JP5565193B2 - 配電区間の負荷予測方法および配電系統制御システム - Google Patents
配電区間の負荷予測方法および配電系統制御システム Download PDFInfo
- Publication number
- JP5565193B2 JP5565193B2 JP2010181648A JP2010181648A JP5565193B2 JP 5565193 B2 JP5565193 B2 JP 5565193B2 JP 2010181648 A JP2010181648 A JP 2010181648A JP 2010181648 A JP2010181648 A JP 2010181648A JP 5565193 B2 JP5565193 B2 JP 5565193B2
- Authority
- JP
- Japan
- Prior art keywords
- load
- data
- temperature
- distribution section
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 16
- 238000010248 power generation Methods 0.000 claims description 56
- 238000000605 extraction Methods 0.000 claims description 31
- 238000006243 chemical reaction Methods 0.000 claims description 20
- 238000012937 correction Methods 0.000 claims description 17
- 238000004364 calculation method Methods 0.000 claims description 10
- 238000000611 regression analysis Methods 0.000 claims description 6
- 239000000284 extract Substances 0.000 claims description 5
- 238000005259 measurement Methods 0.000 claims description 3
- 230000005855 radiation Effects 0.000 description 25
- 238000010586 diagram Methods 0.000 description 7
- 238000009795 derivation Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 238000005314 correlation function Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000007639 printing Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 230000003595 spectral effect Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
図1は、本発明の実施形態にかかる配電系統制御システム100が適用される配電系統132を示す図である。図1に示すように、変電所136a、136bから送り出された電力は、配電系統132によって、複数の一般家庭140a〜140c等に供給される。一般家庭140b、140cには、太陽光発電機142a、142bが備えられており、配電系統132に連系している。
図2は、配電系統制御システム100の概略構成を示すブロック図である。図3は、配電系統制御システム100の動作を説明するフローチャートである。図2に示すように、配電系統制御システム100は、システム制御部102および記憶部104を含んで構成されるコンピュータシステムである。
Claims (4)
- 任意の配電区間において、気温およびその気温における負荷を含む負荷データを所定時間ごとに取得してデータテーブルに記憶させる情報取得ステップと、
前記データテーブルから、負荷を予測したい時点の時刻である対象時刻の負荷データを抽出して第1データ群を生成する第1情報抽出ステップと、
前記データテーブルから、前記対象時刻に近い時刻の負荷データを抽出して第2データ群を生成する第2情報抽出ステップと、
前記第1データ群と第2データ群の気温に対する負荷の比を求め、この比を用いて前記第2データ群の負荷の値をスケール変換するスケール変換ステップと、
前記第1データ群の負荷データが不足している温度域をスケール変換後の第2データ群の負荷データで補間するデータ補間ステップと、
補間後の前記第1データ群に基づいて、前記対象時刻の気温と負荷の関係式を導出する関係式導出ステップと、
前記配電区間の前記負荷を予測したい時点の気温から、前記関係式に基づいて該配電区間の負荷を予測する負荷予測ステップと、
を含み、
前記負荷データに含まれる負荷は、前記配電区間のセンサ内蔵自動開閉器によって実測された見かけ上の負荷に、該配電区間に連系した複数の太陽光発電機の総発電量を加えた実負荷であることを特徴とする配電区間の負荷予測方法。 - 前記複数の太陽光発電機の総発電量は、予め、次式「太陽光発電機の発電量の実測値/太陽光発電機の定格発電容量=第1係数×気温+第2係数×日射量+第3係数」に基づき、第1係数×気温+第2係数×日射量+第3係数で表される補正式を重回帰分析によって導出しておき、
前記複数の太陽光発電機の総定格発電容量に前記補正式を乗じることで算出されることを特徴とする請求項2に記載の配電区間の負荷予測方法。 - 前記第1情報抽出ステップおよび第2情報抽出ステップにおいては、前記データテーブルから快晴時の負荷データを抽出することを特徴とする請求項2または3に記載の配電区間の負荷予測方法。
- 任意の配電区間において、気温およびその気温における負荷を含む負荷データを所定時間ごとに取得する情報取得部と、
前記負荷データが記憶されるデータテーブルを有する記憶部と、
前記データテーブルから、負荷を予測したい時点の時刻である対象時刻の負荷データを抽出して第1データ群を生成する第1情報抽出部と、
前記第1情報抽出部にて抽出された負荷データが所定温度域ごとに一定以上あるか否かを判定するサンプル数判定部と、
前記サンプル数判定部が否と判定した場合に、前記データテーブルから前記対象時刻に近い時刻の負荷データを抽出して第2データ群を生成する第2情報抽出部と、
前記第1データ群と第2データ群の気温に対する負荷の比を求め、この比を用いて前記第2データ群の負荷の値をスケール変換するスケール変換部と、
前記スケール変換後の第2データ群の負荷データを用いて、前記第1データ群の負荷データが不足している温度域を補間するデータ補間部と、
補間後の前記第1データ群に基づいて、前記対象時刻の気温と負荷の関係式を導出する関係式導出部と、
前記配電区間の前記負荷を予測したい時点の気温から、前記関係式に基づいて該配電区間の負荷を予測する負荷予測部と、
前記負荷予測部が予測した負荷に基づいて、配電系統の運用を行う切替制御部と、
を備え、
前記負荷データに含まれる負荷は、前記配電区間のセンサ内蔵自動開閉器によって実測された見かけ上の負荷に、該配電区間に連系した複数の太陽光発電機の総発電量を加えた実負荷であることを特徴とする配電系統制御システム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2010181648A JP5565193B2 (ja) | 2010-08-16 | 2010-08-16 | 配電区間の負荷予測方法および配電系統制御システム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2010181648A JP5565193B2 (ja) | 2010-08-16 | 2010-08-16 | 配電区間の負荷予測方法および配電系統制御システム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2012044739A JP2012044739A (ja) | 2012-03-01 |
JP5565193B2 true JP5565193B2 (ja) | 2014-08-06 |
Family
ID=45900419
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2010181648A Expired - Fee Related JP5565193B2 (ja) | 2010-08-16 | 2010-08-16 | 配電区間の負荷予測方法および配電系統制御システム |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5565193B2 (ja) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102624017B (zh) * | 2012-03-22 | 2014-03-26 | 清华大学 | 一种基于负荷预测的电池储能系统削峰填谷实时控制方法 |
JP6314529B2 (ja) * | 2014-02-21 | 2018-04-25 | 富士電機株式会社 | 配電系統の実負荷推定に資する学習データの作成方法、プログラム並びに配電系統の実負荷推定装置および推定方法 |
KR101663874B1 (ko) * | 2014-10-23 | 2016-10-07 | 한국전력공사 | 배전선로의 구간 부하 산정 장치 및 방법 |
CN104751241B (zh) * | 2015-03-25 | 2017-10-31 | 广西大学 | 一种风电功率区间预测的方法 |
JP6696235B2 (ja) * | 2016-03-11 | 2020-05-20 | 東京電力ホールディングス株式会社 | 配電制御システム、及び予測プログラム |
CN115329907B (zh) * | 2022-10-14 | 2023-01-31 | 杭州致成电子科技有限公司 | 基于dbscan聚类的电负荷补全方法和系统 |
CN118306255B (zh) * | 2024-06-07 | 2024-08-30 | 杭州柏来科技有限公司 | 一种充电桩动态功率调度方法、电子设备和介质 |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6173519A (ja) * | 1984-09-14 | 1986-04-15 | 株式会社日立製作所 | 負荷予想方法 |
JP2681421B2 (ja) * | 1991-06-20 | 1997-11-26 | 株式会社日立製作所 | 需要量予測方法及び装置 |
JPH0779530A (ja) * | 1993-09-08 | 1995-03-20 | Hitachi Ltd | 配電区間負荷推定方法 |
JPH11346438A (ja) * | 1998-06-01 | 1999-12-14 | Fuji Electric Co Ltd | 電力需要量予測方法 |
JP2000163394A (ja) * | 1998-11-27 | 2000-06-16 | Toyo Electric Mfg Co Ltd | 配水需要量予測方法 |
JP3926616B2 (ja) * | 2001-12-12 | 2007-06-06 | 関西電力株式会社 | 分散型電源に連係する配電系統の操作方式 |
JP4266011B2 (ja) * | 2005-01-21 | 2009-05-20 | 中国電力株式会社 | 配電系統負荷想定方法、配電系統負荷想定装置 |
JP2010193594A (ja) * | 2009-02-17 | 2010-09-02 | Tokyo Electric Power Co Inc:The | 太陽光発電システムの最大発電量推定方法、配電系統の制御方法、及び配電系統制御装置 |
JP2010193605A (ja) * | 2009-02-18 | 2010-09-02 | Tokyo Electric Power Co Inc:The | 配電区間の負荷推定方法及び配電系統制御方法 |
JP2012010508A (ja) * | 2010-06-25 | 2012-01-12 | Mitsubishi Heavy Industries Mechatronics Systems Ltd | 発電量予測装置、発電量予測システム、発電量予測方法、及び発電量予測プログラム |
-
2010
- 2010-08-16 JP JP2010181648A patent/JP5565193B2/ja not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2012044739A (ja) | 2012-03-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5565193B2 (ja) | 配電区間の負荷予測方法および配電系統制御システム | |
JP5505191B2 (ja) | 太陽光発電量予測方法および配電系統制御システム | |
JP5493886B2 (ja) | 太陽光発電量予測システムおよび太陽光発電量予測方法 | |
Touati et al. | Investigation of solar PV performance under Doha weather using a customized measurement and monitoring system | |
Wang et al. | Operational optimization and demand response of hybrid renewable energy systems | |
Mills | Implications of wide-area geographic diversity for short-term variability of solar power | |
Brano et al. | An improved five-parameter model for photovoltaic modules | |
JP3984604B2 (ja) | 太陽光発電システムの発電量予測方法、装置、およびプログラム | |
JP5957372B2 (ja) | 日射量計算方法及び供給電力決定方法 | |
JP2010193594A (ja) | 太陽光発電システムの最大発電量推定方法、配電系統の制御方法、及び配電系統制御装置 | |
JP2010193605A (ja) | 配電区間の負荷推定方法及び配電系統制御方法 | |
Van Sark et al. | Review of PV performance ratio development | |
KR102578223B1 (ko) | 태양광 발전량 예측 장치 | |
KR101305584B1 (ko) | 에너지 발전량 예측 시스템 및 방법 | |
JP6287306B2 (ja) | 電力推定装置、電力推定方法、および、プログラム | |
JP2012043857A (ja) | 快晴時判定装置および太陽光発電量予測システム | |
Mohan et al. | Solar energy disaggregation using whole-house consumption signals | |
JP2018011494A (ja) | 太陽光発電出力推定装置及び太陽光発電出力推定方法 | |
Korab et al. | A dynamic thermal model for a photovoltaic module under varying atmospheric conditions | |
Obara et al. | Study on method of electricity and heat storage planning based on energy demand and tidal flow velocity forecasts for a tidal microgrid | |
Copper et al. | Australian technical guidelines for monitoring and analysing photovoltaic systems | |
JP2014095941A (ja) | 太陽光発電出力推定装置 | |
Schulte et al. | Forecast-based charging strategy to prolong the lifetime of lithium-ion batteries in standalone PV battery systems in Sub-Saharan Africa | |
Bajpai et al. | Techno-economic performance evaluation among different solar photovoltaic system configurations | |
Ibraheem et al. | Impact of photovoltaic (PV) systems on distribution networks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20130315 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20140127 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20140218 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20140421 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20140520 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20140602 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5565193 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
LAPS | Cancellation because of no payment of annual fees |