JPH03161641A - Construction of reinforced concrete building - Google Patents

Construction of reinforced concrete building

Info

Publication number
JPH03161641A
JPH03161641A JP29877789A JP29877789A JPH03161641A JP H03161641 A JPH03161641 A JP H03161641A JP 29877789 A JP29877789 A JP 29877789A JP 29877789 A JP29877789 A JP 29877789A JP H03161641 A JPH03161641 A JP H03161641A
Authority
JP
Japan
Prior art keywords
reinforcements
slab
pca
forms
boards
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP29877789A
Other languages
Japanese (ja)
Other versions
JP2722121B2 (en
Inventor
Norie Yukimura
幸村 憲衛
Shuichi Ueno
修一 植野
Chihiro Kato
千博 加藤
Shunzo Saito
斉藤 駿三
Noriaki Kimura
木村 典明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP29877789A priority Critical patent/JP2722121B2/en
Publication of JPH03161641A publication Critical patent/JPH03161641A/en
Application granted granted Critical
Publication of JP2722121B2 publication Critical patent/JP2722121B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

PURPOSE:To shorten term of works and to improve efficiency in execution of work by erecting temporary supports that are to be left in place of the underside of beam reinforcements in the span direction, and by installing PCa boards or slab half PCa boards to brackets that are provided to the temporary supports. CONSTITUTION:A frame 3 is assembled and installed to the upper part of a temporary support 2, and top reinforcements 1a and bottom reinforcements 1b for reinforcements 1 for a prefabricated beam are fixed to the upper and the lower parts of the frame. Brackets 4 provided to the support 2 are made to sustain half PCa boards 7, and forms 9 for the beam and forms 10 for a wall are fabricated and attached to both sides of the support 2. Half PCa boards 11 are set on timberings 6 for corridors or the like and column reinforcements 12 for the upper story are added by press- connection. On the upper side of the half PCa boards 7, the column reinforcements 12 are surrounded with half PCa boards 13 and forms 19 are attached round wall PCa members 14. Slab reinforcements are then arranged on the upper face of the half PCa boards 7 and concrete 20 is cast in place to the inside of the beam forms 9, the wall forms 10 and the half PCa forms 13 for the columns, making the concrete integral.

Description

【発明の詳細な説明】 [産業上の利用分野1 本発明は、特にスラブPCa板やスラブ半PCa板を使
用した鉄筋コンクリート造建築物の構築工法に関するも
のである。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field 1] The present invention particularly relates to a construction method for a reinforced concrete building using a slab PCa board or a half-slab PCa board.

[vt米の1支術1 従米、スラブ半PCa板を使用した鉄筋コンクリート造
建築物の構築工法としては、戸境壁等の垂直部材を現場
打ちする場合には、スラブ半Pca板を型材の上に載せ
て、スラブ、梁及び壁を一体にコンクリート打設してい
た。
[Vt rice 1 branch technique 1] As a construction method for reinforced concrete buildings using slab half PCa board, when vertical members such as door boundary walls are cast on site, slab half PCa board is placed on top of the form material. The slab, beams, and walls were poured in concrete.

[発明が解決しようとする課題] しかしながら、上記従米の工法では、柱・梁・壁の型枠
を組み立てた後に入ラブPCa板を取り付けるので、床
上作業が下階の作業後になってしまい、その間鉄筋工が
作業待ち状態となって工期が長くなるという問題点があ
った。
[Problem to be solved by the invention] However, in the above-mentioned construction method, the Irub PCa board is installed after assembling formwork for columns, beams, and walls, so work on the floor is done after work on the lower floor, and during that time There was a problem in that the reinforcing bar workers had to wait for work, prolonging the construction period.

本発明は、上記従米の問題点を解決するためになされた
もので、その目的とするところは、上階の鉄筋組立作業
と下階の型枠工事を並行して行い、工期を短縮すること
がでさるばかりでなく、施工性を向上せしめることので
きる鉄筋コンクリート造建築物の構築工法を提供するこ
とにある.[課題を解決するための手段] 本発明の鉄筋コンクリート造建築物の構築工法は、スパ
ン方向の梁鉄筋下に埋殺し用の仮設支柱を建て込み、該
仮設支柱に付設したブラケットにスラブPCa板または
スラブ半Pct板を架設することを特徴とするものであ
る。
The present invention was made in order to solve the above-mentioned problem of laziness, and its purpose is to shorten the construction period by performing reinforcing bar assembly work on the upper floor and formwork work on the lower floor in parallel. The purpose of this invention is to provide a construction method for reinforced concrete buildings that not only improves construction efficiency but also improves workability. [Means for Solving the Problems] The method of constructing a reinforced concrete building of the present invention is to erect a temporary support for burying under the beam reinforcing bars in the span direction, and attach a slab PCa board or a bracket attached to the temporary support. It is characterized by constructing a half-slab Pct board.

[実施例1 以下、本発明の一実施例について図面を参照しながら説
明する, tJIhl図において、1はスパン方向に取り付けたプ
レハブ梁鉄筋であって、その下に仮設支柱2を建て込ん
で、プレハブ梁鉄筋1の撓みを防止する.該仮設支柱2
は戸境壁内に配列されていて、壁内に埋め殺しとなる.
該仮設支柱2によるプレノ)ブ果鉄筋1の支持l4mの
詳細を、第IA図に示す。
[Example 1] Hereinafter, an example of the present invention will be described with reference to the drawings. Prevent the deflection of prefabricated beam reinforcing bars 1. The temporary support 2
are arranged within the wall between the doors, and are buried within the wall.
Details of the support 14m of the planar reinforcing bars 1 by the temporary struts 2 are shown in FIG. IA.

該図において、上記仮設支柱2の上部に山型w4等によ
りフレーム3を枠組みして取り付け、該7レーム3の上
下部に上記プレハブ梁鉄筋1の上端筋1aおよび下端筋
1bを固着している.上記7レーム3の側部にはブラケ
ット4が付Bされていて、後述するスラブ半PCa板を
受けるようになっている.尚、L記仮設支柱2の基81
S2 aはスラブコンクリート内に定着されている. プレハブ梁鉄筋1の取り付けが完了したら、第2図に示
す上うに、上記仮設支柱2が配列されている戸境璧鉄筋
5の配筋を行う。また、必要に応じて廊下部分およびバ
ルコニ一部分にスラブ支保工6を仮設する. 次に、第3図に示すように、スラブ半PCa板7を架設
する.この架設作業は、第3A図に示すように、スラブ
半PCa板7の端部を上記仮設支柱2のブラケット4に
受けさせて行う.尚、該仮設支柱2はスラブ半PCa板
の荷重のみを受けるようになっていて、場所打ちコンク
リートを打設する際には、スラブ半PCa板7の下にサ
ポート8を設置して支保する. スラブ半PCa板7の架設が完了すると、その下側では
、上記プレハブ梁鉄筋1および仮設支柱2の両側に梁型
枠9および壁型枠10の組付け作業を行う(tpJ3A
図参照).また、tjIJ3図に示すように、廊下部分
およびバルコニ一部分の支保工6上に半PCa板11を
セットする.更に、上階用の柱筋12を圧接して継ぎ足
す. また、架設したスラブ半PCa板7の上側では、14図
に示すように、上記圧接した柱筋12の周囲に柱半PC
a型枠13および壁PCa部材14を組み付ける.第4
A図および154B図に、その組付けの詳細を示すよう
に、建込調整ボルト15により柱牛PCa型神13の建
て込み状態を調整すると共に、レベルII4整ボルト1
6により柱の高さをiIIl整する.また、柱牛PCa
型枠13と壁PCag材14の組付け部分には建て入り
調整ボルト17により調整しながら組付け固定する。尚
、第4B図に示す上うに、上記柱半PCa型枠13に開
口部13aをあけることで、スパン方向の戸境壁を場所
打ちコンクリートで一体化する。
In the figure, a frame 3 is attached to the upper part of the temporary support 2 using a chevron-shaped w4 or the like, and the upper and lower reinforcements 1a and 1b of the prefabricated beam reinforcing bars 1 are fixed to the upper and lower parts of the seven frames 3, respectively. .. A bracket 4 is attached to the side of the seven frames 3, and is adapted to receive a slab half PCa plate to be described later. In addition, the base 81 of the temporary support column 2
S2 a is anchored in slab concrete. When the installation of the prefabricated beam reinforcing bars 1 is completed, the reinforcing bars 5 for the door boundary wall on which the temporary supports 2 are arranged are arranged as shown in FIG. In addition, temporary slab supports 6 will be installed in the hallway and balcony areas as necessary. Next, as shown in Fig. 3, a half-slab PCa board 7 is constructed. This erection work is carried out by receiving the end of the half-slab PCa board 7 on the bracket 4 of the temporary support 2, as shown in FIG. 3A. The temporary support 2 is designed to receive only the load of the half-slab PCa board, and when pouring concrete is placed, a support 8 is installed under the half-slab PCa board 7 for support. When the erection of the slab half-PCa board 7 is completed, below it, the beam formwork 9 and wall formwork 10 are assembled on both sides of the prefabricated beam reinforcing bars 1 and temporary supports 2 (tpJ3A
(see figure). Also, as shown in Figure tjIJ3, a half-PCa board 11 is set on the support 6 of the hallway and part of the balcony. Furthermore, add the column reinforcements 12 for the upper floor by applying pressure. Moreover, on the upper side of the constructed slab half-PCa board 7, as shown in FIG.
Assemble formwork 13 and wall PCa member 14. Fourth
As shown in Figures A and 154B in detail, the installation state of the pillar PCa type 13 is adjusted using the installation adjustment bolt 15, and the level II 4 adjustment bolt 1 is adjusted.
Adjust the height of the pillar by step 6. Also, the pillar cow PCa
The formwork 13 and the wall PCag material 14 are assembled and fixed while being adjusted using built-in adjustment bolts 17 at the assembly portion. As shown in FIG. 4B, openings 13a are formed in the half-column PCa formwork 13 to integrate the door boundary wall in the span direction with cast-in-place concrete.

さらに、桁行方向の梁鉄筋18の周囲に梁型枠19を組
み付ける. 次に、第5図に示すように、上階のプレl)ブ梁鉄筋1
を取り付けると共に、仮設支柱2により支持せしめ、上
記スラブ半PCa板7の上面にスラブ配筋を行うと共に
、該スラブ半PCa板7上、梁型枠9内、壁型枠10内
および柱牛PCa型枠13内等に場所打ちコンクリート
20を同時に一体打ちする(第6図). 尚、上記実施例ではスラブ半PCa板を架設するように
したが、本発明は、これに限定するものではなく、スラ
ブPCa板であってもよい.[発明の効果J (1)スラブPCa板を梁・柱・壁等の型枠作業前に敷
き込むため、スラブPCa板の上階における柱・5!P
Ca8lS材の取り付け作業や鉄筋組立作業と、下階で
の梁・壁等の型枠作業を同時に行うことができる. (2)スラブPCa板の敷き込みが先行するため、下階
での型枠組立作業が雨天でも可能である.(3)スパン
方向の梁下に入れる仮設支柱は、スラブPCalを支え
ると共にプレハブ梁鉄筋の撓み防止にも役立つ. また、仮設支柱を設けることにより、支保工が少なくな
り、桁行方向、スパン方向の型枠作業の際に従米通りの
施工性が確保できる。
Furthermore, a beam formwork 19 is assembled around the beam reinforcing bars 18 in the beam direction. Next, as shown in Figure 5,
At the same time, it is supported by temporary supports 2, and slab reinforcement is placed on the upper surface of the slab half PCa board 7, and on the slab half PCa board 7, inside the beam form 9, inside the wall form 10, and on the column PCa. Cast-in-place concrete 20 is simultaneously poured into the formwork 13, etc. (Fig. 6). In the above embodiment, a half-slab PCa board was constructed, but the present invention is not limited to this, and a slab PCa board may also be used. [Effect of the invention J (1) In order to lay the slab PCa board before formwork work for beams, columns, walls, etc., the pillars on the upper floor of the slab PCa board 5! P
It is possible to install Ca8lS materials, assemble reinforcing bars, and formwork for beams, walls, etc. on the lower floor at the same time. (2) Because the slab PCa board is laid in advance, formwork assembly work on the lower floor can be done even in rainy weather. (3) Temporary supports placed under the beams in the span direction not only support the slab PCal but also help prevent the prefabricated beam reinforcing bars from deflecting. In addition, by providing temporary supports, the amount of supporting work is reduced, and workability can be ensured as required during formwork work in the girder direction and span direction.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は仮設支柱による梁プレハブ鉄筋の架設状態を示
す施工説明図、第IA図は仮設支柱による梁プレハブ鉄
筋の取り付けの詳細図、@2図は壁配筋図、第3図はス
ラブ半PCa板の架設等を示す施工説明図、@3A図は
その架設状態の詳細図、第4図は柱PCa部材等の取付
け施工説明図、第4A図は柱PCa部材の取付け詳細図
、第4B図はi94A図B−Bに沿った断而図、第5図
は上階の梁プレハブ鉄篩の架設状態の施工説明閃、第6
図は場所打ちコンクリートの施工説明図である.】・・
梁プレハブ鉄筋、1a ・t−.端筋、I b・・下端
筋、2・・仮設支IL、2a・・・基部、3・・・7レ
ーム、4 ・ブラケ/F、5・・・戸境壁鉄筋、6 ス
ラブ支保工、7・・・スラブj P C a板、8・・
・サポート、9・・・梁ヘリ枠、10・−・壁型枠、1
1・・半PCa板、12・柱筋、13・・柱半PCaへ
11枠、+3a・=開[1部、14−壁1)C a部村
、l5・・・建込調整ボルト、16・・・レベル調整ボ
ルト、I7・・・建て入り調整ボルト、18・・・梁鉄
筋、19・・梁型枠、20・・・場所打ちコンクリート
Figure 1 is a construction explanatory drawing showing the state of erection of prefabricated beam reinforcing bars using temporary supports, Figure IA is a detailed view of the installation of prefabricated beam reinforcing bars using temporary supports, Figure @2 is a wall reinforcement diagram, and Figure 3 is a half-slab. A construction explanatory diagram showing the erection of PCa boards, etc., Figure @3A is a detailed diagram of the erection state, Figure 4 is an explanatory diagram of installation of column PCa members, etc., Figure 4A is a detailed diagram of installation of column PCa members, and Figure 4B The figure is a cutting diagram along the I94A diagram B-B, Figure 5 is a construction explanation of the prefabricated iron sieve beam on the upper floor, and Figure 6 is
The figure is an explanatory diagram of pour-in-place concrete construction. ]・・
Beam prefabricated reinforcing bars, 1a/t-. End reinforcement, I b... Lower end reinforcement, 2... Temporary support IL, 2a... Base, 3... 7 frame, 4 - Bracket/F, 5... Door boundary wall reinforcement, 6 Slab support, 7... Slab j P C a board, 8...
・Support, 9...Beam edge frame, 10...Wall formwork, 1
1. Half PCa board, 12. Column reinforcement, 13. 11 frames to column half PCa, +3a. = Open [1 part, 14-wall 1) C a part village, l5... Erecting adjustment bolt, 16 ... Level adjustment bolt, I7 ... Construction adjustment bolt, 18 ... Beam reinforcement, 19 ... Beam formwork, 20 ... Cast-in-place concrete.

Claims (1)

【特許請求の範囲】[Claims] スパン方向の梁鉄筋下に埋殺し用の仮設支柱を建て込み
、該仮設支柱に付設したブラケットにスラブPC_a板
またはスラブ半PC_a板を架設することを特徴とする
鉄筋コンクリート造建築物の構築工法。
A construction method for a reinforced concrete building characterized by erecting a temporary support for burying under the beam reinforcing bars in the span direction, and erecting a slab PC_a plate or a slab half PC_a plate on a bracket attached to the temporary support.
JP29877789A 1989-11-18 1989-11-18 Construction method of reinforced concrete building Expired - Fee Related JP2722121B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP29877789A JP2722121B2 (en) 1989-11-18 1989-11-18 Construction method of reinforced concrete building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP29877789A JP2722121B2 (en) 1989-11-18 1989-11-18 Construction method of reinforced concrete building

Publications (2)

Publication Number Publication Date
JPH03161641A true JPH03161641A (en) 1991-07-11
JP2722121B2 JP2722121B2 (en) 1998-03-04

Family

ID=17864082

Family Applications (1)

Application Number Title Priority Date Filing Date
JP29877789A Expired - Fee Related JP2722121B2 (en) 1989-11-18 1989-11-18 Construction method of reinforced concrete building

Country Status (1)

Country Link
JP (1) JP2722121B2 (en)

Also Published As

Publication number Publication date
JP2722121B2 (en) 1998-03-04

Similar Documents

Publication Publication Date Title
US7219474B2 (en) Load bearing building panel
JP2915897B1 (en) Building construction method
JPH03161641A (en) Construction of reinforced concrete building
RU2206673C2 (en) Process of erection of monolithic frames
JP2577973B2 (en) How to build a building with a basement
JP2780055B2 (en) Construction method of reinforced concrete building
KR102372473B1 (en) Constuction Structure for Joint of PC-Colunm and PC-Girder Using Temporay Bracket
RU99118847A (en) METHOD FOR ESTABLISHING MONOLITHIC FRAMES
JP2784450B2 (en) Reinforced concrete foundation
JP2745238B2 (en) Temporary support for slab half PCa board erection
JP2002364139A (en) Steel stair mounting hardware, mounting device and mounting method
JP2724891B2 (en) Construction method of pillar half PCa formwork
JP3086384B2 (en) Foundation structure and foundation construction method
RU2052052C1 (en) Method for installing floors in many-storied blocks of flats by lifting
AU2002234421B2 (en) A load bearing building panel
JP2759360B2 (en) Construction method of reinforced concrete building
JPH04128430A (en) Concrete foundation
SU1638277A1 (en) Building
JPH1181679A (en) Construction for building
JPH0261238A (en) Steel plate concrete method
JP2715162B2 (en) Reinforcement method for joints between piles and foundations
JPH08177068A (en) Construction of underground structure
JP2001032376A (en) Floor slab frame and construction method for skeleton
JPH0333327A (en) Structure for continuous footing
JPH0715177B2 (en) How to build a reinforced concrete structure

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081128

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees