JP5450016B2 - Concrete formwork - Google Patents

Concrete formwork Download PDF

Info

Publication number
JP5450016B2
JP5450016B2 JP2009277435A JP2009277435A JP5450016B2 JP 5450016 B2 JP5450016 B2 JP 5450016B2 JP 2009277435 A JP2009277435 A JP 2009277435A JP 2009277435 A JP2009277435 A JP 2009277435A JP 5450016 B2 JP5450016 B2 JP 5450016B2
Authority
JP
Japan
Prior art keywords
web
base plate
panel
mold
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2009277435A
Other languages
Japanese (ja)
Other versions
JP2011117241A (en
Inventor
正 斉原
Original Assignee
正 斉原
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 正 斉原 filed Critical 正 斉原
Priority to JP2009277435A priority Critical patent/JP5450016B2/en
Priority to KR1020100050257A priority patent/KR100997170B1/en
Priority to CN2010105485763A priority patent/CN102086671B/en
Publication of JP2011117241A publication Critical patent/JP2011117241A/en
Application granted granted Critical
Publication of JP5450016B2 publication Critical patent/JP5450016B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2/8647Walls made by casting, pouring, or tamping in situ made in permanent forms with ties going through the forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

本発明は、鉄筋組や鉄骨を囲んで相対して設置された型枠パネル間に構成されるコンクリート打設空間部(本出願ではキャビティと称するものとする。)内にコンクリートを打設して鉄筋コンクリート構造物や鉄骨鉄筋コンクリート構造物(コンクリート構造物)を形成するコンクリート打設用型枠に関し、特に型枠パネルとして発泡合成樹脂製の第1型枠パネル及び第2型枠パネルを用い、これら第1型枠パネルと第2型枠パネルが表裏主面に一体化したコンクリート構造物を形成するコンクリート打設用型枠に関する。   In the present invention, concrete is placed in a concrete placement space (referred to as a cavity in the present application) configured between formwork panels that are placed opposite to each other surrounding a reinforcing bar or steel frame. The present invention relates to a concrete casting form for forming a reinforced concrete structure and a steel reinforced concrete structure (concrete structure). Particularly, the first and second formwork panels made of foamed synthetic resin are used as the formwork panels. The present invention relates to a formwork for placing concrete that forms a concrete structure in which a first formwork panel and a second formwork panel are integrated on the front and back main surfaces.

従来のコンクリート建造物の形成工法は、一般に、鉄筋を組み合わせる配筋工程と、配筋を囲んで所定の間隔を以って型枠パネルを対向設置する型枠組工程と、型枠パネル間に構成したキャビティ内にコンクリートを流し込むコンクリート打設工程を施し、所定の養生期間を経た後に型枠パネルを解体する工程を経て柱、梁、壁或いはスラブ等の各コンクリート躯体部位を形成する。従来工法においては、このように各コンクリート躯体部位を形成する際に組み立てた型枠パネルを解体して工事現場から搬出する作業が行われ、手間がかかるとともに解体作業の日数や型枠パネルや組立用部材等を一時保管するスペース等が必要であった。   Conventional concrete building forming methods generally consist of a rebaring process that combines reinforcing bars, a formwork assembly process that surrounds the rebars and places the formwork panels facing each other at a predetermined interval, and the formwork panels. A concrete pouring process for pouring concrete into the cavity is performed, and after a predetermined curing period, a concrete panel such as a column, a beam, a wall, or a slab is formed through a process of disassembling the formwork panel. In the conventional construction method, the form panels assembled when forming each concrete frame part in this way are dismantled and transported from the construction site. A space for temporarily storing the members and the like was necessary.

また、従来のコンクリート建造物の形成工法においては、上述したコンクリート躯体部位に対して間柱や枠材等の内装ボード等の内装材を取り付けるための取付部材の組立工程を施す。また、従来工法においては、剥きだしのコンクリート躯体の表面に適宜の断熱・防湿ボード等の断熱・防湿体を敷き込んで断熱、遮音、防湿等の対応を図った後に、内装材の取付工程が施される。したがって、従来工法においては、断熱・防湿体及びその設置工程も行われるために日数やコスト増となっていた。   Further, in the conventional method for forming a concrete building, an assembling process of an attachment member for attaching an interior material such as an interior board such as a stud or a frame material to the above-described concrete frame part is performed. In addition, in the conventional construction method, after installing appropriate heat insulation / moisture-proof body such as heat insulation / moisture-proof board on the surface of the bare concrete frame, the installation process of the interior material is performed after measures such as heat insulation, sound insulation, moisture prevention, etc. Applied. Therefore, in the conventional construction method, the heat insulation / moisture-proof body and its installation process are also performed, which increases the number of days and costs.

上述した従来のコンクリート建造物の形成工法の問題を解決する工法として、本出願人も発泡合成樹脂製の型枠パネルを用い、この枠パネルを形成するコンクリート躯体部位の表面に残してコンクリート構造物を形成する工法を提案した(特許文献1を参照。)。かかるコンクリート建造物の形成工法によれば、型枠パネルの解体工程が不要となり、またコンクリート躯体部位の表面に一体化された発泡合成樹脂製の型枠パネルが上述した断熱・防湿体の機能を奏する。   As a method of solving the problems of the conventional concrete building forming method described above, the present applicant also used a foamed synthetic resin form panel, and left it on the surface of the concrete frame part forming this frame panel. The construction method which forms is proposed (refer patent document 1). According to the concrete building forming method, the dismantling process of the formwork panel is not necessary, and the foamed synthetic resin formwork panel integrated on the surface of the concrete frame part functions as the above-described heat insulating and moisture-proof body. Play.

特許第4169159号公報Japanese Patent No. 4169159

特許文献1に記載のコンクリート打設用型枠は、一対の発泡合成樹脂製の型枠パネルを連結機構を介して対向間隔を調整可能にして組み合わせてなる。コンクリート打設用型枠は、連結機構が、中央部で結合することによりX字状に組み合わされた一対のアーム(ウェブ)と、型枠パネルの外側面にそれぞれ組み合わされて各アームの先端部を連結する連結片が形成された一対のプレートとにより構成する。コンクリート打設用型枠は、一対のアームが中央部において回動自在に結合され、先端部が型枠パネルを貫通されたプレートの取付片と連結位置を調整されて連結されることにより型枠パネルの対向間隔が適宜設定されて型枠の組立が行われる。   The concrete casting form described in Patent Document 1 is formed by combining a pair of foamed synthetic resin form panels with an opposing distance adjustable via a coupling mechanism. The concrete casting mold is composed of a pair of arms (webs) combined in an X shape by connecting the coupling mechanisms at the center, and the outer ends of the formwork panels. And a pair of plates on which connecting pieces are formed. The concrete placement formwork is formed by a pair of arms that are pivotally coupled at the central portion, and the tip end portion is connected to a plate mounting piece that has penetrated the formwork panel to adjust the connection position. Assembling of the mold is performed by appropriately setting the interval between the panels.

かかるコンクリート打設用型枠においては、上述した作用効果を奏する型枠パネル一体型のコンクリート躯体部位を形成するとともに、連結機構を介して型枠パネルの対向間隔を調整することにより厚み仕様を異にするコンクリート躯体部位を形成することが可能である。コンクリート打設用型枠においては、簡易な構造の連結機構が型枠パネルを保持するとともにコンクリート躯体部位の内部に残って鉄筋とともにその機械的強度を保持する補強材としても機能する。コンクリート打設用型枠においては、キャビティ内に連結機構を設置しても鉄筋の配筋スペースを充分に確保し、コンクリートの流れが確保されることによりジャンカの発生が無い高精度のコンクリート躯体部位を形成する。   In such a concrete casting formwork, a concrete frame part integrated with a formwork panel having the above-described effects is formed, and a thickness specification is changed by adjusting a facing interval of the formwork panel via a coupling mechanism. It is possible to form a concrete skeleton part to be made. In a concrete casting formwork, a connecting mechanism with a simple structure holds the formwork panel and also functions as a reinforcing material that remains inside the concrete frame part and maintains its mechanical strength along with the reinforcing bars. In the concrete placement formwork, even if a coupling mechanism is installed in the cavity, a sufficient space for reinforcing bars is secured and the flow of concrete is ensured, so there is no generation of junkers and high precision concrete frame parts Form.

上述した種々の特徴を有するコンクリート打設用型枠ではあるが、型枠パネル間に構成された狭いキャビティ内においてそれぞれに形成した取付孔を位置合わせした後に連結ピン等の連結部材を嵌挿して各アームとプレートとを結合することから、組立時の作業性がやや悪くなるといった問題があった。また、コンクリート打設用型枠においては、各アーム間を連結する連結部材とともに上述した各アームとプレートを連結する多くの連結ピンを用いることから、従来工法との比較で省部品化が図られるもまだ部品点数が多いといった問題があった。さらに、コンクリート打設用型枠においては、各アームに鉄筋の組付部を一体に形成することにより精度の高い配筋が行われるようにしたが、その組み付けがかえって面倒になる箇所があった。   Although it is a formwork for concrete placement having the various features described above, a connecting member such as a connecting pin is inserted after positioning the mounting holes formed in the narrow cavities formed between the formwork panels. Since each arm and the plate are coupled, there is a problem that workability at the time of assembly is slightly deteriorated. Moreover, in the concrete casting formwork, since many connecting pins for connecting each arm and the plate are used together with the connecting member for connecting the arms, parts can be saved in comparison with the conventional method. However, there was still a problem that the number of parts was large. Furthermore, in the concrete casting formwork, the rebar assembly was integrally formed on each arm so that high-precision bar arrangement was performed, but there were places where the assembly would be complicated instead. .

本出願人は、上述した型枠パネル一体型のコンクリート建造物を形成する先願のコンクリート打設用型枠の特徴を踏襲するとともに、問題点を解決すべく鋭意検討を重ねた。本発明は、さらに構造が簡易で効率的な設置が行われ、キャビティ内に充分な配筋スペースを確保しつつコンクリートの流動性を保持して良好な仕上がりのコンクリート構造物を形成することを可能とするコンクリート打設用型枠を提供することを目的とする。   The present applicant followed the characteristics of the concrete application form of the prior application for forming the above-described concrete structure integrated with the form panel, and conducted extensive studies to solve the problems. The present invention further enables simple and efficient installation, and it is possible to form a concrete structure with a good finish while maintaining the fluidity of the concrete while ensuring sufficient space in the cavity. An object of the present invention is to provide a concrete casting form.

上述した目的を達成する本発明に係るコンクリート打設用型枠は、所定の対向間隔を以って対向設置することにより相対する内側面間にコンクリートを打設するキャビティを構成する発泡合成樹脂製の第1型枠パネル及び第2型枠パネルに対して、中央部を連結されてX字状に組み合わされる第1ウェブと第2ウェブを1組として複数組がキャビティ内にそれぞれ設置される複数のウェブ組と、第1型枠パネルと第2型枠パネルに対して着脱されて各ウェブ組の第1ウェブと第2ウェブを第1型枠パネルと第2型枠パネルに一体化させる複数の第1ベースプレートと第2ベースプレートにより構成した連結機構を組み付けることにより、第1型枠パネルと第2型枠パネルの対向間隔を保持してキャビティ内へのコンクリート打設が行われるようにする。コンクリート打設用型枠においては、キャビティ内に所定の配筋を施してコンクリート打設を行い、所定の養生期間を経た後の脱型作業を不要として第1型枠パネルと第2型枠パネルがそのまま主面に一体化されたコンクリート構造物を形成する。   The concrete casting mold according to the present invention that achieves the above-mentioned object is made of a foamed synthetic resin that constitutes a cavity for placing concrete between opposing inner surfaces by facing each other with a predetermined spacing. A plurality of sets each having a first web and a second web, which are combined in an X shape with the central portion connected to the first formwork panel and the second formwork panel. A plurality of web sets, a first formwork panel, and a second formwork panel that are attached to and detached from each other to integrate the first web and the second web of each web set into the first formwork panel and the second formwork panel. By assembling the connecting mechanism constituted by the first base plate and the second base plate, the concrete is placed into the cavity while maintaining the facing distance between the first form panel and the second form panel. To. In the concrete casting formwork, the first formwork panel and the second formwork panel do not require demolding work after a predetermined curing period by placing a predetermined reinforcing bar in the cavity. Forms a concrete structure integrated with the main surface as it is.

コンクリート打設用型枠は、第1型枠パネル及び第2型枠パネルが、それぞれの外側面の相対する位置に複数のベースプレート組付部を長さ方向に並んで形成するとともに、これらベースプレート組付部に厚み方向に貫通してそれぞれ第1ウェブ嵌挿スリットと第2ウェブ嵌挿スリットを形成してなる。コンクリート打設用型枠は、各ウェブ組の第1ウェブと第2ウェブが、それぞれ中央部に連結部を形成し、一端側に第1ベースプレート係合部を形成するとともに他端側に第2ベースプレート係合部を形成してなり、連結部を介して中央部を連結されてX字状に組み合わされることによりウェブ組を構成する。第1ウェブと第2ウェブは、ウェブ組が第1型枠パネルと第2型枠パネルに組み合わされた状態で、先端部に形成した第1ベースプレート係合部と第2ベースプレート係合部が、第1型枠パネル又は第2型枠パネルに相対して形成した第1ウェブ嵌挿スリット又は第2ウェブ嵌挿スリットに嵌挿されてベースプレート組付部から外側面に突出させる。   In the concrete casting form, the first form panel and the second form panel are formed by arranging a plurality of base plate assembling portions side by side in the length direction at positions opposite to each other, and these base plate sets A first web insertion slit and a second web insertion slit are formed through the attachment portion in the thickness direction, respectively. In the concrete casting form, the first web and the second web of each web set each form a connecting portion at the center, a first base plate engaging portion at one end, and a second at the other end. A base plate engaging part is formed, and the web part is configured by connecting the central part through a connecting part and combining them in an X shape. The first web and the second web have a first base plate engaging portion and a second base plate engaging portion formed at the tip in a state where the web set is combined with the first form panel and the second form panel, It is inserted into a first web insertion slit or a second web insertion slit formed opposite to the first formwork panel or the second formwork panel and protrudes from the base plate assembly portion to the outer surface.

コンクリート打設用型枠は、第1ベースプレートと第2ベースプレートに、第1ウェブ嵌挿スリット或いは第2ウェブ嵌挿スリットを貫通した第1ウェブの第1ベースプレート係合部或いは第2ウェブの第2ベースプレート係合部に相対する第1ウェブ係合部及び第2ウェブ係合部が形成される。第1ベースプレートと第2ベースプレートは、ウェブ組を第1型枠パネル或いは第2型枠パネルに組み合わせた状態で、これら第1型枠パネル或いは第2型枠パネルの外側面からそれぞれのベースプレート組付部に着脱される。第1ベースプレートと第2ベースプレートは、第1型枠パネルと第2型枠パネルを貫通して外側面に突出された第1ウェブの第1ベースプレート係合部或いは第2ウェブの第2ベースプレート係合部を相対する第1ウェブ係合部或いは第2ウェブ係合部にそれぞれ係合させてベースプレート組付部に組み付けられる。   The formwork for placing concrete includes the first base plate engaging portion of the first web or the second web of the second web penetrating the first base plate and the second base plate through the first web insertion slit or the second web insertion slit. A first web engaging portion and a second web engaging portion that are opposed to the base plate engaging portion are formed. The first base plate and the second base plate are assembled from the outer surface of the first form panel or the second form panel in a state where the web set is combined with the first form panel or the second form panel. It is attached to the part. The first base plate and the second base plate pass through the first form panel and the second form panel and protrude to the outer surface. The first base plate engaging portion of the first web or the second base plate engaging of the second web The parts are engaged with the first web engaging part or the second web engaging part facing each other, and assembled to the base plate assembling part.

コンクリート打設用型枠においては、例えば第1型枠パネルを基準としてその内側面に複数のウェブ組がそれぞれベースプレート組付部と対向位置するように並べられて組み付けられる。コンクリート打設用型枠においては、第1型枠パネルに対してウェブ組が、第1ウェブ嵌挿スリット或いは第2ウェブ嵌挿スリットに相対する第1ウェブの第1ベースプレート係合部或いは第2ウェブの第2ベースプレート係合部を嵌挿し、それぞれの先端部をベースプレート組付部から外側面に突出させて組み付けられる。コンクリート打設用型枠においては、第1型枠パネルに対して第1ベースプレートが、第1ウェブ係合部及び第2ウェブ係合部にそれぞれ相対する第1ウェブの第1ベースプレート係合部或いは第2ウェブの第2ベースプレート係合部を係合させて組み付けられることにより、第1型枠パネルに対してウェブ組を一体化させる。   In the concrete casting formwork, for example, a plurality of web sets are arranged side by side on the inner surface of the first formwork panel so as to be opposed to the base plate assembly portion. In the concrete placement formwork, the first web base plate engaging portion or the second web set is opposed to the first web insertion slit or the second web insertion slit with respect to the first formwork panel. The second base plate engaging part of the web is fitted and inserted, and the respective tip parts are assembled to protrude from the base plate assembling part to the outer surface. In the concrete casting form, the first base plate is opposed to the first web engaging part and the second web engaging part with respect to the first form panel, respectively. By assembling the second base plate engaging portion of the second web to be engaged, the web set is integrated with the first formwork panel.

コンクリート打設用型枠においては、内側面にウェブ組を組み付けた第1型枠パネルに対して第2型枠パネルが、ウェブ組をベースプレート組付部に対向位置させて対設する。コンクリート打設用型枠においては、第2型枠パネルに対してウェブ組が、第1ウェブ嵌挿スリット或いは第2ウェブ嵌挿スリットに相対する第1ウェブの第1ベースプレート係合部或いは第2ウェブの第2ベースプレート係合部を嵌挿し、それぞれの先端部をベースプレート組付部から外側面に突出させて組み付けられる。コンクリート打設用型枠においては、第2型枠パネルに対して第2ベースプレートが外側面からベースプレート組付部に組み付けられる。コンクリート打設用型枠においては、第2ベースプレートが、第1ウェブ係合部及び第2ウェブ係合部にそれぞれ相対する第1ウェブの第1ベースプレート係合部或いは第2ウェブの第2ベースプレート係合部を係合させて第2型枠パネルに組み付けられることにより、第2型枠パネルに対してウェブ組を一体化させる。   In the concrete casting formwork, the second formwork panel is opposed to the first formwork panel with the web set assembled on the inner surface with the web set facing the base plate assembly portion. In the concrete casting formwork, the first web base plate engaging portion or the second web set is opposed to the first web insertion slit or the second web insertion slit with respect to the second formwork panel. The second base plate engaging part of the web is fitted and inserted, and the respective tip parts are assembled to protrude from the base plate assembling part to the outer surface. In the concrete casting form, the second base plate is assembled to the base plate assembly portion from the outer surface with respect to the second form panel. In the concrete casting form, the second base plate is engaged with the first base plate engaging portion of the first web or the second base plate of the second web facing the first web engaging portion and the second web engaging portion, respectively. The web set is integrated with the second formwork panel by engaging the joint portion and assembling the second formwork panel.

コンクリート打設用型枠においては、上述した作業により、第1型枠パネルと第2型枠パネルが複数のウェブ組を介して所定の対向間隔を以って対向設置され、相対する内側面間にコンクリートを打設するキャビティを構成する。コンクリート打設用型枠においては、各ウェブ組の第1ウェブと第2ウェブが、第1型枠パネルと第2型枠パネルを保持するとともに、これら第1型枠パネルと第2型枠パネルのベースプレート組付部に組み付けた第1ベースプレート及び第2ベースプレートにより保持される。   In the concrete placement formwork, the first formwork panel and the second formwork panel are installed facing each other through a plurality of web sets with a predetermined facing distance by the above-described work, and between the opposing inner side faces. A cavity for placing concrete into the wall is constructed. In the concrete casting formwork, the first web and the second web of each web set hold the first formwork panel and the second formwork panel, and the first formwork panel and the second formwork panel. Are held by the first base plate and the second base plate assembled to the base plate assembly portion.

コンクリート打設用型枠においては、上述した第2型枠パネルを組み合わせる際に、例えば第1型枠パネルに沿って多数の鉄筋を組み合わせて設置する所定の配筋作業が行われる。コンクリート打設用型枠においては、第1型枠パネルと第2型枠パネル間に構成されたキャビティ内にコンクリートを流し込むコンクリート打設が行われる。コンクリート打設用型枠においては、キャビティ内に設置する各ウェブ組の第1ウェブと第2ウェブが簡易な形状であることから充分な配筋スペースが確保される。コンクリート打設用型枠においては、キャビティ内においてコンクリートの流動性が充分に保持されてジャンカの発生を無くすとともにコンクリートを締固めするバイブレータを用いることも可能であり、良好な仕上がりのコンクリート構造物を形成する。   In the concrete placement formwork, when the above-described second formwork panel is combined, for example, a predetermined bar arrangement work is performed in which a large number of reinforcing bars are combined and installed along the first formwork panel. In the concrete placement form, concrete placement is performed in which concrete is poured into a cavity formed between the first formwork panel and the second formwork panel. In the concrete casting form, since the first web and the second web of each web set installed in the cavity have a simple shape, a sufficient bar arrangement space is secured. In concrete casting molds, it is possible to use a vibrator that maintains the fluidity of the concrete in the cavity and eliminates the generation of junkers and compacts the concrete. Form.

コンクリート打設用型枠においては、第1型枠パネルと第2型枠パネルがそのままコンクリート躯体の主面に一体化されたコンクリート構造物を形成することで、所定の養生期間を経た後の脱型作業を不要とする。コンクリート打設用型枠においては、第1型枠パネルと第2型枠パネルを一体化する各連結機構がコンクリート躯体の補強機能も奏することで、機械的強度の大きなコンクリート構造物を形成する。コンクリート打設用型枠においては、第1型枠パネルと第2型枠パネルが断熱材として機能することで、断熱材の貼込み作業を不要とすることも可能となり工期を短縮して施工コストを低減する。コンクリート打設用型枠においては、断熱性の向上とともに、遮音性、高気密性、耐火性、換気性、耐久性或いは耐震性の向上を図ったコンクリート構造物を形成する。   In the concrete placement formwork, the first formwork panel and the second formwork panel form a concrete structure that is integrated with the main surface of the concrete frame as it is, so that it is removed after a predetermined curing period. No mold work is required. In the concrete casting formwork, each connecting mechanism that integrates the first formwork panel and the second formwork panel also has a function of reinforcing the concrete frame, thereby forming a concrete structure having high mechanical strength. In the concrete placement formwork, the first formwork panel and the second formwork panel function as heat insulating materials, so it is possible to eliminate the need to paste the heat insulating materials, shortening the work period and reducing the construction cost. Reduce. In the concrete casting form, a concrete structure is formed with improved heat insulation, sound insulation, high airtightness, fire resistance, ventilation, durability, or earthquake resistance.

以上のように構成された本発明に係るコンクリート打設用型枠によれば、第1型枠パネル及び第2型枠パネルを、X字状に組み合わされる第1ウェブと第2ウェブを1組とする複数組のウェブ組と、第1型枠パネル及び第2型枠パネルの外側面に組み合わされて各ウェブ組の第1ウェブと第2ウェブの先端部を保持する第1ベースプレートと第2ベースプレートにより一体化する。本発明に係るコンクリート打設用型枠によれば、配筋作業や組立作業の効率化が図られ、さらに型枠解体工程を不要とすることと相俟って工期を大幅に短縮する。本発明に係るコンクリート打設用型枠によれば、キャビティ内に設置する各ウェブ組の第1ウェブと第2ウェブが簡易な形状であって内部に充分な配筋スペースを確保することから、打設したコンクリートが良好に流れてジャンカの発生を無くすことが可能であり、高精度のコンクリート建造物を形成することを可能とする。本発明に係るコンクリート打設用型枠によれば、工期の短縮化と部材費の低減により工費を大幅に低減することが可能である。   According to the concrete casting form according to the present invention configured as described above, the first mold panel and the second form panel are combined in a X-shaped first web and second web. A plurality of web sets, and a first base plate and a second base plate that are combined with the outer surfaces of the first and second formwork panels to hold the first and second webs of each web set. Integrate with the base plate. According to the concrete casting form according to the present invention, the efficiency of the bar arrangement work and the assembling work can be improved, and further, the construction period can be greatly shortened in combination with the need for the mold form disassembling process. According to the concrete casting form according to the present invention, the first web and the second web of each web set installed in the cavity have a simple shape and ensure a sufficient bar arrangement space inside. The cast concrete can flow well and the occurrence of jumpers can be eliminated, and a high-precision concrete building can be formed. According to the concrete casting form according to the present invention, the construction cost can be greatly reduced by shortening the construction period and reducing the member cost.

本発明の実施の形態として示すコンクリート打設用型枠の要部斜視図である。It is a principal part perspective view of the concrete placement form shown as embodiment of this invention. 同コンクリート打設用型枠の要部分解斜視図である。It is a principal part disassembled perspective view of the same concrete placement form. 同コンクリート打設用型枠の要部断面図である。It is principal part sectional drawing of the same mold for concrete placement. 同コンクリート打設用型枠を構成する型枠パネルの要部正面図である。It is a principal part front view of the formwork panel which comprises the same mold for concrete placement. 同コンクリート打設用型枠を構成するウェブの正面図である。It is a front view of the web which comprises the same mold for concrete placement. 同コンクリート打設用型枠を構成するベースプレートの側面図である。It is a side view of the base plate which comprises the same mold for concrete placement. 同ベースプレートの平面図である。It is a top view of the base plate. 同コンクリート打設用型枠の組立工程を説明する要部分解斜視図である。It is a principal part exploded perspective view explaining the assembly process of the same mold for concrete placement. 同コンクリート打設用型枠の組立工程におけるベースプレートの組立工程を説明する要部斜視図である。It is a principal part perspective view explaining the assembly process of the base plate in the assembly process of the same concrete placement formwork. 同コンクリート打設用型枠により形成したコンクリート建造物を示す要部断面図である。It is principal part sectional drawing which shows the concrete building formed with the same mold for concrete placement. 同コンクリート打設用型枠に対する型枠保持部の組立工程を説明する要部分解斜視図である。It is a principal part disassembled perspective view explaining the assembly process of the mold holding part with respect to the same mold for concrete placement.

以下、本発明の第1の実施の形態として示すコンクリート打設用型枠1(以下、型枠1と略称する。)について、図面を参照して詳細に説明する。型枠1は、図1乃至図3に示すように所定の対向間隔を以って対向設置されることにより内部にコンクリートを打設するキャビティ10を構成する第1型枠パネル2A及び第2型枠パネル2Bと、これら第1型枠パネル2Aと第2型枠パネル2B間に組み付けられてその対向間隔を保持する複数の連結機構3により構成する。型枠1は、連結機構3が、第1ウェブ5Aと第2ウェブ5Bを1組とする複数のウェブ組4と、それぞれ第1型枠パネル2Aに着脱される複数の第1ベースプレート6A及び第2型枠パネル2Bに着脱される複数の第2ベースプレート6Bにより構成する。   Hereinafter, a concrete casting form 1 (hereinafter abbreviated as a form 1) shown as a first embodiment of the present invention will be described in detail with reference to the drawings. As shown in FIGS. 1 to 3, the mold 1 is disposed opposite to each other with a predetermined interval, thereby forming a first mold panel 2 </ b> A and a second mold that constitute a cavity 10 in which concrete is placed. The frame panel 2B is constituted by a plurality of connecting mechanisms 3 that are assembled between the first mold panel 2A and the second mold panel 2B and maintain the facing distance therebetween. The formwork 1 includes a plurality of web sets 4 in which the connecting mechanism 3 includes a first web 5A and a second web 5B, and a plurality of first base plates 6A and a first base plate 6A attached to and detached from the first formwork panel 2A. It comprises a plurality of second base plates 6B attached to and detached from the two-frame panel 2B.

なお、第1型枠パネル2Aと第2型枠パネル2Bは、上下(表裏)を反転して対向設置するように用いられる同一形状のパネル材であることから、以下個別に説明する場合を除いて型枠パネル2と総称する。また、各ウェブ組4の第1ウェブ5Aと第2ウェブ5Bも上下(表裏)を反転して組み合わされる同一形状のウェブであることから、以下個別に説明する場合を除いてウェブ5と総称する。さらに、第1ベースプレート6Aと第2ベースプレート6Bも、上下(表裏)を反転して組み合わされる同一形状のプレート部材であることから、以下個別に説明する場合を除いてベースプレート6と総称する。   In addition, since the 1st formwork panel 2A and the 2nd formwork panel 2B are the panel materials of the same shape used so that it may be installed facing upside down (front and back), except when it demonstrates separately below Collectively referred to as a formwork panel 2. Further, the first web 5A and the second web 5B of each web set 4 are also webs of the same shape that are combined by inverting them upside down (front and back), and are therefore collectively referred to as webs 5 unless otherwise described below. . Furthermore, since the first base plate 6A and the second base plate 6B are plate members having the same shape that are combined by reversing the upper and lower sides (front and back), they are collectively referred to as the base plate 6 unless otherwise described below.

型枠1は、例えば図10に示すように縦筋8Aを適宜立設したベースコンクリート7上に第1段型枠1Aが桟木43により位置決めされて設置されてコンクリート壁等のコンクリート躯体9の基部を形成し、この基部上に第2段型枠1Bが設置されてコンクリート躯体9の上部を形成する。型枠1は、順次この工程を繰り返すことにより、所定の高さのコンクリート躯体9を形成する。なお、型枠1は、かかる工程に限定されないことは勿論であり、従来の一般的な工法、例えば予め多数組を多段に組み合わせて所定の高さのコンクリート躯体9を形成するようにしてもよい。   For example, as shown in FIG. 10, the mold 1 is placed on a base concrete 7 with vertical bars 8 </ b> A provided upright by positioning the first-stage mold 1 </ b> A with a pier 43 and a base of a concrete frame 9 such as a concrete wall. And the second stage mold 1B is installed on the base to form the upper part of the concrete frame 9. The mold 1 forms a concrete frame 9 having a predetermined height by sequentially repeating this process. Needless to say, the mold 1 is not limited to such a process, and a conventional general construction method, for example, a plurality of sets in advance may be combined in multiple stages to form a concrete frame 9 having a predetermined height. .

型枠1は、それぞれのキャビティ10内に縦筋8Aに対して横筋8Bを適宜配筋してなる鉄筋組8が設置されるように、第1型枠パネル2Aと第2型枠パネル2Bが連結機構3A、3Bによってそれぞれ所定の対向間隔を保持されて設置される。なお、型枠1は、コンクリート壁ばかりでなく、コンクリート建造物の柱、梁、壁或いはスラブ等の各コンクリート躯体部位を形成する型枠であってもよく、形成部位に応じて適宜設置される。   In the mold 1, the first mold panel 2 </ b> A and the second mold panel 2 </ b> B are arranged so that a reinforcing bar set 8 in which the horizontal bars 8 </ b> B are appropriately arranged with respect to the vertical bars 8 </ b> A is installed in each cavity 10. Each of the coupling mechanisms 3A and 3B is installed with a predetermined facing distance. The formwork 1 may be a formwork for forming each concrete frame part such as a pillar, beam, wall, or slab of a concrete building as well as a concrete wall, and is appropriately set according to the formation part. .

型枠1は、図10に示すように表裏主面に第1型枠パネル2Aと第2型枠パネル2Bを一体化してなるコンクリート躯体9を形成する。型枠1は、後述するように第1型枠パネル2Aと第2型枠パネル2Bを180mmの間隔を以って対向設置してキャビティ10を構成し、コンクリート躯体9の表裏主面にそれぞれ45mm厚の第1型枠パネル2Aと第2型枠パネル2Bを一体化して全体で270mmの厚みのコンクリート壁を形成する。したがって、型枠1も、上述した先願のコンクリート打設用型枠と同様に、型枠パネルの解体工程を不要とし、コンクリート躯体9一体化した型枠パネル2により断熱性、遮音性、高気密性、耐火性、換気性、耐久性或いは耐震性の向上を図ったコンクリート構造物を工期の大幅短縮化を図って形成することを可能とする。   As shown in FIG. 10, the formwork 1 forms a concrete frame 9 formed by integrating the first formwork panel 2A and the second formwork panel 2B on the front and back main surfaces. As will be described later, the mold 1 is configured so that the first mold panel 2A and the second mold panel 2B face each other with an interval of 180 mm to form a cavity 10, and 45 mm each on the front and back main surfaces of the concrete frame 9. The thick first mold panel 2A and the second mold panel 2B are integrated to form a concrete wall having a thickness of 270 mm as a whole. Accordingly, the mold 1 also eliminates the process of disassembling the mold panel, as in the concrete casting mold of the prior application described above, and has a heat insulation, sound insulation, high performance by the mold panel 2 integrated with the concrete frame 9. It is possible to form a concrete structure with improved airtightness, fire resistance, ventilation, durability, or earthquake resistance while greatly shortening the construction period.

型枠1は、型枠パネル2が、発泡合成樹脂材、例えば発泡ポリエチレン樹脂を素材として横長矩形のパネル体に形成される。型枠パネル2は、例えば長さが約1200mm、幅が約400mm、厚さが約45mmの外形寸法を以って形成される。型枠パネル2は、かかる外形寸法仕様に限定されないことは勿論であり、コンクリート躯体9の仕様、形成部位或いはその他の条件に応じて適宜の仕様を以って形成される。型枠パネル2は、素材として、例えば発泡スチロール樹脂、発泡ポリエチレン樹脂或いは発泡ポリウレタン樹脂等の発泡合成樹脂材を用いてもよい。型枠パネル2は、かかる発泡合成樹脂材を素材とすることによりコンクリートが内部に入り込んで硬化してコンクリート躯体9と強固に一体化する。型枠パネル2は、上述した素材を用いることにより、簡易に加工することが可能であるとともに軽量であることから運搬や設置等の取扱いが簡便であり、またコンクリート躯体9の表面に一体化することにより上述した断熱性等の特性を奏するようにする。   As for the formwork 1, the formwork panel 2 is formed in a horizontally long rectangular panel body using a foamed synthetic resin material, for example, a foamed polyethylene resin. The formwork panel 2 is formed with external dimensions of, for example, a length of about 1200 mm, a width of about 400 mm, and a thickness of about 45 mm. Of course, the formwork panel 2 is not limited to such an external dimension specification, and is formed with an appropriate specification according to the specification of the concrete housing 9, the formation site, or other conditions. The mold panel 2 may use a foamed synthetic resin material such as a foamed polystyrene resin, a foamed polyethylene resin, or a foamed polyurethane resin as a material. The formwork panel 2 is made of such a foamed synthetic resin material, so that the concrete enters the inside and is hardened to be firmly integrated with the concrete frame 9. By using the above-mentioned materials, the formwork panel 2 can be easily processed and is lightweight, so that handling such as transportation and installation is easy, and it is integrated with the surface of the concrete frame 9. Thus, the above-described characteristics such as heat insulation are exhibited.

型枠パネル2は、第1型枠パネル2Aと第2型枠パネル2Bが上述したように上下を反転して約180mmの間隔を以って対向設置され、内側となる一方の主面11A、11B(以下、内側面11と総称する。)間でコンクリートが打設されるキャビティ10を構成する同一形状のパネル材である。型枠パネル2には、型枠1を組み立てた状態で外側となる他方主面12A、12B(以下、外側面12と総称する。)に、複数のベースプレート組付部13A、13B(以下、ベースプレート組付部13と総称する。)が形成される。なお、以下の型枠パネル2の説明において、上下左右の用語は、図1を基準とし、同図で手前側に示す型枠パネル2Aに対して相手側の型枠パネル2Bが上下反転して組み合わされることから、上下左右の位置が逆となる。   The formwork panel 2 is arranged so that the first formwork panel 2A and the second formwork panel 2B are turned upside down as described above and are opposed to each other with an interval of about 180 mm. It is the panel material of the same shape which comprises the cavity 10 in which concrete is laid between 11B (henceforth the inner surface 11). The mold panel 2 includes a plurality of base plate assembly portions 13A and 13B (hereinafter referred to as base plates) on the other main surfaces 12A and 12B (hereinafter collectively referred to as the outer surfaces 12) which are outside in a state where the mold 1 is assembled. The assembly part 13 is collectively referred to.). In the following description of the formwork panel 2, the terms “upper, lower, left and right” are based on FIG. 1, and the other formwork panel 2B is turned upside down with respect to the formwork panel 2A shown on the front side in FIG. Since they are combined, the vertical and horizontal positions are reversed.

型枠パネル2は、ベースプレート組付部13を図1及び図2において1個のみを図示するが、外側面12に長さ方向に並んで複数個が形成される。型枠パネル2は、後述するようにベースプレート組付部13にそれぞれ連結機構3が組み付けられることにより保持されて型枠1を組み立てる。型枠パネル2は、ベースプレート組付部13A、13Bが第1型枠パネル2Aと第2型枠パネル2Bの外側面12A、12Bに、相対して形成される。   Although only one base plate assembly portion 13 is shown in FIGS. 1 and 2, the mold panel 2 is formed in plural on the outer side surface 12 in the length direction. As will be described later, the mold panel 2 is held by assembling the connecting mechanism 3 to the base plate assembling portion 13 to assemble the mold 1. In the mold panel 2, base plate assembling portions 13A and 13B are formed so as to be opposed to the outer surfaces 12A and 12B of the first mold panel 2A and the second mold panel 2B.

型枠パネル2は、上述した外形寸法と対向間隔を以って対向配置される場合に、図示を省略するが長さ方向の両端部位にそれぞれ半割り形状のベースプレート組付部半体を形成するとともに約400mmの間隔を以って2個のベースプレート組付部13を外側面12に形成する。型枠1においては、上述した外形寸法の型枠パネル2に対して長さ方向に約400mmの間隔を以って連結機構3を組み合わすことにより、コンクリート打設時における機械的強度が保持されるとともに形成したコンクリート躯体9が後述するように連結機構3のウェブ5により機械的強度が保持されるようにする。   When the formwork panel 2 is arranged opposite to the outer dimensions described above with a facing interval, a half-shaped base plate assembly half is formed at each end portion in the length direction, although not shown. At the same time, two base plate assembly portions 13 are formed on the outer surface 12 with an interval of about 400 mm. In the mold 1, the mechanical strength at the time of placing concrete is maintained by combining the connection mechanism 3 with a distance of about 400 mm in the length direction with respect to the mold panel 2 having the above-described outer dimensions. In addition, the mechanical strength of the formed concrete casing 9 is maintained by the web 5 of the coupling mechanism 3 as will be described later.

ベースプレート組付部13は、型枠パネル2の外側面12に、図2及び図4に示すようにナット嵌合凹部14と、第1ウェブ嵌挿スリット15及び第2ウェブ嵌挿スリット16と、第1ベース嵌合スリット17及び第2ベース嵌合スリット18を形成した部位により構成される。ベースプレート組付部13には、後述するように型枠パネル2の外側面12からベースプレート6が組み付けられる。   As shown in FIGS. 2 and 4, the base plate assembly portion 13 is formed on the outer surface 12 of the mold panel 2 with a nut fitting recess 14, a first web fitting insertion slit 15, and a second web fitting insertion slit 16. It is comprised by the site | part in which the 1st base fitting slit 17 and the 2nd base fitting slit 18 were formed. As will be described later, the base plate 6 is assembled to the base plate assembly portion 13 from the outer surface 12 of the mold panel 2.

ナット嵌合凹部14は、ベースプレート組付部13の中央部に位置して形成される。ナット嵌合凹部14は、後述するようにベースプレート組付部13に組み付けられるベースプレート6の内面に設けた取付ナット部材33が位置決めされて嵌合されるようにする。ナット嵌合凹部14は、型枠パネル2に対してベースプレート6を外側面12に組み付ける際に取付ナット部材33のガイド機能を奏するとともに、組み合わせ状態を保持して移動を規制する機能も奏する。   The nut fitting recess 14 is formed at the center of the base plate assembly 13. As will be described later, the nut fitting recess 14 positions and fits the mounting nut member 33 provided on the inner surface of the base plate 6 assembled to the base plate assembly 13. The nut fitting recess 14 has a function of guiding the mounting nut member 33 when the base plate 6 is assembled to the outer surface 12 with respect to the mold panel 2 and also has a function of holding the combined state and restricting movement.

第1ウェブ嵌挿スリット15及び第2ウェブ嵌挿スリット16は、ベースプレート組付部13に、ナット嵌合凹部14を挟む上下領域の対称位置に型枠パネル2を貫通する高さ方向のスリットとして形成される。第1ウェブ嵌挿スリット15及び第2ウェブ嵌挿スリット16は、それぞれのスリット幅が第1ウェブ5A及び第2ウェブ5Bの厚みとほぼ等しく、後述するように相対する第1ウェブ5A及び第2ウェブ5Bの先端部を型枠パネル2の内側面11から外側面12へと突出させる。   The first web insertion slit 15 and the second web insertion slit 16 are formed in the base plate assembly 13 as slits in the height direction that penetrate the formwork panel 2 at symmetrical positions in the upper and lower regions sandwiching the nut fitting recess 14. It is formed. The first web insertion slit 15 and the second web insertion slit 16 have a slit width substantially equal to the thickness of the first web 5A and the second web 5B, and the first web 5A and the second web 2 are opposed to each other as described later. The front end portion of the web 5 </ b> B is projected from the inner side surface 11 of the mold panel 2 to the outer side surface 12.

第1ベース嵌合スリット17及び第2ベース嵌合スリット18は、図4に示すように、ナット嵌合凹部14を挟む両側領域の対称位置に形成された高さ方向の底付きスリットからなる。第1ベース嵌合スリット17及び第2ベース嵌合スリット18は、後述するようにベースプレート6をベースプレート組付部13においてその両縁部を位置決めして組み付けて保持するとともに、移動を規制する。   As shown in FIG. 4, the first base fitting slit 17 and the second base fitting slit 18 are made of slits with a bottom in the height direction formed at symmetrical positions in both side regions sandwiching the nut fitting recess 14. As will be described later, the first base fitting slit 17 and the second base fitting slit 18 position and assemble both ends of the base plate 6 in the base plate assembling portion 13 and restrict the movement.

型枠パネル2には、上述したように長さ方向の両端部位にそれぞれ半割り形状のベースプレート組付部半体が形成される。型枠パネル2は、横方向に隣り合って組み合わされた状態で、このベースプレート組付部半体が組み合わされて1個のベースプレート組付部13を構成する。型枠パネル2は、このベースプレート組付部13にも後述するように連結機構3を構成するウェブ組4が組み付けられる。型枠パネル2は、このように突き合わせ部位においても、長さ方向の途中部位と同様に連結機構3により保持されることで端部の浮き上がりが規制されるとともに機械的強度が大きな型枠1を構成する。   As described above, the half-shaped base plate assembly half is formed in the mold panel 2 at both end portions in the length direction. In a state where the formwork panels 2 are combined side by side in the lateral direction, the base plate assembly part halves are combined to form one base plate assembly part 13. As will be described later, the web frame 4 constituting the coupling mechanism 3 is also assembled to the base plate assembly portion 13 of the mold panel 2. In this way, the mold panel 2 is held by the connecting mechanism 3 in the same way as the midway part in the length direction, so that the lifting of the end portion is regulated and the mechanical strength is high. Configure.

なお、ベースプレート組付部13については、型枠パネル2の外側面12に上述した部位を形成したが、かかる構成に特定されないことは勿論である。ベースプレート組付部13は、例えば外側面12にベースプレート6を内部に装填する凹部を形成し、この凹部内に各部位を形成して構成してもよい。かかるベースプレート組付部13は、ベースプレート6が外側面12から厚み分突出しないようにし、またベースプレート6の外周部を溝壁により規制することで、上述したナット嵌合凹部14或いは第1ベース嵌合スリット17や第2ベース嵌合スリット18を省略することも可能である。   In addition, about the baseplate assembly | attachment part 13, although the site | part mentioned above was formed in the outer surface 12 of the formwork panel 2, of course, it is not specified to this structure. The base plate assembling part 13 may be formed by forming, for example, a recess for loading the base plate 6 in the outer surface 12 and forming each part in the recess. The base plate assembly portion 13 prevents the base plate 6 from protruding from the outer surface 12 by a thickness, and restricts the outer peripheral portion of the base plate 6 by the groove wall, so that the nut fitting concave portion 14 or the first base fitting described above is performed. The slit 17 and the second base fitting slit 18 can be omitted.

型枠パネル2は、多数枚が相対する外周縁部を突き合わせて上下左右に組み合わされて設置されることにより型枠1を構成する。型枠パネル2には、突き合わせる外周縁部において、コンクリート漏れを生じさせる隙間の発生を防止しかつ段差が生じることなく平坦な外側面を形成するために、相対嵌合される嵌合部19が形成される。なお、嵌合部19については、上下の外周縁部に形成した嵌合部19A、19Bのみを図示して詳細に説明する。   The formwork panel 2 constitutes the formwork 1 by abutting the outer peripheral edge portions where a large number of sheets face each other and being installed by being combined vertically and horizontally. The formwork panel 2 has a fitting portion 19 which is relatively fitted in order to prevent the generation of a gap causing concrete leakage and to form a flat outer surface without causing a step at the outer peripheral edge to be abutted. Is formed. In addition, about the fitting part 19, only fitting part 19A, 19B formed in the up-and-down outer periphery part is illustrated and demonstrated in detail.

型枠パネル2は、図1及び図2に示すようにその外周縁部が厚み方向に対して1/2厚の外側領域と内側領域に区割りされ、この外側領域と内側領域に嵌合部19を一体に形成する。嵌合部19は、外周縁部の外側領域に長さ方向に隣り合って形成された多数個の外側嵌合凸部20A、20B(以下、外側嵌合凸部20と総称する。)及び多数個の外側嵌合凹部21A、21B(以下、外側嵌合凹部21と総称する。)と、内側領域に長さ方向に隣り合って形成された多数個の内側嵌合凸部22A、22B(以下、内側嵌合凸部22と総称する。)及び多数個の内側嵌合凹部23A、23B(以下、内側嵌合凹部23と総称する。)とから構成される。嵌合部19は、外側嵌合凸部20と外側嵌合凹部21が外周縁部の外側領域に長さ方向の全域に亘って交互に形成されるとともに、内側嵌合凸部22と内側嵌合凹部23が外周縁部の内側領域に長さ方向の全域に亘って交互に形成されてなる。   As shown in FIGS. 1 and 2, the outer peripheral edge of the mold panel 2 is divided into an outer region and an inner region having a thickness of ½ with respect to the thickness direction, and a fitting portion 19 is formed between the outer region and the inner region. Are integrally formed. The fitting portion 19 includes a large number of outer fitting convex portions 20A and 20B (hereinafter collectively referred to as the outer fitting convex portion 20) and a large number formed adjacent to each other in the length direction in the outer region of the outer peripheral edge portion. Outer fitting recesses 21A and 21B (hereinafter collectively referred to as outer fitting recesses 21) and a large number of inner fitting protrusions 22A and 22B (hereinafter referred to as the lengthwise direction of the inner region). , And collectively referred to as the inner fitting convex portion 22) and a large number of inner fitting concave portions 23A and 23B (hereinafter collectively referred to as the inner fitting concave portion 23). The fitting part 19 includes an outer fitting convex part 20 and an outer fitting concave part 21 that are alternately formed in the outer region of the outer peripheral edge over the entire length direction, and the inner fitting convex part 22 and the inner fitting part. Combined recesses 23 are alternately formed in the inner region of the outer peripheral edge over the entire length direction.

嵌合部19は、外側嵌合凸部20と外側嵌合凹部21及び内側嵌合凸部22と内側嵌合凹部23が、その凸寸法と凹寸法をほぼ同等にして形成する。嵌合部19は、外側嵌合凸部20と外側嵌合凹部21の列に対して内側嵌合凸部22と内側嵌合凹部23の列が1ピッチ分ずらして形成することで、外側嵌合凸部20に内側嵌合凹部23が対向位置するとともに外側嵌合凹部21に内側嵌合凸部22が対向位置する。また、嵌合部19は、型枠パネル2の上側外周縁部と下側外周縁部において、外側嵌合凸部20と外側嵌合凹部21の列に対して内側嵌合凸部22と内側嵌合凹部23の列が1ピッチ分ずれて形成される。   The fitting part 19 is formed by the outer fitting convex part 20 and the outer fitting concave part 21 and the inner fitting convex part 22 and the inner fitting concave part 23 having substantially the same convex dimension and concave dimension. The fitting portion 19 is formed by shifting the inner fitting convex portion 22 and the inner fitting concave portion 23 by one pitch with respect to the outer fitting convex portion 20 and the outer fitting concave portion 21. The inner fitting concave portion 23 faces the mating convex portion 20 and the inner fitting convex portion 22 faces the outer fitting concave portion 21. In addition, the fitting portion 19 includes an inner fitting convex portion 22 and an inner portion with respect to the row of the outer fitting convex portion 20 and the outer fitting concave portion 21 in the upper outer peripheral edge portion and the lower outer peripheral edge portion of the formwork panel 2. The rows of fitting recesses 23 are formed with a shift of one pitch.

型枠パネル2は、図3に示すように、一方側において中央型枠パネル2A1に対してその下段に型枠パネル2A2が組み合わされるとともに、上段に型枠パネル2A3が組み合わされる。型枠パネル2は、他方側においても同様に中央型枠パネル2B1に対してその下段に型枠パネル2B2が組み合わされるとともに、上段に型枠パネル2B3が組み合わされる。型枠パネル2は、左右の各型枠パネル組の上下に隣り合う各型枠パネルが、上述した構成の相対する嵌合部19により、上下外周縁部の内外領域において嵌合凸部と嵌合凹部が組み合わされた構造となる。型枠パネル2は、かかる嵌合構造により上下左右で互いに同一面を構成するようにして組み合わされる。   As shown in FIG. 3, the formwork panel 2 is combined with the formwork panel 2A2 at the lower stage and the formwork panel 2A3 at the upper stage with respect to the central formwork panel 2A1 on one side. Similarly, on the other side of the mold panel 2, the mold panel 2B2 is combined at the lower stage with respect to the central mold panel 2B1, and the mold panel 2B3 is combined at the upper stage. In the formwork panel 2, the formwork panels adjacent to each other on the upper and lower sides of the left and right formwork panel sets are fitted with the fitting convex portions in the inner and outer regions of the upper and lower outer peripheral edges by the fitting portions 19 having the above-described configuration. It becomes a structure in which the concavity is combined. The formwork panels 2 are combined so as to form the same plane on the top, bottom, left and right by such a fitting structure.

なお、型枠パネル2は、長さ方向の両縁部に形成される嵌合部が、例えば上下方向に長い外側嵌合凸部と外側嵌合凹部を交互に形成するとともに、これら外側嵌合凸部と外側嵌合凹部に対して1ピッチ分ずらして同形の内側嵌合凸部と内側嵌合凹部を交互に形成して構成する。型枠パネル2は、かかる嵌合部の構造により左右方向の組み合わせが簡易に行われるようになる。   In addition, as for the formwork panel 2, the fitting part formed in the both edges of a length direction forms an outer fitting convex part and an outer fitting recessed part which are long in the up-down direction alternately, for example, and these outer fittings The inner fitting convex portion and the inner fitting concave portion having the same shape are alternately formed by shifting by one pitch with respect to the convex portion and the outer fitting concave portion. The formwork panel 2 can be easily combined in the left-right direction by the structure of the fitting portion.

型枠パネル2は、上述したように型枠パネル2Aに対して上下に反転した型枠パネル2Bが対向配置されて図1及び図3に示すように各ベースプレート組付部13にそれぞれ組み付けられる連結機構3により対向間隔を保持される。連結機構3は、上述したように複数のウェブ組4と、複数のベースプレート6により構成し、ウェブ組4が詳細を後述するように中央部を連結されてX字状に組み合わされる第1ウェブ5Aと第2ウェブ5Bを1組として構成される。連結機構3は、ウェブ組4がベースプレート組付部13に対向した内側面11間に組み付けられて型枠パネル2を保持し、ベースプレート6が外側面12からベースプレート組付部13に組み付けられてウェブ組4を保持する。   As described above, the mold panel 2 is connected to the base plate assembling part 13 as shown in FIGS. 1 and 3 with the mold panel 2B inverted up and down with respect to the mold panel 2A. The facing distance is maintained by the mechanism 3. As described above, the connecting mechanism 3 includes the plurality of web sets 4 and the plurality of base plates 6, and the web sets 4 are combined in an X shape by connecting the central portions as will be described in detail later. And the second web 5B as one set. The coupling mechanism 3 includes a web assembly 4 assembled between the inner side surfaces 11 facing the base plate assembly portion 13 to hold the formwork panel 2, and a base plate 6 assembled from the outer surface 12 to the base plate assembly portion 13 Hold set 4.

連結機構3は、1組の型枠パネル2に対してベースプレート組付部13と同数のウェブ組4が用いられる。なお、連結機構3は、上述したように型枠パネル2の長さ方向の両縁部に相対形成したベースプレート組付部半体により構成したベースプレート組付部にも共用してウェブ組4が用いられ、隣り合って設置された型枠パネル2を保持する。   In the connection mechanism 3, the same number of web sets 4 as the base plate assembling portions 13 are used for one set of formwork panels 2. The connecting mechanism 3 is also used by the web assembly 4 in common with the base plate assembly portion formed by the base plate assembly portion halves formed relative to both edges in the length direction of the formwork panel 2 as described above. The formwork panels 2 installed next to each other are held.

ウェブ5は、防錆性や機械的強度が大きなステンレス材等の金属板材を素材とし、図5に示すように高さ方向の傾斜を付された基部24と、この基部24の両端部に一体に形成された第1ベースプレート係合部25及び第2ベースプレート係合部26とから構成される。ウェブ5は、例えば厚みが約3.2mmであり、基部24が約50°乃至約55°の傾斜角度を付されて第1ベースプレート係合部25と第2ベースプレート係合部26の間隔を上述した第1型枠パネル2Aと第2型枠パネル2Bの対向間隔、すなわち180mmに設定する長さを以って形成される。基部24には、中央部に位置して厚み方向に貫通する連結孔27が形成される。   The web 5 is made of a metal plate material such as stainless steel having high rust resistance and mechanical strength, and as shown in FIG. 5, the base 24 is inclined in the height direction and integrated with both ends of the base 24. The first base plate engaging portion 25 and the second base plate engaging portion 26 are formed. The web 5 has a thickness of about 3.2 mm, for example, and the base portion 24 is inclined at an angle of about 50 ° to about 55 ° so that the distance between the first base plate engaging portion 25 and the second base plate engaging portion 26 is as described above. The first formwork panel 2A and the second formwork panel 2B are formed with a facing distance, that is, with a length set to 180 mm. The base portion 24 is formed with a connecting hole 27 that is located in the central portion and penetrates in the thickness direction.

ウェブ5は、第1ベースプレート係合部25と第2ベースプレート係合部26が左右対称形状の部位からなる。したがって、以下の説明では、第1ベースプレート係合部25の構成について代表して説明し、第2ベースプレート係合部26側の構成については対応する部位に同一符号を付すことにより説明を省略する。第1ベースプレート係合部25は、図5に示すように基部24の先端から水平方向に折曲形成された部位からなり、突当て部位28と、嵌挿部位29と、係合溝30とから構成される。   The web 5 includes a portion in which the first base plate engaging portion 25 and the second base plate engaging portion 26 are symmetrical. Therefore, in the following description, the configuration of the first base plate engaging portion 25 will be described as a representative, and the description of the configuration on the second base plate engaging portion 26 side will be omitted by attaching the same reference numerals to the corresponding portions. As shown in FIG. 5, the first base plate engaging portion 25 includes a portion that is bent in the horizontal direction from the tip of the base portion 24, and includes a bumping portion 28, a fitting insertion portion 29, and an engaging groove 30. Composed.

突当て部位28は、詳細には基部24の上縁部と下縁部から突出する部位からなり、上述したベースプレート組付部13に形成した第1ウェブ嵌挿スリット15や第2ウェブ嵌挿スリット16のスリット長よりも大きな幅を以って形成される。突当て部位28は、後述するように嵌挿部位29を第1ウェブ嵌挿スリット15或いは第2ウェブ嵌挿スリット16に嵌挿して型枠パネル2にウェブ5を組み付ける際に、図3に示すようにその外側縁28A、28Bが開口縁と突き当たる。突当て部位28は、これにより型枠パネル2に対する嵌挿部位29の嵌挿量を規定する。   Specifically, the abutting portion 28 includes portions projecting from the upper edge portion and the lower edge portion of the base 24, and the first web insertion slit 15 and the second web insertion slit formed in the base plate assembly portion 13 described above. It is formed with a width larger than 16 slit lengths. The abutting portion 28 is shown in FIG. 3 when the web 5 is assembled to the formwork panel 2 by inserting the insertion portion 29 into the first web insertion slit 15 or the second web insertion slit 16 as described later. Thus, the outer edges 28A and 28B abut against the opening edges. The abutting portion 28 thereby defines the amount of insertion of the insertion portion 29 into the formwork panel 2.

嵌挿部位29は、突当て部位28外側に向かって一体に突出された部位からなり、上述したベースプレート組付部13に形成した第1ウェブ嵌挿スリット15や第2ウェブ嵌挿スリット16のスリット長とほぼ等しい幅と型枠パネル2の厚みよりもやや大きい長さを以って形成される。嵌挿部位29は、型枠パネル2に対して、後述するように内側面11に開口した第1ウェブ嵌挿スリット15或いは第2ウェブ嵌挿スリット16に嵌挿されてベースプレート組付部13から外側面12に突出する。   The insertion part 29 is a part integrally protruding toward the outside of the abutting part 28, and the slits of the first web insertion slit 15 and the second web insertion slit 16 formed in the base plate assembly part 13 described above. It is formed with a width substantially equal to the length and a length slightly larger than the thickness of the formwork panel 2. The insertion portion 29 is inserted into the first web insertion insertion slit 15 or the second web insertion insertion slit 16 opened in the inner surface 11 with respect to the mold panel 2 as will be described later. Projects to the outer surface 12.

係合溝30は、嵌挿部位29に、その上縁部に開口する高さ方向の溝からなり、詳細を後述するベースプレート6の厚みとほぼ等しい溝幅を以って形成される。係合溝30は、嵌挿部位29に、突当て部位28から型枠パネル2の厚みよりもやや大きい位置において形成される。係合溝30は、嵌挿部位29を第1ウェブ嵌挿スリット15或いは第2ウェブ嵌挿スリット16に嵌挿し突当て部位28が内側面11に突き当てられた状態において、型枠パネル2の外側面12から突出する。   The engaging groove 30 is a groove in the height direction that opens at the upper edge of the fitting insertion portion 29, and is formed with a groove width substantially equal to the thickness of the base plate 6 to be described later in detail. The engagement groove 30 is formed in the insertion part 29 at a position slightly larger than the thickness of the mold panel 2 from the abutting part 28. The engagement groove 30 is inserted into the first web insertion / insertion slit 15 or the second web insertion / insertion slit 16 and the abutment portion 28 is abutted against the inner surface 11. Projects from the outer surface 12.

ウェブ組4においては、第1ウェブ5Aと第2ウェブ5Bが表裏反転され、それぞれの連結孔27を連通させて厚み方向に積層するようにして組み合わされる。ウェブ組4においては、連結孔27に連結ピン31を嵌挿して第1ウェブ5Aと第2ウェブ5Bを中央部において互いに軸回りに回動自在に組み合わす。ウェブ組4においては、図3に示すように第1ウェブ5Aと第2ウェブ5BをX字状に開いた状態にして型枠パネル2との組み合わせが行われる。また、ウェブ組4においては、第1ウェブ5Aと第2ウェブ5Bを閉じた状態とすることにより、運搬時等において取り扱いを容易とするとともにスペースの効率化が図られるようにする。なお、ウェブ組4は、第1ウェブ5Aと第2ウェブ5Bを、例えば連結孔27にかしめピンを嵌挿してかしめ処理を施すことによりX字状に開いた状態で一体化するようにしてもよい。   In the web set 4, the first web 5 </ b> A and the second web 5 </ b> B are reversed, and are combined so that the respective connection holes 27 are communicated and stacked in the thickness direction. In the web set 4, the connection pin 31 is fitted into the connection hole 27, and the first web 5 </ b> A and the second web 5 </ b> B are combined so as to be rotatable around the axis at the center. In the web set 4, as shown in FIG. 3, the first web 5 </ b> A and the second web 5 </ b> B are opened in an X shape, and are combined with the formwork panel 2. Further, in the web set 4, the first web 5A and the second web 5B are closed to facilitate handling during transportation and to improve the efficiency of the space. The web set 4 may be integrated with the first web 5A and the second web 5B being opened in an X shape by, for example, inserting a caulking pin into the connecting hole 27 and performing caulking processing. Good.

ウェブ組4は、上述したよう同一部材として形成されて表裏反転して組み合わされる第1ウェブ5Aと第2ウェブ5Bによって構成することにより、部材の共通化によるコスト低減が図られるとともに型枠1の組立作業の効率化も図られるようになる。なお、ウェブ組4は、これら第1ウェブ5Aと第2ウェブ5Bが異なる仕様の部材として形成され、いずれか一方を機械的強度の大きな主部材とするとともに、他方を補助部材として簡易な形状に形成するようにしてもよい。   The web set 4 is formed as the same member as described above, and is constituted by the first web 5A and the second web 5B which are reversed and combined to reduce the cost due to the common use of the members and the mold 1 The efficiency of assembly work can also be improved. In the web set 4, the first web 5A and the second web 5B are formed as members having different specifications, and either one is a main member having high mechanical strength and the other is an auxiliary member in a simple shape. You may make it form.

ベースプレート6も、防錆性や機械的強度が大きなステンレス材等の金属板材を素材として形成され、上述したベースプレート組付部13の第1ベース嵌合スリット17及び第2ベース嵌合スリット18よりもやや短い長さでありかつその対向間隔とほぼ同幅の縦長矩形の板状部材からなる。ベースプレート6は、全長が約320mm、幅が約49mm、厚みが約1.6mmの部材であり、第1型枠パネル2Aと第2型枠パネル2B間に組み付けられてこれらを所定の対向間隔に保持するウェブ組4の第1ウェブ5Aと第2ウェブ5Bを充分な機械的強度を以って保持するとともに、第1型枠パネル2Aと第2型枠パネル2Bの外側面12に一体化されてこれらを補強する。   The base plate 6 is also made of a metal plate material such as stainless steel having high rust prevention and mechanical strength, and is more than the first base fitting slit 17 and the second base fitting slit 18 of the base plate assembly 13 described above. It consists of a vertically long rectangular plate-like member having a slightly short length and substantially the same width as the facing interval. The base plate 6 is a member having an overall length of about 320 mm, a width of about 49 mm, and a thickness of about 1.6 mm. The base plate 6 is assembled between the first mold frame panel 2A and the second mold frame panel 2B so as to have a predetermined facing distance. The first web 5A and the second web 5B of the web set 4 to be held are held with sufficient mechanical strength and are integrated with the outer surface 12 of the first mold panel 2A and the second mold panel 2B. To reinforce them.

ベースプレート6には、図6及び図7に示すように中央部に形成した取付孔32から後述する型枠支保具(フォームタイ)41を取り付ける取付ネジ部材40がねじ込まれる。ベースプレート6には、取付ネジ部材40、換言すれば型枠支保具41を外側面に対して簡易な作業により着脱自在に取付可能とするとともに、強固に取り付けるために取付ナット部材33が設けられる。取付ナット部材33は、金属材により内孔に内周ネジを設け、型枠パネル2側のナット嵌合凹部14の深さよりもやや小さな軸長の筒状部材から構成される。取付ナット部材33は、ネジ孔を取付孔32と同心状態にして、ベースプレート6の内面に一体化されて設けられる。   As shown in FIGS. 6 and 7, the base plate 6 is screwed with a mounting screw member 40 for mounting a formwork support (form tie) 41 to be described later from a mounting hole 32 formed at the center. A mounting nut member 33 is provided on the base plate 6 so that the mounting screw member 40, in other words, the formwork support 41 can be detachably attached to the outer surface by a simple operation and is firmly attached. The mounting nut member 33 is formed of a cylindrical member having an axial length slightly smaller than the depth of the nut fitting recess 14 on the mold panel 2 side, provided with an inner peripheral screw in the inner hole by a metal material. The mounting nut member 33 is provided integrally with the inner surface of the base plate 6 with the screw hole concentric with the mounting hole 32.

ベースプレート6は、型枠パネル2の外側面12に組み付けた状態において、内面に設けた取付ナット部材33が型枠パネル2側のナット嵌合凹部14内に嵌合される。ベースプレート6は、この取付ナット部材33のナット嵌合凹部14内への嵌合によって、型枠パネル2に対して主面が外側面12と同一面を構成するとともに組み合わせ状態が保持されかつ移動が規制されて組み合わせが行われる。   In the state where the base plate 6 is assembled to the outer surface 12 of the mold panel 2, a mounting nut member 33 provided on the inner surface is fitted into the nut fitting recess 14 on the mold panel 2 side. By fitting the mounting nut member 33 into the nut fitting recess 14, the base plate 6 has a principal surface that is the same as the outer surface 12 with respect to the mold panel 2, and the combined state is maintained and the base plate 6 is moved. Regulated and combined.

ベースプレート6には、取付孔32を挟む上下領域の対称位置に第1ウェブ係合部34及び第2ウェブ係合部35が形成される。第1ウェブ係合部34及び第2ウェブ係合部35は、上述した型枠パネル2の外側面12から突出したウェブ5の第1ベースプレート係合部25及び第2ベースプレート係合部26にそれぞれ対応して形成された部位である。第1ウェブ係合部34及び第2ウェブ係合部35は、第1ベースプレート係合部25及び第2ベースプレート係合部26を嵌挿させる切欠き幅を有しかつこれら第1ベースプレート係合部25及び第2ベースプレート係合部26の高さよりも大きな長さを有する高さ方向のスリットとして形成されてなる。   In the base plate 6, a first web engagement portion 34 and a second web engagement portion 35 are formed at symmetrical positions in the upper and lower regions sandwiching the attachment hole 32. The first web engaging portion 34 and the second web engaging portion 35 are respectively formed on the first base plate engaging portion 25 and the second base plate engaging portion 26 of the web 5 protruding from the outer surface 12 of the mold panel 2 described above. It is the part formed correspondingly. The first web engaging portion 34 and the second web engaging portion 35 have a notch width into which the first base plate engaging portion 25 and the second base plate engaging portion 26 are inserted, and these first base plate engaging portions. 25 and a slit in the height direction having a length larger than the height of the second base plate engagement portion 26.

ベースプレート6は、第1ウェブ係合部34と第2ウェブ係合部35を上述した形状のスリットとして形成することで、組み合わされる型枠パネル2やウェブ組4に多少の位置ズレが生じていてもウェブ5の第1ベースプレート係合部25及び第2ベースプレート係合部26の嵌挿操作が容易に行われるようにする。なお、第1ウェブ係合部34と第2ウェブ係合部35は、上述した形状に限定されないことは勿論であり、例えばウェブ5の第1ベースプレート係合部25及び第2ベースプレート係合部26を側方から嵌挿させるように一方側を側方に開放した切欠き部により構成してもよい。   In the base plate 6, the first web engaging portion 34 and the second web engaging portion 35 are formed as the slits having the above-described shape, so that some misalignment occurs in the formwork panel 2 and the web set 4 to be combined. In addition, the first base plate engaging portion 25 and the second base plate engaging portion 26 of the web 5 are easily inserted and inserted. Needless to say, the first web engaging portion 34 and the second web engaging portion 35 are not limited to the shapes described above. For example, the first base plate engaging portion 25 and the second base plate engaging portion 26 of the web 5 are used. You may comprise by the notch part which open | released one side to the side so that may be inserted from the side.

ベースプレート6には、長さ方向の両側縁部位に沿って直角に折曲された部位からなる第1係合フランジ部36と第2係合フランジ部37が形成される。第1係合フランジ部36と第2係合フランジ部37は、上述した型枠パネル2のベースプレート組付部13に形成した第1ベース嵌合スリット17及び第2ベース嵌合スリット18にそれぞれ対応して形成された部位である。第1係合フランジ部36と第2係合フランジ部37は、上述したようにベースプレート6が第1ベース嵌合スリット17や第2ベース嵌合スリット18のスリット長よりもやや小さい長さとされることから、その長さも第1ベース嵌合スリット17や第2ベース嵌合スリット18のスリット長よりもやや小さい。   The base plate 6 is formed with a first engagement flange portion 36 and a second engagement flange portion 37 that are formed by bending at right angles along both side edge portions in the length direction. The 1st engagement flange part 36 and the 2nd engagement flange part 37 respond | correspond to the 1st base fitting slit 17 and the 2nd base fitting slit 18 which were formed in the baseplate assembly | attachment part 13 of the formwork panel 2 mentioned above, respectively. It is the site | part formed. As described above, the first engagement flange portion 36 and the second engagement flange portion 37 have a length slightly shorter than the slit lengths of the first base fitting slit 17 and the second base fitting slit 18 in the base plate 6. Therefore, the length is also slightly smaller than the slit lengths of the first base fitting slit 17 and the second base fitting slit 18.

ベースプレート6は、ウェブ組4が組み付けられた型枠パネル2に対してその外側面12からベースプレート組付部13に組み付けられることにより、ウェブ組4のウェブ5を型枠パネル2と一体化させる。ベースプレート6は、例えば第1係合フランジ部36と第2係合フランジ部37の下方部位を型枠パネル2の相対する第1ベース嵌合スリット17と第2ベース嵌合スリット18に相対係合させるようにして、型枠パネル2に組み合わせる。ベースプレート6は、この状態で第1ウェブ係合部34と第2ウェブ係合部35が、型枠パネル2の外側面12から突出したウェブ5の相対する第1ベースプレート係合部25と第2ベースプレート係合部26と対向位置される。   The base plate 6 is assembled to the base plate assembling portion 13 from the outer surface 12 of the base plate 6 to which the web set 4 is assembled, thereby integrating the web 5 of the web set 4 with the form panel 2. For example, the base plate 6 is relatively engaged with the first base fitting slit 17 and the second base fitting slit 18 of the mold panel 2 at lower portions of the first engagement flange portion 36 and the second engagement flange portion 37. In such a manner, it is combined with the formwork panel 2. In this state, the first web engaging portion 34 and the second web engaging portion 35 are opposed to the first base plate engaging portion 25 and the second opposing web 5 protruding from the outer surface 12 of the mold panel 2. It is positioned opposite to the base plate engaging portion 26.

ベースプレート6は、係合された第1係合フランジ部36及び第2係合フランジ部37と第1ベース嵌合スリット17と第2ベース嵌合スリット18をガイドとして上方部位を外側面12側へと回動させるようにすることにより、第1ウェブ係合部34及び第2ウェブ係合部35にウェブ5の第1ベースプレート係合部25及び第2ベースプレート係合部26が嵌合して組み合わせが行われる。ベースプレート6は、取付ナット部材33がナット嵌合凹部14に相対係合することにより、型枠パネル2に対してその外側面12に位置決めされて組み付けられる。   The base plate 6 has an upper portion toward the outer surface 12 side with the engaged first and second engaging flange portions 36 and 37, the first base fitting slit 17, and the second base fitting slit 18 as a guide. The first base plate engaging portion 25 and the second base plate engaging portion 26 of the web 5 are fitted and combined with the first web engaging portion 34 and the second web engaging portion 35. Is done. The base plate 6 is positioned and assembled to the outer surface 12 with respect to the mold panel 2 when the mounting nut member 33 is relatively engaged with the nut fitting recess 14.

ベースプレート6は、これによりウェブ5に対して一種のかんぬき作用を奏してウェブ5が型枠パネル2から脱落しないように保持する。ベースプレート6は、ウェブ5の突き当て部位28との間で型枠パネル2を厚み方向に挟み込むことにより、ウェブ5、換言すればウェブ組4と共同して型枠1を組み立てた状態に保持する。   Accordingly, the base plate 6 holds a kind of punching action on the web 5 so that the web 5 does not fall off the formwork panel 2. The base plate 6 holds the mold frame 1 in an assembled state with the web 5, in other words, the web assembly 4, by sandwiching the mold panel 2 in the thickness direction between the base plate 6 and the abutting portion 28 of the web 5. .

なお、ベースプレート6は、上述した回動操作による型枠パネル2への組み付け方法に限定されないことは勿論である。ベースプレート6は、例えば第1係合フランジ部36及び第2係合フランジ部37と第1ベース嵌合スリット17と第2ベース嵌合スリット18をガイドとして、型枠パネル2に沿ってスライド操作することにより組み付けることも可能である。また、ベースプレート6は、その他適宜の方法により組付を行って型枠パネル2と各ウェブ組4を一体化するようにしてもよい。   Needless to say, the base plate 6 is not limited to the above-described method of assembling the form plate 2 by the turning operation. The base plate 6 is slid along the formwork panel 2 using, for example, the first engagement flange portion 36 and the second engagement flange portion 37, the first base fitting slit 17, and the second base fitting slit 18 as a guide. It is also possible to assemble by. Further, the base plate 6 may be assembled by any other appropriate method so that the formwork panel 2 and each web set 4 are integrated.

また、ベースプレート6は、上述した型枠パネル2に組み付けて型枠1を組み立てた後に、例えばキャビティ10内に補強材等を追加する必要が生じた場合でもその対応を可能とする。ベースプレート6は、組み付け操作と逆の手順により型枠パネル2の外側面12に沿って上方へと移動させかつ回動操作することによりウェブ5の保持状態を解除してウェブ組4から型枠パネル2の取り外しを可能とさせる。   Further, the base plate 6 can cope with a case where, for example, it is necessary to add a reinforcing material or the like in the cavity 10 after assembling the mold 1 by assembling the base plate 6. The base plate 6 is moved upward along the outer side surface 12 of the formwork panel 2 by the procedure reverse to the assembling operation and is turned to release the holding state of the web 5 from the web set 4 to the formwork panel. 2 can be removed.

型枠1においては、上述したように構成された第1型枠パネル2Aと第2型枠パネル2Bを、X字状に組み合わせてなる第1ウェブ5A及び第2ウェブ5Bを1組としたウェブ組4と第1ベースプレート6A及び第2ベースプレート6Bにより構成される複数の連結機構3により、相対する内側面を所定の間隔に保持してキャビティ10を構成して組み立てが行われる。型枠1の組立工程は、配筋作業の効率化等を考慮して第1型枠パネル2A或いは第2型枠パネル2Bの一方、例えば第2ウェブ5B側に予め連結機構3の組み付けが行われる。   In the formwork 1, the web which made the 1st web 5A and 2nd web 5B which combined the 1st formwork panel 2A and the 2nd formwork panel 2B which were comprised as mentioned above in X shape one set. Assembling is performed by configuring the cavity 10 with the inner surfaces facing each other at a predetermined interval by the plurality of coupling mechanisms 3 configured by the set 4, the first base plate 6A, and the second base plate 6B. In the assembly process of the mold 1, the coupling mechanism 3 is assembled in advance on one of the first mold panel 2 </ b> A or the second mold panel 2 </ b> B, for example, the second web 5 </ b> B in consideration of the efficiency of the bar arrangement work. Is called.

型枠1の組立工程は、第2型枠パネル2Bの内側面11Bに複数のウェブ組4をそれぞれベースプレート組付部13Bと対向位置するように並べて組み付ける。型枠1の組立工程は、第2型枠パネル2Bに対して各ウェブ組4が、第1ウェブ嵌挿スリット15B或いは第2ウェブ嵌挿スリット16Bに相対する第1ウェブ5Aの第1ベースプレート係合部25B及び第2ウェブ5Bの第2ベースプレート係合部26Bを嵌挿し、それぞれの嵌挿部位29をベースプレート組付部13Bから外側面12Bに突出させて組み付ける。   In the assembly process of the mold 1, the plurality of web sets 4 are arranged side by side on the inner surface 11 </ b> B of the second mold panel 2 </ b> B so as to face the base plate assembly 13 </ b> B. The process of assembling the mold 1 involves the first base plate of the first web 5A in which each web set 4 is opposed to the first web insertion slit 15B or the second web insertion slit 16B with respect to the second mold panel 2B. The mating portion 25B and the second base plate engaging portion 26B of the second web 5B are fitted and inserted, and the respective fitting insertion portions 29 are projected from the base plate assembling portion 13B to the outer surface 12B and assembled.

型枠1の組立工程は、第2型枠パネル2Bに対して第2ベースプレート6Bが、第1ウェブ係合部34B及び第2ウェブ係合部35Bにそれぞれ相対する第1ウェブ5Aの第1ベースプレート係合部25B及び第2ウェブ5Bの第2ベースプレート係合部26Bを係合させて組み付ける。型枠1の組立工程は、これにより第2型枠パネル2Bに対してその内側面11B側に長さ方向に並んで複数のウェブ組4を一体化させる。   In the assembly process of the mold 1, the second base plate 6B is opposed to the first web engaging part 34B and the second web engaging part 35B with respect to the second mold panel 2B. The engaging portion 25B and the second base plate engaging portion 26B of the second web 5B are engaged and assembled. In the assembly process of the mold 1, the plurality of web sets 4 are thereby integrated in the longitudinal direction on the inner surface 11 </ b> B side with respect to the second mold panel 2 </ b> B.

型枠1の組立工程は、それぞれウェブ組4を一体化した多数の第2型枠パネル2Bが、縦筋8Aを立設したベースコンクリート7上に左右に並べて設置される。型枠1の組立工程は、ベースコンクリート7上に設置された桟木43に沿って、上述した作業によりそれぞれウェブ組4の組付が行われた多数の第2型枠パネル2Bが設置される。型枠1の組立工程は、隣り合う第2型枠パネル2Bが長さ方向の側縁部に相対して形成された嵌合部19を突き合わせてそれぞれの嵌合凸部と嵌合凹部を嵌合することにより組み合せが行われる。なお、型枠1の組立工程は、第2型枠パネル2Bの組み合わせに際して、相対する側縁部に形成したベースプレート組付部半体が突き合わされて構成したベースプレート組付部にウェブ組4の組み付けが行われる。   In the assembly process of the mold 1, a large number of second mold panels 2 </ b> B each integrating the web set 4 are arranged side by side on the base concrete 7 in which the vertical bars 8 </ b> A are erected. In the assembly process of the mold 1, a large number of second mold panels 2 </ b> B each having the web assembly 4 assembled by the above-described operation are installed along the pier 43 installed on the base concrete 7. In the assembly process of the mold 1, the adjacent second mold panel 2B abuts the fitting portion 19 formed opposite to the side edge in the length direction and fits the fitting convex portion and the fitting concave portion. The combination is performed by combining. The assembly process of the mold 1 is performed by assembling the web assembly 4 to the base plate assembly portion formed by abutting the base plate assembly portion halves formed on the opposite side edges when the second mold panel 2B is assembled. Is done.

型枠1の組立工程は、長さ方向に並べて設置した第2型枠パネル2Bに沿って、縦筋8Aに対して横筋8Bを適宜配筋してなる鉄筋組8が設置される。型枠1の組立工程は、一方側が開放されかつ上述したウェブ組4の構成から横筋8Bを通す充分なスペースが確保されることにより、効率的に配筋作業を行うことが可能である。   In the assembling process of the mold 1, a reinforcing bar set 8 is installed along the second mold panel 2 </ b> B arranged side by side in the length direction. The assembling process of the mold 1 can efficiently perform the bar-laying work by opening one side and securing a sufficient space through the transverse bar 8B from the configuration of the web set 4 described above.

型枠1の組立工程は、長さ方向に並べて設置し内側面11Bに沿って配筋を施した第2型枠パネル2Bに対向して、第1型枠パネル2Aが並べられて設置される。型枠1の組立工程は、第1型枠パネル2Aも、ベースコンクリート7上に第2型枠パネル2B側の桟木43と所定の対向間隔を以って設置された桟木43に沿って設置される。型枠1の組立工程は、各第1型枠パネル2Aが、相対する第2型枠パネル2Bに組み付けたウェブ組4をベースプレート組付部13Aにそれぞれ対向位置させて対向設置される。   In the assembly process of the mold 1, the first mold panel 2 </ b> A is arranged side by side so as to face the second mold panel 2 </ b> B arranged in the length direction and arranged along the inner side surface 11 </ b> B. . In the assembling process of the mold 1, the first mold panel 2 </ b> A is also installed along the pier 43 installed on the base concrete 7 with a predetermined distance from the pier 43 on the second mold panel 2 </ b> B side. The In the assembly process of the mold 1, each first mold panel 2 </ b> A is placed opposite to each other with the web set 4 assembled to the opposing second mold panel 2 </ b> B facing the base plate assembly portion 13 </ b> A.

型枠1の組立工程は、第1型枠パネル2Aに対して各ウェブ組4が、第1ウェブ嵌挿スリット15A或いは第2ウェブ嵌挿スリット16Aに相対する第1ウェブ5Aの第1ベースプレート係合部25A及び第2ウェブ5Bの第2ベースプレート係合部26Aを嵌挿させ、図8に示すようにそれぞれの嵌挿部位29をベースプレート組付部13Aから外側面12Aに突出させて組み付ける。型枠1の組立工程は、第1型枠パネル2Aに対してその外側面12A側から第1ベースプレート6Aの組付が行われ、この第1ベースプレート6Aにより第1型枠パネル2Aに対してウェブ組4が固定されるようにする。   In the assembly process of the mold 1, each web set 4 with respect to the first mold panel 2 </ b> A is associated with the first base plate of the first web 5 </ b> A facing the first web insertion slit 15 </ b> A or the second web insertion slit 16 </ b> A. The mating portion 25A and the second base plate engaging portion 26A of the second web 5B are fitted and inserted, and as shown in FIG. 8, each fitting insertion portion 29 is projected from the base plate assembling portion 13A to the outer surface 12A and assembled. The assembly process of the mold 1 is performed by assembling the first base plate 6A from the outer surface 12A side to the first mold panel 2A, and the first base plate 6A allows the web to the first mold panel 2A. Set 4 is fixed.

型枠1の組立工程は、第1型枠パネル2Aに対して第1ベースプレート6Aが、図9に示すように第1係合フランジ部36と第2係合フランジ部37の下方部位をそれぞれ型枠パネル2の相対する第1ベース嵌合スリット17と第2ベース嵌合スリット18に相対係合させる。型枠1の組立工程は、この際に第2ベースプレート係合部26Aを相対する第2ウェブ係合部35Aに嵌挿させる。型枠1の組立工程は、同図矢印で示すように、第1ベースプレート6Aの上方部位を第1型枠パネル2A側へと回動操作する。型枠1の組立工程は、これにより第1ベースプレート係合部25Aが相対する第1ウェブ係合部34Aを嵌挿し、第1型枠パネル2Aに対して第1ベースプレート6Aの組付が行われる。型枠1の組立工程は、第1ベースプレート6Aを介して第1型枠パネル2Aに対してウェブ組4が固定され、ウェブ組4を介して第2型枠パネル2Bに対向して第1型枠パネル2Aが設置される。   In the assembling process of the mold 1, the first base plate 6 </ b> A forms the lower part of the first engagement flange 36 and the second engagement flange 37 as shown in FIG. 9 with respect to the first mold panel 2 </ b> A. The first base fitting slit 17 and the second base fitting slit 18 facing each other of the frame panel 2 are relatively engaged. In the assembling process of the mold 1, the second base plate engaging portion 26 </ b> A is inserted into the opposing second web engaging portion 35 </ b> A at this time. In the assembly process of the mold 1, as shown by the arrows in the figure, the upper part of the first base plate 6A is rotated to the first mold panel 2A side. In the assembly process of the mold 1, the first web engagement portion 34 </ b> A is opposed to the first base plate engagement portion 25 </ b> A, and the first base plate 6 </ b> A is assembled to the first mold panel 2 </ b> A. . In the assembly process of the mold 1, the web set 4 is fixed to the first mold panel 2 </ b> A via the first base plate 6 </ b> A, and the first mold is opposed to the second mold panel 2 </ b> B via the web set 4. A frame panel 2A is installed.

型枠1の組立工程は、多数の第1型枠パネル2Aが上述した作業によりそれぞれウェブ組4の組付が行われるとともに、第2型枠パネル2Bと対向してベースコンクリート7上に隣り合って設置されてそれぞれの組み合わせが行われる。型枠1の組立工程は、隣り合う第1型枠パネル2Aが長さ方向の側縁部に相対して形成された嵌合部19を突き合わせてそれぞれの嵌合凸部と嵌合凹部を嵌合することにより組み合せが行われる。なお、型枠1の組立工程においては、第1型枠パネル2Aの組み合わせに際しても、相対する側縁部に形成したベースプレート組付部半体が突き合わされて構成したベースプレート組付部にウェブ組4の組み付けが行われる。   The assembly process of the mold 1 is performed by assembling the web assembly 4 on each of the many first mold panels 2A by the above-described operation, and is adjacent to the base concrete 7 so as to face the second mold panel 2B. Each combination is performed. In the assembly process of the mold 1, the adjacent first mold panel 2A is brought into contact with the fitting part 19 formed opposite to the side edge in the length direction, and the fitting convex part and the fitting concave part are fitted. The combination is performed by combining. In the assembly process of the mold 1, the web assembly 4 is attached to the base plate assembly that is formed by abutting the base plate assembly halves formed on the opposite side edges when the first mold panel 2 </ b> A is assembled. Is assembled.

型枠1の組立工程は、上述した作業を経てベースコンクリート7上に、それぞれ複数の第1型枠パネル2Aと第2型枠パネル2Bを長さ方向に組み合わせ、各第1型枠パネル2Aと第2型枠パネル2Bが複数のウェブ組4により所定の対向間隔を以って対向設置されて相対する内側面11間にコンクリートを打設するキャビティ10を構成した第1段型枠1Aを組み立てる。型枠1の組立工程においては、軽量で取り扱いが簡便な第1型枠パネル2Aと第2型枠パネル2Bを用いることにより簡易な作業により型枠1の組立を行うことが可能である。型枠1の組立工程においては、一方の型枠パネル2を設置した状態で配筋を行うことにより作業の効率化が図られる。なお、型枠1の組立工程は、必要に応じて第1段型枠1A上に第2段型枠1Bを組み立てるようにしてもよい。   The assembly process of the mold 1 is performed by combining the first mold panel 2A and the second mold panel 2B in the length direction on the base concrete 7 through the above-described operations. The second mold panel 2B is opposed to each other by a plurality of web sets 4 with a predetermined facing interval, and a first-stage mold 1A is formed which constitutes a cavity 10 for placing concrete between the opposing inner side surfaces 11. . In the process of assembling the mold 1, it is possible to assemble the mold 1 by a simple operation by using the first mold panel 2 </ b> A and the second mold panel 2 </ b> B that are lightweight and easy to handle. In the assembly process of the mold 1, work efficiency can be improved by performing bar arrangement with one mold panel 2 installed. In the assembly process of the mold 1, the second-stage mold 1 </ b> B may be assembled on the first-stage mold 1 </ b> A as necessary.

以上の組立工程を経て組み立てられた型枠1には、キャビティ10内にコンクリートが打設されるが、従来の一般的な型枠と同様に打設したコンクリートの圧力に対して型枠パネル2を保持する支保構造が付設される。型枠1は、ベースプレート6に対して取付ネジ部材40が着脱され、この取付ネジ部材40を介して支保構造として従来一般に用いられている型枠支保具41が互換使用される。型枠1は、図1に示すように型枠支保具41によって各第1型枠パネル2Aと第2型枠パネル2Bに沿って例えば各パイプ材等の支保材42が付設されてしっかりと保持される。   Concrete is cast into the cavity 10 in the mold 1 assembled through the above assembly process, but the mold panel 2 against the pressure of the concrete cast in the same manner as a conventional general mold. A support structure is provided for holding. A mounting screw member 40 is attached to and detached from the mold plate 1 with respect to the base plate 6, and a mold supporting tool 41 conventionally used as a supporting structure is used interchangeably through the mounting screw member 40. As shown in FIG. 1, the formwork 1 is firmly held by a formwork supporter 41 along with the first formwork panel 2A and the second formwork panel 2B. Is done.

型枠1には、上述したようにベースプレート6に取付孔32が設けられるとともに、取付孔32に対応して内面側に取付ナット部材33が設けられている。型枠1には、ベースプレート6に対して、その外側面から取付孔32に取付ネジ部材40を嵌挿するとともに取付ナット部材33にねじ込むことにより、取付ナット部材33の基端側を所定の長さで突出させる。型枠1は、後述する脱型時に取付ナット部材33をベースプレート6から取り外すことが可能である。   In the mold 1, the mounting hole 32 is provided in the base plate 6 as described above, and the mounting nut member 33 is provided on the inner surface side corresponding to the mounting hole 32. In the mold 1, the base end side of the mounting nut member 33 is fixed to the base plate 6 by inserting a mounting screw member 40 into the mounting hole 32 from the outer surface and screwing into the mounting nut member 33. Let it protrude. The mold 1 can remove the mounting nut member 33 from the base plate 6 at the time of demolding described later.

型枠支保具41は、従来周知の型枠支保具(フォームタイ)が用いられることから詳細を省略するが、ソケット、フォームタイ本体、クランパ等により構成される。型枠支保具41は、ソケットが取付ネジ部材40に着脱され、フォームタイ本体に型枠パネル2を保持する例えば縦支保材42Aと横支保材42Bを格子状に組み合わせた支保材42を組み付けるとともに、フォームタイ本体に対してクランパをネジ込むことにより支保材42をベースプレート6に圧接して保持する。   The formwork support 41 is composed of a socket, a form tie body, a clamper, and the like, although details are omitted since a conventionally known formwork support (form tie) is used. As for the formwork support 41, the socket is attached to and detached from the attachment screw member 40, and for example, the support material 42 that holds the formwork panel 2 on the foam tie body, for example, a combination of the vertical support material 42A and the horizontal support material 42B in a lattice shape, Then, the support member 42 is held in pressure contact with the base plate 6 by screwing the clamper into the foam tie body.

型枠1に対して型枠支保具41を組み付ける工程の概要について、以下説明する。型枠1には、図11に示すようにベースプレート6に対して、その外側面12側から取付孔32に嵌挿された取付ネジ部材40が取付ナット部材33にねじ込まれることによりその先端側を突出させて組み付けられる。型枠1においては、ベースプレート6に取付ナット部材33を設けたことにより、取付ネジ部材40の着脱操作が簡易に行われるとともに強固な組付が行われる。   The outline of the process of assembling the formwork support 41 to the formwork 1 will be described below. As shown in FIG. 11, the mold 1 is attached to the mounting nut member 33 with the mounting screw member 40 fitted into the mounting hole 32 from the outer surface 12 side of the base plate 6. It is assembled with protruding. In the mold 1, the mounting nut member 33 is provided on the base plate 6, so that the mounting screw member 40 can be easily attached / detached and firmly assembled.

型枠1には、取付ネジ部材40にソケットがネジ込まれ、このソケットに一体化されたフォームタイ本体がベースプレート6の外側面12に突出して組み付けられる。型枠1においては、図1及び図11に示すように型枠パネル2の外側面に、長さ方向に対して所定の間隔を以って配列した縦支保材42Aと長さ方向に対して所定の間隔を以って配列した横支保材42Bがフォームタイ本体を介して組み付けられる。型枠1においては、フォームタイ本体に対してクランパがネジ込まれることにより、フォームタイ本体に支持された横支保材42Bが押圧されて縦支保材42Aと共同して型枠パネル2の外側面に圧接されることで、型枠支保具41により支保される。   In the mold 1, a socket is screwed into an attachment screw member 40, and a foam tie body integrated with the socket projects from the outer surface 12 of the base plate 6 and is assembled. In the mold 1, as shown in FIGS. 1 and 11, the longitudinal support 42 </ b> A arranged on the outer surface of the mold panel 2 at a predetermined interval with respect to the length direction and the length direction. The lateral support members 42B arranged with a predetermined interval are assembled through the foam tie body. In the mold 1, when the clamper is screwed into the foam tie body, the lateral support material 42 </ b> B supported by the foam tie body is pressed to cooperate with the vertical support material 42 </ b> A and the outer surface of the mold panel 2. It is supported by the formwork support 41 by being pressed against.

以上の工程を経てベースコンクリート7上に設置された型枠1には、キャビティ10内にコンクリートが打設される。型枠1においては、簡易な構造の第1ウェブ5Aと第2ウェブ5Bからなるウェブ組4とベースプレート6からなる連結機構3により第1型枠パネル2Aと第2型枠パネル2Bの対向間隔を保持してキャビティ10を構成する。型枠1においては、キャビティ10内に充分な配筋スペースが確保されてコンクリートの流動性が充分に保持される。型枠1においては、打設時にコンクリートを固締めするためのバイブレータを用いることも可能である。型枠1においては、これによりジャンカの発生を無くして良好な仕上がりのコンクリート構造物を形成する。型枠1においては、打設されたコンクリートの圧力に対して、上述した連結機構3とともに付設した型枠支保具41により第1型枠パネル2Aと第2型枠パネル2Bがその対向間隔をしっかりと保持される。   The concrete is placed in the cavity 10 on the mold 1 installed on the base concrete 7 through the above steps. In the formwork 1, the opposing space between the first formwork panel 2 </ b> A and the second formwork panel 2 </ b> B is set by the connecting mechanism 3 made of the web set 4 and the base plate 6 made of the first web 5 </ b> A and the second web 5 </ b> B having a simple structure. The cavity 10 is formed by holding. In the mold 1, a sufficient bar arrangement space is secured in the cavity 10 and the fluidity of the concrete is sufficiently maintained. In the mold 1, it is possible to use a vibrator for fastening concrete at the time of placing. In the mold 1, this eliminates the occurrence of junkers and forms a concrete structure with a good finish. In the formwork 1, the first formwork panel 2 </ b> A and the second formwork panel 2 </ b> B are firmly spaced from each other by the formwork support 41 provided together with the above-described connection mechanism 3 against the pressure of the placed concrete. And held.

型枠1においては、所定の養生期間を経た後の脱型作業を不要として第1型枠パネル2Aと第2型枠パネル2Bがそのままコンクリート躯体9の主面に一体化されてなるコンクリート構造物を形成する。コンクリート構造物は、第1型枠パネル2Aと第2型枠パネル2B或いはウェブ組4が鉄筋組8とともにコンクリート躯体9の補強機能を奏し、機械的強度の向上が図られる。コンクリート構造物は、第1型枠パネル2Aと第2型枠パネル2Bが断熱材として機能し、断熱材の貼込み作業を不要として工期の短縮化や施工コストの低減が図られ、断熱性の向上とともに遮音性、高気密性、耐火性、換気性、耐久性或いは耐震性の向上が図られる。   In the formwork 1, a concrete structure in which the first formwork panel 2 </ b> A and the second formwork panel 2 </ b> B are integrated as they are on the main surface of the concrete frame 9 without the need for demolding after a predetermined curing period. Form. In the concrete structure, the first form panel 2A and the second form panel 2B or the web set 4 have the reinforcing function of the concrete frame 9 together with the reinforcing bar set 8, and the mechanical strength is improved. In the concrete structure, the first formwork panel 2A and the second formwork panel 2B function as a heat insulating material, and it is possible to shorten the construction period and reduce the construction cost by eliminating the need to paste the heat insulating material. In addition to improvement, sound insulation, high airtightness, fire resistance, ventilation, durability, or earthquake resistance are improved.

型枠1においては、型枠パネル2の外側面に組み合わせた各型枠支保具41の取り外しが行われる。型枠支保具41は、クランパを緩めて支保材42を取り外した後に、フォームタイ本体を設けたソケットのベースプレート6に組み付けた取付ネジ部材40からの取り外しが行われる。型枠1においては、取付ネジ部材40のベースプレート6からの取り外しが行われる。型枠1においては、ベースプレート6の取付孔32に取付ナット部材33を設けたことにより、従来の型枠支保具41をそのまま用いて簡易な作業により着脱が簡易に行われ、作業効率の向上が図られる。   In the formwork 1, each formwork support 41 combined with the outer surface of the formwork panel 2 is removed. The formwork support 41 is removed from the mounting screw member 40 assembled to the base plate 6 of the socket provided with the foam tie body after the clamper is loosened and the support material 42 is removed. In the mold 1, the attachment screw member 40 is removed from the base plate 6. In the mold 1, the mounting nut member 33 is provided in the mounting hole 32 of the base plate 6, so that the conventional mold support 41 is used as it is and can be easily attached and detached to improve work efficiency. Figured.

本発明は、上述した実施の形態として示した型枠1に限定されるものでは無く、特許請求の範囲及びその主旨を逸脱することなく、構成要件について様々な変更、置換が行われることは勿論である。   The present invention is not limited to the mold 1 shown as the embodiment described above, and various changes and substitutions can be made to the constituent elements without departing from the scope and spirit of the claims. It is.

1 コンクリート打設用型枠(型枠)、2 型枠パネル、3 連結機構、4 ウェブ組、5 ウェブ、6 ベースプレート、9 コンクリート躯体、10 キャビティ、11 内側面、12 外側面、13 ベースプレート組付部、14 ナット嵌合凹部、15 第1ウェブ嵌挿スリット、16 第2ウェブ嵌挿スリット、17 第1ベース嵌合スリット、18 第2ベース嵌合スリット、19 嵌合部、20 外側嵌合凸部、21 外側嵌合凹部、22 内側嵌合凸部、23 内側嵌合凹部、24 梁部、25 第1ベースプレート係合部、26 第2ベースプレート係合部、27 連結孔、28 突当て部位、29 嵌挿部位、30 係合溝、32 取付孔、33 取付ナット部材、34 第1ウェブ係合部、35 第2ウェブ係合部、36 第1係合フランジ部、37 第2係合フランジ部、40 取付ネジ部材、41 型枠支保具、42 支保材   DESCRIPTION OF SYMBOLS 1 Formwork for concrete placement (formwork), 2 formwork panel, 3 connection mechanism, 4 web assembly, 5 web, 6 base plate, 9 concrete frame, 10 cavity, 11 inner side surface, 12 outer side surface, 13 base plate assembly Part, 14 nut fitting recessed part, 15 1st web fitting insertion slit, 16 2nd web fitting insertion slit, 17 1st base fitting slit, 18 2nd base fitting slit, 19 fitting part, 20 outer fitting convex Part, 21 outer fitting concave part, 22 inner fitting convex part, 23 inner fitting concave part, 24 beam part, 25 first base plate engaging part, 26 second base plate engaging part, 27 connecting hole, 28 abutting part, 29 fitting insertion site, 30 engaging groove, 32 mounting hole, 33 mounting nut member, 34 first web engaging portion, 35 second web engaging portion, 36 first engaging flange , 37 second engaging flange section, 40 mounting screw member, 41 Formwork 支保 instrument, 42 pre-supports

Claims (5)

それぞれの外側面の相対する位置に複数のベースプレート組付部が長さ方向に並んで形成されるとともに、これらベースプレート組付部にそれぞれ第1ウェブ嵌挿スリットと第2ウェブ嵌挿スリットを形成してなり、所定の対向間隔を以って対向設置することにより相対する内側面間にコンクリートを打設するキャビティを構成する発泡合成樹脂製の第1型枠パネル及び第2型枠パネルと、
中央部を連結されてX字状に組み合わされる第1ウェブと第2ウェブを1組として上記キャビティ内にそれぞれ上記ベースプレート組付部に対向位置して設置されることにより上記第1型枠パネルと上記第2型枠パネルの対向間隔を保持する複数のウェブ組と、
上記第1型枠パネル及び上記第2型枠パネルの上記ベースプレート組付部にそれぞれ組み付けて相対する上記第1ウェブ及び上記第2ウェブを上記第1型枠パネル及び上記第2型枠パネルと一体化させる複数の第1ベースプレート及び複数の第2ベースプレートを備え、
上記第1ウェブ及び上記第2ウェブには、それぞれの両端部に上記第1型枠パネル又は上記第2型枠パネルの上記ベースプレート組付部に相対して形成した上記第1ウェブ嵌挿スリット又は上記第2ウェブ嵌挿スリットに嵌挿されて上記外側面へと突出する第1ベースプレート係合部及び第2ベースプレート係合部が形成され、
上記第1ベースプレート及び上記第2ベースプレートには、上記第1ウェブ嵌挿スリット又は上記第2ウェブ嵌挿スリットを貫通して上記第1型枠パネル又は上記第2型枠パネルの外側面に突出した上記第1ウェブ及び上記第2ウェブの上記第1ベースプレート係合部及び上記第2ベースプレート係合部に相対して第1ウェブ係合部及び第2ウェブ係合部が形成され、
上記第1型枠パネルと上記第2型枠パネルが、上記第1ウェブ嵌挿スリット又は上記第2ウェブ嵌挿スリットに上記第1ウェブと上記第2ウェブの上記第1ベースプレート係合部及び上記第2ベースプレート係合部を嵌挿させて組み合わせた上記ウェブ組により相対する内側面間に上記キャビティを構成して対向間隔を保持され、
上記ウェブ組の上記第1ウェブと上記第2ウェブが、上記第1型枠パネル及び上記第2型枠パネルの外側面に突出した上記第1ベースプレート係合部及び上記第2ベースプレート係合部を、上記ベースプレート組付部に組み付けた上記第1ベースプレート及び上記第2ベースプレートの上記第1ウェブ係合部及び上記第2ウェブ係合部に係合させることにより保持されて組み合わされるコンクリート打設用型枠。
A plurality of base plate assembly parts are formed side by side in the lengthwise direction at opposite positions of the respective outer surfaces, and a first web insertion slit and a second web insertion slit are formed in these base plate assembly parts, respectively. A first formwork panel and a second formwork panel made of foamed synthetic resin, which constitute a cavity for placing concrete between opposing inner surfaces by facing each other with a predetermined facing distance;
The first mold panel and the first web and the second web, which are combined in an X shape by connecting the central portions, are disposed in the cavity so as to face each of the base plate assembly portions. A plurality of web sets that hold the opposing spacing of the second formwork panel;
The first web and the second web that are assembled and opposed to the base plate assembling part of the first mold panel and the second mold panel are integrated with the first mold panel and the second mold panel, respectively. Including a plurality of first base plates and a plurality of second base plates
In the first web and the second web, the first web insertion slit or the first web insertion slit formed on both ends of the first web and the base plate assembly of the second mold panel or the second web, respectively. A first base plate engaging portion and a second base plate engaging portion that are inserted into the second web insertion slit and project to the outer surface are formed,
The first base plate and the second base plate project through the first web insertion slit or the second web insertion slit and protrude to the outer surface of the first form panel or the second form panel. A first web engaging portion and a second web engaging portion are formed opposite to the first base plate engaging portion and the second base plate engaging portion of the first web and the second web,
The first mold panel and the second mold panel are connected to the first web fitting slit or the second web fitting slit, and the first base plate engaging portion of the first web and the second web, and the second web fitting slit. The opposing space is maintained by configuring the cavity between the inner surfaces facing each other by the web set in which the second base plate engaging portion is inserted and combined,
The first base plate engaging portion and the second base plate engaging portion in which the first web and the second web of the web set protrude on the outer surfaces of the first mold panel and the second mold panel. A concrete casting mold that is held and combined by engaging the first web engaging portion and the second web engaging portion of the first base plate and the second base plate assembled to the base plate assembling portion. frame.
上記第1型枠パネル及び上記第2型枠パネルは、外周縁部に嵌合部が形成されるとともに、相対する嵌合部を嵌合することにより外周縁部を突き合わせて多数枚が上下左右に組み合わされて設置され、
上記嵌合部が、パネル厚の1/2の内側領域と外側領域のそれぞれに、嵌合凸部と、この嵌合凸部とほぼ同等の開口寸法を有する嵌合凹部を長さ方向の全域に亘って交互に形成してなる内側嵌合部と外側嵌合部から構成されるとともに、これら内側嵌合部と外側嵌合部の上記嵌合凸部と上記嵌合凹部とが対向位置するように1ピッチ分ずれて形成されてなり、
上下を反転させた状態で上下左右に組み合わされる請求項1に記載のコンクリート打設用型枠。
The first formwork panel and the second formwork panel have a fitting portion formed on the outer peripheral edge portion, and the outer peripheral edge portions are brought into contact with each other by fitting the opposing fitting portions so that a plurality of sheets are vertically and horizontally Installed in combination with
The fitting portion has a fitting convex portion and a fitting concave portion having an opening size substantially equal to the fitting convex portion in each of the inner region and the outer region which are ½ of the panel thickness. The inner fitting portion and the outer fitting portion are alternately formed over the inner fitting portion, and the fitting convex portion and the fitting concave portion of the inner fitting portion and the outer fitting portion are opposed to each other. As shown in FIG.
The concrete placement form according to claim 1, which is combined vertically and horizontally with the top and bottom reversed.
上記第1ウェブ及び上記第2ウェブは、所定の厚みを有する金属板材を素材とし、中央部に結合部を形成するとともに両端部に上記第1ベースプレート係合部と上記第2ベースプレート係合部を形成し、反転した状態で相対する上記結合部を結合してX字状に組み合わされる同一部材が用いられ、
組み合わせ角度を調整自在とする上記結合部を介して結合される請求項1又は請求項2に記載のコンクリート打設用型枠。
The first web and the second web are made of a metal plate material having a predetermined thickness, and a coupling portion is formed in the central portion, and the first base plate engagement portion and the second base plate engagement portion are formed at both ends. The same member that is formed and combined in an X shape by connecting the above-described connecting portions in an inverted state is used,
The formwork for concrete placement according to claim 1 or 2, which is coupled through the coupling portion that allows adjustment of a combination angle.
上記第1ベースプレートと上記第2ベースプレートは、上記第1ウェブ係合部及び上記第2ウェブ係合部が、相対係合される上記第1ベースプレート係合部及び上記第2ベースプレート係合部よりも大きなスリット長を有して形成されることにより、その差の範囲で移動されることにより上記第1ウェブ又は上記第2ウェブの保持状態を解除自在とされ、
上記第1ウェブ又は上記第2ウェブのいずれか一方の保持状態を解除することにより、上記第1型枠パネル又は第2型枠パネルの取り外しが行われる請求項1乃至請求項3のいずれか1項に記載のコンクリート打設用型枠。
The first base plate and the second base plate are configured so that the first web engaging portion and the second web engaging portion are more engaged than the first base plate engaging portion and the second base plate engaging portion, which are relatively engaged with each other. By being formed with a large slit length, the holding state of the first web or the second web can be released by moving within the range of the difference,
4. The detachment of the first form panel or the second form panel is performed by releasing the holding state of either the first web or the second web. The formwork for concrete placement as described in the item.
上記第1ベースプレートと上記第2ベースプレートには、少なくとも長さ方向のほぼ中央に位置して厚み方向に貫通する貫通孔が形成されるとともに、上記第1型枠パネルと上記第2型枠パネルとの対向面に上記貫通孔と同心状態で取付ナット部材が設けられ、
上記貫通孔から嵌挿されて上記取付ナット部材にネジ込んだ取付ネジ部材を介して、上記型枠パネルの外側面を保持する型枠支保具の組付が行われる請求項1乃至請求項4のいずれか1項に記載のコンクリート打設用型枠。
In the first base plate and the second base plate, a through hole is formed at least approximately in the center in the length direction and penetrates in the thickness direction. The first mold panel and the second mold panel A mounting nut member is provided concentrically with the through hole on the opposite surface of
The formwork supporting tool for holding the outer surface of the formwork panel is assembled through an attachment screw member that is inserted from the through hole and screwed into the attachment nut member. The formwork for concrete placement as described in any one of the above.
JP2009277435A 2009-12-07 2009-12-07 Concrete formwork Expired - Fee Related JP5450016B2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2009277435A JP5450016B2 (en) 2009-12-07 2009-12-07 Concrete formwork
KR1020100050257A KR100997170B1 (en) 2009-12-07 2010-05-28 Formwork for casting concrete
CN2010105485763A CN102086671B (en) 2009-12-07 2010-11-15 Formwork for casting concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009277435A JP5450016B2 (en) 2009-12-07 2009-12-07 Concrete formwork

Publications (2)

Publication Number Publication Date
JP2011117241A JP2011117241A (en) 2011-06-16
JP5450016B2 true JP5450016B2 (en) 2014-03-26

Family

ID=43410206

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009277435A Expired - Fee Related JP5450016B2 (en) 2009-12-07 2009-12-07 Concrete formwork

Country Status (3)

Country Link
JP (1) JP5450016B2 (en)
KR (1) KR100997170B1 (en)
CN (1) CN102086671B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023096531A1 (en) * 2021-11-29 2023-06-01 Общество с ограниченной ответственностью "Аэрокарбон Глобал" Modular enclosing structure and structural module thereof

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101203298B1 (en) * 2012-03-22 2012-11-21 주식회사 예스스틸 Form for construction work
KR101247837B1 (en) 2012-05-30 2013-03-26 주식회사 예스스틸 Form for construction work
KR101476665B1 (en) 2012-11-23 2015-01-06 주식회사 예스스틸 Both-sided insulated form for construction work integrating insulation
US10487501B2 (en) * 2014-10-15 2019-11-26 Twinwall Icf Limited Formwork system
JP6655320B2 (en) * 2015-07-31 2020-02-26 正 斉原 Supporting member, concrete casting formwork, and method of building concrete structure
CN105332450B (en) * 2015-11-25 2017-09-26 沈阳建筑大学 A kind of exterior wall disassembly-free thermal-insulation form board quickly assembled
CN106014455B (en) * 2016-07-15 2018-07-10 湖南远东钢模有限公司 A kind of ditch cable trench trolley box template
US11352787B2 (en) * 2019-06-18 2022-06-07 Victor Amend Concrete form panel, and concrete formwork comprising same
CN115898017B (en) * 2022-09-26 2023-10-31 广东科信工程管理有限公司 Building engineering template fixing equipment

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08246579A (en) * 1995-03-08 1996-09-24 Kaapura:Kk Thickness adjusting apparatus for wall structure unit and thickness adjusting method using it
CA2312158C (en) 2000-02-11 2003-11-04 Polyform A.G.P. Inc. Stackable construction panel
CA2358195C (en) * 2001-05-04 2007-12-18 Polyform A.G.P. Inc. Improvements in a stackable construction panel system
JP2006112090A (en) * 2004-10-13 2006-04-27 Tadashi Saihara Concrete placing form
JP4169159B2 (en) 2005-05-02 2008-10-22 正 斉原 Concrete formwork
JP4546979B2 (en) 2007-02-09 2010-09-22 昌道 石山 Formwork member having attachment means and concrete wall forming method
CN201043353Y (en) * 2007-06-07 2008-04-02 中国建筑第七工程局 Architect guide template

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023096531A1 (en) * 2021-11-29 2023-06-01 Общество с ограниченной ответственностью "Аэрокарбон Глобал" Modular enclosing structure and structural module thereof

Also Published As

Publication number Publication date
CN102086671A (en) 2011-06-08
JP2011117241A (en) 2011-06-16
KR100997170B1 (en) 2010-11-29
CN102086671B (en) 2013-03-27

Similar Documents

Publication Publication Date Title
JP5450016B2 (en) Concrete formwork
WO2017022610A1 (en) Support member, form for placing concrete, and method for constructing concrete structure
KR101479014B1 (en) Nodular Box Girder, and Constructing Method of such Nodular Box Girder
KR101702459B1 (en) Panel fixture for building and construction method for panel assembly for building using that
JP6701236B2 (en) Concrete formwork
KR101203298B1 (en) Form for construction work
JP6655319B2 (en) Construction method of concrete structure and concrete formwork
KR101247837B1 (en) Form for construction work
JP6009411B2 (en) Joint material construction method and joint material support structure
KR101946500B1 (en) Hinged connected CFT column
JP5876300B2 (en) Corner formwork
JP6730404B2 (en) Building joint structure
KR20070117737A (en) Euro type form of concrete form
KR20080087196A (en) The slab and beam form construction table form
JP6106776B2 (en) Support structure and concrete wall construction method
KR100579448B1 (en) Steel mould side reinforcement apparatus for building execution
JP6401535B2 (en) Precast concrete components used for foundation construction
KR102162737B1 (en) Prefabricated wall structure
KR100397580B1 (en) A method of executing a building using an iron reinforcing rod
JP2018123601A (en) Partition panel
JP2909884B2 (en) Formwork equipment
KR20150109876A (en) Conneting member for fixing form and construction method using the same
JP4065271B2 (en) Architectural formwork
JP3198035U (en) Concrete formwork
JP2006257663A (en) Joint structure of precast concrete foundation, and precast concrete foundation

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20121206

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20131122

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131203

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131225

R150 Certificate of patent or registration of utility model

Ref document number: 5450016

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees