JPH04128430A - concrete foundation - Google Patents

concrete foundation

Info

Publication number
JPH04128430A
JPH04128430A JP25123390A JP25123390A JPH04128430A JP H04128430 A JPH04128430 A JP H04128430A JP 25123390 A JP25123390 A JP 25123390A JP 25123390 A JP25123390 A JP 25123390A JP H04128430 A JPH04128430 A JP H04128430A
Authority
JP
Japan
Prior art keywords
foundation
concrete
steel
anchor bolt
footing beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP25123390A
Other languages
Japanese (ja)
Other versions
JP2860501B2 (en
Inventor
Masakazu Tsukada
雅一 塚田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP25123390A priority Critical patent/JP2860501B2/en
Publication of JPH04128430A publication Critical patent/JPH04128430A/en
Application granted granted Critical
Publication of JP2860501B2 publication Critical patent/JP2860501B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PURPOSE:To improve the strength of the foundation by burying an anchor bolt in the upper end of a steel framed concrete footing beam made of I-type steel, and while fixing a framework member such as a pillar or the like to the footing beam with the anchor belt. CONSTITUTION:Foundation of a prefabricated house or the like is constructed with steel framed concrete footing beam, which is obtained by arranging reinforcements in surrounding of an I-type steel 1, and while an anchor bolt 9 connected to a flange of the I-type steel 1 is buried in the upper end of the footing beam. A framework member 15 such as a pillar is fixed to the footing beam with the anchor bolt 9. The concrete foundation having the high strength can be thereby obtained.

Description

【発明の詳細な説明】 産業上の利用分野 この発明は、コンクリート基礎であって特に鉄骨製の基
礎梁を用いたものに関する。
DETAILED DESCRIPTION OF THE INVENTION Field of the Invention This invention relates to concrete foundations, particularly those using steel foundation beams.

従来の技術 従来、現場施工の湿式1法によって構築されるプレハブ
住宅等の基礎においては、配筋をし更にコンクリートを
打設する際に予め基礎上方に突出するアンカーボルトを
設置しておき、コンクリート硬化後にこのアンカーボル
トへ柱等の軸組を固定することが行われている。
Conventional technology In the past, for the foundations of prefabricated houses, etc. constructed using the wet method of on-site construction, anchor bolts protruding above the foundation were installed in advance when reinforcing was arranged and concrete was poured. After hardening, a frame such as a column is fixed to the anchor bolt.

発明が解決しようとする課題 上記従来のコンクリート基礎において、アンカボルトは
コンクリートの打設前に型枠等へ取り付けるなどによっ
て設置されるが、その位置精度が正確になされていない
と柱等の取イ1が不可能となる。しかしながら、このア
ンカーボルトを精度良く設置することはきわめて困難で
、また、コンクリートの打設の際に狂い易く、コンクリ
ート硬化後に台直しと称する修正作業が必要となり、ア
ンカーボルドー本−木に付いてかかる作業を行うとそれ
だけ作業期間が長くなり、かつ、コス)・も高くなる欠
点があった。
Problems to be Solved by the Invention In the above-mentioned conventional concrete foundation, anchor bolts are installed by attaching them to formwork etc. before pouring concrete, but if the positioning accuracy is not accurate, the removal of columns etc. 1 becomes impossible. However, it is extremely difficult to install these anchor bolts accurately, and they tend to go awry during concrete pouring, requiring correction work called resetting after the concrete has hardened, and the anchor bolts become attached to the tree. There was a drawback that the more work was done, the longer the work period and the higher the cost.

この発明は、このような従来の欠点を解消することを目
的としてなされたものである。
The present invention was made with the aim of eliminating such conventional drawbacks.

課題を解決するための手段 上記の課題を解決するため、この発明では、■)型鋼か
らなる鋼製基礎梁をそのフランジが」二下平行となるよ
うにして設置して、この基礎集の上部側のフランジより
一ヒ方にアンカーボルトを突出させ、かつ、この基ff
l梁の周囲に鉄筋を配筋してコンクリートを打設すると
ともに、そのコンクリート上面に突出するアンカーボル
トで同じくコンクリート上面に設置した柱等の骨組材を
固定することを特徴とする。
Means for Solving the Problems In order to solve the above problems, in this invention, ■) a steel foundation beam made of shaped steel is installed so that its flanges are parallel to each other, and the upper part of the foundation beam is The anchor bolt is made to protrude from the side flange to one side, and this base ff
It is characterized by arranging reinforcing bars around the beam and pouring concrete, and anchor bolts protruding from the top of the concrete to fix frame members such as columns that are also set on the top of the concrete.

作   用 上記この発明によれば、アンカーボルトが基礎長手方向
に沿って設置される鋼製の基礎集に取付けられるので、
この基山粱さえ精度良く設置すれば、自ずとアンカーボ
ルトの位置も精度良く設置されることになる。しかも、
基礎集はH型鋼からなるためかなりの重量を有しており
、コンクリド打設時に狂う恐れが少ない。
According to the above invention, the anchor bolt is attached to the steel foundation set installed along the longitudinal direction of the foundation.
If this Kiyama kat is installed accurately, the anchor bolt will naturally be placed accurately as well. Moreover,
Since the foundation collection is made of H-shaped steel, it is quite heavy, so there is little risk of it going awry during concrete pouring.

