CN202007369U - Rapid joint for rails - Google Patents

Rapid joint for rails Download PDF

Info

Publication number
CN202007369U
CN202007369U CN2011200713871U CN201120071387U CN202007369U CN 202007369 U CN202007369 U CN 202007369U CN 2011200713871 U CN2011200713871 U CN 2011200713871U CN 201120071387 U CN201120071387 U CN 201120071387U CN 202007369 U CN202007369 U CN 202007369U
Authority
CN
China
Prior art keywords
rails
track
rapid joint
splint
rapid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200713871U
Other languages
Chinese (zh)
Inventor
葛沛新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011200713871U priority Critical patent/CN202007369U/en
Application granted granted Critical
Publication of CN202007369U publication Critical patent/CN202007369U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Connection Of Plates (AREA)

Abstract

The utility model discloses a rapid joint for rails, which is characterized in that the rapid joint comprises at least two bases, a front splint and a rear splint, wherein the base is fixedly connected with the front splint to form one whole body, the base is provided with a fixing seat, the fixing seat is provided with a fixing device, and the rear splint is fixed at one sides of the rails by the fixing device. After a rail splint is replaced by the rapid joint for the rails, rapid connection of two short rails can be realized, and the connected rails have smooth joints without a malposition phenomenon so that the stability of a vehicle in the transporting process is improved, and the transporting process is safer; and meanwhile, connecting holes do not need to be arranged on the short rails which are cut off, so that the working time of cutting the rails is saved. The rapid joint for the rails has a simple structure so that bolts do not need to be inserted in the connecting holes in the using process; and when in use, the rapid joint is convenient and reliable to fasten, therefore, not only the labor intensity of workers is reduced, but also the working efficiency of rails connection is greatly improved.

Description

Track snap joint
Technical field
The utility model relates to the linkage of a kind of track and track, can realize the joint that is connected fast between the track that is cut under particularly a kind of mine and the track.
Background technology
At present normally realize being connected between the track of down-hole and the track by the road clamping plate.Two ends have connecting hole on the road clamping plate, and the connecting hole correspondence on this connecting hole and two tracks that need to be connected is connected two tracks with the road clamping plate by connecting bolt then.Though this connected mode is simple, reliable, only hold whole rail level with both hands and be suitable for, and down-hole track commonly used is an irregular track of end face two.Because the reason of haulage device, the track of full-length is subjected to the influence of appointed conditions such as cage toward the down-hole transportation time at present, and transportation is difficulty comparatively, so numerous applying units has only the track one with full-length to be truncated into two, transport the down-hole to cage again after becoming the short track of length.The mode of blocking usually is oxygen welding cutting, this just formed all short rail one ends neatly, the other end has welding slag and cross section not too smooth, simultaneously also will with oxygen welding cut end cut out match with the road clamping plate, wear the connecting hole that fastening bolt is used.Because the gas welding cutting accuracy is lower, cannot say for sure to demonstrate,prove the positional precision of connecting hole, on the track cut end welding slag is arranged again simultaneously, this just makes the clamping plate of attaining the Way be difficult to realize the smooth-going connection of interorbital, is prone to non-greatly promptly little, the rail connection in track and interorbital shrinkage joint and is prone to inconsistent phenomenon one high and one low, the first from left right side.
Summary of the invention
The purpose of this utility model is a kind of easy to connect, easy to operate, safe and reliable track snap joint of design.
Realize that scheme of the present utility model is: a kind of track snap joint is characterized in that described snap joint comprises at least two bases, a front plate and a rear plate; The affixed formation one of described base and front plate, base is provided with holder, and holder is provided with fastening devices, and rear plate is fixed in a side of track by fastening devices.
The utility model replaces the quick connection that can realize two short rails behind the road clamping plate, and the rail joint after the connection smooth-going, inconsistent phenomenon can not appear, the stability of vehicle transport process is improved, transportation is safer.Simultaneously, the short rail after the cut-out no longer needs to cut out connecting hole, saves the man-hour of track cutting; This device the utility model is simple in structure, need not remove to wear bolt to connecting hole in the use, and fastening convenience, reliable during use when reducing labor strength, has increased substantially the work efficiency that track connects.
Description of drawings
Fig. 1 is structural representation of the present utility model, and Fig. 1 analyses and observe the B-B place of position at Fig. 2;
Fig. 2 is the vertical view of the A-A position of Fig. 1;
Number in the figure: 1 base, 2 front plates, 3 tracks, 4 rear plates, 5 check nuts, 6 fastening bolts, 7 holders, 8 sleepers, 9 shrinkage pools, 10 strengthen the back of the body, 11 grooves.
The specific embodiment
Referring to Fig. 1, deck includes base 1 in the present embodiment, the cross sectional shape of one end of base 1 is a hook solid, the top of crotch and front plate 2 affixed formation one, the other end of base 1 is provided with holder 7, and the fastening devices that is arranged on the holder 7 comprises fastening bolt 6, holder 7 is provided with the screw that matches with fastening bolt 6, the fastening bolt 6 that passes screw holds out against a side at track 3 with rear plate 4, and the front plate 2 of track 3 opposite sides and rear plate 4 are finished the joint of track 3 together.On the fastening bolt 6 check nut 5 can be set, to prevent in use loosening of the utility model.Referring to Fig. 2, front plate 2, rear plate 4 have groove 11 at the middle part with track 3 applyings, the back side of groove 11 correspondences, be provided with the reinforcement back of the body 10 of projection, during use, groove 11 and track 3 junction correspondences, the welding slag when making cutting does not influence the applying of clamping plate and track 3, strengthens being provided with of the back of the body 10 simultaneously and guarantees intensity of the present utility model and safe handling.Below the joint of the track 3 that need connect, sleeper 8 can be set, the utility model in use, base 1 splits two sides at sleeper 8, spacing between two bases can be the width of sleeper 8, can guarantee the utility model stability in use more effectively like this.The position of the back side of rear plate 4 and fastening bolt 6 correspondences is provided with shrinkage pool 9, in use can not be subjected to displacement between assurance fastening bolt 6 and the rear plate 4.

Claims (3)

1. a track snap joint is characterized in that, described snap joint comprises at least two bases (1), a front plate (2) and a rear plate (4); Described base (1) and the affixed formation one of front plate (2), base (1) is provided with holder (7), and holder (7) is provided with fastening devices, and rear plate (4) is fixed in a side of track (3) by fastening devices.
2. by the described track snap joint of claim 1, it is characterized in that, described fastening devices comprises fastening bolt (6), the screw that holder (7) is provided with and fastening bolt (6) matches, and the fastening bolt (6) that passes screw holds out against a side at track (3) with rear plate (4); Check nut (5) can be set on the fastening bolt (6).
3. by the described track snap joint of claim 1, it is characterized in that described front plate (2), rear plate (4) have groove (11) at the middle part with track (3) applying, the back side that groove (11) is corresponding, (10) are carried on the back in the reinforcement that is provided with projection.
CN2011200713871U 2011-03-17 2011-03-17 Rapid joint for rails Expired - Fee Related CN202007369U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200713871U CN202007369U (en) 2011-03-17 2011-03-17 Rapid joint for rails

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200713871U CN202007369U (en) 2011-03-17 2011-03-17 Rapid joint for rails

Publications (1)

Publication Number Publication Date
CN202007369U true CN202007369U (en) 2011-10-12

Family

ID=44749024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200713871U Expired - Fee Related CN202007369U (en) 2011-03-17 2011-03-17 Rapid joint for rails

Country Status (1)

Country Link
CN (1) CN202007369U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110846950A (en) * 2019-12-15 2020-02-28 湘潭市恒欣实业有限公司 Track butt joint connects fixing clip
CN110846946A (en) * 2019-12-15 2020-02-28 湘潭市恒欣实业有限公司 Rail butt joint fixing seat
CN110872795A (en) * 2019-12-15 2020-03-10 湘潭市恒欣实业有限公司 Rail butt joint fixing clamp
CN110939023A (en) * 2019-12-15 2020-03-31 湘潭市恒欣实业有限公司 Fixing device for butt joint of rail
CN111676741A (en) * 2020-07-02 2020-09-18 湘潭市恒欣实业有限公司 Rail butt joint combined connecting sleeve

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110846950A (en) * 2019-12-15 2020-02-28 湘潭市恒欣实业有限公司 Track butt joint connects fixing clip
CN110846946A (en) * 2019-12-15 2020-02-28 湘潭市恒欣实业有限公司 Rail butt joint fixing seat
CN110872795A (en) * 2019-12-15 2020-03-10 湘潭市恒欣实业有限公司 Rail butt joint fixing clamp
CN110939023A (en) * 2019-12-15 2020-03-31 湘潭市恒欣实业有限公司 Fixing device for butt joint of rail
CN111676741A (en) * 2020-07-02 2020-09-18 湘潭市恒欣实业有限公司 Rail butt joint combined connecting sleeve

Similar Documents

Publication Publication Date Title
CN202007369U (en) Rapid joint for rails
CN204000487U (en) A kind of track switch
CN202264014U (en) Trolley for carbon dioxide protection welding machine
CN203160074U (en) Track locating tool in track hole drilling
CN203111203U (en) Mining vehicle baffling device for mine
CN102556086B (en) Special vehicle for switches
CN206071621U (en) A kind of new steel structure shed
CN103350706A (en) Mine car masking device
CN204357089U (en) A kind of building construction scaffold
CN102235176A (en) Transporting equipment for fully-mechanized coal face
CN209397448U (en) Construction of Ballastless Track bridge floor gantry rail fixture
CN203066503U (en) Edge and opening protection device
CN201650357U (en) Mechanization mining face transporting device
CN204780479U (en) Track
CN203625733U (en) Anti-toppling device for manually poking and moving long steel rail
JP5840633B2 (en) Installation method of turnout on track rail and sleeper hanging bracket
CN210104455U (en) Colliery is mine car track stop device in pit
CN212128675U (en) Novel keep off tiny fragments of stone, coal, etc. board and novel tiny fragments of stone, coal, etc. wall that keeps off
CN103737068A (en) Novel track shoe drilling fixture
CN213653066U (en) Light sleeper combination for shield construction
CN204343110U (en) A kind of turnout switch
CN203248931U (en) Deviation rectifying device for built-in foundation bolt in lines and rows
CN213057076U (en) Movable rail-holding self-pressing type car arrester
CN104442914B (en) System for monitoring relative displacement between railway steel rail and rail board
CN203716006U (en) Coal mine underground fully mechanized mining gate road power transformation train fast-to-mount and fast-to-dismount type iron sleeper

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111012

Termination date: 20130317