JPH01322064A - Scaffold erection method for construction work performing temporary general grounding using scaffolding steel pipe - Google Patents

Scaffold erection method for construction work performing temporary general grounding using scaffolding steel pipe

Info

Publication number
JPH01322064A
JPH01322064A JP15600988A JP15600988A JPH01322064A JP H01322064 A JPH01322064 A JP H01322064A JP 15600988 A JP15600988 A JP 15600988A JP 15600988 A JP15600988 A JP 15600988A JP H01322064 A JPH01322064 A JP H01322064A
Authority
JP
Japan
Prior art keywords
scaffold
scaffolding
construction
construction work
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15600988A
Other languages
Japanese (ja)
Inventor
Kiyoshi Nagashima
清 長嶋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TOKI ENG KK
Original Assignee
TOKI ENG KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TOKI ENG KK filed Critical TOKI ENG KK
Priority to JP15600988A priority Critical patent/JPH01322064A/en
Publication of JPH01322064A publication Critical patent/JPH01322064A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE:To enable the cost of construction to be saved while enhancing safety by using a scaffolding steel pipe building a necessary member in a construction work spot on the ground and collectively lifting the built up scaffold member to be mounted. CONSTITUTION:A scaffold main unit 2 corresponding to the length of a scaffold necessary for construction work, main members 3a, 3b for being linked between scaffold supports and diagonal members 3 of a truss beam are built up into a truss shape on the ground. While a handrail and/or a safety net 6 of the scaffold are also built up simultaneously. The built up scaffold is hoisted up to a predetermined position by winches 18a, 18b winding up a wire rope 13 and connected to scaffold supporting metal fixtures 17a, 17b by using bolts.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は橋梁架設工事や、鉄鋼構造物の工事現場にお
いて使用する建設工事用足場工法である。
[Detailed Description of the Invention] [Industrial Field of Application] The present invention is a scaffolding method for construction work used in bridge construction work and steel structure construction sites.

〔従来の技術及びこの発明が解決しようとする問題点〕
従来、橋梁架設工事や、鉄鋼構造物の建設工事現場にお
いて用いられている工法は、建わくを組立てて、その上
に布わくや、手摺9等を取付ける1ざ 工法も、鉄柱(ベント)を建てたシ、又はビヤ−を利用
しfcシしてその支間内に、ワイヤーロープを張シ渡し
て後、その上に足場用鋼管(コロガシ)を並列にならべ
、それをワイヤーロープに固縛して後に足場板や、手摺
如等を取付ける工法で、全て高所作業をともなうもので
あるが、この安全のために行う足場工事において、時に
は死亡事故も発生しているのが現況である。そこで、こ
の高所作業を取シやめ全て地上にて組立てを完了させる
ことによって、安全度向上のためと工費節減の技術的問
題が生じてくるのである。
[Prior art and problems to be solved by this invention]
Traditionally, the construction methods used at bridge construction and steel structure construction sites include the one-shot construction method, in which the building frame is assembled and a cloth frame, handrails, etc. are attached on top of it; After constructing an FC or via, stretch a wire rope between its spans, then line up steel pipes for scaffolding in parallel on top of it, and secure them to the wire rope. This is a construction method in which scaffold boards, handrails, etc. are installed after construction, and all work involves work at heights, but the current situation is that fatal accidents sometimes occur during scaffolding work performed for safety purposes. Therefore, by eliminating this work at high places and completing all assembly on the ground, technical problems arise in order to improve safety and reduce construction costs.

〔問題点を解決するための手段〕[Means for solving problems]

この発明は、上記問題点に鑑み、これを解決せんとして
提案せられたものであシ、建設工事用足場に必要な部材
は全て、地上にて組立てを完了すること。その主要部材
は、足場用鋼管及び緊結金具を使用し、接手には、軸力
に対し充分な許容応力をもつ接手を使用することを特徴
とする、建設工事用足場の工法を提供せんとするもので
ある。
This invention was proposed in view of the above-mentioned problems and as a solution to these problems.All the members necessary for scaffolding for construction work should be assembled on the ground. The present invention aims to provide a construction method for scaffolding for construction work, which uses scaffolding steel pipes and fastening fittings as its main components, and uses joints with sufficient allowable stress against axial force as joints. It is something.

〔作用〕[Effect]

建設工事に必要な足場の長さに相応した足場の梁は、軸
方向に強力な抵抗力をもっ接手を用いて接合する。又、
支間の長さに応じて主要部材の梁は、トラス形に組立て
る。トラスを構成する部材は、全て足場用鋼管及び緊結
金具を用いて、工場又は現場において組立てる。横方向
の部材も全て、足場用鋼管及び緊結金具を使用して組立
て、その上に足場板や手摺シや、安全ネット等を地上に
て組立てる。又、足場の両端部には足場本体固定金具と
、ロープ、プーリー(滑車)を取付けておく。
Scaffolding beams corresponding to the length of scaffolding required for construction work are joined using joints with strong resistance in the axial direction. or,
The main beams are assembled into a truss shape depending on the length of the span. All members constituting the truss are assembled in a factory or on-site using scaffolding steel pipes and fastening fittings. All horizontal members will be assembled using scaffolding steel pipes and fastening fittings, and then scaffolding boards, handrails, safety nets, etc. will be assembled on the ground. Also, attach the scaffold body fixing fittings, ropes, and pulleys to both ends of the scaffold.

一方、工事に必要な高さの位置に壁や、ビヤ−1又はイ
ンドを利用して、足場を支えるに必要な固定金具と、工
事用足場を一括吊上げるためのロープ、プーリー(滑車
)を設置しておく。以上の組立て作業が全部完了した時
点で、−活量上げをウィンチ等の巻上機を用いて行う工
法であるが、吊上げに必要なワイヤーロープ及びロープ
、プーリーは、足場の全重量に合せてロープの懸数及び
ロープ数は、建設業者の手持ちのもので、そこに生ずる
力に相応したものをえらんで決定するもので、1人の合
図者と、4人の足場を固定する作業者、兼見張人によっ
て上架仮設が施工できるので、安全にして容易、且つ工
事費節減が可能な工事を完遂することができる。
On the other hand, by using walls, vias or india at the height required for the construction work, install the fixing hardware necessary to support the scaffolding, as well as ropes and pulleys to lift the construction scaffolding all at once. Set it up. When all of the above assembly work is completed, - This method uses a hoisting machine such as a winch to lift the scaffold, but the wire ropes, ropes, and pulleys necessary for hoisting should be adjusted according to the total weight of the scaffold. The rope suspension and the number of ropes are determined by what the construction contractor has on hand and are appropriate for the force generated.One signaler, four workers securing the scaffolding, Since the temporary structure of the elevated structure can be constructed by the watchman, the work can be completed safely, easily, and at a reduced construction cost.

〔実施例〕〔Example〕

以下、この発明の一実施例を別添付図に従って詳述する
。(1)は橋梁の桁を支えるためのビヤ−(橋台)であ
って、(2)は橋梁の本体であシ、この橋梁本体をビヤ
−間に架設後、本発明の足場用鋼管を用いて、−括上架
仮設を行なう建設工事用足場工法を施工した場合の実施
例について述べる。
DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail below with reference to the accompanying drawings. (1) is a via (bridge abutment) for supporting the girder of the bridge, and (2) is the main body of the bridge. After the bridge main body is constructed between the vias, the scaffolding steel pipe of the present invention is used. Next, an example will be described in which the scaffolding method for construction work is used to temporarily construct a temporary elevated structure.

(3a)(ab)は足場支間に掛は渡すだめの主材で、
トラスの上弦、下弦であって支間距離をLとし、上弦−
下弦の高さをHとすれば、Hの高さの割合は支間距離り
に対しLAs以上に設定する。(3)はトラス梁の斜材
であって、偏芯ローラ付緊結金具によって(3a)(a
b)に接合する。(3C)は両側のトラス梁を連結する
部材で(3) (3a) (3b) (3C)とも全て
≠4EL6の足場鋼管を用いである。(5)は作業場所
の足場板であり、(6)は安全ネットである。(7a)
 (7b)は足場用鋼管を用いて一括上果仮設を行なう
建設工事用足場架設工法を施工する場合に用いる吊上用
ロープ、プーリー(滑車)をビヤ−上に固定する九めの
固定金具であって、(8)はビヤ−の兼さに応じて伸縮
可能な、ターンバックルで、固定金具をビヤ−に締付け
る几めに用いる。(9a) (9b)は足場本体固定金
具であって% (9a)は上架用ロープ、プーリーを具
備したもので、トラス梁の上弦端部に設けである。(9
b)は(ロ)のワイヤーロープによって(9りと結ばれ
る固定金具で、下弦材の両端に設ける。
(3a) (ab) is the main material of the scaffolding span,
The upper and lower chords of the truss, where the span distance is L, and the upper chord -
Assuming that the height of the lower chord is H, the ratio of the height of H to the span distance is set to be greater than or equal to LAs. (3) is a diagonal member of a truss beam, and (3a) (a
b) Join. (3C) is a member that connects the truss beams on both sides, and (3) (3a) (3b) (3C) are all made of ≠4EL6 scaffolding steel pipes. (5) is a scaffold board at the work place, and (6) is a safety net. (7a)
(7b) is the ninth fixing bracket for fixing the lifting rope and pulley (pulley) to the top of the via, which is used when constructing the scaffolding method for construction work, which uses scaffolding steel pipes to temporarily construct the upper heel. (8) is a turnbuckle that can be expanded and contracted according to the size of the beer, and is used for tightening the fixing fitting to the beer. (9a) and (9b) are fixtures for fixing the scaffolding body, and (9a) is equipped with ropes and pulleys for climbing, and is installed at the upper chord end of the truss beam. (9
b) is a fixing fitting that is tied together with the wire rope (b), and is installed at both ends of the bottom chord.

(2)のワイヤーロープを(至)のウィンチによって所
定の位置まで吊上げ% (17a) (17b)の足場
支え金具にボルトを用いて接合することによって、足場
用鋼管を用いて一括上栗仮設を行なう建設工事用足場架
設工法によって、建設工事用足場架設は容易に完了する
ことを示し九−実施例でおる。
By hoisting the wire rope in (2) to a predetermined position using the winch in (to) and connecting it to the scaffolding support fittings in (17a) and (17b) using bolts, perform bulk temporary construction using scaffolding steel pipes. Example 9 shows that the erection of scaffolding for construction work can be easily completed by the method of erecting scaffolding for construction work.

〔発明の効果〕〔Effect of the invention〕

この発明は叙述せる一実施例に記述せる如く、高所作業
を行なうことなく地上にて組立てられるので、きわめて
安全な工法で69、且つ各建設会社が手持ちの足場鋼管
を用いて組立てられるので工費節減にも相当な効果が得
られ1、父、これを牌体すれば元の足場用鋼管の単管と
して保管できる効果をともなう実用的価値ある発明であ
る。
As described in the embodiment described below, this invention can be assembled on the ground without performing work at height, so it is an extremely safe construction method69, and it can be assembled using scaffolding steel pipes that each construction company has on hand, so the construction cost is low. It has a considerable effect on saving money1, and if it is made into tiles, it can be stored as a single pipe of the original scaffolding steel pipe, so it is an invention of practical value.

【図面の簡単な説明】[Brief explanation of the drawing]

めυ、第2図はその正面図で、この発明の全体的な工法
の構成部分を示す。第3図はこの発明の断面で、第4図
はトラス梁の構成方法を示す。第5図は上弦材の断面図
であって、緊結金具によって結合し友部分を示す。第6
図は吊上げ用部材とこれをビヤ−に固定する状態を示し
、1g7図は第6図の平面図である。 特許出願人 有限会社 東起エンジニアリング代光取締
役  長 嶋   清
Fig. 2 is a front view showing the constituent parts of the overall construction method of this invention. FIG. 3 is a cross section of the present invention, and FIG. 4 shows a method of constructing a truss beam. FIG. 5 is a cross-sectional view of the upper chord member, showing a portion connected by a fastening fitting. 6th
The figure shows the lifting member and the state in which it is fixed to the beer, and Figure 1g7 is a plan view of Figure 6. Patent applicant: Kiyoshi Nagashima, director of Toki Engineering Yokohama Co., Ltd.

Claims (2)

【特許請求の範囲】[Claims] (1)足場の主要部材の全てに足場用鋼管を用いて、建
設工事現場にて必要な部材を地上にて、ほとんどの部分
品を含めて組立て、この足場を一括して上架する工事工
法。
(1) A construction method that uses scaffolding steel pipes for all of the main components of the scaffold, assembles the necessary components, including most of the parts, on the ground at the construction site, and then erects the scaffold all at once.
(2)部材の接合に必要な接手には、軸方向の外力に対
し強力な抵抗力をもつ、足場用鋼管接手を使用せしもの
(2) The joints needed to join the members are steel pipe joints for scaffolding, which have strong resistance to external forces in the axial direction.
JP15600988A 1988-06-25 1988-06-25 Scaffold erection method for construction work performing temporary general grounding using scaffolding steel pipe Pending JPH01322064A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15600988A JPH01322064A (en) 1988-06-25 1988-06-25 Scaffold erection method for construction work performing temporary general grounding using scaffolding steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15600988A JPH01322064A (en) 1988-06-25 1988-06-25 Scaffold erection method for construction work performing temporary general grounding using scaffolding steel pipe

Publications (1)

Publication Number Publication Date
JPH01322064A true JPH01322064A (en) 1989-12-27

Family

ID=15618329

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15600988A Pending JPH01322064A (en) 1988-06-25 1988-06-25 Scaffold erection method for construction work performing temporary general grounding using scaffolding steel pipe

Country Status (1)

Country Link
JP (1) JPH01322064A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06141421A (en) * 1992-10-23 1994-05-20 Yonden Eng Kk Overhead footing for electric construction
CN100441779C (en) * 2006-04-19 2008-12-10 中国建筑第二工程局有限公司 Bridge construction method for air prefabrication and translation in place
JP2009108557A (en) * 2007-10-29 2009-05-21 Jr West Built Co Ltd Method of constructing guard net and fall prevention structure using guard net
CN103306205A (en) * 2013-06-09 2013-09-18 中国十七冶集团有限公司 Construction method of longitudinal wet joint formwork of prefabricated T beam or box beam
CN104213509A (en) * 2014-09-26 2014-12-17 重庆交通建设(集团)有限责任公司 Cable rope hoisting anchor rope type anchorage construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06141421A (en) * 1992-10-23 1994-05-20 Yonden Eng Kk Overhead footing for electric construction
CN100441779C (en) * 2006-04-19 2008-12-10 中国建筑第二工程局有限公司 Bridge construction method for air prefabrication and translation in place
JP2009108557A (en) * 2007-10-29 2009-05-21 Jr West Built Co Ltd Method of constructing guard net and fall prevention structure using guard net
JP4714203B2 (en) * 2007-10-29 2011-06-29 株式会社ジェイアール西日本ビルト Protective net construction method
CN103306205A (en) * 2013-06-09 2013-09-18 中国十七冶集团有限公司 Construction method of longitudinal wet joint formwork of prefabricated T beam or box beam
CN104213509A (en) * 2014-09-26 2014-12-17 重庆交通建设(集团)有限责任公司 Cable rope hoisting anchor rope type anchorage construction method
CN104213509B (en) * 2014-09-26 2016-08-24 重庆交通建设(集团)有限责任公司 A kind of cable hoisting anchor cable formula anchorage construction method

Similar Documents

Publication Publication Date Title
EP3147425B1 (en) A hub
EP0211671B1 (en) Trussed girder and method of constructing the roof framing of a building using the trussed girder
JP2010065378A (en) Hanging scaffold and method for erecting the same
CN109231006A (en) The construction method of hanging hang structure under a kind of steel structure truss
CN108894329B (en) Overhanging type pipe truss and mounting method of supporting rod thereof
JPH01322064A (en) Scaffold erection method for construction work performing temporary general grounding using scaffolding steel pipe
JPH06200625A (en) Frame method of arch truss construction
CN207062787U (en) Can Fast Installation remove maintenance construction platform
US5150556A (en) Chord truss roof structure
CN214531431U (en) Truss combination roof truss of opening string roof beam and encorbelmenting
JP3247749B2 (en) Construction method of long span truss beams
CN209924407U (en) Combined working platform for steel structure high-altitude installation
JP3049300B2 (en) Construction method of beam truss in building with overhead traveling crane
JP3100574B2 (en) Suspended scaffold and its erection method
JP2690822B2 (en) Steel construction method for low-rise buildings
CN209523125U (en) Hoist cable scaffold support construction and system
JP2691261B2 (en) Facility method of arch form support
KR19980012036U (en) Safety rope hanger of steel structure
JPS61162672A (en) Reinforcement skeletal construction and handrail for pre-mounting of beam member
CA3146732A1 (en) Monorail system and related scaffold structures, systems and methods of use
JP2740878B2 (en) Construction method of beam string roof structure
CN117188597A (en) Steel frame internal arch structure and flexible back-pull relay hoisting construction method thereof
CN115787996A (en) Overhung construction method and overhung frame for super-high building
JPH084113A (en) Installation method for structural steel small beam
JPH0475337B2 (en)