JP6166940B2 - Lifting method and lifting assist device using crane - Google Patents
Lifting method and lifting assist device using crane Download PDFInfo
- Publication number
- JP6166940B2 JP6166940B2 JP2013091897A JP2013091897A JP6166940B2 JP 6166940 B2 JP6166940 B2 JP 6166940B2 JP 2013091897 A JP2013091897 A JP 2013091897A JP 2013091897 A JP2013091897 A JP 2013091897A JP 6166940 B2 JP6166940 B2 JP 6166940B2
- Authority
- JP
- Japan
- Prior art keywords
- crane
- lifting
- suspended
- length
- cord
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Description
本発明は、クレーンを用いた吊り上げ方法および吊り上げ補助装置に関し、さらに詳しくは、複雑な操作を行なうことなく、クレーンフックから吊り下げられた吊ワイヤの下端部の吊り具の揺れを抑制して、この吊り具を吊荷に安全に取り付けることができるクレーンを用いた吊り上げ方法および吊り上げ補助装置に関するものである。 The present invention relates to a lifting method and a lifting auxiliary device using a crane, and more specifically, without performing a complicated operation, suppressing the swing of the lifting tool at the lower end of the hanging wire suspended from the crane hook, The present invention relates to a lifting method using a crane and a lifting assist device that can safely attach the lifting tool to a suspended load.
クレーンを用いて打設する杭等の吊荷を吊り上げる際には、シャックル等の吊り具を下端部に備えた吊ワイヤを用いている。この吊ワイヤは、クレーンフックに吊り下げられていて、吊荷を吊り下げる際にはクレーンワイヤを繰り出すことにより徐々に下方移動させて、最終的に作業者によって吊荷に取り付けられている。吊り具を吊荷に取り付けた後は、クレーンワイヤを巻き取ることにより、吊荷を吊り上げて目的の場所まで移動させる。 When lifting a suspended load such as a pile to be driven using a crane, a suspension wire having a hanging tool such as a shackle at the lower end is used. The suspension wire is suspended from a crane hook. When the suspension load is suspended, the suspension wire is gradually moved downward by feeding the crane wire and is finally attached to the suspension load by an operator. After the lifting tool is attached to the suspended load, the suspended load is lifted and moved to a target location by winding the crane wire.
このように吊り具を吊荷に取り付けようとするときに、クレーン(ブーム)の動きや風の影響によって、クレーンワイヤおよび吊ワイヤは少なからず搖動する。そのため、最下端に位置している吊り具は、揺れ幅が最も大きくなる。吊り具の揺れが大きいと、作業員が吊り具を吊荷に安全に取り付けることが難しくなる。特に、船上クレーンによる吊り上げ作業の場合は、波による揺れが加わるために、一段と揺れが複雑になり、作業者の安全を確保することが難しくなる。そして、安全を確保するために、より慎重に作業をしなければならなくなり、作業時間が増大して工期が予定よりも長くなるという問題も生じる。 Thus, when it is going to attach a lifting tool to a suspended load, the crane wire and the suspension wire are not a little swung due to the movement of the crane (boom) and the influence of the wind. Therefore, the swinging tool located at the lowermost end has the largest swing width. When the swinging of the hanging tool is large, it becomes difficult for the worker to safely attach the hanging tool to the suspended load. In particular, in the case of a lifting work by an onboard crane, a vibration due to a wave is added, so that the vibration becomes more complicated and it is difficult to ensure the safety of the operator. And in order to ensure safety, it has to work more carefully, and there also arises a problem that the work time increases and the construction period becomes longer than planned.
クレーン装置による吊り動作を制御する方法や装置は種々提案されている(例えば、特許文献1参照)。特許文献1では、縦メタセンタからブーム先端までの目標水平距離および目標ブーム先端高さを求めて、目標水平距離を維持するように吊り動作時のブーム起伏角度を調節するとともに、目標ブーム先端高さを維持するように吊荷の巻き上げ速度を調節することで、船の揺れおよび吊荷の振れを有効に抑止するようにしている。しかしながら、このように提案のように、ブームの起伏角度の調節とともに、吊荷の巻き上げ速度を調節するなど、従来の方法は、複数の動作を同時に調節しなければならず、複雑な操作が必要であった。これに伴って、装置も大掛かりになり易いという問題がある。
Various methods and devices for controlling the suspension operation by the crane device have been proposed (see, for example, Patent Document 1). In
本発明の目的は、複雑な操作を用いることなく、クレーンフックから吊り下げられた吊ワイヤの下端部の吊り具の揺れを抑制して、この吊り具を吊荷に安全に取り付けることができるクレーンを用いた吊り上げ方法および吊り上げ補助装置を提供することにある。 An object of the present invention is to suppress a swing of a suspension device at a lower end portion of a suspension wire suspended from a crane hook without using a complicated operation, and to safely attach the suspension device to a suspended load. It is an object to provide a lifting method and a lifting assisting device using the above.
上記目的を達成するため本発明のクレーンを用いた吊り上げ方法は、クレーンフックから吊り下げられた吊ワイヤの下端部の吊り具を吊荷に取り付けた後、この吊り具を取り付けた吊荷をクレーンにより吊り上げるクレーンを用いた吊り上げ方法において、前記クレーンフックに、長さ調節索を繰り出しおよび巻取りする吊り上げ補助装置を吊り下げて、この長さ調節索を前記吊ワイヤに接続固定し、前記吊り具を吊荷に取り付ける際には、前記吊り上げ補助装置によって、前記長さ調節索を繰り出しまたは巻取りすることにより、前記吊り具の揺れが小さくなるように前記クレーンフックと前記吊り具との距離を調節し、前記吊り具を吊荷に取り付けた後は、この吊荷をクレーンにより吊り上げた際に吊り上げる吊荷の重量が前記長さ調節索に作用しない長さになるまで、前記吊り上げ補助装置によって、前記長さ調節索を繰り出し、前記吊り上げ補助装置による前記長さ調節索の繰り出しおよび巻取りを無線操作で行なうことを特徴とする。
また、本発明の別のクレーンを用いた吊り上げ方法は、クレーンフックから吊り下げられた吊ワイヤの下端部の吊り具を吊荷に取り付けた後、この吊り具を取り付けた吊荷をクレーンにより吊り上げるクレーンを用いた吊り上げ方法において、前記クレーンフックに、長さ調節索を繰り出しおよび巻取りする吊り上げ補助装置を吊り下げて、この長さ調節索を前記吊ワイヤに接続固定し、この長さ調節索を前記吊ワイヤに接続固定する接続部に、予め設定された限界荷重が前記長さ調節索に作用した際に前記吊ワイヤに対する接続固定を解除する安全機構を設け、前記吊り具を吊荷に取り付ける際には、前記吊り上げ補助装置によって、前記長さ調節索を繰り出しまたは巻取りすることにより、前記吊り具の揺れが小さくなるように前記クレーンフックと前記吊り具との距離を調節し、前記吊り具を吊荷に取り付けた後は、この吊荷をクレーンにより吊り上げた際に吊り上げる吊荷の重量が前記長さ調節索に作用しない長さになるまで、前記吊り上げ補助装置によって、前記長さ調節索を繰り出すことを特徴とする。
In order to achieve the above object, the lifting method using the crane of the present invention is such that after the suspension device at the lower end of the suspension wire suspended from the crane hook is attached to the suspension load, the suspension load attached with this suspension device is removed from the crane. In the lifting method using the crane that is lifted by the above-described lifting device, a lifting assist device for feeding and winding the length adjusting rope is suspended from the crane hook, and the length adjusting rope is connected and fixed to the hanging wire, Is attached to a suspended load, the distance between the crane hook and the lifting device is reduced by extending or winding the length adjusting cord by the lifting assist device so that the swinging of the lifting device is reduced. After adjusting and attaching the lifting tool to the suspended load, the weight of the suspended load lifted when the suspended load is lifted by the crane is adjusted to the length. Until a length that does not act on, by the lifting aid, it said to decremental length adjusting rope, and performs the feeding and the winding of said length adjusting search by the lifting aid by wireless operation .
In the lifting method using another crane of the present invention, the lifting device at the lower end of the suspension wire suspended from the crane hook is attached to the suspended load, and then the suspended load attached with the lifting device is lifted by the crane. In the lifting method using a crane, a lifting assist device for feeding and winding the length adjustment cord is suspended from the crane hook, and the length adjustment cord is connected and fixed to the suspension wire. The connecting portion for connecting and fixing the suspension wire to the suspension wire is provided with a safety mechanism for releasing the connection and fixing to the suspension wire when a preset limit load acts on the length adjusting cord, and the suspension tool is used as a suspension load. When installing, the lifting assist device extends or winds up the length adjusting cord so that the swing of the lifting device is reduced. After the distance between the hook and the suspension is adjusted and the suspension is attached to the suspended load, the length of the suspended load that is lifted when the suspended load is lifted by the crane does not act on the length adjusting cord. The length adjusting cord is fed out by the lifting assist device until it becomes.
本発明の吊り上げ補助装置は、クレーンフックに吊り下げられた状態で、長さ調節索を繰り出しおよび巻取りする吊り上げ補助装置であって、前記長さ調節索が、下端部に吊り具を有して前記クレーンフックから吊り下げられる吊ワイヤに接続固定され、前記吊り具を吊荷に取り付ける際には、前記長さ調節索を繰り出しまたは巻取りすることにより、前記吊り具の揺れが小さくなるように前記クレーンフックと前記吊り具との距離を調節し、前記吊り具を吊荷に取り付けた後は、この吊荷をクレーンにより吊り上げた際に吊り上げる吊荷の重量が前記長さ調節索に作用しない長さになるまで、前記長さ調節索を繰り出す構成にして、前記長さ調節索の繰り出しおよび巻取りの操作内容を無線送信する無線コントローラと、この無線コントローラからの送信信号を受信する受信機とを設け、この受信機が受信した前記無線コントローラから操作内容に基づいて、前記長さ調節索の繰り出しおよび巻取りを行なう構成にしたことを特徴とする。
本発明の別の吊り上げ補助装置は、クレーンフックに吊り下げられた状態で、長さ調節索を繰り出しおよび巻取りする吊り上げ補助装置であって、前記長さ調節索が、下端部に吊り具を有して前記クレーンフックから吊り下げられる吊ワイヤに接続固定されて、前記長さ調節索を前記吊ワイヤに接続固定する接続部に、予め設定された限界荷重が前記長さ調節索に作用した際に前記吊ワイヤに対する接続固定を解除する安全機構を備えて、前記吊り具を吊荷に取り付ける際には、前記長さ調節索を繰り出しまたは巻取りすることにより、前記吊り具の揺れが小さくなるように前記クレーンフックと前記吊り具との距離を調節し、前記吊り具を吊荷に取り付けた後は、この吊荷をクレーンにより吊り上げた際に吊り上げる吊荷の重量が前記長さ調節索に作用しない長さになるまで、前記長さ調節索を繰り出す構成にしたことを特徴とする。
The lifting assist device of the present invention is a lifting assist device that feeds and winds up the length adjusting cord in a state of being suspended by a crane hook, and the length adjusting cord has a lifting tool at a lower end portion. Connecting and fixing to a suspension wire suspended from the crane hook, and when the suspension tool is attached to a suspended load, the swing of the suspension tool is reduced by extending or winding the length adjusting cord. After adjusting the distance between the crane hook and the suspension tool and attaching the suspension tool to the suspended load, the weight of the suspended load lifted when the suspended load is lifted by the crane acts on the length adjusting cord. until the length is not, in the structure for feeding the length adjustment cord, a wireless controller that the feeding and operation content of the winding of the length adjusting search for radio transmission, the radio control A receiver provided for receiving the transmission signal from La, based on the operation content from the wireless controller the receiver has received, is characterized in that the configuration in which the feed and take-up of said length adjusting search .
Another lifting assisting device of the present invention is a lifting assisting device that feeds and winds up the length adjusting cord in a state where it is suspended by a crane hook, and the length adjusting cord has a lifting tool at the lower end. A predetermined limit load is applied to the length adjusting cord at a connection portion that is connected and fixed to a hanging wire that is suspended from the crane hook and that connects and fixes the length adjusting cord to the hanging wire. In this case, a safety mechanism for releasing the connection and fixing to the suspension wire is provided, and when the suspension device is attached to a suspended load, the swing of the suspension device is reduced by extending or winding the length adjusting cord. After adjusting the distance between the crane hook and the suspension so that the suspension is attached to the suspended load, the weight of the suspended load lifted when the suspended load is lifted by the crane is the length. Fushisaku until a length that does not act on, characterized in that the arrangement for feeding the length adjustment search.
本発明によれば、クレーンフックに、長さ調節索を繰り出しおよび巻取りする吊り上げ補助装置を吊り下げて、この長さ調節索を、クレーンフックに吊り下げられた下端部に吊り具を有する吊ワイヤに接続固定した状態にして、吊り具を吊荷に取り付ける際には、吊り上げ補助装置によって、長さ調節索を繰り出しまたは巻取りをすることで、吊り具の揺れが小さくなるようにクレーンフックと前記吊り具との距離を調節する操作を行なうだけで、吊り具の揺れ幅を小さくできる。吊り具を吊荷に取り付けた後は、この吊荷をクレーンにより吊り上げた際に吊り上げる吊荷の重量が長さ調節索に作用しない長さになるまで、吊り上げ補助装置によって、長さ調節索を繰り出すことで、長さ調節索を耐荷重の小さな仕様にできる。これに伴って、吊り下げ補助装置を軽量化および小型化するには非常に有利になる。 According to the present invention, the lifting auxiliary device for feeding and winding the length adjusting cord is suspended from the crane hook, and the length adjusting cord is suspended from the lower end portion suspended from the crane hook. When attaching the hanging tool to the suspended load with the wire connected and fixed, the lifting hook can be used to extend or wind up the length adjustment cord so that the swing of the lifting tool can be reduced. The swinging width of the hanger can be reduced simply by adjusting the distance between the hanger and the hanger. After the lifting tool is attached to the suspended load, the lifting assist device is used to lift the length adjustment cord until the weight of the suspended load that is lifted by the crane becomes a length that does not act on the length adjustment cord. By extending the cable, the length adjustment cord can be made to have a small load resistance. Accordingly, it is very advantageous to reduce the weight and size of the suspension assisting device.
以下、本発明のクレーンを用いた吊り上げ方法および吊り上げ補助装置を図に示した実施形態に基づいて説明する。 Hereinafter, a lifting method and a lifting assist device using the crane of the present invention will be described based on the embodiments shown in the drawings.
図1、図2に例示するように本発明の吊り上げ補助装置1(以下、補助装置1という)は、クレーンフック11に吊り下げられた状態で使用される。この実施形態では、起重機船13に設置されたクレーン7のクレーンワイヤ10に取り付けられたクレーンフック11に補助装置1が吊り下げられている。クレーンフック11には、補助装置1の他に、下端部にシャックル等の吊り具6aを備えた吊ワイヤ6が吊り下げられている。
As illustrated in FIGS. 1 and 2, the
この補助装置1は、長さ調節索3と、この長さ調節索3を巻取りおよび繰り出す巻き芯2とを有している。巻き芯2は駆動モータ2aによって正回転および逆回転する。長さ調節索3は下端部に接続部3aを有している。この接続部3aは、長さ調節索3を吊ワイヤ6の任意の位置に接続して固定する。長さ調節索3には後述するように、過大な耐荷重が要求されないため、スチールワイヤやスチールコードに限らず、樹脂ロープ等の各種ロープ、ゴム紐等の伸縮性のある部材やこれに類するものを用いることができる。
The
この実施形態では、さらに、無線コントローラ4および受信機5が備わっている。無線コントローラ4は、長さ調節索3の繰り出しおよび巻取りの操作内容を無線送信する。受信機5は、無線コントローラ4からの送信信号を受信して、無線コントローラ4から操作内容に基づいて駆動モータ2aを作動させて長さ調節索3の繰り出しおよび巻取りを行なう。
In this embodiment, a
以下、この補助装置1を用いて吊荷15を吊り上げる手順、即ち、本発明のクレーンを用いた吊り上げ方法を、台船14に積載された杭等の吊荷15を吊り上げる場合を例にして説明する。
Hereinafter, a procedure for lifting the suspended
2本のクレーンワイヤ10にはそれぞれ、クレーンフック11が取り付けられていて、それぞれのクレーンフック11には、補助装置1および吊ワイヤ6が吊り下げられている。長さ調節索3の下端部は、接続部3aによって吊ワイヤ6の適宜の位置(例えば、吊ワイヤ6の長さ方向中央部)に接続固定する。起重機船13には台船14が隣接している。ここで、クレーン7の旋回体9およびブーム8を適切な位置に移動させ、巻上げドラム12を回転駆動させてクレーンワイヤ10を繰り出す。これにより、吊ワイヤ6の下端部にある吊り具6aを吊荷15に向かって下方移動させる。
A
この際に、ブーム8の移動や風、波の影響によって吊り具6aは搖動する。そこで、無線コントローラ4を用いて、補助装置1の巻き芯2を作動させて長さ調節索3の巻取りや繰り出しを行なう。長さ調節索3を巻き取ると図3に例示するように、クレーンフック11と吊り具6aとの距離が短くなる。図2に例示するように、巻き取った長さ調節索3を繰り出すとクレーンフック11と吊り具6aとの距離が長くなる。ここでは、吊り具6aの揺れが小さくなるようにクレーンフック11と吊り具6aとの距離を調節する。一般的には、図3に例示するように、クレーンフック11と吊り具6aとの距離を短くすると吊り具6aの揺れ幅を小さくできる。
At this time, the hanging
このようにして、吊り具6aの揺れを見ながら、無線コントローラ4を操作してクレーンフック11と吊り具6aとの距離を調節することにより、吊り具6aの揺れ幅を小さくした状態で、吊荷15の取付け位置の近傍に吊り具6aを下方移動させる。作業者は下方移動してきた吊り具6aを保持して、吊り具6aを吊りピース等の固定部16を介して吊荷15に固定する。
In this way, while observing the swing of the
吊り具6aを吊荷15に取り付けた後は、巻上げドラム12を回転駆動させてクレーンワイヤ10を巻き取って吊荷15をクレーン7により吊り上げる。この吊り上げ作業に際して、吊り上げる吊荷15の重量が長さ調節索3に作用しない長さになるまで、補助装置1によって、長さ調節索3を繰り出す。この状態にした後、図4に例示するようにクレーン7により吊荷15を吊り上げる。図4の状態では、クレーンワイヤ10および吊ワイヤ6に吊荷15の重量が作用する。一方、長さ調節索3は弛んでいるので吊荷15の重量が作用しない。次いで、旋回体9およびブーム8を適切な位置に移動させて吊荷15を目的の場所に移動させる。
After attaching the
上記のとおり本発明では、クレーン7の操作(ブーム8の起伏、クレーンワイヤ10の繰り出し、旋回体9の旋回)は通常どおり行ない、吊り具6aを吊荷15に取り付ける際に、長さ調節索3を繰り出しまたは巻取りすることにより、吊り具6aの揺れが小さくなるようにクレーンフック11と吊り具6aとの距離を調節する操作を行なうだけで、吊り具6aの揺れ幅を小さくできる。即ち、複雑な操作を行なうことなく、クレーンフック11から吊り下げられた吊ワイヤ6の下端部の吊り具6aの揺れを抑制して、吊り具6aを吊荷15に安全に取り付けることが可能になっている。
As described above, in the present invention, the operation of the crane 7 (raising and lowering the boom 8, feeding the
吊荷15が大規模な杭等の場合は、吊り具6aの大きさおよび重量が大きくなるため(例えば、重量は20kg程度)、吊り具6aの搖動は、作業者にとっては極めて危険になる。特に、船に設置されたクレーン7による吊り上げ作業の場合は、陸上に設置されたクレーンによる吊り上げ作業の場合と比較して、波による揺れが加わるために、一段と吊り具6aの揺れが複雑になり、作業者の安全を確保することが難しくなる。このような場合であっても、本発明を適用することにより、吊り具6aの揺れ幅を抑制して、作業者の安全を確保することができるので、作業時間が増大して工期が予定よりも長くなるという問題を回避するには有利になる。もちろん、本発明は、陸上に設置されたクレーンを用いた吊り上げ作業にも適用することができる。
When the suspended
本発明では、吊り具6aを吊荷15に取り付けた後は、吊り上げる吊荷15の重量を長さ調節索3に作用させないので、長さ調節索3を耐荷重の小さな仕様にできる。これに伴って、補助装置1を軽量化および小型化するには非常に有利になる。
In the present invention, after the
例えば、吊荷重10トンのクレーンフック11の場合、径50mm程度、長さ25m程度、重量300kg程度の吊ワイヤ6を用いる。一方、長さ調節索3は、クレーンフック11と吊り具6aとの長さを調節するために、この吊ワイヤ6を上下移動させることができる耐荷重があれば足りることになる。即ち、この場合、長さ調節索3は300kg程度の重さを安全に吊ることができる耐荷重(厳密には吊ワイヤ6が屈曲した際に生じる反発力等に対応するための力等も加えた荷重)でよいので、吊ワイヤ6の耐荷重(10トン)に比して数%程度の耐荷重で足りることになる。
For example, in the case of the
この実施形態では、補助装置1による長さ調節索3の繰り出しおよび巻取りを無線操作によって行っているので、吊り具6aの搖動具合を確認し易い位置で、長さ調節索3の繰り出しおよび巻取りの操作を行なうことができる。
In this embodiment, since the
また、この実施形態では、過大な重量の吊荷15を吊り上げるため、クレーン7には複数のクレーンワイヤ10が備わり、それぞれのクレーンワイヤ10にクレーンフック11が取り付けられている。そして、それぞれのクレーンフック11から吊り下げられた吊ワイヤ6に、それぞれのクレーンフック11に吊り下げられた補助装置1の長さ調節索3を接続固定している。本発明は、この実施形態のようなクレーンワイヤ10(クレーンフック11)が複数の場合に限定されることはなく、クレーンワイヤ10(クレーンフック11)が単数の場合にも適用することができる。
In this embodiment, in order to lift an excessively heavy suspended
また、1台の補助装置1によって1本の吊ワイヤ6を上下移動させる構成だけでなく、1台の補助装置1によって複数本の吊ワイヤ6を上下移動させる構成にすることもできる。1台の補助装置1によって複数本の吊ワイヤ6を上下移動させる場合には、それぞれの吊ワイヤ6に1本ずつ長さ調整索3を接続する。或いは、1本の長さ調整索3を途中で枝分かれさせて、複数本の吊ワイヤ6のそれぞれに接続する。
Further, not only a configuration in which one
長さ調節索3の接続部3aは吊ワイヤ6の長手方向に移動できて、任意の位置で固定できる構成にしておくとよい。そして、接続部3aを固定する位置を適度に異ならせることにより、吊ワイヤ6の特定箇所に応力が集中することを回避するとよい。
The connecting
接続部3aには、予め設定された限界荷重が長さ調節索3に作用した際に、即座に吊ワイヤ6との接続固定を解除する安全機構を設けることもできる。この安全機構を設けると、何らかの原因によって、長さ調節索3に予め設定された限界荷重が作用すると、長さ調節索3にはそれ以上の荷重が作用しないので、補助装置1の損傷を防止するには非常に有効である。この限界荷重は、例えば、長さ調節索3の保証耐荷重以下に設定する。
The connecting
補助装置1は、実施形態で例示したように巻き芯2を駆動モータ2aによって回転させる構造に限らず、他の構造を採用することもできる。例えば、引き出されたテープ状のメジャーが内蔵されたゼンマイバネの付勢力によって巻き取られる巻尺と同様の構造にすることもできる。この場合、巻き芯2にゼンマイバネが付設されて、長さ調整索3がゼンマイバネの付勢力によって巻き取られる。
The
この構造の場合、吊り具6aを吊荷15に取り付けるまでは、ゼンマイバネの付勢力によって長さ調整索3が巻き取られてクレーンフック11と吊り具6aとの距離を短くして吊り具6aの揺れ幅を小さくする。吊り具6aを吊荷15に取り付けた後、クレーンワイヤ10を巻き取って吊ワイヤ6に吊荷15に重量が作用するまでは、長さ調整索3が繰り出される。そして、吊ワイヤ6に吊荷15の重量が作用した後に、長さ調整索3に実質的に吊荷15の重量が作用することはなく、クレーンワイヤ10および吊ワイヤ6によって吊荷15が吊り上げられる。
In the case of this structure, until the hanging
1 吊り上げ補助装置
2 巻き芯
2a 駆動モータ
3 長さ調節索
3a 接続部
4 無線コントローラ
5 受信機
6 吊ワイヤ
6a 吊り具
7 クレーン
8 ブーム
9 旋回体
10 クレーンワイヤ
11 クレーンフック
12 巻上げドラム
13 起重機船
14 台船
15 吊荷
16 固定部
DESCRIPTION OF
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013091897A JP6166940B2 (en) | 2013-04-25 | 2013-04-25 | Lifting method and lifting assist device using crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013091897A JP6166940B2 (en) | 2013-04-25 | 2013-04-25 | Lifting method and lifting assist device using crane |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2014213994A JP2014213994A (en) | 2014-11-17 |
JP6166940B2 true JP6166940B2 (en) | 2017-07-19 |
Family
ID=51940129
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013091897A Active JP6166940B2 (en) | 2013-04-25 | 2013-04-25 | Lifting method and lifting assist device using crane |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6166940B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104961043B (en) * | 2015-04-29 | 2017-05-31 | 招商局重工(江苏)有限公司 | A kind of crane barge and its Multifunctional hanging hook, Multifunctional hanging hook group |
CN114060221B (en) * | 2021-11-11 | 2024-02-06 | 江苏亨通蓝德海洋工程有限公司 | Cabin hoisting and docking method for offshore wind turbine installation by floating ship |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000219476A (en) * | 1999-01-28 | 2000-08-08 | Nittetsu Unyu Kk | One-man slinging accessory |
JP3501103B2 (en) * | 2000-05-24 | 2004-03-02 | コベルコ建機株式会社 | Method and apparatus for controlling suspension operation of shipboard crane device |
JP2002193582A (en) * | 2000-12-28 | 2002-07-10 | Ishikawajima Harima Heavy Ind Co Ltd | Swing preventing device for container crane |
JP4163450B2 (en) * | 2002-05-28 | 2008-10-08 | 石川島運搬機械株式会社 | Crane steadying method |
JP4600374B2 (en) * | 2006-09-21 | 2010-12-15 | コベルコクレーン株式会社 | Crane boom head |
-
2013
- 2013-04-25 JP JP2013091897A patent/JP6166940B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
JP2014213994A (en) | 2014-11-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2279978B1 (en) | Drum tensioning method and apparatus for load hoist wire rope | |
US9346656B2 (en) | Stabilization and control of a crane load | |
CN108149928B (en) | Tower end installation method of stay cable | |
JP2018020858A (en) | crane | |
CN102131727B (en) | Devices of crane for movement control of hoisting wire, and uses thereof | |
KR20130134838A (en) | Robot arm apparatus for mooring | |
JP6166940B2 (en) | Lifting method and lifting assist device using crane | |
CN104340907A (en) | Hoisting and winching control device capable of preventing rope from messing and control method | |
JP2018193235A (en) | crane | |
JP2018095433A (en) | Crane | |
JP6558399B2 (en) | crane | |
JP5296614B2 (en) | Leaving device, crane and rope wiring method | |
JP2011240998A (en) | Suspending implement and method of lifting and conveying suspending cargo using the same | |
JP4600374B2 (en) | Crane boom head | |
JP5948542B1 (en) | Simple crane | |
JP2018090372A (en) | Workpiece conveyance method using crane | |
JP2003192271A (en) | Storing method of tower attachment of mobile crane and device thereof | |
WO2011151633A2 (en) | Device for positioning or stabilising a load attached to a crane | |
JP7238531B2 (en) | crane | |
JP2015168579A (en) | Collecting device | |
JP7275702B2 (en) | front strut backstop | |
JP7253930B2 (en) | Tension overload protector and crane | |
JP6203104B2 (en) | Unloading device | |
JP2018172189A (en) | Quay crane and method for controlling quay crane | |
JP2023111751A (en) | Suspended load rotating device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20160203 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20161219 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20161227 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20170206 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20170606 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20170626 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6166940 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |