JP6951303B2 - プレスプリッティングによる発破掘削工法 - Google Patents
プレスプリッティングによる発破掘削工法 Download PDFInfo
- Publication number
- JP6951303B2 JP6951303B2 JP2018143565A JP2018143565A JP6951303B2 JP 6951303 B2 JP6951303 B2 JP 6951303B2 JP 2018143565 A JP2018143565 A JP 2018143565A JP 2018143565 A JP2018143565 A JP 2018143565A JP 6951303 B2 JP6951303 B2 JP 6951303B2
- Authority
- JP
- Japan
- Prior art keywords
- charge
- blasting
- holes
- hole
- excavation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005422 blasting Methods 0.000 title claims description 90
- 238000009412 basement excavation Methods 0.000 title claims description 73
- 238000000034 method Methods 0.000 title claims description 52
- 230000002093 peripheral effect Effects 0.000 claims description 40
- 239000011148 porous material Substances 0.000 claims description 4
- 239000002360 explosive Substances 0.000 description 30
- 239000011435 rock Substances 0.000 description 8
- 238000005553 drilling Methods 0.000 description 5
- 125000006850 spacer group Chemical group 0.000 description 4
- 238000005474 detonation Methods 0.000 description 3
- 238000011068 loading method Methods 0.000 description 3
- 239000004927 clay Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 239000013013 elastic material Substances 0.000 description 2
- 230000002238 attenuated effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000003814 drug Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Description
10b〜10j 装薬孔
11 空孔
12a 爆薬(親ダイ)
12b 爆薬(増ダイ)
13 亀裂
14 閉塞栓
15 スペーサ
20 切羽面(発破掘削の対象となる地盤面、掘削領域)
20a アーチ形状部分
21 山岳トンネル
21a アーチ形状部分
22 外側の地盤
Claims (5)
- 発破掘削の対象となる地盤面における掘削領域の周縁部に沿って、プレスプリッティング発破による亀裂を生じさせた後に、引き続いて周縁部の内側の掘削領域の発破掘削を行なうプレスプリッティングによる発破掘削工法において、
前記プレスプリッティング発破は、前記掘削領域の周縁部に沿って所定の間隔をおいて形成された複数の装薬孔の各隣接する一対の装薬孔の間の部分に、空孔を形成した状態で行なわれるようになっており、
前記空孔は、各隣接する一対の装薬孔の間の部分において、一方の装薬孔の側に片寄せて配置されて形成されることにより、プレスプリッティング発破の際に、前記空孔と前記一方の装薬孔との間に亀裂が連続した状態で形成され、前記空孔と他方の装薬孔との間に亀裂が分断した状態で形成されるようになっているプレスプリッティングによる発破掘削工法。 - 前記装薬孔は、前記掘削領域の周縁部に沿って、600〜900mmの所定の中心間間隔をおいて複数形成されており、各隣接する一対の装薬孔の間の部分において、各々の前記空孔は、前記一方の装薬孔から、150〜250mmの中心間間隔となる領域に納まるように、前記一方の装薬孔側に片寄せて配置されて形成される請求項1記載のプレスプリッティングによる発破掘削工法。
- 前記装薬孔に装薬が、体積デカップリング法によって装填される請求項1又は2記載のプレスプリッティングによる発破掘削工法。
- 前記装薬孔は、1.0〜3.0mの穿孔深さを有するように形成され、前記空孔は、前記装薬孔よりも0.15〜0.25m長い穿孔深さを有するように形成される請求項1〜3のいずれか1項記載のプレスプリッティングによる発破掘削工法。
- 前記発破掘削の対象となる地盤面は、山岳トンネル工法によって形成されるトンネルの切羽面である請求項1〜4のいずれか1項記載のプレスプリッティングによる発破掘削工法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018143565A JP6951303B2 (ja) | 2018-07-31 | 2018-07-31 | プレスプリッティングによる発破掘削工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018143565A JP6951303B2 (ja) | 2018-07-31 | 2018-07-31 | プレスプリッティングによる発破掘削工法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2020020139A JP2020020139A (ja) | 2020-02-06 |
JP6951303B2 true JP6951303B2 (ja) | 2021-10-20 |
Family
ID=69589584
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2018143565A Active JP6951303B2 (ja) | 2018-07-31 | 2018-07-31 | プレスプリッティングによる発破掘削工法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6951303B2 (ja) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113899269A (zh) * | 2021-10-08 | 2022-01-07 | 首钢集团有限公司 | 一种岩体爆破方法 |
CN114320315A (zh) * | 2022-01-11 | 2022-04-12 | 湖南省通盛工程有限公司 | 一种用于隧道掘进施工中的预裂法 |
CN114440721B (zh) * | 2022-03-09 | 2023-06-06 | 黄河勘测规划设计研究院有限公司 | 隧洞硬质围岩节理发育区爆浆加固法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS53138901A (en) * | 1977-05-12 | 1978-12-04 | Hoshino Kenzo | Method of excavating base rock |
JPS605758B2 (ja) * | 1978-08-16 | 1985-02-13 | 清水建設株式会社 | 岩盤切削方法 |
JPS5798800A (en) * | 1980-12-10 | 1982-06-19 | Miwa Engineering Kk | Intermittent slit type blasting method |
JPH087040B2 (ja) * | 1986-07-03 | 1996-01-29 | 清水建設株式会社 | 地下空洞掘進における発破方法 |
JPH0673974A (ja) * | 1991-11-01 | 1994-03-15 | Shimizu Corp | 岩盤掘削方法 |
JP3059621B2 (ja) * | 1993-12-11 | 2000-07-04 | 株式会社奥村組 | 岩盤等の爆破方法 |
KR100814356B1 (ko) * | 2007-03-19 | 2008-03-18 | 대원전기 주식회사 | 송전철탑의 기초를 시공하기 위한 철탑기초 지발다단암반발파공법 |
-
2018
- 2018-07-31 JP JP2018143565A patent/JP6951303B2/ja active Active
Also Published As
Publication number | Publication date |
---|---|
JP2020020139A (ja) | 2020-02-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6951303B2 (ja) | プレスプリッティングによる発破掘削工法 | |
CN103175451B (zh) | 一种隧道减震孔控制爆破的施工方法 | |
CN102758633B (zh) | 一种围岩情况较好的大断面隧道的施工方法 | |
KR101040787B1 (ko) | 분산장약을 이용한 수평 발파공법 | |
KR100358780B1 (ko) | 에어튜브를 이용한 진동 및 폭음제어 터널발파방법 | |
KR20080085523A (ko) | 터널의 발파 시공 방법 | |
JP2018193678A (ja) | トンネル掘削方法 | |
CN104596372B (zh) | 提高爆破进尺率并降低爆破振动的隧道掘进方法 | |
KR100852960B1 (ko) | 수퍼홀 피라미드형 노치균열 컷을 이용한 터널의 심발공부영역 형성방법 | |
KR100536609B1 (ko) | 벤치발파에서 암반 사면의 보호를 위한 제어 발파 방법 | |
KR101202000B1 (ko) | 터널 및 수직구 발파공사의 다단장약과 다중장약에 의한 진동제어 발파방법 | |
KR100312349B1 (ko) | 단계별 전진식 브이 카트 발파 공법 | |
JP4216957B2 (ja) | 発破掘削工法 | |
KR100395409B1 (ko) | 터널발파공법(에스.비.티)의 심발공 배치방법 | |
KR20020074766A (ko) | V-분할 확심 발파 공법 (M-Cut공법) | |
CN104481544B (zh) | 巷道帮臌的钻孔爆破卸压方法 | |
KR100852961B1 (ko) | 장단 분산 장약 진동 제어에 의한 터널의 확대공부 영역형성방법 | |
JP3059621B2 (ja) | 岩盤等の爆破方法 | |
KR20210112929A (ko) | 자유면 확장을 이용한 비전기뇌관 분산장약 지반 발파공법 | |
KR100599982B1 (ko) | 터널 발파 공법 | |
JP3486103B2 (ja) | 岩盤等の爆破方法 | |
KR101153367B1 (ko) | 심발 발파 방법 | |
KR100852959B1 (ko) | 미진동 균열 파쇄 기능을 갖는 터널의 형성방법 | |
KR102339387B1 (ko) | 3개의 자유 면을 이용하여 굴착 효율을 향상시키는 굴착 면 굴착 공법 | |
KR20060071200A (ko) | 암반 파쇄 공법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20200805 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20210729 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20210907 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20210924 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6951303 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |