JPH01223270A - Foundation for tombstone - Google Patents

Foundation for tombstone

Info

Publication number
JPH01223270A
JPH01223270A JP5017788A JP5017788A JPH01223270A JP H01223270 A JPH01223270 A JP H01223270A JP 5017788 A JP5017788 A JP 5017788A JP 5017788 A JP5017788 A JP 5017788A JP H01223270 A JPH01223270 A JP H01223270A
Authority
JP
Japan
Prior art keywords
tombstone
foundation
ashes
tower root
pillars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5017788A
Other languages
Japanese (ja)
Inventor
Shigemitsu Fujii
藤井 繁光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP5017788A priority Critical patent/JPH01223270A/en
Publication of JPH01223270A publication Critical patent/JPH01223270A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PURPOSE:To improve the drainage at the periphery and the holding of a tombstone and facilitate the ashes laying by providing an ashes laying section between tower root pillars erected on foundation stones arranged in a drilled hole inside foundation piles and installing the tombstone on it. CONSTITUTION:Outer faces 2 are provided on foundation piles 7 and 7 via foundations 3, the inside is grilled and foundation stones 8 and 8 are put, tower root pillars 9 and 9 are erected on them. At this time connections between 8, 8 and 9, 9 are made firm by the use of connecting metals or the coupling between recesses and projections. An ashes laying section 5 is provided between the tower root pillars 9 and 9, filling earth 6 is put in the grilled section and back-filled without tightening. A tombstone 1 is installed on the tower root pillars 9 and 9 and held.

Description

【発明の詳細な説明】 この発明は墓石を建立する際、基礎にコンクリートを多
量に使用しなくとも墓が動かないようにし、又納骨の際
墓石を解体せずに墓の下の土に穴を掘り土中に納骨が出
来る墓石の基礎工法でちる。従来の工法は墓石が傾か々
いようにと多量のセメントを使用して工事をした、する
と墓石の下は雨水の排水が悪く、墓の基礎としては不適
当であり又納骨にしても仏を土に帰す為には墓石を移動
しなくては出来ない。本発明はそのような欠点を々くす
為に考えたもので、その構造を図面で説明する。第1図
は旧来工法の正面断面図で、長石2の下に基礎コンクリ
ート3を多量に使用している墓石1の下は墓石が傾かな
いように土と石4で固めて作る為に雨水の排水が悪く水
溜が出来る又墓石の周囲に水分が多いと土が腐食して悪
臭が発生して良くない、納骨にしても土中に骨を埋葬す
る際には、墓石の上部三段を解体移動して納骨しなけれ
ばなら々い。
[Detailed Description of the Invention] This invention prevents the grave from moving when erecting a tombstone without using a large amount of concrete for the foundation, and also makes it possible to make a hole in the soil under the grave without dismantling the tombstone when interment. This is a gravestone foundation construction method that allows gravestones to be buried in the ground. The conventional construction method used a large amount of cement to prevent the tombstones from tilting, but rainwater drainage under the tombstones was poor, making it unsuitable as a foundation for a tomb, and even if the ashes were interred, it was difficult to place a Buddha. In order to return to earth, the tombstone must be moved. The present invention has been devised to alleviate such drawbacks, and its structure will be explained with reference to the drawings. Figure 1 is a front cross-sectional view of the conventional construction method. Under the tombstone 1, a large amount of foundation concrete 3 is used under the feldspar 2. The area under the tombstone 1 is hardened with soil and stones 4 to prevent the tombstone from tilting, so rainwater can drain away. Poor drainage can cause water puddles.Also, if there is a lot of water around the gravestone, the soil will corrode and create a bad odor, which is not good.Even if the bones are to be interred, the top three steps of the gravestone should be dismantled before burial. We have to move and interment the remains.

第2図は本発明の墓石の基礎工法で、排水を良くする為
に基礎コンクリート3を少なく使用してそのかわりに基
礎杭7を使用する。又、墓石が傾それぞれ設けて固着し
て使用すれば、墓石の下に入れるサバ土6は固めずに施
行する事が出来る。
FIG. 2 shows the tombstone foundation construction method of the present invention, in which less foundation concrete 3 is used and foundation piles 7 are used instead in order to improve drainage. Furthermore, if the tombstones are tilted and fixed in place, the mackerel soil 6 placed under the tombstones can be placed without hardening.

墓石は、塔根柱9の上に立設するために傾くことがない
、又墓石の下のサバ±6を固めずに使用するために排水
が良く、納骨部5の周囲は清潔に管理することが出来る
The tombstone is placed upright on the base pillar 9, so it does not tilt, and the mackerel ±6 under the tombstone is used without compacting, so drainage is good, and the area around the ossuary part 5 is kept clean. I can do it.

墓石建立時にセメントの使用源を少なくして、雨水の排
水を良くし、納骨時の骨の埋葬に際して墓石を移動せず
に納骨できる工法は第2図及び第3、第4図で示す通シ
、塔根柱9と基礎石8を使用することにより可能である
。第3図、第4図は塔根柱9と基礎石8との部分使用例
を示し、第3図は塔根柱9と基礎石8とをステンレスの
連結金具で固定して施行すれば、塔根柱上部の墓石の重
量を十分に保持することが出来る。又墓石の下地面に穴
を堀り納骨しても塔根柱9と基礎石8とが離脱すること
なく墓石も煩くことがない。
The construction method shown in Figures 2, 3, and 4 is a construction method that reduces the amount of cement used when erecting tombstones, improves drainage of rainwater, and allows bones to be interred without moving the tombstones. , is possible by using the tower root column 9 and the foundation stone 8. Figures 3 and 4 show examples of partial usage of the tower base pillar 9 and foundation stone 8. Figure 3 shows that if the tower base pillar 9 and foundation stone 8 are fixed with stainless steel connecting fittings, It can sufficiently hold the weight of the tombstone at the top of the tower base pillar. Furthermore, even if a hole is dug in the base of the tombstone and the ashes are buried, the base pillar 9 and the foundation stone 8 will not separate, and the tombstone will not be bothered.

本発明は以上のような溝造で墓を建てるから、墓地は清
潔で排水もよく信仰の場所として最高によい場所が提供
できる。又墓地内の腐食した土もく、先祖が眠る良い場
所が提供できる。
Since the present invention constructs graves using the ditch construction as described above, the cemetery is clean and has good drainage, providing the best place for worship. Also, the rotten soil within the cemetery provides a good place for ancestors to rest.

納骨部5は塔根柱9で囲むので納骨する範囲が決まり、
又塔根柱は墓石を支える役と、仏を安置する場所の囲の
役も併用し、合せて墓石の下に穴を堀って納骨する際は
、墓地前部から傾斜して墓石下に穴を堀って納骨すれば
墓石を移動しなくても納骨が出来る。墓石の下を堀った
シ埋めたシしても、墓石の重量は塔根柱と基礎石に支え
られて墓石は傾くこともない。塔根柱は仏の近くに埋設
するので墓石と同じ材質の御影石を使用する。御影石は
化学変化も少なく気候にも強いので土中に埋めるお墓の
基礎としては最適である。
The ossuary burial area 5 is surrounded by the pedestal pillar 9, so the area in which the ashes will be interred is determined.
In addition, the base pillar is used both to support the tombstone and to enclose the place where the Buddha is enshrined.In addition, when digging a hole under the tombstone and placing the ashes there, it is tilted from the front of the cemetery and placed under the tombstone. If a hole is dug and the ashes are interred, the ashes can be interred without having to move the tombstone. Even if the tombstone is dug and buried, the weight of the tombstone is supported by the base pillars and foundation stones, and the tombstone will not tilt. Since the base pillar will be buried near the Buddha, granite, which is the same material as the tombstone, will be used. Because granite undergoes little chemical change and is resistant to climate, it is ideal as the foundation for graves buried in the ground.

したがって本発明は、人が死んで土に帰る(永眠)場所
に納骨をする際に墓石を移動することなく納骨が出来、
又墓石が煩(のを防ぐことの出来る墓石の基礎工法であ
る。
Therefore, the present invention enables burial of ashes at a place where a person returns to the earth (eternal rest) after death, without having to move the tombstone.
It is also a basic construction method for tombstones that can prevent tombstones from becoming troublesome.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は旧来工法の正面断面図である 第2図は本発明工法の正面断面図である@3図、第4図
は本発明工法の部分図である。
Figure 1 is a front cross-sectional view of the conventional method. Figure 2 is a front cross-sectional view of the method of the present invention. Figure 3 is a partial view of the method of the present invention.

Claims (1)

【特許請求の範囲】[Claims] 墓石底面と設置地面の間に複数の石柱を設け、石柱と同
数の基礎石を石柱の下に敷設定着して墓石を支持した墓
石の基礎。
A tombstone foundation in which multiple stone pillars are installed between the bottom of the tombstone and the ground, and the same number of foundation stones as the stone pillars are placed under the pillars to support the tombstone.
JP5017788A 1988-03-02 1988-03-02 Foundation for tombstone Pending JPH01223270A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5017788A JPH01223270A (en) 1988-03-02 1988-03-02 Foundation for tombstone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5017788A JPH01223270A (en) 1988-03-02 1988-03-02 Foundation for tombstone

Publications (1)

Publication Number Publication Date
JPH01223270A true JPH01223270A (en) 1989-09-06

Family

ID=12851917

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5017788A Pending JPH01223270A (en) 1988-03-02 1988-03-02 Foundation for tombstone

Country Status (1)

Country Link
JP (1) JPH01223270A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590407A (en) * 2013-11-15 2014-02-19 山西一建集团有限公司 Inverted-crown type tomb restoration construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590407A (en) * 2013-11-15 2014-02-19 山西一建集团有限公司 Inverted-crown type tomb restoration construction method

Similar Documents

Publication Publication Date Title
Soles The early Gournia town
JP7105399B2 (en) Grave with drainage mechanism and its repair method
JP3212073U (en) Circle-shaped tree funeral gathering tomb
JPH01223270A (en) Foundation for tombstone
US7200906B2 (en) Earth contact burial container, burial systems and methods
US4019294A (en) Marker support arrangement
Kulicka Islamic necropolis at Kom el-Dikka in Alexandria: research in the 2010–2013 seasons
JP3638680B2 (en) Wall tomb
JP7330410B1 (en) tombstone
KR19990084161A (en) A family burial ground and construction method thereof
KR200350416Y1 (en) The environmental-friendly charnel house
KR102672522B1 (en) How to create a flat grave
JP2023118419A (en) Cinerary urn type graveyard structure
JP3055381U (en) Double-layered osseous chamber structure in a tomb
JP3002292U (en) Osseous room
KR100688339B1 (en) The changeable cemetery
Gilkes et al. Two Roman mausolea on the Vrina Plain
Peilstöcker et al. Yafo, Ganor Compound
KR200227285Y1 (en) Family charnel
JPH10252313A (en) Graveyard, block for preparation of graveyard, and preparation work for graveyard
Zilberbod et al. Mazor (El'ad), Area H7 (A)
Azarpay Cairns, kurums and dambs: a note on pre-Islamic surface burials in eastern Iran and Central Asia
JP2023079248A (en) Permanent memorial service grave, building method of permanent memorial service grave
KR200193196Y1 (en) Family charnel burial ground
KR970005144Y1 (en) Ashes storage case