実施例 第2図は、この発明の基礎梁(1)であって、そのフラ
ンジ(2)(3)が上下平行となるようにして設置され
るl(型鋼からなるものであり、ウェブ(4)の側面に
は、上下のフランジ(2)(3)に跨るようにしてスチ
フナープレート (5)が、長手方向に間隔をおいて複
数個溶接されている。ウェブの端部には、基礎集(1)
を長手方向に接続するだめのボルト穴(6)が形成され
、スチフナープレート (5)には、同じくT字型また
は十字型に接続するだめのボルト穴(7)が形成されて
いる。これらの接続は、接合プレートを介して行われる
。更に、上部側のフランジ(2)には、アンカーボルト
 (9)を取り付けるための取り付は穴(8)が形成さ
れている。アンカーボルト(9)は、その下端をこの取
り付は穴(8)に差し込み、同じくこの下端の雄螺子に
螺合した対のナツト(10)  (10)で、フランジ
(2)の上下両側から締め付は固定するようになってい
る。
Embodiment FIG. 2 shows a foundation beam (1) of the present invention, which is installed so that its flanges (2) and (3) are vertically parallel to each other. ), a plurality of stiffener plates (5) are welded at intervals in the longitudinal direction so as to straddle the upper and lower flanges (2) and (3). (1)
A double bolt hole (6) is formed in the stiffener plate (5) to connect the stiffener plate (5) in the longitudinal direction, and a double bolt hole (7) is formed in the stiffener plate (5) to connect the stiffener plate (5) in a T-shape or a cross shape. These connections are made via junction plates. Further, the upper flange (2) is provided with a hole (8) for attaching an anchor bolt (9). For this installation, insert the lower end of the anchor bolt (9) into the hole (8), and insert it from both the upper and lower sides of the flange (2) with a pair of nuts (10) (10), which are also screwed into the male screws at the lower end. The tightening is designed to be fixed.

第1図は、基礎施工後の状態を示したもので、栗石(1
1)上方に方形ループ上の縦筋(12)を配筋し、更に
、基礎長手方向に配列されたそれら縦筋(12)の各コ
ーナー及び中間部に跨って横主筋(13)を溶接し、こ
の縦筋(12)によって囲まれるスペース内に、基礎長
手方向に沿って前記の基td!梁(1)を配置している
。そして、この基礎梁(1〉の上部フランジ(2)に前
記のようにして取付けられたアンカーボルト (9)が
基礎コンクリート(14)の天端より上方に突出し、こ
のアンカーボルト(9)の」1端に、その基礎天端に設
置した柱(15)の下端の接合プレート(16)がボル
ト固定されている。
Figure 1 shows the state after foundation construction.
1) Arrange vertical reinforcements (12) in a rectangular loop above, and further weld horizontal main reinforcements (13) across each corner and intermediate part of the vertical reinforcements (12) arranged in the longitudinal direction of the base. , in the space surrounded by this vertical reinforcement (12), the base td! along the base longitudinal direction. Beam (1) is placed. The anchor bolt (9) attached to the upper flange (2) of this foundation beam (1) as described above protrudes upward from the top of the foundation concrete (14), and the anchor bolt (9) A joint plate (16) at the lower end of a column (15) installed at the top of the foundation is bolted to one end.

なお、上記基礎の施工方法の例としては、まず、鉄筋(
12)  (13)配筋をして基1iIi!粱(1)の
下面の高さまでコンクリート(14)を打設して、その
天端のレベル出しを行った後、その天端に基礎集(1)
を設置して高さ及び通りの調整をして、再度コンクリー
ト (14)を打設することが考えられる。
In addition, as an example of the construction method of the above-mentioned foundation, first of all, reinforcing steel (
12) (13) Arrange reinforcement and base 1iIi! After pouring concrete (14) to the height of the bottom surface of 粱 (1) and leveling the top of the concrete, the foundation collection (1) is placed on the top of the concrete (14).
It may be possible to install concrete, adjust the height and street, and pour concrete (14) again.

発明の効果 り上のように、この発明によれば、アンカーボルトが基
礎長手方向に沿って設置される鋼製の基礎集に取付けら
れるので、この基礎梁さえ精度良く設置すれば、自ずと
アンカーボルトの位置も精度良く設置されることになる
。しかも、基礎集けH型鋼からなるためかなりの重量を
有しており、コンクリート打設時に狂う恐れが少ない。
Effects of the Invention According to the present invention, the anchor bolts are attached to the steel foundation set installed along the longitudinal direction of the foundation, so if the foundation beam is installed with precision, the anchor bolts will automatically attach. It will also be installed with high accuracy. Furthermore, since it is made of H-shaped steel for the foundation, it is quite heavy, so there is little risk of it going awry during concrete pouring.

更に、基礎コンクリートは、鉄筋と基礎梁によって補強
された鉄骨鉄筋コンクリートとなるので、非常に強度の
高いコンクリート基礎が得られる。
Furthermore, since the foundation concrete is steel reinforced concrete reinforced with reinforcing bars and foundation beams, a very strong concrete foundation can be obtained.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は、この発明の実施例を示す基礎の横断面図、第
2図は、基礎集の要部の斜視図である。 (1)・・・基礎梁、(2)(3)・・・フランジ、(
9)・・・アンカーボルト、(14)・・・基礎コンク
リート(15)・・柱。 特 許出願人 積水ハウス株式会社
FIG. 1 is a cross-sectional view of a foundation showing an embodiment of the present invention, and FIG. 2 is a perspective view of a main part of the foundation collection. (1)...Foundation beam, (2)(3)...Flange, (
9)...Anchor bolt, (14)...Foundation concrete (15)...Column. Patent applicant Sekisui House Co., Ltd.

Claims (1)

【特許請求の範囲】[Claims] H型鋼からなる鋼製基礎梁をそのフランジが上下平行と
なるようにして設置して、この基礎梁の上部側のフラン
ジより上方にアンカーボルトを突出させ、かつ、この基
礎梁の周囲に鉄筋を配筋してコンクリートを打設すると
ともに、そのコンクリート上面に突出するアンカーボル
トで同じくコンクリート上面に設置した柱等の骨組材を
固定することを特徴とするコンクリート基礎。
A steel foundation beam made of H-shaped steel is installed so that its flanges are vertically parallel, and anchor bolts are projected upward from the upper flanges of this foundation beam, and reinforcing bars are installed around this foundation beam. A concrete foundation is characterized by placing reinforcement and pouring concrete, and anchoring bolts protruding from the top of the concrete to secure frame members such as columns that are also set on the top of the concrete.
JP25123390A 1990-09-19 1990-09-19 Concrete foundation Expired - Fee Related JP2860501B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25123390A JP2860501B2 (en) 1990-09-19 1990-09-19 Concrete foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25123390A JP2860501B2 (en) 1990-09-19 1990-09-19 Concrete foundation

Publications (2)

Publication Number Publication Date
JPH04128430A true JPH04128430A (en) 1992-04-28
JP2860501B2 JP2860501B2 (en) 1999-02-24

Family

ID=17219698

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25123390A Expired - Fee Related JP2860501B2 (en) 1990-09-19 1990-09-19 Concrete foundation

Country Status (1)

Country Link
JP (1) JP2860501B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0841897A (en) * 1994-08-03 1996-02-13 Marukami Komuten:Kk Foundation for building and construction method therefor
JP2003321845A (en) * 2002-05-01 2003-11-14 Panahome Corp Reinforcement-steel frame core unit for foundation, and connection structure for the unit
CN104989101A (en) * 2015-05-25 2015-10-21 中国五冶集团有限公司 Discharging platform construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0841897A (en) * 1994-08-03 1996-02-13 Marukami Komuten:Kk Foundation for building and construction method therefor
JP2003321845A (en) * 2002-05-01 2003-11-14 Panahome Corp Reinforcement-steel frame core unit for foundation, and connection structure for the unit
CN104989101A (en) * 2015-05-25 2015-10-21 中国五冶集团有限公司 Discharging platform construction method

Also Published As

Publication number Publication date
JP2860501B2 (en) 1999-02-24

Similar Documents

Publication Publication Date Title
KR100346960B1 (en) An apparatus and method for anchoring steel column to concrete
JPH02164931A (en) Foundation construction method for building
JP3453895B2 (en) How to install anchor bolts on large steel frames
JP2860501B2 (en) Concrete foundation
JP3084654B2 (en) Construction foundation, foundation structure using the same, and construction method thereof
JPH07247557A (en) Foundation, column mold, and underground beam made of precast reinforced concrete
JPH09151463A (en) Column-integrated column base anchoring foundation structire and work execution method therefor
JP2860491B2 (en) Solid foundation using steel frame
JP2813605B2 (en) Construction foundation and construction method
JP2784450B2 (en) Reinforced concrete foundation
JPH0881918A (en) Pipe and construction method thereof
JPS605748B2 (en) Construction method for walls using unit steel formwork
JP3244102U (en) Steel house foundation structure and anchor set used therein
JP2869764B2 (en) Reservoir construction method
JP2614000B2 (en) Basics of steel frame
JP2782111B2 (en) Steel framing construction method
JP2536250Y2 (en) Steel foundation beam
JP2784449B2 (en) Steel reinforced concrete foundation
JP2780055B2 (en) Construction method of reinforced concrete building
JP2775330B2 (en) How to rebuild buildings using steel columns
JPH0492021A (en) Foundation structure of building and construction method thereof
JP2724891B2 (en) Construction method of pillar half PCa formwork
JP2554382B2 (en) Dwelling
JPH08105062A (en) Footing structure and executing method thereof
JPH06220869A (en) Drop-in type steel frame bridge pier and process of construction thereof

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees