JPH0322514B2 - - Google Patents

Info

Publication number
JPH0322514B2
JPH0322514B2 JP23888783A JP23888783A JPH0322514B2 JP H0322514 B2 JPH0322514 B2 JP H0322514B2 JP 23888783 A JP23888783 A JP 23888783A JP 23888783 A JP23888783 A JP 23888783A JP H0322514 B2 JPH0322514 B2 JP H0322514B2
Authority
JP
Japan
Prior art keywords
chimney
post
lifting device
crane
wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP23888783A
Other languages
Japanese (ja)
Other versions
JPS60133172A (en
Inventor
Giichi Uehara
Takayoshi Nakai
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP23888783A priority Critical patent/JPS60133172A/en
Publication of JPS60133172A publication Critical patent/JPS60133172A/en
Publication of JPH0322514B2 publication Critical patent/JPH0322514B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】 本発明は煙突頂部の建付工法に係るものであ
る。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a construction method for erecting the top of a chimney.

鉄塔上部から直ちに集煙部だけ突出するように
構成された従来の鉄塔型煙突では、ポストクレン
によつて筒身用の集煙部材を吊上げ、鉄塔上部に
一旦仮置きし、ポストクレンを解体して取外した
のち、筒身上に集煙部の建付けを行なつてきた。
In conventional tower-type chimneys, which are configured so that only the smoke collection part immediately protrudes from the top of the tower, the smoke collection member for the barrel is lifted up by a post crane, temporarily placed at the top of the tower, and then the post crane is dismantled. After removing it, a smoke collection section was installed on top of the cylinder.

本発明は鉄塔上部からの筒身の突出高さが大き
く、鉄塔頂部に集煙部材を仮置きする場所もな
く、前記従来の工法が適用できない場合に好適な
煙突頂部の建付工法を提供することを目的として
提案されたもので、煙突頂部最終部材の建付に際
し、煙突頂部に配設されたポストクレンのポスト
頂部と地上部との間にケーブルワイヤによる吊上
装置を架設し、同吊上装置によつて前記ポストク
レンのブームを取外して吊降し、次いで前記吊上
装置によつて煙突頂部最終部材を煙突頂部に吊上
げ建付し、前記ポストクレンのポストを筒身内を
通して吊降すことを特徴とする煙突頂部の建付工
法に係るものである。
The present invention provides a construction method for erecting the top of a chimney, which is suitable for cases where the protruding height of the cylinder from the top of the steel tower is large and there is no place to temporarily place a smoke collection member at the top of the steel tower, so that the conventional construction method cannot be applied. This was proposed for the purpose of erecting the final chimney top member, by installing a cable wire lifting device between the top of the post crane installed at the top of the chimney and the above ground. The boom of the post crane is removed and suspended by the upper device, then the final chimney top member is hoisted to the top of the chimney by the lifting device, and the post of the post crane is suspended through the inside of the cylinder. This relates to a method of erecting the top of a chimney, which is characterized by the following.

本発明においては前記したように、煙突頂部最
終部材の建付に際し、煙突頂部に配設されたポス
トクレンのポスト頂部と地上部との間に、ケーブ
ルワイヤによる吊上装置を架設し、同吊上装置に
よつて前記ポストクレンのブームを取外して吊降
したのち、同吊上装置によつて煙突頂部最終部材
を煙突頂部に吊上げて所定位置に建付け、次いで
前記吊上装置によつてポストクレンのポストを煙
突筒身に吊降して取出すようにしたものであり、
従つて本発明によれば鉄塔上端より上方に筒身が
大きく突出している場合においても、筒身頂部の
廻りに大がかりな難かしい足場組みや、部材置場
を組立てたり解体することなく、安全に能率よく
煙突頂部最終部材の吊上げ、建付けが行なわれる
ものである。
As described above, in the present invention, when the final member of the chimney top is erected, a lifting device using a cable wire is installed between the post top of the post crane installed at the top of the chimney and the ground part. After the boom of the post crane is removed and suspended by the upper device, the final member of the chimney top is hoisted to the top of the chimney by the same lifting device and erected in a predetermined position, and then the post crane is lifted by the lifting device. The crane post is suspended from the chimney barrel and taken out.
Therefore, according to the present invention, even when the barrel protrudes significantly above the top of the steel tower, it can be safely and efficiently done without requiring large-scale and difficult scaffolding around the top of the barrel or assembling or dismantling a parts storage area. The final part of the chimney top is often lifted and erected.

以下本発明を図示の実施例について説明する。 The present invention will be described below with reference to the illustrated embodiments.

1,2は夫々周知の工法で建付けられた鉄塔及
び同鉄塔1より上方に大きく突出する煙突筒身、
3は筒身頂部に架設されたポストクレンのポスト
で、同ポスト3から地上のアンカー4までワイヤ
ケーブル5が張設され、同ワイヤケーブル5にキ
ヤリヤー6が取付けられる。キヤリヤー6の上下
には夫々吊上ワイヤ7及び荷吊ワイヤ8が接続さ
れ、吊上ワイヤ7は前記ポスト3及び筒身2下部
に配設された案内滑車9,10並にアンカー4に
配設され案内滑車11を経由してウインチ12に
接続され、荷吊ワイヤ8はアンカー4に配設され
た案内滑車13を経由して前記ウインチ12に接
続され、同ウインチ12の操作によつてキヤリヤ
ー6がワイヤケーブル5に沿つて昇降するように
なつている。なお前記各ワイヤ5,7,8キヤリ
ヤー6、各案内滑車9,10,11,13及びウ
インチ12が前記したケーブルワイヤによる吊上
装置を構成するものである。
1 and 2 are a steel tower built using a well-known construction method, and a chimney barrel that protrudes significantly upwards from the steel tower 1.
Reference numeral 3 denotes a post of a post crane installed on the top of the cylinder, a wire cable 5 is stretched from the post 3 to an anchor 4 on the ground, and a carrier 6 is attached to the wire cable 5. A lifting wire 7 and a load lifting wire 8 are connected to the upper and lower ends of the carrier 6, respectively, and the lifting wire 7 is connected to the guide pulleys 9 and 10 provided at the bottom of the post 3 and the barrel 2, as well as to the anchor 4. The load lifting wire 8 is connected to the winch 12 via a guide pulley 11 disposed on the anchor 4, and by operating the winch 12, the carrier 6 is is adapted to rise and fall along the wire cable 5. The wires 5, 7, 8, the carrier 6, the guide pulleys 9, 10, 11, 13, and the winch 12 constitute the cable wire lifting device described above.

而して前記吊上装置を利用してポストクレンの
ブームを吊下ろしたのち、(図面はこの段階の状
態を示す)集煙部材14を荷吊ワイヤ8に玉掛け
し、ウインチ12を操作して吊上ワイヤ7でキヤ
リヤー6をワイヤケーブル5に沿つて吊上げ、筒
身2上のポスト3の廻りの定位置に建付ける。
After lowering the boom of the post crane using the lifting device, the smoke collection member 14 (the figure shows the state at this stage) is hung on the load lifting wire 8, and the winch 12 is operated. The carrier 6 is lifted up along the wire cable 5 by the lifting wire 7 and is erected at a fixed position around the post 3 on the cylinder body 2.

次いで前記吊上げ装置を取外すとともに、ポス
ト3を筒身2内に吊下ろし、分解して外部に取出
す。
Next, the lifting device is removed, and the post 3 is suspended into the barrel 2, disassembled, and taken out.

このように図示の実施例によれば、鉄塔1の上
端より筒身2が大きく突出している場合でも、筒
身2頂部の廻りに大がかりな足場や部材置場を配
設することなく、安全且つ能率的に集煙部材14
の吊上げ、建付けが行なわれるものである。
In this way, according to the illustrated embodiment, even if the cylinder body 2 largely protrudes from the top end of the steel tower 1, there is no need to arrange large-scale scaffolding or parts storage around the top of the cylinder body 2, and the construction can be carried out safely and efficiently. smoke collection member 14
This involves hoisting and erecting.

以上本発明を実施例について説明したが、本発
明は勿論このような実施例にだけ局限されるもの
ではなく、本発明の精神を逸脱しない範囲内で
種々の設計の改変を施しうるものである。
Although the present invention has been described above with reference to embodiments, the present invention is, of course, not limited to such embodiments, and can be modified in various ways without departing from the spirit of the present invention. .

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明に係る煙突頂部の建付工法の一実
施例の実施状況を示す側面図である。 1……鉄塔、2……筒身、3……ポスト、4…
…アンカー、5……ワイヤケーブル、6……キヤ
リアー、7……吊上ワイヤ、8……荷吊ワイヤ、
9,10,11……案内滑車、12……ウイン
チ、13……案内滑車、14……集煙部材。
The drawing is a side view showing the implementation status of one embodiment of the chimney top construction method according to the present invention. 1... Steel tower, 2... Tube, 3... Post, 4...
... Anchor, 5 ... Wire cable, 6 ... Carrier, 7 ... Lifting wire, 8 ... Load lifting wire,
9, 10, 11... Guide pulley, 12... Winch, 13... Guide pulley, 14... Smoke collecting member.

Claims (1)

【特許請求の範囲】[Claims] 1 煙突頂部最終部材の建付に際し、煙突頂部に
配設されたポストクレンのポスト頂部と地上部と
の間にケーブルワイヤによる吊上装置を架設し、
同吊上装置によつて前記ポストクレンのブームを
取外して吊降し、次いで前記吊上装置によつて煙
突頂部最終部材を煙突頂部に吊上げ建付けし、前
記ポストクレンのポストを筒身内を通して吊降す
ことを特徴とする煙突頂部の建付工法。
1. When erecting the final chimney top member, a cable wire lifting device is installed between the top of the post crane installed at the top of the chimney and the above ground.
The boom of the post crane is removed and suspended by the same lifting device, and then the final chimney top member is lifted and erected at the top of the chimney by the lifting device, and the post of the post crane is suspended through the inside of the cylinder. A construction method for the top of a chimney that is characterized by a drop.
JP23888783A 1983-12-20 1983-12-20 Building method of chimeny top part Granted JPS60133172A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23888783A JPS60133172A (en) 1983-12-20 1983-12-20 Building method of chimeny top part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23888783A JPS60133172A (en) 1983-12-20 1983-12-20 Building method of chimeny top part

Publications (2)

Publication Number Publication Date
JPS60133172A JPS60133172A (en) 1985-07-16
JPH0322514B2 true JPH0322514B2 (en) 1991-03-27

Family

ID=17036736

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23888783A Granted JPS60133172A (en) 1983-12-20 1983-12-20 Building method of chimeny top part

Country Status (1)

Country Link
JP (1) JPS60133172A (en)

Also Published As

Publication number Publication date
JPS60133172A (en) 1985-07-16

Similar Documents

Publication Publication Date Title
JPH0322514B2 (en)
JPH10205429A (en) Construction method for wind power generator
JPH06323503A (en) Assembling method for large size suspension type boiler
JP2879316B2 (en) Pole for building pole
GB2115368A (en) A method of raising a transmission pole or lighting mast
JPH05286694A (en) Construction method and crane for assembling external type steel tower
RU2101445C1 (en) Smoke stack and method of its erection
JPH0718743A (en) Construction method for large span domelike roof
JPH11336328A (en) Hanging guide for pipe
JPH0729138Y2 (en) Scaffold for dismantling tower-like structures
JPH049793Y2 (en)
JPS58117806A (en) Scaffolding device for work in blast furnace
JPH0321777A (en) Construction method of iron-frame pillar
SU836329A1 (en) Method of erecting a cylindrical structure
KR890000742B1 (en) Method of self climbing for post crane
JPS60144460A (en) Scaffold apparatus and its installation
JPS5852187A (en) Jib crane
JPH1037527A (en) Method for constructing inner and outer cylinder of chimney simultaneously
JPH05508Y2 (en)
JPS6152308B2 (en)
JPS5841160A (en) Method and apparatus for preventing pain scattering in painting work of high chimney
JPS5928713B2 (en) How to build a steel tower
JPH0348110B2 (en)
JPS6128680A (en) Rising construction method of transmission iron tower
JPS63130867A (en) Fear reducing method in high place work