JP7042590B2 - Lifting management system and lifting management method - Google Patents

Lifting management system and lifting management method Download PDF

Info

Publication number
JP7042590B2
JP7042590B2 JP2017220445A JP2017220445A JP7042590B2 JP 7042590 B2 JP7042590 B2 JP 7042590B2 JP 2017220445 A JP2017220445 A JP 2017220445A JP 2017220445 A JP2017220445 A JP 2017220445A JP 7042590 B2 JP7042590 B2 JP 7042590B2
Authority
JP
Japan
Prior art keywords
lifting
unit
operation log
information
input
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017220445A
Other languages
Japanese (ja)
Other versions
JP2019089640A (en
Inventor
康浩 ▲高▼橋
寛 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2017220445A priority Critical patent/JP7042590B2/en
Publication of JP2019089640A publication Critical patent/JP2019089640A/en
Application granted granted Critical
Publication of JP7042590B2 publication Critical patent/JP7042590B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、揚重管理システム、及び揚重管理方法に関する。 The present invention relates to a lifting management system and a lifting management method.

高層ビル等の建物の建設現場には、多くの資材が搬入される。ここで搬入される資材としては、例えば、建築資材、設備資材、躯体材、及び仮設材等、様々なものがある。これらの搬入された資材、仮設機械、及び作業員(以下、これらを「資材等」と総称する)は、建設現場に設置された揚重エレベータ及びクレーン等の揚重装置によって、建設中の建物内部の各階へと揚重される。特に大規模な建設現場においては、揚重装置は、多数の施工業者によって頻繁に利用される。そのため、施工業者間で揚重装置を効率的に共用することが求められる。例えば、特許文献1に記載の資材揚重管理システムは、揚重装置の利用スケジュール情報をデータベースにより一元管理し、当該利用スケジュール情報の集計及び出力を行うことにより揚重作業の効率化を図る。 Many materials are brought into the construction sites of buildings such as high-rise buildings. The materials carried in here include, for example, various materials such as building materials, equipment materials, skeleton materials, and temporary materials. These imported materials, temporary machines, and workers (hereinafter collectively referred to as "materials, etc.") are the buildings under construction by the lifting equipment such as lifting elevators and cranes installed at the construction site. It is lifted to each floor inside. Lifting equipment is frequently used by a large number of contractors, especially at large construction sites. Therefore, it is required to efficiently share the lifting device among the contractors. For example, the material lifting management system described in Patent Document 1 centrally manages the usage schedule information of the lifting device from a database, and collects and outputs the usage schedule information to improve the efficiency of the lifting work.

特開2004-307132号公報Japanese Unexamined Patent Publication No. 2004-307132

ところで、特に中規模以上の建設現場においては、揚重専門業者が施工業者各社の揚重作業を一括して請け負うことがある。この場合、揚重専門業者が施工業者各社に対して、実施した揚重作業に対する労務費を請求するが、そのためには揚重実績を記録しておく必要がある。しかしながら、特許文献1に記載の資材揚重管理システムは、揚重装置の利用スケジュールを管理するが、揚重実績の記録は行わない。従来、揚重専門業者は、例えば、建設現場において揚重実績を手書きのメモ等によって逐次記録していたため、揚重実績の記録及び集計に手間が掛かるという課題があった。また、手作業での記録によって揚重実績が現場内で埋没し、当該揚重実績が次の揚重作業計画に対して活かされないという課題があった。上述の課題を鑑み、本発明は、効率的に揚重実績を記録し一元管理することができる揚重管理システム、及び揚重管理方法を提供することを目的とする。 By the way, especially at a medium-sized or larger construction site, a lifting specialist may collectively undertake the lifting work of each contractor. In this case, the lifting specialist charges the contractors for the labor cost for the lifting work performed, but for that purpose, it is necessary to record the lifting results. However, the material lifting management system described in Patent Document 1 manages the usage schedule of the lifting device, but does not record the lifting results. Conventionally, a lifting specialist has, for example, sequentially recorded the lifting results by handwritten memos or the like at a construction site, so that there is a problem that it takes time and effort to record and tabulate the lifting results. In addition, there is a problem that the lifting record is buried in the site by the manual recording, and the lifting record is not utilized for the next lifting work plan. In view of the above problems, it is an object of the present invention to provide a lifting management system and a lifting management method capable of efficiently recording and centrally managing lifting results.

本発明は上記の課題を解決するためになされたものであり、本発明の一態様としては、データ入力端末と、稼働ログ取得装置と、揚重管理サーバと、を有する揚重管理システムであって、前記データ入力端末は、揚重装置による揚重の内容に関する揚重情報の入力を受け付ける入力部と、計測の開始及び終了が前記入力部から入力されることに応じて、前記揚重に要した揚重の開始から終了までの揚重時間を計測する揚重時間計測部と、前記揚重時間を含む、前記入力部によって入力された前記揚重情報を前記揚重管理サーバへ送信する揚重情報送信部と、を備え、前記稼働ログ取得装置は、前記揚重情報に基づく前記揚重における前記揚重装置の稼働ログを取得する稼働ログ取得部と、前記稼働ログ取得部によって取得された前記稼働ログを前記揚重管理サーバへ送信する稼働ログ送信部と、を備え、前記揚重管理サーバは、前記揚重情報送信部から送信された前記揚重情報と、前記稼働ログ送信部から送信された前記稼働ログと、を記憶する記憶部、を備えることを特徴とする揚重管理システムである。 The present invention has been made to solve the above problems, and one aspect of the present invention is a lifting management system including a data input terminal, an operation log acquisition device, and a lifting management server. The data input terminal has an input unit that accepts input of lifting information regarding the content of lifting by the lifting device, and the lifting device receives the start and end of measurement from the input unit. The lifting time measuring unit that measures the lifting time from the start to the end of the required lifting and the lifting information input by the input unit including the lifting time are transmitted to the lifting management server. The operation log acquisition device is provided with a lifting information transmission unit, and the operation log acquisition device is acquired by the operation log acquisition unit and the operation log acquisition unit that acquire the operation log of the lifting device in the lifting based on the lifting information. The lift management server includes an operation log transmission unit that transmits the operation log to the lift management server, and the lift management server transmits the lift information transmitted from the lift information transmission unit and the operation log transmission. It is a lifting management system characterized by including the operation log transmitted from the unit and a storage unit for storing the operation log.

また、本発明の一態様としては入力部が、揚重装置による揚重の内容に関する揚重情報の入力を受け付ける入力ステップと、計測の開始及び終了が前記入力ステップにおいて入力されることに応じて、前記揚重に要した揚重の開始から終了までの揚重時間を計測する揚重時間計測ステップと、稼働ログ取得部が、前記揚重情報に基づく前記揚重における前記揚重装置の稼働ログを取得する稼働ログ取得ステップと、記憶部が、前記揚重時間を含む揚重情報と前記稼働ログとを記憶する記憶ステップと、を有することを特徴とする揚重管理方法である。 Further, as one aspect of the present invention, the input unit receives input of lifting information regarding the content of lifting by the lifting device, and the start and end of measurement are input in the input step. , The lifting time measurement step for measuring the lifting time from the start to the end of the lifting required for the lifting, and the operation log acquisition unit operate the lifting device in the lifting based on the lifting information. It is a lifting management method characterized by having an operation log acquisition step for acquiring a log, and a storage unit having a storage step for storing the lifting information including the lifting time and the operation log.

本発明によれば、効率的に揚重実績を記録し一元管理することができる。 According to the present invention, the lifting results can be efficiently recorded and centrally managed.

揚重管理システムの全体構成を示すブロック図である。It is a block diagram which shows the whole structure of a lifting management system. 稼働ログ取得装置による稼働ログ取得を説明するための図である。It is a figure for demonstrating the operation log acquisition by an operation log acquisition apparatus. 揚重管理システムの動作を示すフローチャートである。It is a flowchart which shows the operation of a lifting management system. データ入力端末に表示される画面の一例を示す図である。It is a figure which shows an example of the screen displayed on the data input terminal. データ入力端末に表示される画面の一例を示す図である。It is a figure which shows an example of the screen displayed on the data input terminal. データ入力端末に表示される画面の一例を示す図である。It is a figure which shows an example of the screen displayed on the data input terminal. データ入力端末に表示される画面の一例を示す図である。It is a figure which shows an example of the screen displayed on the data input terminal. データ入力端末に表示される画面の一例を示す図である。It is a figure which shows an example of the screen displayed on the data input terminal.

<実施形態>
以下、本発明の実施の形態について説明する。
<Embodiment>
Hereinafter, embodiments of the present invention will be described.

[揚重管理システムの全体構成]
以下、揚重管理システムの全体構成について、図面を参照しながら説明する。図1は、本発明の一実施形態に係る揚重管理システムの全体構成を示すブロック図である。揚重管理システム1は、揚重装置LFに付設される情報システムである。本実施形態においては、揚重装置LFは、高層建築物の建設現場に設置された仮設の揚重エレベータであるものとする。なお、本発明を適用することができる揚重装置は、揚重エレベータに限られるものではない。本発明は、例えば、タワークレーンや移動式クレーン等のその他の揚重装置に対しても適用することができる。
図1に図示するように、揚重管理システム1は、データ入力端末10と、稼働ログ取得装置20と、揚重管理サーバ30と、出力装置40と、通信ネットワーク50と、を含んで構成される。
[Overall configuration of lifting management system]
Hereinafter, the overall configuration of the lifting management system will be described with reference to the drawings. FIG. 1 is a block diagram showing an overall configuration of a lifting management system according to an embodiment of the present invention. The lifting management system 1 is an information system attached to the lifting device LF. In the present embodiment, the lifting device LF is assumed to be a temporary lifting elevator installed at a construction site of a high-rise building. The lifting device to which the present invention can be applied is not limited to the lifting elevator. The present invention can also be applied to other lifting devices such as tower cranes and mobile cranes.
As shown in FIG. 1, the lifting management system 1 includes a data input terminal 10, an operation log acquisition device 20, a lifting management server 30, an output device 40, and a communication network 50. To.

データ入力端末10は、揚重エレベータである揚重装置LFの籠(例えば箱状の、資材等を載せる構造物)の中において、揚重装置LFのオペレータによって用いられる端末装置である。データ入力端末10は、例えば、タブレット型の小型情報端末、スマートフォン、またはパーソナルコンピュータであり、通信ネットワーク50を介して揚重管理サーバ30と通信接続する。 The data input terminal 10 is a terminal device used by an operator of the lifting device LF in a cage (for example, a box-shaped structure on which materials and the like are placed) of the lifting device LF which is a lifting elevator. The data input terminal 10 is, for example, a tablet-type small information terminal, a smartphone, or a personal computer, and communicates with and connects to the lifting management server 30 via the communication network 50.

図1に図示するように、データ入力端末10は、入力部11と、揚重情報送信部12と、揚重時間計測部13と、を含んで構成される。入力部11は、揚重装置LFのオペレータの操作による揚重情報の入力を受け付ける。ここでいう揚重情報とは、例えば、揚重される資材等の種別、委託会社名(施工業者名)、揚重資材名、及び積込階や行先階等の揚重に関する内容を示す情報である。入力部11は、例えばタッチパネル等の入力デバイスを含んで構成される。なお、入力部11は、キーボード、マウス、またはポインティングデバイス等を含むような構成であってもよい。揚重情報送信部12は、入力部11によって入力された揚重情報を、通信ネットワーク50を介して揚重管理サーバ30へ送信する。揚重情報送信部12は、通信ネットワーク50を介して外部の装置と通信接続するための通信インターフェースである。揚重時間計測部13は、揚重開始時刻及び揚重終了時刻を計測する。なお、計測された揚重開始時刻及び揚重終了時刻は、揚重情報送信部12により、通信ネットワーク50を介して揚重管理サーバ30へ送信される。 As shown in FIG. 1, the data input terminal 10 includes an input unit 11, a lifting information transmitting unit 12, and a lifting time measuring unit 13. The input unit 11 receives the input of the lifting information by the operation of the operator of the lifting device LF. The lifting information referred to here is, for example, information indicating the type of material to be lifted, the name of the consignment company (constructor name), the name of the lifted material, and the contents related to the lifting of the loading floor, destination floor, etc. Is. The input unit 11 includes an input device such as a touch panel. The input unit 11 may be configured to include a keyboard, a mouse, a pointing device, and the like. The lifting information transmitting unit 12 transmits the lifting information input by the input unit 11 to the lifting management server 30 via the communication network 50. The lifted information transmission unit 12 is a communication interface for communicating with an external device via the communication network 50. The lifting time measuring unit 13 measures the lifting start time and the lifting end time. The measured lifting start time and lifting end time are transmitted by the lifting information transmission unit 12 to the lifting management server 30 via the communication network 50.

稼働ログ取得装置20は、揚重装置LFに接続された装置であり、揚重装置LFの稼働ログを取得する。稼働ログ取得装置20は、通信ネットワーク50を介して揚重管理サーバ30と通信接続することができる。 The operation log acquisition device 20 is a device connected to the lifting device LF, and acquires the operation log of the lifting device LF. The operation log acquisition device 20 can communicate with the lifting management server 30 via the communication network 50.

図1に図示するように、稼働ログ取得装置20は、稼働ログ取得部21と、稼働ログ送信部22と、を含んで構成される。稼働ログ取得部21は、揚重装置LFの稼働ログを取得する。稼働ログ送信部22は、稼働ログ取得部21によって取得された稼働ログを、通信ネットワーク50を介して揚重管理サーバ30へ送信する。 As shown in FIG. 1, the operation log acquisition device 20 includes an operation log acquisition unit 21 and an operation log transmission unit 22. The operation log acquisition unit 21 acquires the operation log of the lifting device LF. The operation log transmission unit 22 transmits the operation log acquired by the operation log acquisition unit 21 to the lifting management server 30 via the communication network 50.

以下、稼働ログ取得装置20による稼働ログの取得について、図2を参照しながらさらに詳しく説明する。図2は、本発明の一実施形態に係る揚重管理システムの稼働ログ取得装置による稼働ログ取得を説明するための図である。図示するように、揚重装置LFは、コントローラLF1と、運転操作部LF2と、センサー部LF3と、動力部LF4と、を備えている。 Hereinafter, the acquisition of the operation log by the operation log acquisition device 20 will be described in more detail with reference to FIG. FIG. 2 is a diagram for explaining operation log acquisition by the operation log acquisition device of the lifting management system according to the embodiment of the present invention. As shown in the figure, the lifting device LF includes a controller LF1, an operation operation unit LF2, a sensor unit LF3, and a power unit LF4.

コントローラLF1は、例えば、PLC(Programmable Logic Controller)等の制御装置である。運転操作部LF2は、オペレータが揚重装置LFを操縦する(籠を移動させる)ための操作入力を行うための入力デバイスである。運転操作部LF2は、当該操作入力に基づく操作状態を示す情報をコントローラLF1へ出力する。センサー部LF3は、揚重装置LFの機器状態を検知するセンサーを含んで構成される。センサー部LF3は、検知した機器状態を示す情報をコントローラLF1へ出力する。動力部LF4は、運転操作部LF2から出力された操作状態を示す情報を、コントローラLF1を介して取得する。動力部LF4は、取得した操作状態を示す情報に基づいて、揚重装置LFを作動させる(籠を移動させる)。また、動力部LF4は、作動させた揚重装置LFの機器状態を検知する。動力部LF4は、検知した機器状態を示す情報をコントローラLF1へ出力する。また、コントローラLF1は、運転操作部LF2から取得した操作状態を示す情報、センサー部LF3から取得した機器状態を示す情報、及び動力部LF4から取得した機器状態を示す情報に基づいて、揚重装置LFの稼働ログを生成する。 The controller LF1 is, for example, a control device such as a PLC (Programmable Logic Controller). The operation operation unit LF2 is an input device for the operator to perform an operation input for operating the lifting device LF (moving the cage). The operation operation unit LF2 outputs information indicating an operation state based on the operation input to the controller LF1. The sensor unit LF3 includes a sensor that detects the device state of the lifting device LF. The sensor unit LF3 outputs information indicating the detected device status to the controller LF1. The power unit LF4 acquires the information indicating the operation state output from the operation operation unit LF2 via the controller LF1. The power unit LF4 operates the lifting device LF (moves the cage) based on the acquired information indicating the operating state. Further, the power unit LF4 detects the equipment state of the operated lifting device LF. The power unit LF4 outputs information indicating the detected device status to the controller LF1. Further, the controller LF1 is a lifting device based on the information indicating the operation state acquired from the operation operation unit LF2, the information indicating the equipment state acquired from the sensor unit LF3, and the information indicating the equipment state acquired from the power unit LF4. Generate an LF operation log.

稼働ログ取得装置20の稼働ログ取得部21は、定期的に(例えば、1秒毎に)コントローラLF1にアクセスし、揚重装置LFの稼働ログの読み出しを行う。ここでいう稼働ログとは、例えば、荷重、階数、電流/電圧値、及び警報/故障情報等である。稼働ログ取得部21は、取得した複数の稼働ログを、時系列に並べて、揚重管理サーバ30へ送信するためのデータ形式(例えば、CSV形式)に加工した稼働ログファイルを生成する。稼働ログ取得部21は、一定期間(例えば、600秒間)分の稼働ログ毎に1つの稼働ログファイルを生成し、生成した稼働ログファイル(以下、単に「稼働ログ」とも言う)を稼働ログ送信部22へ出力する。稼働ログ送信部22は、稼働ログ取得部21から出力された稼働ログを、通信ネットワーク50を介して揚重管理サーバ30へ送信する。 The operation log acquisition unit 21 of the operation log acquisition device 20 periodically (for example, every second) accesses the controller LF1 and reads out the operation log of the lifting device LF. The operation log referred to here is, for example, a load, a floor, a current / voltage value, an alarm / failure information, and the like. The operation log acquisition unit 21 arranges a plurality of acquired operation logs in chronological order and generates an operation log file processed into a data format (for example, CSV format) for transmission to the lifting management server 30. The operation log acquisition unit 21 generates one operation log file for each operation log for a certain period (for example, 600 seconds), and transmits the generated operation log file (hereinafter, also simply referred to as “operation log”) to the operation log. Output to unit 22. The operation log transmission unit 22 transmits the operation log output from the operation log acquisition unit 21 to the lifting management server 30 via the communication network 50.

再び図1に戻って説明する。揚重管理サーバ30は、データ入力端末10から送信された揚重情報、及び、稼働ログ取得装置20から送信された稼働ログを取得する。揚重管理サーバ30は、取得した揚重情報及び稼働ログを、自動的に(例えば、取得する毎に、または一定期間ごとに)、あるいは出力装置40からの要求(指示)に応じて、集計したり加工したりする。揚重管理サーバ30は、集計や加工をしたデータ(以下、「揚重実績データ」とも言う)を、出力装置40からの要求に応じて出力する。 It will be described again by returning to FIG. The lifting management server 30 acquires the lifting information transmitted from the data input terminal 10 and the operation log transmitted from the operation log acquisition device 20. The lifting management server 30 aggregates the acquired lifting information and operation log automatically (for example, every time it is acquired or at regular intervals) or in response to a request (instruction) from the output device 40. And process. The lifting management server 30 outputs aggregated and processed data (hereinafter, also referred to as “lifting actual data”) in response to a request from the output device 40.

揚重管理サーバ30は、例えば、インターネット上に構築されたクラウド環境に接続されたクラウドサーバである。揚重管理サーバ30は、例えば、汎用コンピュータ等の情報処理装置を含んで構成される。図1に図示するように、揚重管理サーバ30は、通信部31と、記憶部32と、集計部33と、を含んで構成される。 The lifting management server 30 is, for example, a cloud server connected to a cloud environment built on the Internet. The lifting management server 30 includes, for example, an information processing device such as a general-purpose computer. As shown in FIG. 1, the lifting management server 30 includes a communication unit 31, a storage unit 32, and an aggregation unit 33.

通信部31は、通信ネットワーク50を介して外部の装置と通信接続するための通信インターフェースである。通信部31は、データ入力端末10の揚重情報送信部12から送信された揚重情報(揚重時間計測部13によって計測された揚重時間を示す情報を含む)を、通信ネットワーク50を介して受信する。また、通信部31は、稼働ログ取得装置20の稼働ログ送信部22から送信された稼働ログを、通信ネットワーク50を介して受信する。通信部31は、受信した揚重情報及び稼働ログを、記憶部32に記憶させる。また、通信部31は、出力装置40から送信されたデータ取得要求を取得する。通信部31は、取得したデータ取得要求に応じて、記憶部32に記憶された揚重実績データ、あるいは集計部33によって随時集計された揚重実績データを、通信ネットワーク50を介して出力装置40へ送信する。 The communication unit 31 is a communication interface for communicating with an external device via the communication network 50. The communication unit 31 transmits the lifting information (including the information indicating the lifting time measured by the lifting time measuring unit 13) transmitted from the lifting information transmitting unit 12 of the data input terminal 10 via the communication network 50. To receive. Further, the communication unit 31 receives the operation log transmitted from the operation log transmission unit 22 of the operation log acquisition device 20 via the communication network 50. The communication unit 31 stores the received lifting information and the operation log in the storage unit 32. Further, the communication unit 31 acquires the data acquisition request transmitted from the output device 40. In response to the acquired data acquisition request, the communication unit 31 outputs the lift record data stored in the storage unit 32 or the lift record data aggregated at any time by the aggregation unit 33 via the communication network 50. Send to.

記憶部32は、通信部31が受信した揚重情報及び稼働ログを記憶する。また、記憶部32は、集計部33によって揚重情報及び稼働ログが集計・加工された揚重実績データを記憶する。記憶部32は、例えば、HDD(Hard Disk Drive;ハードディスクドライブ)、半導体メモリ等の記憶媒体、またはこれらの記憶媒体の任意の組み合わせによって構成される。 The storage unit 32 stores the lifting information and the operation log received by the communication unit 31. Further, the storage unit 32 stores the lifting result data in which the lifting information and the operation log are aggregated and processed by the aggregation unit 33. The storage unit 32 is composed of, for example, a storage medium such as an HDD (Hard Disk Drive), a semiconductor memory, or any combination of these storage media.

集計部33は、記憶部32に記憶された揚重情報及び稼働ログを、自動的に、あるいは出力装置40からの要求に応じて、集計したり加工したりする。集計部33は、例えば、揚重情報及び稼働ログを集計してグラフ化した揚重実績データを生成したり、揚重情報及び稼働ログを帳票形式の揚重実績データに加工したりする。集計部33は、集計・加工した揚重実績データを記憶部32に記憶させる。なお、グラフ化した揚重実績データとは、例えば、揚重実績グラフ、稼働率集計グラフ、フロア別集計グラフ、資材別集計グラフ、及び資機材管理グラフ等である。また、帳票形式の揚重実績データとは、例えば、委託会社(施工会社)毎に揚重費用を集計した揚重費集計表等である。 The totaling unit 33 aggregates and processes the lifting information and the operation log stored in the storage unit 32 automatically or in response to a request from the output device 40. For example, the tabulation unit 33 aggregates the lift information and the operation log to generate a graphed lift record data, and processes the lift information and the operation log into a form-type lift record data. The totaling unit 33 stores the totaled and processed lifting result data in the storage unit 32. The graphed lifting performance data is, for example, a lifting performance graph, an operating rate total graph, a floor-specific total graph, a material-specific total graph, a material / equipment management graph, and the like. Further, the lifting record data in the form of a form is, for example, a lifting cost summary table or the like that totals the lifting costs for each consignment company (construction company).

出力装置40は、通信ネットワーク50を介して揚重管理サーバ30へ、データ取得要求を送信する。データ取得要求は、例えば、ユーザによる操作入力に基づいて生成される。出力装置40は、送信したデータ取得要求に応じて揚重管理サーバ30から送信された揚重実績データを、通信ネットワーク50を介して取得する。出力装置40は、例えば、パーソナルコンピュータ等の情報処理装置である。 The output device 40 transmits a data acquisition request to the lifting management server 30 via the communication network 50. The data acquisition request is generated based on, for example, an operation input by the user. The output device 40 acquires the lifting performance data transmitted from the lifting management server 30 in response to the transmitted data acquisition request via the communication network 50. The output device 40 is, for example, an information processing device such as a personal computer.

図1に図示するように、出力装置40は、出力部41を含んで構成される。出力部41は、上記取得した揚重実績データに基づくグラフ及び帳票等を表示する。出力部41は、例えば、液晶ディスプレイである。 As shown in FIG. 1, the output device 40 includes an output unit 41. The output unit 41 displays a graph, a form, or the like based on the acquired lifting record data. The output unit 41 is, for example, a liquid crystal display.

通信ネットワーク50は、例えば、インターネットであり、有線の通信ネットワークであってもよいし、一部または全部が無線の通信ネットワークであってもよい。例えば、データ入力端末10及び稼働ログ取得装置20は、無線通信によって当該無線通信の通信基地局(アクセスポイント)にアクセスしてインターネットに接続し、当該インターネットを介して揚重管理サーバ30と通信接続する。 The communication network 50 may be, for example, the Internet, a wired communication network, or a part or all of a wireless communication network. For example, the data input terminal 10 and the operation log acquisition device 20 access the communication base station (access point) of the wireless communication by wireless communication, connect to the Internet, and connect to the lifting management server 30 via the Internet. do.

[揚重管理システムの動作]
以下、揚重管理システム1の動作の一例について、図面を参照しながら説明する。図3は、本発明の一実施形態に係る揚重管理システムの動作を示すフローチャートである。本フローチャートが示す揚重管理システム1の動作は、定期的に(例えば、1秒毎に)開始する。(ステップS001)データ入力端末10の入力部11に、揚重装置LFのオペレータの操作による揚重情報の入力があった場合、ステップS003へ進む。そうでない場合、ステップS002へ進む。(ステップS002)稼働ログ取得装置20の稼働ログ取得部21が揚重装置LFの稼働ログを取得した場合、ステップS006へ進む。そうでない場合、ステップS001へ戻る。(ステップS003)データ入力端末10の入力部11は、入力された揚重情報を、揚重情報送信部12へ出力する。揚重情報送信部12は、入力部11から出力された揚重情報を取得し、取得した揚重情報を、通信ネットワーク50を介して揚重管理サーバ30へ送信する。その後、ステップS004へ進む。(ステップS004)揚重管理サーバ30の通信部31は、データ入力端末10の揚重情報送信部12から送信された揚重情報を受信する。通信部31は、受信した揚重情報を記憶部32に記憶させる。その後、ステップS005へ進む。(ステップS005)稼働ログ取得装置20の稼働ログ取得部21が揚重装置LFの稼働ログを取得した場合、ステップS006へ進む。そうでない場合、ステップS008へ進む。(ステップS006)稼働ログ取得装置20の稼働ログ取得部21は、取得した稼働ログを、稼働ログ送信部22へ出力する。稼働ログ送信部22は、稼働ログ取得部21から出力された稼働ログを取得し、取得した稼働ログを、通信ネットワーク50を介して揚重管理サーバ30へ送信する。その後、ステップS007へ進む。(ステップS007)揚重管理サーバ30の通信部31は、稼働ログ取得装置20の稼働ログ送信部22から送信された稼働ログを受信する。通信部31は、受信した稼働ログを記憶部32に記憶させる。その後、ステップS008へ進む。(ステップS008)揚重管理サーバ30の集計部33は、記憶部32に記憶された揚重情報及び稼働ログを集計・加工する。 以上で本フローチャートの処理が終了する。
[Operation of lifting management system]
Hereinafter, an example of the operation of the lifting management system 1 will be described with reference to the drawings. FIG. 3 is a flowchart showing the operation of the lifting management system according to the embodiment of the present invention. The operation of the lifting management system 1 shown in this flowchart starts periodically (for example, every second). (Step S001) If the input unit 11 of the data input terminal 10 is input with the lifting information by the operation of the operator of the lifting device LF, the process proceeds to step S003. If not, the process proceeds to step S002. (Step S002) When the operation log acquisition unit 21 of the operation log acquisition device 20 acquires the operation log of the lifting device LF, the process proceeds to step S006. If not, the process returns to step S001. (Step S003) The input unit 11 of the data input terminal 10 outputs the input lift information to the lift information transmission unit 12. The lifting information transmitting unit 12 acquires the lifting information output from the input unit 11, and transmits the acquired lifting information to the lifting management server 30 via the communication network 50. After that, the process proceeds to step S004. (Step S004) The communication unit 31 of the lifting management server 30 receives the lifting information transmitted from the lifting information transmitting unit 12 of the data input terminal 10. The communication unit 31 stores the received lift information in the storage unit 32. After that, the process proceeds to step S005. (Step S005) When the operation log acquisition unit 21 of the operation log acquisition device 20 acquires the operation log of the lifting device LF, the process proceeds to step S006. If not, the process proceeds to step S008. (Step S006) The operation log acquisition unit 21 of the operation log acquisition device 20 outputs the acquired operation log to the operation log transmission unit 22. The operation log transmission unit 22 acquires the operation log output from the operation log acquisition unit 21, and transmits the acquired operation log to the lifting management server 30 via the communication network 50. After that, the process proceeds to step S007. (Step S007) The communication unit 31 of the lifting management server 30 receives the operation log transmitted from the operation log transmission unit 22 of the operation log acquisition device 20. The communication unit 31 stores the received operation log in the storage unit 32. Then, the process proceeds to step S008. (Step S008) The totaling unit 33 of the lifting management server 30 aggregates and processes the lifting information and the operation log stored in the storage unit 32. This completes the processing of this flowchart.

[揚重情報の入力例]
以下、揚重装置LFのオペレータによるデータ入力端末10への揚重情報の入力の一例について、図面を参照しながら説明する。図4~図8は、本発明の一実施形態に係る揚重管理システムのデータ入力端末に表示される画面の一例を示す図である。
[Example of inputting lifting information]
Hereinafter, an example of inputting lifting information to the data input terminal 10 by the operator of the lifting device LF will be described with reference to the drawings. 4 to 8 are diagrams showing an example of a screen displayed on a data input terminal of the lifting management system according to the embodiment of the present invention.

揚重装置LFのオペレータがデータ入力端末10へ揚重情報を入力する際、オペレータは、まず図4に示す揚重種別選択画面Scr1をデータ入力端末10に表示させる。図4に図示するように、揚重種別選択画面Scr1の上段には、「建築資材」や「設備資材」等の揚重種別を示す文言が表示されている。揚重装置LFのオペレータは、揚重する資材等に該当する揚重種別が表示された表示領域内の「揚重開始」ボタン画像の部分をタップすることにより、揚重種別が選択される。例えば、揚重装置LFのオペレータは、建築資材の揚重作業を行う場合には、揚重種別選択画面Scr1に表示された「建築資材」の文言の下に表示されている「揚重開始」ボタン画像の部分をタップする。なお、「揚重開始」ボタン画像の部分がタップされると、データ入力端末10の揚重時間計測部13により揚重時間の計測が開始される。 When the operator of the lifting device LF inputs the lifting information to the data input terminal 10, the operator first displays the lifting type selection screen Scr1 shown in FIG. 4 on the data input terminal 10. As shown in FIG. 4, words indicating the lifting type such as "building material" and "equipment material" are displayed in the upper part of the lifting type selection screen Scr1. The operator of the lifting device LF selects the lifting type by tapping the part of the "lifting start" button image in the display area in which the lifting type corresponding to the material to be lifted is displayed. For example, when the operator of the lifting device LF performs the lifting work of the building material, the "lifting start" displayed under the wording of "building material" displayed on the lifting type selection screen Scr1. Tap the part of the button image. When the portion of the "lifting start" button image is tapped, the lifting time measurement unit 13 of the data input terminal 10 starts measuring the lifting time.

図4に図示するように、揚重種別選択画面Scr1の中段には、揚重装置LFのオペレータによってそれまでに選択された内容が表示される。揚重種別選択画面Scr1において揚重種別が選択されると、「1.揚重選択」の文言が表示された表示領域の下に、上記選択された揚重種別を示す文言が表示される。なお、図4は、揚重種別が選択される前の時点での揚重種別選択画面Scr1を表したものであるため、選択された揚重種別を示す文言は表示されていない。 As shown in FIG. 4, in the middle of the lifting type selection screen Scr1, the contents selected so far by the operator of the lifting device LF are displayed. When the lifting type is selected on the lifting type selection screen Scr1, the wording indicating the selected lifting type is displayed below the display area in which the wording of "1. Lifting selection" is displayed. Since FIG. 4 shows the lifting type selection screen Scr1 before the lifting type is selected, the wording indicating the selected lifting type is not displayed.

図4に図示するように、揚重種別選択画面Scr1の下段には、「ホーム画面へ」ボタン画像、揚重時間を示す文字列、及び「次へ」ボタン画像が表示されている。「揚重開始」ボタン画像の部分がタップされると、揚重情報の入力の操作はキャンセルされ、データ入力端末10のホーム画面(図示せず)へ画面遷移する。揚重時間を示す文字列は、「揚重開始」ボタン画像の部分がタップされると、1秒ごとに表示が更新されていく。これにより、揚重装置LFのオペレータは、揚重作業を開始してから経過した時間を随時把握することができる。「次へ」ボタン画像の部分がタップされると、図5に示す会社選択画面Scr2へ画面遷移する。なお、揚重種別が選択されていない場合には、会社選択画面Scr2へ画面遷移できないようにしてもよい。 As illustrated in FIG. 4, a "to home screen" button image, a character string indicating the lifting time, and a "next" button image are displayed in the lower part of the lifting type selection screen Scr1. When the "lifting start" button image portion is tapped, the operation of inputting the lifting information is canceled, and the screen transitions to the home screen (not shown) of the data input terminal 10. The display of the character string indicating the lifting time is updated every second when the part of the "lifting start" button image is tapped. As a result, the operator of the lifting device LF can grasp the elapsed time from the start of the lifting operation at any time. "Next" button When the image part is tapped, the screen transitions to the company selection screen Scr2 shown in FIG. If the lifting type is not selected, the screen transition to the company selection screen Scr2 may not be possible.

図5に図示するように、会社選択画面Scr2の上段には、「A社」や「B社」等の委託会社(施工業者)の会社名が表示されている。揚重装置LFのオペレータは、資材等を揚重する委託会社の会社名に該当する会社名が表示された表示領域の部分をタップすることにより、委託会社が選択される。 As shown in FIG. 5, the company names of the consignment companies (constructors) such as "Company A" and "Company B" are displayed in the upper part of the company selection screen Scr2. The operator of the lifting device LF selects the consignment company by tapping the part of the display area in which the company name corresponding to the company name of the consignment company that lifts the materials and the like is displayed.

図5に図示するように、会社選択画面Scr2の中段には、揚重種別選択画面Scr1と同様に、揚重装置LFのオペレータによってそれまでに選択された内容が表示される。会社選択画面Scr2において委託会社が選択されると、「2.会社選択」の文言が表示された表示領域の下に、上記選択された委託会社の会社名を示す文言が表示される。なお、図5は、委託会社が選択される前の時点での会社選択画面Scr2を表したものであるため、選択された委託会社の会社名を示す文言は表示されていない。なお、図5に図示するように「1.揚重選択」の文言が表示された表示領域の下には、揚重種別選択画面Scr1において選択された揚重種別を示す文言が表示される。図5は、揚重種別選択画面Scr1において揚重種別として「建築資材」が選択された場合における会社選択画面Scr2を表したものである。 As shown in FIG. 5, in the middle of the company selection screen Scr2, the contents selected so far by the operator of the lifting device LF are displayed as in the lifting type selection screen Scr1. When the consignment company is selected on the company selection screen Scr2, the wording indicating the company name of the selected consignment company is displayed below the display area in which the wording of "2. Company selection" is displayed. Since FIG. 5 shows the company selection screen Scr2 before the consignment company is selected, the wording indicating the company name of the selected consignment company is not displayed. As shown in FIG. 5, a word indicating the lifting type selected on the lifting type selection screen Scr1 is displayed below the display area in which the wording of "1. Lifting selection" is displayed. FIG. 5 shows the company selection screen Scr2 when "building material" is selected as the lifting type on the lifting type selection screen Scr1.

図5に図示するように、会社選択画面Scr2の下段には、「戻る」ボタン画像、揚重時間を示す文字列、及び「次へ」ボタン画像が表示されている。「戻る」ボタン画像の部分がタップされると、委託会社の選択の操作がキャンセルされ、図4に示した揚重種別選択画面Scr1へ再び画面遷移する(戻る)。揚重時間を示す文字列は、揚重種別選択画面Scr1と同様に、揚重作業を開始してから経過した時間が表示される。「次へ」ボタン画像の部分がタップされると、図6に示す資材選択画面Scr3へ画面遷移する。なお、委託会社が選択されていない場合には、資材選択画面Scr3へ画面遷移できないようにしてもよい。 As illustrated in FIG. 5, a "back" button image, a character string indicating the lifting time, and a "next" button image are displayed in the lower part of the company selection screen Scr2. "Back" button When the part of the image is tapped, the operation of selecting the consignment company is canceled, and the screen transitions again (returns) to the lifting type selection screen Scr1 shown in FIG. As for the character string indicating the lifting time, the time elapsed since the lifting work is started is displayed as in the case of the lifting type selection screen Scr1. "Next" button When the image part is tapped, the screen transitions to the material selection screen Scr3 shown in FIG. If the consignment company is not selected, the screen transition to the material selection screen Scr3 may not be possible.

図6に図示するように、資材選択画面Scr3の上段には、「耐火壁ボード」や「ボード」等の資材名が表示されている。揚重装置LFのオペレータは、揚重する資材に該当する資材名が表示された表示領域の部分をタップすることにより、資材が選択される。なお、資材名が表示された表示領域の下には任意指定欄が表示されている。揚重装置LFのオペレータは、この任意指定欄において、揚重する資材の「山数/台数」や「揚重単価」を任意で指定(入力)することができる。 As shown in FIG. 6, material names such as "fireproof wall board" and "board" are displayed in the upper part of the material selection screen Scr3. The operator of the lifting device LF selects the material by tapping the portion of the display area in which the material name corresponding to the material to be lifted is displayed. An optional designation field is displayed below the display area where the material name is displayed. The operator of the lifting device LF can arbitrarily specify (input) the "mountain number / number" and "lifting unit price" of the material to be lifted in this optional designation field.

図6に図示するように、資材選択画面Scr3の中段には、揚重種別選択画面Scr1及び会社選択画面Scr2と同様に、揚重装置LFのオペレータによってそれまでに選択された内容が表示される。資材選択画面Scr3において資材が選択されると、「3.資材選択」の文言が表示された表示領域の下に、上記選択された資材の資材名を示す文言が表示される。なお、図6は、資材が選択される前の時点での資材選択画面Scr3を表したものであるため、選択された資材の資材名を示す文言は表示されていない。なお、図6に図示するように「2.会社選択」の文言が表示された表示領域の下には、会社選択画面Scr2において選択された委託会社の会社名を示す文言が表示される。図6は、揚重種別選択画面Scr1において揚重種別として「建築資材」が選択され、会社選択画面Scr2において委託会社として「B社」が選択された場合における資材選択画面Scr3を表したものである。 As shown in FIG. 6, in the middle of the material selection screen Scr3, the contents selected so far by the operator of the lifting device LF are displayed as in the lifting type selection screen Scr1 and the company selection screen Scr2. .. When a material is selected on the material selection screen Scr3, the wording indicating the material name of the selected material is displayed below the display area in which the wording of "3. Material selection" is displayed. Since FIG. 6 shows the material selection screen Scr3 before the material is selected, the wording indicating the material name of the selected material is not displayed. As shown in FIG. 6, the wording indicating the company name of the consignment company selected on the company selection screen Scr2 is displayed below the display area where the wording of "2. Company selection" is displayed. FIG. 6 shows the material selection screen Scr3 when "building material" is selected as the lifting type on the lifting type selection screen Scr1 and "company B" is selected as the consignment company on the company selection screen Scr2. be.

図6に図示するように、資材選択画面Scr3の下段には、「戻る」ボタン画像、揚重時間を示す文字列、及び「次へ」ボタン画像が表示されている。「戻る」ボタン画像の部分がタップされると、資材の選択の操作がキャンセルされ、図5に示した会社選択画面Scr2へ再び画面遷移する(戻る)。揚重時間を示す文字列は、揚重種別選択画面Scr1及び会社選択画面Scr2と同様に、揚重作業を開始してから経過した時間が表示される。「次へ」ボタン画像の部分がタップされると、図7に示す階数選択画面Scr4へ画面遷移する。なお、資材が選択されていない場合には、階数選択画面Scr4へ画面遷移できないようにしてもよい。 As illustrated in FIG. 6, a "back" button image, a character string indicating the lifting time, and a "next" button image are displayed in the lower part of the material selection screen Scr3. "Back" button When the part of the image is tapped, the operation of selecting the material is canceled, and the screen transitions (returns) to the company selection screen Scr2 shown in FIG. 5 again. Similar to the lifting type selection screen Scr1 and the company selection screen Scr2, the character string indicating the lifting time displays the time elapsed since the lifting work was started. "Next" button When the image part is tapped, the screen transitions to the floor selection screen Scr4 shown in FIG. 7. If the material is not selected, the screen transition to the floor selection screen Scr4 may not be possible.

図7に図示するように、階数選択画面Scr4の上段には、揚重する資材等の積込階の入力欄と、行先階の入力欄と、「回数選択 終了」ボタン画像と、が表示されている。なお、図7に例示する階数選択画面Scr4においては、積込階と行先階との組み合わせが3組分まで入力可能である。揚重装置LFのオペレータによって、揚重する資材等の積込階と行先階とがそれぞれ入力された後、「回数選択 終了」ボタン画像の部分がタップされることにより、階数(積込階及び行先階)が選択される。 As shown in FIG. 7, in the upper part of the floor number selection screen Scr4, an input field for the loading floor for materials to be lifted, an input field for the destination floor, and an image of the "end selection of number of times" button are displayed. ing. In the floor selection screen Scr4 illustrated in FIG. 7, up to three combinations of the loading floor and the destination floor can be input. After the loading floor and destination floor of the materials to be lifted are input by the operator of the lifting device LF, the number of floors (loading floor and destination floor) can be tapped by tapping the "Finish selection end" button image. Destination floor) is selected.

図7に図示するように、階数選択画面Scr4の中段には、揚重種別選択画面Scr1、会社選択画面Scr2、及び資材選択画面Scr3と同様に、揚重装置LFのオペレータによってそれまでに選択された内容が表示される。階数選択画面Scr4において階数が選択されると、「4.階数選択」の文言が表示された表示領域の下に、上記選択された階数を示す文言が表示される。なお、図7は、階数が選択される前の時点での階数選択画面Scr4を表したものであるため、選択された階数を示す文言は表示されていない。なお、図7に図示するように「3.資材選択」の文言が表示された表示領域の下には、資材選択画面Scr3において選択された資材の資材名を示す文言が表示される。図7は、揚重種別選択画面Scr1において揚重種別として「建築資材」が選択され、会社選択画面Scr2において委託会社として「B社」が選択され、資材選択画面Scr3において資材として「耐火壁ボード」が選択された場合における階数選択画面Scr4を表したものである。 As shown in FIG. 7, in the middle of the floor number selection screen Scr4, like the lifting type selection screen Scr1, the company selection screen Scr2, and the material selection screen Scr3, they have been selected by the operator of the lifting device LF. The contents are displayed. When the floor number is selected on the floor number selection screen Scr4, the wording indicating the selected floor number is displayed below the display area in which the wording of "4. Floor number selection" is displayed. Since FIG. 7 shows the floor selection screen Scr4 before the floor is selected, the wording indicating the selected floor is not displayed. As shown in FIG. 7, under the display area where the wording of "3. Material selection" is displayed, a wording indicating the material name of the material selected on the material selection screen Scr3 is displayed. In FIG. 7, "building material" is selected as the lifting type on the lifting type selection screen Scr1, "company B" is selected as the consignment company on the company selection screen Scr2, and "fireproof wall board" is selected as the material on the material selection screen Scr3. It represents the floor selection screen Scr4 when "" is selected.

図7に図示するように、階数選択画面Scr4の下段には、「戻る」ボタン画像、揚重時間を示す文字列、及び「次へ」ボタン画像が表示されている。「戻る」ボタン画像の部分がタップされると、階数の選択の操作がキャンセルされ、図6に示した資材選択画面Scr3へ再び画面遷移する(戻る)。揚重時間を示す文字列は、揚重種別選択画面Scr1、会社選択画面Scr2及び資材選択画面Scr3と同様に、揚重作業を開始してから経過した時間が表示される。「次へ」ボタン画像の部分がタップされると、図8に示す揚重実績修正及び終了画面Scr5へ画面遷移する。なお、階数が選択されていない場合には、揚重実績修正及び終了画面Scr5へ画面遷移できないようにしてもよい。 As illustrated in FIG. 7, a "back" button image, a character string indicating the lifting time, and a "next" button image are displayed in the lower part of the floor selection screen Scr4. "Back" button When the part of the image is tapped, the operation of selecting the floor number is canceled, and the screen transitions (returns) to the material selection screen Scr3 shown in FIG. 6 again. As the character string indicating the lifting time, the time elapsed since the lifting work is started is displayed as in the case of the lifting type selection screen Scr1, the company selection screen Scr2, and the material selection screen Scr3. "Next" button When the part of the image is tapped, the screen transitions to the lifting result correction and end screen Scr5 shown in FIG. If the number of floors is not selected, the screen transition to the lifting record correction and end screen Scr5 may not be possible.

図8に図示するように、揚重実績修正及び終了画面Scr5には、完了した揚重作業の揚重実績データが表示される。図7に例示する揚重実績修正及び終了画面Scr5においては、3つの揚重実績データまで一度に表示可能である。図8に図示するように、例えば、1つめの揚重実績データを示す「揚重資材1」の文言が表示された表示領域には、揚重種別が「建築資材」であり、委託会社名が「B社」であり、資材名が「耐火壁ボード」である資材が、積込階である「1階」から行先階である「15階」へ揚重されたことを示す情報が表示されている。また、揚重された資材(耐火壁ボード)の台数が「2」台であり、揚重単価は「3000」円であることが表示されている。以上の表示内容は、上述した、揚重種別選択画面Scr1、会社選択画面Scr2、及び資材選択画面Scr3、及び階数選択画面Scr4において、揚重装置LFのオペレータによって入力された内容に基づく情報である。 As shown in FIG. 8, the lifting result correction and end screen Scr5 displays the lifting result data of the completed lifting work. In the lifting record correction and end screen Scr5 illustrated in FIG. 7, up to three lifting record data can be displayed at once. As shown in FIG. 8, for example, in the display area where the wording of "lifting material 1" indicating the first lifting record data is displayed, the lifting type is "building material" and the consignment company name. Is "Company B" and the information indicating that the material whose material name is "Fireproof wall board" has been lifted from the loading floor "1st floor" to the destination floor "15th floor" is displayed. Has been done. Further, it is displayed that the number of lifted materials (refractory wall boards) is "2" and the lifting unit price is "3000" yen. The above display contents are information based on the contents input by the operator of the lifting device LF on the above-mentioned lifting type selection screen Scr1, company selection screen Scr2, material selection screen Scr3, and floor number selection screen Scr4. ..

また、各揚重実績データの表示領域には、それぞれ、揚重作業を開始してから経過した時間である揚重時間を示す文字列、「修正」ボタン画像、及び「終了」ボタン画像が表示されている。揚重装置LFのオペレータは、「修正」ボタン画像の部分をタップすることにより、揚重実績データの修正を行うことができる。例えば、揚重種別選択画面Scr1、会社選択画面Scr2、及び資材選択画面Scr3、及び階数選択画面Scr4において入力された内容と実際の揚重内容とが異なっている場合には、揚重装置LFのオペレータは、この揚重実績修正及び終了画面Scr5において、実際の揚重内容と一致するように揚重実績データの修正を行う。また、揚重装置LFのオペレータは、実際の揚重作業が完了した場合、当該揚重作業に該当する揚重実績データの表示領域内の「終了」ボタン画像の部分をタップする。これにより、データ入力端末10の揚重時間計測部13による、当該揚重作業に対する揚重時間の計測が終了する。揚重時間の計測が終了することにより、当該揚重作業に該当する揚重実績データの表示領域内の揚重時間を示す文字列の表示の更新が停止する。これにより、揚重装置LFのオペレータは、当該揚重作業に要した揚重時間を把握することができる。また、当該揚重時間を示す情報は、揚重管理サーバ30の記憶部32に記憶される。 Further, in the display area of each lifting result data, a character string indicating the lifting time, which is the time elapsed since the lifting work was started, a "correction" button image, and an "end" button image are displayed, respectively. Has been done. The operator of the lifting device LF can correct the lifting actual data by tapping the portion of the "correction" button image. For example, if the contents input on the lifting type selection screen Scr1, the company selection screen Scr2, the material selection screen Scr3, and the floor number selection screen Scr4 are different from the actual lifting contents, the lifting device LF may be used. The operator corrects the lifting result data so as to match the actual lifting content on the lifting result correction and end screen Scr5. Further, when the actual lifting work is completed, the operator of the lifting device LF taps the part of the "end" button image in the display area of the lifting actual data corresponding to the lifting work. This completes the measurement of the lifting time for the lifting work by the lifting time measuring unit 13 of the data input terminal 10. When the measurement of the lifting time is completed, the update of the display of the character string indicating the lifting time in the display area of the lifting actual data corresponding to the lifting work is stopped. As a result, the operator of the lifting device LF can grasp the lifting time required for the lifting operation. Further, the information indicating the lifting time is stored in the storage unit 32 of the lifting management server 30.

[揚重実績及び稼働ログの集計例]
以下、揚重管理サーバ30の集計部33による揚重情報及び稼働ログの集計の一例について説明する。本実施形態に係る揚重管理システム1は、データ入力端末10から入力された揚重情報(揚重時間計測部13によって計測された揚重時間を示す情報を含む)と、稼働ログ取得装置によって取得された稼働ログと、を対応付けてデータを集計・加工することができるため、揚重情報または稼働ログのいずれか一方だけでは把握できない揚重実績データを生成し、出力装置40に出力することができる。
[Example of aggregation of lifting results and operation logs]
Hereinafter, an example of totaling the lifting information and the operation log by the totaling unit 33 of the lifting management server 30 will be described. The lifting management system 1 according to the present embodiment uses the lifting information (including the information indicating the lifting time measured by the lifting time measuring unit 13) input from the data input terminal 10 and the operation log acquisition device. Since the data can be aggregated and processed in association with the acquired operation log, the lifting actual data that cannot be grasped only by either the lifting information or the operation log is generated and output to the output device 40. be able to.

上述したように、揚重管理サーバ30の集計部33は、記憶部32に記憶された揚重情報及び稼働ログを、自動的に、あるいは出力装置40からの要求に応じて、集計したり加工したりする。集計部33は、例えば、揚重情報及び稼働ログを、集計してグラフ化した揚重実績データを生成したり、帳票形式の揚重実績データに加工したりする。集計部33は、揚重情報及び稼働ログを集計・加工し、例えば、揚重実績グラフや揚重費集計表等の揚重実績データを生成する。 As described above, the totaling unit 33 of the lifting management server 30 aggregates or processes the lifting information and the operation log stored in the storage unit 32 automatically or in response to a request from the output device 40. To do. The totaling unit 33, for example, aggregates the lifting information and the operation log to generate a graphed lifting actual data, or processes the lifting actual data into a form format. The tabulation unit 33 aggregates and processes the lifting information and the operation log, and generates, for example, lifting performance data such as a lifting performance graph and a lifting cost summary table.

揚重実績グラフは、例えば、1日の各時間帯における揚重装置LFの稼働状態(稼働状態であるか非稼働状態であるか)を、揚重装置LF毎に示したグラフである。揚重実績グラフにより、ユーザは、時間帯毎の揚重装置LFの空き状況を確認することができ、確認された情報を次のサイクルにおける揚重計画に反映させることができる。これにより、ユーザは、例えば、各揚重装置LFの負荷分散を図ることができ、より効率的に各揚重装置LFを稼働させることができる。 The lifting performance graph is a graph showing, for example, the operating state (whether the lifting device LF is in the operating state or the non-operating state) in each time zone of the day for each lifting device LF. The lifting performance graph allows the user to confirm the availability of the lifting device LF for each time zone, and the confirmed information can be reflected in the lifting plan in the next cycle. As a result, the user can, for example, distribute the load of each lifting device LF, and can operate each lifting device LF more efficiently.

揚重費集計表は、例えば、データ入力端末10の揚重時間計測部13によって計測された揚重作業毎の揚重時間や、データ入力端末10に表示された資材選択画面Scr3において入力された揚重単価等に基づいて、揚重作業に要した揚重費用を委託会社(施工会社)毎に集計した表である。揚重費集計表により、例えば揚重専門業者は、委託会社毎に請求する揚重費用を容易に把握することができ、揚重費用の請求に係る作業負担が軽減される。 The lifting cost summary table is input, for example, on the lifting time for each lifting operation measured by the lifting time measuring unit 13 of the data input terminal 10 or on the material selection screen Scr3 displayed on the data input terminal 10. It is a table that aggregates the lifting costs required for lifting work for each consignment company (construction company) based on the lifting unit price, etc. From the lifting cost summary table, for example, a lifting specialist can easily grasp the lifting cost to be charged for each consignment company, and the work burden related to the billing of the lifting cost is reduced.

以上説明したように、本実施形態に係る揚重管理システム1は、データ入力端末10から送信された揚重情報と稼働ログ取得装置20から送信された稼働ログとを取得して記憶する揚重管理サーバ30を備える。揚重管理サーバ30は、取得した揚重情報及び稼働ログを、自動的に、あるいは出力装置40からの要求に応じて、集計したり加工したりして、出力することができる。このような構成により、本実施形態に係る揚重管理システム1は、従来手作業によって行われてきた揚重実績の記録方法に比べて、より効率的に揚重実績を記録し一元管理することができる。すなわち、従来、手作業で記録されていたことによって現場内で埋没していた揚重実績がデータベースによって一元管理されるため、揚重実績を次の揚重作業計画に活かすようにすることが可能になる。また、以上のような構成により、本実施形態に係る揚重管理システム1は、揚重作業が行われると同時に自動的に揚重実績データを生成してデータベースに記憶させることができ、揚重実績の集計に係るユーザの作業負担を軽減することができる。また、以上のような構成により、本実施形態に係る揚重管理システム1は、データ入力端末10から入力された揚重情報と稼働ログ取得装置によって取得された稼働ログとを対応付けてデータを集計・加工することができるため、揚重情報または稼働ログのいずれか一方だけでは把握することができない揚重実績データを、ユーザに対して提示することができる。また、以上のような構成により、本実施形態に係る揚重管理システム1は、揚重作業を委託する施工業者ごとに揚重実績データを生成するため、揚重作業を一括して請け負う揚重専門業者は、各施工業者の揚重装置の利用状況に即した揚重費用の請求を容易に行うことができる。 As described above, the lifting management system 1 according to the present embodiment acquires and stores the lifting information transmitted from the data input terminal 10 and the operation log transmitted from the operation log acquisition device 20. A management server 30 is provided. The lifting management server 30 can automatically aggregate or process the acquired lifting information and operation log in response to a request from the output device 40 and output it. With such a configuration, the lifting management system 1 according to the present embodiment records and centrally manages the lifting results more efficiently than the conventional manual lifting method for recording the lifting results. Can be done. In other words, since the lifting results that were previously buried manually at the site are centrally managed by the database, it is possible to utilize the lifting results in the next lifting work plan. become. Further, with the above configuration, the lifting management system 1 according to the present embodiment can automatically generate the lifting actual data and store it in the database at the same time as the lifting work is performed, and the lifting can be performed. It is possible to reduce the work load of the user related to the aggregation of actual results. Further, with the above configuration, the lifting management system 1 according to the present embodiment correlates data with the lifting information input from the data input terminal 10 and the operation log acquired by the operation log acquisition device. Since it can be aggregated and processed, it is possible to present to the user the lifting performance data that cannot be grasped only by either the lifting information or the operation log. Further, with the above configuration, the lifting management system 1 according to the present embodiment generates lifting performance data for each contractor who outsources the lifting work, so that the lifting work is collectively undertaken. The specialist can easily charge the lifting cost according to the usage status of the lifting device of each contractor.

以上、この発明の実施形態について詳しく説明してきたが、具体的な構成は上述のものに限られることはなく、この発明の要旨を逸脱しない範囲内において様々な設計変更等をすることが可能である。 Although the embodiments of the present invention have been described in detail above, the specific configuration is not limited to the above-mentioned ones, and various design changes and the like can be made without departing from the gist of the present invention. be.

なお、上述した実施形態における揚重管理システム1の一部又は全部をコンピュータで実現するようにしてもよい。その場合、この制御機能を実現するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することによって実現してもよい。なお、ここでいう「コンピュータシステム」とは、揚重管理システム1に内蔵されたコンピュータシステムであって、OSや周辺機器等のハードウェアを含むものとする。また、「コンピュータ読み取り可能な記録媒体」とは、フレキシブルディスク、光磁気ディスク、ROM、CD-ROM等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。さらに「コンピュータ読み取り可能な記録媒体」とは、インターネット等のネットワークや電話回線等の通信回線を介してプログラムを送信する場合の通信回線のように、短時間、動的にプログラムを保持するもの、その場合のサーバやクライアントとなるコンピュータシステム内部の揮発性メモリのように、一定時間プログラムを保持しているものも含んでもよい。また上記プログラムは、前述した機能の一部を実現するためのものであっても良く、さらに前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるものであってもよい。また、上述した実施形態における揚重管理システム1の一部又は全部を、LSI(Large Scale Integration)等の集積回路として実現してもよい。揚重管理システム1の各機能ブロックは個別にプロセッサ化してもよいし、一部、または全部を集積してプロセッサ化してもよい。また、集積回路化の手法はLSIに限らず専用回路、または汎用プロセッサで実現してもよい。また、半導体技術の進歩によりLSIに代替する集積回路化の技術が出現した場合、当該技術による集積回路を用いてもよい。 In addition, a part or all of the lifting management system 1 in the above-described embodiment may be realized by a computer. In that case, the program for realizing this control function may be recorded on a computer-readable recording medium, and the program recorded on the recording medium may be read by a computer system and executed. The "computer system" referred to here is a computer system built in the lifting management system 1, and includes hardware such as an OS and peripheral devices. Further, the "computer-readable recording medium" refers to a portable medium such as a flexible disk, a magneto-optical disk, a ROM, or a CD-ROM, and a storage device such as a hard disk built in a computer system. Further, a "computer-readable recording medium" is a medium that dynamically holds a program for a short time, such as a communication line when a program is transmitted via a network such as the Internet or a communication line such as a telephone line. In that case, a program may be held for a certain period of time, such as a volatile memory inside a computer system serving as a server or a client. Further, the above-mentioned program may be for realizing a part of the above-mentioned functions, and may be further realized for realizing the above-mentioned functions in combination with a program already recorded in the computer system. Further, a part or all of the lifting management system 1 in the above-described embodiment may be realized as an integrated circuit such as an LSI (Large Scale Integration). Each functional block of the lifting management system 1 may be individually made into a processor, or a part or all of them may be integrated into a processor. Further, the method of making an integrated circuit is not limited to the LSI, and may be realized by a dedicated circuit or a general-purpose processor. Further, when an integrated circuit technology that replaces an LSI appears due to advances in semiconductor technology, an integrated circuit based on this technology may be used.

1・・・揚重管理システム、10・・・データ入力端末、11・・・入力部、12・・・揚重情報送信部、13・・・揚重時間計測部、21・・・稼働ログ取得部、22・・・稼働ログ送信部、20・・・稼働ログ取得装置、30・・・揚重管理サーバ、31・・・通信部、32・・・記憶部、33・・・集計部、40・・・出力装置、41・・・出力部、50・・・通信ネットワーク、LF・・・揚重装置 1 ... Lifting management system, 10 ... Data input terminal, 11 ... Input unit, 12 ... Lifting information transmission unit, 13 ... Lifting time measurement unit, 21 ... Operation log Acquisition unit, 22 ... Operation log transmission unit, 20 ... Operation log acquisition device, 30 ... Lifting management server, 31 ... Communication unit, 32 ... Storage unit, 33 ... Aggregation unit , 40 ... output device, 41 ... output unit, 50 ... communication network, LF ... lifting device

Claims (5)

データ入力端末と、稼働ログ取得装置と、揚重管理サーバと、を有する揚重管理システムであって、
前記データ入力端末は、
揚重装置による揚重の内容に関する揚重情報の入力を受け付ける入力部と、
計測の開始及び終了が前記入力部から入力されることに応じて、前記揚重に要した揚重の開始から終了までの揚重時間を計測する揚重時間計測部と、
前記揚重時間を含む、前記入力部によって入力された前記揚重情報を前記揚重管理サーバへ送信する揚重情報送信部と、
を備え、
前記稼働ログ取得装置は、
前記揚重情報に基づく前記揚重における前記揚重装置の稼働ログを取得する稼働ログ取得部と、
前記稼働ログ取得部によって取得された前記稼働ログを前記揚重管理サーバへ送信する稼働ログ送信部と、
を備え、
前記揚重管理サーバは、
前記揚重情報送信部から送信された前記揚重情報と、前記稼働ログ送信部から送信された前記稼働ログと、を記憶する記憶部、
を備えることを特徴とする揚重管理システム。
A lifting management system having a data input terminal, an operation log acquisition device, and a lifting management server.
The data input terminal is
An input unit that accepts the input of lifting information regarding the contents of lifting by the lifting device,
A lifting time measuring unit that measures the lifting time from the start to the end of the lifting required for the lifting according to the input of the start and end of the measurement from the input unit, and the lifting time measuring unit.
A lifting information transmitting unit that transmits the lifting information input by the input unit to the lifting management server, including the lifting time .
Equipped with
The operation log acquisition device is
An operation log acquisition unit that acquires an operation log of the lifting device in the lifting based on the lifting information, and an operation log acquisition unit.
An operation log transmission unit that transmits the operation log acquired by the operation log acquisition unit to the lifting management server, and an operation log transmission unit.
Equipped with
The lifting management server is
A storage unit that stores the lift information transmitted from the lift information transmission unit and the operation log transmitted from the operation log transmission unit.
Lifting management system characterized by being equipped with.
前記揚重管理サーバは、
前記揚重情報と前記稼働ログとを対応付けて集計した揚重実績データを、前記揚重装置を利用するユーザごとに生成する集計部
をさらに備えることを特徴とする請求項1に記載の揚重管理システム。
The lifting management server is
The lifting according to claim 1, further comprising a totaling unit for generating the lifting actual data aggregated by associating the lifting information with the operation log for each user who uses the lifting device. Heavy management system.
前記データ入力端末は
前記集計部は、前記揚重時間計測部によって計測された前記揚重時間に基づいて集計した前記揚重実績データを生成する
ことを特徴とする請求項2に記載の揚重管理システム。
The data input terminal is
The lifting management system according to claim 2, wherein the totaling unit generates the totaled lifting actual data based on the lifting time measured by the lifting time measuring unit.
前記入力部は、揚重単価を示す前記揚重情報の入力を受け付け、
前記集計部は、前記入力部によって受け付けられた前記揚重情報に基づく前記揚重単価に基づいて、前記揚重における揚重費用を示す揚重費集計表を生成する
ことを特徴とする請求項2または請求項3に記載の揚重管理システム。
The input unit receives the input of the lifting information indicating the lifting unit price, and receives the input.
The claim is characterized in that the aggregation unit generates a lifting cost summary table showing the lifting cost in the lifting based on the lifting unit price based on the lifting information received by the input unit. 2 or the lifting management system according to claim 3.
入力部が、揚重装置による揚重の内容に関する揚重情報の入力を受け付ける入力ステップと、
計測の開始及び終了が前記入力ステップにおいて入力されることに応じて、前記揚重に要した揚重の開始から終了までの揚重時間を計測する揚重時間計測ステップと、
稼働ログ取得部が、前記揚重情報に基づく前記揚重における前記揚重装置の稼働ログを取得する稼働ログ取得ステップと、
記憶部が、前記揚重時間を含む揚重情報と前記稼働ログとを記憶する記憶ステップと、
を有することを特徴とする揚重管理方法。
An input step in which the input unit accepts input of lifting information regarding the contents of lifting by the lifting device, and
A lifting time measurement step for measuring the lifting time from the start to the end of the lifting required for the lifting according to the input of the start and the end of the measurement in the input step, and the lifting time measurement step.
An operation log acquisition step in which the operation log acquisition unit acquires an operation log of the lifting device in the lifting based on the lifting information, and
A storage step in which the storage unit stores the lifting information including the lifting time and the operation log, and
A lifting management method characterized by having.
JP2017220445A 2017-11-15 2017-11-15 Lifting management system and lifting management method Active JP7042590B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017220445A JP7042590B2 (en) 2017-11-15 2017-11-15 Lifting management system and lifting management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017220445A JP7042590B2 (en) 2017-11-15 2017-11-15 Lifting management system and lifting management method

Publications (2)

Publication Number Publication Date
JP2019089640A JP2019089640A (en) 2019-06-13
JP7042590B2 true JP7042590B2 (en) 2022-03-28

Family

ID=66837192

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017220445A Active JP7042590B2 (en) 2017-11-15 2017-11-15 Lifting management system and lifting management method

Country Status (1)

Country Link
JP (1) JP7042590B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023179084A (en) * 2022-06-07 2023-12-19 株式会社日立産機システム Crane device and crane control system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004362088A (en) 2003-06-03 2004-12-24 Shimizu Corp Management system for movement of material and equipment
JP2009208878A (en) 2008-03-03 2009-09-17 Shimizu Corp Material lifting management system using temporary elevator, and lifting management method
JP2013129503A (en) 2011-12-21 2013-07-04 Ohbayashi Corp Lifting method of lifting object using temporary elevator

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2528666B2 (en) * 1987-08-15 1996-08-28 株式会社竹中工務店 Construction lifting equipment management system
SE9501306L (en) * 1995-02-20 1996-08-21 Alimak Ab Elevator recording system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004362088A (en) 2003-06-03 2004-12-24 Shimizu Corp Management system for movement of material and equipment
JP2009208878A (en) 2008-03-03 2009-09-17 Shimizu Corp Material lifting management system using temporary elevator, and lifting management method
JP2013129503A (en) 2011-12-21 2013-07-04 Ohbayashi Corp Lifting method of lifting object using temporary elevator

Also Published As

Publication number Publication date
JP2019089640A (en) 2019-06-13

Similar Documents

Publication Publication Date Title
JP5605891B1 (en) Information processing apparatus, information processing method, program, and recording medium
WO2019196557A1 (en) Elevator operation control method, elevator control device and application server
JP7042590B2 (en) Lifting management system and lifting management method
JP6447611B2 (en) Schedule management apparatus and method
JP6742125B2 (en) Business management device, information processing method, and business management program
JP6627470B2 (en) Equipment management systems, information equipment and programs
US20220215314A1 (en) Systems and Methods for Improved Management of the Supply Chain in a Construction Project
JP5579946B1 (en) Remote quality control system
JP7168277B1 (en) Information processing method, information processing system and program
CN107219825B (en) Method for providing inspection instruction, job site management system, and storage medium
JP2006227983A (en) Worker placement support device, method, program and recording medium
JP2020129312A (en) Building performance management method and performance management system
JP5981607B1 (en) Gas equipment work management system
JP2018190417A (en) Information processor and information processing method
JP6423699B2 (en) Work application processing device, work application processing method, and program
JP6813747B2 (en) Construction estimate creation support device and construction estimate creation support system
JP2018032257A (en) Information processing device, information processing system, information processing program, and information processing method
US20120130689A1 (en) Rigging Calculation Software
JP2019179441A (en) Portable terminal, information processing method, program, and man-hour management system
JP2015026226A (en) Pickup data processing system
JP2018106581A (en) Work improvement support system
TW201833854A (en) Work instruction system, information processing device, program, and work instruction method
JP2020170446A (en) Building management system
JP5795414B1 (en) Repair work support system
JP2020144486A (en) Property information management system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201104

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20211007

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20211026

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211202

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220308

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220315

R150 Certificate of patent or registration of utility model

Ref document number: 7042590

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150