CN204357089U - A kind of building construction scaffold - Google Patents

A kind of building construction scaffold Download PDF

Info

Publication number
CN204357089U
CN204357089U CN201420805198.6U CN201420805198U CN204357089U CN 204357089 U CN204357089 U CN 204357089U CN 201420805198 U CN201420805198 U CN 201420805198U CN 204357089 U CN204357089 U CN 204357089U
Authority
CN
China
Prior art keywords
down bars
fixed
hold
wall bracket
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420805198.6U
Other languages
Chinese (zh)
Inventor
胡金亮
姜旭
付志江
姜波
姜敏华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Open City Environmental Construction Ltd By Share Ltd
Original Assignee
In Build City And Build And Establish Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by In Build City And Build And Establish Group Co Ltd filed Critical In Build City And Build And Establish Group Co Ltd
Priority to CN201420805198.6U priority Critical patent/CN204357089U/en
Application granted granted Critical
Publication of CN204357089U publication Critical patent/CN204357089U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of building construction scaffold, comprise wall bracket, platform frame, construction platform, protective guard and buttress post, described buttress post is obliquely installed, and bottom is fixed on floor, and top is fixed on wall bracket, knee wall support; Described platform frame is fixed on wall bracket; Platform frame supports fixing construction platform and protective guard; Described wall bracket comprises inboard portion, tip portion and Outboard Sections, and described inboard portion, wall top portion and Outboard Sections are integrative-structures; Described platform frame comprises horizontal hold-down bars, support column, vertical hold-down bars and guardrail fixed leg.The utility model structure is simple, and intensity is large, safe and reliable, and major part is integrative-structure, without the need to dismounting, and applied range.

Description

A kind of building construction scaffold
Technical field
The utility model relates to building operations instrument, is specifically related to building construction scaffold.
Background technology
Scaffold is the various supports of the vertical and horizontal transport set up for job site, and traditional scaffold safe coefficient is enough not high, and the time of installing and removing is long, and steel using amount is many.
Utility model content
For the problems referred to above, problem to be solved in the utility model is to provide a kind of safe and reliable, and assembling and dissembling speed is fast, the building operations scaffold that steel using amount is few.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is, a kind of building construction scaffold, scaffold comprises wall bracket, platform frame, construction platform, protective guard and buttress post, described buttress post is obliquely installed, bottom is fixed on floor, and top is fixed on wall bracket, knee wall support; Described platform frame is fixed on wall bracket; Platform frame supports fixing construction platform and protective guard.
As preferably, the top of described buttress post is helicitic texture, is connected with wall bracket is detachable.
As preferably, described wall bracket comprises inboard portion, tip portion and Outboard Sections, described inboard portion, wall top portion and Outboard Sections are integrative-structures, and inboard portion and Outboard Sections are respectively along the both sides of tip portion to downward-extension, and the length of inboard portion is much smaller than the length of Outboard Sections.
As preferably, described Outboard Sections comprises joint face and smooth wall contact surface, and described joint face is parallel with wall contact surface, and joint face is interval with locking piece; The top of joint face is concordant with the top of wall contact surface, and the bottom of joint face is above the bottom of wall contact surface, separated by a distance.
As preferably, the top of described inboard portion is provided with fastener hole, by the detachable fixing wall bracket of two cap securing member on wall.
As preferably, described platform frame comprises horizontal hold-down bars, support column, vertical hold-down bars and guardrail fixed leg, described construction platform is positioned on horizontal hold-down bars, and horizontal hold-down bars first end is fixed on the top of vertical hold-down bars, and horizontal hold-down bars second end is connected with the top of support column; The bottom of support column is fixed on the bottom of vertical hold-down bars; Described guardrail fixed leg is that the second end of transversely hold-down bars upwards extends to form, for fixed protection hurdle.
As preferably, described vertical hold-down bars comprises joint face, and described joint face is connected with the joint face of wall bracket Outboard Sections; The joint face of described vertical hold-down bars is provided with the fixing lockhole that to match with locking piece, for fixed platform bracing frame in wall bracket.
As preferably, described horizontal hold-down bars, welding or bolt between support column and vertical hold-down bars, is adopted to connect.
As preferably, described guardrail fixed leg is provided with fastener, for fixed protection hurdle.
As preferably, scaffold by stud detachable be fixed on need construction wall on.
The utility model beneficial effect, the utility model structure is simple, and intensity is large, safe and reliable, and major part is integrative-structure, without the need to dismounting, applied range.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation
Wherein, wall bracket 300, platform frame 400, construction platform 510, protective guard 520, Outboard Sections 330, horizontal hold-down bars 410, support column 420, vertical hold-down bars 430, guardrail fixed leg 450, hook fastening devices 454
Fig. 2 is the utility model wall bracket texture edge schematic diagram
Wherein, two cap securing member 212, inboard portion 310, tip portion 320, Outboard Sections 330, locking piece 340, first joint face 336, wall contact surface 334, buttress post 600, buttress capital end 604
Fig. 3 is the utility model platform support frame structure side schematic view
Wherein, platform frame 400, horizontal hold-down bars 410, support column 420, vertical hold-down bars 430, guardrail fixed leg 450, first end 411, second end 412, second joint face 436, construction platform 510
Detailed description of the invention
By reference to the accompanying drawings, the utility model structure is described further.
A kind of building construction scaffold, by reference to the accompanying drawings 1, comprise wall bracket 300, platform frame 400, construction platform 510, protective guard 520, buttress post 600, described buttress post 600 is obliquely installed, bottom is fixed on floor, and top is fixed on wall bracket 300, knee wall support 300; Described platform frame 400 is fixed on wall bracket 300, supports and fixing platform 510 and the protective guard 520 of constructing.
Further, described buttress capital end 604 is helicitic textures, is connected with wall bracket 300 is detachable.
Further, described wall bracket 300, platform frame 400 and buttress post 600 are equipped with 2.
Further, composition graphs 2, described wall bracket 300 comprises inboard portion 310, tip portion 320 and Outboard Sections 330, described inboard portion 310, tip portion 320 and Outboard Sections 330 are integrative-structures, inboard portion 310 and Outboard Sections 330 are respectively along the both sides of tip portion 320 to downward-extension, and the length of inboard portion 310 is less than the length of Outboard Sections 330.
Further, described Outboard Sections 330 comprises the first joint face 336 and smooth wall contact surface 334, described joint face 336 is parallel with wall contact surface 334, and joint face 336 top is concordant with wall contact surface 334 top, and the bottom of joint face 336 is positioned at above the bottom of wall contact surface 334; Joint face 336 is interval with locking piece 340.
Further, the top of described inboard portion 310 is provided with fastener hole, by the detachable fixing wall bracket 300 of two cap securing member 212 on wall.
Further, composition graphs 3, described platform frame 400 comprises horizontal hold-down bars 410, support column 420, vertical hold-down bars 430, guardrail fixed leg 450, described construction platform 510 is positioned on horizontal hold-down bars 410, first end 411 is fixed on the top of vertical hold-down bars 430, and the second end 412 is connected with the top of support column 420; The bottom of support column 420 is fixed on the bottom of vertical hold-down bars 430; Described horizontal hold-down bars 410, support column 420 and vertical hold-down bars 430 form triangle; Described guardrail fixed leg 450 is that the second end 412 of transversely hold-down bars 410 upwards extends to form, for fixed protection hurdle 520.
Further, vertical hold-down bars 430 comprises the second joint face 436, and described second joint face 436 is connected with the first joint face 336; Second joint face 436 is provided with the fixing lockhole that to match with locking piece 340, for fixed platform bracing frame 400 in wall bracket 300.
Further, described horizontal hold-down bars 410, support column 420 adopt welding manner to be connected with vertical hold-down bars 430.
Further, described guardrail fixed leg 450 is provided with hook fastening devices 454, for fixed protection hurdle 520.

Claims (5)

1. a building construction scaffold, comprises wall bracket, platform frame, construction platform, protective guard and buttress post, it is characterized in that: described buttress post is obliquely installed, and bottom is fixed on floor, and top is fixed on wall bracket, knee wall support; Described platform frame is fixed on wall bracket; Platform frame supports fixing construction platform and protective guard; Described wall bracket comprises inboard portion, tip portion and Outboard Sections, and described inboard portion, wall top portion and Outboard Sections are integrative-structures, and inboard portion and Outboard Sections are respectively along the both sides of tip portion to downward-extension; Described Outboard Sections comprises joint face and smooth wall contact surface, and described joint face is parallel with wall contact surface, and joint face is interval with locking piece; The top of joint face is concordant with the top of wall contact surface; Described platform frame comprises horizontal hold-down bars, support column, vertical hold-down bars and guardrail fixed leg, described construction platform is positioned on horizontal hold-down bars position, first end of horizontal hold-down bars is fixed on the top of vertical hold-down bars, and horizontal hold-down bars second end is connected with the top of support column; The bottom of support column is fixed on the bottom of vertical hold-down bars; Described guardrail fixed leg fixed protection hurdle, guardrail fixed leg is that the second end of transversely hold-down bars upwards extends to form; Described vertical hold-down bars comprises joint face, and described joint face is connected with the joint face of wall bracket Outboard Sections, and the joint face of described vertical hold-down bars is provided with the fixing lockhole that to match with locking piece, and described locking piece and lockhole fixed platform bracing frame are on wall bracket.
2. a kind of building construction scaffold according to claim 1, is characterized in that: the top of described buttress post is helicitic texture, is connected with wall bracket is detachable.
3. a kind of building construction scaffold according to claim 1, is characterized in that: the top of described inboard portion is provided with fastener hole, by two cap securing member detachable connection buttress post and wall bracket.
4. a kind of building construction scaffold according to claim 1, is characterized in that: described guardrail fixed leg is provided with fastener, fixed protection hurdle.
5. a kind of building construction scaffold according to claim 1, is characterized in that: described horizontal hold-down bars, employing welding or bolt connection between support column and vertical hold-down bars.
CN201420805198.6U 2014-12-17 2014-12-17 A kind of building construction scaffold Expired - Fee Related CN204357089U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420805198.6U CN204357089U (en) 2014-12-17 2014-12-17 A kind of building construction scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420805198.6U CN204357089U (en) 2014-12-17 2014-12-17 A kind of building construction scaffold

Publications (1)

Publication Number Publication Date
CN204357089U true CN204357089U (en) 2015-05-27

Family

ID=53258567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420805198.6U Expired - Fee Related CN204357089U (en) 2014-12-17 2014-12-17 A kind of building construction scaffold

Country Status (1)

Country Link
CN (1) CN204357089U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612297A (en) * 2018-03-30 2018-10-02 上海二十冶建设有限公司 Face do-nothing operation stage apparatus on the outside of a kind of pulling type
CN110259093A (en) * 2019-05-09 2019-09-20 江苏江都建设集团有限公司 A kind of Novel pole nodal operation platform and its installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612297A (en) * 2018-03-30 2018-10-02 上海二十冶建设有限公司 Face do-nothing operation stage apparatus on the outside of a kind of pulling type
CN110259093A (en) * 2019-05-09 2019-09-20 江苏江都建设集团有限公司 A kind of Novel pole nodal operation platform and its installation method

Similar Documents

Publication Publication Date Title
CN203923913U (en) The load formula carrier structure of Bridge High-pier bent cap
CN204174935U (en) A kind of outer wall of basement one side formwork supporting and protection structure
CN201730348U (en) Steel-structure safety device for high-altitude operation
CN204357089U (en) A kind of building construction scaffold
CN203698595U (en) Gantry supporting device for convenient placement of curved linear sections
WO2012046049A3 (en) Scaffold safety rail and method of assembly
CN204728738U (en) Building site protector
CN205077847U (en) Horizontal escape way
CN204152231U (en) Socket type safety guard rail
CN202194395U (en) Tool type edge protector rack
CN205742975U (en) A kind of direct plugging type scaffold
CN204402042U (en) A kind of early dismantling head being used as assembling construction formwork
CN204024010U (en) The flat sliding platform of a kind of high long cornice construction water
CN204023422U (en) A kind of assembling Coping Construction operating platform
CN204850515U (en) Steel construction faces limit protector
CN204775838U (en) A device of passing a bridge for it is current between container ship ladder
CN204623801U (en) A kind of scaffold clamp
CN204728149U (en) Be applicable to the quick lap joint track of geological hazard control engineering rolling topography
CN203034785U (en) Reinforcement mesh scaffold board
CN203684714U (en) Temporary security protective barrier
CN202530734U (en) Outside-overhanging scaffold
CN201991203U (en) Scaffold
CN206385822U (en) A kind of civil engineering guard rail
CN105298137A (en) Steel column concrete auxiliary vibration device and installation and using method thereof
CN205077395U (en) Bow -shaped bridge floor guardrail installation device with adjustable fast

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 330200 Liantang Avenue, Jiangxi, Nanchang County, No. 268, No.

Patentee after: Built in the city to open the Environment Construction Co.,Ltd.

Address before: 330299 Liantang Avenue, Jiangxi, Nanchang County, No. 268, No.

Patentee before: ZHONGJIAN CHENGKAI CONSTRUCTION GROUP CO.,LTD.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 330000 No. 268, Liantang Avenue, Nanchang, Jiangxi, Nanchang County

Patentee after: CHINA OPEN CITY ENVIRONMENTAL CONSTRUCTION LIMITED BY SHARE Ltd.

Address before: 330200 Liantang Avenue, Jiangxi, Nanchang County, No. 268, No.

Patentee before: Built in the city to open the Environment Construction Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150527

Termination date: 20211217