Construction method of anchor body in soft undergroundInfo
- Publication number
- JP2958542B2 JP2958542B2 JP3189580A JP18958091A JP2958542B2 JP 2958542 B2 JP2958542 B2 JP 2958542B2 JP 3189580 A JP3189580 A JP 3189580A JP 18958091 A JP18958091 A JP 18958091A JP 2958542 B2 JP2958542 B2 JP 2958542B2
- Authority
- JP
- Japan
- Prior art keywords
- anchor body
- anchor
- bag
- sand
- bag body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/221—General power management systems
Landscapes
- Piles And Underground Anchors (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、厚い軟弱層に覆われた
水底地盤に、作業台船等の被係留物を係留するためのア
ンカー体の施工方法に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing an anchor for mooring an object to be moored, such as a workboat, on a submarine ground covered with a thick soft layer.
【0002】[0002]
【従来の技術】従来、海上工事において作業台船等の被
係留物を、軟弱水底地盤に係留させる場合には、コンク
リートの塊を沈めたり、杭を打設したりして、これらを
アンカー体として係留索を連結し、被係留物の係留を行
っている。2. Description of the Related Art Conventionally, in the case of mooring an object to be moored, such as a workboat, in a marine work, a concrete block is sunk or a pile is put into place, and these are anchored. The mooring line is connected to moor the object to be moored.
【0003】[0003]
【発明が解決しようとする課題】上記の従来技術には、
次のような問題点が存在する。 <イ>コンクリートの塊や杭をアンカー体として使用す
る場合は、それらの養生期間を含めた作製期間あるいは
打設期間を必要とするため、施工期間の長期化を招く。 <ロ>既設の重量コンクリートを運搬して沈める作業、
あるいは杭を打設する作業には、かなりの手間が掛か
る。 <ハ>コンクリート塊が自沈してしまうような軟弱層が
厚く堆積している場所では、どこまで沈むか予測が難し
く、沈設場所の特定が困難である。 <ニ>一度沈設したコンクリート塊あるいは杭は、引き
上げて再利用することが困難である。 <ホ>杭を打設する杭打設船自体の係留方法が問題とな
る。SUMMARY OF THE INVENTION The above prior arts include:
The following problems exist. <A> When using concrete blocks or piles as anchors, a production period including a curing period for them or a casting period is required, which leads to a longer construction period. <B> Work to transport and sink existing heavy concrete,
Alternatively, the work of placing a pile requires a lot of work. <C> In a place where a thick soft layer where concrete lumps spontaneously settle is deposited thickly, it is difficult to predict how far the sink will sink, and it is difficult to specify the place where the concrete is settled. <D> It is difficult to pull up and reuse concrete masses or piles that have been laid. <E> The method of mooring the pile driving ship itself for driving the piles is a problem.
【0004】[0004]
【課題を解決するための手段】本発明は、上記のような
問題点を解決するためになされたもので、施工の簡易化
及び施工期間の短縮を図ることができる軟弱水底地盤に
おけるアンカー体の施工方法を提供することを目的とす
る。即ち、本発明は、開口部を開設した支持板と、この
支持板の開口部に連通させて垂下させた有底の袋体と
を、軟弱水底地盤上に設置し、前記袋体内に係留索を連
結したアンカー体を収納し、アンカー体の上部から袋体
内に砂を圧入して、袋体を下方に向けて拡張させるとと
もにアンカー体を所定の深度まで沈降させて設置する、
軟弱水底地盤におけるアンカー体の施工方法である。ま
た、開口部を開設した支持板と、この支持板の開口部に
連通させて垂下させた有底の袋体とを、軟弱水底地盤上
に設置し、前記袋体内に係留索を連結したアンカー体を
収納し、アンカー体の上部近傍に空気あるいは水の噴射
ホースの噴射端を固定し、アンカー体の上部から袋体内
に砂を圧入して、袋体を下方に向けて拡張させるととも
にアンカー体及び噴射ホースを所定の深度まで沈降させ
て設置した後、噴射ホースの噴射端から空気あるいは水
を噴射し、アンカー体上部の砂を攪拌して液状化させな
がら係留索を引き上げてアンカー体を除去する、軟弱水
底地盤におけるアンカー体の施工方法である。また、上
記の方法において、アンカー体を軟弱水底地盤中に沈降
させる途中あるいは沈降完了後に、係留索を介して袋体
内に圧入した砂に振動を与えて締め固めを行う軟弱水底
地盤におけるアンカー体の施工方法である。さらに、上
記の方法において、袋体を透水性の材質で形成した軟弱
水底地盤におけるアンカー体の施工方法である。DISCLOSURE OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and an object of the present invention is to provide an anchor body in a soft underground where the construction can be simplified and the construction period can be shortened. The purpose is to provide a construction method. That is, the present invention provides a support plate having an opening, and a bottomed bag body which is communicated with the opening portion of the support plate and is hung down on a soft underwater ground, and a mooring line is provided in the bag body. The anchor body connected with the anchor body is stored, sand is pressed into the bag body from the top of the anchor body, the bag body is expanded downward, and the anchor body is settled to a predetermined depth and installed.
This is a method of constructing an anchor body on soft underground. In addition, an anchor having an opening and a bottomed bag connected to the opening of the support plate and hanging therefrom is installed on a soft underground, and a mooring line is connected to the bag. The body is stored, the jet end of the air or water injection hose is fixed near the upper part of the anchor body, sand is pressed into the bag body from the upper part of the anchor body, the bag body is expanded downward, and the anchor body is expanded. After setting the jet hose down to the specified depth and installing it, air or water is jetted from the jet end of the jet hose, and the mooring line is pulled up while the sand on the anchor body is stirred and liquefied, and the anchor body is removed. This is a method of constructing an anchor body on soft underground. Further, in the above method, during or after the sedimentation of the anchor body in the soft underground, the anchor body in the soft underground that vibrates and compacts the sand pressed into the bag body via the mooring line. The construction method. Further, in the above method, the present invention is a method for constructing an anchor body in a soft underground where a bag body is formed of a water-permeable material.
【0005】[0005]
【実施例】以下、図面を参照しながら、本発明の一実施
例について説明する。 <イ>袋体付き支持板の設置 支持板1は、図1に示すように、中央等に開口部11を
開設した鋼板等である。この支持板1は、軟弱層が厚く
堆積している場所であっても、後述の砂杭全体が軟弱層
内に沈下しないように、十分な反力を地盤面にとれるよ
う広い面積のものを用いる。また、支持板1の開口部1
1に連通させて、有底の袋体2を垂下させる。この袋体
2は収縮、拡張可能な撓性の材質で作製する。袋体2を
透水性の材質で作製する場合は、周辺地盤中の水分を砂
杭に吸収し、周辺地盤の圧密を促進することができる。
さらに、支持板1の開口部11には、砂を袋体2内に圧
入するための圧入ホース3の圧入端31を固定する。そ
して、以上のように構成した支持板1及び袋体2を、図
2に示すように、軟弱地盤上に設置する。An embodiment of the present invention will be described below with reference to the drawings. <A> Installation of Support Plate with Bag The support plate 1 is a steel plate or the like having an opening 11 at the center or the like as shown in FIG. The support plate 1 has a large area so that a sufficient reaction force can be taken on the ground surface so that the entire sand pile described below does not sink into the soft layer even in a place where the soft layer is thickly deposited. Used. Also, the opening 1 of the support plate 1
1 and the bottomed bag 2 is hung down. The bag 2 is made of a flexible material that can be contracted and expanded. When the bag body 2 is made of a water-permeable material, moisture in the surrounding ground can be absorbed by the sand piles, and the consolidation of the surrounding ground can be promoted.
Further, a press-fit end 31 of a press-fit hose 3 for press-fitting sand into the bag 2 is fixed to the opening 11 of the support plate 1. Then, the support plate 1 and the bag body 2 configured as described above are installed on soft ground as shown in FIG.
【0006】<ロ>アンカー体の設置 アンカー体4は、十分な引き抜き抵抗を得られるもので
あれば種々の形状を採用できるが、例えば図1に示すよ
うに、袋体2内に収納可能な円盤を用いることができ
る。このアンカー体4は、後述の軟弱地盤内への沈降を
容易にするため、鋼板等を用いて重量を付与すると良
い。また、アンカー体4には、チェーン等の係留索41
の一端を連結し、この係留索41の他端は作業台船等の
海上の被係留物に連結される。さらに、アンカー体4の
上部近傍には、空気あるいは水の噴射ホース5の噴射端
51を固定する。この噴射端51は、上方に向けて配置
すると、後述の砂の液状化効果がより良く得られる。そ
して、以上のように構成したアンカー体4を、図2に示
すように、軟弱地盤上に設置した袋体2内に設置する。<B> Installation of Anchor Body The anchor body 4 can adopt various shapes as long as it has a sufficient pull-out resistance. For example, as shown in FIG. A disk can be used. The anchor body 4 may be given a weight using a steel plate or the like in order to easily settle into the soft ground described later. In addition, the anchor body 4 includes a mooring line 41 such as a chain.
And the other end of the mooring line 41 is connected to an offshore mooring object such as a workboat. Further, near the upper part of the anchor body 4, the jet end 51 of the air or water jet hose 5 is fixed. When the jetting end 51 is arranged upward, a sand liquefaction effect described later can be more effectively obtained. And the anchor body 4 comprised as mentioned above is installed in the bag body 2 installed on soft ground as shown in FIG.
【0007】<ハ>砂の圧入 次に、図2に示すように、圧入ホース3を介して、アン
カー体4の上部から袋体2内に砂6を圧入する。そし
て、図3に示すように、袋体2を下方に向けて拡張させ
るとともに、アンカー体4及び噴射ホース5を所定の深
度まで沈降させ、アンカー体4の設置作業を終了する。
以上のように、袋体2内に砂6を圧入して砂杭を造成
し、この砂杭の底部にアンカー体4を位置させることに
よって、係留に必要な十分な引き抜き抵抗を得ることが
できる。なお、アンカー体4を上記のように軟弱地盤中
に沈降させる途中あるいは沈降完了後に、係留索41を
介して袋体2内に圧入した砂6に振動を与えて締め固め
を行うことによって、砂杭の剪断抵抗を増加させること
ができるため、引き抜き抵抗をよりいっそう高めること
ができる。<C> Press-in of Sand Next, as shown in FIG. 2, sand 6 is pressed into the bag 2 from above the anchor 4 through the press-in hose 3. Then, as shown in FIG. 3, the bag body 2 is expanded downward, the anchor body 4 and the injection hose 5 are settled to a predetermined depth, and the installation work of the anchor body 4 is completed.
As described above, the sand 6 is pressed into the bag body 2 to form a sand pile, and the anchor body 4 is positioned at the bottom of the sand pile, whereby a sufficient pull-out resistance required for mooring can be obtained. . In the meantime, while the anchor body 4 is submerged in the soft ground as described above or after the subsidence is completed, the sand 6 pressed into the bag body 2 via the mooring line 41 is subjected to vibration to compact the sand 6. Since the shear resistance of the pile can be increased, the pull-out resistance can be further increased.
【0008】<ニ>アンカー体の除去 上記のように設置したアンカー体4を除去する場合は、
図4に示すように、噴射ホース5の噴射端51から空気
あるいは水を噴射しながら、係留索41を引き上げてア
ンカー体4を除去する。このように、噴射端51から空
気あるいは水を噴射するよって、アンカー体4上部の砂
6が攪拌されて液状化し、剪断抵抗が減少するため、ア
ンカー体4の引き抜きを容易に行うことができる。<D> Removal of the anchor body When removing the anchor body 4 installed as described above,
As shown in FIG. 4, the mooring line 41 is pulled up and the anchor body 4 is removed while jetting air or water from the jet end 51 of the jet hose 5. In this way, the air 6 or the water is jetted from the jet end 51, whereby the sand 6 above the anchor body 4 is agitated and liquefied, and the shear resistance is reduced, so that the anchor body 4 can be easily pulled out.
【0009】[0009]
【本発明の効果】本発明は以上説明したようになるた
め、次のような効果を得ることができる。 <イ>軟弱地盤上に設置した袋体内に砂を圧入して砂杭
を造成し、その砂杭の底部にアンカー体を位置させるこ
とによって、係留に必要な十分な引き抜き抵抗を得るこ
とができる。そのため、コンクリートの塊や杭のように
養生期間を含めた作製期間あるいは打設期間が不要であ
るため、施工期間の短縮化を図ることができる。Since the present invention has been described above, the following effects can be obtained. <B> By inserting sand into the bag placed on soft ground to create a sand pile and positioning the anchor at the bottom of the sand pile, sufficient pulling resistance required for mooring can be obtained. . Therefore, unlike the concrete block and the pile, the production period including the curing period or the casting period is not required, and thus the construction period can be shortened.
【0010】<ロ>袋体内に砂を圧入するだけの簡易な
作業で済むため、施工の簡易化を図ることができる。<B> Since a simple operation of merely pressing sand into the bag body is sufficient, the construction can be simplified.
【0011】<ハ>軟弱層が厚く堆積している場所であ
っても、支持板により砂杭の沈下に対する反力を地盤面
にとることができる。そのため、砂杭全体が軟弱地盤内
に沈下することがなく、設計通りの施工を行うことがで
きる。従って、沈設場所を選ばず、広範囲な施工に適用
できる。<C> Even in a place where the soft layer is thickly deposited, the reaction force against the settlement of the sand pile can be applied to the ground surface by the support plate. Therefore, the entire sand pile does not sink into the soft ground, and the construction can be performed as designed. Therefore, the present invention can be applied to a wide range of construction regardless of the location of the submerged place.
【0012】<ニ>袋体内の砂に振動を与えて締め固め
ることによって、砂杭の剪断抵抗を増加させ、アンカー
体の引き抜き抵抗を高めることができる。<D> By vibrating and compacting the sand in the bag body, the shear resistance of the sand pile can be increased, and the pull-out resistance of the anchor body can be increased.
【0013】<ホ>袋体を透水性材質で作製することに
よって、周辺地盤中の水分を砂杭に吸収し、周辺地盤の
圧密を促進することができる。そのため、アンカー体の
引き抜き抵抗をよりいっそう高めることができる。<E> By making the bag body of a water-permeable material, moisture in the surrounding ground can be absorbed by the sand piles, and the compaction of the surrounding ground can be promoted. Therefore, the pull-out resistance of the anchor body can be further increased.
【0014】<ヘ>アンカー体の除去時には、袋体内で
空気あるいは水を噴射しながら、アンカー体を引き抜
く。従って、袋体内の砂が攪拌されて液状化し、剪断抵
抗が減少するため、アンカー体の引き抜きを容易に行う
ことができる。<F> When removing the anchor, the anchor is pulled out while blowing air or water into the bag. Therefore, the sand in the bag is stirred and liquefied, and the shear resistance is reduced, so that the anchor can be easily pulled out.
【0015】<ト>アンカー体は除去可能であるため、
再利用することができ、経済的である。<G> Since the anchor body is removable,
Reusable and economical.
【0016】<チ>施工の終了後、地盤中には、砂杭と
袋体のみが残存するため、環境に及ぼす影響は皆無であ
る。<H> After the completion of the construction, only the sand pile and the bag remain in the ground, so that there is no influence on the environment.
【図1】 アンカー構造の説明図FIG. 1 is an explanatory view of an anchor structure.
【図2】 支持板の設置状態の説明図FIG. 2 is an explanatory view of an installation state of a support plate.
【図3】 アンカー体の設置完了状態の説明図FIG. 3 is an explanatory diagram of a completed installation state of the anchor body.
【図4】 アンカー体の除去方法の説明図FIG. 4 is an explanatory view of a method of removing an anchor body.
Claims (4)
の開口部に連通させて垂下させた有底の袋体とを、軟弱
水底地盤上に設置し、 前記袋体内に係留索を連結したアンカー体を収納し、 アンカー体の上部から袋体内に砂を圧入して、袋体を下
方に向けて拡張させるとともにアンカー体を所定の深度
まで沈降させて設置する、 軟弱水底地盤におけるアンカー体の施工方法。1. A support plate having an opening and a bottomed bag body which is communicated with the opening of the support plate and hung down are installed on a soft underground ground, and a mooring cable is provided in the bag body. An anchor in soft underground where the connected anchor body is stored, sand is pressed into the bag body from the top of the anchor body, the bag body is expanded downward, and the anchor body is settled down to a predetermined depth and installed. Body construction method.
の開口部に連通させて垂下させた有底の袋体とを、軟弱
水底地盤上に設置し、 前記袋体内に係留索を連結したアンカー体を収納し、 アンカー体の上部近傍に空気あるいは水の噴射ホースの
噴射端を固定し、 アンカー体の上部から袋体内に砂を圧入して、袋体を下
方に向けて拡張させるとともにアンカー体及び噴射ホー
スを所定の深度まで沈降させて設置した後、 噴射ホースの噴射端から空気あるいは水を噴射し、 アンカー体上部の砂を攪拌して液状化させながら係留索
を引き上げてアンカー体を除去する、 軟弱水底地盤におけるアンカー体の施工方法。2. A support plate having an opening and a bottomed bag body which is communicated with the opening of the support plate and is hung down on a soft underwater ground, and a mooring line is provided in the bag body. The connected anchor body is housed, the jet end of the air or water injection hose is fixed near the upper part of the anchor body, sand is pressed into the bag body from the upper part of the anchor body, and the bag body is expanded downward. At the same time, the anchor body and the injection hose are settled down to the specified depth and installed, and then air or water is injected from the injection end of the injection hose, and the mooring rope is pulled up while stirring and liquefying the sand above the anchor body. A method for installing anchors on soft underground to remove the body.
る途中あるいは沈降完了後に、係留索を介して袋体内に
圧入した砂に振動を与えて締め固めを行う、請求項1又
は2記載の軟弱水底地盤におけるアンカー体の施工方
法。3. The softness according to claim 1, wherein the sand pressed into the bag body via the mooring line is compacted by vibrating the sand while the anchor body is submerged in the soft underground or after the subsidence is completed. Construction method of anchor body on underwater ground.
乃至3記載の軟弱水底地盤におけるアンカー体の施工方
法。4. The bag according to claim 1, wherein the bag is made of a water-permeable material.
4. The method for constructing an anchor body in a soft underground ground according to any one of items 3 to 3.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3189580A JP2958542B2 (en) | 1991-07-04 | 1991-07-04 | Construction method of anchor body in soft underground |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3189580A JP2958542B2 (en) | 1991-07-04 | 1991-07-04 | Construction method of anchor body in soft underground |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH059935A JPH059935A (en) | 1993-01-19 |
JP2958542B2 true JP2958542B2 (en) | 1999-10-06 |
Family
ID=16243713
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP3189580A Expired - Lifetime JP2958542B2 (en) | 1991-07-04 | 1991-07-04 | Construction method of anchor body in soft underground |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2958542B2 (en) |
-
1991
- 1991-07-04 JP JP3189580A patent/JP2958542B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH059935A (en) | 1993-01-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101327833B (en) | Power embedment anchor with high-frequency small amplitude vibration | |
WO2014121684A1 (en) | Pre-formed marine fixed platform and method of installation | |
EP1382751B1 (en) | Ground improvement | |
JP2958542B2 (en) | Construction method of anchor body in soft underground | |
JP2663021B2 (en) | Ground improvement method by sand pile formation ship | |
JP2000144737A (en) | Compaction device of underwater charging material | |
CN210942138U (en) | Water surface photovoltaic power generation system and anchoring device thereof | |
KR101031571B1 (en) | Method for constructing seperating type caisson | |
JP7182649B2 (en) | Method for installing tubular metal piles on rocky ground | |
JP4058551B2 (en) | Seismic reinforcement method for existing structures | |
CN1648353A (en) | Concrete transplanting steel bar cage pile forming technical method of long screw hole drilling and center pump pressure | |
JPH0598651A (en) | Press-in method for undersea foundation | |
JP3554901B2 (en) | How to pile well | |
JP2904386B2 (en) | Sinker embedding method and sinker | |
CN115897640B (en) | Construction method of permeable breakwater | |
JPS60215924A (en) | Settlement of steel skeleton for underwater foundation structure | |
CN207519430U (en) | The environment-friendly type gravity type foundation of the controllable postposition ballast of dive | |
JPH10231517A (en) | Pile head concrete elimination method and device for concrete-charged steel pipe pile | |
JPH11152735A (en) | Modifying method for soft ground surface layer | |
JPH07166565A (en) | Execution method for gravitational force type offshore structure and structure thereof | |
JP2001214418A (en) | Method for producing and installing concrete caisson on water surface | |
JP2001214419A (en) | Method for setting up ocean stricture using caisson | |
KR100408132B1 (en) | Method of construction for the lower part reinforcement of well open cassion in hard ground. | |
HU187453B (en) | Apparatus for stabilizing against floating up construction being under water table, particularly reinforced concrete engineering structure and method for producing the structure | |
GB2132668A (en) | Concrete pile installing method |