JP6872931B2 - Invert construction method - Google Patents

Invert construction method Download PDF

Info

Publication number
JP6872931B2
JP6872931B2 JP2017033736A JP2017033736A JP6872931B2 JP 6872931 B2 JP6872931 B2 JP 6872931B2 JP 2017033736 A JP2017033736 A JP 2017033736A JP 2017033736 A JP2017033736 A JP 2017033736A JP 6872931 B2 JP6872931 B2 JP 6872931B2
Authority
JP
Japan
Prior art keywords
invert
passage
construction
tunnel
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017033736A
Other languages
Japanese (ja)
Other versions
JP2018138738A (en
Inventor
竹中 計行
計行 竹中
克彦 高倉
克彦 高倉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2017033736A priority Critical patent/JP6872931B2/en
Publication of JP2018138738A publication Critical patent/JP2018138738A/en
Application granted granted Critical
Publication of JP6872931B2 publication Critical patent/JP6872931B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、インバート施工方法に関する。 The present invention relates to an invert construction method.

供用後のトンネルにおいて、何らかの原因により盤ぶくれが生じて、路盤が浮き上がる場合がある。盤ぶくれの対策工としては、盤ぶくれが生じた箇所に対してインバートを施工するのが最も効果的である。
供用中のトンネルにおいてインバートを施工する場合は、掘削、インバートコンクリートの打設・養生および埋め戻しを片側ずつ行う、いわゆる半割施工を採用するのが一般的である。ところが、一般的な道路トンネルにおいて半割施工を実施する場合には、トンネル中央部でのインバート施工を行う際に道路幅員を縮小する必要がある。一方、高速道路等、道路幅員を縮小することができないトンネルでは、通行止めにした状態で施工を行う必要があった。
In the tunnel after operation, the roadbed may rise due to blistering for some reason. As a countermeasure against board blisters, it is most effective to perform inverting on the part where board blisters occur.
When performing inverts in a tunnel in service, it is common to adopt so-called half-split construction, in which excavation, placing / curing of invert concrete, and backfilling are performed one side at a time. However, when half-split construction is carried out in a general road tunnel, it is necessary to reduce the road width when performing invert construction in the central part of the tunnel. On the other hand, in tunnels such as expressways where the width of the road cannot be reduced, it was necessary to carry out the construction in a closed state.

そのため、特許文献1には、通行止めを要することなく、供用中のトンネルにおいてインバート施工を行う施工方法として、中央部を除いた左右のインバートを施工するとともに、インバートの中央部に対応する箇所に挿入された鋼管により左右のインバートを接続する方法が開示されている。
また、特許文献2には、中央部を除いた左右のインバートを施工するとともに、一方のインバートを施工する際に、インバートの中央部に対応する位置から土塊を抜き出すことにより形成された隙間にコンクリートを打設することにより、トンネル中央部において左右のインバートを接続する施工方法が開示されている。
Therefore, in Patent Document 1, as a construction method for performing invert construction in a tunnel in service without requiring traffic closure, left and right inverts excluding the central portion are constructed and inserted at a location corresponding to the central portion of the invert. A method of connecting the left and right inverts with a steel pipe is disclosed.
Further, in Patent Document 2, the left and right inverts excluding the central portion are constructed, and when one invert is constructed, concrete is formed in the gap formed by extracting the soil mass from the position corresponding to the central portion of the invert. The construction method for connecting the left and right inverts at the center of the tunnel is disclosed.

特開2014−111861号公報Japanese Unexamined Patent Publication No. 2014-111861 特開2016−102369号公報Japanese Unexamined Patent Publication No. 2016-102369

特許文献1のインバート施工方法は、インバートの構造が複雑であるとともに、鋼管の圧入等の施工に手間がかかるため、工期が長くなる。
また、特許文献2のインバート施工方法も同様に、土塊の抜き出しに手間がかかるため工期が長くなる。また、供用中の道路の下側を掘削するため、施工を慎重に行う必要がある。
このような観点から、本発明は、安全かつ早期に施工を行うことが可能なインバート施工方法を提案することを課題とする。
In the invert construction method of Patent Document 1, the structure of the invert is complicated and it takes time and effort to press-fit the steel pipe, so that the construction period becomes long.
Similarly, in the invert construction method of Patent Document 2, the construction period becomes long because it takes time and effort to extract the soil mass. In addition, since the underside of the road in service is excavated, it is necessary to carry out the construction carefully.
From this point of view, it is an object of the present invention to propose an invert construction method capable of performing construction safely and at an early stage.

前記課題を解決するための本発明のインバート施工方法は、トンネル断面中央の一方側を供用させた状態で他方側においてインバート施工を行う先施工工程と、トンネル断面中央の他方側を供用させた状態で一方側においてインバート施工を行う後施工工程とを備える、いわゆる半割施工方法を採用するものである。前記先施工工程は、既設道路の一方側部分を第一仮設通行路として開放した状態で行う作業として、他方側のインバート掘削を行う第一掘削作業と、前記第一掘削作業により露出した地山に対してインバートコンクリートを打ち込み、養生して他方側インバートを形成する第一打設作業と、前記他方側のインバート上に支保部材を介して覆工板を敷設して第二仮設通行路を構築する通行路仮設作業とを備えている。また、前記後施工工程は、第二仮設通行路を開放した状態で行う作業として、一方側のインバート掘削を行う第二掘削作業と、記第二掘削作業により露出した地山に対してインバートコンクリートを打ち込み、養生して一方側インバートを形成する第二打設作業と、行路を構築する通行路構築作業とを備えている。そして、前記第二打設作業において、前記一方側インバートの端部を前記他方側インバートに接続することで一方側から他方側に連続するインバートを形成し、前記通行路構築作業において前記一方側インバート上を埋め戻すとともに通行路の一方側部分を形成した後、前記通行路の一方側部分を第三仮設通行路として開放した状態で、前記第二仮設通行路の撤去、他方側インバート上の埋め戻しおよび前記通行路の一方側部分に接続する通行路の他方側部分の施工を行うことを特徴としている。 The invert construction method of the present invention for solving the above problems includes a pre-construction step in which one side of the center of the tunnel cross section is in service and the other side is inverted, and a state in which the other side of the center of the tunnel cross section is in service. The so-called half-split construction method is adopted, which includes a post-construction process in which invert construction is performed on one side. The pre-construction process is performed with one side of the existing road open as the first temporary passage, the first excavation work for invert excavation on the other side, and the ground exposed by the first excavation work. see write out the invert concrete respect, a first shot設作industry to form the other side invert to cure, the second temporary way road laying the lining plate through支保member on inverting the other side It is equipped with temporary passage work to build a road. In addition, the post-construction process includes the second excavation work for invert excavation on one side and the invert concrete for the ground exposed by the second excavation work as the work to be performed with the second temporary passage open. see write hit a includes a second shot設作industry to form a cured to one side inverted, and a traffic channel construction task of building through path. Then, in the second casting work, the end of the one-side invert is connected to the other-side invert to form a continuous invert from one side to the other, and in the passage construction work, the one-side invert is formed. After backfilling the top and forming one side of the passage, the second temporary passage is removed and the other side is filled on the invert with one side of the passage open as the third temporary passage. It is characterized in that the return and the construction of the other side portion of the passageway connected to the one side portion of the passageway are performed .

かかるインバート施工方法によれば、トンネル内を全面的に通行止めにすることなく、供用中のトンネルに対してインバートを施工することができる。そのため、盤ぶくれ等に起因する浮き上がりを効果的に防止することができる。また、トンネル底部に対して連続したインバートを設置するため、構造が複雑ではなく、施工性に優れている。 According to such an invert construction method, it is possible to construct an invert on a tunnel in service without completely closing the inside of the tunnel. Therefore, it is possible to effectively prevent lifting due to blistering of the board or the like. In addition, since a continuous invert is installed at the bottom of the tunnel, the structure is not complicated and the workability is excellent.

本発明のインバート施工方法によれば、安全かつ早期にトンネルのインバートを施工することができる。 According to the invert construction method of the present invention, tunnel invert can be safely and quickly constructed.

本実施形態に係るトンネルを示す断面図である。It is sectional drawing which shows the tunnel which concerns on this embodiment. 先行施工工程の作業状況を示す断面図であって、(a)は第一掘削作業、(b)は第一打設作業である。It is sectional drawing which shows the work situation of the preceding construction process, (a) is the first excavation work, (b) is the first placing work. (a)は先行施工工程の通行路仮設作業を示す断面図、(b)は後行施工工程の第二掘削作業を示す断面図である。(A) is a cross-sectional view showing a passage temporary construction work of a preceding construction process, and (b) is a cross-sectional view showing a second excavation work of a subsequent construction process. 図3(b)に続く後行施工工程の作業状況を示す断面図であって、(a)は第二打設作業、(b)は通行路構築作業である。It is sectional drawing which shows the work situation of the follow-up construction process following FIG. 3 (b), (a) is a 2nd casting work, and (b) is a passage construction work. (a)および(b)は、図4(b)に続く通行路構築作業を示す断面図である。(A) and (b) are cross-sectional views showing the passage construction work following FIG. 4 (b).

本実施形態では、図1に示すように、供用中の道路トンネル(以下、単に「トンネル1」という。)に対して、盤ぶくれ防止を目的として、全面的に通行止めにすることなく、インバート2を新設する場合について説明する。
本実施形態のトンネル1は、アーチ状の覆工コンクリート11により側壁及び頂部が被覆されていて、底部にはインバートを備えておらず、既設道路3が地山に直接構築されている。なお、既設道路3の下側中央部には、中央排水路4が形成されている。
In the present embodiment, as shown in FIG. 1, the road tunnel in service (hereinafter, simply referred to as "tunnel 1") is inverted for the purpose of preventing board blistering without completely closing the road. The case where 2 is newly installed will be described.
In the tunnel 1 of the present embodiment, the side wall and the top are covered with the arch-shaped lining concrete 11, the bottom is not provided with an invert, and the existing road 3 is directly constructed on the ground. A central drainage channel 4 is formed in the lower central portion of the existing road 3.

本実施形態のインバート施工方法は、トンネル断面中央Cの一方側(本実施形態では右側)を供用させた状態で他方側(本実施形態では左側)においてインバート施工を行う先施工工程と、トンネル断面中央Cの他方側を供用させた状態で一方側においてインバート施工を行う後施工工程とを備える、いわゆる半割施工方法である。 The invert construction method of the present embodiment includes a pre-construction step in which one side (right side in this embodiment) of the tunnel cross-section center C is in service and invert construction is performed on the other side (left side in this embodiment), and a tunnel cross section. This is a so-called half-split construction method, which includes a post-construction step in which invert construction is performed on one side while the other side of the center C is in service.

先行施工工程は、第一掘削作業と、第一打設作業と、通行路仮設作業とを備えている。
先行施工工程では、図2(a)に示すように、既設道路3の右側部分を仮設通行路5として開放する。なお、仮設通行路5は、車道51の左右に路肩52,52を確保しておく。仮設通行路5のトンネル断面中央C側の端部には、必要に応じて防護柵等の安全設備6を設置しておく。
The pre-construction process includes a first excavation work, a first driving work, and a temporary passage work.
In the preceding construction process, as shown in FIG. 2A, the right side portion of the existing road 3 is opened as a temporary passage 5. In the temporary passage 5, road shoulders 52 and 52 are secured on the left and right sides of the road 51. Safety equipment 6 such as a protective fence is installed at the end of the temporary passage 5 on the C side of the center of the tunnel cross section, if necessary.

第一掘削作業では、トンネル断面中央Cの左側部分のインバート掘削(以下、「第一インバート掘削」という。)を行う。
第一インバート掘削に先立ち、既設の付帯設備(避難通路等)を撤去し、覆工コンクリート11および支保工(吹付けコンクリートや鋼製支保工)12の脚部に足付けコンクリート部材21を形成する。足付けコンクリート部材21の施工が完了したら、バックホウ等の掘削機Mを利用して、トンネル1の底部を掘削する。第一インバート掘削は、道路中心(トンネル断面中央C)よりも左側であって、中央排水路4から所定の間隔を確保できるように行う。すなわち、第一インバート掘削では、既設道路3の中央部を含めた右側部分を残置させた状態で、トンネル1の底部の左側部分を掘削する。第一インバート掘削の掘削深度および形状は、新設するインバート2の断面形状および寸法に応じて決定する。
In the first excavation work, invert excavation (hereinafter, referred to as "first invert excavation") of the left side portion of the tunnel cross-section center C is performed.
Prior to the first invert excavation, the existing ancillary equipment (evacuation passage, etc.) is removed, and the foot concrete member 21 is formed on the legs of the lining concrete 11 and the support (sprayed concrete or steel support) 12. .. When the construction of the foot concrete member 21 is completed, the bottom of the tunnel 1 is excavated by using an excavator M such as a backhoe. The first invert excavation is performed so as to be on the left side of the center of the road (center C of the tunnel cross section) and to secure a predetermined distance from the central drainage channel 4. That is, in the first invert excavation, the left side portion of the bottom portion of the tunnel 1 is excavated while the right side portion including the central portion of the existing road 3 is left behind. The excavation depth and shape of the first invert excavation are determined according to the cross-sectional shape and dimensions of the newly installed invert 2.

第一打設作業は、図2(b)に示すように、第一掘削作業により露出した地山に対してインバートコンクリートを打ち込み、養生して、トンネル1のインバート2の左側部分(左インバート22)を形成する。このとき、左インバート22の左側端部は、足付けコンクリート部材21に接続する。また、必要に応じてインバートコンクリートを締め固める。なお、インバート2(左インバート22)の厚さは、地山状況等に応じて適宜決定する。また、インバート2には、必要に応じて鉄筋を配筋してもよい。 In the first placing work, as shown in FIG. 2B, invert concrete is poured into the ground exposed by the first excavation work, cured, and the left side portion of the invert 2 of the tunnel 1 (left invert 22). ) Is formed. At this time, the left end portion of the left invert 22 is connected to the foot concrete member 21. Also, compact the invert concrete if necessary. The thickness of the invert 2 (left invert 22) is appropriately determined according to the ground conditions and the like. Further, reinforcing bars may be arranged in the invert 2 if necessary.

通行路仮設作業では、図3(a)に示すように、左インバート22上に仮設通行路5を構築する。仮設通行路5は、左インバート22上に形成された支保部材53を介して覆工板54を敷設することにより形成する。覆工板54は、道路(既設道路3)の路面以上の高さ位置において、トンネル1の側壁の近傍からトンネル断面中央部までの範囲に敷設する。すなわち、仮設通行路5(右端に敷設された覆工板54)の右端部は、既設道路3の残置部分の左端部上に、片持ち梁上に張り出している。なお、仮設通行路5の構造は限定されるものではなく、例えば、トンネル軸方向に沿って仮桟橋を架設することにより形成してもよい。仮設通行路5は、通行路として必要な幅員(図2(a)に示す車道51および左右の路肩52の幅)を確保している。また、仮設通行路5のトンネル断面中央C側の端部には、必要に応じて防護柵等の安全設備6を設置しておく。 In the temporary passage work, as shown in FIG. 3A, the temporary passage 5 is constructed on the left invert 22. The temporary passage 5 is formed by laying a lining plate 54 via a support member 53 formed on the left invert 22. The lining plate 54 is laid at a height above the road surface of the road (existing road 3) in a range from the vicinity of the side wall of the tunnel 1 to the central portion of the tunnel cross section. That is, the right end portion of the temporary passage 5 (the lining plate 54 laid at the right end) overhangs the cantilever on the left end portion of the remaining portion of the existing road 3. The structure of the temporary passage 5 is not limited, and may be formed by, for example, constructing a temporary pier along the tunnel axial direction. The temporary passage 5 secures the width required as a passage (the width of the roadway 51 and the left and right shoulders 52 shown in FIG. 2A). In addition, safety equipment 6 such as a protective fence is installed at the end of the temporary passage 5 on the C side of the center of the tunnel cross section, if necessary.

後施工工程は、第二掘削作業と、第二打設作業と、通行路構築作業とを備えている。
後施工工程では、図3(b)に示すように、覆工板54により形成された仮設通行路5を開放する。第二掘削作業では、トンネル中央部および右側(一方側)部分のインバート掘削(以下、「第二インバート掘削」という。)を行う。第二インバート掘削に先立ち、既設の付帯設備を撤去し、覆工コンクリート11および支保工(吹付けコンクリートや鋼製支保工)12の脚部に足付けコンクリート部材21を形成する。足付けコンクリート部材21の施工が完了したら、バックホウ等の掘削機Mを利用して、トンネル1の底部を掘削する。このとき、仮設通行路5(覆工板54)の下側も含めて掘削する。
The post-construction process includes a second excavation work, a second driving work, and a passage construction work.
In the post-construction process, as shown in FIG. 3B, the temporary passage 5 formed by the lining plate 54 is opened. In the second excavation work, invert excavation of the central part of the tunnel and the right side (one side) (hereinafter referred to as "second invert excavation") is performed. Prior to the second invert excavation, the existing ancillary equipment is removed, and the foot concrete member 21 is formed on the legs of the lining concrete 11 and the support (sprayed concrete or steel support) 12. When the construction of the foot concrete member 21 is completed, the bottom of the tunnel 1 is excavated by using an excavator M such as a backhoe. At this time, excavation is performed including the lower side of the temporary passage 5 (lining plate 54).

第二打設作業では、図4(a)に示すように、第一掘削作業により露出した地山に対してインバートコンクリートを打ち込み、養生して、トンネル1の右側のインバート2(右インバート23)を形成する。右インバート23は、左端部を左インバート22に接続するとともに、右端部を足付けコンクリート部材21に接続する。また、必要に応じてインバートコンクリートを締め固める。 In the second casting work, as shown in FIG. 4A, invert concrete is poured into the ground exposed by the first excavation work, cured, and the invert 2 on the right side of the tunnel 1 (right invert 23). To form. The right end portion of the right invert 23 is connected to the left invert 22 and the right end portion is connected to the footed concrete member 21. Also, compact the invert concrete if necessary.

通行路構築作業では、インバート2上に本設道路7を構築する。まず、図4(b)に示すように、右インバート23上を埋め戻すとともに、幅方向中央部に中央排水路4を配設する。次に、中央排水路4の上方を含めて本設道路(通行路)7の右側部分の舗装を行う。このとき、本設道路7の側溝も敷設する。本設道路7の右側部分の施工が完了したら、図5(a)に示すように、この本設道路7の右側部分を仮設通行路5として開放し、支保部材53および覆工板54(図4(b)参照)を撤去する。そして、図5(a)および(b)に示すように、トンネル1の左側部分の埋め戻し、側溝の敷設および舗装を行い、本設道路7を完成させる。 In the passage construction work, the main road 7 is constructed on the invert 2. First, as shown in FIG. 4B, the upper part of the right invert 23 is backfilled, and the central drainage channel 4 is arranged at the center in the width direction. Next, the right side portion of the main road (traffic route) 7 including the upper part of the central drainage channel 4 is paved. At this time, a gutter of the main road 7 is also laid. When the construction of the right side portion of the main road 7 is completed, as shown in FIG. 5A, the right side portion of the main road 7 is opened as a temporary passage 5, and the support member 53 and the lining plate 54 (FIG. 5). 4 (b)) is removed. Then, as shown in FIGS. 5A and 5B, the left side portion of the tunnel 1 is backfilled, a gutter is laid and paved, and the main road 7 is completed.

以上、本実施形態のインバート施工方法によれば、トンネル1内を全面的に通行止めにすることなく、供用中のトンネル1に対してインバート2を施工することができる。そのため、供用中のトンネル1に対して、盤ぶくれ等に起因する浮き上がりを効果的に防止することができる。
また、支保部材53を介して敷設された覆工板54により仮設通行路5を形成しているため、標準的な内空断面のトンネルであっても、仮設通行路5の幅員を縮小せずに、中央部の掘削を行うことができる。その結果、トンネル底部に対して連続したインバート2を施工することができる。また、インバート2は、トンネル1の横断方向に対して一体に連続しているため、盤ぶくれ対策工として、効果的であり、なおかつ、安定性に優れている。したがって、施工性に優れており、ひいては、短期間で効果的な盤ぶくれ防止対策を行うことができる。
また、仮設通行路5を構成する覆工板54は、支保部材53により支持されているため、安全性に優れている。
As described above, according to the invert construction method of the present embodiment, the invert 2 can be constructed on the tunnel 1 in service without completely closing the inside of the tunnel 1. Therefore, it is possible to effectively prevent the tunnel 1 in service from being lifted due to blistering or the like.
Further, since the temporary passage 5 is formed by the lining plate 54 laid via the support member 53, the width of the temporary passage 5 is not reduced even in a tunnel having a standard internal cross section. In addition, the central part can be excavated. As a result, continuous invert 2 can be applied to the bottom of the tunnel. Further, since the invert 2 is integrally continuous with respect to the crossing direction of the tunnel 1, it is effective as a board blistering countermeasure work and is excellent in stability. Therefore, it is excellent in workability, and by extension, effective measures to prevent board blistering can be taken in a short period of time.
Further, since the lining plate 54 constituting the temporary passage 5 is supported by the support member 53, it is excellent in safety.

以上、本発明に係る実施形態について説明した。しかし、本発明は、前述の実施形態に限られず、前記の各構成要素については、本発明の趣旨を逸脱しない範囲で、適宜変更が可能である。
インバート2を新設するトンネル1は、道路トンネルに限定されるものではない。
また、前記実施形態では、トンネル1の左側を先に施工する場合について説明したが、施工の順序は限定されるものではなく、右側を先に施工してもよい。
The embodiment according to the present invention has been described above. However, the present invention is not limited to the above-described embodiment, and each of the above-mentioned components can be appropriately modified without departing from the spirit of the present invention.
The tunnel 1 in which the invert 2 is newly constructed is not limited to the road tunnel.
Further, in the above-described embodiment, the case where the left side of the tunnel 1 is constructed first has been described, but the order of construction is not limited, and the right side may be constructed first.

1 トンネル
2 インバート
3 既設道路
4 中央排水路
5 仮設通行路
6 安全設備
7 本設道路(通行路)
C トンネル断面中央
1 Tunnel 2 Invert 3 Existing road 4 Central drainage channel 5 Temporary passage 6 Safety equipment 7 Main road (passage)
C tunnel cross section center

Claims (1)

トンネル断面中央の一方側を供用させた状態で、他方側においてインバート施工を行う先施工工程と、
トンネル断面中央の他方側を供用させた状態で、一方側においてインバート施工を行う後施工工程と、を備える供用中のトンネルのインバート施工方法であって、
前記先施工工程は、既設道路の一方側部分を第一仮設通行路として開放した状態で行う作業として、
他方側のインバート掘削を行う第一掘削作業と、
前記第一掘削作業により露出した地山に対してインバートコンクリートを打ち込み、養生して他方側インバートを形成する第一打設作業と、
前記他方側のインバート上に支保部材を介して覆工板を敷設して第二仮設通行路を構築する通行路仮設作業と、を備えており、
前記後施工工程は、第二仮設通行路を開放した状態で行う作業として、
一方側のインバート掘削を行う第二掘削作業と、
前記第二掘削作業により露出した地山に対してインバートコンクリートを打ち込み、養生して一方側インバートを形成する第二打設作業と、
行路を構築する通行路構築作業と、を備えており、
前記第二打設作業において、前記一方側インバートの端部を前記他方側インバートに接続することで一方側から他方側に連続するインバートを形成し、
前記通行路構築作業において前記一方側インバート上を埋め戻すとともに通行路の一方側部分を形成した後、前記通行路の一方側部分を第三仮設通行路として開放した状態で、前記第二仮設通行路の撤去、他方側インバート上の埋め戻しおよび前記通行路の一方側部分に接続する通行路の他方側部分の施工を行うことを特徴とするインバート施工方法。
Pre-construction process in which one side of the center of the tunnel cross section is in service and invert construction is performed on the other side.
This is an invert construction method for a tunnel in service, which comprises a post-construction process in which invert construction is performed on one side with the other side in the center of the tunnel cross section in service.
The pre-construction process is performed with one side of the existing road open as the first temporary passage.
The first excavation work to perform invert excavation on the other side,
See write out the invert concrete against natural ground exposed by said first drilling operation, a first shot設作industry to form the other side invert to cure,
It is provided with a passage temporary work for constructing a second temporary passage by laying a lining plate on the invert on the other side via a support member.
The post-construction process is performed with the second temporary passageway open.
The second excavation work to perform invert excavation on one side and
A second shot設作industry saw write out the invert concrete, to form a cured to one side inverted relative to the natural ground exposed by the second drilling operation,
And the way road construction work to build a through path, equipped with a,
In the second casting operation, the end of the one-sided invert is connected to the other-side invert to form a continuous invert from one side to the other.
In the passage construction work, after backfilling the one-sided invert and forming one side portion of the passage, the second temporary passage is opened with one portion of the passage opened as a third temporary passage. An invert construction method comprising removing a road, backfilling on an invert on the other side, and constructing the other side portion of the passage connecting to one side portion of the passage.
JP2017033736A 2017-02-24 2017-02-24 Invert construction method Active JP6872931B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017033736A JP6872931B2 (en) 2017-02-24 2017-02-24 Invert construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017033736A JP6872931B2 (en) 2017-02-24 2017-02-24 Invert construction method

Publications (2)

Publication Number Publication Date
JP2018138738A JP2018138738A (en) 2018-09-06
JP6872931B2 true JP6872931B2 (en) 2021-05-19

Family

ID=63450948

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017033736A Active JP6872931B2 (en) 2017-02-24 2017-02-24 Invert construction method

Country Status (1)

Country Link
JP (1) JP6872931B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7294965B2 (en) 2019-09-13 2023-06-20 戸田建設株式会社 Joint structure between steel shoring and inverted concrete
CN116163761A (en) * 2023-04-06 2023-05-26 中交(广州)建设有限公司 Quick switching structure and quick switching excavation method for tunnel in underground tunnel

Also Published As

Publication number Publication date
JP2018138738A (en) 2018-09-06

Similar Documents

Publication Publication Date Title
US20180030684A1 (en) Arched cut-and-cover structure and method of its construction
JP6480815B2 (en) Tunnel junction structure and tunnel construction method
KR100862977B1 (en) Precast concrete file and method for constructing thereof
KR102197103B1 (en) One-sided Camber-type Composite File for Retaining Wall and Method for manufacturing this same and Method for constructing Retaining Wall using this same
JP6872931B2 (en) Invert construction method
JP6170268B1 (en) Ballast track subbase formation method
JP5843413B1 (en) Lowering method of existing tunnel
CN109024324B (en) Steep slope ladder culvert for dismantling-free and protection of pipeline and construction method
JP6543176B2 (en) Building method
JP4406577B2 (en) Digging road
JP6177468B1 (en) Installation or replacement of tunnel inverts in service
JP3789100B2 (en) How to build a widening tunnel
JP5915074B2 (en) How to form an underground space under a ground transportation
JP2020041381A (en) Invert construction method in tunnel
JP4680676B2 (en) Three-dimensional intersection construction method using backfilling material and construction material of fluidized soil
JP2017206882A (en) Method of constructing underground structure
KR101481810B1 (en) Method for construction of constinuous overlap pile wall using the double casing for construction of constinuous overlap pile wall
JP2004019100A (en) Construction method for underground structure, and underground structure
KR101204058B1 (en) Steel Pipe for Underground Watertight Wall
KR200429447Y1 (en) A sheet mold for the pipe protective process
CN205775900U (en) Railway internal connecting type box-shaped contains nodule structure
JP2006112137A (en) Structure of diverging/merging section of branch tunnel, and its construction method
Konstantis et al. Box jacking/pushing method for tunnel construction in rock: Doha Metro, Gold Line Project
RU60166U1 (en) SCREEN CONSTRUCTION BETWEEN ENGINEERING CONSTRUCTION AND PIPELINES UNDER IT
JP6543177B2 (en) Building method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20191224

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20201026

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20201110

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210104

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210413

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210420

R150 Certificate of patent or registration of utility model

Ref document number: 6872931

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150