程説明図である。
符号説明
1−砂a造酸鉛 2−バイブロハンマー3−ホッパー
4−砂杭造成用中空管
5−タンパ−6−リーダー 7−ウィンチ8−ワイヤー
ロープ 9−サンドビン lO−ベルトコンベヤ 11
−グランドホッパー12−パケット t3−滑車 14
−ワイヤーロープ 15−ウィンチ 16−海底地盤1
7−砂杭 18−マウンドFigure 1 is an explanatory diagram showing an example of the entire apparatus for carrying out the method of the present invention. Figure 2 is an explanatory diagram showing the procedure for compaction and leveling in the method of the present invention. Figures 1w43 (a) to (c) are It is an explanatory diagram of the case where sand piles and mounds are created by the invention method. Code explanation 1-Sand a acid lead 2-Vibrohammer 3-Hopper
4-Hollow pipe for sand pile construction 5-Tamper 6-Leader 7-Winch 8-Wire rope 9-Sand bin lO-Belt conveyor 11
-Ground hopper 12-Packet t3-Pulley 14
-Wire rope 15-Winch 16-Seafloor ground 1
7-Sand pile 18-Mound
Claims (2)
ーを着脱自在に取付け、該中空管上部のホッパーから砂
、砂利、砕石等の締固め均し材料を中空管内に供給して
中空管下端から海底地盤へ排出散布し、中空管頭部に装
備するバイブロハンマーの振動によって上記材料を締固
め均すことを特徴とする砂杭造成船による地盤改良工法
。(1) A tamper is removably attached to the outer periphery of the lower end of a hollow pipe for sand pile construction on a sand pile construction ship, and compacted and leveled materials such as sand, gravel, crushed stone, etc. are supplied into the hollow pipe from the hopper at the top of the hollow pipe. A ground improvement method using a sand pile construction vessel, which is characterized by discharging and dispersing the material from the lower end of a hollow pipe onto the seabed ground, and compacting and leveling the material by vibration of a vibrohammer installed at the head of the hollow pipe.
後、該砂杭造成個所にマウンドを造成するに際して、砂
杭造成用中空管の下端外周にタンパーを着脱自在に取付
け、該中空管上部のホッパーからマウンド造成ならびに
締固め均し材料を中空管内に供給して中空管下端から排
出することによりマウンドを築造すると共に該マウンド
を中空管頭部に装備するバイブロハンマーによって締固
め均することを特徴とする砂杭造成船による地盤改良工
法。(2) After sand piles are constructed on the soft ground of the seabed by a sand pile construction ship, when creating a mound at the location where the sand piles will be constructed, a tamper is removably attached to the outer periphery of the lower end of the hollow pipe for sand pile construction. A mound is built by supplying mound creation and compaction leveling material into the hollow tube from a hopper at the top of the hollow tube and discharging it from the lower end of the hollow tube, and a vibrohammer that equips the head of the hollow tube with the mound. A ground improvement method using a sand pile construction vessel that is characterized by compaction and leveling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP17318989A JP2663021B2 (en) | 1989-07-05 | 1989-07-05 | Ground improvement method by sand pile formation ship |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP17318989A JP2663021B2 (en) | 1989-07-05 | 1989-07-05 | Ground improvement method by sand pile formation ship |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0339515A true JPH0339515A (en) | 1991-02-20 |
JP2663021B2 JP2663021B2 (en) | 1997-10-15 |
Family
ID=15955746
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP17318989A Expired - Fee Related JP2663021B2 (en) | 1989-07-05 | 1989-07-05 | Ground improvement method by sand pile formation ship |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2663021B2 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05187021A (en) * | 1992-01-11 | 1993-07-27 | Morinagagumi:Kk | Riprap leveler on sea bottom |
JPH05187020A (en) * | 1992-01-10 | 1993-07-27 | Morinagagumi:Kk | Riprap-arranging equipment on sea bottom |
JP4969694B1 (en) * | 2011-07-27 | 2012-07-04 | 潔 斎藤 | Underwater rubble foundation leveling device |
JP2013174055A (en) * | 2012-02-23 | 2013-09-05 | Nippon Kaikou Kk | Underwater obstacle crushing device and underwater obstacle crushing method |
CN106245649A (en) * | 2016-07-27 | 2016-12-21 | 中国石油大学(华东) | Bucket type Aerial Submarine Pipeline ramming controlling device and construction method |
CN106245650A (en) * | 2016-07-27 | 2016-12-21 | 中国石油大学(华东) | Aerial Submarine Pipeline double freedom sand controlling device |
CN108824414A (en) * | 2018-07-18 | 2018-11-16 | 中交四航工程研究院有限公司 | Underwater strong rammer subtraction unit and its construction method |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5446005B2 (en) * | 2009-12-15 | 2014-03-19 | あおみ建設株式会社 | Submerged mound compaction method and compaction device |
KR102136610B1 (en) * | 2019-05-28 | 2020-07-22 | (주)더파빌리온 | Process for Deep Cement Mixing for Recycling Floating Soil at Sea Bed |
-
1989
- 1989-07-05 JP JP17318989A patent/JP2663021B2/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05187020A (en) * | 1992-01-10 | 1993-07-27 | Morinagagumi:Kk | Riprap-arranging equipment on sea bottom |
JPH05187021A (en) * | 1992-01-11 | 1993-07-27 | Morinagagumi:Kk | Riprap leveler on sea bottom |
JP4969694B1 (en) * | 2011-07-27 | 2012-07-04 | 潔 斎藤 | Underwater rubble foundation leveling device |
JP2013174055A (en) * | 2012-02-23 | 2013-09-05 | Nippon Kaikou Kk | Underwater obstacle crushing device and underwater obstacle crushing method |
CN106245649A (en) * | 2016-07-27 | 2016-12-21 | 中国石油大学(华东) | Bucket type Aerial Submarine Pipeline ramming controlling device and construction method |
CN106245650A (en) * | 2016-07-27 | 2016-12-21 | 中国石油大学(华东) | Aerial Submarine Pipeline double freedom sand controlling device |
CN106245650B (en) * | 2016-07-27 | 2018-05-01 | 中国石油大学(华东) | Aerial Submarine Pipeline double freedom Throwing sand controlling devices |
CN108824414A (en) * | 2018-07-18 | 2018-11-16 | 中交四航工程研究院有限公司 | Underwater strong rammer subtraction unit and its construction method |
Also Published As
Publication number | Publication date |
---|---|
JP2663021B2 (en) | 1997-10-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5446005B2 (en) | Submerged mound compaction method and compaction device | |
JPH0339515A (en) | Soil improvement method employing sand pile construction barge | |
RU2090699C1 (en) | Offshore platform and method of its construction | |
CN107059857A (en) | Steel pile casting follow-up method under the conditions of deep water inclined scar | |
CN114197439B (en) | Construction method and construction equipment for high-current deepwater underwater gravel pile | |
JP2689002B2 (en) | Method for compacting and leveling mound of seabed by sand pile construction ship | |
CN106400807B (en) | Extra large work barge grouting method and its equipment | |
JP2515888B2 (en) | Construction method of steel pipe pile for building offshore structure and its equipment | |
CN113356179B (en) | Treatment method of hydraulic structure foundation | |
CN106400745B (en) | A kind of sea work barge operational method and equipment | |
JP4593496B2 (en) | How to create an artificial tidal flat | |
JPH08170343A (en) | Finishing construction method of underwater rubble mound | |
CN206328759U (en) | Extra large work barge grouting equipment | |
JP2000248527A (en) | Earthquake resistant reinforcing method for existing structure | |
JP2791913B2 (en) | Detection method of draft of hull in compaction method of sea bottom mound using sand pile building ship | |
JPS60105715A (en) | Consolidating and levelling weight for underwater rubble-mound foundation | |
JP2004197307A (en) | Soil improving method | |
JPH0229811B2 (en) | ||
JP3957283B2 (en) | Ground improvement method | |
JP2002004283A (en) | Mound leveling equipment of submarine ground | |
JPH11107279A (en) | Water bottom ground improvement method and device thereof | |
JPS6233822Y2 (en) | ||
JPS6037311A (en) | Leveling and compacting work of underwater rubble foundation | |
JP2958542B2 (en) | Construction method of anchor body in soft underground | |
Gerwick | Preparation of foundations for concrete caisson sea structures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080620 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080620 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090620 Year of fee payment: 12 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090620 Year of fee payment: 12 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313111 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090620 Year of fee payment: 12 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
LAPS | Cancellation because of no payment of annual fees |