JP4993336B2 - 複合サイクル/複合プロセス施設を最適化する方法 - Google Patents

複合サイクル/複合プロセス施設を最適化する方法 Download PDF

Info

Publication number
JP4993336B2
JP4993336B2 JP2006031876A JP2006031876A JP4993336B2 JP 4993336 B2 JP4993336 B2 JP 4993336B2 JP 2006031876 A JP2006031876 A JP 2006031876A JP 2006031876 A JP2006031876 A JP 2006031876A JP 4993336 B2 JP4993336 B2 JP 4993336B2
Authority
JP
Japan
Prior art keywords
plant
performance
power
simulating
output
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2006031876A
Other languages
English (en)
Other versions
JP2006220151A (ja
Inventor
ピーター・アントン・ペシュトル
マルタン・ポッシュ
ビジャン・ダヴァリ
マルコ・ロバート・ディールマン
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Electric Co
Original Assignee
General Electric Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by General Electric Co filed Critical General Electric Co
Publication of JP2006220151A publication Critical patent/JP2006220151A/ja
Application granted granted Critical
Publication of JP4993336B2 publication Critical patent/JP4993336B2/ja
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41885Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by modeling, simulation of the manufacturing system
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/0205Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric not using a model or a simulator of the controlled system
    • G05B13/024Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric not using a model or a simulator of the controlled system in which a parameter or coefficient is automatically adjusted to optimise the performance
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/14Combined heat and power generation [CHP]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/16Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
    • Y02P80/15On-site combined power, heat or cool generation or distribution, e.g. combined heat and power [CHP] supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Manufacturing & Machinery (AREA)
  • Automation & Control Theory (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Software Systems (AREA)
  • Medical Informatics (AREA)
  • Evolutionary Computation (AREA)
  • Health & Medical Sciences (AREA)
  • Artificial Intelligence (AREA)
  • General Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Description

本発明は一般的に製造施設の制御に関し、より詳しくは製造施設のシステムのアウトプットの最適化を促進するのに使用するシステムに関する。
少なくともいくつかの既知の発電プラントは、少なくともいくつかのそれらのシステムを、化学プラント、地域暖房施設、および/または製紙工場などの、ただし限定ではない少なくとも1つのプロセスプラントと結合している。発電プラントとプロセスプロセスを結合することは、そうでない場合は大気、あるいは発電プロセスまたはプロセスプラントのいずれかの熱シンクに棄却されるであろうエネルギを使用することによって、発電プロセスおよびプロセスプラントのうちの1つ、または両方の効率を増加させることを促進することができる。既知の複合電力およびプロセスプラントには、ガスタービン、燃焼または非燃焼熱回収ボイラー、蒸気タービン、化石燃料燃焼ボイラー、太陽熱ボイラー、冷却塔、凝縮器、および/または給水加熱器の様々な組合せが含まれる。
動作では、複合電力およびプロセスプラントの要求量は、顧客の要求レベル、および天候状態などの、ただし限定されない他の予想不可能な事象に基づいて変動する可能性がある。さらに、電力要求量とプロセス生産量の間の比率は、季節的な稼動に基づいて変動する可能性がある。したがって、既知の組合せプラントは、電力およびプロセスアウトプットの要求される指定に合致するように広い範囲の動作状態を有して使用するように設計される場合がある。
しかしながら、各プラントが複合サイクル/複合プロセスプラントシステム内のすべての他のプラントと異なる動作特性を有する場合があり、したがって、アウトプット単位当りのリソースの使用に則して定義される各プラントの動作効率がすべての他のプラント動作効率と異なる場合があるので、組合せプラントの設計は困難である場合がある。例えば、複合発電プラントおよび水塩分除去プロセスプラント内で、いくつかのリソースは電力を発生させるために、かつ/または水の塩分除去のために使用されることができるが、リソースの各プラントでの使用の効率を改善することは、必ずしも経済的な電力発生および水生産に対し最大の効果を生じさせるとは限らない場合がある。より具体的には、複合施設内の各プラントは、そのプラントの効率の最大化を促進するように、すなわち、最小限の量のリソースを使用して生産アウトプットを生じさせるように、個別に運転される場合がある。しかしながら、各個々のプラントの効率を最大化させることが、複合システムの効率を最大化させることを促進しない場合がある。
したがって、製造システムの効率の最大化を促進するために、少なくともいくつかの既知の発電システムは、可能な最高の製造システム効率を達成することを容易にするために、動作するガスタービンの基数、ガスおよび蒸気タービンの負荷レベル、ダクト燃焼、動作する脱塩プラントの基数、最高海水温度、再循環比率、およびブローダウンの頻度および継続時間などの(ただし限定ではない)プラント設定値を選択することを試みている。しかしながら、各プラントの効率および複合生産施設の効率に影響を及ぼす条件が絶えず変化するので、複合製造施設の最適な効率を達成するために、プラントパラメータを監視し、適切に調整することが困難である場合がある。
一態様では、複合サイクル発電プラントを動作させる方法が提供される。このシステムは、蒸気使用プロセスプラントに熱伝達連通で結合された少なくとも1つの発電プラントを含む。この方法は、発電プラント性能をシミュレートするステップと、プロセスプラント性能をシミュレートするステップと、発電プラントおよびプロセスプラントのシミュレーション結果を使用して、プラント装置およびプラント性能をパラメータ化するステップと、複合サイクル発電/蒸気使用プロセスプラントの効率を高めることを促進するパラメータ設定値を求めるために、目的関数によってパラメータ化された連立方程式および制約条件を解くステップとを含む。
別の態様では、プログラムによってエンコードされたコンピュータ読取可能な媒体が提供される。このプログラムはコンピュータに、発電プラント性能をシミュレートすること、プロセスプラントの性能をシミュレートすること、発電プラントおよびプロセスプラントのシミュレーション結果を使用して、全体的なプラント装置および全体的なプラント性能をパラメータ化すること、および複合サイクル発電/蒸気使用プロセスプラントの効率を高めることを促進するパラメータ設定値を求めるために、目的関数によってパラメータ化された連立方程式および制約条件を解くことを指示するように構成される。
さらに別の態様では、複合サイクル/複合プロセスプラント最適化システムが提供される。このシステムは、多量の廃熱を発生する第1のプロセスプラントと、熱を少なくとも1つのプラントプロセスへの入力として使用する、第1のプロセスプラントと熱伝達連通する第2のプロセスプラントと、第1のプロセスプラントおよび第2のプロセスプラントのうちの少なくとも1つに動作的に結合されるコンピュータとを含み、このコンピュータは、第1のプロセスプラントおよび第2のプロセスプラントのプロセスパラメータを監視し、第1のプロセスプラント性能をシミュレートし、第2のプロセスプラント性能をシミュレートし、第1および第2の発電およびプロセスプラントのシミュレーション結果を使用して複数のプラント装置の全体およびプラント性能の全体をパラメータ化し、複合サイクル発電/蒸気使用プロセスプラントの効率を高めることを促進するパラメータ設定値を求めるために、目的関数によってパラメータ化された連立方程式および制約条件を解くように構成される。
図1は、例示的な複合サイクル/複合プロセスプラント100の概略図である。この例示的な実施形態では、プラント100は、1対のガスタービン発電プラント104を含む発電部分102、1対の熱回収蒸気発生器(HRSG)108を含む熱回収部分106、および脱塩プラント112を含むプロセスプラント部分110を含む。発電部分102は、ガスタービンエンジン、化石燃料ボイラー、バイオマス燃料ボイラー、排熱回収ボイラー、廃棄物焼却炉、原子炉ボイラー、地熱源、および太陽光源を含むことができる(ただし限定ではない)熱発電プラントの組合せを使用して構成することができる。熱回収部分106は、非燃焼および燃焼熱回収蒸気発生器、ならびに他の既知の熱回収装置を有して構成することができる。プロセスプラント部分110は、製油所、製紙工場、製造施設、地域暖房、養魚場、製パン工場、蒸気吸収冷却器、および農業製品処理プラントなど(ただし限定ではない)の、熱をそのプロセスへの入力として使用する様々な種類のプラントを含むことができる。
例示的な実施形態では、複数のガスタービンエンジン104それぞれは、ガスタービンエンジン118に軸116を介して結合される発電機を含む。各ガスタービンエンジン118は、軸124を介してタービン122に結合される圧縮機120を含む。燃焼器126が、圧縮機出口128が燃焼器126を介してタービン入口130と流体連通で結合されるように、圧縮機120とタービン122の間に結合される。劣化した排ガスは、タービン排ガス出口132を通りタービン122を出る。排気ガスが通路を介してHRSG108内に導かれるので、このガス内の熱エネルギがHRSG108を貫通して流れる水を蒸気に変換する。次いで排ガスは、煙突134を通りHRSG108から排出され、大気または汚染制御装置(図示せず)に開放される。HRSG108で製造された蒸気は、蒸気ライン138を介して蒸気ヘッダ136へ送られ、そこで蒸気は様々な蒸気負荷部140および脱塩プラント112に分配するために使用できる。脱塩プラント112は、原料塩水を脱塩プラント112に供給するのに使用される海水入口142、プラント112から処理された淡水を取り除くための蒸留水出口144、および蒸気/凝縮HRSGサイクルを完結させるために凝縮した蒸気をHRSG108に戻すための凝縮水戻り146とを含む。
各プラント部分102、106、および110は、監視計器、ポンプ、モータ、通気ファン、タンク、バルブ、冷却塔、凝縮器、給水加熱器、および化学処理システムなどの(ただし限定ではない)図示しない様々な補助的な装置も含む。
動作では、圧縮機120を通り空気が流れ、圧縮空気は燃焼器126に送られる。燃焼器126からの排気ガス流がタービン122を駆動し、タービン122が発電機114を駆動する。排気ガスはタービン122を出て、排気ガス内に含有される熱がHRSG108を貫通して流れる水に伝達されるように、HRSG108に入る。蒸気はHRSG108を出て、ヘッダ136に結合された様々な負荷に分配するために、蒸気ヘッダ136に送られる。脱塩プラント112が、蒸留工程で原料水を沸騰させるため、またはフラッシュ工程で水を加熱するために蒸気を受け取る。ガス状の水が、再生的に集められ淡水貯蔵システム(図示せず)に供給される。供給原料水は予備加熱され、プラント112に供給される。復水は集められ、HSRG108に戻され、そこで再び加熱され連続サイクルで蒸気になる。
発電と水製造の間の比率は、季節的な要求量などの(ただし限定ではない)いくつかの要因に基づいて変わる。この発電プラントおよび脱塩プラントは、広い範囲の動作状態に対して設計され、電力および水の要求される指定量は、多くの異なる状態で達成することができる。各状態を全体的な熱消費率および全体的な経済的効率に関連づけることができる。全体的に最適な熱消費率で運転することは、多くの場合全体的に最適な経済効率を生み出さない可能性がある。システムの運転者は、動作するガスタービンの基数、ガスおよび蒸気タービンの負荷レベル、ダクト燃焼、動作する脱塩プラントの基数、頂部ブライン(塩水)温度、再循環比率、およびブローダウンなどの(ただし限定ではない)複数のプラント設定を、任意の所与の発電量および水量の指定に対し最適な経済的稼働を達成するために変更することができる。
図2は、(図1に示す)熱発電プラントおよびプロセスプラント100のアウトプットを最適化するために使用することができる熱発電プラントおよびプロセスプラント最適化システム200のための構成の例示的な実施形態のデータフロー図である。この例示的な実施形態では、システム200は、発電部分102の様々な構成部品に結合された監視および制御計器202を含む。そのような計器は、圧力および温度センサ、流量および速度センサ、燃焼ガスセンサ(ただし限定ではなく)を含むことができる。システム200は、熱回収部分106に関連する監視および制御計器204およびプロセスプラント110に関連する監視および制御計器206も含む。監視および制御計器202、204、および206のそれぞれは、測定されたプロセスパラメータを示す信号を、分散制御システム(distributed control system)(DCS)208に伝達する。DCS208は、信号を受信し、所定のアルゴリズムに従って信号を処理し、監視および制御計器202、204、および206にそれぞれ、プラント動作に変化を及ぼすための制御信号を伝達する。DCS208は、ソフトウェアデータ収集モジュール(data acquisition module)(DAM)210と連動している。例示的な実施形態では、DAM210は、DCS208に通信的に結合された独立のPCベースのコンピュータシステム上で実行するソフトウェアコードセグメントである。
DAM210は、将来的な参照および分析用の保管データを保存するデータベース/ヒストリアン212に通信的に結合される。一実施形態では、データベース/ヒストリアン212は、OSI Software,Inc.of San Leandro、Califoniaから商業的に入手可能な、PI Systemである。熱バランスモジュール214が要望により、測定されたデータに可能な限り近接して一致するようにプラントの質量およびエネルギバランスモデルを調整するアルゴリズムをコンピュータ処理するために、DAM210およびデータベース/ヒストリアン212からデータを受信する。モデルと測定データの間の差異は、データ内の誤りを示す場合がある。性能モジュール216が、主要なプラント装置の期待される性能を予想するために、プラント装置モデルを使用する。予想される性能と現在の性能の間の相違は、汚れ、錆腐蝕、および破損などの(ただし限定ではない)それぞれの構成部品の状態の劣化である可能性がある。性能モジュール216は、プラント電力および熱消費率の変化に最大の影響を有する性能問題を特定できるように、時間にわたる劣化を追跡する。この例示的な実施形態では、プロセスプラント110が脱塩プラントであり、性能モジュールは、例えば、ただし限定ではなく、淡水要求量負荷レベル、頂部ブライン温度、海水注入温度、および頂部ブラインヒータ劣化を使用して脱塩プラント熱消費量をモデル化することができる。
オプテマイザモジュール218が、プラント100の経済的指定を最適化するように、プラント100の様々な動作構成部品の方法論を評価する。少なくともいくつかの既知の指定方法論が、熱消費率は金銭上のリソースに等しいという仮定を置いて、熱消費率に基づいてプラントを指定する。その一方、オプテマイザモジュール218は、より高い熱消費率を有する構成部品が指定される可能性がある最適化を解くことができる。例えば、ある状況では、ヘッダ136からの蒸気の要求量が、電力に対する要求量を追い越す場合があり、または部分102からの電力が電気的なシステム要求によって制限される場合がある。効率のより低いガスタービンエンジン104を指定することによって、制限を超える電力出力を上昇させることなしにより多くの熱が回収可能になる場合もある。
この例示的な実施形態では、オプテマイザモジュール218が、オンライン(自動)とオフライン(手動)モードの選択可能である。オンラインモードでは、オプテマイザ218は、発電される電力のコスト、発電の各レベルでの増分コスト、プロセス蒸気のコスト、および所定の周期性、例えばリアルタイムで、または5分毎に1回でのプラントを動作させる利益などの、現行のプラントの経済的なパラメータを自動的に計算する。オフラインモードは、定常状態の性能、「仮定(what−if)」シナリオの分析、予算およびグレードアップの任意選択の分析、あるいは現行の発電能力、目標熱消費率、保証条件に対する現行のプラント稼働の修正、稼働制約および補修作業の影響、あるいは燃料消費量の予想をシミュレートするのに使用することができる。オプテマイザ218は、プラントの経済モデルによって、プラントの熱バランスを結合することによる効率に基づくアウトプットではなく、リアルタイムの経済的コストデータ、アウトプット価格、負荷レベル、および装置の劣化に基づくプラント100に対する利益が最大になるアウトプットを計算する。オプテマイザ218は、各構成部品の劣化に個々に整合するように調整することができる。オプテマイザ218は、助言的な出力220を作り出すことができ、かつ/またはクローズドフィードバックループの制御出力222も作り出すことができる。助言的な出力220は、プラント100の収益性を最大にするのを促進するために、各構成部品を最適化するためのプラント100の制御可能なパラメータを何処にセットすべきかを運転者に推奨する。さらにオプテマイザ218は、リアルタイムのコストを計算し、電力購入ユーザ(図示せず)に伝達することができる。この例示的な実施形態では、助言的な出力220は、コンピュータが実行するオプテマイザモジュール218と通信的に結合されたコンピュータ表示スクリーンである。代替の実施形態では、助言的な出力は、遠隔のワークステーション表示スクリーンであり、ワークステーションがネットワーク(図示せず)を介してオプテマイザ218のデータにアクセスする。さらに、重大なプラント性能パラメータを求めるために助言的出力220を監視することもできる。
クローズドフィードバックループ制御出力222は、オプテマイザモジュール218からデータを受け取り、プラント装置のリアルタイムフィードバック制御を実行するために、DCS制御モジュール用の設定点および/またはバイアス設定値を計算する。
図3は、サーバシステム312、通信的にサーバシステム312に接続される顧客システム314とも呼ばれる複数の顧客サブシステムを含む、リアルタイム熱発電プラントおよびプロセスプラント最適化システム300の簡略化したブロック図である。本明細書で使用されるリアルタイムは、結果に影響する入力の変化の後、実質的に短い時間で結果が起きること、例えば、コンピュータの計算を言う。この周期は、定常的に繰り返されるタスクの各繰り返しの間の時間の量である。そのような繰り返されるタスクは、周期的なタスク(periodic task)と呼ばれる。この時間周期は、結果の重大性および/または結果を発生させるために入力の処理を実行するシステムの能力に基づいて選択することができるリアルタイムシステムの設計パラメータである。さらに、リアルタイムで起きる事象は、実質的な内包的な遅れなしで起きる。例示的な実施形態では、計算値は1分の周期性でリアルタイムで最新のものにされる。一実施形態では、顧客のシステム314は、サーバシステム312がインターネットを介して顧客システム314にアクセス可能なような、ウェブブラウザを含むコンピュータである。顧客システム314は、ローカルエリアネットワーク(LAN)または広域エリアネットワーク(WAN)、ダイアルイン接続、ケーブルモデムおよび特別高速ISDNラインなどのネットワークを含む多くのインターフェースを介してインターネットに相互接続される。顧客システム314は、ウェブベースの電話器、パーソナルデジタルアシスタント(PDA)、または他のウェブベースの接続可能な装置を含むインターネットに相互接続可能な任意の装置であり得る。データベースサーバ316は、以下でより詳細に説明する複数の事項に関する情報を格納するデータベース320に接続される。一実施形態では、集中化されたデータベース320がサーバシステム312に記録され、顧客システム314の1つを介してサーバシステム312にログオンすることによって、顧客システム314の1つで潜在的なユーザがアクセスすることができる。代替の実施形態では、データベース320は、サーバシステム312から遠隔に記録され、非集中化であることができる。
図4は、(図1に示す)複合サイクル/複合プロセスプラント100の稼働の例示的な方法400のフローチャートである。この例示的な実施形態では、プロセスプラント100は、蒸気使用プロセスプラントに熱伝達連通で結合される少なくとも1つの発電プラントを含む。方法400は、発電プラント監視計器データを受信するソフトウェアコードセグメントのプラント性能モジュールを使用して発電プラント性能をシミュレート402するステップを含む。このデータは、プラント分散制御システム(DCS)からネットワークを介して受信することができ、あるいはサーバまたはプラント性能モジュールにアクセス可能な他のコンピュータ上で実行するデータベース/ヒストリアンソフトウェアプログラムから受信することができる。さらに、発電プラント性能をシミュレートするステップ402に使用されたものと同様な方法で、プロセスプラント性能がシミュレート404される。同じ方法で各プラントの性能を求めることによって、各プラントに対し別々に最適設定を求めるのではなく、プラント全体に対して最適な制御設定を求めるために、プラント全体を単一のプラントとして取り扱うことが可能になる。各主要プラント構成部品に対する測定値は、構成部品のバイアスによって構成部品上に全体プラント効率を表示するためにパラメータ化406される。プラント装置およびプラント性能をパラメータ化することは、ガスタービン圧縮機、ガスタービン、熱回収蒸気発生器(HRSG)、通気ファン、冷却塔、凝縮器、給水加熱器、ブライン加熱器、蒸発器、フラッシュタンク、およびブラインブローダウンなどの(ただし限定ではない)構成部品の効率を計算することを含む。同様に、熱消費率および性能計算がパラメータ化406され、結果として得られる連立方程式は、各パラメータがサンプリングされた時間から内包的な遅れなしに計算結果が利用可能になるように、リアルタイムで解かれる408。パラメータ化された連立方程式および制約条件を解く408ことは、プラント全体に対する現行の熱バランスを求めること、および運転予備電力の要求、電気システムの要求量、補修活動、淡水要求量、および構成部品の故障などの、ただし限定ではないプラントの稼働に対する現行の制約条件を使用して期待される性能を求めることも含むことができる。パラメータ化された方程式および制約条件を解く408ことは、将来の熱バランスが求められた期待される性能に等しくなるように現行の熱バランスを修正するように調整するためのパラメータを求めることも含むことができる。
代替の実施形態では、パラメータ化された連立方程式および制約条件を解くこと408は、プラント全体に対する入口条件を求めること、この求められた入口条件およびプラント全体の所定のモデルに基づいて全体のアウトプットを予測すること、プラント全体の現行のアウトプットを求めること、予測されたアウトプットを求められたアウトプットと比較すること、および求められたアウトプットが予測されたアウトプットに等しくなるまでプラントパラメータを調整することとを含む。
この例示的な実施形態では、プロセスプラントは多段フラッシュ(multistage flash)(MSF)設計の脱塩プラントであり、海水または塩水がブライン加熱器内の圧力の沸点のちょうど下の温度に加熱される。蒸発器の内側の圧力は、蒸発器チューブ束の内側の冷却器塩水の効果に起因して、ブライン加熱器の圧力より低い。加熱器から蒸発器に熱い塩水が入るとき、蒸発器内の減圧された圧力によって、液体のいくらかが直ちに蒸気に転換することが起きる、すなわち水が蒸気に急速気化する。この蒸気が凝縮し、その潜熱を入ってくる海水に引き渡す。この海水はさらにブライン加熱器内で加熱される。多段フラッシュ脱塩プラントを画成するために、いくつかの段の加熱器および蒸発器を流体連通で一緒に結合することができる。この脱塩プラントの性能をシミュレートすることは、少なくとも1つのプロセスプラントの負荷レベル、頂部ブライン温度、海水取水温度、および頂部ブライン加熱器汚れの関数としてプロセスプラント熱消費量を特長づけることを含む。
この例示的な実施形態では、方法400は、パラメータ化された方程式を使用してプラント装置の制御可能なプラントパラメータとプラント性能を相互に関係づけるステップ、プラント全体の熱消費率を最小限にすることまたはプラント全体の利益を最大限にすることを含む目的関数を使用して最適化の目的を定義するステップ、および装置の各個々の部片の動作の物理的に可能な範囲、および/または、全体的な制限が最大発電量、最大燃料消費量、および/または凝縮のための最大水使用量である制約条件を使用する全体的な制限を定義するステップも含む。
上記に開示した方法およびシステムは、複合サイクル/複合プロセス施設を最適化するコスト効率が高く、信頼性の高い手段を提供する。より具体的には、この方法および設備は、最適化システムが、脱塩プラントに結合されたガスタービン発電機を含む複合サイクル発電プラントに対する最適な制御設定を推奨することを容易にする。結果として、本明細書で開示された方法および設備は、コスト効率に優れかつ信頼性の高い形で、発電および海水からの淡水の製造を行うことを容易にする。
複合サイクル/複合プロセス施設最適化システムの例示的な実施形態が上記で詳細に開示されている。このシステムは本明細書で開示する具体的な実施形態に限定されず、むしろ、各システムの構成部品は独立に、または本明細書で説明した他の構成部品から分離して使用することができる。各システム構成部品は、他のシステムの構成部品と組み合わせて使用することもできる。
本発明は、様々な具体的な実施形態に則して説明してきたが、この分野の技術者は、特許請求の範囲の趣旨および範囲内で改変して実施形態することができることを理解するであろう。
例示的な複合サイクル/複合プロセスプラントの概略図である。 図1に示す熱発電プラントおよびプロセスプラントのアウトプットを最適化するために使用することができる熱発電プラントおよびプロセスプラント最適化システムのための構成の例示的な実施形態のデータフロー図である。 図1に示す熱発電プラントおよびプロセスプラントのアウトプットを最適化するために使用することができるリアルタイム熱発電プラントおよびプロセスプラント最適化システムの簡略化したブロック図である。 図1に示す複合サイクル/複合プロセスプラントの例示的な稼働方法のフローチャートである。
符号の説明
100 複合サイクル/複合プロセスプラント
102 発電部分
104 ガスタービン発電プラント
106 熱回収部分
108 熱回収蒸気発生器(HRSG)
110 プロセスプラント部分
112 脱塩プラント
116 軸
118 ガスタービンエンジン
120 圧縮機
122 タービン
124 軸
126 燃焼器
128 圧縮機出口
130 タービン入口
132 タービン排ガス出口
134 煙突
138 蒸気ライン
136 蒸気ヘッダ
140 蒸気負荷部
142 海水入口
144 蒸留水出口
146 凝縮水戻り
200 最適化システム
300 最適化システム
400 最適化方法のフローチャート

Claims (9)

  1. 蒸気使用プロセスプラント(110)に熱伝達連通で結合された発電プラント(102)を少なくとも1つ有する複合サイクル発電プラント(100)を稼働させる方法(400)であって、
    発電プラント性能をシミュレートするステップ(402)と、
    プロセスプラント性能をシミュレートするステップ(404)と、
    前記発電プラントおよびプロセスプラントシミュレーション結果を使用して、プラント装置およびプラント性能をパラメータ化するステップ(406)と、
    前記複合サイクル発電/蒸気使用プロセスプラントの効率を高めることを促進するパラメータ設定値を求めるために、目的関数によってパラメータ化された連立方程式および制約条件を解くステップ(408)と
    を含
    稼働方法(400)が、さらに、パラメータ化された方程式を使用して、プラント装置の制御可能なプラントパラメータとプラント性能を相互に関係づけるステップを含むことを特徴とする複合サイクル発電プラントの稼働方法(400)。
  2. 前記プロセスプラント性能をシミュレートするステップが、脱塩プラント性能をシミュレートするステップを含むことを特徴とする請求項1記載の方法。
  3. 前記発電プラント性能をシミュレートするステップが、前記発電プラントの熱的性能を監視するステップを含むことを特徴とする請求項1記載の方法。
  4. 前記発電プラントの熱的性能を監視するステップが、前記発電プラントの熱消費率をリアルタイムで監視するステップを含むことを特徴とする請求項3記載の方法。
  5. 前記プロセスプラント性能をシミュレートするステップが、プロセスプラント熱消費量を、少なくとも1つのプロセスプラントの負荷レベル、頂部ブライン温度、海水取水温度、および頂部ブライン加熱器汚れの関数として特長づけるステップを含むことを特徴とする請求項1記載の方法。
  6. プラント装置およびプラント性能をパラメータ化するステップが、ガスタービン圧縮機(120)、ガスタービン(118)、熱回収蒸気発生器(HRSG)(108)、通気ファン、冷却塔、凝縮器、給水加熱器、ブライン加熱器、蒸発器、フラッシュタンク、およびブラインブローダウンのうちの少なくとも1つに対して効率を計算するステップを含むことを特徴とする請求項1記載の方法。
  7. パラメータ化された連立方程式および制約条件を解くステップが、
    前記プラント全体に対する現行の熱バランスを求めるステップと、
    稼働に対する現行の制約条件を使用して期待される性能を求めるステップと、
    将来の熱バランスが前記求められた期待される性能に等しくなるように、前記現行の熱バランスを修正するように調整するためのパラメータを求めるステップとを含むことを特徴とする請求項1記載の方法。
  8. パラメータ化された連立方程式および制約条件を解くステップが、
    前記プラント全体に対する入口条件を求めるステップと、
    前記求められた入口条件および前記プラント全体の所定のモデルに基づいて、前記プラント全体のアウトプットを予測するステップと、
    前記プラント全体の現行のアウトプットを求めるステップと、
    前記予測されたアウトプットを前記求められたアウトプットと比較するステップと、
    前記求められたアウトプットが前記予測されたアウトプットに等しくなるまでプラントパラメータを調整するステップとを含むことを特徴とする請求項1記載の方法。
  9. 前記発電機プラントの熱消費率を最小限にすることおよび利益を最大限にすることの少なくとも1つを含む目的関数を使用して、最適化の目的を定義するステップをさらに含むことを特徴とする請求項1記載の方法。
JP2006031876A 2005-02-10 2006-02-09 複合サイクル/複合プロセス施設を最適化する方法 Expired - Fee Related JP4993336B2 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US11/055,312 US7356383B2 (en) 2005-02-10 2005-02-10 Methods and apparatus for optimizing combined cycle/combined process facilities
US11/055,312 2005-02-10

Publications (2)

Publication Number Publication Date
JP2006220151A JP2006220151A (ja) 2006-08-24
JP4993336B2 true JP4993336B2 (ja) 2012-08-08

Family

ID=36693073

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006031876A Expired - Fee Related JP4993336B2 (ja) 2005-02-10 2006-02-09 複合サイクル/複合プロセス施設を最適化する方法

Country Status (6)

Country Link
US (1) US7356383B2 (ja)
EP (1) EP1698956B1 (ja)
JP (1) JP4993336B2 (ja)
CN (1) CN1866140A (ja)
CA (1) CA2535204A1 (ja)
DE (1) DE602006007890D1 (ja)

Families Citing this family (89)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7288921B2 (en) * 2004-06-25 2007-10-30 Emerson Process Management Power & Water Solutions, Inc. Method and apparatus for providing economic analysis of power generation and distribution
US20160246905A1 (en) 2006-02-14 2016-08-25 Power Analytics Corporation Method For Predicting Arc Flash Energy And PPE Category Within A Real-Time Monitoring System
US8036872B2 (en) * 2006-03-10 2011-10-11 Edsa Micro Corporation Systems and methods for performing automatic real-time harmonics analyses for use in real-time power analytics of an electrical power distribution system
US9557723B2 (en) 2006-07-19 2017-01-31 Power Analytics Corporation Real-time predictive systems for intelligent energy monitoring and management of electrical power networks
US9092593B2 (en) 2007-09-25 2015-07-28 Power Analytics Corporation Systems and methods for intuitive modeling of complex networks in a digital environment
AU2007214459B2 (en) * 2006-02-14 2012-05-10 Edsa Micro Corporation Systems and methods for real-time system monitoring and predictive analysis
US20170046458A1 (en) 2006-02-14 2017-02-16 Power Analytics Corporation Systems and methods for real-time dc microgrid power analytics for mission-critical power systems
EP1991929A4 (en) * 2006-03-10 2010-03-03 Edsa Micro Corp SYSTEMS AND METHOD FOR REAL-TIME EVALUATION OF A PROTECTION DEVICE IN AN ELECTROENERGY DISTRIBUTION SYSTEM
US7693608B2 (en) * 2006-04-12 2010-04-06 Edsa Micro Corporation Systems and methods for alarm filtering and management within a real-time data acquisition and monitoring environment
US8150559B2 (en) * 2006-06-23 2012-04-03 Saudi Arabian Oil Company Systems and program product for heat exchanger network energy efficiency assessment and lifetime retrofit
US8150560B2 (en) * 2006-06-23 2012-04-03 Saudi Arabian Oil Company Methods for heat exchanger network energy efficiency assessment and lifetime retrofit
US7729809B2 (en) * 2006-06-23 2010-06-01 Saudi Arabian Oil Company System, method, and program product for targeting and identification of optimal process variables in constrained energy recovery systems
US8116920B2 (en) 2009-10-08 2012-02-14 Saudi Arabian Oil Company System, method, and program product for synthesizing non-thermodynamically constrained heat exchanger networks
US7844440B2 (en) * 2006-07-07 2010-11-30 Edsa Micro Corporation Systems and methods for real-time dynamic simulation of uninterruptible power supply solutions and their control logic systems
EP2076858A4 (en) * 2006-10-24 2011-05-04 Edsa Micro Corp SYSTEMS AND METHODS FOR REAL-TIME SYNCHRONIZED ELECTRICAL SYSTEM SIMULATOR FOR SIMULATION ANALYSIS AND PREDICTION ON POWER GENERATING NETWORKS
US8180622B2 (en) * 2006-10-24 2012-05-15 Power Analytics Corporation Systems and methods for a real-time synchronized electrical power system simulator for “what-if” analysis and prediction over electrical power networks
CA2679632C (en) * 2007-03-12 2018-01-09 Emerson Process Management Power & Water Solutions, Inc. Method and apparatus for generalized performance evaluation of equipment using achievable performance derived from statistics and real-time data
CA2883059A1 (en) * 2007-11-07 2009-11-12 Power Analytics Corporation Systems and methods for real-time forecasting and predicting of electrical peaks and managing the energy, health, reliability, and performance of electrical power systems based onan artificial adaptive neural network
US9495386B2 (en) 2008-03-05 2016-11-15 Ebay Inc. Identification of items depicted in images
US10936650B2 (en) 2008-03-05 2021-03-02 Ebay Inc. Method and apparatus for image recognition services
US8352148B2 (en) * 2008-05-21 2013-01-08 General Electric Company System for controlling input profiles of combined cycle power generation system
US8219437B2 (en) * 2008-07-10 2012-07-10 Palo Alto Research Center Incorporated Methods and systems for constructing production plans
US8145334B2 (en) * 2008-07-10 2012-03-27 Palo Alto Research Center Incorporated Methods and systems for active diagnosis through logic-based planning
US8165705B2 (en) * 2008-07-10 2012-04-24 Palo Alto Research Center Incorporated Methods and systems for continuously estimating persistent and intermittent failure probabilities for production resources
US8266092B2 (en) * 2008-07-10 2012-09-11 Palo Alto Research Center Incorporated Methods and systems for target value path identification
US8478473B2 (en) * 2008-07-28 2013-07-02 General Electric Company Method and systems for controlling gas turbine engine temperature
US9335761B2 (en) * 2008-09-30 2016-05-10 Rockwell Automation Technologies, Inc. Procedure classification for industrial automation
NZ590408A (en) * 2008-10-21 2012-12-21 Fuji Electric Co Ltd An online diagnostic method and system for a geothermal generation facility
US8359110B2 (en) * 2009-03-23 2013-01-22 Kuhn Lukas D Methods and systems for fault diagnosis in observation rich systems
US8437941B2 (en) 2009-05-08 2013-05-07 Gas Turbine Efficiency Sweden Ab Automated tuning of gas turbine combustion systems
US9354618B2 (en) 2009-05-08 2016-05-31 Gas Turbine Efficiency Sweden Ab Automated tuning of multiple fuel gas turbine combustion systems
US9267443B2 (en) 2009-05-08 2016-02-23 Gas Turbine Efficiency Sweden Ab Automated tuning of gas turbine combustion systems
US9671797B2 (en) 2009-05-08 2017-06-06 Gas Turbine Efficiency Sweden Ab Optimization of gas turbine combustion systems low load performance on simple cycle and heat recovery steam generator applications
US9323234B2 (en) * 2009-06-10 2016-04-26 Fisher-Rosemount Systems, Inc. Predicted fault analysis
US8447564B2 (en) * 2009-06-24 2013-05-21 General Electric Company Systems and method for power plant performance reconciliation
CN102472483A (zh) * 2009-07-10 2012-05-23 株式会社Ihi 蒸汽供给装置
US8433450B2 (en) * 2009-09-11 2013-04-30 Emerson Process Management Power & Water Solutions, Inc. Optimized control of power plants having air cooled condensers
US20110071952A1 (en) * 2009-09-18 2011-03-24 Gaffney Michael P System and method of optimizing resource consumption
US20110082597A1 (en) 2009-10-01 2011-04-07 Edsa Micro Corporation Microgrid model based automated real time simulation for market based electric power system optimization
BE1019108A3 (nl) * 2009-12-02 2012-03-06 Atlas Copco Airpower Nv Werkwijze voor het aansturen van een samengestelde inrichting en inrichting waarin deze werkwijze kan worden toegepast.
US20110146307A1 (en) * 2009-12-23 2011-06-23 Ofer Kogel Condenser ventilation control
JP5602878B2 (ja) * 2009-12-31 2014-10-08 アーベーベー・リサーチ・リミテッド 発電プラントに対する負荷スケジューリングを最適化する方法及び制約解析モジュール
US8453444B2 (en) * 2010-01-11 2013-06-04 David Haynes Power plant using compressed or liquefied air for energy storage
WO2011114703A1 (ja) * 2010-03-18 2011-09-22 株式会社 東芝 プラント運転支援システム、プラント運転支援プログラム及びプラント運転支援方法
US20110259014A1 (en) * 2010-04-23 2011-10-27 General Electric Company Refinery residuals processing for integrated power, water, and chemical products
JP5042342B2 (ja) * 2010-06-08 2012-10-03 中国電力株式会社 電力需要計画調整装置、電力需要計画調整方法、及びプログラム
US8076789B2 (en) * 2010-12-21 2011-12-13 General Electric Company System and method for controlling wind turbine power output
CN102053613B (zh) * 2010-12-31 2012-08-29 北京三博中自科技有限公司 一种工业过程设备能量实时监控系统及监控方法
US20120283988A1 (en) * 2011-05-03 2012-11-08 General Electric Company Automated system and method for implementing unit and collective level benchmarking of power plant operations
US9298173B2 (en) * 2012-02-02 2016-03-29 General Electric Company System and method to performance tune a system
US11050249B2 (en) 2012-03-23 2021-06-29 Concentric Power, Inc. Systems and methods for power cogeneration
US9453477B2 (en) 2012-03-23 2016-09-27 Concentric Power, Inc. Systems and methods for power cogeneration
US9002530B2 (en) * 2012-04-23 2015-04-07 General Electric Company Power plant operation enhancement
US20130282190A1 (en) * 2012-04-24 2013-10-24 General Electric Company System and method for configuration and management of power plant assets
CN102645348A (zh) * 2012-04-28 2012-08-22 北京三博中自科技有限公司 一种蒸汽透平驱动的流体输送设备能效监控系统
US10846766B2 (en) 2012-06-29 2020-11-24 Ebay Inc. Contextual menus based on image recognition
US10189733B2 (en) * 2012-08-13 2019-01-29 Enviro Water Minerals Company, Inc. Heating system for desalination
US9411326B2 (en) 2012-08-21 2016-08-09 General Electric Company Plant control optimization system including visual risk display
US9163827B2 (en) * 2012-11-01 2015-10-20 General Electric Company System and method for using boiler feedwater
US10521518B2 (en) 2012-12-05 2019-12-31 Deif A/S Emulating power system operations
US9477214B2 (en) * 2013-03-07 2016-10-25 General Electric Company Plant control systems and methods
CN103246263B (zh) * 2013-04-22 2015-04-15 天津大学 冷热电联供微网系统的通用优化调度方法
CN103637674B (zh) * 2013-12-03 2015-09-30 天津鑫玛新能源科技有限公司 一种基于密闭循环式蒸箱的蒸汽增压回收系统
US9957843B2 (en) 2013-12-31 2018-05-01 General Electric Company Methods and systems for enhancing control of power plant generating units
US20150184549A1 (en) 2013-12-31 2015-07-02 General Electric Company Methods and systems for enhancing control of power plant generating units
US9404426B2 (en) 2013-12-31 2016-08-02 General Electric Company Methods and systems for enhancing control of power plant generating units
US9734479B2 (en) * 2014-02-20 2017-08-15 General Electric Company Method and system for optimization of combined cycle power plant
WO2015167558A1 (en) * 2014-04-30 2015-11-05 Hewlett-Packard Development Company, L.P. Determination of compatible equipment in a manufacturing environment
US9926852B2 (en) 2015-03-03 2018-03-27 General Electric Company Methods and systems for enhancing control of power plant generating units
US9932907B2 (en) 2015-03-03 2018-04-03 General Electric Company Methods and systems for enhancing control of power plant generating units
US9960598B2 (en) 2015-03-03 2018-05-01 General Electric Company Methods and systems for enhancing control of power plant generating units
US20160273408A1 (en) * 2015-03-19 2016-09-22 General Electric Company Power generation system having compressor creating excess air flow and eductor for augmenting same
US10024197B2 (en) 2015-03-19 2018-07-17 General Electric Company Power generation system having compressor creating excess air flow and turbo-expander using same
US20160273403A1 (en) * 2015-03-19 2016-09-22 General Electric Company Power generation system having compressor creating excess air flow and turbo-expander using same
US9863285B2 (en) 2015-03-19 2018-01-09 General Electric Company Power generation system having compressor creating excess gas flow for supplemental gas turbine system
US10287988B2 (en) 2015-03-27 2019-05-14 General Electric Company Methods and systems for enhancing operation of power plant generating units and systems
US20160299999A1 (en) * 2015-04-09 2016-10-13 General Electric Company Systems and methods for power plant model optimization
JP6523788B2 (ja) 2015-05-22 2019-06-05 株式会社東芝 プラント操作装置、プラント操作方法およびプラント操作プログラム
WO2017160307A1 (en) * 2016-03-18 2017-09-21 General Electric Company System and method for predicting and managing life consumption of gas turbine parts
US10417614B2 (en) 2016-05-06 2019-09-17 General Electric Company Controlling aircraft operations and aircraft engine components assignment
US10318904B2 (en) 2016-05-06 2019-06-11 General Electric Company Computing system to control the use of physical state attainment of assets to meet temporal performance criteria
US10338576B2 (en) 2016-05-17 2019-07-02 General Electric Company Intelligent management system for balance of plant
US10534328B2 (en) 2016-06-21 2020-01-14 General Electric Company Methods and systems for enhancing control of power plant generating units
US10452041B2 (en) 2017-03-31 2019-10-22 General Electric Company Gas turbine dispatch optimizer real-time command and operations
JP6965167B2 (ja) * 2018-01-12 2021-11-10 三菱パワー株式会社 ガスタービンコジェネレーションシステム及びその運転切換方法
JP7088812B2 (ja) * 2018-11-12 2022-06-21 三菱重工業株式会社 コンバインドサイクルプラント、その制御装置、及びその運転方法
US11261761B2 (en) * 2019-10-14 2022-03-01 Saudi Arabian Oil Company Energy real-time optimizer for steam and condensation balance using GAMS
CN112231908B (zh) * 2020-10-15 2023-03-21 国网山东省电力公司电力科学研究院 一种抽凝式机组抽汽流量对应负荷上下限的确定方法
CN112678904B (zh) * 2020-11-04 2023-03-17 杭州电子科技大学 一种多级闪蒸海水淡化系统结垢清洗装置及方法

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US705852A (en) * 1902-03-04 1902-07-29 Jacob Lehmann Double-working planing-machine.
US4258424A (en) * 1972-12-29 1981-03-24 Westinghouse Electric Corp. System and method for operating a steam turbine and an electric power generating plant
US4455614A (en) 1973-09-21 1984-06-19 Westinghouse Electric Corp. Gas turbine and steam turbine combined cycle electric power generating plant having a coordinated and hybridized control system and an improved factory based method for making and testing combined cycle and other power plants and control systems therefor
JPS526855A (en) * 1975-07-04 1977-01-19 Hitachi Ltd Combined electric generating plant
EP0411873A3 (en) 1989-08-02 1993-11-18 Westinghouse Electric Corp Improved plant operating system employing a deterministic, probabilistic and subjective modeling system
US5347466A (en) * 1991-07-15 1994-09-13 The Board Of Trustees Of The University Of Arkansas Method and apparatus for power plant simulation and optimization
US5925223A (en) 1993-11-05 1999-07-20 Simpson; Gary D. Process for improving thermal efficiency while producing power and desalinating water
JP3250147B2 (ja) 1997-10-22 2002-01-28 株式会社日立製作所 電力系統の周波数特性推定方法および装置
DE59710790D1 (de) 1997-12-17 2003-10-30 Alstom Switzerland Ltd Verfahren zum Betrieb einer Gasturbogruppe
US6681155B1 (en) * 1998-08-31 2004-01-20 Mitsubishi Chemical Corporation Optimizing control method and optimizing control system for power plant
US6591225B1 (en) 2000-06-30 2003-07-08 General Electric Company System for evaluating performance of a combined-cycle power plant
EP1217473A1 (en) 2000-12-21 2002-06-26 Abb Research Ltd. Optimizing plant control values of a power plant
DE60120192T2 (de) 2001-11-29 2006-11-16 Abb Research Ltd. Optimaler Betrieb eines Kraftwerks
JP2004076658A (ja) * 2002-08-20 2004-03-11 Toshiba Corp コンバインドサイクル発電プラントの起動スケジュール策定方法および起動スケジュール策定装置
JP2004133650A (ja) 2002-10-10 2004-04-30 Mitsubishi Heavy Ind Ltd 制御用ロジックのシミュレーション検証方法及びシミュレーション検証用パソコン
US20040102872A1 (en) 2002-11-26 2004-05-27 Schick Louis Andrew Method and tool for power plant operational optimization
JP2004211587A (ja) 2002-12-27 2004-07-29 Toshiba Corp 発電プラントの運用支援システム
JP4575176B2 (ja) * 2005-01-17 2010-11-04 株式会社日立製作所 排熱回収ボイラの発生蒸気推定方法及び発電設備の保全計画支援方法

Also Published As

Publication number Publication date
CA2535204A1 (en) 2006-08-10
DE602006007890D1 (de) 2009-09-03
US20060178782A1 (en) 2006-08-10
CN1866140A (zh) 2006-11-22
EP1698956A1 (en) 2006-09-06
EP1698956B1 (en) 2009-07-22
US7356383B2 (en) 2008-04-08
JP2006220151A (ja) 2006-08-24

Similar Documents

Publication Publication Date Title
JP4993336B2 (ja) 複合サイクル/複合プロセス施設を最適化する方法
US9335748B2 (en) Energy management system
CA2714466C (en) Optimized control of power plants having air cooled condensers
US9709966B2 (en) Thermo-economic modeling and optimization of a combined cooling, heating, and power plant
Fast et al. Application of artificial neural networks to the condition monitoring and diagnosis of a combined heat and power plant
Vieira et al. Exergoeconomic improvement of a complex cogeneration system integrated with a professional process simulator
Kotowicz et al. The influence of economic parameters on the optimal values of the design variables of a combined cycle plant
JP2015149885A (ja) 発電所発電ユニットの制御を高度化するための方法およびシステム
Strušnik et al. Exergoeconomic machine-learning method of integrating a thermochemical Cu–Cl cycle in a multigeneration combined cycle gas turbine for hydrogen production
Emamdoost et al. Implementing multiple-effect distillation and reverse osmosis thermal coupling to improve desalination process performance in combined water and power plants
Zeqiu et al. Modeling and optimization of the steam turbine network of an ethylene plant
Beiron et al. Dynamic modeling for assessment of steam cycle operation in waste-fired combined heat and power plants
Rossi et al. A methodology for energy savings verification in industry with application for a CHP (combined heat and power) plant
Sindareh-Esfahani et al. Model predictive control of a heat recovery steam generator during cold start-up operation using piecewise linear models
Mohtaram et al. An innovative approach for utilizing waste heat of a triple-pressure cogeneration combined cycle power plant by employing TRR method and thermodynamic analysis
JPH08339204A (ja) 火力発電プラント自律適応最適化制御システム
Silva et al. Thermodynamic information system for diagnosis and prognosis of power plant operation condition
Król et al. Economic analysis of heat production in existing medium size combined heat and power plant, with respect to the CO2 allowances purchasing cost
Kabiri et al. Dynamic R-Curve analysis and optimization of steam power plant solar repowering
Pechtl et al. Integrated thermal power and desalination plant optimization
Alhammadi et al. A cyber-security framework for boiler of steam power plant using simulation data to train machine learning model
Li et al. Parametric optimization of steam turbine networks by using commercial simulation software
Cerri et al. Inverse methodologies for actual status recognition of gas turbine components
Buljubašić et al. Improvement of steam boiler plant efficiency based on results of on-line performance monitoring
Hynes et al. Management of an Industrial Facility Using an Artificial Neural Network Monitoring System

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090206

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20101228

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20101228

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110405

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20111004

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120203

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20120210

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120410

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120427

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150518

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4993336

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees