JP5840633B2 - Installation method of turnout on track rail and sleeper hanging bracket - Google Patents

Installation method of turnout on track rail and sleeper hanging bracket Download PDF

Info

Publication number
JP5840633B2
JP5840633B2 JP2013027907A JP2013027907A JP5840633B2 JP 5840633 B2 JP5840633 B2 JP 5840633B2 JP 2013027907 A JP2013027907 A JP 2013027907A JP 2013027907 A JP2013027907 A JP 2013027907A JP 5840633 B2 JP5840633 B2 JP 5840633B2
Authority
JP
Japan
Prior art keywords
rail
sleeper
pair
balance
branching device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013027907A
Other languages
Japanese (ja)
Other versions
JP2014156727A (en
Inventor
定雄 三森
定雄 三森
允 早川
允 早川
誠二 細川
誠二 細川
国博 今井
国博 今井
Original Assignee
株式会社三森総業
保線機器整備株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社三森総業, 保線機器整備株式会社 filed Critical 株式会社三森総業
Priority to JP2013027907A priority Critical patent/JP5840633B2/en
Publication of JP2014156727A publication Critical patent/JP2014156727A/en
Application granted granted Critical
Publication of JP5840633B2 publication Critical patent/JP5840633B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Description

本発明は、現場に搬入してきた分岐器運搬車上から新分岐器を、軌道路上の旧分岐器を撤去した分岐器設置位置に設置するために用いる、軌道レールにおける分岐器の設置方法およびマクラギ吊金具に関するものである。   The present invention relates to a method for installing a branching device on a track rail and a sleeper used for installing a new branching device on a branching vehicle transporter that has been brought into the field at a branching device installation position from which an old branching device has been removed on a trackway. It relates to a hanging bracket.

旧分岐器に代えて新分岐器を設置するには、作業場所の確保の難しさから、分岐器の設置個所(旧分岐器を撤去した)から離れた処で新たな分岐器を組立て、該新たな分岐器を、例えば、特許文献1或いは2に記載の運搬車で設置現場へと搬送し、該運搬車に備えたクレーン装置や別途用意のクレーンなどにより道床上に下ろして、別途用意したクレーン車や重量の嵩む大型の山越器を用いて、旧分岐器を撤去した分岐器設置位置に設置するようにしている(例えば、特許文献1,2参照。)。   In order to install a new branching device in place of the old branching device, a new branching device is assembled at a location away from the branching device installation location (the old branching device has been removed) due to the difficulty of securing the work place. For example, a new branching device is transported to the installation site by a transport vehicle described in Patent Document 1 or 2, and is separately prepared by lowering it on the roadbed by a crane device provided in the transport vehicle or a separately prepared crane. The crane is installed at a branching unit installation position where the old branching unit is removed using a crane vehicle or a large-sized Yamakoshi device that is heavy (see, for example, Patent Documents 1 and 2).

特公昭62−20945号公報Japanese Examined Patent Publication No. 62-20945 実開昭54−121408号公報Japanese Utility Model Publication No. 54-121408

しかし、前記特許文献1,2に記載の従来技術は、据付け現場において、クレーン車やクレーン装置を用いて分岐器を吊上げ、設置場所に据付ける方法を採るため、クレーン(保管台数の少ない)等を設置する現場に搬送しておかねばならず、その(重機の)搬送や使用料等を含めた設置コストが掛かる。また、レール山越器を用いるにしても、チェーンブロックの横移動を利用するものであるため、設置場所の隣接位置に担(運搬)車で搬送しておかねばならず、従って、当該設置場所位置まで敷設したレールがないときは、実施できない、という使用上の制約があった。   However, the prior art described in Patent Documents 1 and 2 uses a method of lifting a branching device using a crane truck or a crane device at the installation site and installing it at the installation site. It must be transported to the site where it is installed, and installation costs including its (heavy equipment) transport and usage fees are incurred. Also, even if a rail Yamakoshi device is used, since it uses the lateral movement of the chain block, it must be transported to a position adjacent to the installation location by a carrier (transport) vehicle. When there was no rail laid up to, there was a restriction in use that could not be carried out.

本発明は、このようの従来技術の問題点に鑑みなされたもので、設置作業の省力化を図れ、機材的にも人員的にもコストを低減できる、軌道レールにおける分岐器の設置方法およびマクラギ吊金具を提供することを目的とする。   The present invention has been made in view of the above-described problems of the prior art, and can save labor in installation work and can reduce costs both in terms of equipment and personnel, and a method of installing a branching device on a track rail and sleepers It aims at providing a hanging metal fitting.

上記目的を達成するため、本発明に係る軌道レールにおける分岐器の設置方法では、軌道レール上に適宜の間隔を置いて走行する複数の分岐器運搬車上に、マクラギ上に並設した少なくとも一対の直線に沿うレールを備えた分岐器をわたして積載する工程と、分岐器を構成する前記一対のレールが設置されたマクラギにマクラギ吊金具を固定すると共に、マクラギに固定したマクラギ吊金具を介して天秤レールを着脱自在に組付ける天秤レール組付け工程と、旧分岐器を撤去して複数のレール山越器を、前記分岐器運搬車の走行方向に沿って並設した分岐器設置個所に設置すると共に、複数のレール山越器を設置した分岐器設置個所に前記分岐器を積載した前記分器運搬車を移動させる工程と、その移動に伴って前記分岐器を前記各レール山越器に順次送り込み、各レール山越器に備えられたチェーンブロックのローラ付きレールキャッチにマクラギ吊金具の上部に組み付けられた前記天秤レールを順次掛止させて、前記分岐器運搬車側から前記レール山越器側へと分岐器を渡す工程と、その後、各レール山越器に備えられたチェーンブロックを操作して前記分岐器を前記分岐器設置個所に下ろす工程と、を有することを特徴とする。
また、この軌道レールにおける分岐器の設置方法で使用する本発明に係るマクラギ吊金具は、梁部と、一対の挟持枠と、第1クランプボルトと、第2クランプボルトと、天秤レール受部と、天秤レール押付け片および第3クランプボルトとを有し、梁部は、マクラギ側面方向の断面の横幅よりも長く、かつ、その両側に一対の挟持枠を回動自在に支持する軸部が設けられる一方、その軸部の間にマクラギを縦方向に押さえるための第1クランプボルトが螺合する第1ボルト孔が設けられ、一対の挟持枠は、マクラギの断面の縦幅よりも長く、かつ、下部には内側に延びマクラギの下側面に当接する下側面支持部を有する一方、上部が梁部の両側の軸部にそれぞれ回動可能に取付けられ、軸部より上側には、それぞれ、マクラギを横方向に押さえるための第2クランプボルトが螺合する第2ボルト孔が設けられ、第2クランプボルトの先端部を梁部の左右両側の側面にそれぞれ当接させて回転させることにより、一対の挟持枠の下端部をそれぞれマクラギの方に移動させて、一対の挟持枠によりマクラギを左右両側から挟持すると共に、第1クランプボルトを回転させてその先端部と一対の挟持枠それぞれの下側面支持部とにより上下両側からマクラギを挟持する一方、天秤レール受部の上に天秤レールを載せて、天秤レール受部のボルト孔と天秤レール押付け片のボルト孔とに第3クランプボルトを挿入して締め付けることにより天秤レール受部の上面と各天秤レール押付け片の押付け面との間で天秤レールを着脱自在に組付けたことを特徴とする。
ここで、一対の挟持枠の下側面支持部には、それぞれ、先端が鋭利に形成され上方に突出し、マクラギの下側面に突き刺さる先鋭突出部が設けられていると良い。
In order to achieve the above object, according to the method for installing a branching device in a track rail according to the present invention, at least a pair of branching device vehicles arranged in parallel on sleepers on a plurality of branching device vehicles traveling at appropriate intervals on the track rail. A step of loading a branching device having rails along a straight line, and fixing a sleeper hanging bracket to a sleeper on which the pair of rails constituting the branching device is installed, and a sleeper hanging bracket fixed to the sleeper Assembling the balance rail in a detachable manner, and removing the old branching device and installing multiple rail Yamakoshi devices at the branching device installation location along the running direction of the branching vehicle while, the step of moving loaded with the splitter to the splitter installation point that installing a plurality of rails Yamakoshi instrument the partial Toki instrument truck, each rail the turnout with the movement The balance rail assembled on the upper part of the sleeper bracket is sequentially hooked to the rail catches of the chain blocks provided in each rail Yamakoshi, and the rails from the turner transporter side are A step of delivering a branching device to the Yamakoshi device side, and then a step of operating a chain block provided in each rail Yamakoshi device to lower the branching device to the branching device installation location.
Moreover, the sleeper suspension fitting according to the present invention used in the method of installing the branching device in the track rail includes a beam portion, a pair of clamping frames, a first clamp bolt, a second clamp bolt, and a balance rail receiving portion. , A balance rail pressing piece and a third clamp bolt, the beam portion is longer than the lateral width of the cross section in the side direction of the sleeper, and a shaft portion for rotatably supporting a pair of clamping frames is provided on both sides thereof On the other hand, a first bolt hole into which a first clamp bolt for pressing the sleeper in the vertical direction is provided between the shaft portions, the pair of holding frames is longer than the vertical width of the cross section of the sleeper, and The lower part has a lower side supporting part that extends inward and contacts the lower side of the sleeper, while the upper part is pivotally attached to the shafts on both sides of the beam part. Is pressed sideways A second bolt hole for engaging the second clamp bolt is provided, and the tip end portion of the second clamp bolt is brought into contact with the left and right side surfaces of the beam portion to rotate, thereby rotating the pair of clamping frames. Each lower end is moved toward the sleeper, the sleeper is clamped from both the left and right sides by a pair of clamping frames, and the first clamp bolt is rotated to rotate the tip and the lower side support part of each of the pair of clamping frames. By holding the sleeper from both the upper and lower sides, placing the balance rail on the balance rail receiving part and inserting and tightening the third clamp bolt into the bolt hole of the balance rail receiving part and the bolt hole of the balance rail pressing piece The balance rail is detachably assembled between the upper surface of the balance rail receiving portion and the pressing surface of each balance rail pressing piece.
Here, it is preferable that the lower side support portions of the pair of holding frames are each provided with a sharp protrusion that has a sharp tip and protrudes upward and pierces the lower side of the sleeper.

本発明に係る軌道レールにおける分岐器の設置方法およびマクラギ吊金具よれば、人力での搬入が可能な軽量なレール山越器に備えられたチェーンブロックの先端にローラ付レールキャッチを設けることにより、該ローラ付レールキャッチのローラを利用して分岐器を縦送り(レールの長手方向に沿う送り込み)して、分岐器の設置作業を行うものであるから、大型機械(重機)による機材の搬入の必要性がなく、場所もとらず、コスト的に安価に分岐器の設置作業を行うことができる。
特に、本発明に係る軌道レールにおける分岐器の設置方法およびマクラギ吊金具によれば、分岐器のレールを吊上げるのではなく、分岐器が設置されたマクラギを吊上げるため、通常のレール断面と異なる箇所があってレールの頭部を吊上げることが困難な場合でも、問題なく分岐器を吊上げることができる。
According to the installation method of the branching device and the sleeper suspension fitting in the track rail according to the present invention, by providing a rail catch with a roller at the tip of a chain block provided in a lightweight rail mountain-going device that can be carried in manually, Since the branching device is installed by feeding the branching device vertically (feeding along the longitudinal direction of the rail) using the roller of the rail catch with roller, it is necessary to carry in equipment by a large machine (heavy equipment) Therefore, the installation work of the branching device can be performed at a low cost regardless of the location.
In particular, according to the method of installing the branching device and the sleeper hanging bracket in the track rail according to the present invention, instead of lifting the rail of the branching device, to lift the sleeper on which the branching device is installed, Even if it is difficult to lift the head of the rail due to different locations, the branching device can be lifted without any problem.

(a)〜(d)それぞれ本発明に係る分岐器設置方法の工程を示す図である。(A)-(d) is a figure which shows the process of the branching device installation method which concerns on this invention, respectively. 分岐器設置終了直前の状態を示す側面図である。It is a side view which shows the state just before completion | finish of a branching device installation. 分岐器設置終了直前の状態を示す平面図である。It is a top view which shows the state just before completion | finish of a branching device installation. レール山越器のチェーンブロックの先端に設けられたローラ付レールキャッチの作業状態を示す正面図である。It is a front view which shows the operation state of the rail catch with a roller provided in the front-end | tip of the chain block of a rail Yamakoshi device. レール山越器のチェーンブロックの先端に設けられたローラ付レールキャッチの作業状態を示す側面図である。It is a side view which shows the operation state of the rail catch with a roller provided in the front-end | tip of the chain block of a rail Yamakoshi device. 分岐器を吊上げているレール山越器全体の状態を示す図である。It is a figure which shows the state of the whole rail Yamakoshi device which has lifted the turnout. 分岐器を吊上げているレール山越器全体の状態を示す他の図である。It is another figure which shows the state of the whole rail Yamakoshi device which has lifted the turnout. 分岐器のマクラギを吊上げているマクラギ吊金具を示す側面図である。It is a side view which shows the sleeper hanging metal fitting which is lifting the sleeper of a turnout. 分岐器のマクラギを吊上げているマクラギ吊金具を示す平面図である。It is a top view which shows the sleeper hanging metal fitting which is lifting the sleeper of a turnout. 分岐器のマクラギを吊上げているマクラギ吊金具を示す正面図である。It is a front view which shows the sleeper hanging metal fitting which is lifting the sleeper of a turnout. マクラギ吊金具の構成を示す部分断面図である。It is a fragmentary sectional view which shows the structure of a sleeper hanging metal fitting. (a),(b)それぞれマクラギ吊金具がマクラギを挟持するまでの動作を示す正面図である。(A), (b) It is a front view which shows operation | movement until a sleeper hanging bracket clamps a sleeper, respectively. (a),(b)それぞれマクラギ吊金具がマクラギを挟持するまでの動作を示す正面図である。(A), (b) It is a front view which shows operation | movement until a sleeper hanging bracket clamps a sleeper, respectively.

本発明に係る軌道レールにおける分岐器の設置方法は、既設の軌道レール上に適宜の間隔を置いて配した複数(実施形態では3台)の分岐器運搬車Cに分岐器Aをわたして積載する工程と、分岐器Aの直線状の第一基本レールA1と該第一基本レールA1に略平行する第一トングレールA2および傾斜状の第二基本レールA1’に、後述するマクラギ吊金具1を介して天秤レール3を着脱自在に組付ける工程を相前後して行う。   The method of installing the branching device in the track rail according to the present invention is such that the branching device A is loaded onto a plurality (three in the embodiment) of the branching device transporter C arranged at an appropriate interval on the existing track rail. And a straight first basic rail A1 of the branching device A, a first tongue rail A2 substantially parallel to the first basic rail A1, and an inclined second basic rail A1 ′. The steps of assembling the balance rail 3 detachably through the spar are performed in succession.

なお、図示(例えば、図3で示す)の分岐器Aは第一、第二の基本レールA1,A1’の間にクロッシングを介して一体的にした第一、第二のトングレールA2,A2’を介在させ、これら各レールA1,A1’.A2,A2’をマクラギBで連結して構成し、後記するように、第一基本レールA1と第二基本レールA1’側の前記トングレールA2の直線状を利用して設置作業を行う。   The branching device A shown in the figure (for example, shown in FIG. 3) is a first and second Tongler A2, A2 integrated with a first crossing between the first and second basic rails A1, A1 ′. ', And each of these rails A1, A1'. A2 and A2 'are connected by sleepers B, and, as will be described later, the installation work is performed by using the straight shape of the first basic rail A1 and the second basic rail A1' on the side of the tongrel A2.

この分岐器Aは、工場で組立ててクレーン車を利用して現場に搬送しても良いが、概して、クレーン車を利用しても、踏切りの近傍の道床の空地までに搬送するのが限界である。そのため、当該個所において組立てて分岐器Aを得るのが一般である。   This branching device A may be assembled at the factory and transported to the site using a crane vehicle. However, in general, even if a crane vehicle is used, it is limited to transporting it to the open space near the railroad crossing. is there. Therefore, it is common to obtain the branching device A by assembling at the location.

道床脇の分岐器Aを、適宜数(ここでは、例えば、3台とする。)の分岐器運搬車Cにわたして積載するには、分岐器Aの各レールA1,A1’.A2,A2’の適宜のものに掛止するフック状のレールキャッチを備えた公知のレール横移動用の山越器を利用して分岐器Aを横移動させるようにして行う。もとより、許されるなら、クレーンで吊上げる等別途手段を利用しても不都合はない。   In order to load the roadside branching device A on an appropriate number (for example, three) of the branching device carrier C, each rail A1, A1 '. The branching device A is moved laterally by using a well-known Yamakoshi device for laterally moving the rail provided with a hook-like rail catch that is hooked to an appropriate one of A2 and A2 '. Of course, if allowed, there is no inconvenience even if another means is used such as lifting with a crane.

分岐器運搬車Cは、図1や図2等に示すように、分岐器Aを敷設した状態で積載できる空間域を占める台盤C1を備えた車体C2を、前後それぞれ一対の車輪C3,C3で受支させた手動方式のものを用いているが、動力源を搭載した自動式のものを用いても必ずしも不都合ではない。   As shown in FIGS. 1 and 2, etc., the branching device transporter C has a vehicle body C2 provided with a platform C1 that occupies a space area in which the branching device A is laid, and a pair of wheels C3 and C3. However, it is not always inconvenient to use an automatic type equipped with a power source.

実施形態では、この分岐器運搬車Cに渡して分岐器Aを積載する前記作業(工程)前に、図8〜図13に示すように、分岐器Aを構成する第一基本レールA1、第一トングレールA2および第二基本レールA1’が載置されているマクラギBに後述する所要数のマクラギ吊金具1を用いて天秤レール3を組付ける。   In the embodiment, before the operation (step) of loading the branching device A over the branching device transporter C, as shown in FIGS. 8 to 13, the first basic rail A1 constituting the branching device A, the first The balance rail 3 is assembled to the sleeper B on which the one ton gray rail A2 and the second basic rail A1 ′ are placed by using the required number of sleeper hanging fittings 1 described later.

この組付け作業は、前記の通り、分岐器運搬車Cに対する分岐器Aの積載作業と相前後して行えば良いが、積載作業より先に行えば、足場が不安定な道床上で行う必要がないので、安全性を確保できる。   As described above, this assembling work may be performed in parallel with the loading work of the branching device A on the branching vehicle C. However, if it is performed before the loading work, it is necessary to perform on the roadbed where the scaffolding is unstable. Since there is no, safety can be secured.

天秤レール3は、適宜の長さにした軌道用のレール材をそのまま用いている。これは、チェーンブロック4(図4、5)のローラ付キャッチ400をそのまま使用して吊り上げることができるからである。なお、図4および図において、300は天秤レール3の頭部、301は天秤レール3の脚部、400Aはローラ付キャッチ400のローラである。ここで、天秤レール3の頭部300が掛止部となり、脚部301が組付け部となる。なお、山越器に使用するチェーンブロック4やローラ付キャッチ400は公知である。   As the balance rail 3, a rail material for a track having an appropriate length is used as it is. This is because the catch 400 with a roller of the chain block 4 (FIGS. 4 and 5) can be used as it is and can be lifted. In FIGS. 4 and 4, reference numeral 300 denotes a head of the balance rail 3, 301 denotes a leg portion of the balance rail 3, and 400A denotes a roller of the catch 400 with a roller. Here, the head portion 300 of the balance rail 3 serves as a latching portion, and the leg portion 301 serves as an assembly portion. In addition, the chain block 4 and catch 400 with a roller used for a Yamakoshi device are well-known.

(マクラギ吊金具の構成)
次に、分岐器Aに天秤レール3を組み付けるためのマクラギ吊金具1について説明する。
(Composition of sleeper hanging bracket)
Next, the sleeper fitting 1 for assembling the balance rail 3 to the branching device A will be described.

マクラギ吊金具1は、図8〜図13に示すように、分岐器Aが載置されたマクラギBを吊るためのもので、梁部11と、一対の挟持枠12,12と、一対の第1クランプボルト13,13および第2クランプボルト14,14と、天秤レール受部15と、4つの天秤レール押付け片16および第3クランプボルト17とを有している。   As shown in FIGS. 8 to 13, the sleeper hanging bracket 1 is for hanging a sleeper B on which a branching device A is placed, and includes a beam portion 11, a pair of holding frames 12 and 12, and a pair of first The first clamp bolts 13 and 13 and the second clamp bolts 14 and 14, the balance rail receiving portion 15, the four balance rail pressing pieces 16 and the third clamp bolt 17 are provided.

梁部11は、図8〜図11に示すように、マクラギBの断面の横幅よりも長い一対の側板111,111の間に、底板112と、挟持枠12,12側の第2クランプボルト14,14の先端部が当接する一対の当接板113,113を設けて構成される。一対の側板111,111の両側には、それぞれ、一対の挟持枠12,12を回動自在に支持する軸部111aが設けられている。底板112両側には、マクラギBを縦方向に押さえるための第1クランプボルト13,13が螺合する第1ボルト孔114,114が設けられている。   As shown in FIGS. 8 to 11, the beam portion 11 includes a bottom plate 112 and a second clamp bolt 14 on the side of the sandwiching frames 12, 12 between a pair of side plates 111, 111 longer than the lateral width of the cross section of sleeper B. , 14 is provided with a pair of abutting plates 113, 113 with which the front end portions abut. On both sides of the pair of side plates 111, 111, shaft portions 111a that rotatably support the pair of sandwiching frames 12, 12 are provided. On both sides of the bottom plate 112, there are provided first bolt holes 114, 114 into which first clamp bolts 13, 13 for pressing the sleeper B in the vertical direction are screwed.

一対の挟持枠12,12は、図8〜図13に示すように、それぞれ、マクラギBの断面の縦幅よりも長く、その下端部には、内側に延びマクラギBの下側面に当接する下側面支持部121,121をボルト125により固定するための複数段の取付け孔124,124が設けられている一方、上端部より下がった位置で梁部11両側の軸部111aにそれぞれ回動可能に取付けられている。また、その軸部111aより上側には、それぞれ、ボルト支持板123,123が設けられており、そのボルト支持板123,123に、マクラギBを横方向に押さえるための第2クランプボルト14,14が螺合する第2ボルト孔122,122が設けられている。   As shown in FIGS. 8 to 13, each of the pair of holding frames 12 and 12 is longer than the longitudinal width of the cross section of sleeper B, and has a lower end that extends inward and contacts the lower surface of sleeper B. A plurality of mounting holes 124 and 124 for fixing the side support portions 121 and 121 with bolts 125 are provided, and the shaft portions 111a on both sides of the beam portion 11 can be rotated at positions lower than the upper end portions. Installed. In addition, bolt support plates 123 and 123 are provided above the shaft portion 111a, respectively, and second clamp bolts 14 and 14 for pressing the sleeper B in the lateral direction on the bolt support plates 123 and 123, respectively. Are provided with second bolt holes 122 and 122 into which the screw bolts are engaged.

以上のように構成されたマクラギ吊金具1を使用して、分岐器Aに天秤レール3を組み付けるためには、まず、分岐器Aが載置されているマクラギBへマクラギ吊金具1を取り付ける。   In order to assemble the balance rail 3 to the turnout A using the sleeper suspension 1 configured as described above, first, the sleeper attachment 1 is attached to the sleeper B on which the turnout A is placed.

次に、本発明に係る軌道レールにおける分岐器設置方法について説明する。   Next, the branching device installation method in the track rail according to the present invention will be described.

(分岐器運搬車C上に分岐器Aを積載)
まず、既設の軌道レール上に適宜の間隔を置いて配した複数(実施形態では3台)の分岐器運搬車Cに分岐器Aをわたして積載する。
(Branch A is loaded on the Branch Car C)
First, the branching device A is loaded onto a plurality (three in the embodiment) of the branching vehicle transporter C arranged at an appropriate interval on the existing track rail.

(マクラギBへのマクラギ吊金具1の取り付け)
次に、このマクラギ吊金具1をマクラギBに固定する場合には、図12(a)に示すように、第1クランプボルト13,13および第2クランプボルト14,14は予め緩めておき、梁部11に対し一対の挟持枠12,12は、その下端部を広げておき、マクラギBに対し挿入し易い状態に準備しておく。
(Mounting of sleeper 1 to sleeper B)
Next, when this sleeper suspension fitting 1 is fixed to sleeper B, the first clamp bolts 13 and 13 and the second clamp bolts 14 and 14 are loosened in advance as shown in FIG. The pair of holding frames 12, 12 is prepared so that the lower end portion of the pair of holding frames 12, 12 is widened and can be easily inserted into the sleeper B.

そして、図12(b)に示すように、このマクラギ吊金具1の一対の挟持枠12,12の間にマクラギBを挿入して、まず、図13(a)に示すように、一対の挟持枠12,12側の第2クランプボルト14,14の先端部を梁部11の左右両側の側面113,113にそれぞれ当接させて回転させることにより、一対の挟持枠12,12の下端部をそれぞれマクラギBの方に移動させて、一対の挟持枠12,12によりマクラギBをその左右両側から挟持する。   Then, as shown in FIG. 12 (b), a sleeper B is inserted between the pair of holding frames 12, 12 of the sleeper hanging fitting 1, and first, as shown in FIG. By rotating the front end portions of the second clamp bolts 14, 14 on the frame 12, 12 side against the left and right side surfaces 113, 113 of the beam portion 11, the lower ends of the pair of sandwiching frames 12, 12 are moved. The sleeper B is moved toward the sleeper B, and the sleeper B is sandwiched by the pair of sandwiching frames 12 and 12 from both the left and right sides.

次に、このマクラギ吊金具1の梁部11側の第1クランプボルト13,13を回転させてその先端のスイーベル部131,131をマクラギBの上側面に押し付けて、図13(b)に示すように、第1クランプボルト13,13と、一対の挟持枠12,12それぞれの下側面支持部121,121とにより上下両側からマクラギBを挟持する。   Next, the first clamp bolts 13 and 13 on the beam part 11 side of the sleeper hanging metal fitting 1 are rotated so that the swivel parts 131 and 131 at the tips thereof are pressed against the upper side surface of the sleeper B, as shown in FIG. As described above, the sleeper B is clamped from both the upper and lower sides by the first clamp bolts 13 and the lower side support portions 121 and 121 of the pair of clamping frames 12 and 12, respectively.

その結果、このマクラギ吊金具1によれば、第2クランプボルト14,14により調整しながら一対の挟持枠12,12によりマクラギBをその左右両方向から挟持できると共に、第1クランプボルト13,13により調整しながら第1クランプボルト13,13と一対の挟持枠12,12それぞれの下側面支持部121,121とにより上下方向からマクラギBを挟持するため、マクラギBの断面形状や断面の縦方向の長さが変更されたり、経年変化によりマクラギの断面に多少の寸法の違いが生じても、その変更や多少の寸法の違いに対応してマクラギBに固定することができる。   As a result, according to the sleeper hanging bracket 1, the sleeper B can be clamped from both the left and right directions by the pair of clamping frames 12, 12 while being adjusted by the second clamp bolts 14, 14, and the first clamp bolts 13, 13 are used. Since the sleeper B is sandwiched from above and below by the first clamp bolts 13 and 13 and the lower support members 121 and 121 of the pair of sandwiching frames 12 and 12 while adjusting, the cross-sectional shape of the sleeper B and the longitudinal direction of the cross-section Even if the length is changed or a slight difference in dimension occurs in the cross section of the sleeper due to aging, the sleeper B can be fixed to the sleeper B corresponding to the change or slight difference in dimension.

また、このマクラギ吊金具1では、一対の挟持枠12,12の軸部111aより上部には、ボルト支持板123,123が設けられており、そのボルト支持板123,123に第2ボルト孔122,122が設けられているため、図12(a)に示すように,一対の挟持枠12,12の下端部をそれぞれ広げて、マクラギBに取り付ける際には、そのボルト支持板123,123により、一対の挟持枠12,12の下端部をより広く開くことが可能となり、マクラギBにこのマクラギ吊金具1を取り付ける際の取り付け作業性が向上する。そのため、このマクラギ吊金具1によれば、特定の一の形状のマクラギBの取り付けに限定して使用するものではなく、断面形状が台形形状や、正方形状、さらには縦長または横長の長方形状等の複数種類のマクラギBの取り付けに使用するが可能となる。   Further, in this sleeper hanging bracket 1, bolt support plates 123, 123 are provided above the shaft portions 111 a of the pair of holding frames 12, 12, and the second bolt holes 122 are formed in the bolt support plates 123, 123. , 122 are provided, as shown in FIG. 12 (a), when the lower ends of the pair of holding frames 12, 12 are expanded and attached to sleepers B, the bolt support plates 123, 123 are used. The lower end portions of the pair of holding frames 12 and 12 can be opened more widely, and the attachment workability when attaching the sleeper hanging bracket 1 to the sleeper B is improved. Therefore, according to this sleeper hanging fitting 1, it is not limited to the attachment of the sleeper B having a specific shape, and the cross-sectional shape is a trapezoidal shape, a square shape, or a vertically or horizontally long rectangular shape, etc. It becomes possible to use it for the attachment of multiple types of sleepers B.

また、一対の挟持枠12,12の下側面支持部121,121の先端には、それぞれ、先端が鋭利に形成され上方に突出し、マクラギBの下側面に突き刺さる先鋭突出部121aが設けられているため、図13(b)に示すように、第1クランプボルト13,13を回転させてその先端のスイーベル部131,131をマクラギBの上側面に押し付けた場合は、先鋭突出部121aがマクラギBの下側面に突き刺さったり、突き刺さらないまでも食い込むため、マクラギBに安定した状態で取り付けることが出来る。ただし、本発明においては、先鋭突出部121aを設けることも任意であり、省略しても良い。   In addition, sharp tips 121a are formed at the tips of the lower side support portions 121, 121 of the pair of sandwiching frames 12, 12 so that the tips are sharply formed and protrude upward and pierce the lower side of sleeper B. Therefore, as shown in FIG. 13 (b), when the first clamp bolts 13, 13 are rotated and the swivel portions 131, 131 at the tips thereof are pressed against the upper side surface of the sleeper B, the sharp protrusions 121 a are formed in the sleeper B It can be attached to sleeper B in a stable state because it digs into the lower surface of the sword or even bites it without being stabbed. However, in the present invention, provision of the sharp protrusion 121a is optional and may be omitted.

さらに、一対の挟持枠12,12の下端部には、マクラギB断面の縦方向の長さに応じて下側面支持部121,121の取り付け高さを変更できるよう上下方向に複数段(ここでは、説明の便宜上、例えば、3段とするが、3段に限定されるものではない。)の取付け孔124,124を設けている。そのため、このマクラギ吊金具1が取り付けるべきマクラギBの断面の縦方向(上下方向)の長さが複数種類ある場合でも、一対の挟持枠12,12における下側面支持部121,121の取り付け高さを調整することにより、縦方向(上下方向)の長さが複数種類のマクラギBに対応して、取り付けることができる。例えば、マクラギBの断面形状が正方形の場合は、中段の取付け孔124,124に下側面支持部121,121を取付ける一方、それより縦方向の長さが長い縦長のマクラギBの場合は、最下段の取付け孔124,124に下側面支持部121,121を取付け、縦方向の長さが短い横長のマクラギBの場合は、最上段の取付け孔124,124に下側面支持部121,121を取付けることになる。   Further, at the lower ends of the pair of sandwiching frames 12 and 12, a plurality of steps (here, a plurality of upper and lower support portions 121 and 121 can be mounted in accordance with the longitudinal length of the sleeper B cross section). For convenience of explanation, for example, the number of mounting holes 124 and 124 is three, but the number is not limited to three. Therefore, even when there are a plurality of longitudinal (vertical direction) lengths of the cross section of the sleeper B to which the sleeper hanging bracket 1 is to be attached, the attachment height of the lower side support portions 121 and 121 in the pair of holding frames 12 and 12 By adjusting, the length in the vertical direction (vertical direction) can be attached corresponding to a plurality of sleepers B. For example, when the cross-sectional shape of sleeper B is square, the lower side support portions 121 and 121 are attached to the middle mounting holes 124 and 124, while in the case of vertical sleeper B having a longer vertical length than that, Lower side support portions 121 and 121 are attached to the lower mounting holes 124 and 124, and in the case of a horizontal sleeper B having a short vertical length, the lower side support portions 121 and 121 are attached to the uppermost mounting holes 124 and 124. Will be installed.

(マクラギ吊金具1への天秤レール3の取り付け)
以上のようにして適宜間隔で複数のマクラギ吊金具1をマクラギBに固定した後は、図8〜図10に示すように、各マクラギ吊金具1の天秤レール受部15の上に天秤レール3を載せて、天秤レール受部15のボルト孔と4枚の天秤レール押付け片15のボルト孔とにそれぞれ第3クランプボルト17を挿入して締め付ける。これにより、天秤レール受部15の上面と、4枚の各天秤レール押付け片16の押付け面(底面)との間で天秤レール3の脚部301を挟持して、天秤レール3をマクラギ吊金具1に着脱自在に固定することができる。
(Attaching the balance rail 3 to the sleeper hanging bracket 1)
After fixing a plurality of sleeper suspension brackets 1 to sleepers B at appropriate intervals as described above, the balance rail 3 is placed on the balance rail receiving portion 15 of each sleeper suspension bracket 1 as shown in FIGS. The third clamp bolts 17 are inserted into the bolt holes of the balance rail receiving part 15 and the bolt holes of the four balance rail pressing pieces 15 and tightened. Thereby, the leg part 301 of the balance rail 3 is clamped between the upper surface of the balance rail receiving portion 15 and the pressing surface (bottom surface) of each of the four balance rail pressing pieces 16, and the balance rail 3 is attached to the sleeper hanging bracket. 1 can be detachably fixed.

(分岐器Aを複数の分岐器運搬車C1に積載して移動)
このようにして天秤レール3を上方に取付けたマクラギ吊金具1を用いて、図1(a)に示すように分岐器Aを適当に間隔を開けた複数の分岐器運搬車Cに掛け渡すように積載し、分岐器Aを積載した分岐器運搬車Cを、当該積載場所から旧分岐器を撤去した現場に移動させる。
(Branch A is loaded and moved on a plurality of branch trucks C1)
As shown in FIG. 1 (a), the branching device A is hung over a plurality of branching device transporting vehicles C with appropriate intervals as shown in FIG. The branching vehicle C loaded with the branching device A is moved to the site where the old branching device has been removed from the loading place.

(分岐器Aの新規設置個所へ適宜数のレール山越器Tを設置)
旧分岐器の撤去場所である分岐器の新規設置個所には、分岐器運搬車Cの当該個所到達以前に、適宜数のレール山越器T,…を分岐器運搬車Cの前進方向延長上に(レールの長手方向に)沿わせて設置して、分岐器Aの設置個所への据付け(設置)が直ちに行えるようにしてある。なお、必要とする数のレール山越器T全部を、必ずしも設置する必要はなく、分岐器運搬車C側から適宜数設置したレール山越器T側に分岐器Aを移行中(既に配置済のレール山越器T側に)に、配置済のレール山越器T群に新たなレール山越器Tを順次追加しても不都合はない。
(Appropriate number of rails Yamakoshi T are installed at the new installation location of branching device A)
At the newly installed place of the turnout, which is the place where the old turnout is removed, an appropriate number of rail Yamakoshi T,... It is installed along (in the longitudinal direction of the rail) so that the installation (installation) of the branching device A can be immediately performed. It is not always necessary to install all the required number of rail Yamakoshi Ts. The branching unit A is being transferred from the branching vehicle C side to the rail Yamakoshi T side, which is appropriately installed (the rails already arranged). It is not inconvenient to sequentially add new rail Yamakoshi T to the already arranged rail Yamakoshi T group on the Yamakoshi T side.

レール山越器T(公知)は、図6や図7に示すように、長手方向の両端の支持脚Tで、上面に走行路を有する走行桁T2を備え、走行桁T2には、走行路上を自在に移動する2個のチェーンブロック4,4を備えたものである。 Rail Yamakoshi unit T (known), as shown in FIGS. 6 and 7, the support legs T 1 of the longitudinal ends, provided with a crane T2 having a running path to the top surface, the crane T2 is traveling path It is provided with two chain blocks 4 and 4 that move freely.

(分岐器運搬車Cからレール山越器Tへの分岐器Aの受け渡し)
最先の分岐器運搬車Cが旧分岐器を撤去した分岐器設置個所に至る(図1(a))と、進行方向の最先の分岐器運搬車Cには、分岐器Aの長手方向の一端が、分岐器運搬車Cが前進できる軌道レールの死点位置から該死点に最も近接して配した、符号TAで示すレール山越器Tのレールキャッチ400までの離開距離より長い距離量だけ突出させてある。そのため、分岐器Aの長手方向の一端の突出部が分岐器運搬車Cの移動に伴って当該位置に配したチェーンブロック4のローラ付レールキャッチ400の上方に位置し(図1(b))、その状態で該先端部をチェーンブロック4を作動させて引き上げると先端部は略正位置に配せられる。この状態のとき最先の運搬車はブレーキ等により停止状態に置かれている。
(Delivery of turnout A from turnout carrier C to rail Yamakoshi T)
When the earliest branching device transporter C reaches the branching device installation location from which the old branching device has been removed (FIG. 1 (a)), the first branching device transporter vehicle C in the traveling direction includes the longitudinal direction of the branching device A. One end of the rail is longer than the disengagement distance to the rail catch 400 of the rail Yamakoshi T, which is arranged closest to the dead center from the dead center position of the track rail where the branching vehicle C can move forward. It is protruding. Therefore, the protruding portion at one end in the longitudinal direction of the branching device A is located above the rail catch 400 with a roller of the chain block 4 arranged at the position along with the movement of the branching vehicle C (FIG. 1B). In this state, when the tip portion is lifted by operating the chain block 4, the tip portion is disposed at a substantially normal position. In this state, the earliest transport vehicle is stopped by a brake or the like.

そして、この状態で他の分岐器運搬車Cを移動させると、分岐器運搬車C上に積載した分岐器A上に位置する天秤レール3は、ローラ付レールキャッチ400のローラ400Aに摺接してローラ400Aの転動に従って案内されて次段の山越器Tにわたり、前記と同様の操作により該次段の山越器Tのレールキャッチ400上に載せられる。その際、前進死点位置に移動した分岐器運搬車Cは停止する。   Then, when another branching device transporter C is moved in this state, the balance rail 3 positioned on the branching unit A loaded on the branching unit transporting vehicle C is brought into sliding contact with the roller 400A of the rail catch 400 with a roller. Guided according to the rolling of the roller 400A, the next stage Yamakoshi T is placed on the rail catch 400 of the next stage Yamakoshi T by the same operation as described above. At that time, the branching vehicle C that has moved to the forward dead center position stops.

そして、次段以下の分岐器運搬車Cにより移動方向に並べて設置したレール山越器T,…に前記先端部が順次送り込まれ(図1(c))、最終的には、分岐器運搬車Cにかけ渡して積載した分岐器Aは、直線方向に並べた適宜数の山越器Tのレールキャッチ400に支持され、旧分岐器のあった設置個所の直上に配せられることになる(図1(d))。   And the said front-end | tip part is sequentially sent to the rail Yamakoshi T, ... arranged side by side in the moving direction by the branching-equipment transporter C in the next stage (FIG. 1 (c)), and finally the branching-unit transporting vehicle C. The branching device A that is loaded and loaded is supported by the rail catches 400 of the appropriate number of Yamakoshi Ts arranged in a straight line, and is placed directly above the installation location where the old branching unit was located (FIG. 1 ( d)).

この状態に至る間、山越器Aのレールキャッチ400には分岐器A等の荷重が負荷されるので、該分岐器Aに組付けた天秤レール3の移動方向に揺れがあっても、該揺れに対応してチェーンブロック4は走行桁T2に沿って位置を変えることができるため、分岐器運搬車Cからレール山越器Tへ不都合のない移行操作が行われる。   During this state, the rail catch 400 of the Yamakoshi device A is loaded with a load such as the branch device A. Therefore, even if the balance rail 3 assembled to the branch device A swings, Since the position of the chain block 4 can be changed along the traveling girder T2, the transfer operation from the branching device transporter C to the rail Yamakoshi T is performed without any inconvenience.

なお、本実施形態にあって、分岐器Aの第二基本レールA1にも、その傾斜にあわせて天秤レール3を配したのは、直線に沿わせて並ぶ第一基本レールA1と第一トングレールA2側の荷重との荷重バランスを採るためで、ほぼ平行に並ぶ(前記第一基本レールA1と第一トングレールA2のように)2本のレールのみに配した天秤レール3だけ配しても不都合がなければ、それで移動時の荷重バランスを採れるのであるから、実施形態でいう第二基本レールA1’部の天秤レール3は省略しても良い。   In the present embodiment, the balance rail 3 is also arranged on the second basic rail A1 of the branching device A according to the inclination of the first basic rail A1 and the first tongs arranged along a straight line. In order to balance the load on the rail A2 side, only the balance rail 3 arranged on only two rails is arranged in parallel (like the first basic rail A1 and the first tongue rail A2). If there is no inconvenience, the load balance at the time of movement can be taken. Therefore, the balance rail 3 of the second basic rail A1 ′ portion in the embodiment may be omitted.

この第二基本レールA1’部の天秤レールは、該レールA1’(の傾斜部)に対応して短いが、該天秤レールを受支したチェーンブロックは傾斜状に対応して分岐器Aの移動方向と交差する方向に前記説明の通り、移動でき、また、第二基本レールA1’に係る天秤レールは、所定のレール山越器T位置に至ると、当該山越器Tのレールキャッチ400から自動的に外れることはいうまでもない。   The balance rail of the second basic rail A1 ′ is short corresponding to the rail A1 ′ (inclined portion thereof), but the chain block that receives and supports the balance rail is inclined to move the branching device A. As described above, the balance rail according to the second basic rail A1 ′ can automatically move from the rail catch 400 of the Yamakoshi device T when it reaches the predetermined rail Yamakoshi device T position. Needless to say, it's out of the way.

なお、第一基本レールA1等に用いる天秤レール3の長さは、当該レール(第二基本レールA1’の場合は傾斜部すなわち第一トングレールA2より外方に突出する部分)より同長以上のほうが有効である。   In addition, the length of the balance rail 3 used for the first basic rail A1 or the like is equal to or longer than the rail (in the case of the second basic rail A1 ′, an inclined portion, that is, a portion protruding outward from the first tongue rail A2). Is more effective.

(分岐器Aを分岐器設置個所に下ろす)
そして、分岐器設置個所に並べて設置した多数の山越器T,…に支持させた分岐器Aは、当該山越器Tのチェーンブロック4を操作することによって分岐器設置個所に下ろす(図2、3)。そして、ボルト6を緩めて天秤レール3やマクラギ吊金具1を取り外すことにより分岐器Aの設置操作が終了する。
(Drop branch device A to the branch device installation location)
Then, the branching device A supported by a large number of Yamakoshi devices T,... Installed side by side at the branching device installation location is lowered to the branching device installation location by operating the chain block 4 of the Yamakoshi device T (FIGS. 2, 3). ). And the installation operation of the branching device A is complete | finished by loosening the volt | bolt 6 and removing the balance rail 3 and the sleeper hanging bracket 1.

A 分岐器
B マクラギ
T レール山越器
C 分岐器運搬車
1 マクラギ用固定具
11 梁部
111 側板
111a 軸部
112 底板
113 当接板
114 第1ボルト孔
115 支柱支持部
116 支柱固定ネジ
12 挟持枠
121 下側面支持部
121a 先鋭突出部
122 第2ボルト孔
123 ボルト支持板
124 取付け孔
13 第1クランプボルト
131 スイーベル部
14 第2クランプボルト
15 天秤レール受部
16 天秤レール押付け片
17 第3クランプボルト
3 天秤レール
300 頭部
301 脚部
4 チェーンブロック
400 ローラ付レールキャッチ
A branch device B sleeper T rail Yamakoshi device C branch device carrier 1 sleeper fixture 11 beam portion 111 side plate 111a shaft portion 112 bottom plate 113 abutting plate 114 first bolt hole 115 column support portion 116 column fixing screw 12 clamping frame 121 Lower side support part 121a Sharp projecting part 122 Second bolt hole 123 Bolt support plate 124 Mounting hole 13 First clamp bolt 131 Swivel part 14 Second clamp bolt 15 Balance rail receiving part 16 Balance rail pressing piece 17 Third clamp bolt 3 Balance Rail 300 Head 301 Leg 4 Chain block 400 Rail catch with roller

Claims (3)

軌道レール上に適宜の間隔を置いて走行する複数の分岐器運搬車上に、マクラギ上に並設した少なくとも一対の直線に沿うレールを備えた分岐器をわたして積載する工程と、
分岐器を構成する前記一対のレールが設置されたマクラギにマクラギ吊金具を固定すると共に、マクラギに固定したマクラギ吊金具を介して天秤レールを着脱自在に組付ける天秤レール組付け工程と、
旧分岐器を撤去して複数のレール山越器を、前記分岐器運搬車の走行方向に沿って並設した分岐器設置個所に設置すると共に、複数のレール山越器を設置した分岐器設置個所に前記分岐器を積載した前記分器運搬車を移動させる工程と、
その移動に伴って前記分岐器を前記各レール山越器に順次送り込み、各レール山越器に備えられたチェーンブロックのローラ付きレールキャッチにマクラギ吊金具の上部に組み付けられた前記天秤レールを順次掛止させて、前記分岐器運搬車側から前記レール山越器側へと分岐器を渡す工程と、
その後、各レール山越器に備えられたチェーンブロックを操作して前記分岐器を前記分岐器設置個所に下ろす工程と、
を有することを特徴とする軌道レールにおける分岐器設置方法。
A step of loading a branching device having rails along at least a pair of straight lines arranged side by side on a sleeper on a plurality of branching vehicle vehicles traveling at appropriate intervals on a track rail;
A balance rail assembling step of detachably assembling the balance rail via the sleeper hanging bracket fixed to the sleeper while fixing the sleeper hanging bracket to the sleeper where the pair of rails constituting the branching device is installed,
Remove the old turnout and install multiple rail Yamakoshi devices at the branch device installation locations that are juxtaposed along the direction of travel of the branch vehicle, and at the branch installation locations where multiple rail Yamakoshi devices are installed. a step of moving the content Toki device truck loaded with the turnout,
Along with the movement, the branching device is sequentially sent to each rail mountain-going device, and the balance rail assembled on the upper part of the sleeper hanging bracket is sequentially hooked to the rail catch with a roller of the chain block provided in each rail mountain-going device. Letting the branch device pass from the branch vehicle carrier side to the rail Yamakoshi device side;
Thereafter, the chain block provided in each rail Yamakoshi device is operated to lower the branch device to the branch device installation location,
The branching device installation method in a track rail characterized by having.
請求項1の軌道レールにおける分岐器設置方法において使用するマクラギ吊金具は、
梁部と、一対の挟持枠と、第1クランプボルトと、第2クランプボルトと、天秤レール受部と、天秤レール押付け片および第3クランプボルトとを有し、
梁部は、マクラギ側面方向の断面の横幅よりも長く、かつ、その両側に一対の挟持枠を回動自在に支持する軸部が設けられる一方、その軸部の間にマクラギを縦方向に押さえるための第1クランプボルトが螺合する第1ボルト孔が設けられ、
一対の挟持枠は、マクラギの断面の縦幅よりも長く、かつ、下部には内側に延びマクラギの下側面に当接する下側面支持部を有する一方、上部が梁部の両側の軸部にそれぞれ回動可能に取付けられ、軸部より上側には、それぞれ、マクラギを横方向に押さえるための第2クランプボルトが螺合する第2ボルト孔が設けられ、
第2クランプボルトの先端部を梁部の左右両側の側面にそれぞれ当接させて回転させることにより、一対の挟持枠の下端部をそれぞれマクラギの方に移動させて、一対の挟持枠によりマクラギを左右両側から挟持すると共に、第1クランプボルトを回転させてその先端部と一対の挟持枠それぞれの下側面支持部とにより上下両側からマクラギを挟持する一方、
天秤レール受部の上に天秤レールを載せて、天秤レール受部のボルト孔と天秤レール押付け片のボルト孔とに第3クランプボルトを挿入して締め付けることにより天秤レール受部の上面と各天秤レール押付け片の押付け面との間で天秤レールを着脱自在に組付けたことを特徴とするマクラギ吊金具。
The sleeper hanging bracket used in the branching device installation method in the track rail according to claim 1 is:
A beam portion, a pair of clamping frames, a first clamp bolt, a second clamp bolt, a balance rail receiving portion, a balance rail pressing piece and a third clamp bolt;
The beam portion is longer than the width of the cross section in the side direction of the sleeper and is provided with shaft portions that rotatably support the pair of holding frames on both sides, while the sleeper is vertically held between the shaft portions. A first bolt hole into which a first clamp bolt for screwing is provided,
The pair of holding frames is longer than the longitudinal width of the sleeper, and has a lower side support portion that extends inward and contacts the lower side surface of the sleeper, while the upper portion is on each of the shaft portions on both sides of the beam portion. A second bolt hole into which a second clamp bolt for holding the sleeper in a lateral direction is screwed is provided above the shaft portion.
By rotating the tip part of the second clamp bolt against the left and right side surfaces of the beam part respectively, the lower ends of the pair of holding frames are moved toward the sleepers, and the sleepers are moved by the pair of holding frames. While sandwiching from both the left and right sides, the first clamp bolt is rotated to clamp sleepers from both the upper and lower sides by the tip portion and the lower side support portion of each of the pair of clamping frames,
The balance rail is placed on the balance rail receiving portion, and the third clamp bolt is inserted and tightened into the bolt hole of the balance rail receiving portion and the bolt hole of the balance rail pressing piece, and the upper surface of the balance rail receiving portion and each balance. A sleeper hanging bracket, wherein the balance rail is detachably assembled with the pressing surface of the rail pressing piece.
請求項2記載のマクラギ吊金具において、
一対の挟持枠の下側面支持部には、それぞれ、先端が鋭利に形成され上方に突出し、マクラギの下側面に突き刺さる先鋭突出部が設けられていることを特徴とするマクラギ吊金具。
In the sleeper hanging bracket according to claim 2,
A sleeper hanging bracket characterized in that a pair of holding frame lower surface support portions each have a sharp projecting portion formed with a sharp tip and projecting upward and piercing the lower surface of a sleeper.
JP2013027907A 2013-02-15 2013-02-15 Installation method of turnout on track rail and sleeper hanging bracket Active JP5840633B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013027907A JP5840633B2 (en) 2013-02-15 2013-02-15 Installation method of turnout on track rail and sleeper hanging bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013027907A JP5840633B2 (en) 2013-02-15 2013-02-15 Installation method of turnout on track rail and sleeper hanging bracket

Publications (2)

Publication Number Publication Date
JP2014156727A JP2014156727A (en) 2014-08-28
JP5840633B2 true JP5840633B2 (en) 2016-01-06

Family

ID=51577766

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013027907A Active JP5840633B2 (en) 2013-02-15 2013-02-15 Installation method of turnout on track rail and sleeper hanging bracket

Country Status (1)

Country Link
JP (1) JP5840633B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7315451B2 (en) * 2019-12-19 2023-07-26 東光産業株式会社 Lifting and moving mechanism for heavy members and method for lifting and moving the same

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5929814Y2 (en) * 1981-10-23 1984-08-27 日本国有鉄道 Rail gas pressure welding machine
JP4096188B2 (en) * 2003-07-01 2008-06-04 十三 松井 Rail holder and rail laying method using the holder
JP5251183B2 (en) * 2008-03-14 2013-07-31 株式会社交通建設 Yamakoshi and the method of transporting long heavy goods using it
AU2011276937A1 (en) * 2010-07-08 2013-02-21 Antony Scott A suspended rail system

Also Published As

Publication number Publication date
JP2014156727A (en) 2014-08-28

Similar Documents

Publication Publication Date Title
US8006624B2 (en) Machine for unloading and positioning rails on crossties in railway tracks
RU2374378C2 (en) Vehicle
WO2020107311A1 (en) Aerated concrete drill rod inserting and pulling crane and movable drill rod rotating device thereof
CN110055832B (en) Sleeper capable of being combined vertically and horizontally and convenient to disassemble and assemble
JP5840465B2 (en) Method and apparatus for installing a turnout on a track rail
AU2011260627A1 (en) A vehicle combination for transporting rails
JPH0778321B2 (en) Machinery for picking up, laying and transporting washer
JP4185901B2 (en) Track slab laying position adjustment device
DE112016001320T5 (en) A jib attachment / separation device of a crane and jib attachment / separation method for a crane
US20210261175A1 (en) Universal Track Derailer Assembly
JP5840633B2 (en) Installation method of turnout on track rail and sleeper hanging bracket
US7004076B2 (en) Material handling system enclosed track arrangement
US20170021841A1 (en) Jump Rail System
CN202007369U (en) Rapid joint for rails
JP2019014599A (en) Carriage mounting jig for forklift and member carriage mounting method using the same
CN110005452A (en) A kind of base tunnel supporting arch quick-mount system and installation method
US6089161A (en) Method and apparatus for transporting railway track sections
JP2005207143A (en) Rail overturning preventing device and rail connecting method
WO2003025286A1 (en) Rail installation
CN221681520U (en) Device for magnetic suspension track construction operation
JP3057085U (en) Rail material truck for railway
CN2827971Y (en) Device for unloading long steel rail at construction field and road building
JP5388123B2 (en) Rail point switching device for multi-gauge type traveling vehicles
JP3200190U (en) Rail extension lifting machine
CN210856814U (en) Dual-purpose steel rail pushing vehicle

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140917

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150616

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150721

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150727

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150908

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150909

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20151027

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20151111

R150 Certificate of patent or registration of utility model

Ref document number: 5840633

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250