JP5075091B2 JP2008279515A JP2008279515A JP5075091B2 JP 5075091 B2 JP5075091 B2 JP 5075091B2 JP 2008279515 A JP2008279515 A JP 2008279515A JP 2008279515 A JP2008279515 A JP 2008279515A JP 5075091 B2 JP5075091 B2 JP 5075091B2
Authority
JP
Japan
Prior art keywords
pile
ground
cast
improved ground
improved
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2008279515A
Other languages
Japanese (ja)
Other versions
JP2010106543A (en
Inventor
政幸 神田
英俊 西岡
勝 舘山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Railway Technical Research Institute
Original Assignee
Railway Technical Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Railway Technical Research Institute filed Critical Railway Technical Research Institute
Priority to JP2008279515A priority Critical patent/JP5075091B2/en
Publication of JP2010106543A publication Critical patent/JP2010106543A/en
Application granted granted Critical
Publication of JP5075091B2 publication Critical patent/JP5075091B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Piles And Underground Anchors (AREA)

Description

この発明は、場所打ち杭の施工方法、特に、改良地盤内に、安定液を使用しないアースドリル工法により杭本体を改良地盤と一体的に構築することによって、アースドリル工法の利点を備え、しかも、杭本体の施工性の向上、杭本体径の縮小化による施工コストの低減、安定液の不使用による杭本体の品質向上、および、杭本体径の擬似的増加による耐震性、水平抵抗等の向上を図ることができる、場所打ち杭の施工方法に関するものである。   This invention has the advantages of the earth drill method by constructing the pile body integrally with the improved ground by the ground drill method that does not use a stabilizing liquid in the improved ground, in particular, in the improved ground. , Improvement of workability of pile body, reduction of construction cost by reducing pile body diameter, improvement of pile body quality by non-use of stabilizing liquid, and earthquake resistance, horizontal resistance, etc. by pseudo increase of pile body diameter The present invention relates to a method for constructing cast-in-place piles that can be improved.

建物の杭基礎工法の一つに、場所打ち杭工法がある。この工法には、アースドリル工法、オールケーシング工法 、リバース工法等がある。場所打ち杭工法は、予め、工場で製造した杭を地中に打ち込む既製杭工法と比べて、以下のような利点を有している。   One of the pile foundation methods for buildings is the cast-in-place pile method. This method includes an earth drill method, an all-casing method, and a reverse method. The cast-in-place pile construction method has the following advantages compared to the ready-made pile construction method in which a pile manufactured in a factory is driven into the ground in advance.

(1)杭径や杭長を自在に選択できる。
(2)大口径、大深度の杭の施工が可能である。
(1) Pile diameter and pile length can be selected freely.
(2) Pile construction with large diameter and depth is possible.

上記アースドリル工法は、地盤をケーシングの建て込み予定深度まで掘削し、掘削孔にケーシングを建て込み、土質に適合した安定液を掘削孔に注入しながらさらに掘削し、予定深度まで掘削した後、地上で組み立てた鉄筋籠を掘削孔内に挿入し、そして、掘削孔内にコンクリートを打設して固化させるものであり、以下のような利点を有している。   The above earth drill method excavates the ground to the planned depth of the casing, lays the casing in the excavation hole, further excavates while injecting a stable liquid suitable for the soil into the excavation hole, after excavating to the planned depth, Reinforcing rods assembled on the ground are inserted into the excavation hole, and concrete is cast into the excavation hole and solidified, and has the following advantages.

(a)低振動・低騒音である。
(b)設備が簡単で施工速度が速く経済的である。
(c)狭い敷地内でも施工可能である。
(A) Low vibration and low noise.
(B) Equipment is simple, construction speed is fast and economical.
(C) Construction is possible even in a small site.

上記アースドリル工法により軟弱地盤に杭を施工する場合には、掘削孔内に注入する安定液の水位を高くするか、ケーシングの建て込み深さを深くし、これにより、掘削孔壁の崩壊を防止して、地盤の安定化を図る必要があった。   When piles are constructed on soft ground by the above-mentioned earth drill method, the level of the stabilizing liquid injected into the drilling hole is increased or the depth of the casing is increased, thereby causing the collapse of the drilling hole wall. It was necessary to prevent and stabilize the ground.

しかしながら、このような対策をとっても十分な地盤の安定化が図れないことがあった。また、所定径で掘削孔を掘削しても、周辺の軟弱地盤が掘削孔壁を押圧して掘削孔を細くする結果、掘削杭径が小さくなって、設計杭径を満足しないことがあった。さらに、安定液が打設コンクリートに混入して、杭本体の品質が低下する恐れがあった。   However, even if such measures are taken, the ground may not be sufficiently stabilized. In addition, even when excavating a drilling hole with a predetermined diameter, the surrounding soft ground pressed the drilling hole wall and narrowed the drilling hole. As a result, the drilling pile diameter was reduced and the design pile diameter was not satisfied. . Furthermore, there was a risk that the quality of the pile body would deteriorate due to the stabilizing liquid mixed into the cast concrete.

このようなことから、既製杭を用いた工法に変更せざるを得ない場合があったが、上述のような利点を有するアースドリル工法を採用することが望まれている。   For this reason, there has been a case where it has been necessary to change to a construction method using a ready-made pile, but it is desired to employ an earth drill construction method having the above-described advantages.

しかしながら、軟弱地盤であっても掘削孔壁を十分に保護することができ、しかも、周辺の軟弱地盤が掘削孔壁を押圧することによる掘削杭径の縮小の問題がなく、さらに、安定液の打設コンクリートへの混入による杭本体の品質の低下の問題がない、アースドリル工法による杭の施工方法は、まだ提案されていない。   However, even in soft ground, the drilling hole wall can be sufficiently protected, and there is no problem of reduction in the diameter of the excavated pile due to the surrounding soft ground pressing the drilling hole wall. There has not yet been proposed a method for constructing a pile by the earth drill method, which does not have a problem of deterioration in the quality of the pile main body due to mixing into the cast concrete.

そこで、本願発明者等は、軟弱地盤であっても掘削孔壁を十分に保護することができ、しかも、周辺の軟弱地盤が掘削孔壁を押圧することによる掘削杭径の縮小の問題がなく、さらに、安定液の打設コンクリートへの混入による杭本体の品質の低下の問題がない、アースドリル工法による杭の施工方法を得るべく、鋭意検討を重ねた。この結果、地盤改良と併用して掘削を行えば、上記問題を全て解決することができるといった知見を得た。   Therefore, the inventors of the present application can sufficiently protect the excavation hole wall even in soft ground, and there is no problem of reduction in the diameter of the excavation pile due to the surrounding soft ground pressing the excavation hole wall. Furthermore, in order to obtain a pile construction method by the earth drill method, there was no problem of deterioration of the pile body quality due to the mixing of the stabilizing liquid into the cast concrete. As a result, we have learned that all of the above problems can be solved by excavating in combination with ground improvement.

この発明は、上記知見に基づきなされたものであって、安定液を使用しないアースドリル工法により、改良地盤内に杭本体を改良地盤と一体的に構築することによって、アースドリル工法の利点を備え、しかも、杭本体の施工性の向上、杭本体径の縮小化による施工コストの低減、安定液の不使用による杭本体の品質向上、および、杭本体径の擬似的増加による耐震性、水平抵抗等の向上を図ることができる、場所打ち杭の施工方法を提供することを目的とする。   This invention has been made on the basis of the above knowledge, and has an advantage of the earth drill method by constructing the pile body integrally with the improved ground in the improved ground by an earth drill method that does not use a stabilizing liquid. In addition, improvement of the workability of the pile body, reduction of construction costs by reducing the diameter of the pile body, improvement of the quality of the pile body by not using a stabilizing liquid, and earthquake resistance and horizontal resistance due to a pseudo increase in the diameter of the pile body It aims at providing the construction method of a cast-in-place pile which can aim at improvement.

この発明は、上記知見に基づきなされたものであって、下記を特徴とするものである。   The present invention has been made on the basis of the above findings, and is characterized by the following.

請求項1に記載の発明は、地盤内に改良地盤を円柱状に構築し、次いで、前記改良地盤の中心部に、安定液を使用することなく掘削孔を形成し、次いで、前記掘削孔内に鉄筋籠を挿入し、そして、前記鉄筋籠が挿入された前記掘削孔内にコンクリートを打設して、前記改良地盤内に前記改良地盤と一体的に杭本体を構築する、場所打ち杭の施工方法において、前記改良地盤内に鉄筋籠を構築し、この後、前記鉄筋籠の内側に前記杭本体を構築することに特徴を有するものである。 In the invention according to claim 1, the improved ground is constructed in a cylindrical shape in the ground, and then a drilling hole is formed in the center of the improved ground without using a stabilizing liquid, The cast-in- place pile is inserted into the excavation hole into which the reinforcing bar is inserted, and a pile body is constructed integrally with the improved ground in the improved ground . The construction method is characterized in that a reinforcing bar is built in the improved ground, and thereafter, the pile main body is built inside the reinforcing bar .

請求項2に記載の発明は、請求項1に記載の、場所打ち杭の施工方法において、前記改良地盤を前記杭本体を構築する深さまで構築することに特徴を有するものである。   The invention according to claim 2 is characterized in that, in the construction method for cast-in-place piles according to claim 1, the improved ground is constructed to a depth at which the pile main body is constructed.

請求項3に記載の発明は、請求項1に記載の、場所打ち杭の施工方法において、前記改良地盤を軟弱地盤層のみに構築することに特徴を有するものである。   The invention according to claim 3 is characterized in that, in the construction method for cast-in-place piles according to claim 1, the improved ground is constructed only in the soft ground layer.

請求項4に記載の発明は、請求項1から3の何れか1つに記載の、場所打ち杭の施工方法において、前記杭本体の径寸法を、前記杭本体の長手方向において同一とすることに特徴を有するものである。   Invention of Claim 4 makes the diameter dimension of the said pile main body the same in the longitudinal direction of the said pile main body in the construction method of a cast-in-place pile as described in any one of Claim 1 to 3. It has the characteristics.

請求項5に記載の発明は、請求項1から3の何れか1つに記載の、場所打ち杭の施工方法において、前記杭本体の径寸法を、前記杭本体の長手方向において部分的に異ならせることに特徴を有するものである。   Invention of Claim 5 is the construction method of a cast-in-place pile as described in any one of Claim 1 to 3, If the radial dimension of the said pile main body is partially different in the longitudinal direction of the said pile main body. It has a characteristic in making it.

この発明によれば、安定液を使用しないアースドリル工法により、改良地盤内に杭本体を改良地盤と一体的に構築することによって、アースドリル工法の利点である、低振動・低操音、設備が簡単で施工速度が速く経済的、狭い敷地内でも施工可能といった利点を備え、しかも、杭本体の施工性の向上、杭本体径の縮小化による施工コストの低減、安定液の不使用による杭本体の品質向上、および、杭本体径の擬似的増加による耐震性、水平抵抗等の向上を図ることができる。   According to the present invention, by constructing the pile main body integrally with the improved ground in the improved ground by an earth drill method that does not use a stabilizer, the low-vibration / low-noise operation, equipment that is an advantage of the ground drill method Is easy, fast and economical, and has the advantages of being able to work even in a small site. In addition, it improves the workability of the pile body, reduces the construction cost by reducing the pile body diameter, and does not use a stable liquid. It is possible to improve the quality of the main body, and improve the earthquake resistance, horizontal resistance, etc. due to the pseudo increase in the pile main body diameter.

この発明の、場所打ち杭の施工方法の一実施態様を、図面を参照しながら説明する。   One embodiment of the method for constructing cast-in-place piles of the present invention will be described with reference to the drawings.

図1は、この発明の、場所打ち杭の施工方法による地盤改良工程を示す図であり、(a)は、概略平面図、(b)は、概略断面図、(c)は、改良地盤に鉄筋籠を構築した場合の概略断面図である。図2は、この発明の、場所打ち杭の施工方法による掘削工程を示す図であり、(a)は、概略平面図、(b)は、概略断面図である。図3は、この発明の、場所打ち杭の施工方法による杭本体構築工程を示す図であり、(a)は、概略平面図、(b)は、概略断面図である。   FIG. 1 is a diagram showing a ground improvement process by a cast-in-place pile construction method according to the present invention, where (a) is a schematic plan view, (b) is a schematic cross-sectional view, and (c) is an improved ground. It is a schematic sectional drawing at the time of constructing a reinforcing bar rod. 2A and 2B are diagrams showing the excavation process by the cast-in-place pile construction method of the present invention, wherein FIG. 2A is a schematic plan view and FIG. 2B is a schematic cross-sectional view. Drawing 3 is a figure showing a pile main part construction process by a construction method of cast-in-place pile of this invention, (a) is a schematic plan view and (b) is a schematic sectional view.

この発明の、場所打ち杭の施工方法は、先ず、図1に示すように、軟弱地盤1に円柱状の改良地盤2を構築する。円柱状の改良地盤2は、例えば、テノコラム(登録商標)工法により構築する。テノコラム工法とは、セメント系固化材を液状にして軟弱地盤1に注入し、軟弱地盤1と固化材液とを攪拌混合して、柱状の改良体、すなわち、改良地盤2を軟弱地盤1内に構築するものである。   As shown in FIG. 1, the cast-in-place pile construction method of the present invention first constructs a cylindrical improved ground 2 on a soft ground 1. The columnar improved ground 2 is constructed by, for example, a teno column (registered trademark) method. The teno-column method is a method in which a cement-based solidified material is liquefied and poured into the soft ground 1, and the soft ground 1 and the solidified material liquid are stirred and mixed so that the columnar improved body, that is, the improved ground 2 is placed in the soft ground 1. To build.

以下、テノコラム工法を、図面を参照しながらさらに説明する。   Hereinafter, the teno column method will be further described with reference to the drawings.

図7は、テノコラム工法の実施設備を示す概略図である。   FIG. 7 is a schematic view showing equipment for carrying out the teno column method.

図7に示すように、テノコラム工法の施工設備は、水槽5、セメントサイロ6、ミキシングプラント7およびポンプ8を備えたプラント側設備と、施工機本体9および攪拌装置10を備えた施工機側設備とからなっていて、以下のようにして、地盤改良が行われる。   As shown in FIG. 7, the teno column construction equipment includes plant-side equipment including a water tank 5, a cement silo 6, a mixing plant 7 and a pump 8, and construction equipment-side equipment including a construction machine main body 9 and a stirring device 10. The ground is improved as follows.

水槽5とセメントサイロ6から水とセメントがそれぞれミキシングプラント7に送られ、ここで、水とセメントとが混合されてセメントスラリーが調製される。このようにして調製されたセメントスラリーは、ポンプ8によって施工機本体9に送られる。施工機本体9に送られたセメントスラリーは、先端に攪拌羽根11が取り付けられた攪拌装置10に送られる。攪拌装置10は、セメントスラリーを軟弱地盤1に注入しながら攪拌羽根11により軟弱地盤1を所定深度まで攪拌する。これによって、攪拌羽根11が通過し、攪拌された円柱状の地盤部分は、軟弱地盤とセメントスラリーとが混合された状態となる。この後、攪拌羽根11を引き上げ、セメントを固化させれば、軟弱地盤1内には、図1に示すように、円柱状の改良地盤2が構築される。   Water and cement are respectively sent from the water tank 5 and the cement silo 6 to the mixing plant 7, where water and cement are mixed to prepare a cement slurry. The cement slurry thus prepared is sent to the construction machine main body 9 by the pump 8. The cement slurry sent to the construction machine main body 9 is sent to a stirring device 10 having a stirring blade 11 attached to the tip. The stirring device 10 stirs the soft ground 1 to a predetermined depth by the stirring blade 11 while injecting cement slurry into the soft ground 1. Thereby, the stirring blade 11 passes and the columnar ground part stirred is in a state where the soft ground and the cement slurry are mixed. Then, if the stirring blade 11 is pulled up and the cement is solidified, a cylindrical improved ground 2 is constructed in the soft ground 1 as shown in FIG.

なお、上記方法により改良地盤2を構築する場合、セメントスラリーの注入量を軟弱地盤1の深さ方向の軟弱の程度に応じて調整したり、あるいは、セメントスラリーの注入箇所を調整することもできる。例えば、攪拌羽根11の外周側からのセメントスラリーの注入量を増やすことによって、改良地盤2の外周部の強度を他の部分に比べて高めることができる。   When the improved ground 2 is constructed by the above method, the amount of cement slurry injected can be adjusted according to the degree of softness in the depth direction of the soft ground 1, or the cement slurry injection location can be adjusted. . For example, the strength of the outer peripheral portion of the improved ground 2 can be increased as compared with other portions by increasing the amount of cement slurry injected from the outer peripheral side of the stirring blade 11.

このようにして、軟弱地盤1に円柱状の改良地盤2を構築したら、図2に示すように、改良地盤2内に掘削孔3を形成し、この後、図3に示すように、掘削孔3内に、鉄筋籠14により補強されたコンクリート16からなる杭本体4を改良地盤2と一体的に構築する。杭本体4は、アースドリル工法によって構築するが、軟弱地盤ではなく改良地盤2内に杭本体4を構築するので、ケーシングや安定液を使用する必要がない。この点で、上述したアースドリル工法と相違する。   When the cylindrical improved ground 2 is constructed on the soft ground 1 in this way, the excavation hole 3 is formed in the improved ground 2 as shown in FIG. 2, and then the excavation hole is obtained as shown in FIG. 3, the pile body 4 made of concrete 16 reinforced by the reinforcing bar 14 is constructed integrally with the improved ground 2. Although the pile main body 4 is constructed by the earth drill method, the pile main body 4 is constructed not in the soft ground but in the improved ground 2, so there is no need to use a casing or a stabilizing liquid. This point is different from the above-described earth drill method.

以下、この発明で実施するアースドリル工法を、図面を参照しながらさらに詳しく説明する。   Hereinafter, the earth drill method implemented in the present invention will be described in more detail with reference to the drawings.

図4は、この発明で実施するアースドリル工法による改良地盤への場所打ち杭の構築工程を示す図であり、(a)は、掘削機の回転軸を円柱状の改良地盤の中心に位置決めした状態を示す概略断面図、(b)は、掘削機の回転軸に取り付けられた掘削刃により改良地盤を掘削している状態を示す概略断面図、(c)は、掘削孔が形成された改良地盤を示す概略断面図、(d)は、掘削孔内に鉄筋籠を挿入した状態を示す概略断面図、(e)は、鉄筋籠が挿入された掘削孔内にコンクリートを打設して杭本体を構築した状態を示す概略断面図である。   FIG. 4 is a diagram showing a process for constructing a cast-in-place pile on the improved ground by the earth drill method according to the present invention. FIG. 4A shows the rotary shaft of the excavator positioned at the center of the cylindrical improved ground. The schematic sectional drawing which shows a state, (b) is a schematic sectional drawing which shows the state which excavates the improved ground with the excavation blade attached to the rotating shaft of an excavator, (c) is the improvement in which the excavation hole was formed Schematic cross-sectional view showing the ground, (d) is a schematic cross-sectional view showing a state in which a reinforcing bar is inserted into the excavation hole, (e) is a concrete pile placed in the excavation hole in which the reinforcing bar is inserted It is a schematic sectional drawing which shows the state which constructed | assembled the main body.

先ず、図4(a)に示すように、掘削機(図示せず)の回転軸(ケリーバ)12が円柱状の改良地盤2の中心上に来るように位置決めする。次に、図4(b)に示すように、回転軸12の先端に掘削刃13を取り付け、掘削刃13を回転させて改良地盤2を掘削する。掘削刃13による掘削深度は、改良地盤2の構築深さ範囲内とする。次に、図4(c)に示すように、改良地盤2の中心部に掘削孔3が形成されたら、図4(d)に示すように、地上で予め組み立てた鉄筋籠14をクレーン15により掘削孔3内に吊り下げて挿入する。そして、図4(e)に示すように、鉄筋籠14が挿入された掘削孔3内にコンクリート16を打設し、コンクリート16を固化させれば、改良地盤2の中心部には、図3に示すように、円柱状の杭本体4が改良地盤2と一体的に構築される。   First, as shown in FIG. 4A, positioning is performed so that the rotary shaft (Kelly bar) 12 of the excavator (not shown) is on the center of the cylindrical improved ground 2. Next, as shown in FIG. 4 (b), the excavating blade 13 is attached to the tip of the rotating shaft 12, and the excavating blade 13 is rotated to excavate the improved ground 2. The excavation depth by the excavation blade 13 is set within the construction depth range of the improved ground 2. Next, as shown in FIG. 4 (c), when the excavation hole 3 is formed in the center of the improved ground 2, as shown in FIG. 4 (d), the rebar bar 14 assembled in advance on the ground is moved by the crane 15. It is suspended and inserted into the excavation hole 3. Then, as shown in FIG. 4 (e), if concrete 16 is placed in the excavation hole 3 into which the reinforcing bar 14 has been inserted and the concrete 16 is solidified, the center of the improved ground 2 will have FIG. As shown in FIG. 2, the columnar pile body 4 is constructed integrally with the improved ground 2.

改良地盤2は、上記例のように、杭本体4の全体に亘って構築しても良いが、図5に示すように、軟弱地盤層のみに構築しても良く、これにより、施工コストを低減することができる。   The improved ground 2 may be constructed over the entire pile body 4 as in the above example, but as shown in FIG. 5, it may be constructed only on the soft ground layer, thereby reducing the construction cost. Can be reduced.

なお、図5(a)は、軟弱地盤層が地盤の上層部にある場合であり、図5(b)は、軟弱地盤層が地盤の中央部にある場合であり、各図の左側に地盤深さと地盤強度との関係を示す。地盤強度は、図中、右に行くほど高いことを示す。図5(b)に示すように、改良地盤2を地盤の中央部に形成するには、テノコラム工法の場合、攪拌羽根11の径を換えることにより容易に行える。   5 (a) shows a case where the soft ground layer is in the upper layer of the ground, and FIG. 5 (b) shows a case where the soft ground layer is in the center of the ground. Shows the relationship between depth and ground strength. The ground strength is higher as it goes to the right in the figure. As shown in FIG. 5 (b), the improved ground 2 can be easily formed in the center of the ground by changing the diameter of the stirring blade 11 in the case of the teno column method.

また、上記例のように、杭本体4の径寸法を杭本体4の長手方向において同一としても良いが、図6に示すように、改良地盤2内に形成する掘削孔3の径を、掘削孔3の長手方向において部分的に異ならせれば、すなわち、杭本体4の径寸法を、杭本体4の長手方向において部分的に異ならせれば、杭本体4が改良地盤2と、より一体的に構築される。掘削孔3の径を掘削孔3の長手方向において部分的に異ならせるには、径の異なる掘削刃13を使用すれば良い。   Moreover, although the diameter dimension of the pile main body 4 is good also in the longitudinal direction of the pile main body 4 like the said example, as shown in FIG. 6, the diameter of the excavation hole 3 formed in the improved ground 2 is excavated. If the holes 3 are partially different in the longitudinal direction, that is, if the diameter dimensions of the pile body 4 are partially varied in the longitudinal direction of the pile body 4, the pile body 4 is more integrated with the improved ground 2. Built. In order to make the diameter of the excavation hole 3 partially different in the longitudinal direction of the excavation hole 3, excavation blades 13 having different diameters may be used.

さらに、図1(c)に示すように、改良地盤2内に円筒状鉄筋籠17を改良地盤2と同心円状に構築し、鉄筋籠17の内側に掘削孔3を形成すれば、杭本体4の構築時の掘削孔3の壁の崩落を確実に防止することができる。鉄筋籠17は、可能ならば改良地盤2の全長に亘って構築しても良いが、図示のように上層のみでも良い。また、鉄筋籠17の上部を掘削孔3から突出させて、杭本体4上に構築する構造物あるいはフーチングと鉄筋籠17の上部とを一体化すれば、スムーズな応力伝達を図ることができる。なお、鉄筋籠17を改良地盤2内に構築するには、改良地盤2の未硬化時に、バイブレーターによる振動工法により鉄筋籠17を改良地盤2内に落とし込めば良い。   Further, as shown in FIG. 1 (c), if a cylindrical reinforcing bar 17 is constructed concentrically with the improved ground 2 in the improved ground 2, and the excavation hole 3 is formed inside the reinforcing bar 17, the pile body 4 The collapse of the wall of the excavation hole 3 during construction can be reliably prevented. The reinforcing bar 17 may be constructed over the entire length of the improved ground 2 if possible, but may be only the upper layer as shown. Further, if the upper part of the reinforcing bar 17 is protruded from the excavation hole 3 and the structure or footing constructed on the pile body 4 is integrated with the upper part of the reinforcing bar 17, smooth stress transmission can be achieved. In order to construct the reinforcing bar 17 in the improved ground 2, the reinforcing bar 17 may be dropped into the improved ground 2 by a vibration method using a vibrator when the improved ground 2 is not cured.

以上説明したように、この発明によれば、安定液を使用しないアースドリル工法により、改良地盤2内に杭本体4を改良地盤2と一体的に構築することによって、以下のような効果がもたらされる。   As described above, according to the present invention, the following effects are brought about by constructing the pile body 4 integrally with the improved ground 2 in the improved ground 2 by an earth drill method that does not use a stabilizing liquid. It is.

(イ)アースドリル工法の利点である、低振動・低操音、設備が簡単で施工速度が速く経済的、狭い敷地内でも施工可能であるといった利点をそのまま有する。
(ロ)掘削孔3の崩壊等の恐れが皆無なので、杭本体4の施工性が大幅に向上する。
(ハ)周辺地盤により掘削孔壁が押圧されることにより、掘削孔3の径が小さくなって、設計杭径を満足しないといった恐れは皆無である。
(ニ)安定液を使用する必要がないので、安定液がコンクリートに混入して杭本体4の品質が低下するといった恐れは皆無である。
(ホ)杭本体4は、改良地盤2により補強されるので、杭本体4の径を縮小化することができ、この結果、施工コストが低減する。
(へ)改良地盤2により杭本体4の径が擬似的に増加することになるので、耐震性、水平抵抗等の向上を図ることができる。
(A) It has the advantages of the earth drill method, such as low vibration and low noise handling, simple equipment, fast construction speed, economics, and construction in a small site.
(B) Since there is no fear of collapse of the excavation hole 3, the workability of the pile body 4 is greatly improved.
(C) There is no fear that the diameter of the excavation hole 3 is reduced and the design pile diameter is not satisfied because the excavation hole wall is pressed by the surrounding ground.
(D) Since there is no need to use a stabilizing liquid, there is no fear that the stabilizing liquid will be mixed into the concrete and the quality of the pile body 4 will be deteriorated.
(E) Since the pile main body 4 is reinforced by the improved ground 2, the diameter of the pile main body 4 can be reduced, and as a result, the construction cost is reduced.
(F) Since the diameter of the pile body 4 is increased in a pseudo manner by the improved ground 2, it is possible to improve the earthquake resistance, the horizontal resistance, and the like.

この発明の、場所打ち杭の施工方法による地盤改良工程を示す図であり、(a)は、概略平面図、(b)は、概略断面図、(c)は、改良地盤に鉄筋籠を構築した場合の概略断面図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a figure which shows the ground improvement process by the construction method of a cast-in-place pile of this invention, (a) is a schematic plan view, (b) is a schematic sectional drawing, (c) constructs a reinforcing bar in the improved ground It is a schematic sectional drawing at the time of doing. この発明の、場所打ち杭の施工方法による掘削工程を示す図であり、(a)は、概略平面図、(b)は、概略断面図である。It is a figure which shows the excavation process by the construction method of a cast-in-place pile of this invention, (a) is a schematic plan view, (b) is a schematic sectional drawing. この発明の、場所打ち杭の施工方法による杭本体構築工程を示す図であり、(a)は、概略平面図、(b)は、概略断面図である。It is a figure which shows the pile main body construction process by the construction method of a cast-in-place pile of this invention, (a) is a schematic plan view, (b) is a schematic sectional drawing. この発明で実施するアースドリル工法による改良地盤への場所打ち杭の構築工程を示す図であり、(a)は、掘削機の回転軸を円柱状の改良地盤の中心に位置決めした状態を示す概略断面図、(b)は、掘削機の回転軸に取り付けられた掘削刃により改良地盤を掘削している状態を示す概略断面図、(c)は、掘削孔が形成された改良地盤を示す概略断面図、(d)は、掘削孔内に鉄筋籠を挿入した状態を示す概略断面図、(e)は、鉄筋籠が挿入された掘削孔内にコンクリートを打設して杭本体を構築した状態を示す概略断面図である。It is a figure which shows the construction process of the cast-in-place pile to the improved ground by the earth drill method implemented by this invention, (a) is a schematic which shows the state which positioned the rotating shaft of the excavator in the center of the cylindrical improved ground Sectional drawing, (b) is a schematic sectional view showing a state in which the improved ground is excavated by the excavating blade attached to the rotary shaft of the excavator, and (c) is an outline showing the improved ground in which the excavation hole is formed. Cross-sectional view, (d) is a schematic cross-sectional view showing a state in which a reinforcing bar is inserted into the excavation hole, and (e) is a concrete body placed in the excavation hole in which the reinforcing bar is inserted to construct a pile body It is a schematic sectional drawing which shows a state. 軟弱地盤層のみに改良地盤を構築して掘削孔を形成した状態を示す概略断面図であり、(a)は、軟弱地盤層が地盤の上層部にある場合であり、(b)は、軟弱地盤層が地盤の中央部にある場合である。It is a schematic sectional drawing which shows the state where the improved ground was built only in the soft ground layer, and the excavation hole was formed, (a) is a case where a soft ground layer exists in the upper layer part of the ground, (b) is soft This is when the ground layer is in the center of the ground. 改良地盤内に形成する掘削孔の径を、掘削孔の長手方向において部分的に異ならせた状態を示す概略断面図である。It is a schematic sectional drawing which shows the state which made the diameter of the excavation hole formed in improved ground partially differ in the longitudinal direction of an excavation hole. テノコラム工法の施工設備を示す概略図である。It is the schematic which shows the construction equipment of a teno column construction method.

符号の説明Explanation of symbols

1:軟弱地盤
2:改良地盤
3:掘削孔
4:杭本体
5:水槽
6:セメントサイロ
7:ミキシングプラント
8:ポンプ
9:施工機本体
10:攪拌装置
11:攪拌羽根
12:回転軸
13:掘削刃
14:鉄筋籠
15:クレーン
16:コンクリート
17:鉄筋籠
1: Soft ground 2: Improved ground 3: Excavation hole 4: Pile main body 5: Water tank 6: Cement silo 7: Mixing plant 8: Pump 9: Construction machine main body 10: Agitation device 11: Agitation blade 12: Rotating shaft 13: Excavation Blade 14: Rebar rod 15: Crane 16: Concrete 17: Rebar rod

Claims (5)

地盤内に改良地盤を円柱状に構築し、次いで、前記改良地盤の中心部に、安定液を使用することなく掘削孔を形成し、次いで、前記掘削孔内に鉄筋籠を挿入し、そして、前記鉄筋籠が挿入された前記掘削孔内にコンクリートを打設して、前記改良地盤内に前記改良地盤と一体的に杭本体を構築する、場所打ち杭の施工方法において、
前記改良地盤内に鉄筋籠を構築し、この後、前記鉄筋籠の内側に前記杭本体を構築することを特徴とする、場所打ち杭の施工方法。
The improved ground is built in a cylindrical shape in the ground, then a drill hole is formed in the center of the improved ground without using a stabilizing liquid, and then a reinforcing bar is inserted into the drill hole, and In the construction method of cast-in-place pile, in which concrete is placed in the excavation hole into which the reinforcing bar is inserted, and the pile body is built integrally with the improved ground in the improved ground ,
A cast-in-place pile construction method , wherein a reinforcing bar is built in the improved ground, and thereafter, the pile main body is built inside the reinforcing bar .
前記改良地盤を前記杭本体を構築する深さまで構築することを特徴とする、請求項1に記載の、場所打ち杭の施工方法。   2. The cast-in-place pile construction method according to claim 1, wherein the improved ground is constructed to a depth at which the pile main body is constructed. 前記改良地盤を軟弱地盤層のみに構築することを特徴とする、請求項1に記載の、場所打ち杭の施工方法。   2. The cast-in-place pile construction method according to claim 1, wherein the improved ground is constructed only in a soft ground layer. 前記杭本体の径寸法を、前記杭本体の長手方向において同一とすることを特徴とする、請求項1から3の何れか1つに記載の、場所打ち杭の施工方法。   4. The cast-in-place pile construction method according to claim 1, wherein the pile body has the same diameter in the longitudinal direction of the pile body. 5. 前記杭本体の径寸法を、前記杭本体の長手方向において部分的に異ならせることを特徴とする、請求項1から3の何れか1つに記載の、場所打ち杭の施工方法。   4. The cast-in-place pile construction method according to any one of claims 1 to 3, characterized in that a diameter dimension of the pile body is partially varied in a longitudinal direction of the pile body.
JP2008279515A 2008-10-30 2008-10-30 Casting method for cast-in-place piles Expired - Fee Related JP5075091B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008279515A JP5075091B2 (en) 2008-10-30 2008-10-30 Casting method for cast-in-place piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008279515A JP5075091B2 (en) 2008-10-30 2008-10-30 Casting method for cast-in-place piles

Publications (2)

Publication Number Publication Date
JP2010106543A JP2010106543A (en) 2010-05-13
JP5075091B2 true JP5075091B2 (en) 2012-11-14

Family

ID=42296254

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008279515A Expired - Fee Related JP5075091B2 (en) 2008-10-30 2008-10-30 Casting method for cast-in-place piles

Country Status (1)

Country Link
JP (1) JP5075091B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105370314A (en) * 2015-10-23 2016-03-02 长安大学 Cold region tunnel heat production and water collection device

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015402B (en) * 2012-12-27 2014-08-13 南京林业大学 Construction method for inhibiting frost heaving and thaw collapse of horizontally frozen end through cement-soil reinforcement method
JP2014227729A (en) * 2013-05-23 2014-12-08 東日本旅客鉄道株式会社 Banking reinforcement structure and banking reinforcement method
CN103821137B (en) * 2014-03-27 2016-03-23 江西中恒地下空间科技有限公司 The construction method of guncreting pile at the bottom of the embedding rock of a kind of long auger, expansion
JP2019039140A (en) * 2017-08-22 2019-03-14 鹿島建設株式会社 Method for constructing ground improvement body and method for constructing pile
CN112554177B (en) * 2021-02-22 2021-05-11 中铁九局集团第四工程有限公司 Construction method of ultra-long small-diameter cast-in-situ bored pile
CN113482013A (en) * 2021-07-12 2021-10-08 中国水电建设集团十五工程局有限公司 Manual hole digging construction method for cast-in-place pile
CN113802552B (en) * 2021-10-27 2022-10-11 浙江工业职业技术学院 Pile surrounding soil body reinforcing method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59195925A (en) * 1983-04-20 1984-11-07 Toshio Enoki Construction of on-site concrete pile
JPS63315724A (en) * 1987-06-16 1988-12-23 Takenaka Komuten Co Ltd Execution work of cast-in-place concrete pile with high yield strength
JPH07145616A (en) * 1993-11-24 1995-06-06 Kajima Corp Cast-in-place concrete piling method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105370314A (en) * 2015-10-23 2016-03-02 长安大学 Cold region tunnel heat production and water collection device
CN105370314B (en) * 2015-10-23 2017-09-01 长安大学 A kind of tunnel in cold area heat production captation

Also Published As

Publication number Publication date
JP2010106543A (en) 2010-05-13

Similar Documents

Publication Publication Date Title
JP5075091B2 (en) Casting method for cast-in-place piles
JP5852038B2 (en) Construction method of on-site cast-in-place concrete piles and steel pipes with excavation blades
KR101527723B1 (en) Complex Ground Improving Devive and Ground Improving Method Using The Same
JP5075090B2 (en) Cast-in-place pile construction method and cast-in-place pile
JP2002155530A (en) Embedding method and tip metal fitting of existing pile
JP4946695B2 (en) Construction method of double pipe type pile head structure
JP2013147933A (en) Earth retaining wall construction method, cast-in-place pile construction method, earth retaining wall, and cast-in-place pile
JP4811176B2 (en) Construction method of ready-made piles
JP5075094B2 (en) Construction method and foundation structure of foundation structure in structure
KR100628511B1 (en) External reinforcement reverse circulation drill method
JP5948068B2 (en) Pile construction method with anchors
JP2019039140A (en) Method for constructing ground improvement body and method for constructing pile
JP4872561B2 (en) Construction method of ready-made piles
JP5075093B2 (en) Construction method and foundation structure of foundation structure in structure
JP2014066010A (en) Method of ground improvement around pile head
JP2005282043A (en) Earth retaining wall reinforcing method
JP6730121B2 (en) Underground wall construction method
JP5634036B2 (en) Method for constructing retaining wall, method for constructing pile, retaining wall, pile
JP2001081770A (en) Pile foundation work
JP2015132062A (en) Ground reinforcement method using small diameter concrete cast-in-place pile
JP2014177827A (en) Core material and soil cement continuous wall construction method using the same
JP5075092B2 (en) Construction method and foundation structure of foundation structure in structure
JP6634251B2 (en) Pile foundation structure, ready-made pile burying device, method of constructing pile foundation structure using said ready-made pile burying device
JP4413166B2 (en) Cast-in-place pile construction method and cast-in-place pile structure
JP7299482B2 (en) Prefabricated pile burying method and foundation pile using prefabricated pile

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20101122

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120222

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120321

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120517

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120807

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120824

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150