JP6340248B2 JP2014107236A JP2014107236A JP6340248B2 JP 6340248 B2 JP6340248 B2 JP 6340248B2 JP 2014107236 A JP2014107236 A JP 2014107236A JP 2014107236 A JP2014107236 A JP 2014107236A JP 6340248 B2 JP6340248 B2 JP 6340248B2
Authority
JP
Japan
Prior art keywords
water
pile
retaining wall
ground
adjacent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014107236A
Other languages
Japanese (ja)
Other versions
JP2015221993A (en
Inventor
卓史 中村
卓史 中村
利三郎 浅野
利三郎 浅野
久雄 熊切
久雄 熊切
悠貴 玉川
悠貴 玉川
俊明 實松
俊明 實松
高義 上野
高義 上野
俊治 吉村
俊治 吉村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Chemical Grouting Co Ltd
Original Assignee
Kajima Corp
Chemical Grouting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp, Chemical Grouting Co Ltd filed Critical Kajima Corp
Priority to JP2014107236A priority Critical patent/JP6340248B2/en
Publication of JP2015221993A publication Critical patent/JP2015221993A/en
Application granted granted Critical
Publication of JP6340248B2 publication Critical patent/JP6340248B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

本発明は、山留め壁およびその構築方法に関する。   The present invention relates to a retaining wall and a construction method thereof.

地下構造物の構築時などでは、山留め壁を構築したうえで、その前方の掘削予定箇所の掘削が行われる。地下水位よりも深く地盤を掘削する場合には、山留め壁として、止水機能を有するソイルセメント壁などが用いられる。   When constructing an underground structure, a mountain retaining wall is constructed, and then an excavation site ahead is excavated. When excavating the ground deeper than the groundwater level, a soil cement wall having a water stopping function is used as a retaining wall.

ソイルセメント壁は複数のソイルセメントの柱状体からなり、隣り合う柱状体同士をラップさせることで止水機能を有する連続壁を構築したものである。ソイルセメントの柱状体は、地盤をオーガヘッドなどの掘削刃で掘削して柱状体に対応する径の掘削穴を形成し、掘削穴内で地盤の土とセメントミルク等をスクリュー等で混合、撹拌した後、H型鋼等の芯材を掘削穴内に挿入することで構築される。   The soil cement wall is composed of a plurality of columnar bodies of soil cement, and a continuous wall having a water stopping function is constructed by wrapping adjacent columnar bodies together. The soil cement columnar body is excavated with a drilling blade such as an auger head to form a drilling hole with a diameter corresponding to the columnar body. Then, it is constructed by inserting a core material such as H-shaped steel into the excavation hole.

特許文献1、2には、ソイルセメント壁を構築する際に、止水が必要な部分のみでソイルセメントの柱状体をラップさせることが記載されており、これにより材料面のコストを低減できる。   Patent Documents 1 and 2 describe that when a soil cement wall is constructed, the columnar body of the soil cement is wrapped only at a portion where water stop is necessary, thereby reducing the material cost.

その他の山留め壁の例として、特許文献3には、親杭と横矢板からなる山留め壁の背後において、地盤内の地下水の流れを遮断する位置に止水部を設けることが記載されている。   As an example of another mountain retaining wall, Patent Document 3 describes that a water retaining portion is provided at a position where the flow of groundwater in the ground is blocked behind the mountain retaining wall composed of a main pile and a lateral sheet pile.

特開2012−107444号公報JP 2012-107444 A 特開平9−279569号公報Japanese Patent Laid-Open No. 9-279568 特開2009−68203号公報JP 2009-68203 A

上記の特許文献1〜3は、いずれも必要な箇所のみに止水機能を持たせるものであるが、特許文献1、2のようなソイルセメント壁では芯材の全長に渡ってセメントミルク等が充填されるので、上記の手法によっても材料面のコストは依然大きく、またセメントミルク等の硬化前に芯材を打設する必要があり施工が困難であった。また特許文献3の方法では土圧を支持する横矢板と止水部を併用することからコストの点で問題があった。   In each of Patent Documents 1 to 3 described above, a water stop function is given only to a necessary portion. However, in a soil cement wall as in Patent Documents 1 and 2, cement milk or the like is spread over the entire length of the core material. Since it is filled, the material cost is still high even by the above-mentioned method, and it is necessary to cast a core material before the cement milk or the like is hardened, so that the construction is difficult. In addition, the method of Patent Document 3 has a problem in terms of cost because it uses a horizontal sheet pile that supports earth pressure and a water stop.

本発明は、前述した問題点に鑑みてなされたもので、その目的は、所定箇所での止水が可能で、かつ簡易に構築できコストも抑えることができる山留め壁等を提供することである。   The present invention has been made in view of the above-described problems, and an object thereof is to provide a mountain retaining wall or the like that can be water-stopped at a predetermined location, can be easily constructed, and can be reduced in cost. .

前述した目的を達成するための第1の発明は、地盤に打設された複数の杭材と、前記杭材の高さ方向の一部のみで止水材を充填することで、隣り合う前記杭材に接触するように形成された止水部と、を具備し、前記止水材が、隣り合う前記杭材の間から充填されたことを特徴とする山留め壁である。
第2の発明は、地盤に打設された複数の杭材と、前記杭材の高さ方向の一部のみで止水材を充填することで、隣り合う前記杭材に接触するように形成された止水部と、前記杭材の高さ方向の前記止水材の充填箇所を除く一部で、隣り合う前記杭材の間に設けられた板材と、を具備することを特徴とする山留め壁である。
The first invention for achieving the above-described object is that the plurality of pile members placed on the ground and the water-stopping material are filled only with a part in the height direction of the pile members, so that the adjacent ones A water retaining portion formed so as to come into contact with the pile material , wherein the water still material is filled from between the adjacent pile materials .
2nd invention is formed so that it may contact with the adjacent said pile material by filling with a water stop material only with the some pile material cast in the ground, and a part of height direction of the said pile material. And a plate material provided between the adjacent pile materials, except for a portion of the pile material that is filled with the waterproof material in the height direction of the pile material. It is a mountain retaining wall.

記止水材が、前記杭材の前方にはみださないように充填されることが望ましい Before Kitome water material, it is filled so as not to protrude in front of the pile material is desirably.

の発明は、地盤に複数の杭材を打設する工程と、前記杭材の高さ方向の一部のみで止水材を充填することで、隣り合う前記杭材に接触するように止水部を形成する工程と、を有し、前記止水材を、隣り合う前記杭材の間から充填することを特徴とする山留め壁の構築方法である。
第4の発明は、地盤に複数の杭材を打設する工程と、前記杭材の高さ方向の一部のみで止水材を充填することで、隣り合う前記杭材に接触するように止水部を形成する工程と、前記杭材の高さ方向の前記止水材の充填箇所を除く一部で、隣り合う前記杭材の間に板材を設ける工程と、を有することを特徴とする山留め壁の構築方法である。
In the third invention, a plurality of pile members are placed on the ground, and the water-stopping material is filled only in a part in the height direction of the pile members so as to contact the adjacent pile members. possess a step of forming a water-stop portion, the water stopping material is earth retaining wall construction wherein the filling from between said pilings adjacent.
In the fourth invention, a plurality of pile materials are placed on the ground, and the water-stopping material is filled only in a part in the height direction of the pile materials so as to contact the adjacent pile materials. A step of forming a water stop portion, and a step of providing a plate material between the adjacent pile materials in a part excluding the filling portion of the water stop material in the height direction of the pile material. It is a construction method of the retaining wall.

記止水材が、地盤に直接挿入したロッドから高圧噴射を行うことにより充填されることが望ましい。また、前記止水材が、前記杭材の前方にはみださないように充填されることが望ましい Before Kitome water material, it it is desirable filled by performing high-pressure injection directly inserted rod ground. Moreover, it is desirable that the water stop material is filled so as not to protrude in front of the pile material .

本発明によれば、杭材の高さ方向の一部のみに止水材を充填して止水部を形成するので、従来のソイルセメント壁に比べ止水材の量が減り、止水部を簡易に構築し材料面のコストも抑えることができ、環境面でも好適である。また、杭材を打設した後、止水材を隣り合う杭材の間から充填して止水部を形成できるので、止水材の硬化前に杭材を打設する必要がなく施工が容易である。さらに、止水部は杭材に接触するように形成されるので、これにより土圧を好適に負担させることができ横矢板等も省略できる。また、止水材の充填箇所以外の部分、例えば全層のうち砂質土、砂れき土の割合が小さい層などで出水した場合は、別途板材を設け、想定できなかった出水に対して漏水による被害を防止できる。また、板材により土圧を負担させることもできる。   According to the present invention, since the water stop material is formed by filling only a part of the pile material in the height direction, the amount of the water stop material is reduced as compared with the conventional soil cement wall, Can be easily constructed and the cost of the material can be suppressed, which is also preferable from the environmental viewpoint. In addition, after placing the pile material, it is possible to fill the water-stopping material from between the adjacent pile materials to form the water-stop part, so there is no need to drive the pile material before hardening the water-stopping material. Easy. Furthermore, since the water stop part is formed so as to be in contact with the pile material, the earth pressure can be suitably borne by this, and the lateral sheet piles can be omitted. In addition, if water is discharged from a portion other than the water filling material, such as a layer with a small proportion of sandy or gravel in all layers, a separate plate is provided, and leakage due to water leakage that could not be assumed. Damage can be prevented. Moreover, earth pressure can also be borne by a board | plate material.

さらに、地盤に直接挿入したロッドから高圧噴射を行い止水材を充填することで、止水材と地盤の土を混合、撹拌し、地盤と置き換えて容易に止水部を形成できる。また止水部に対応する径の掘削穴を掘削する必要もないので、地盤掘削時に掘削刃が杭材に干渉するといったこともない。さらに、止水材を杭材の前方にはみださないように充填することで、地盤の掘削時に止水部を除去する必要もなくなる。   Further, by filling the water-stopping material by high-pressure injection from the rod directly inserted into the ground, the water-stopping material and the soil of the ground are mixed and stirred, and the water-stopping portion can be easily formed by replacing the ground. Further, since it is not necessary to excavate a drilling hole having a diameter corresponding to the water stop portion, the excavating blade does not interfere with the pile material during ground excavation. Furthermore, it is not necessary to remove the water stop portion when excavating the ground by filling the water stop material so that it does not protrude in front of the pile material.

本発明によれば、所定箇所での止水が可能で、かつ簡易に構築できコストも抑えることができる山留め壁等を提供することができる。   ADVANTAGE OF THE INVENTION According to this invention, the water retaining wall etc. which can be water-stopped in a predetermined location, and can be constructed | assembled easily and the cost can be suppressed can be provided.

山留め壁1を示す図The figure which shows the retaining wall 1 山留め壁1の斜視図Perspective view of mountain retaining wall 1 山留め壁1の水平方向断面を示す図The figure which shows the horizontal direction cross section of the retaining wall 1 山留め壁1の構築方法を示す図The figure which shows the construction method of the retaining wall 1 山留め壁1の構築方法を示す図The figure which shows the construction method of the retaining wall 1 セメントミルクの充填を示す図Diagram showing filling of cement milk 山留め壁1aとその構築方法を説明する図The figure explaining the retaining wall 1a and its construction method

以下、図面に基づいて、本発明の実施形態について説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

[第1の実施形態]
(1.山留め壁1)
まず、本発明の実施形態に係る山留め壁について、図1〜図3を参照して説明する。図1は山留め壁1を示す図であり、山留め壁1を高さ方向に沿って見たものである。図2は山留め壁1の斜視図であり、図3は山留め壁1の水平方向断面を示す図である。図3(a)はソイルセメント13の位置での水平方向断面、図3(b)は鋼板15の位置での水平方向断面を示す。
[First embodiment]
(1. Mountain retaining wall 1)
First, a mountain retaining wall according to an embodiment of the present invention will be described with reference to FIGS. FIG. 1 is a view showing a mountain retaining wall 1 as seen along the height direction. FIG. 2 is a perspective view of the retaining wall 1, and FIG. 3 is a view showing a horizontal section of the retaining wall 1. FIG. 3A shows a horizontal section at the position of the soil cement 13, and FIG. 3B shows a horizontal section at the position of the steel plate 15.

山留め壁1は地盤100に設けられる。地盤100は、砂質土などの透水層101と、粘性土などの不透水層102を有する。山留め壁1の前方の地盤100を掘削することで、掘削箇所200が形成される。以降、山留め壁1において前方とは掘削箇所200の方向を指し、後方とは地盤100の方向を指すものとする。   The mountain retaining wall 1 is provided on the ground 100. The ground 100 has a water permeable layer 101 such as sandy soil and a water impermeable layer 102 such as viscous soil. The excavation location 200 is formed by excavating the ground 100 in front of the retaining wall 1. Hereinafter, in the retaining wall 1, the front refers to the direction of the excavation site 200, and the rear refers to the direction of the ground 100.

山留め壁1は、H型鋼11、ソイルセメント13、鋼板15等を有し、地盤100の透水層101および不透水層102に設けられる。   The retaining wall 1 includes an H-shaped steel 11, a soil cement 13, a steel plate 15, and the like, and is provided in the water-permeable layer 101 and the water-impermeable layer 102 of the ground 100.

H型鋼11は、山留め壁1の高さ方向に設けられる杭材であり、平面上間隔を空けて複数設けられる。   The H-shaped steel 11 is a pile material provided in the height direction of the retaining wall 1, and a plurality of H-shaped steels 11 are provided at intervals on a plane.

ソイルセメント13は、H型鋼11の高さ方向の一部で、透水層101など止水したい区間である止水対象区間に設けられる止水部である。ソイルセメント13は、セメントミルク(止水材)をH型鋼11の間から充填し、地盤100の土と混合、撹拌することで形成され、図3(a)に示すように隣り合うH型鋼11のウェブ等に接するように設けられる。   The soil cement 13 is a part of the H-shaped steel 11 in the height direction, and is a water stop portion provided in a water stop target section such as the water permeable layer 101 where water stop is desired. The soil cement 13 is formed by filling cement milk (water-stopping material) from between the H-shaped steels 11, mixing with the soil of the ground 100 and stirring, and as shown in FIG. It is provided in contact with the web or the like.

鋼板15は、H型鋼11の高さ方向のソイルセメント13(セメントミルクの充填箇所)以外の一部で、図3(b)に示すように地盤100の亀裂103等から出水した部分あるいは出水の恐れのある部分に設けられる板材である。鋼板15は例えば鉄板であり、隣り合うH型鋼11の間の前方を覆うように、H型鋼11のフランジに溶接等により固定する。   The steel plate 15 is a part other than the soil cement 13 (the place where the cement milk is filled) in the height direction of the H-shaped steel 11, as shown in FIG. It is a plate material that is provided in a portion where there is a fear. The steel plate 15 is an iron plate, for example, and is fixed to the flange of the H-shaped steel 11 by welding or the like so as to cover the front between the adjacent H-shaped steels 11.

なお、本実施形態では、不透水層102が非常に強固である等の理由により不透水層102で山留め壁1に土圧が生じないものとし、出水部分等に鋼板15を取り付けるのみとしたが、山留め壁1に土圧が生じる箇所では、横矢板等の板材をH型鋼11の間に取り付けて土圧を支持させるのがよい。   In the present embodiment, the impervious layer 102 is very strong, and it is assumed that earth pressure is not generated on the retaining wall 1 in the impermeable layer 102, and the steel plate 15 is only attached to the water discharge portion or the like. In a place where earth pressure is generated on the retaining wall 1, it is preferable to attach a plate material such as a sheet pile between the H-shaped steels 11 to support the earth pressure.

(2.山留め壁1の構築方法)
次に、山留め壁1の構築方法について説明する。山留め壁1を構築する際は、まず図4(a)に示すように、地盤100にH型鋼11を挿入する。H型鋼11は振動工法やプレボーリング工法、強制圧入工法などの従来工法により挿入され、前記したように平面上間隔を空けて複数並べて設けられる。
(2. Construction method of mountain retaining wall 1)
Next, the construction method of the mountain retaining wall 1 will be described. When the mountain retaining wall 1 is constructed, first, the H-shaped steel 11 is inserted into the ground 100 as shown in FIG. The H-shaped steel 11 is inserted by a conventional method such as a vibration method, a pre-boring method, or a forced press-fitting method, and as described above, a plurality of H-shaped steels 11 are provided at intervals on a plane.

本実施形態では、前記のソイルセメント13が、地盤改良で多用される高圧噴射撹拌工法を利用して形成される。すなわち、図4(b)に示すように、H型鋼11の間の地盤100に1本のロッド20を直接挿入し、前記の止水対象区間にて、ロッド端部のノズル(不図示)からセメントミルクを高圧噴射して充填する。   In the present embodiment, the soil cement 13 is formed using a high-pressure jet stirring method that is frequently used for ground improvement. That is, as shown in FIG. 4B, one rod 20 is directly inserted into the ground 100 between the H-shaped steel 11, and from the nozzle (not shown) at the rod end in the water stop target section. Fill with cement milk by high pressure injection.

ロッド20を引き上げつつ、図6(a)に示すようにロッド端部のノズルから周囲の地盤100に向かって矢印に示すようにセメントミルクを高圧噴射することで、セメントミルクが地盤100の土と混合、撹拌され、図6(b)に示すようにソイルセメント13が地盤100と置き換えて形成される。   While lifting the rod 20, the cement milk is sprayed from the nozzle at the rod end toward the surrounding ground 100 as shown by an arrow as shown in FIG. After mixing and stirring, the soil cement 13 is formed by replacing the ground 100 as shown in FIG.

なお、図6の例では、H型鋼11のウェブの中心付近に対応する位置にロッド20が挿入されており、セメントミルクがH型鋼11の前方にはみ出して充填され、ソイルセメント13がH型鋼11の前方に突出している。また、この例ではソイルセメント13が略円形断面になるようにセメントミルクを高圧噴射するが、ソイルセメント13の形成時には、ソイルセメント13が非円形断面となるようにセメントミルクを高圧噴射することも可能である。ソイルセメント13の幅もH型鋼11の間隔に合わせて変更できる。さらに、セメントミルクは水平方向に噴射するだけでなく、ロッド先端のノズル(不図示)から下方に噴射することも可能であり、この場合には止水対象区間の下端部でも十分にセメントミルクが充填でき、ソイルセメント13とH型鋼11との密着性が高まり止水性が向上する。   In the example of FIG. 6, the rod 20 is inserted at a position corresponding to the vicinity of the center of the web of the H-shaped steel 11, the cement milk protrudes and fills the front of the H-shaped steel 11, and the soil cement 13 is filled with the H-shaped steel 11. Projecting forward. In this example, the cement milk is injected at a high pressure so that the soil cement 13 has a substantially circular cross section. However, when the soil cement 13 is formed, the cement milk may be injected at a high pressure so that the soil cement 13 has a non-circular cross section. Is possible. The width of the soil cement 13 can also be changed according to the interval of the H-shaped steel 11. Furthermore, the cement milk can be sprayed not only in the horizontal direction but also downward from a nozzle (not shown) at the tip of the rod. In this case, the cement milk is sufficiently injected even at the lower end of the water stop target section. It can be filled, and the adhesion between the soil cement 13 and the H-shaped steel 11 is increased, and the water stoppage is improved.

山留め壁1の構築方法の説明に戻る。次に、図5(a)に示すように、H型鋼11の前方の地盤100を掘削する。ソイルセメント13の位置では、H型鋼11の前方に突出したソイルセメント13を除去しつつ、掘削を行う。   Returning to the description of the method for constructing the retaining wall 1. Next, as shown in FIG. 5A, the ground 100 in front of the H-shaped steel 11 is excavated. At the position of the soil cement 13, excavation is performed while removing the soil cement 13 protruding forward of the H-shaped steel 11.

この後、ソイルセメント13の位置から下方へとさらに掘削を続ける。図5(b)に示すように、出水部分等の必要な箇所では、前記したように隣り合うH型鋼11の間に鋼板15を設ける。こうして必要な深さまで掘削を行うと、図1等で説明した山留め壁1が構築される。   Thereafter, further excavation is continued from the position of the soil cement 13 downward. As shown in FIG.5 (b), the steel plate 15 is provided between the adjacent H-shaped steel 11 as mentioned above in required places, such as a water discharge part. When excavation is performed to the necessary depth in this way, the retaining wall 1 described with reference to FIG.

以上説明したように、本実施形態によれば、H型鋼11の高さ方向の一部のみにセメントミルクを充填してソイルセメント13を形成するので、従来のソイルセメント壁に比べセメントミルクの量が減り、ソイルセメント13を簡易に構築し材料面のコストも抑えることができ、環境面でも好適である。また、先にH型鋼11を打設した後、セメントミルクを隣り合うH型鋼11の間から充填してソイルセメント13を形成できるので、セメントミルクの硬化前にH型鋼11を打設する必要がなく施工が容易である。さらに、ソイルセメント13はH型鋼11に接触するように形成されるので、これにより土圧を好適に負担させることができ横矢板等も省略できる。ただし、ソイルセメント13を設けた箇所で、さらにH型鋼11間に横矢板等を設けることは可能である。   As described above, according to the present embodiment, since the cement cement is formed by filling cement milk only in a part in the height direction of the H-shaped steel 11, the amount of cement milk is larger than that of the conventional soil cement wall. Therefore, the soil cement 13 can be easily constructed and the cost of the material can be suppressed. Moreover, since the soil cement 13 can be formed by first filling the H-shaped steel 11 and then filling cement milk between the adjacent H-shaped steels 11, it is necessary to cast the H-shaped steel 11 before the cement milk is hardened. Easy to install. Furthermore, since the soil cement 13 is formed so as to come into contact with the H-shaped steel 11, the earth pressure can be suitably borne by this, and a side sheet pile or the like can be omitted. However, it is possible to further provide a horizontal sheet pile or the like between the H-shaped steel 11 at the place where the soil cement 13 is provided.

また、ソイルセメント13以外の部分では、例えば砂質土、砂れき土の割合が小さい層などで出水した場合に、出水部分等で上記のように鋼板15を設け、想定できなかった出水に対して簡易に漏水による被害を防止できる。また横矢板等により土圧を負担させることも可能である。   Further, in the portion other than the soil cement 13, for example, when the water is discharged in a layer having a small proportion of sandy soil or sandy gravel, the steel plate 15 is provided as described above in the water discharge portion, etc. Damage caused by water leakage can be easily prevented. It is also possible to bear earth pressure with a horizontal sheet pile or the like.

さらに、地盤100に直接挿入したロッド20から高圧噴射を行いセメントミルクを充填することで、セメントミルクと地盤100の土を混合、撹拌し、地盤100と置き換えて容易にソイルセメント13が形成できる。またソイルセメント13に対応する径の掘削穴を掘削する必要もないので、地盤掘削時に掘削刃がH型鋼11に干渉するといったこともない。   Furthermore, by filling the cement milk with the cement milk by performing high-pressure injection from the rod 20 directly inserted into the ground 100, the cement milk and the soil of the ground 100 are mixed and stirred, and the soil cement 13 can be easily formed by replacing the ground 100. Further, since it is not necessary to excavate a drilling hole having a diameter corresponding to the soil cement 13, the excavating blade does not interfere with the H-shaped steel 11 during ground excavation.

しかしながら、本発明はこれに限ることはない。例えば杭材としてはH型鋼11に限らず、山型鋼やC型鋼、鋼管、木製杭なども用いることが可能である。また、止水材としてはセメントミルクの他水ガラス、薬液の高圧噴射によるもの等も考えられる。   However, the present invention is not limited to this. For example, the pile material is not limited to the H-shaped steel 11, and angle steel, C-shaped steel, steel pipes, wooden piles, and the like can also be used. Moreover, as a water stop material, the thing by water glass of cement milk, the high pressure injection of a chemical | medical solution, etc. can be considered.

また、止水対象区間は、止水したい区間であればよく、透水層101に限らない。例えば粘性土などの不透水層102でも、若干砂が混じっているので計画上止水したい場合や、水を完全に止めたい場合はこれを止水対象区間とする。あるいは逆に、透水層101でも水を通したい場合は計画上止水対象区間としない。   Moreover, the water stop target section should just be a section which wants to stop water, and is not restricted to the water permeable layer 101. FIG. For example, even in the impermeable layer 102 such as clay soil, since some sand is mixed, if it is desired to stop the water on a plan basis or if it is desired to completely stop the water, this is set as the water stop target section. Or conversely, if water is to be passed through the water permeable layer 101 as well, it is not set as a water-stop target section in the plan.

また、図1の例では山留め壁1の下端部が不透水層102に達しているが、地盤100の層と山留め壁1の深さの関係はこれに限らない。例えば山留め壁1の下端部が透水層101内にある場合もある。また、地下水レベルがより低い位置にある等の理由により、常時は地下水のない透水層101等の区間でも、降水時の対策等の観点からこれを止水対象区間とすることもある。さらに、止水対象区間は1つに限らず、高さ方向に離れて複数設定してもよい。この場合は、複数の止水対象区間のそれぞれでソイルセメント13等の止水部を形成し止水を行えばよい。   In the example of FIG. 1, the lower end portion of the retaining wall 1 reaches the impermeable layer 102, but the relationship between the layer of the ground 100 and the depth of the retaining wall 1 is not limited thereto. For example, the bottom end of the mountain retaining wall 1 may be in the water permeable layer 101. Further, due to the groundwater level being at a lower position, even the section of the permeable layer 101 or the like that does not have groundwater at all times may be set as a water-stop target section from the viewpoint of measures in case of precipitation. Furthermore, the number of water stop target sections is not limited to one, and a plurality of sections may be set apart in the height direction. In this case, the water stop part such as the soil cement 13 may be formed in each of the plurality of water stop target sections to perform the water stop.

[第2の実施形態]
次に、本発明の第2の実施形態について説明する。第2の実施形態はソイルセメント13の形成位置が異なる例であり、その他については同様であるので説明を省略する。
[Second Embodiment]
Next, a second embodiment of the present invention will be described. 2nd Embodiment is an example from which the formation position of the soil cement 13 differs, and since it is the same about others, description is abbreviate | omitted.

図7(a)は山留め壁1aのソイルセメント13の位置での水平方向断面を示す図である。図7(a)に示すように、本実施形態では、セメントミルクがH型鋼11の前方にはみ出さないように充填され、ソイルセメント13がH型鋼11の前方に突出しないように形成される。   Fig.7 (a) is a figure which shows the horizontal direction cross section in the position of the soil cement 13 of the retaining wall 1a. As shown in FIG. 7A, in this embodiment, the cement milk is filled so as not to protrude forward of the H-shaped steel 11, and the soil cement 13 is formed so as not to protrude forward of the H-shaped steel 11.

山留め壁1aを構築する際は、図7(b)に示すように、地盤100にロッド20を挿入する位置をH型鋼11のウェブの中心付近よりも後方にずらし、ロッド端部のノズルから矢印に示すようにセメントミルクを高圧噴射する。これにより、セメントミルクをH型鋼11の前方にはみ出さないように充填できる。   When constructing the retaining wall 1a, as shown in FIG. 7B, the position where the rod 20 is inserted into the ground 100 is shifted rearward from the vicinity of the center of the web of the H-shaped steel 11, and the arrow from the nozzle at the rod end Cement milk is injected at a high pressure as shown in FIG. Thereby, the cement milk can be filled so as not to protrude to the front of the H-shaped steel 11.

この場合、地盤100を掘削する際に前記の図5(a)で説明したようにソイルセメント13を除去する必要がない。従って掘削作業が容易になり、ソイルセメント13の処分コストが低減でき環境面でも好ましい。   In this case, when excavating the ground 100, it is not necessary to remove the soil cement 13 as described above with reference to FIG. Therefore, excavation work becomes easy, the disposal cost of the soil cement 13 can be reduced, and this is preferable from the environmental viewpoint.

以上、添付図を参照しながら、本発明の実施形態を説明したが、本発明の技術的範囲は、前述した実施形態に左右されない。当業者であれば、特許請求の範囲に記載された技術的思想の範疇内において各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。   As mentioned above, although embodiment of this invention was described referring an accompanying drawing, the technical scope of this invention is not influenced by embodiment mentioned above. It is obvious for those skilled in the art that various modifications or modifications can be conceived within the scope of the technical idea described in the claims, and these are naturally within the technical scope of the present invention. It is understood that it belongs.

1、1a………山留め壁
11………H型鋼
13………ソイルセメント
15………鋼板
100………地盤
200………掘削箇所
1, 1a ......... Mountain retaining wall 11 ... ... H-shaped steel 13 ... ... Soil cement 15 ... ... Steel plate 100 ... ... Ground 200 ... ... Excavation point

Claims (7)

地盤に打設された複数の杭材と、
前記杭材の高さ方向の一部のみで止水材を充填することで、隣り合う前記杭材に接触するように形成された止水部と、
を具備し、
前記止水材が、隣り合う前記杭材の間から充填されたことを特徴とする山留め壁。
A plurality of piles placed on the ground,
By filling the water-stopping material only with a part in the height direction of the pile material, the water-stop portion formed so as to contact the adjacent pile material,
Equipped with,
The mountain retaining wall , wherein the water blocking material is filled from between the adjacent pile materials .
地盤に打設された複数の杭材と、
前記杭材の高さ方向の一部のみで止水材を充填することで、隣り合う前記杭材に接触するように形成された止水部と、
前記杭材の高さ方向の前記止水材の充填箇所を除く一部で、隣り合う前記杭材の間に設けられた板材と、
を具備することを特徴とする山留め壁。
A plurality of piles placed on the ground,
By filling the water-stopping material only with a part in the height direction of the pile material, the water-stop portion formed so as to contact the adjacent pile material,
A plate material provided between the pile materials adjacent to each other, except for a portion where the waterstop material is filled in the height direction of the pile material,
A retaining wall characterized by comprising:
前記止水材が、前記杭材の前方にはみださないように充填されたことを特徴とする請求項1または請求項2のいずれかに記載の山留め壁。   The mountain retaining wall according to claim 1 or 2, wherein the water blocking material is filled so as not to protrude in front of the pile material. 地盤に複数の杭材を打設する工程と、
前記杭材の高さ方向の一部のみで止水材を充填することで、隣り合う前記杭材に接触するように止水部を形成する工程と、
を有し、
前記止水材を、隣り合う前記杭材の間から充填することを特徴とする山留め壁の構築方法。
A process of placing a plurality of pile materials on the ground;
The step of forming the water stop portion so as to contact the adjacent pile material by filling the water stop material with only a part of the height direction of the pile material,
I have a,
The construction method of the mountain retaining wall characterized by filling the said water stop material from between the adjacent said pile materials .
地盤に複数の杭材を打設する工程と、
前記杭材の高さ方向の一部のみで止水材を充填することで、隣り合う前記杭材に接触するように止水部を形成する工程と、
前記杭材の高さ方向の前記止水材の充填箇所を除く一部で、隣り合う前記杭材の間に板材を設ける工程と、
を有することを特徴とする山留め壁の構築方法。
A process of placing a plurality of pile materials on the ground;
The step of forming the water stop portion so as to contact the adjacent pile material by filling the water stop material with only a part of the height direction of the pile material,
The step of providing a plate material between the adjacent pile materials in a part excluding the filling portion of the water stop material in the height direction of the pile materials;
A method for constructing a retaining wall, characterized by comprising:
前記止水材が、地盤に直接挿入したロッドから高圧噴射を行うことにより充填されることを特徴とする請求項または請求項記載の山留め壁の構築方法。 The method for constructing a retaining wall according to claim 4 or 5 , wherein the water-stopping material is filled by performing high-pressure injection from a rod inserted directly into the ground. 前記止水材が、前記杭材の前方にはみださないように充填されることを特徴とする請求項から請求項のいずれかに記載の山留め壁の構築方法。 The method for constructing a retaining wall according to any one of claims 4 to 6 , wherein the water blocking material is filled so as not to protrude in front of the pile material.
JP2014107236A 2014-05-23 2014-05-23 Mountain retaining wall, how to construct a mountain retaining wall Active JP6340248B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014107236A JP6340248B2 (en) 2014-05-23 2014-05-23 Mountain retaining wall, how to construct a mountain retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014107236A JP6340248B2 (en) 2014-05-23 2014-05-23 Mountain retaining wall, how to construct a mountain retaining wall

Publications (2)

Publication Number Publication Date
JP2015221993A JP2015221993A (en) 2015-12-10
JP6340248B2 true JP6340248B2 (en) 2018-06-06

Family

ID=54785153

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014107236A Active JP6340248B2 (en) 2014-05-23 2014-05-23 Mountain retaining wall, how to construct a mountain retaining wall

Country Status (1)

Country Link
JP (1) JP6340248B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6618114B2 (en) * 2015-12-25 2019-12-11 株式会社竹中工務店 Construction method of mountain retaining wall by the retaining wall and parent pile sheet pile method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5122213A (en) * 1974-08-19 1976-02-21 Kajima Corp DODOMESHI SUIHEKIKOHO
US4909675A (en) * 1988-08-24 1990-03-20 Osamu Taki In situ reinforced structural diaphragm walls and methods of manufacturing
JPH07109096B2 (en) * 1993-11-30 1995-11-22 建技開発株式会社 Impermeable method for underground wall
JP2003193461A (en) * 2001-12-27 2003-07-09 Chem Grouting Co Ltd Underground wall construction method
JP4888293B2 (en) * 2007-09-11 2012-02-29 株式会社大林組 Earth retaining wall made of parent pile sheet pile, water stop structure of earth retaining wall made of parent pile side sheet pile, construction method of earth retaining wall made of parent pile side sheet pile, and retaining wall of earth retaining wall made of parent pile side sheet pile Water method

Also Published As

Publication number Publication date
JP2015221993A (en) 2015-12-10

Similar Documents

Publication Publication Date Title
KR20080026014A (en) Establishment method of soil guard structure
JP5584542B2 (en) Ground deformation prevention method and underground structure construction method using the same
KR20100068597A (en) A shoring method using arch plate pile and h-pile
KR101065017B1 (en) A shoring method using arch plate pile and H-Pile
JP6189597B2 (en) Columnar structure reinforcement structure and columnar structure reinforcement method
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
JP2019015100A (en) Removing method of earth retaining wall
JP6225458B2 (en) Retaining wall and its construction method
KR101924383B1 (en) A Environment-Friendly construction method of drainage channel on softground by Grouting and Mixing of Solidifying Agent
JP2013104215A (en) Liquefaction prevention method
JP6340248B2 (en) Mountain retaining wall, how to construct a mountain retaining wall
JP5407642B2 (en) Composite dike and its construction method
KR101807366B1 (en) A Foundation Method Of Continuous and Cut Off wall By Overlap Casing
JP5930580B2 (en) Earth retaining wall and method of constructing earth retaining wall
JP2013147805A (en) Method and structure for countermeasure against liquefaction
KR101021913B1 (en) A method for constructing cut-off temporary structure for sheathing work
JP4888293B2 (en) Earth retaining wall made of parent pile sheet pile, water stop structure of earth retaining wall made of parent pile side sheet pile, construction method of earth retaining wall made of parent pile side sheet pile, and retaining wall of earth retaining wall made of parent pile side sheet pile Water method
JP4905296B2 (en) Method for constructing retaining wall and retaining wall
JP2008045367A (en) Ground consolidation construction method and ground-subsidence correction construction method
JP2005256571A (en) Continuous wall body and its construction method
KR101008012B1 (en) Ground improving method running parallel ground solidification and excavation replacement
KR20090078684A (en) Composite wall using angled channel and constructing method thereof
WO2009139510A1 (en) Construction method for continuous cut-off wall using overlap casing
JP6470648B2 (en) Structure of composite underground continuous wall and construction method of composite underground continuous wall
JP6196901B2 (en) Construction methods and structures that reinforce existing structures

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170113

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20171117

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20171212

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180206

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180508

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180514

R150 Certificate of patent or registration of utility model

Ref document number: 6340248

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250