JPH02117465A - Loading installation for container train - Google Patents

Loading installation for container train

Info

Publication number
JPH02117465A
JPH02117465A JP27209988A JP27209988A JPH02117465A JP H02117465 A JPH02117465 A JP H02117465A JP 27209988 A JP27209988 A JP 27209988A JP 27209988 A JP27209988 A JP 27209988A JP H02117465 A JPH02117465 A JP H02117465A
Authority
JP
Japan
Prior art keywords
container
loading
yard
guide rail
unloading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP27209988A
Other languages
Japanese (ja)
Inventor
Osamu Murakami
修 村上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Zosen Corp
Original Assignee
Hitachi Zosen Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Zosen Corp filed Critical Hitachi Zosen Corp
Priority to JP27209988A priority Critical patent/JPH02117465A/en
Publication of JPH02117465A publication Critical patent/JPH02117465A/en
Pending legal-status Critical Current

Links

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

PURPOSE:To facilitate loading and unloading of a container by providing a transport track having a container holding device via a guide rail capable of traveling freely, between a yard for loading a container wherein a plurality of railroad sidings are provided and a yard for carrying in and out containers near by said yard. CONSTITUTION:A yard for loading a container is provided by laying a plurality of railroad sidings 3 via a branch railroad 2 parallelly at the side of a traveling railroad 1 of the departure and arrival line of a train. A guide rail 6 arranged at the upper side for guiding a container is provided along the both of the yards 4, 5, the guide rail 6 comprises a loading yard side guide rail 6a, a carrying in-out yard side rail 6b arranged crossing to said rail 6a and a guide rail 6c for connection. A container transport track 11 having a holding device 12 which freely holds a container train A and a container B on the carrying-in-out yard 5 is provided at the guide rails 6 capable of travelling.

Description

【発明の詳細な説明】 産業上の利用分野 本発明はコンテナ列車における荷役設備に関するもので
ある。
DETAILED DESCRIPTION OF THE INVENTION Field of the Invention The present invention relates to cargo handling equipment in container trains.

従来の技術 従来、コンテナ列車のコンテナ荷役用ヤードには、第5
図に示すように、本線である走行線路41から分岐線路
42を介して多数の引込線路43が設けられ、各引込線
路43に引込まれたコンテナ列車のコンテナは、それぞ
れ)1t−&−クリフトによってその荷役すなわち積み
降ろしが行なわれていた。
Conventional technology Conventionally, a container handling yard for a container train has a fifth
As shown in the figure, a large number of lead-in tracks 43 are provided from the main running track 41 via branch tracks 42, and the containers of the container train drawn into each lead-in track 43 are transported by 1t-&-clift, respectively. Cargo handling, or loading and unloading, was being carried out.

発明が解決しようとする課題 上記従来の荷役設備によると、コンテナの積み降ろしは
フォークリフトによって一個づつ行なわれているため、
荷役作業に多くの時間を要するとともに、フォークリフ
トの必要作業スペースが広いため、各引込線路同志の間
隔を広くする必要が生じ、広大な敷地を要するという問
題があり、さらには各引込線路でのコンテナの行先に応
じた仕分は作業がスムースに行なわれないため、仕分は
作業に多大な時間を要するという問題もあった。
Problems to be Solved by the Invention According to the conventional cargo handling equipment described above, containers are loaded and unloaded one by one using a forklift.
In addition to requiring a lot of time for cargo handling work, the work space required for forklifts is large, so it becomes necessary to widen the distance between each lead-in track, resulting in the problem of requiring a vast site. There is also the problem that sorting according to the destination does not work smoothly, and that sorting takes a lot of time.

そこで、本発明は上記問題点を解消し得るコンテナ列車
における荷役設備を提供することを目的とする。
Therefore, an object of the present invention is to provide cargo handling equipment for a container train that can solve the above problems.

課題を解決するための手段 上記問題点を解決するため、本発明のコンテナ列車にお
ける荷役設備は、走行線路から分岐線路を介して複数本
のコンテナ列車引込線路を敷設し、これら引込線路部を
コンテナ荷役用ヤードとなすとともに、このコンテナ荷
役用ヤードと、このコンテナ荷役用ヤードに隣接して設
けられたコンテナ搬出入用ヤードとに亘って案内レール
を配置し、複数IIl設けられた上記各搬出入ヤード側
案内レールを、引込線路上方の荷役ヤード側案内レール
に対して、同一水平面内で所定角度でもって傾きを有せ
しめて配置し、この案内レールに、コンテナを保持解放
自在な保持!!!置を有するコンテナ搬送台車を走行自
在に設けたものである。
Means for Solving the Problems In order to solve the above-mentioned problems, the cargo handling equipment for container trains of the present invention lays a plurality of container train lead-in tracks from the running track via branch tracks, and connects these lead-in tracks to the container train. In addition to a cargo handling yard, guide rails are arranged across this container cargo handling yard and a container loading/unloading yard provided adjacent to this container loading/unloading yard. The yard side guide rail is arranged so as to be inclined at a predetermined angle in the same horizontal plane with respect to the cargo handling yard side guide rail above the lead-in track, and the container can be held and released on this guide rail! ! ! It is equipped with a container transport vehicle that can move freely.

作用 上記構成において、コンテナ列車上のコンテナを降ろす
場合、まず分岐線路を介してコンテナ列車を引込線路に
引込む。次に、その上方の案内レールに案内待糎された
搬送台車に各コンテナを保持させ、そしてこの状態で搬
送台車をコンテナ荷役用ヤードから例えば運搬先に応じ
てコンテナ搬出入用ヤードの所定の搬出入側案内レール
に移動させて、コンテナを所定の荷降ろし場所に降ろせ
ばよい。また、上記空のコンテナ列車にコンテナを積込
む場合、コンテナ搬出入側案内レールの所定の積込み場
所で、あらかじめ搬送台車にコンテナを保持させておき
、そしてこの状態で搬送台中をコンテナ荷役用ヤードに
移動させ、そして上記空のコンテナ列車上にコンテナを
降ろせばよい。
Effect In the above configuration, when unloading a container on a container train, the container train is first drawn into the lead-in track via the branch track. Next, each container is held on a carrier that is guided by the upper guide rail, and in this state, the carrier is transported from the container loading/unloading yard to a designated container loading/unloading yard depending on the destination. Simply move the container to the entrance guide rail and unload the container at the designated unloading location. In addition, when loading containers onto the above-mentioned empty container train, the containers are held in advance on the carrier at the designated loading location on the guide rail on the container loading and unloading side, and in this state, the containers are moved to the container handling yard. All you have to do is move the container and unload it onto the empty container train.

実施例 以下、本発明の一実施例を第1図〜第4図に基づき説明
する。
EXAMPLE Hereinafter, an example of the present invention will be explained based on FIGS. 1 to 4.

まず、第1図に基づき、線路の配置について説明する。First, the arrangement of the lines will be explained based on FIG.

1は列車の発着線である複数本(例えば3本)の走行線
路で、その側方には2本の分岐線路2を介して複数本(
例えば6本)の引込線路3が並行に敷設されてコンテナ
荷役用ヤード(以下、単に荷役ヤードという)4とされ
るとともに、この荷役ヤード4に隣接してコンテナ搬出
入用ヤード(以下、単に搬出入ヤードという)5が設け
られている。上記荷役ヤード4と搬出入ヤード5とに亘
っては、コンテナを案内するための案内レール6が設け
られている。上記案内レール6は、各引込線路3の上方
位置でかつ各引込線路3に沿って配置された荷役ヤード
側案内レール6aと、搬出入ヤード5の上方位置でかつ
同一水平面内で上記荷役ヤード側案内レール6aと直角
方向で配置された搬出入ヤード側案内レール6bと、こ
れら荷役ヤード側案内レール6aと搬出入ヤード側案内
レール6bとを連結する連結用案内レール6Cとから構
成されている。なお、各搬出入ヤード側案内レール6b
は、例えばコンテナの運搬業者ずなわちコンテナの行先
に対応して複数本(例えば11本)設けられており、ま
た各搬出入ヤード側案内レール6bの荷役ヤード寄り部
分はコンテナの荷降ろし部aとされるとともに、その反
対側すなわち外側はコンテナの積込み部すとされている
Reference numeral 1 denotes a plurality of (for example, three) running tracks that serve as departure and arrival lines for trains, and on the sides there are multiple (for example, three) running tracks via two branch tracks 2.
For example, six (6) lead-in lines 3 are laid in parallel to form a container handling yard (hereinafter simply referred to as a loading/unloading yard) 4, and adjacent to this loading/unloading yard 4, a container loading/unloading yard (hereinafter simply referred to as a loading/unloading yard) is constructed. 5 (referred to as an entry yard) is provided. A guide rail 6 for guiding containers is provided between the cargo handling yard 4 and the loading/unloading yard 5. The guide rail 6 is located above each lead-in track 3 and is arranged along each lead-in track 3 on the loading/unloading yard side guide rail 6a, and is located above the loading/unloading yard 5 and in the same horizontal plane on the loading/unloading yard side. It is composed of a loading/unloading yard side guide rail 6b arranged perpendicular to the guide rail 6a, and a connecting guide rail 6C connecting the loading/unloading yard side guide rail 6a and the loading/unloading yard side guide rail 6b. In addition, each loading/unloading yard side guide rail 6b
For example, a plurality of rails (for example, 11 rails) are provided corresponding to the container transporter, that is, the destination of the container, and the portion of each loading/unloading yard side guide rail 6b closer to the loading/unloading yard is located at the container unloading section a. The opposite side, that is, the outside, is said to be the loading area of the container.

また、荷役ヤード4には建屋が、搬出入ヤード5には屋
根が設けられており、したがって案内レール6は、それ
ぞれの天井部分に配置されている。
Further, the cargo handling yard 4 is provided with a building, and the loading/unloading yard 5 is provided with a roof, so the guide rails 6 are arranged on the ceilings of each.

そして、上記案内レール6には、第2図に示すように、
コンテナ列車A上および搬出入ヤード5におけるコンテ
ナBを保持解放自在な保持装置12を有するコンテナ搬
送台車11が走行自在に設けられている。すなわち、第
3図および第4図に示すように、この搬送台車11は、
保持装置12を有する台車本体13と、この台車本体1
3の上部前後位置(第3図および第4図においては一方
しか図示せず)にそれぞれ設けられて上記案内レール6
の案内空間14を形成する下フランジ板15上面を走行
自在な走行装置16とから構成されている。上記台車本
体13に設けられる保持装置12は、台車本体13下面
の4WAからチェーン17を介して吊持された昇降枠体
18と、同じく台車本体13の4隅から垂下されるとと
もに上記チェーン17の途中を押下げまたは緩めること
により昇降枠体18を昇降させる第1シリンダー装置1
9と、上記昇降枠体18の両測部前後位置にその上方中
間部が水平ピン20を介して揺動自在に吊持されたコン
テナ保持用の保持爪21と、弁降枠体18上面の前後左
右位置に設けられて各保持爪21の上端部を押し引きし
て保持爪21を接近離間させるすなわちコンテナを保持
解放させる第2シリンダー装置22とから構成されてい
る。また、上記各走行装置16は、台車本体13上面に
旋回自在に取付けられた旋回体23と、この旋回体23
から下フランジ板15のスリット15aを挿通された前
後一対の連結棹24を介して上方に突設されるとともに
下7ランジ板15の上面上を走行自在な左右一対の走行
車輪25を有する走行フレーム26と、この走行フレー
ム26上に配置されるとともに一対のスプロケット27
.28および無端状チェーン29を介して上記走行車輪
25を回転駆動させる電1J71機30と、走行フレー
ム26上端の前後位置に取付けられるとともに上フラン
ジ板31側のガイド溝32に案内される走行用ガイドロ
ーラ33とから構成されている。なお、この走行用ガイ
ドローラ33を介して電源および制御信号が供給される
。ところで、この搬送台車11はコンテナ列車Aのコン
テナBの数(−列車分は100個程度)に応じて多数用
意されるとともに、各搬送台車11の走行および方向指
示は、中央コントロール室の制御装置によって与えられ
る。
As shown in FIG. 2, on the guide rail 6,
A container carrier 11 is movably provided and has a holding device 12 that can hold and release containers B on the container train A and in the loading/unloading yard 5. That is, as shown in FIGS. 3 and 4, this transport vehicle 11 is
A truck body 13 having a holding device 12 and this truck body 1
3 (only one side is shown in FIGS. 3 and 4), the guide rails 6
It is comprised of a traveling device 16 that can freely travel on the upper surface of a lower flange plate 15 that forms a guide space 14. The holding device 12 provided on the trolley body 13 has a lifting frame 18 suspended from 4WA on the lower surface of the trolley body 13 via a chain 17, and a lifting frame 18 that is also suspended from the four corners of the trolley body 13 and attached to the chain 17. First cylinder device 1 that raises and lowers the lifting frame 18 by pushing down or loosening the middle part
9, a holding claw 21 for holding a container whose upper intermediate portion is swingably suspended via a horizontal pin 20 at the front and back positions of both measuring parts of the lifting frame 18, and a holding claw 21 for holding a container on the upper surface of the valve lifting frame 18 It is comprised of second cylinder devices 22 which are provided at front, rear, right and left positions and push and pull the upper end of each holding claw 21 to move the holding claws 21 toward and away from each other, that is, to hold and release the container. Further, each of the traveling devices 16 includes a revolving body 23 rotatably attached to the upper surface of the truck body 13, and
A running frame having a pair of left and right running wheels 25 that project upwardly through a pair of front and rear connecting rods 24 inserted through slits 15a of a lower flange plate 15, and that are capable of running freely on the upper surface of the lower 7 flange plate 15. 26, and a pair of sprockets 27 disposed on the running frame 26.
.. 28 and an electric 1J71 machine 30 that rotationally drives the traveling wheels 25 via an endless chain 29, and a traveling guide that is attached to the front and back positions of the upper end of the traveling frame 26 and guided by a guide groove 32 on the upper flange plate 31 side. It is composed of a roller 33. Note that power and control signals are supplied via this traveling guide roller 33. By the way, a large number of these transport vehicles 11 are prepared according to the number of containers B in the container train A (approximately 100 containers for the minus train), and the running and direction of each transport vehicle 11 is controlled by a control device in the central control room. given by.

また、上記分岐線路2は、第1図に示すように、走行線
路1側に接続された固定分岐線路部2aと、各引込線路
3に対して直交する方向で走行自在な走行台車7上に配
置されて任意の引込線路3に接続可能にされた移動分岐
線路部2bとから構成され、この移動分岐線路部2bの
長さは、 a成(例えば20輌)のコンテナ列車の長さ
よりも長くされている。したがって、この走行台車7上
の移動分岐線路部2bを使用することによって、ある引
込線路3上のコンテナ列車を他の任意の引込線路3上に
移動させることができる。また、分岐、?2路部2は、
走行線路1と同一本数すなわち2本設けられており、し
たがって走行台車7も2台設けられている。
Further, as shown in FIG. 1, the branch line 2 includes a fixed branch line section 2a connected to the running track 1 side, and a running bogie 7 that can freely run in a direction orthogonal to each lead-in line 3. The moving branch line section 2b is arranged so that it can be connected to any lead-in line 3, and the length of this moving branch line section 2b is longer than the length of an A-sized (for example, 20 cars) container train. has been done. Therefore, by using the moving branch line section 2b on the traveling bogie 7, a container train on a certain lead-in track 3 can be moved onto any other lead-in track 3. Also, branching? 2nd road section 2 is
The same number of running tracks 1, that is, two, are provided, and accordingly, two running bogies 7 are also provided.

次に、コンテナの荷役作業について説明する。Next, container cargo handling work will be explained.

まず、コンテナ列車を電気橢関車からディーゼル様間車
に連結替えした後、固定および移動分岐線路部2a、2
bを介して所定の引込線路3に引込む。次に、この引込
線路3上方の荷役ヤード側案内レール6aに案内待門さ
れた各搬送台車11の保持に貿12を作動さすてコンテ
ナ列車A上のコンテナBを一斉に保持して(−車輌ごと
に順番に保持してもよい)所定高さまで吊上げる。勿論
、搬送台車11はコンテナ列ftfAに積載されたコン
テナBの数だけ待機されている。この吊上げられた各コ
ンテナBは、中央コントロール室からの搬送台車11の
走行指令により、矢印Cで示すように、連結用案内レー
ル5Cを介して行先に応じた所定のか出入ヤード側案内
レール6bの荷降ろし部aにワ肋される。そして、コン
テナBは床面上またはコンテナ積載台上に降ろされ、フ
ォークリフトによりすぐそばに3寺芸しているトラック
に積込まれ、その後トラックは矢印dで示すようにコン
テナの積込み部すとは反対側から出ていく。
First, after reconnecting the container train from an electric railroad car to a diesel railroad car, the fixed and mobile branch line sections 2a, 2
It is drawn into a predetermined lead-in line 3 via b. Next, the transport 12 is operated to hold each of the transport vehicles 11 that are guided to the cargo handling yard side guide rail 6a above the lead-in track 3, and the containers B on the container train A are held all at once. (You may hold each item in turn) until it reaches a specified height. Of course, the transport vehicles 11 are on standby in the same number as the containers B loaded on the container row ftfA. Each of the lifted containers B is moved to a predetermined entrance/exit yard side guide rail 6b according to the destination via the connecting guide rail 5C, as shown by the arrow C, according to a travel command for the transport vehicle 11 from the central control room. It is loaded onto the unloading section a. Container B is then lowered onto the floor or onto a container loading platform, and is loaded by a forklift onto a nearby truck, which then moves to the container loading area as shown by arrow d. Go out the other side.

一方、空になったコンテナ列車Aにコンテナを積込む場
合、搬出入ヤード側案内レール6bの積込み部すで特別
させられている搬送台車11に、トラックにより外@ 
(矢印eで示す)から運び込まれた積込用コンテナBを
保持させる。なお、この作業はコンテナの荷降ろし作業
とは関係なく行なうことができるため、コンテナの荷役
作業の効率化を図ることができる。次に、この積込用コ
ンテナBを保持した状態で多数待dさせられた搬送台車
11が、空のコンテナ列車A上方の荷役ヤード側案内レ
ール6aに走行移動されて、空のコンテナ列車Aに一斉
にコンテナBの積込みが行なわれる。
On the other hand, when loading a container onto an empty container train A, a truck loads the container onto the carriage 11, which has a special loading section on the loading/unloading yard side guide rail 6b.
The loading container B brought in from (indicated by arrow e) is held. In addition, since this work can be performed independently of the container unloading work, it is possible to improve the efficiency of the container cargo handling work. Next, a large number of transport vehicles 11 that have been kept waiting while holding the loading containers B are moved to the cargo handling yard side guide rail 6a above the empty container train A, and are moved to the loading yard side guide rail 6a above the empty container train A. Containers B are loaded all at once.

積込みが完了すると、移動および固定分岐線路部2b、
2aを介して着発線である走行線路1上に移動された後
、再びディーゼル懇関車から電気a間車に連結替えされ
て、所定目的地に向けて梵申される。
When loading is completed, the movable and fixed branch line section 2b,
After being moved onto the running track 1, which is the arrival/departure line, via the train 2a, the diesel railcar is reconnected from the diesel railcar to the electric A-series railcar, and is then driven to a predetermined destination.

ところで、上記説明において、空のコンテナ列車へにコ
ンテナBを積込むのに、搬出入ヤード5からコンテナB
を移動させたが、例えば同じ荷役ヤード4からコンテナ
Bを積込むこともてきる。
By the way, in the above explanation, when loading container B onto an empty container train, container B is loaded from loading/unloading yard 5.
However, for example, container B can also be loaded from the same cargo handling yard 4.

すなわち、別の引込線路3上の荷役ヤード側案内レール
6aにコンテナBを保持した搬送台車11を多数待機さ
せておき、空のコンテナ列車Bを−旦どちらか一方の走
行台車7上の移動分岐線路部2bに移動させる。そして
、走行台車7をコンテナBを保持待機している引込線路
3に対応する位置まで走行させ、空のコンテナ列車Aを
その引込線路3上に移動させてコンテナBを積込めばよ
い。
That is, a large number of transport vehicles 11 holding containers B are kept on standby on the cargo handling yard side guide rail 6a on another lead-in track 3, and the empty container train B is moved to a moving branch on one of the running vehicles 7. It is moved to the track section 2b. Then, the traveling bogie 7 is driven to a position corresponding to the lead-in track 3 holding and waiting the container B, and the empty container train A is moved onto the lead-in track 3 and the container B is loaded thereon.

また、他方の走行台車7を使用すれば、同時に他のコン
テナ列車Aの引込み、または走行線路1への引出し作業
も行なうことができる。このように、各引込線路3に直
接接続される分岐線路2の一部を走行台車7上に設けて
、この走行台車7の走行移動により、各引込線路3に分
岐させるようにしたので、従来、各分岐部で必要とした
斜め部分く第5図のf部分)は不要となり、設備全体を
短かくすることができる。
Furthermore, by using the other running bogie 7, it is possible to pull in another container train A or pull it out onto the running track 1 at the same time. In this way, a part of the branch line 2 that is directly connected to each lead-in track 3 is provided on the running bogie 7, and the branching line 2 is branched to each lead-in track 3 by the running movement of the running bogie 7. , the diagonal sections required at each branch (portion f in FIG. 5) are no longer necessary, and the entire equipment can be shortened.

なお、上記実施例においては、搬出入ヤード側案内レー
ルを荷役ヤード側案内レールに対して直角方向で配置し
たが、例えば所定角度(60゜70’など)で斜めに接
続配置した構成としてもよい。
In addition, in the above embodiment, the loading/unloading yard side guide rail is arranged at right angles to the loading/unloading yard side guide rail, but it may also be configured such that it is connected and arranged diagonally at a predetermined angle (60° 70', etc.). .

梵明の効果 上記本発明の構成によると、コンテナ荷役用ヤードとコ
ンテナ搬出入用ヤードとの間で、コンテナの保持装置を
有する搬送台車を案内レールを介して走行自在に設けた
ので、コンテナ列車上のコンテナを一斉に搬送台車に保
持させてコンテナ搬出入用ヤードに移動させることがで
き、したがって従来のように直接フォークリフトに一個
づつより積み降ろす必要がないため、作業時間を大幅に
短縮することができるとともに、引込線路間隔を狭くす
ることができるので、広大な敷地を必要としない。また
、複数個の搬出入ヤード側案内レールは、それぞれ荷役
ヤード側案内レールに対して、所定角度でもって枝状に
配置されるため、各コンテナの運搬先に応じて各搬出入
ヤード側案内レールを対応させておけば、コンテナの仕
分作業を効率よく行なうことができ、さらに各搬出入ヤ
ード側案内レールの一端側をコン、テナの荷降ろし部に
、他端側を積込み部にすれば、互いに関係なくコンテナ
の積み降ろしを行なうことができ、コンテナの荷役作業
の効率化すなわち作業時間を大幅に短縮することができ
る。
Effects of Brahma According to the above-mentioned structure of the present invention, since the transport vehicle having the container holding device is provided so as to be freely movable via the guide rail between the container cargo handling yard and the container loading/unloading yard, the container train Containers can be held all at once on a transport vehicle and moved to the container loading/unloading yard.Therefore, there is no need to directly load and unload one by one onto a forklift as in the past, significantly reducing work time. In addition to this, the spacing between lead-in tracks can be narrowed, so a vast site is not required. In addition, since the plural loading/unloading yard side guide rails are arranged in a branch shape at a predetermined angle with respect to the loading/unloading yard side guide rail, each loading/unloading yard side guide rail can be adjusted depending on the destination of each container. If these are made to correspond, container sorting work can be carried out efficiently, and if one end of each loading/unloading yard guide rail is used as the unloading section for containers and containers, and the other end is used as the loading section, Containers can be loaded and unloaded independently of each other, and the efficiency of container cargo handling work can be improved, that is, the working time can be significantly shortened.

【図面の簡単な説明】[Brief explanation of drawings]

第1図〜第4図は本発明の一実施例を示すもので、第1
図は線路の配置を示す平面図、第2図は搬送台車の斜視
図、第3図は搬送台車の正面図、第4図は搬送台車の側
面図、第5図は従来例の線路の配置を示す平面図である
。 1・・・走行線路、2・・・分岐線路、3・・・引込線
路、4・・・コンテナ荷役用ヤード、5・・・コンテナ
搬出入用ヤード、6・・・案内レール、6a・・・荷受
ヤード側案内レール、6b・・・搬出入ヤード側案内レ
ール、6C・・・連結用案内レール、7・・・走行台中
、11・・・搬送台車、12・・・保持8置。 代理人   森  本  義  弘
Figures 1 to 4 show one embodiment of the present invention.
The figure is a plan view showing the layout of the tracks, Figure 2 is a perspective view of the carrier, Figure 3 is a front view of the carrier, Figure 4 is a side view of the carrier, and Figure 5 is the layout of conventional tracks. FIG. 1... Travel track, 2... Branch track, 3... Leading track, 4... Container cargo handling yard, 5... Container loading/unloading yard, 6... Guide rail, 6a...・Receiving yard side guide rail, 6b... Loading/unloading yard side guide rail, 6C... Connection guide rail, 7... Inside the traveling platform, 11... Transport trolley, 12... Holding 8 places. Agent Yoshihiro Morimoto

Claims (1)

【特許請求の範囲】[Claims] 1、走行線路から分岐線路を介して複数本のコンテナ列
車引込線路を敷設し、これら引込線路部をコンテナ荷役
用ヤードとなすとともに、このコンテナ荷役用ヤードと
、このコンテナ荷役用ヤードに隣接して設けられたコン
テナ搬出入用ヤードとに亘つて案内レールを配置し、複
数個設けられた上記各搬出入ヤード側案内レールを、引
込線路上方の荷役ヤード側案内レールに対して、同一水
平面内で所定角度でもつて傾きを有せしめて配置し、こ
の案内レールに、コンテナを保持解放自在な保持装置を
有するコンテナ搬送台車を走行自在に設けたことを特徴
とするコンテナ列車における荷役設備。
1. Lay a plurality of container train lead-in tracks from the running track via branch tracks, and use these lead-in tracks as a container handling yard. A guide rail is arranged across the provided container loading/unloading yard, and each of the plurality of said loading/unloading yard side guide rails is placed in the same horizontal plane with respect to the loading/unloading yard side guide rail above the lead-in track. 1. Cargo handling equipment for a container train, characterized in that the guide rail is arranged with an inclination at a predetermined angle, and a container transport trolley having a holding device capable of holding and releasing a container is provided on the guide rail so as to be freely movable.
JP27209988A 1988-10-27 1988-10-27 Loading installation for container train Pending JPH02117465A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27209988A JPH02117465A (en) 1988-10-27 1988-10-27 Loading installation for container train

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27209988A JPH02117465A (en) 1988-10-27 1988-10-27 Loading installation for container train

Publications (1)

Publication Number Publication Date
JPH02117465A true JPH02117465A (en) 1990-05-01

Family

ID=17509067

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27209988A Pending JPH02117465A (en) 1988-10-27 1988-10-27 Loading installation for container train

Country Status (1)

Country Link
JP (1) JPH02117465A (en)

Similar Documents

Publication Publication Date Title
JPH09105104A (en) Rail unloading car
TW200307638A (en) Automated guided vehicle system
EA011069B1 (en) Method and reloading system for reloading or at least one loading unit
JPH10101231A (en) Device for transferring cargo horizontally
US5421688A (en) Installation for the load transfer of piece goods in the form of load units such as containers, returnable containers, semi-trailers or the like
SK378792A3 (en) Device for transloading unit loads such as containers, swap bodies, semitrailers or the like
JPH02117465A (en) Loading installation for container train
JPH0262323A (en) Cargo handling equipment in container train
JPH11245804A (en) Transfer system
JPH02117462A (en) Traveling carriage for loading installation of cargo train
RU2028406C1 (en) Device for loading, transportation and laying of track structure
JPH1017109A (en) Railway container terminal
JPS6357270B2 (en)
JP2890009B2 (en) Railway vehicle transport device and railway vehicle three-dimensional storage facility
JP3202261B2 (en) Panel transportation and erection equipment
JPH06212822A (en) Roof parking device
JP3574927B2 (en) Railway vehicle maintenance equipment
EA014996B1 (en) Track arrangement
JPH10159499A (en) Conveying device used in tunnel construction
JP3092045B2 (en) Transport trolley
JPS59223604A (en) Transporting, storing, and handling system for cargo
JPH06179506A (en) Conveying/floor placing storage device
JP3213712B2 (en) Container automatic transfer device and transfer method
CN118107615A (en) Overhead rail transport system for cargo transportation
JPS6228026B2 (en)