JPH02240320A - Construction method of cast-in-place concrete pile - Google Patents
Construction method of cast-in-place concrete pileInfo
- Publication number
- JPH02240320A JPH02240320A JP6073789A JP6073789A JPH02240320A JP H02240320 A JPH02240320 A JP H02240320A JP 6073789 A JP6073789 A JP 6073789A JP 6073789 A JP6073789 A JP 6073789A JP H02240320 A JPH02240320 A JP H02240320A
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- extra
- fill section
- partition cover
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title description 12
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 23
- 238000005192 partition Methods 0.000 claims abstract description 21
- 238000000034 method Methods 0.000 claims description 9
- 230000002787 reinforcement Effects 0.000 abstract description 14
- 239000000428 dust Substances 0.000 abstract description 4
- 239000011248 coating agent Substances 0.000 abstract 4
- 238000000576 coating method Methods 0.000 abstract 4
- 241001669679 Eleotris Species 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は上部構造物の荷重を直接支持し得るような地盤
が地表面下近傍にない場合に、該荷重を支持地盤に伝達
させる現場打ちコンクリート杭の築造工法に関するもの
である。Detailed Description of the Invention (Industrial Field of Application) The present invention provides an on-site construction method for transmitting the load of a superstructure to the supporting ground when there is no ground near the ground surface that can directly support the load of the superstructure. It concerns the construction method of concrete piles.
(従来の技術)
地表面下近傍に上部構造物の荷重を直接支持し得るよう
な地盤がない場合には、支持地盤に到達する杭を地中に
打ち込んで、上記荷重を支持地盤に伝達する杭基礎工法
がある。(Prior art) If there is no ground that can directly support the load of the superstructure near the ground surface, piles that reach the supporting ground are driven into the ground to transfer the load to the supporting ground. There is a pile foundation method.
この杭基礎工法には打撃工法、埋込杭工法、現場打ちコ
ンクリート工法等があるが、近年は、■周辺地盤や近接
構造物への影響及び騒音が少なく、安全確実に施工する
ことができる、■長尺ぐい(50〜60m)および任意
形状の杭の施工が可能である、■残土処理が比較的容易
にできる、というこれら■、■、■等の理由から現場打
ちコンクリート杭工法が頻繁に使用されている。This pile foundation construction method includes hammering construction method, embedded pile construction method, cast-in-place concrete construction method, etc., but in recent years, the following methods have been developed: ■ It is possible to construct long piles (50 to 60 m) and piles of arbitrary shapes, and ■ It is relatively easy to dispose of residual soil. For these reasons, the cast-in-place concrete pile method is frequently used. It is used.
この現場打ちコンクリート杭工法は、地盤に掘削した孔
に鉄筋籠を建込んだ後に、コンクリートを充填し、該コ
ンクリートが硬化した後に、地上に突出した杭頭の余盛
部を、強度上の理由により折り収っていた。This cast-in-place concrete pile construction method involves erecting a reinforcing bar cage into a hole drilled in the ground, filling it with concrete, and after the concrete has hardened, the excess portion of the pile head that protrudes above the ground is removed for strength reasons. The situation had been resolved.
この枕頭の余盛部の切り取りは、静的破砕剤やさく岩槻
等を用いて行っていた。The excess portion of the head of the sleeper was cut out using static crushing agents, drilling tools, etc.
(発明が解決しようとする課題)
しかし、上記枕頭の余盛部の切り取りは、静的破砕剤で
は縦割れが発生してしまい容易に切り取れず、またさく
岩槻では大騒音及び多量の粉塵が発生し周辺環境へ悪影
響等企及ぼすとともに、多大の時間を要するという問題
があった。(Problem to be solved by the invention) However, when cutting out the excess portion of the head of the sleeper, it is not easy to cut out using a static crushing agent because vertical cracks occur, and when drilling iwatsuki, a large amount of noise and a large amount of dust are generated. However, there were problems in that it not only had a negative impact on the surrounding environment, but also took a lot of time.
本発明は上記問題に鑑みてなされたものであり、その目
的は現場打ちコンクリート杭における杭頭の余盛部を騒
音及び粉塵等を発生させずに短時間で、かつ容易に切り
取れる現場打ちコンクリ−I・杭の築造工法を提供する
ことである。The present invention has been made in view of the above-mentioned problems, and its purpose is to provide a cast-in-place concrete pile in which the excess portion of the pile head of a cast-in-place concrete pile can be easily removed in a short time without generating noise or dust. -I. To provide a pile construction method.
(課題を達成するための手段)
以上の課題を達成するための、本発明の手段たる構成は
、余盛部の主筋に被覆カバーが夫々被覆され、かつ該余
盛部下部の主鉄筋内側に開閉自在な仕切カバーが開放さ
れた状態で取り付けられた鉄筋籠を地中に掘削された孔
に建込み、核化にコンクリートを充填した後、ただちに
前記仕切刃バーをコンクリート中で閉塞して杭本体と余
盛部とを絶縁することを特徴とする現場打ちコンクリー
ト杭の築造工法に存する。(Means for Achieving the Object) In order to achieve the above object, the structure of the present invention is such that the main reinforcing bars of the reinforcement section are each covered with a covering cover, and the main reinforcing bars at the bottom of the reinforcement section are covered with covers. A reinforcing bar cage with a partition cover that can be opened and closed is installed in a hole drilled underground, and the core is filled with concrete, and then the partition blade bar is immediately closed in concrete and piled. This invention consists in a construction method for cast-in-place concrete piles, which is characterized by insulating the main body and the extra heap.
(作用)
而して上記構成によれば、被覆カバーにより余盛部と主
鉄筋は分離されるとともに、仕切カバーにより杭本体と
余盛部とが分離されているので、該余盛部は杭から容易
に切り収ることができる。(Function) According to the above configuration, the extra layer and the main reinforcement are separated by the covering cover, and the pile main body and the extra layer are separated by the partition cover, so the extra layer is separated from the main reinforcing bar by the partition cover. It can be easily cut off from
(実施例)
以下、本発明の現場打ちコンクリート杭の築造工法の一
実施例を図面に基づいて説明する。(Example) Hereinafter, an example of the method for constructing cast-in-place concrete piles of the present invention will be described based on the drawings.
第1図〜第5図は現場打ちコンクリ−1〜杭Aの工程図
を示したものであり、先ず初めに第1図に示すように、
地中に孔mを掘削するとともに、核化mに鉄筋n1を建
込む。Figures 1 to 5 show the process diagrams for cast-in-place concrete 1 to pile A. First, as shown in Figure 1,
A hole m is excavated underground, and reinforcing bars n1 are erected in the core m.
該鉄筋filは複数の主筋2と、これち主筋2の外側適
宜間隔をもってに配筋した帯筋2aとにより構成され、
上部の余盛部3の各主筋2には被覆カバー4が被覆され
、該余盛部3の各主筋2下端の内側には仕切カバー5が
収り付けられている。The reinforcing bars fil are composed of a plurality of main reinforcing bars 2 and tie bars 2a arranged at appropriate intervals outside the main reinforcing bars 2,
Each main reinforcement 2 of the upper reinforcement section 3 is covered with a cover 4, and a partition cover 5 is housed inside the lower end of each main reinforcement 2 of the upper reinforcement section 3.
また前記余盛部3の主筋2と孔mとの間にスペーサが介
在されている。Further, a spacer is interposed between the main reinforcement 2 of the extra portion 3 and the hole m.
仕切カバー5は開閉自在な開口部5aを備えな軟性合成
樹脂製の半円形又は三日月形のシートであり、外周部が
前記主筋2に固定されるとともに、前記開口部5aが開
いた状態で鉄筋f!1の内面に容易に切れる掛は紐5b
等で取り付けられている。また、該開口部5aの上端に
は開口部5aを閉塞するための引紐6が備えられ、その
引紐6の引手部6aは帯筋2aの外側を通って余盛部3
の主筋2の上端に係止されている。The partition cover 5 is a semicircular or crescent-shaped sheet made of soft synthetic resin with an opening 5a that can be opened and closed, and the outer periphery is fixed to the main reinforcing bars 2, and the reinforcing bars are attached with the opening 5a open. f! The string that can be easily cut on the inner surface of 1 is string 5b.
It is attached with etc. Further, a drawstring 6 for closing the opening 5a is provided at the upper end of the opening 5a, and a pull portion 6a of the drawstring 6 passes through the outside of the strap 2a and connects to the excess portion 3.
It is locked to the upper end of the main reinforcement 2.
上記仕切カバー5は防水性に優れたシートであれは上記
のものに限られない。The partition cover 5 is not limited to the one described above as long as it is a sheet with excellent waterproof properties.
次に第2図に示すように、前記鉄筋n1が建込まれた孔
mにトレミー管下によりコンクリートnが注入されて杭
本体が1aが形成される。Next, as shown in FIG. 2, concrete n is injected into the hole m in which the reinforcing bars n1 have been installed through a tremie pipe to form a pile body 1a.
そして、第3図に示すように、仕切カバー5の真上の余
盛部3までコンクリートnが充填された後、前記引紐6
の両引手部6aを交互に引くことにより、前記掛は紐5
bが切断されて仕切カバー5の開口部5aがコンクリー
ト中で閉塞されて杭本体1aと全盛部3とが絶縁される
。As shown in FIG. 3, after the concrete n is filled up to the excess portion 3 directly above the partition cover 5,
By alternately pulling both the handle parts 6a, the hook is attached to the string 5.
b is cut, the opening 5a of the partition cover 5 is closed in concrete, and the pile main body 1a and the heap portion 3 are insulated.
この場合、仕切カバー5はコンクリート中で閉塞される
ため完全に閉塞されない場合もあるが、それであっても
、杭体1aと余盛部3とを絶縁することは可能である。In this case, the partition cover 5 is blocked in the concrete, so it may not be completely blocked, but even in that case, it is possible to insulate the pile body 1a and the extra layer 3.
次に第4図に示すように、これらのコンクリートnが硬
化した後、前記余盛部3の下端、すなわち仕切カバー5
が埋設された杭本体1aの周面を破壊することにより、
余盛部3のコンクリートが容易に切り取れる。これは、
該余盛部3の主筋2に被覆カバー4が被覆されて主筋2
とコンクリートnが分離されているとともに、仕切カバ
ー3により杭本体1aと余盛部3とが分離されているた
めである。Next, as shown in FIG.
By destroying the surrounding surface of the pile body 1a in which is buried,
The concrete in the excess portion 3 can be easily cut out. this is,
The main reinforcing bars 2 of the extra portion 3 are covered with the covering cover 4 and the main reinforcing bars 2
This is because the pile main body 1a and the extra heap portion 3 are separated by the partition cover 3.
(発明の効果)
本発明は以上の様な構成にしたことにより下記の効果を
有する。(Effects of the Invention) The present invention has the following effects by having the above configuration.
■ 余盛部の主筋に被覆カバーが夫々被覆され、かつ該
余盛部下部の主鉄筋内側に開閉自在な仕切カバーが開放
された状態で取り付けられた鉄筋籠を地中に掘削された
孔に建込み、核化にコンクリートを充填した後、ただち
に前記仕切カバーをコンクリート中で閉塞して杭本体と
余盛部とを絶縁したことにより、該コンクリートが硬化
した後に前記仕切カバーが埋設された杭本体の周面を破
壊するだけで余盛部を杭本体から容易に切り取ることが
できるとともに、大騒音及び粉塵の発生を防止すること
ができる。■ The reinforcing bar cage, in which the main reinforcing bars of the extra heap are each covered with a covering cover, and a partition cover that can be opened and closed is attached to the inner side of the main reinforcing bars at the bottom of the extra heel, is inserted into a hole drilled underground. A pile in which the partition cover is buried after the concrete has hardened, by immediately closing the partition cover in concrete to insulate the pile body and the extra heap after filling concrete for erection and coreization. The excess portion can be easily cut off from the pile body by simply destroying the peripheral surface of the body, and generation of large noise and dust can be prevented.
■ 現場打ちコンクリ−1〜杭の余盛部を容易に切り取
ることができるので、工期の短縮及び工費の低減を図る
ことができる。■ Cast-in-place concrete 1 - Since the excess portion of the pile can be easily cut out, the construction period can be shortened and the construction cost can be reduced.
第1図〜第5図は本発明の現場打ちコンクリート杭の築
造工法の工程図、第6図は同拡大平面図である。
尚、図中、
A;現場打ちコンクリート
1:鉄筋能
2:余盛部
3:被覆カバー 4:仕切カバー5:主鉄筋
m;孔
n:コンクリート
である。
第4図
7A
第5図1 to 5 are process diagrams of the method for constructing cast-in-place concrete piles of the present invention, and FIG. 6 is an enlarged plan view of the method. In the figure, A: Cast-in-place concrete 1: Reinforcing bar capacity 2: Excess portion 3: Covering cover 4: Partition cover 5: Main reinforcing bar
m; hole n: concrete. Figure 4 7A Figure 5
Claims (1)
部下部の主鉄筋内側に開閉自在な仕切カバーが開放され
た状態で取り付けられた鉄筋籠を地中に掘削された孔に
建込み、該孔にコンクリートを充填した後、ただちに前
記仕切カバーをコンクリート中で閉塞して杭本体と余盛
部とを絶縁することを特徴とする現場打ちコンクリート
杭の築造工法。A reinforcing bar cage is constructed in a hole drilled underground, in which the main reinforcing bars of the extra heap are each covered with a covering cover, and a partition cover that can be opened and closed is attached to the inner side of the main reinforcing bars at the bottom of the extra heel. 1. A method for constructing a cast-in-place concrete pile, characterized in that after the hole is filled with concrete, the partition cover is immediately closed in concrete to insulate the pile body and the extra heap.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6073789A JPH02240320A (en) | 1989-03-15 | 1989-03-15 | Construction method of cast-in-place concrete pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6073789A JPH02240320A (en) | 1989-03-15 | 1989-03-15 | Construction method of cast-in-place concrete pile |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH02240320A true JPH02240320A (en) | 1990-09-25 |
Family
ID=13150874
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP6073789A Pending JPH02240320A (en) | 1989-03-15 | 1989-03-15 | Construction method of cast-in-place concrete pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH02240320A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5936030A (en) * | 1994-12-21 | 1999-08-10 | Nanosystems | Polyether copolymers and a process for preparing them |
CN102926380A (en) * | 2012-11-20 | 2013-02-13 | 中铁十九局集团第三工程有限公司 | Bridge cast-in-place pile chiseling-free pile head and construction method thereof |
-
1989
- 1989-03-15 JP JP6073789A patent/JPH02240320A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5936030A (en) * | 1994-12-21 | 1999-08-10 | Nanosystems | Polyether copolymers and a process for preparing them |
CN102926380A (en) * | 2012-11-20 | 2013-02-13 | 中铁十九局集团第三工程有限公司 | Bridge cast-in-place pile chiseling-free pile head and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105239578B (en) | Water-rich sand layer deep foundation pit underwater construction method | |
KR100289256B1 (en) | Tunnel construction method in shallow toffee area | |
JP2000352296A (en) | Method o constructing passage just under underground structure | |
JPH02240320A (en) | Construction method of cast-in-place concrete pile | |
JPS59126821A (en) | Erection work of foundation pile | |
JP2790038B2 (en) | Reinforcement method of existing pile foundation building | |
JP3898112B2 (en) | Caisson connection method | |
JPS5869923A (en) | Construction of underground continuous wall with drain layer | |
JPS61109822A (en) | Construction work of pile | |
JPH0721196B2 (en) | Reverse construction method of underground structure | |
JP2001271347A (en) | Drop method for ready-made pile | |
JPS6250516A (en) | Formation work of composite pile | |
JPS61151325A (en) | Method of reinforcing pile head part against horizontal force | |
JPH09291530A (en) | Method for erecting column | |
JP3637945B2 (en) | Construction method of base-isolated building by reverse driving method | |
KR20010007973A (en) | Net bag type pile construction method of weak ground | |
JPH0726569A (en) | Pile foundation construction method for structure exposed to partial earth pressure | |
JPS601451B2 (en) | Water stop mountain stop wall construction method using Benoto pile excavator | |
JPH01226935A (en) | Transmission line tower foundation and its construction | |
JPS59224723A (en) | Breaking and cutting of concrete | |
JPH09195270A (en) | Method of constructing foundation pile, and foundation pile | |
JP2001011874A (en) | Construction method for structural stud using precast pile | |
JP3089034U (en) | Greenhouse foundation | |
JPH06194485A (en) | Construction of nuclear power plant building | |
KR960001455Y1 (en) | A follow-devices for h-section steel pile |