JP7053113B2 - 継続的プロセス検証(cpv)用の分析/統計モデリングを使用するための方法及び装置、製品 - Google Patents
継続的プロセス検証(cpv)用の分析/統計モデリングを使用するための方法及び装置、製品 Download PDFInfo
- Publication number
- JP7053113B2 JP7053113B2 JP2016244982A JP2016244982A JP7053113B2 JP 7053113 B2 JP7053113 B2 JP 7053113B2 JP 2016244982 A JP2016244982 A JP 2016244982A JP 2016244982 A JP2016244982 A JP 2016244982A JP 7053113 B2 JP7053113 B2 JP 7053113B2
- Authority
- JP
- Japan
- Prior art keywords
- batch
- simulated
- process control
- measured
- datasets
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B17/00—Systems involving the use of models or simulators of said systems
- G05B17/02—Systems involving the use of models or simulators of said systems electric
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0218—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
- G05B23/0243—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults model based detection method, e.g. first-principles knowledge model
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41875—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by quality surveillance of production
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/4184—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by fault tolerance, reliability of production system
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41885—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by modeling, simulation of the manufacturing system
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
- G06F17/18—Complex mathematical operations for evaluating statistical data, e.g. average values, frequency distributions, probability functions, regression analysis
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0218—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
- G05B23/0224—Process history based detection method, e.g. whereby history implies the availability of large amounts of data
- G05B23/024—Quantitative history assessment, e.g. mathematical relationships between available data; Functions therefor; Principal component analysis [PCA]; Partial least square [PLS]; Statistical classifiers, e.g. Bayesian networks, linear regression or correlation analysis; Neural networks
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Theoretical Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Data Mining & Analysis (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Physics (AREA)
- Pure & Applied Mathematics (AREA)
- Mathematical Optimization (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- Computer Hardware Design (AREA)
- Bioinformatics & Cheminformatics (AREA)
- Bioinformatics & Computational Biology (AREA)
- Operations Research (AREA)
- Probability & Statistics with Applications (AREA)
- Evolutionary Biology (AREA)
- Algebra (AREA)
- Life Sciences & Earth Sciences (AREA)
- Databases & Information Systems (AREA)
- Software Systems (AREA)
- Testing And Monitoring For Control Systems (AREA)
- General Factory Administration (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/974,458 US10394973B2 (en) | 2015-12-18 | 2015-12-18 | Methods and apparatus for using analytical/statistical modeling for continued process verification (CPV) |
| US14/974,458 | 2015-12-18 |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2017111827A JP2017111827A (ja) | 2017-06-22 |
| JP2017111827A5 JP2017111827A5 (enExample) | 2020-02-06 |
| JP7053113B2 true JP7053113B2 (ja) | 2022-04-12 |
Family
ID=58221976
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2016244982A Active JP7053113B2 (ja) | 2015-12-18 | 2016-12-19 | 継続的プロセス検証(cpv)用の分析/統計モデリングを使用するための方法及び装置、製品 |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US10394973B2 (enExample) |
| JP (1) | JP7053113B2 (enExample) |
| CN (1) | CN106896800B (enExample) |
| DE (1) | DE102016124585A1 (enExample) |
| GB (1) | GB2547086B (enExample) |
Families Citing this family (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102016107491A1 (de) * | 2016-04-22 | 2017-10-26 | Beckhoff Automation Gmbh | Verbindungseinheit, Überwachungssystem und Verfahren zum Betreiben eines Automatisierungssystems |
| AT519096B1 (de) * | 2016-12-23 | 2018-04-15 | Engel Austria Gmbh | Verfahren zum Einstellen einer Formgebungsmaschine |
| CN113946105B (zh) | 2017-02-22 | 2025-01-10 | Asml荷兰有限公司 | 计算量测法 |
| US10649430B2 (en) * | 2018-06-26 | 2020-05-12 | Fisher-Rosemount Systems, Inc. | Method and apparatus for configuring access to multi-variable field devices signals |
| CN108873699B (zh) * | 2018-07-11 | 2021-02-09 | 杭州电子科技大学 | 一种化工时变工业过程混合控制方法 |
| GB201820282D0 (en) | 2018-12-13 | 2019-01-30 | Ge Healthcare Bio Sciences Ab | Method for control of a bioprocess |
| US11899417B2 (en) * | 2019-05-02 | 2024-02-13 | Fisher-Rosemount Systems, Inc. | Methods and apparatus to implement predictive analytics for continuous control system processes |
| JP7084907B2 (ja) * | 2019-11-28 | 2022-06-15 | 花王株式会社 | 品質計測方法及び品質計測装置 |
| JP7249320B2 (ja) * | 2020-11-30 | 2023-03-30 | 三菱ケミカルエンジニアリング株式会社 | 生産プロセスのモニタリング方法 |
| DE102022200946A1 (de) * | 2022-01-28 | 2023-08-03 | Robert Bosch Gesellschaft mit beschränkter Haftung | Verfahren und Vorrichtung zum Parametrieren eines Fertigungsprozesses |
| EP4343458A1 (en) * | 2022-09-21 | 2024-03-27 | Siemens Aktiengesellschaft | Method for monitoring quality of an industrial process |
| CN118732629B (zh) * | 2024-09-02 | 2024-11-12 | 成都秦川物联网科技股份有限公司 | 工业物联网信息云共享的生产工艺智能推荐方法和系统 |
| CN118740634B (zh) * | 2024-09-03 | 2024-11-12 | 成都秦川物联网科技股份有限公司 | 基于云平台的工业物联网信息服务方法、系统及存储介质 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009187175A (ja) | 2008-02-05 | 2009-08-20 | Fuji Electric Systems Co Ltd | バッチプロセスデータの解析装置およびそれを用いた異常検出/品質推定装置 |
| JP2010537282A (ja) | 2007-08-14 | 2010-12-02 | シエル・インターナシヨナル・リサーチ・マートスハツペイ・ベー・ヴエー | 化学プラントや精製所の連続オンラインモニタリング用のシステムおよび方法 |
| JP2011248885A (ja) | 2010-05-21 | 2011-12-08 | Fisher-Rosemount Systems Inc | プロセス分析モデルと実際のプロセス動作とのオンライン整合 |
| JP2016164772A (ja) | 2015-02-26 | 2016-09-08 | 富士電機株式会社 | プロセス監視装置、プロセス監視方法及びプログラム |
Family Cites Families (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6738682B1 (en) * | 2001-09-13 | 2004-05-18 | Advances Micro Devices, Inc. | Method and apparatus for scheduling based on state estimation uncertainties |
| US7379890B2 (en) * | 2003-10-17 | 2008-05-27 | Makor Issues And Rights Ltd. | System and method for profit maximization in retail industry |
| ITTO20040377A1 (it) | 2004-06-07 | 2004-09-07 | Martini Daniele De | Procedimento e sistema per il controllo statistico di processi industriali. |
| US7877154B2 (en) | 2005-09-30 | 2011-01-25 | Fisher-Rosemount Systems, Inc. | Method and system for controlling a batch process |
| US8090676B2 (en) * | 2008-09-11 | 2012-01-03 | Honeywell International Inc. | Systems and methods for real time classification and performance monitoring of batch processes |
| CN101872161A (zh) * | 2010-04-30 | 2010-10-27 | 浙江大学 | 一种基于虚拟现实的流程工业重点装置交互控制方法 |
| US9110462B2 (en) | 2010-05-04 | 2015-08-18 | Frito-Lay North America, Inc. | Batch control using bang-bang control |
| JP2012203714A (ja) | 2011-03-25 | 2012-10-22 | Toshiba Corp | モンテカルロ解析実行制御方法、およびモンテカルロ解析実行制御装置 |
| US9047559B2 (en) * | 2011-07-22 | 2015-06-02 | Sas Institute Inc. | Computer-implemented systems and methods for testing large scale automatic forecast combinations |
| US9110452B2 (en) | 2011-09-19 | 2015-08-18 | Fisher-Rosemount Systems, Inc. | Inferential process modeling, quality prediction and fault detection using multi-stage data segregation |
| US10018997B2 (en) | 2013-06-28 | 2018-07-10 | Fisher-Rosemount Systems, Inc. | Non-intrusive data analytics in a process control system |
| CN104598692B (zh) * | 2015-02-02 | 2017-12-08 | 廖鹰 | 火电厂排放烟尘污染仿真模拟方法 |
| US10331156B2 (en) * | 2015-03-03 | 2019-06-25 | Leidos, Inc. | System and method for big data geographic information system discovery |
-
2015
- 2015-12-18 US US14/974,458 patent/US10394973B2/en active Active
-
2016
- 2016-12-14 GB GB1621305.0A patent/GB2547086B/en active Active
- 2016-12-16 DE DE102016124585.2A patent/DE102016124585A1/de active Pending
- 2016-12-19 JP JP2016244982A patent/JP7053113B2/ja active Active
- 2016-12-19 CN CN201611179007.XA patent/CN106896800B/zh active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2010537282A (ja) | 2007-08-14 | 2010-12-02 | シエル・インターナシヨナル・リサーチ・マートスハツペイ・ベー・ヴエー | 化学プラントや精製所の連続オンラインモニタリング用のシステムおよび方法 |
| JP2009187175A (ja) | 2008-02-05 | 2009-08-20 | Fuji Electric Systems Co Ltd | バッチプロセスデータの解析装置およびそれを用いた異常検出/品質推定装置 |
| JP2011248885A (ja) | 2010-05-21 | 2011-12-08 | Fisher-Rosemount Systems Inc | プロセス分析モデルと実際のプロセス動作とのオンライン整合 |
| JP2016164772A (ja) | 2015-02-26 | 2016-09-08 | 富士電機株式会社 | プロセス監視装置、プロセス監視方法及びプログラム |
Also Published As
| Publication number | Publication date |
|---|---|
| DE102016124585A1 (de) | 2017-06-22 |
| GB201621305D0 (en) | 2017-01-25 |
| CN106896800A (zh) | 2017-06-27 |
| US20170177754A1 (en) | 2017-06-22 |
| JP2017111827A (ja) | 2017-06-22 |
| GB2547086A (en) | 2017-08-09 |
| GB2547086B (en) | 2021-11-10 |
| CN106896800B (zh) | 2021-07-06 |
| US10394973B2 (en) | 2019-08-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP7053113B2 (ja) | 継続的プロセス検証(cpv)用の分析/統計モデリングを使用するための方法及び装置、製品 | |
| JP7320368B2 (ja) | 故障予測装置、故障予測方法およびコンピュータプログラム | |
| US10018997B2 (en) | Non-intrusive data analytics in a process control system | |
| CN111033413B (zh) | 监视设备和用于监视系统的方法 | |
| US10901398B2 (en) | Controller, control program, control system, and control method | |
| KR102408426B1 (ko) | 설비 노화 지수를 이용한 이상 감지 방법 및 장치 | |
| US20180031587A1 (en) | Diagnostic Device and Method for Monitoring Operation of a Technical System | |
| EP2946219B1 (en) | System and method for fault management in lighting systems | |
| US11892819B2 (en) | Control device, control system, control method, and computer-readable storage medium | |
| US11136974B2 (en) | Development of a higher-level model | |
| CN111400850B (zh) | 设备故障分析方法、装置、设备和存储介质 | |
| CN118963303A (zh) | 基于人工智能的奶粉生产线智能监控方法及系统 | |
| CN111880400B (zh) | 用于实现针对连续过程的预测分析的方法和装置 | |
| JP2011253275A (ja) | プラントシミュレータ | |
| AU2022378548A1 (en) | Systems and methods for uncertainty prediction using machine learning | |
| US20190121934A1 (en) | Methods and apparatus to generate an aircraft system model using a standardized architecture | |
| CN120688655A (zh) | 用于获得领域知情ml/ai模型的方法 | |
| TWI830193B (zh) | 預測系統、資訊處理裝置以及資訊處理程式 | |
| CN110728041B (zh) | 信息处理方法及电子设备 | |
| JP2020004001A (ja) | 因果推論モデル構築方法 | |
| JP2023006304A (ja) | 制御システム、モデル生成方法およびモデル生成プログラム | |
| JP7676986B2 (ja) | 情報処理装置、モデル生成プログラムおよびモデル生成方法 | |
| JP4825482B2 (ja) | 不具合発生予測装置および不具合発生予測方法 | |
| JP7471529B1 (ja) | 診断システム及び診断方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20191219 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20191219 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20201222 |
|
| A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20210322 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20210622 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20211019 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20220114 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20220301 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20220330 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7053113 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |