JPH02204292A - Hydraulic elevator installing method - Google Patents

Hydraulic elevator installing method

Info

Publication number
JPH02204292A
JPH02204292A JP1988589A JP1988589A JPH02204292A JP H02204292 A JPH02204292 A JP H02204292A JP 1988589 A JP1988589 A JP 1988589A JP 1988589 A JP1988589 A JP 1988589A JP H02204292 A JPH02204292 A JP H02204292A
Authority
JP
Japan
Prior art keywords
hydraulic jack
hoistway
guide rail
hydraulic
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP1988589A
Other languages
Japanese (ja)
Other versions
JPH0791008B2 (en
Inventor
Tsuguhiko Nakada
次彦 中田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Elevator Engineering and Service Co Ltd
Original Assignee
Hitachi Elevator Engineering and Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Elevator Engineering and Service Co Ltd filed Critical Hitachi Elevator Engineering and Service Co Ltd
Priority to JP1988589A priority Critical patent/JPH0791008B2/en
Publication of JPH02204292A publication Critical patent/JPH02204292A/en
Publication of JPH0791008B2 publication Critical patent/JPH0791008B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

PURPOSE:To heighten work efficiency and safety by providing a working bench on which workers can elevate and work stably in the position of desired height. CONSTITUTION:After the erection of a hydraulic jack 9, a pulley is fitted at the hydraulic jack 9 on a work floor 2, a wire rope with the one end connected to the elevating path 1 side and the other end connected to the frame 11 side respectively is hung on this pulley, thus the cage frame 11 and a working bench 12 can be elevated by the operation of the hydraulic jack 9 through the wire rope. Workers on this working bench 1 perform erection work of the part from the lower part of the elevating path 1 up to the working bench 2. Accordingly, the hydraulic elevator can be installed without setting up scaffolds across the whole length of the elevating path 1.

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は油圧エレベータの据付方法に関する。[Detailed description of the invention] [Industrial application field] The present invention relates to a method of installing a hydraulic elevator.

[従来の技術] 従来、油圧エレベータの据付方法は、昇降路内に井桁状
に組上げられる鋼管または木材からなる固定足場を備え
、この足場に作業位置に応じて作業板を取付けて、この
作業板上でガイドレール、乗場部品などの設置や、油圧
ジヤツキの接続、昇降路内の配線の取付は等を行ない、
その後、井桁状に組上げた足場を解体してから、か゛ご
枠の組立てを行なうようになっていた。
[Prior Art] Conventionally, the installation method of a hydraulic elevator includes a fixed scaffold made of steel pipes or wood that is assembled in the shape of a grid in the hoistway, and a work plate is attached to this scaffold according to the work position. At the top, we installed guide rails, landing parts, etc., connected hydraulic jacks, and installed wiring in the hoistway.
After that, the scaffolding that had been erected in the shape of a crossbeam was dismantled, and then the cage frame was assembled.

なお、ロープ式エレベータにおいては1例えば特開昭5
4−40449号公報に示されるように。
For rope type elevators, for example, 1
As shown in Publication No. 4-40449.

建屋出入口部分に移動足場を設け、この移動足場などで
ガイドレールを昇降路壁部に取付けて1次いで昇降路上
方に形成される機械室に巻上機を設置し、この巻上機に
よりガイドレールに沿ってかご枠を上下動しながら昇降
路内の設置作業、例えば乗場部品や配線、配管の取付け
を行ない、次いでかご枠に天井、側板などを組込み、か
ご廻り配線を行なうものが提案されている。
A movable scaffold is installed at the entrance/exit of the building, and the guide rail is attached to the wall of the hoistway using this movable scaffold, and then a hoist is installed in the machine room formed above the hoistway. It has been proposed that the car frame be moved up and down along the hoistway to perform installation work inside the hoistway, such as installing landing parts, wiring, and piping, and then assembling the ceiling, side panels, etc. into the car frame and wiring around the car. There is.

[発明が解決しようとする課!l!] ところで、上述した従来の油圧エレベータの据付方法で
は、昇降路の全長にわたって足場を組上げることから、
多量の足場材を要するとともに、この足場の組立、解体
に多大の労力が必要であり、また1作業者は足場を自刃
で上り下りしなければならず、作業効率が著しく阻害さ
れるという問題があった。そして、上述した足場を上り
下りする際に転落などの危険を伴うばかりか1足場に設
けられる横桁や作業板が所定位置に固定されており、す
なわち高さ位置を適宜調整することが困難であり1作業
者が伸び上ったり、腰を落すなどの不安定な姿勢を要す
るという安全上の問題もあった。
[The problem that the invention tries to solve! l! ] By the way, in the conventional hydraulic elevator installation method described above, scaffolding is erected along the entire length of the hoistway.
In addition to requiring a large amount of scaffolding material, a great deal of labor is required to assemble and dismantle the scaffolding, and each worker must climb up and down the scaffolding using their own blade, which significantly impedes work efficiency. there were. Not only is there a risk of falling when going up and down the scaffolds mentioned above, but the crossbeams and work plates installed on each scaffold are fixed in a predetermined position, which means that it is difficult to adjust the height position appropriately. There was also a safety issue, as workers were required to sit in unstable positions, such as stretching up or bending down.

本発明は上記のような従来技術における実情に鑑みてな
されたもので、その目的は、昇降路の全長にわたって足
場を設置することを必要とせずに、油圧エレベータの据
付を行なうことのできる油圧エレベータの据付方法を提
供することにある。
The present invention has been made in view of the actual situation in the prior art as described above, and its object is to provide a hydraulic elevator that can be installed without requiring scaffolding to be installed over the entire length of the hoistway. The objective is to provide an installation method.

[課題を解決するための手段] この目的を達成するために本発明は、昇降路内に立設さ
れる油圧ジヤツキと、この油圧ジヤツキの上下動に応じ
て昇降するかご枠とを有する油圧エレベータの据付方法
において、まず上記昇降路の上部に作業床を設け、芯出
しをおこなって上記かご用のガイドレールを昇降路内に
立設し、該ガイドレールに係合する上記かご枠、および
このかご枠の上部に付設される作業台を組立てるととも
に、上記ガイドレールの長平方向に沿って上記油圧ジヤ
ツキ用のガイドレールを立設し1次いでこのガイドレー
ルに係合するガイド金具を上記油圧ジヤツキに取付けて
、この油圧ジヤツキを該油圧ジヤツキ用のガイドレール
に沿って吊上げて立設し、次いでこの油圧ジヤツキと油
圧パワーユニットとを油送管を介して接続し1作業台に
仮設操作盤を装着し、この仮設操作盤と油圧パワーユニ
ット間を工事用運転ケーブルで接続し、次いで上記油圧
ジヤツキを作動させながら上記ガイド金具を取外し、一
端が昇降路側に、他端がかご枠側にそれぞれ連結される
ワイヤロープが掛けられるプーリを上記油圧ジヤツキの
上部に取付け5次いで上記ワイヤロープを介し上記かご
枠および作業台を昇降させながら、この作業台上の作業
者が昇降路内の配線、配管を含む機器の設置作業を行な
うように構成されている。
[Means for Solving the Problems] In order to achieve this object, the present invention provides a hydraulic elevator having a hydraulic jack installed vertically in a hoistway, and a car frame that moves up and down in accordance with the vertical movement of the hydraulic jack. In the installation method, first, a working floor is provided at the top of the hoistway, centering is performed, and the guide rail for the car is erected in the hoistway, and the car frame that engages with the guide rail and the car frame are installed. Assemble a workbench attached to the upper part of the car frame, set up a guide rail for the hydraulic jack along the longitudinal direction of the guide rail, and then attach a guide fitting to engage the guide rail to the hydraulic jack. Once installed, this hydraulic jack is lifted up and erected along the guide rail for the hydraulic jack, and then this hydraulic jack and the hydraulic power unit are connected via an oil pipe, and a temporary operation panel is attached to one workbench. , connect this temporary operation panel and the hydraulic power unit with a construction operation cable, then remove the guide fitting while operating the hydraulic jack, and connect the wire with one end connected to the hoistway side and the other end to the car frame side. A pulley on which the rope is hung is attached to the upper part of the hydraulic jack.5Then, while raising and lowering the car frame and work platform via the wire rope, the worker on the work platform inspects the equipment including wiring and piping in the hoistway. It is configured to perform installation work.

[作用] 本発明は上記のように構成したことから、昇降路下部で
かご用ガイドレールの取付、かご枠の組立、油圧ジヤツ
キの保持、油圧ジヤツキ用ガイドレールの取付が行なわ
れるとともに、昇降路上部に設けられる作業床上で上述
したガイドレールの上部の取付などが行なわれる。そし
て、油圧ジヤツキは吊上げられる際、ガイド金具を介し
上述したガイドレールによって案内されて、昇降路内の
中間高さ位置で人手による支えを要することなく油圧ジ
ヤツキが立設される。また、この油圧ジヤツキの立設後
、上述した作業床上で油圧ジヤツキの上部にプーリを取
付け、このブーりに一端が昇降路側に、他端がかご枠側
にそれぞれ連結されるワイヤロープを掛けて、油圧ジヤ
ツキの作動によりワイヤロープを介しかご枠および作業
台を昇降可能にし、この作業台に乗り込んだ作業者が昇
降路の下部から作業床に至るまでの部分の設置作業を行
なう、これにより昇降路の全長にわたって足場を設置す
ることを必要とせずに、油圧エレベータの据付を行なう
ことができる。
[Function] Since the present invention is configured as described above, the installation of the car guide rail, the assembly of the car frame, the holding of the hydraulic jack, and the installation of the hydraulic jack guide rail are carried out at the lower part of the hoistway, and at the same time The above-mentioned installation of the upper part of the guide rail is carried out on the work floor provided in the section. When the hydraulic jack is lifted, it is guided by the above-mentioned guide rail via the guide fitting, and the hydraulic jack is erected at an intermediate height position in the hoistway without requiring manual support. After the hydraulic jack is erected, a pulley is attached to the top of the hydraulic jack on the above-mentioned work floor, and a wire rope connected to the hoistway side at one end and the car frame side is hung from the pulley at the other end. , the car frame and the work platform can be raised and lowered via a wire rope by the operation of a hydraulic jack, and a worker on this work platform performs the installation work from the bottom of the hoistway to the work floor. Hydraulic elevator installation can be carried out without the need to install scaffolding over the entire length of the road.

[実施例] 以下1本発明の油圧エレベータの据付方法を図に基づい
て説明する。
[Example] Hereinafter, a method for installing a hydraulic elevator according to the present invention will be explained based on the drawings.

第1@ないし第6図は本発明の油圧エレベータの据付方
法の一実施例を説明する図で、第1図は作業手順を示す
フローチャート、第2図は下部ガイドレールが立設され
る状態を示す縦断面図、第3図は油圧ジヤツキが立設さ
れる状態を示す縦断面図、第4図は作業台に乗り込んだ
作業者が設置作業を行なう状態を示す縦断面図、第5図
は油圧ジヤツキの上端部分を示す平面図、第6図は油圧
ジヤツキの上端部分を示す正面図である。なお。
Figures 1 to 6 are diagrams illustrating an embodiment of the hydraulic elevator installation method of the present invention. Figure 1 is a flowchart showing the work procedure, and Figure 2 shows the state in which the lower guide rail is erected. 3 is a vertical sectional view showing the state in which the hydraulic jack is erected, FIG. FIG. 6 is a plan view showing the upper end portion of the hydraulic jack, and FIG. 6 is a front view showing the upper end portion of the hydraulic jack. In addition.

第1図で二重枠で示す手順16〜手順19は第4図に示
すように作業台に乗り込んで行なわれる。
Steps 16 to 19, which are indicated by double frames in FIG. 1, are performed on a workbench as shown in FIG. 4.

第1図の昇降路1内の最上階位置に作業床2が組立てら
れ、この作業床2の上方に上部テンプレート3が設置さ
れ、一方、昇降路1の下部に下部テンプレート4が設置
されて、これらのテンプレート3,4間に芯出し用ピア
ノ線5が張設されている。そして、かご用の下部ガイド
レール6aがピアノ線5を基準線として芯出しされ、ブ
ラケット7を介し昇降路1の壁部に固定される。また。
A work floor 2 is assembled at the top floor position in the hoistway 1 in FIG. 1, an upper template 3 is installed above the work floor 2, and a lower template 4 is installed at the bottom of the hoistway 1. A centering piano wire 5 is stretched between these templates 3 and 4. Then, the lower guide rail 6a for the car is centered using the piano wire 5 as a reference line, and is fixed to the wall of the hoistway 1 via the bracket 7. Also.

昇降路1下部の近傍には油圧パワーユニット8が設置さ
れる。
A hydraulic power unit 8 is installed near the lower part of the hoistway 1.

第3図に示す油圧ジヤツキ9は、昇降路1下部でジヤツ
キ台10により保持される下ジヤツキ9aと、この下ジ
ヤツキ9aの上端に接続可能な上ジヤツキ9bとからな
り、これらの下ジヤツキ9aおよび上ジヤツキ9bの接
続部には互いに螺合する図示しないねじ部がそれぞれ設
けられる。一方。
The hydraulic jack 9 shown in FIG. 3 consists of a lower jack 9a held by a jack stand 10 at the lower part of the hoistway 1, and an upper jack 9b connectable to the upper end of the lower jack 9a. The connecting portions of the upper jacks 9b are provided with threaded portions (not shown) that are screwed into each other. on the other hand.

下部ガイドレール6aに係合する本設用のかご枠11の
上部に、作業者が乗り込む作業台12が付設される。そ
して、下部ガイドレール6aの長手方向に沿って油圧ジ
ヤツキ9用のガイドレール13がブラケット14を介し
立設されるとともに、この1対のガイドレール13は、
開き防止ブラケット15によって互いに離隔する方向へ
開くことが防止される。また、上ジヤツキ9bの上端に
装着されるガイド金具16は、ガイドレール13に係合
し、一方、昇降路1の最上部のブラケット14にシーブ
18が取付けられて、このシーブ18に掛けられるウィ
ンチローブ19は、一端が図示しないウィンチに巻取ら
れ、他端が上述したガイド金具16に接続されている。
A workbench 12 on which an operator rides is attached to the upper part of the car frame 11 for permanent installation that engages with the lower guide rail 6a. A guide rail 13 for the hydraulic jack 9 is erected along the longitudinal direction of the lower guide rail 6a via a bracket 14, and the pair of guide rails 13 are
The opening prevention bracket 15 prevents them from opening in directions away from each other. Further, a guide fitting 16 attached to the upper end of the upper jack 9b engages with the guide rail 13, while a sheave 18 is attached to a bracket 14 at the top of the hoistway 1, and a winch attached to this sheave 18 is attached. One end of the lobe 19 is wound around a winch (not shown), and the other end is connected to the guide fitting 16 described above.

このガイド金具16は、第6図に示すように、上ジヤツ
キ9bの上端に装着される本体20と、この本体2oを
上ジヤツキ9bに連結するビン21と1本体20の上部
に螺合し1例えば下ジヤツキ9a、上ジヤツキ9bの接
続部のねじ部と同一のねじピッチを有するねじ山が形成
される吊りボルト22と、この吊りボルト22の上部に
取付けられ、上述したウィンチローブ19が接続される
吊り金具23と、吊りボルト22に設けられるガイド板
24とから構成されている。このガイド板24は、第5
図に示すように、1対のガイドレール13の突出部にそ
れぞれ係合する係合部24a、24bを両端に備えてい
る。
As shown in FIG. 6, this guide fitting 16 includes a main body 20 attached to the upper end of the upper jack 9b, a bottle 21 that connects the main body 2o to the upper jack 9b, and a screw threaded onto the upper part of the main body 20. For example, a hanging bolt 22 is formed with a thread having the same thread pitch as the threaded portion of the connecting portion of the lower jack 9a and upper jack 9b, and the above-mentioned winch lobe 19 is attached to the upper part of this hanging bolt 22. It consists of a hanging fitting 23 and a guide plate 24 provided on the hanging bolt 22. This guide plate 24 is the fifth
As shown in the figure, engaging portions 24a and 24b are provided at both ends to engage with the protruding portions of the pair of guide rails 13, respectively.

また、第4図に示す油送管25は、油圧パワーユニット
8と下ジヤツキ9aとの間に設けられる。
Further, an oil feed pipe 25 shown in FIG. 4 is provided between the hydraulic power unit 8 and the lower jack 9a.

一方、かご枠12に設置される仮設操作盤26と油圧パ
ワーユニット8との間に工事用運転ケーブル27が配設
されている。そして、前述した第3図などに示すガイド
金具1・′が取外された後、上ジヤツキ9bの上端に図
示しないワイヤロープが掛けられるプーリ28が取付け
られる。
On the other hand, a construction operation cable 27 is disposed between a temporary operation panel 26 installed on the car frame 12 and the hydraulic power unit 8. After the guide fittings 1 and 1 shown in FIG. 3 and the like described above are removed, a pulley 28 on which a wire rope (not shown) is hung is attached to the upper end of the upper jack 9b.

この実施例にあっては第1図に示す作業手順にしたがっ
て油圧エレベータの据付が行なわれる。
In this embodiment, the hydraulic elevator is installed according to the work procedure shown in FIG.

すなわち、まず手順1として第2図に示すように。That is, first, as shown in FIG. 2 as step 1.

昇降路1内の最上階位置に作業床2を組立てて設け1手
順2として作業床2の上方に上部テンプレート3、昇降
路1内の下部に下部テンプレート4をそれぞれ設置して
、手順3としてこれらのテンプレート3,4間にピアノ
線5を張設する。次いで手順4として、ピアノ[5を基
準線として昇降路1内の下部で下部ガイドレール6aを
芯出し、昇降路1の壁部にブラケット7を介して固定し
、手順5として第3図に示すように下部ガイドレール6
aに係合するかご枠11を組立て1手順6としてかご枠
11の上部に作業台12を組立て1手順7として図示し
ないウィンチによりガイドレール13の各部分を吊上げ
て立設し、開き防止ブラケット15を装着するとともに
、このガイドレール13をブラケット14を介し昇降路
1の壁部に仮固定する。次いで手順8として次の(a)
〜(d)で示すように油圧ジヤツキ9を立設する。(a
)下ジヤツキ9aを昇降路1内の下部でジヤツキ台10
を介し仮固定し、(b)上ジヤツキ9bの上端にガイド
金具16を取付け、(c)ガイド金具16がガイドレー
ル13に係合する状態でこのガイド金具16を介し上ジ
ヤツキ9bを吊上げ、(d)これらの下ジヤツキ9a、
上ジヤツキ9bを芯出して互いに接続させる。そして1
手順9としてこの接続された油圧ジヤツキ9をジヤツキ
台10を介し固定する。
A work floor 2 is assembled and installed at the top floor position in the hoistway 1, and in step 1, an upper template 3 is installed above the work floor 2, and a lower template 4 is installed in the lower part of the hoistway 1, and in step 3, these are installed. A piano wire 5 is stretched between the templates 3 and 4. Next, as step 4, center the lower guide rail 6a at the lower part of the hoistway 1 using the piano [5 as a reference line, and fix it to the wall of the hoistway 1 via the bracket 7, and as step 5, as shown in FIG. Lower guide rail 6
Assemble the car frame 11 that engages with the car frame 11 in Step 6 of 1. Assemble the workbench 12 on the top of the car frame 11 in Step 1. In step 7 of Step 1, lift each part of the guide rail 13 with a winch (not shown) and set it upright, and open the opening prevention bracket 15. At the same time, the guide rail 13 is temporarily fixed to the wall of the hoistway 1 via the bracket 14. Next, as step 8, perform the following (a)
A hydraulic jack 9 is set up as shown in ~(d). (a
) Move the lower jack 9a to the jack stand 10 at the bottom of the hoistway 1.
(b) attach the guide fitting 16 to the upper end of the upper jack 9b; (c) lift the upper jack 9b via the guide fitting 16 with the guide fitting 16 engaged with the guide rail 13; d) These lower jacks 9a,
Center the upper jacks 9b and connect them to each other. and 1
In step 9, the connected hydraulic jack 9 is fixed via the jack stand 10.

次いで手順10として、第4図に示すように油圧パワー
ユニット8と油圧ジヤツキ9とを油送管25を介して接
続し、手順11として油圧パワーユニット8を固定し、
手順12として作業台12に仮設操作盤26を装着する
とともに、この仮設操作盤26と油圧パワーユニット8
との間に工事用運転ケーブル27を配設する1次いで手
順13として仮設操作盤26を操作し、油圧パワーユニ
ット8より油送管25を介して油を送り、油圧ジヤツキ
9を作動させて試運転する。そして、この油圧ジヤツキ
9を上昇させてから、作業床2上の作業者が、(e)第
3図などに示すガイド金具16を取外し、(f)第4図
に示すプーリ28を油圧ジヤツキ9の上端に取付ける1
次いで手順14としてプーリ28に図示しないワイヤロ
ープを掛け、その一端を昇降路1側に固定した後、仮設
操作盤26を操作して油圧ジヤツキ9を下降させ、ワイ
ヤロープの他端をかご枠11側に固定し、手順15とし
て下部ガイドレール6aの上部に接続される他のガイド
レール6bの各部分を順次吊上げて立設し、昇降#11
の壁部にブラケット7を介し仮固定する。
Next, in step 10, as shown in FIG. 4, the hydraulic power unit 8 and the hydraulic jack 9 are connected via the oil feed pipe 25, and in step 11, the hydraulic power unit 8 is fixed.
As step 12, the temporary operation panel 26 is attached to the workbench 12, and the temporary operation panel 26 and the hydraulic power unit 8 are
The construction operation cable 27 is installed between the 1st and 1st steps 13, in which the temporary operation panel 26 is operated, oil is sent from the hydraulic power unit 8 through the oil feed pipe 25, and the hydraulic jack 9 is operated to perform a trial run. . After raising this hydraulic jack 9, the worker on the work floor 2 (e) removes the guide fitting 16 shown in FIG. 3, etc., and (f) moves the pulley 28 shown in FIG. Attach to the upper end of 1
Next, in step 14, a wire rope (not shown) is hung around the pulley 28, and one end of the wire rope is fixed to the hoistway 1 side, and then the temporary operation panel 26 is operated to lower the hydraulic jack 9, and the other end of the wire rope is attached to the car frame 11. In step 15, each part of the other guide rail 6b connected to the upper part of the lower guide rail 6a is sequentially lifted up and erected.
It is temporarily fixed to the wall of the housing via a bracket 7.

次いで作業台12に作業者が乗り込んで、仮設操作盤2
6を操作してかご枠11および作業台12を昇降させな
がら1手順16として他のガイドレール6bを下方より
上方へ順次芯出し固定するとともに、(g)作業床2を
解体し、(h)テンプレート3などを解体し1手順17
として各種の機器、例えば乗場部品を取付け1手順18
として昇降路1内に配管、配線を設け1手順19として
昇降路1内の器具を取付ける0次いで手)l!20とし
て作業台12を解体し、手順21としてかご枠11に図
示しない側板、天井を装着し、かごを組立て、最後に1
手順22として試運転、調整を行なう。
Next, the worker gets on the workbench 12 and presses the temporary operation panel 2.
6 to raise and lower the car frame 11 and the workbench 12, as step 16, center and fix the other guide rails 6b sequentially from the bottom to the top, (g) dismantle the workfloor 2, and (h) Disassemble template 3 etc. 1 step 17
Installing various equipment, such as landing parts, 1 Step 18
As step 1, install piping and wiring in the hoistway 1 and install the equipment in the hoistway 1 as step 19. In step 20, the workbench 12 is dismantled, and in step 21, the side plates and ceiling (not shown) are attached to the car frame 11, and the car is assembled.
As step 22, perform a test run and make adjustments.

このように構成した実施例では、昇降路1の全長にわた
って足場を設置することを必要とせず。
In the embodiment configured in this way, it is not necessary to install scaffolding over the entire length of the hoistway 1.

昇降路1の底部、かご枠11上の作業台12、昇降路1
上部の作業床2を足場として油圧エレベータの据付を行
なうことができる。また1作業床2゜作業台12は比較
的少ない足場材から構成され、その組立、解体を容易に
行なうことができる。そして、仮設操作盤26の操作に
より作業床12が昇降するので、自刃での上り下りを要
するものに比べて作業効率や安全性の向上が図れるとと
もに。
Bottom of hoistway 1, work platform 12 on car frame 11, hoistway 1
The hydraulic elevator can be installed using the upper work floor 2 as a scaffold. Further, each work floor 2° work platform 12 is constructed from a relatively small amount of scaffolding material, and can be easily assembled and dismantled. Since the work floor 12 is raised and lowered by operating the temporary operation panel 26, work efficiency and safety can be improved compared to systems that require climbing and lowering using self-scissors.

作業床12の高さ位置を適宜調整して安定な姿勢で作業
することができる。さらに、ガイド金具16の吊りボル
ト22のねじピッチが上ジャツチ9b。
It is possible to work in a stable posture by adjusting the height position of the work floor 12 as appropriate. Furthermore, the thread pitch of the hanging bolt 22 of the guide fitting 16 is the upper jack 9b.

下ジヤツキ9aの接続部のねじピッチと同一に設定され
ていることから、下ジヤツキ9aに上ジャッチ9bをF
Ii!統する際に、上述した吊りボルト22を接続層と
して、この吊りボルト22を介し上ジャツチ9bを吊上
げた状態でこの上ジヤツキ9bを回転させ、下ジヤツキ
9aの接続部に上ジヤツキ9bの接続部を螺合させるこ
とができる。
Since the thread pitch of the connection part of the lower jack 9a is set to be the same as that of the lower jack 9a,
Ii! When controlling the upper jack 9b using the above-mentioned hanging bolt 22 as a connection layer, the upper jack 9b is rotated while the upper jack 9b is lifted up through the hanging bolt 22, and the connecting part of the upper jack 9b is connected to the connecting part of the lower jack 9a. can be screwed together.

なお、第1図に示す手順7(ガイドレール13の立設、
仮固定)は手順6(作業金工2の組立)の次に行なう代
わりに1手順3(ピアノ線5の張設)〜手順5(かご枠
11の組立)のいずれかに次いで行なってもよく1手順
11(パワーユニット8の固定)は手順10(油送管2
5の接続固定)の次に行なう代わりに、最初か、あるい
は手順1(作業床2の組立)〜手順9(油圧ジヤツキ9
の固定)のいずれかの次に行なってもよい。また、手順
12(工事用運転ケーブル27の接続)は手順11(パ
ワーユニット8の固定)の次に行なう代わりに、手順5
(かご枠11の組立)〜手順10(油送管25の接続固
定)のいずれかに次いで行なってもよく1手順15(ガ
イドレール6bの立設仮固定)は手順14(プーリ28
へのワイヤロープ掛け)の次に行なう代わりに5手順4
(下部ガイドレール6aの芯出し固定)〜手順13(試
運転)のいずれかに次いで行なってもよい、そして2手
順17(乗場部品の取付け)〜手M19(昇降路1内の
器具の取付け)は、必要により順序を逆にすることもで
き、あるいは手順16(ガイドレール6bの芯出し固定
)と同時に一括して昇降路1の下部から上部へ順次行な
ってもよい。
Note that step 7 shown in FIG. 1 (erecting the guide rail 13,
Temporary fixing) may be performed after any of Steps 1 to 3 (Stretching the piano wire 5) to Step 5 (Assembling the car frame 11) instead of performing after Step 6 (Assembling the working metalwork 2). Step 11 (fixing power unit 8) is step 10 (oil pipe 2
Instead of doing it after Step 5 (fixing connections), you can do it first or from Step 1 (Assembling work floor 2) to Step 9 (Hydraulic jack 9
It may be performed after either of the following. Also, instead of performing step 12 (connecting the construction operation cable 27) after step 11 (fixing the power unit 8), it is performed in step 5.
(Assembling the car frame 11) to Step 10 (Connecting and fixing the oil feed pipe 25) may be performed after any one of Step 15 (Temporarily fixing the guide rail 6b upright) to Step 14 (Pulley 28
5 step 4 instead of next step 4
(Fixing the centering of the lower guide rail 6a) to step 13 (test run) may be performed, and step 17 (installation of landing parts) to step M19 (installation of equipment in the hoistway 1) may be performed. If necessary, the order may be reversed, or the steps may be performed sequentially from the lower part of the hoistway 1 to the upper part simultaneously with step 16 (centering and fixing the guide rail 6b).

さらに、手順20(作業台12の解体)は手順19(昇
降路1内の器具の取付け)の次に行なう代わりに、手[
16(ガイドレール6bの芯出し固定)〜手順18(昇
降路1内の配管、配線)のいずれかに次いで行なっても
よい。
Furthermore, step 20 (dismantling the workbench 12) is performed manually instead of following step 19 (installation of equipment in the hoistway 1).
The step 16 (centering and fixing the guide rail 6b) to step 18 (piping and wiring in the hoistway 1) may be performed subsequently.

[発明の効果] 本発明は以上のように構成したので、昇降路の全長にわ
たって足場を1置することを必要とせずに油圧エレベー
タの据付を行なうことができ、したがって、足場材を少
なくできるばかりか、足場の組立、解体に要する労力を
少なくできる。そして、油圧ジヤツキの立設後1作業者
は作業台に乗って昇降するとともに、所望の高さ位置か
ら安定な姿勢で作業することができ、固定足場を自刃で
上り下りする従来のものと比べ、作業効率の改善および
安全性の向上を図ることができるという効果がある。
[Effects of the Invention] Since the present invention is configured as described above, a hydraulic elevator can be installed without requiring one scaffold to be placed along the entire length of the hoistway, and therefore, the number of scaffolding materials can be reduced. Alternatively, the labor required for assembling and dismantling the scaffolding can be reduced. After the hydraulic jack is erected, a worker can climb up and down on the workbench and work in a stable posture from a desired height position, compared to the conventional method of climbing up and down a fixed scaffold using its own blade. This has the effect of improving work efficiency and safety.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図ないし第6図は本発明の油圧エレベータの据付方
法の一実施例を説明する図で、第1図は作業手順を示す
フローチャート、第2図は下部ガイドレールが立設され
る状態を示す縦断面図、第3図は油圧ジヤツキが立設さ
れる状態を示す縦断面図、第4図は作業台に乗り込んだ
作業者が設置作業を行なう状態を示す縦断面図、第5図
は油圧ジヤツキの上端部分を示す平面図、第6図は油圧
ジヤツキの上端部分を示す正面図である。 1・・・・・・昇降路、2・・・・・・作業床、6・・
・・・・ガイドレール、6a・・・・・・下部ガイドレ
ール、9・・・・・・油圧ジヤツキ、9a・・・・・・
下ジヤツキ、9b・・・・・・上ジヤツキ、11・・・
・・・かご枠、12・・・・・・作業台、13・・・・
・・ガイドレール、16・・・・・・ガイド金具、26
・・・・・・仮設操作盤、28・・・・・・シーブ。 第 図 第4 図 第3図 第5図 第6図
Figures 1 to 6 are diagrams explaining an embodiment of the hydraulic elevator installation method of the present invention, with Figure 1 being a flowchart showing the work procedure, and Figure 2 showing the state in which the lower guide rail is erected. 3 is a vertical sectional view showing the state in which the hydraulic jack is erected, FIG. FIG. 6 is a plan view showing the upper end portion of the hydraulic jack, and FIG. 6 is a front view showing the upper end portion of the hydraulic jack. 1...Hoistway, 2...Working floor, 6...
...Guide rail, 6a...Lower guide rail, 9...Hydraulic jack, 9a...
Lower jack, 9b... Upper jack, 11...
...Car frame, 12...Workbench, 13...
... Guide rail, 16 ... Guide metal fittings, 26
...Temporary operation panel, 28... Sheave. Figure 4 Figure 3 Figure 5 Figure 6

Claims (1)

【特許請求の範囲】[Claims] (1)昇降路内に立設される油圧ジャッキと、この油圧
ジャッキの上下動に応じて昇降するかご枠とを有する油
圧エレベータの据付方法において、まず上記昇降路の上
部に作業床を設け、芯出しをおこなつて上記かご用のガ
イドレールを昇降路内に立設し、このガイドレールに係
合する上記かご枠、およびこのかご枠上部に付設される
作業台を下部で組立てるとともに、上記ガイドレールの
長手方向に沿つて上記油圧ジャッキ用のガイドレールを
立設し、次いでこのガイドレールに係合するガイド金具
を上記油圧ジャッキに取付けて、この油圧ジャッキをこ
の油圧ジャッキ用のガイドレールに沿つて吊上げて立設
し、次いでこの油圧ジャッキと油圧パワーユニットとを
油送管を介して接続し、上記作業台に仮設操作盤を装着
し、この仮設操作盤と上記油圧パワーユニット間を工事
用運転ケーブルで接続し、次いで上記油圧ジャッキを作
動させながら上記ガイド金具を取外し、一端が昇降路側
に、他端がかご枠側にそれぞれ連結されるワイヤロープ
が掛けられるプーリを上記油圧ジャッキの上部に取付け
、次いで上記ワイヤロープを介し上記かご枠および作業
床を昇降させながら、この作業床上の作業者が昇降路内
の配線、配管を含む機器の設置作業を行なうことを特徴
とする油圧エレベータの据付方法。
(1) In a method for installing a hydraulic elevator having a hydraulic jack installed vertically in a hoistway and a car frame that moves up and down in response to the vertical movement of the hydraulic jack, first, a work floor is provided above the hoistway; After performing centering, the guide rail for the above-mentioned car is erected in the hoistway, the above-mentioned car frame that engages with this guide rail, and the workbench attached to the upper part of this car frame are assembled at the bottom, and the above-mentioned car guide rail is installed in the hoistway. A guide rail for the hydraulic jack is erected along the longitudinal direction of the guide rail, and then a guide fitting that engages with this guide rail is attached to the hydraulic jack, and the hydraulic jack is attached to the guide rail for the hydraulic jack. The hydraulic jack and the hydraulic power unit are then connected via an oil pipe, a temporary operation panel is attached to the work platform, and construction operations are performed between the temporary operation panel and the hydraulic power unit. Connect it with a cable, then remove the guide fitting while operating the hydraulic jack, and install a pulley on top of the hydraulic jack, on which a wire rope is hung, with one end connected to the hoistway side and the other end connected to the car frame side. Then, while raising and lowering the car frame and the work floor via the wire rope, a worker on the work floor installs equipment including wiring and piping in the hoistway. .
JP1988589A 1989-01-31 1989-01-31 How to install a hydraulic elevator Expired - Fee Related JPH0791008B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1988589A JPH0791008B2 (en) 1989-01-31 1989-01-31 How to install a hydraulic elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1988589A JPH0791008B2 (en) 1989-01-31 1989-01-31 How to install a hydraulic elevator

Publications (2)

Publication Number Publication Date
JPH02204292A true JPH02204292A (en) 1990-08-14
JPH0791008B2 JPH0791008B2 (en) 1995-10-04

Family

ID=12011657

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1988589A Expired - Fee Related JPH0791008B2 (en) 1989-01-31 1989-01-31 How to install a hydraulic elevator

Country Status (1)

Country Link
JP (1) JPH0791008B2 (en)

Also Published As

Publication number Publication date
JPH0791008B2 (en) 1995-10-04

Similar Documents

Publication Publication Date Title
JPH0585681A (en) Elevator hoist way work platform and installation method for elevator system structual part
CN109095319B (en) Construction elevator and climbing frame integrated operation system
JPH0754491A (en) Erecting device for exterior curtain wall of building
JPH02204292A (en) Hydraulic elevator installing method
JPH08245116A (en) Installation engineering of elevator
JP4841171B2 (en) Rise-up elevator installation method
JP2612258B2 (en) Elevator installation construction method
JPH021066B2 (en)
JPH11117523A (en) Lifting work platform for elevator parking and method using the same
JPH0470232B2 (en)
JP5382443B2 (en) How to renew an elevator
JPH0470231B2 (en)
JPH0733355A (en) Installation method for elevator
JPH0442296Y2 (en)
JPH0430213Y2 (en)
JP3347968B2 (en) Hydraulic elevator installation method
JPH07309551A (en) Building with elevator and method for forming the building
JPH02305785A (en) Elevator installation process and working floor device for elevator installation
JP2674392B2 (en) Hydraulic elevator installation method
JPH0840666A (en) Method for installing elevator
JP2003034473A (en) Elevator installing method
CN117468691A (en) Assembled self-lifting operation platform in elevator shaft and application method thereof
JP3155693B2 (en) Hydraulic elevator installation method
JP2766769B2 (en) How to bring in air conditioning equipment
JPS5912064A (en) Method of construction of installation of elevator

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees