JP4916283B2 - Power system operation monitoring control system and method - Google Patents

Power system operation monitoring control system and method Download PDF

Info

Publication number
JP4916283B2
JP4916283B2 JP2006303419A JP2006303419A JP4916283B2 JP 4916283 B2 JP4916283 B2 JP 4916283B2 JP 2006303419 A JP2006303419 A JP 2006303419A JP 2006303419 A JP2006303419 A JP 2006303419A JP 4916283 B2 JP4916283 B2 JP 4916283B2
Authority
JP
Japan
Prior art keywords
location
control
monitoring
area
command
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2006303419A
Other languages
Japanese (ja)
Other versions
JP2008123064A (en
Inventor
義明 伊達
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2006303419A priority Critical patent/JP4916283B2/en
Publication of JP2008123064A publication Critical patent/JP2008123064A/en
Application granted granted Critical
Publication of JP4916283B2 publication Critical patent/JP4916283B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、電力の系統の運用管理において、予め作成されている作業の内容を記載した操作票を実行する際に作業の中途で制御を行う制御所などの操作箇所に障害が発生した場合に行われる操作票の書き換え作業を自動的に行い、電力の運用管理を制御所など操作箇所の障害が有った場合も速やかに操作を継続して進めることを可能とする電力系統運用監視制御システム、方法に関する。   In the operation management of the power system, the present invention provides a case where a failure occurs in an operation location such as a control center that performs control in the middle of the operation when an operation slip describing the details of the operation created in advance is executed. Power system operation monitoring and control system that automatically rewrites the operation sheets that are performed and enables power operation management to continue and proceed quickly even if there is a failure in the operation location such as a control center , Regarding the method.

電力系統の運用管理の操作は、1〜2週間程度前に作成され、承認された操作票に基づいて1手順ずつもしくは複数の手順群を一度に自動的に操作を行われている。従来の操作票を用いた操作支援システムでは、技術的手段としての手順作成やチェックを重点的に操作票が作成されている。   The operation management operation of the electric power system is created about one to two weeks ago, and is automatically performed one step at a time or a plurality of procedure groups based on the approved operation slip. In a conventional operation support system using operation slips, operation slips are created with emphasis on procedure creation and checking as technical means.

また、電力の自動系統操作として、特許文献1において電力系統の自動操作を行うために作成した自動系統操作票を、上長等の承認者に承認してもらうための電力監視制御システムにおける自動系統操作票承認システムに関する技術が提案されている。また、特許文献2には、電力系統に異常が発生したときにその異常のレベルを判定することができ、またその異常のレベルに応じて各機器の緊急停止操作や事故による停電の復旧操作を行うことのできる電力系統制御装置に関する技術が提案されている。
特開2004−15903号公報 特開平11−41783号公報
In addition, as an automatic power system operation, an automatic system in a power monitoring and control system for allowing an approver such as a supervisor to approve an automatic system operation form created for performing automatic power system operation in Patent Document 1 Techniques related to operation form approval systems have been proposed. Further, in Patent Document 2, when an abnormality occurs in the power system, the level of the abnormality can be determined, and an emergency stop operation of each device or an operation to recover from a power failure due to an accident is performed according to the abnormality level. Techniques relating to power system control devices that can be performed have been proposed.
JP 2004-15903 A JP 11-41783 A

しかし従来行っている、操作票の運用方法では、機器を操作する順番などは正しく作成され、チェックされるが、運用形態の変更は考慮されていない。このため、例えば制御所から操作する予定が運用やシステムの都合でバックアップ箇所や変電所から制御するようになったり、指令代行により指令箇所が変更になったりするとその操作票は指令箇所や操作箇所、中継箇所などを書き換えて、電話連絡で操作しなければならないため、時間がかかったり、ミスが発生しやすいという問題が有った。またたくさんの箇所の操作が集中しているため、1つの操作に時間がかかると、その影響は広範囲に及んでいた。   However, in the operation method of operation slips that have been performed in the past, the order in which the devices are operated is correctly created and checked, but changes in the operation form are not considered. For this reason, for example, if the schedule to be operated from a control station comes to be controlled from a backup location or a substation for the convenience of operation or system, or the command location is changed due to command substitution, the operation slip will become the command location or operation location. However, since it is necessary to rewrite the relay points and perform operations by telephone contact, there are problems that it takes time and errors are likely to occur. In addition, since operations in many places are concentrated, if one operation takes time, the effect has spread over a wide range.

また、上記特許文献1で提案されている技術は、電力系統を、自動的に制御して系統操作を行うために作成される自動系統操作票を上長等の承認者から承認得る方法として、作成した自動系統操作票の承認をコンピュータネットワークおよびウェブサーバ装置を備えることで行えるようにしたものであり、機器を管理すべきサーバを都合により変更するなどは考えられていない。   In addition, the technique proposed in the above-mentioned Patent Document 1 is a method for obtaining an automatic system operation form created for automatically controlling the power system and performing system operation from an approver such as an upper manager, Approval of the created automatic system operation slip is made possible by providing a computer network and a web server device, and it is not considered to change the server that manages the device for convenience.

また、特許文献2は、電力系統に発生した異常のレベルを的確に判定し、異常のレベルに応じた適切な処置をとりうる措置を取り得るようにしたことおよび、緊急停止を要するような機器異常が発生したとき、自動的に作成された緊急停止手順に従って緊急停止を行うことができるように構成されているが、管理するサーバなどの機器を変更することなどは提案されていない。
本発明は、上述のかかる事情に鑑みてなされたものであり、システムの都合などの何らかの理由で指令箇所、中継箇所、操作箇所などのルートの変更が発生した場合においても、速やかに対応可能な運用管理を可能とする電力系統運用監視制御システム、方法を提供することを目的とする。
Further, Patent Document 2 accurately determines the level of an abnormality that has occurred in the electric power system, and can take measures that can take appropriate measures according to the level of the abnormality, and devices that require an emergency stop. Although an emergency stop can be performed according to an automatically generated emergency stop procedure when an abnormality occurs, it has not been proposed to change a device such as a server to be managed.
The present invention has been made in view of the above-described circumstances, and can respond promptly even when a route change such as a command location, a relay location, or an operation location occurs for some reason such as system convenience. An object of the present invention is to provide a power system operation monitoring control system and method that enable operation management.

上記目的を達成するため、本発明に係わる電力系統運用監視制御システムは、発変電所間を結ぶ電力の送配電線との間に設置される開閉器などの機器の制御を操作手順に従って制御することにより電力系統の運用を行う電力系統運用監視制御システムであって、作業の操作指令を順序に従って記載している操作票データに従って指令を順番に予め定められたエリア内の機器に対して実行するとともに、実行した前記操作指令の結果を中継局に対して通知する操作票実行手段と、エリア内の機器の制御を行う操作箇所の優先順位を時系列に特定する業務執行権スケジュールデータを監視し、自箇所が第2の優先順位になっている場合に、エリア内の第1の優先順位の箇所に障害が発生しているかどうかを前記エリア内機器の障害などの機器の状態を有する監視パケットを参照して判定し、第1の優先順位の箇所の障害を検出した場合は、予め定めた宛先に通知を行い、前記通知を行った宛先からの指示が有った場合、もしくは通信回線などの故障で承諾が取れないが、あらかじめ定められたルールに適用した場合は、第1の優先順位の箇所の制御権を剥奪し、自箇所に制御権を付与するように前記エリア内機器の制御を行う箇所を特定する制御ルートスイッチの内容を書き換え、書き換えた前記制御ルートスイッチの内容を前記中継局に送信する1次局障害判定手段と、を備えた操作箇所と、前記エリア内の操作箇所、操作に関して指令を行う指令箇所、指令の中継を行う中継箇所などの機器の動作状況を監視する箇所監視手段と、前記監視した結果を監視パケットとして関連する箇所に通信ネットワークを介して通知する監視結果送信手段と、前記制御ルートスイッチの内容を前記制御ルートスイッチを有する箇所から受信し、前記制御ルートスイッチの内容に変化が有るか判定し、変化を検出した場合は、前記制御ルートスイッチの変更内容を関連のある箇所に通知し、前記検出した変更内容を反映させて操作票データを修正し、修正を行ったことを第1の優先順位にある操作箇所を含む関係のある箇所に通知する制御ルートスイッチ判定手段と、前記操作箇所からの操作指令を前記エリア内機器に中継し、前記エリア内機器からの受信する前記操作指令の結果などを関連のある箇所に中継する指令中継手段と、を備えた中継局と、を備えたことを特徴とする。   In order to achieve the above object, the power system operation monitoring control system according to the present invention controls the control of devices such as switches installed between power transmission and distribution lines connecting the power generation substations according to the operation procedure. A power system operation monitoring and control system for operating a power system by executing a command to devices in a predetermined area in order according to operation sheet data in which work operation commands are described according to the order In addition, the operation form execution means for notifying the relay station of the result of the executed operation command and the business execution right schedule data for specifying the priority order of the operation locations for controlling the devices in the area in time series are monitored. If the location has the second priority, whether or not a failure has occurred at the location of the first priority in the area indicates the status of the device such as a failure of the device in the area. If a failure is detected at a location of the first priority, a notification is made to a predetermined destination, and if there is an instruction from the destination that made the notification, Alternatively, although the communication line or the like cannot be accepted, the area is configured so that the control right at the first priority order is deprived and the control right is given to the own place when applied to a predetermined rule. An operation location comprising: a primary station failure determination means that rewrites the content of the control route switch that specifies a location to control the internal device, and transmits the rewritten content of the control route switch to the relay station; and the area Location monitoring means for monitoring the operation status of devices such as operation locations within the system, command locations for commanding operations, relay locations for relaying commands, etc., and items related to the monitored results as monitoring packets A monitoring result transmitting means for notifying through the communication network, and receiving the contents of the control route switch from the location having the control route switch, determining whether there is a change in the contents of the control route switch, and detecting the change In this case, the change content of the control route switch is notified to the relevant location, the operation form data is corrected by reflecting the detected change content, and the operation location having the first priority order is corrected. Control route switch determination means for notifying the relevant location including the relay, the operation command from the operation location is relayed to the device in the area, and the result of the operation command received from the device in the area is related And a relay station including a command relay means for relaying to a location.

ここで、機器制御とは、状態確認を含み、また、操作手順は状態確認手順を含む趣旨である。操作票データは操作手順群などを有するデータを意味する。また、あらかじめ定められたルールとしては、たとえば一定時間経過などがある。   Here, the device control includes state confirmation, and the operation procedure includes a state confirmation procedure. The operation form data means data having an operation procedure group and the like. In addition, as a predetermined rule, for example, a certain time has elapsed.

本発明によれば、対象のエリア内の機器の制御を行う操作箇所に障害が発生したり、何らかの理由により操作箇所を変更したりしたい場合においても、制御ルートスイッチを変更することによって、中継局にて制御ルートスイッチの変更内容を業務執行権スケジュールデータを参照して関連のある箇所に通知し、作業の実際の制御手順と指令箇所、中継箇所、操作箇所という作業の流れを記した操作票の内容を制御ルートスイッチの変更に合わせて修正を行い、関連のある箇所に通知することができ、操作箇所になることができる営業所、制御所、発変電所などの箇所は新たに操作箇所になる場合に次の手順から用意に作業を行うことができるので、担当者間で電話連絡を行って作業を確認することによる時間の浪費を削減し、人手作業による間違いを無くすことができ効率的に電力系統の機器の運用管理を行うことができる。   According to the present invention, even when a failure occurs in an operation location for controlling a device in a target area or when it is desired to change the operation location for some reason, the relay station can be changed by changing the control route switch. In the operation form, the change contents of the control route switch are notified to the relevant locations with reference to the business execution right schedule data, and the work flow including the actual control procedure of the work, the command location, the relay location, and the operation location is recorded. The contents of the system can be modified according to the change of the control route switch and notified to the relevant locations, and the locations such as sales offices, control locations, and power substations that can become operation locations are newly operated locations. Can be prepared easily from the next step, so it is possible to reduce the waste of time by making phone calls between the persons in charge and confirming the work. It is possible to perform efficient operation and management of the equipment of the power system it is possible to eliminate the mistake.

好ましくは、前記中継局は、発変電所、制御所、営業所のいずれかに設置されるように構成する。   Preferably, the relay station is configured to be installed at any one of a power generation / substation, a control station, and a sales office.

本発明によれば、中継局を固定的に運用することなく被制御所、制御所、営業所のどこにおいても機能させることができるので、柔軟性の高い電力系統の機器の運用管理をおこなうことができる。ここで、被制御所には発変電所やダムなどが含まれ、制御所には給電所、営業所、制御所バックアップ個所などが含まれる。   According to the present invention, the relay station can be operated anywhere in the controlled station, control station, and sales office without fixed operation, so that the operation management of the power system equipment with high flexibility can be performed. Can do. Here, controlled stations include power substations and dams, and control stations include power supply stations, sales offices, control station backup locations, and the like.

さらに好ましくは、前記通信ネットワークはインターネットであるように構成するもの良い。   More preferably, the communication network is configured to be the Internet.

本発明によれば、独自に構築された、例えばHDLC(High-level Data Link Control procedure)による通信ネットワークのみではなく、IP(Internet Protocol)を用いたインターネット網を用いて電力系統の機器運用管理が可能となるので全てを独自網を張り回すこと無く容易に電力系統の機器の運用管理を行うネットワークを構築することができる。   According to the present invention, not only a communication network constructed by, for example, HDLC (High-level Data Link Control procedure) but also an Internet network using IP (Internet Protocol) can be used to manage the operation of the power system. As a result, it is possible to construct a network that easily manages the operation of the devices in the power system without having to build a unique network for everything.

また、前記監視結果や制御ルートスイッチなどの制御情報を送受信する専用の制御用チャンネルを有するように構成するのも好ましい。   It is also preferable to have a dedicated control channel for transmitting and receiving control information such as the monitoring result and control route switch.

本発明によれば、専用の制御用チャンネルを用いて制御情報を送受信することができるので、信頼性を確保した運用管理を行うことができる。   According to the present invention, since control information can be transmitted and received using a dedicated control channel, operation management with assured reliability can be performed.

さらに、前記制御ルートスイッチの変更通知は変更元から行われ、その変更内容は、中継局の状態検出機能よって、関連する制御装置へ該制御装置が監視制御を行う機器の監視制御伝送用フォーマットに則して通知するように構成するのも好ましい。   Furthermore, the change notification of the control route switch is made from the change source, and the change contents are in the format for monitoring control transmission of the equipment that the control device performs monitoring control to the related control device by the state detection function of the relay station. It is also preferable that the notification is made in accordance with the above.

本発明によれば、内容の変更が有った時のみ通知が行われるので、通知を行う回数を削減することができ、通知を受信をする側も内容の変更が有ったということで通知を受けることで最初から必要な準備を行うことができ、運用管理に関し効率的に行うことができる。   According to the present invention, notification is performed only when there is a change in content, so the number of notifications can be reduced, and the notification receiving side also notifies that there has been a change in content. The necessary preparations can be made from the beginning, and operations can be efficiently performed.

好ましくは、前記中継局は、修正した前記操作票データを作業を行う操作箇所に送信する機能を有するように構成する。   Preferably, the relay station is configured to have a function of transmitting the corrected operation slip data to an operation location where work is performed.

本発明によれば、修正を行った操作票を必要である箇所に自動的に送信することができるので、作業の操作を継続するに際して必要となる操作票データを自分から通信ネットワークを介して取得することなく自動的に取得することができ、作業を効率的に再開することが可能となる。   According to the present invention, the corrected operation slip can be automatically transmitted to a necessary location, so that the operation slip data necessary for continuing the operation of the work is acquired from the user via the communication network. It is possible to automatically obtain the data without having to do so, and it is possible to efficiently resume the work.

さらに好ましくは、前記1次局の障害発生を検出した2次局である箇所は、前記指示に従い、管理対象の前記エリア内の機器に対する操作票データを参照し、既に操作を行った手順以降の手順より操作指令を行うように構成する。   More preferably, the location that is the secondary station that detected the failure of the primary station refers to the operation form data for the devices in the area to be managed in accordance with the instruction, and after the procedure that has already been operated. It is configured to issue an operation command according to the procedure.

本発明によれば、エリア内機器の制御を行う操作箇所である1次局に障害が発生した際にも2次局が自動的に操作票を用いて処理が終了した手順の次の手順から操作指令を継続して行うことができるので、手動による操作の間違いが発生することを無くし、支障なく操作の継続を行うことができ、効率的に電力系統の機器の運用管理を行うことができる。   According to the present invention, even when a failure occurs in the primary station, which is an operation location for controlling the devices in the area, the secondary station automatically uses the operation slip to complete the process. Since operation commands can be performed continuously, manual operation errors do not occur, operations can be continued without any problems, and operation management of power system equipment can be performed efficiently. .

また、前記監視結果の通知は、監視したごとに、または監視した際に障害が発見された時のみに行うように構成するのも好ましい。   It is also preferable that the notification of the monitoring result is performed every time monitoring is performed or only when a failure is discovered during monitoring.

本発明によれば、障害を発見した時にのみ通知することができるので、時間を有効的に使用することができる。   According to the present invention, notification can be made only when a failure is found, so that time can be used effectively.

さらに、1次局に障害が発生している旨の通知は、予め定めた電話、FAX、電子メール、インターネットを用いた独自の通知手段などを用いて行うように構成するのも好ましい。   Furthermore, it is also preferable that the notification that a failure has occurred in the primary station is made using a predetermined telephone, FAX, electronic mail, original notification means using the Internet, or the like.

本発明によれば、障害検出などの通知を予め定めた電話番号、FAX、インターネットにて予め定めた宛先に通知することができるので、直ちに障害などを認識することができ、安心して電力系統の機器の運用管理を行うことができる。   According to the present invention, since notification such as failure detection can be notified to a predetermined telephone number, FAX, and a predetermined destination via the Internet, it is possible to immediately recognize a failure and the like of the power system with peace of mind. Equipment operation management can be performed.

上記目的を達成するため、本発明に係わる電力系統運用監視制御方法は、発変電所間を結ぶ電力の送配電線との間に設置される開閉器などの機器の制御を操作手順に従って制御する操作箇所と、前記操作箇所と関連ある箇所間において制御情報または監視情報の中継を行う中継局を備えて電力系統の運用を行う電力系統運用監視制御方法であって、操作箇所において、作業の操作指令を順序に従って記載している操作票データに従って指令を順番に予め定められたエリア内の機器に対して実行するとともに、実行した前記操作指令の結果を中継局に対して通知する操作票実行ステップと、エリア内の機器の制御を行う操作箇所の優先順位を時系列に特定する業務執行権スケジュールデータを監視し、自箇所が第2の優先順位になっている場合に、エリア内の第1の優先順位の箇所に障害が発生しているかどうかを前記エリア内機器の障害などの機器の状態を有する監視パケットを参照して判定し、第1の優先順位の箇所の障害を検出した場合は、予め定めた宛先に通知を行い、前記通知を行った宛先からの指示が有った場合、もしくは通信回線などの故障で承諾が取れないが、あらかじめ定められたルールに適用した場合は、第1の優先順位の箇所の制御権を剥奪し、自箇所に制御権を付与するように前記エリア内機器の制御を行う箇所を特定する制御ルートスイッチの内容を書き換え、書き換えた前記制御ルートスイッチの内容を前記中継局に送信する1次局障害判定ステップとを含み、中継局において、前記エリア内の操作箇所、操作に関して指令を行う指令箇所、指令の中継を行う中継箇所などの機器の動作状況を監視する箇所監視ステップと、前記監視した結果を監視パケットとして関連する箇所に通信ネットワークを介して通知する監視結果送信ステップと、前記制御ルートスイッチの内容を前記制御ルートスイッチを有する箇所から受信し、前記制御ルートスイッチの内容に変化が有るか判定し、変化を検出した場合は、前記制御ルートスイッチの変更内容を関連のある箇所に通知し、前記検出した変更内容を反映させて操作票データを修正し、修正を行ったことを第1の優先順位にある操作箇所を含む関係のある箇所に通知する制御ルートスイッチ判定ステップと、前記操作箇所からの操作指令を前記エリア内機器に中継し、前記エリア内機器からの受信する前記操作指令の結果などを関連のある箇所に中継する指令中継ステップと、を含むことを特徴とする。   In order to achieve the above object, the power system operation monitoring control method according to the present invention controls the control of devices such as switches installed between power transmission and distribution lines connecting the power generation substations according to the operation procedure. A power system operation monitoring control method for operating a power system with a relay station that relays control information or monitoring information between an operation location and a location related to the operation location. An operation form execution step of executing instructions for devices in a predetermined area in order according to operation form data describing instructions in order and notifying a relay station of a result of the executed operation instructions And when monitoring the execution right schedule data that specifies the priority of operation locations that control devices in the area in time series, and the location is at the second priority And determining whether or not a failure has occurred at a location of the first priority in the area by referring to a monitoring packet having a device status such as a failure of the device in the area. If a failure is detected, a notification is sent to a predetermined destination, and if there is an instruction from the destination that made the notification, or the communication line or the like cannot be approved, When applied, rewrites and rewrites the contents of the control route switch that identifies the location where the device in the area is controlled so that the control right of the location of the first priority is deprived and the control right is given to the location. And a primary station failure determination step for transmitting the contents of the control route switch to the relay station. In the relay station, an operation location in the area, a command location for giving a command regarding the operation, a command relay A location monitoring step for monitoring the operation status of a device such as a relay location, a monitoring result transmission step for notifying the monitored result as a monitoring packet to a relevant location via a communication network, and the contents of the control route switch It is received from the location having the control route switch, it is determined whether there is a change in the content of the control route switch, and when the change is detected, the change content of the control route switch is notified to the relevant location and the detected A control route switch determination step for correcting the operation sheet data to reflect the change contents, and notifying the relevant location including the operation location in the first priority order, and the operation from the operation location Relay the command to the device in the area and relay the result of the operation command received from the device in the area to the relevant location And a command relay step.

好ましくは、前記中継局において、前記制御ルートスイッチ判定ステップは、前記修正した操作票を作業を行う操作箇所に送信するステップを含むように構成する。   Preferably, in the relay station, the control route switch determination step includes a step of transmitting the corrected operation slip to an operation location where work is performed.

本発明によれば、電力系統の操作において指令箇所、中継箇所、操作箇所などの制御ルートに変更が有った場合に、自動的に操作票の修正を行うことが可能となるので、操作票の修正を電話連絡で行うことによる手違いの発生を少なくすることができ、操作票の修正の時間も短縮することができるので、電力系統の操作を効率的に行うことができる。   According to the present invention, the operation slip can be automatically corrected when there is a change in the control route such as the command location, the relay location, and the operation location in the operation of the power system. Therefore, it is possible to reduce the occurrence of mistakes caused by telephone contact and to shorten the time required for correcting the operation slip, so that the power system can be operated efficiently.

以下、本発明の実施の形態を説明する。図1に、本発明の第1の実施の形態に係わる全体の機器接続構成を示す。電力系統運用監視制御システム1は、指令箇所、中継箇所についての記載は無いが、実際の操作指令を行う操作箇所サーバ20としての制御所A、B、Cと、操作箇所/バックアップ箇所/その他の箇所を監視し障害検出を行い障害を発見した場合は、監視している上記操作箇所/バックアップ箇所/その他の箇所に障害の通知を行うと同時に、操作箇所サーバ20から届くエリア内機器50への操作指令をエリア内機器50に通知する中継局サーバ60と、エリア内機器50が通信ネットワーク4を介して接続可能に構成されている。   Embodiments of the present invention will be described below. FIG. 1 shows an overall device connection configuration according to the first embodiment of the present invention. The power system operation monitoring control system 1 does not describe the command location and the relay location, but the control locations A, B, and C as the operation location server 20 that performs the actual operation command, and the operation location / backup location / others. When a failure is detected by monitoring a location, a failure is notified to the monitored operation location / backup location / other location, and at the same time, the in-area device 50 received from the operation location server 20 is notified. The relay server 60 that notifies the operation command to the in-area device 50 and the in-area device 50 are configured to be connectable via the communication network 4.

それぞれのエリア5内には配電盤や機側盤および操作対象の機器が接続される。配電盤や機側盤は実際の機器を収容している子局の配下に存在するものである。但しエリア内機器50は通信ネットワーク4を介して営業所、制御所、および発変電所などから制御できるように構成されている。   In each area 5, a switchboard, a machine side panel, and a device to be operated are connected. The switchboard and the machine side panel exist under the slave station that contains the actual equipment. However, the in-area device 50 is configured to be controlled from a sales office, a control station, a power generation / substation, and the like via the communication network 4.

図2は、電力系統の操作を行うのに使用する事前にオフラインで作成する操作票71の作成およびオンライン中での操作票71の修正の動作の流れの概要を示す図である。以下図2を用いて操作票71の処理概要を説明する。操作票71は、まず操作が行われる予定の日の1〜2週間前にオフライン業務で作成される。オフライン業務での作成に際し、運用ルールD21(A24)および、エリア内機器50の担当を示す業務執行権のスケジュールを示す業務執行権スケジュール表72(A25)および制御権ルートスイッチB21(A26)を用いて図5にその例を示す操作票71を作成する。例えば運用ルールより指令箇所と中継箇所を取得し、業務執行権スケジュール表72および制御ルートスイッチより操作箇所2を取得し、操作内容は運用ルールなどより取得することで操作票71は作成される。   FIG. 2 is a diagram showing an outline of the flow of operations for creating the operation slip 71 created offline in advance and used for operating the power system and for modifying the operation slip 71 online. The processing outline of the operation slip 71 will be described below with reference to FIG. The operation slip 71 is first created in an off-line work 1 to 2 weeks before the date on which the operation is scheduled to be performed. When creating an offline job, the operation rule D21 (A24), the business execution right schedule table 72 (A25) indicating the schedule of the business execution right indicating the charge of the in-area device 50, and the control right route switch B21 (A26) are used. Thus, an operation slip 71 whose example is shown in FIG. 5 is created. For example, a command part and a relay part are acquired from the operation rule, the operation part 2 is acquired from the business execution right schedule table 72 and the control route switch, and the operation content is acquired from the operation rule or the like, thereby creating the operation slip 71.

作成した操作票71は一旦作成したサーバである本実施の形態では中継局サーバ60内にデータベースとして保存され、操作箇所サーバ20に作成されたことが通知されるかもしくはデータそのものが送信される(A28)。実際のエリア内機器50の操作は、担当の操作箇所サーバ20にて中継局サーバ60内に存在する操作票71のデータベースを参照して行われるか、もしくは受信した操作票71を参照して行われる。   In the present embodiment, which is a server once created, the created operation slip 71 is stored as a database in the relay station server 60, and the operation location server 20 is notified of the creation or the data itself is transmitted ( A28). The actual operation of the in-area device 50 is performed by referring to the operation slip 71 database existing in the relay server 60 at the responsible operation location server 20 or referring to the received operation slip 71. Is called.

オンライン業務中に何らかの理由で制御ルートの変更が発生した場合は、図2の上部に記載しているように、オンライン処理中の業務執行権スケジュール表72(A21)に記載の内容と、制御ルートが変更になったことを示す制御権ルートスイッチB21の内容により事前に承認を受けた上でオンラインにて操作票71の修正(A27、A28)を行い、図2中の事故時の操作票71の作成を行う。   When the control route is changed for some reason during the online operation, as described in the upper part of FIG. 2, the contents described in the business execution schedule table 72 (A21) being processed online and the control route 2 is corrected online (A27, A28) after receiving approval in advance according to the content of the control right route switch B21 indicating that the operation has been changed, and the operation slip 71 at the time of the accident in FIG. Create.

本操作票71も中継局サーバ60内にデータベースとして蓄積され、操作する際に操作箇所サーバ20が内容を取得して操作を行うことが可能である。作成された制御ルートが修正された操作票71が作成されたことが通知されるか、もしくは修正された操作票71そのものが操作箇所サーバ20に中継局サーバ60から送信され(A29)、操作箇所サーバ20はその操作票71を元にした操作を実行する。以上のような処理手順にて操作票71は作成/修正され、実行される。   The operation slip 71 is also stored as a database in the relay server 60, and the operation location server 20 can acquire the contents and perform the operation when operating. It is notified that the operation slip 71 in which the created control route has been corrected is created, or the corrected operation slip 71 itself is transmitted from the relay server 60 to the operation location server 20 (A29). The server 20 executes an operation based on the operation slip 71. The operation slip 71 is created / corrected and executed by the processing procedure as described above.

図3は、電力系統運用監視制御システム1を構成する、エリア内機器50の制御を行う操作箇所2に設置される操作箇所サーバ20、処理を中継する中継局6に設置される中継局サーバ60、エリア内機器50の機能ブロック図を示す、操作箇所2および中継局6は、制御所、営業所、発電所および変電所(以降、発電所と変電所を合わせて発変電所と称す)であっても良い。   FIG. 3 shows an operation location server 20 installed in an operation location 2 that controls the in-area device 50, and a relay station server 60 installed in a relay station 6 that relays the processing, which constitutes the power system operation monitoring control system 1. The operation point 2 and the relay station 6 are shown in the functional block diagram of the equipment 50 in the area. The control point, the sales office, the power plant, and the substation (hereinafter, the power plant and the substation are collectively referred to as a power generation substation). There may be.

図3において、上記操作箇所サーバ20、中継局サーバ60、およびエリア内機器50は全て通信ネットワーク4を介して通信可能に接続されている。ここで、電力系統運用監視制御システム1は、電力系統の保守運用をなどの管理を行う電力会社、またはサービス事業者などにより管理、運営される。   In FIG. 3, the operation location server 20, the relay station server 60, and the in-area device 50 are all communicably connected via the communication network 4. Here, the power system operation monitoring control system 1 is managed and operated by an electric power company that manages the maintenance of the power system, or a service provider.

操作箇所サーバ20は、通信ネットワーク4を介してデータの送受信を行うための送受信部22、送受信部22から受け取ったデータの処理、およびその他のさまざまな処理を行う中央演算処理部23、データを記憶するための記憶部24、および、中央演算処理部23との間でデータの入出力を行う入力部25と表示部26から構成されている。入力部25と表示部26はマンマシンインタフェースの機能を有する部分である。送受信部22は通信プロトコルの機能を有する部分である。   The operation location server 20 stores a data, a transmission / reception unit 22 for transmitting / receiving data via the communication network 4, a central processing unit 23 for processing data received from the transmission / reception unit 22, and various other processes. And an input unit 25 for inputting / outputting data to / from the central processing unit 23 and a display unit 26. The input unit 25 and the display unit 26 are parts having a man-machine interface function. The transmission / reception unit 22 is a part having a communication protocol function.

さらに、中央演算処理部23は、送受信部22との間でデータの受け渡しを行う送受信処理手段(機能)231、入力部25あるいは表示部26とデータの受け渡しを行う入出力処理手段(機能)232、入出力処理手段(機能)232または送受信処理手段231を介して受信した業務執行権スケジュール表72、操作票71に記載する内容などの情報を登録する情報登録手段(機能)233、操作票71を逐一実行する操作票実行手段(機能)234、中継局6から受信される各サーバや装置の状態などを含む監視パケットなどにより、エリア内機器50の操作を行う第1番目の優先順位を有する操作箇所である1次局の障害発生などを監視し判定する1次局障害発生手段(機能)235から構成される。   Further, the central processing unit 23 transmits / receives data to / from the transmission / reception unit 22, and input / output processing means (function) 232 performs data transfer with the input unit 25 or the display unit 26. , Information registration means (function) 233 for registering information such as the contents described in the business execution right schedule table 72 and the operation slip 71 received via the input / output processing means (function) 232 or the transmission / reception processing means 231, and the operation slip 71 The first priority order for operating the in-area device 50 is determined by the operation form execution means (function) 234 for executing each of the above, the monitoring packet including the status of each server or device received from the relay station 6, and the like. It comprises primary station failure generation means (function) 235 that monitors and determines the occurrence of a failure in the primary station, which is the operation location.

また、記憶部24は、本電力系統運用監視制御システム1の利用者である利用者の情報を保存する利用者情報データベース(DB)241、操作を行う可能性があるエリア内機器50に関する全ての操作票71を保存する操作票データベース(DB)242、エリア内機器50の操作を行う担当箇所を特定している業務執行権スケジュール表72から構成されている。操作票DB242は、含まれることもあるが、中継局サーバ60内の操作票DB642を参照して作業を行う場合は含まれなくても良い。   In addition, the storage unit 24 includes a user information database (DB) 241 that stores information on a user who is a user of the power system operation monitoring control system 1, and all the devices 50 in the area that may be operated. An operation form database (DB) 242 that stores the operation forms 71 and a business execution right schedule table 72 that specifies locations in charge of operating the devices 50 in the area are configured. The operation slip DB 242 may be included, but may not be included when the work is performed with reference to the operation slip DB 642 in the relay station server 60.

エリア5は、エリア内機器50を備え、エリア内機器50は、通信ネットワーク4を介してデータの送受信を行うための送受信部52、送受信部52から受け取ったデータの処理、およびその他のさまざまな処理を行う中央演算処理部53、および、中央演算処理部53との間でデータの入出力を行う入力部55と表示部56から構成されている。入力部55と表示部56はマンマシンインタフェースの機能を有する部分である。送受信部52は通信プロトコルの機能を有する部分である。   The area 5 includes an in-area device 50, and the in-area device 50 transmits / receives data via the communication network 4, processing of data received from the transmitting / receiving unit 52, and various other processes. A central processing unit 53 that performs data input, and an input unit 55 that inputs and outputs data to and from the central processing unit 53, and a display unit 56. The input unit 55 and the display unit 56 have a man-machine interface function. The transmission / reception unit 52 is a part having a communication protocol function.

さらに、中央演算処理部53は、送受信部52との間でデータの受け渡しを行う送受信処理手段(機能)531、入力部55あるいは表示部56とデータの受け渡しを行う入出力処理手段(機能)532、与えられた操作を実行する操作実行手段(機能)533、実行した操作の結果を通知する実行結果通知手段(機能)534から構成される。   Further, the central processing unit 53 is a transmission / reception processing means (function) 531 for exchanging data with the transmission / reception unit 52, and an input / output processing means (function) 532 for exchanging data with the input unit 55 or the display unit 56. , An operation execution means (function) 533 for executing a given operation, and an execution result notification means (function) 534 for notifying the result of the executed operation.

中継局6は、中継局サーバ60を備え、中継局サーバ60は、通信ネットワーク4を介してデータの送受信を行うための送受信部62、送受信部62から受け取ったデータの処理、およびその他のさまざまな処理を行う中央演算処理部63、データを記憶するための記憶部64、および、中央演算処理部63との間でデータの入出力を行う入力部65と表示部66から構成されている。入力部65と表示部66はマンマシンインタフェースの機能を有する部分である。送受信部62は通信プロトコルの機能を有する部分である。   The relay station 6 includes a relay station server 60. The relay station server 60 transmits / receives data via the communication network 4, processes data received from the transmitter / receiver 62, and various other types. A central processing unit 63 for processing, a storage unit 64 for storing data, and an input unit 65 and a display unit 66 for inputting / outputting data to / from the central processing unit 63 are provided. The input unit 65 and the display unit 66 are parts having a man-machine interface function. The transmission / reception unit 62 has a communication protocol function.

さらに、中央演算処理部63は、送受信部62との間でデータの受け渡しを行う送受信処理手段(機能)631、入力部65あるいは表示部66とデータの受け渡しを行う入出力処理手段(機能)632、操作箇所である制御所などの監視を行う箇所監視手段(機能)634、操作箇所サーバ20から受信される制御ルートスイッチを中継して他の制御所などに通知する制御ルートスイッチ判定手段(機能)635、操作箇所サーバ20から対応するエリア内機器50への指令を中継する指令中継手段(機能)636から構成される。   Further, the central processing unit 63 transmits / receives data to / from the transmitter / receiver 62 (transmission / reception processing means (function) 631), and input / output processing means (function) 632 exchanges data with the input unit 65 or the display unit 66. , Location monitoring means (function) 634 for monitoring the control location as the operation location, control route switch determination means (function) for relaying the control route switch received from the operation location server 20 and notifying other control locations, etc. 635, command relay means (function) 636 that relays a command from the operation location server 20 to the corresponding in-area device 50.

また、記憶部64は、通信を行う各操作箇所である制御所などを監視して取得した状態を管理し保存する操作箇所状態管理データベース(DB)641、操作を行う全てのエリア内機器50の操作票71を保存している操作票データベース(DB)642から構成されている。   In addition, the storage unit 64 monitors the control location, which is each operation location that performs communication, and manages and saves the acquired status, and the operation location status management database (DB) 641 and all the in-area devices 50 that perform the operation. The operation form database (DB) 642 stores the operation form 71.

通信ネットワーク4は、利用者が独自に敷設した専用の通信網または、通信事業者から借り受けた回線をある定めた通信プロトコルを用いて操作箇所サーバ20、エリア内機器50、中継局サーバ60を接続する通信網である。例えば、ADSL(Asymmetric Digital Subscriber Line)、FTTH(Fiber To The Home)、CATV(Community Antenna TeleVision)、広域LAN(Local Area Network)などの回線を使用することが可能である。   The communication network 4 connects the operation point server 20, the in-area device 50, and the relay station server 60 using a dedicated communication network laid by the user or a communication protocol that defines a line borrowed from a communication carrier. Communication network. For example, it is possible to use lines such as ADSL (Asymmetric Digital Subscriber Line), FTTH (Fiber To The Home), CATV (Community Antenna TeleVision), and wide area LAN (Local Area Network).

図4は、業務執行権スケジュール表72のデータ構成例である。図4に示す表においてエリア1内の機器の運用管理は、平日の昼間帯、土水日曜日の夜間は操作箇所としては制御所Aが担当し、平日の夜間、閑散日や休日の昼間、および繁忙日の夜間は制御所Bが代行して担当すること、さらに制御所Bもしくは制御所Cが使用不可になった時は制御所Aが担当することが記載されている。   FIG. 4 is a data configuration example of the business execution right schedule table 72. In the table shown in FIG. 4, the operation management of the devices in the area 1 is performed during the daytime on weekdays, the control center A is in charge of operation at night on Saturdays, Sundays, and nighttime on weekdays, during daytime on off days and holidays, and It is described that the control station B takes charge of the night on busy days, and that the control station A takes charge when the control station B or the control station C becomes unusable.

エリア2内の機器の運用管理も同様に、平日昼間・平日夜間・閑散日・休日の昼間・繁忙日の夜間・土水日の夜間の場合は制御所Bが操作箇所を担当し、制御所Bが使用不可の場合は制御所AまたはCが代行し、制御所AまたはCが使用不可の場合は、制御所Bが担当することが記載されている。本実施の形態では、日時の記載などが無いが、日時を指定して操作箇所を決定しても良い。また、図19に示すように、担当箇所を優先順位順に1次局、2次局、3次局というように登録可能にしても良い。   Similarly, operation and management of equipment in area 2 is handled by control station B in the case of weekday daytime, weekday nighttime, off-day, holiday daytime, busy day night, and Saturday and Wednesday night. It is described that the control station A or C takes the place when B is not usable, and that the control station B takes charge when the control station A or C is unavailable. In this embodiment, there is no description of the date and time, but the operation location may be determined by specifying the date and time. Further, as shown in FIG. 19, the locations in charge may be registered in the order of priority, such as a primary station, a secondary station, and a tertiary station.

本業務執行権スケジュール表72は操作箇所2になることができる制御所、営業所、および発変電所が予め有している。エリア1の場合、制御所AおよびBで管理しており、制御所AおよびBはお互いの稼動状況などを監視パケットを参照することで判定する。例えば、監視パケットの内容を確認することで、あるエリア内機器50の1次局である制御所Aが障害もしくはシステムの都合などで動作できなくなったと2次局である制御所Bが判定することができる。   This business execution right schedule table 72 is previously held by a control station, a sales office, and a power generation / substation that can be the operation location 2. In the case of area 1, management is performed by the control stations A and B, and the control stations A and B determine each other's operation status by referring to the monitoring packet. For example, by confirming the contents of the monitoring packet, the control station B, which is the secondary station, determines that the control station A, which is the primary station of the device 50 in a certain area, cannot operate due to a failure or system convenience. Can do.

その場合には、制御所Bは、承認を得た上で制御権ルートスイッチを変更して執行権を自分に変更して変更した制御権ルートスイッチの内容を中継局サーバ60に監視パケットを用いて送信することで機能することができなくなった制御所Aの執行権を剥奪し、2次局である制御所Bを担当する操作箇所にすることができる。執行権の変更の際には担当者の承認を得ることを必須とするか、またはフラグなどの定義によって承認が無くとも2次局は1次局の執行権の変更処理を行うことができるようにするかを選択するのも可能である。   In that case, the control station B uses the monitoring packet for the relay station server 60 to change the control right route switch after obtaining the approval, change the execution right to itself, and change the contents of the control right route switch to the relay station server 60. By transmitting the data, the execution right of the control station A that has become unable to function can be deprived, and the control station B, which is the secondary station, can be set as the operation point in charge. It is mandatory to obtain the approval of the person in charge when changing the execution right, or the secondary station can change the execution right of the primary station even if there is no approval by the definition of a flag etc. It is also possible to select whether or not.

同様にエリア2の場合は制御所A、B、Cが操作箇所2として担当する可能性が有るので制御所A、B、Cはそれぞれ中継局より受信される監視パケットをチェックする。但し、本図において、制御所Aが動作中の場合は制御所Cは代行することが無いので制御所Bが動作中のときのみ参照するなどの処理が行われる。エリア3においても同様である。   Similarly, in the case of area 2, the control stations A, B, and C may be in charge as the operation point 2, so that the control stations A, B, and C each check a monitoring packet received from the relay station. However, in this figure, when the control station A is in operation, the control station C does not act on its behalf, so processing such as referring to it only when the control station B is in operation is performed. The same applies to area 3.

図19においては、1次局〜3次局まで定義しているので、1次局が動作中の場合は2次局が監視を行い、2次局が動作中の場合は3次局が監視を行うなどの動作がなされる。   In FIG. 19, since the primary station to the tertiary station are defined, the secondary station monitors when the primary station is operating, and the tertiary station monitors when the secondary station is operating. The operation such as performing is performed.

図5は、各機器の操作を記載している操作票71の構成例である。図5に示すように「指令箇所」、「中継箇所」、「操作箇所」、「作業内容」、作業の「済/未」などの項目が記載できるようになっている。通常の作業はこの操作票71に則り、指令箇所である○○制御所から電話で中継箇所である○△電力センターに連絡が届き、さらに○△電力センターから操作箇所である□△営業所に電話で連絡が届き、その連絡を元にして作業内容に記載のある、例えば「201開閉機断」を実行するものである。また作業終了時には「済/未」の欄を「済」に設定する。   FIG. 5 is a configuration example of the operation slip 71 describing the operation of each device. As shown in FIG. 5, items such as “command location”, “relay location”, “operation location”, “work content”, and “finished / unfinished” work can be described. The normal work is based on this operation slip 71. From the control location, which is the command location, the contact from the control location to the relay location is sent to the power center, and from the power location to the location where the operation location is located. A report is received by telephone, and based on the report, for example, “201 switchgear disconnection” described in the work content is executed. At the end of the operation, the “done / not yet” column is set to “done”.

操作票71に記載されている一連の作業の途中に操作箇所2に障害などが発生し、中継局6がそれを検出して監視パケットにその旨を設定して各制御所に仮想チャンネルを用いて通知する。ここで仮想チャンネルとは、複数の制御所の制御権の切り替え用に割り当てられ、遠方監視制御装置の伝送用フォーマット(テレコンフォーマット)に即して関係する制御所との間で切替制御データあるいは状態データ送るためのチャンネルのことを称す。   In the middle of a series of operations described in the operation slip 71, a failure or the like occurs in the operation location 2, and the relay station 6 detects it, sets that in the monitoring packet, and uses a virtual channel for each control station. To notify. Here, the virtual channel is assigned for switching the control right of a plurality of control stations, and switching control data or status between the control stations related to the transmission format (telecon format) of the remote monitoring control device. A channel for sending data.

通知を受信した制御所などは自分が操作箇所2として担当する可能性があるエリアの現時点での操作箇所2に障害が発生したかを上記仮想チャンネルにて受信される監視パケットの内容より判定して、障害を検出した場合でかつ自分が2次局として次の優先順位になっていた場合は、承認を得た上で図7にその例を示す制御権ルートスイッチの対応するエリアの自箇所の欄を「ON」に設定し、障害を検出した1次局の欄を「OFF」に設定して中継局に通知する。新たに担当になった2次局は、「済/未」の欄よりどこまでの作業が終了したのかが特定できるので、次の操作をエリア内機器50に指示することが可能となる。   The control center or the like that has received the notification determines from the contents of the monitoring packet received on the virtual channel whether a failure has occurred at the current operation location 2 in the area where it may be in charge as the operation location 2. If a failure is detected and if the mobile station has the next priority as the secondary station, it is approved and the local area corresponding to the control right route switch shown in FIG. Is set to “ON”, and the column of the primary station in which the failure is detected is set to “OFF” to notify the relay station. The newly assigned secondary station can specify how far the work has been completed from the “done / not yet” column, and can instruct the in-area device 50 to perform the next operation.

図6は制御所、営業所、発変電所などの箇所の状態を示す監視パケットの構成例である。本実施の形態においては、制御所、営業所、発変電所のそれぞれが動作中なのかをOK/NGで示している。例えば、OKであれば「0」、NGであれば「1」などと設定して中継局サーバ60から通知される情報である。例えば図4においてエリア1内の機器の操作の「平日昼間」の担当は制御所Aであるが、次優先順位の担当である制御所Bは、図6内の制御所C1が制御所Aであり、C2が制御所Bである場合は、C1の情報を常に監視して、この情報がNG(例えば1)になった時に制御所Aの障害を検出し、自箇所が担当の操作箇所サーバ20となるべく処理を行うことになる。   FIG. 6 is a configuration example of a monitoring packet indicating the state of a location such as a control station, a sales office, or a substation. In the present embodiment, OK / NG indicates whether each of the control station, the sales office, and the power substation is operating. For example, the information is notified from the relay server 60 by setting “0” for OK, “1” for NG, and the like. For example, in FIG. 4, the control station A is responsible for “weekday daytime” operation of the equipment in the area 1, but the control station B in charge of the next priority is the control station C1 in FIG. Yes, if C2 is the control station B, the information of C1 is always monitored, and when this information becomes NG (for example, 1), the failure of the control station A is detected, and the operation location server in charge of its own location Processing is performed as much as possible.

図7は、制御権ルートスイッチのデータの構成例である。制御権ルートスイッチはどの箇所が操作箇所2であってエリア内の機器の制御権があるかを示すデータであり、エリアごとに制御権がある箇所がオン状態にかっており、その他の箇所はオフ状態になっている。このオン/オフ状態は0/1で表現されていても良い。図7では、エリアID#1の制御権は営業所Aにあり、エリアID#2の制御権は制御所Aにあり、エリアID#3の制御権は発電所Aにあるということを示している。本データは操作箇所2が障害やその他の理由により他の箇所からエリア内の機器を制御する場合などに変更になるため、リアルタイムに使用されるデータである。本制御権ルートスイッチは、図11に示すスイッチSW01〜SW04を表現したものであっても良い。   FIG. 7 is a data configuration example of the control right root switch. The control right root switch is data indicating which part is the operation part 2 and the right to control the equipment in the area. The part having the control right for each area is turned on, and the other parts are off. It is in a state. This on / off state may be expressed as 0/1. FIG. 7 shows that the control right for area ID # 1 is in sales office A, the control right for area ID # 2 is in control office A, and the control right for area ID # 3 is in power station A. Yes. This data is used in real time because it is changed when the operation location 2 controls a device in the area from another location due to a failure or other reason. This control right route switch may represent the switches SW01 to SW04 shown in FIG.

図8は、中継局サーバ60が有する箇所状態管理DB641のデータ構成例である。監視を行うべき制御所、営業所、発変電所などの指令箇所、中継箇所、操作箇所になる可能性がある箇所の稼動状態を例えばある定期的な間隔もしくは、状態の変化があった時にパケットが送信されるようにして取得し本DBに登録する。本箇所状態管理DB641を参照して上述の監視パケットを送信することになる。   FIG. 8 is a data configuration example of the location state management DB 641 included in the relay station server 60. Packets when there is a change in status, for example, at regular intervals, or the operating status of command locations such as control stations, sales offices, and substations to be monitored, relay locations, and locations that may become operation locations Is acquired and registered in this DB. The monitoring packet described above is transmitted with reference to the present location state management DB 641.

第1の実施の形態における電力運用監視制御システム1は以上のように構成され、以下にその動作をフローチャートなどを用いて説明する。   The power operation monitoring control system 1 in the first embodiment is configured as described above, and the operation thereof will be described below using a flowchart and the like.

[1. 制御パケットのシーケンス]
図9は、操作を行うに際して行われる操作箇所、中継局およびエリア内の機器A間で行われる制御パケットの通信のシーケンスチャートを示している。制御パケットとは、操作票71に従って行われるべき作業指令を含むパケットのことである。まず1次局である制御所Aからエリア内機器Aに対する作業内容を含んだ制御パケットがエリア内機器Aを目指して送信され(A91)、中継局に届き、中継局で受信される(A92)。このパケットは例えば、図5の操作票71に示す作業内容そのものもしくは、作業内容をより詳細に一手順ずつ分けられた、例えば「201の遮断機を選択する」といった選択制御信号などである。
[1. Control packet sequence]
FIG. 9 shows a sequence chart of control packet communication performed between the operation location, the relay station, and the device A in the area when the operation is performed. The control packet is a packet including a work command to be performed according to the operation slip 71. First, a control packet including work contents for the in-area device A is transmitted from the control station A, which is the primary station, to the in-area device A (A91), reaches the relay station, and is received by the relay station (A92). . This packet is, for example, the work content itself shown in the operation slip 71 of FIG. 5 or a selection control signal such as “selecting a circuit breaker 201” in which the work content is divided into more detailed procedures one by one.

中継局は受信した制御パケットのエラーチェックおよび制御権のある操作箇所サーバ20からのパケットであるかの正当性をチェック(A92)して、問題がなければ対応するエリア内機器Aに対して制御パケットを中継する(A93)。エリア内機器Aは受信した制御パケットの内容に従って、例えば「201の遮断機を選択」する。エリア内機器Aは受信した指令を含んだ制御パケットに対する応答として、例えば「201遮断機選択OK」などの応答パケットを中継局サーバ60に送信する(A94)。   The relay station checks the error of the received control packet and checks the validity of the packet from the operation location server 20 having the control right (A92), and if there is no problem, controls the corresponding in-area device A. The packet is relayed (A93). The in-area device A performs, for example, “selects a blocker 201” according to the content of the received control packet. The intra-area device A transmits a response packet such as “201 blocker selection OK” to the relay server 60 as a response to the control packet including the received command (A94).

応答パケットを受信した中継局は、受信したエリア内機器Aの業務執行権スケジュール表72を参照し、関連のある箇所、例えば図9では制御所Aおよび制御所Bに応答パケットを転送する(A95、A96)。これ以降のA97〜A9Cは、次の操作指令である、例えば次に行う必要がある「遮断機をオフにする」などの指令を含んでおり、処理はA91〜A96と同様に行われる。上記の手順にて操作票71に従った操作指令が実行される。   The relay station that has received the response packet refers to the received business execution right schedule table 72 of the in-area device A, and forwards the response packet to a relevant location, for example, the control station A and the control station B in FIG. 9 (A95). , A96). Subsequent A97 to A9C include the next operation command, for example, a command such as “turn off the circuit breaker” that needs to be performed next, and the processing is performed in the same manner as A91 to A96. An operation command according to the operation slip 71 is executed in the above procedure.

[2. 監視パケットのシーケンス]
次に監視パケットのシーケンスについて図10を用いて説明する。監視パケットとは、指令箇所、中継箇所、操作箇所になることができる箇所の、例えば停止中、調整中、稼動中などの状態を監視もしくは通知するパケットである。本実施の形態では制御所、営業所、発変電所などから中継局サーバ60に届くものであり、中継局サーバ60で状態の管理を行っている。
[2. Monitoring packet sequence]
Next, the monitoring packet sequence will be described with reference to FIG. The monitoring packet is a packet for monitoring or notifying a state that can be a command point, a relay point, or an operation point, for example, a stop state, an adjustment state, or an operation state. In this embodiment, the information is received from the control station, the sales office, the substation, etc. to the relay station server 60, and the relay station server 60 manages the state.

本監視パケットは詳細は記載していないが、既存の子局−制御局間の制御パケットなどのフォーマットに従って作成することが可能であり、監視のための専用のチャンネルを各制御所、営業所、発変電所などが有するものである。以降、このチャンネルのことを仮想チャンネルと称す。例えば100の子局が存在する場合は、中継局サーバ60は100の子局用のチャンネルと制御所、営業所、発変電所の監視用の1つの仮想チャンネルを有する。   Although details of this monitoring packet are not described, it can be created according to the format of the control packet between the existing slave station and the control station, and a dedicated channel for monitoring is assigned to each control station, sales office, This is what the power substation has. Hereinafter, this channel is referred to as a virtual channel. For example, when there are 100 slave stations, the relay station server 60 has a channel for 100 slave stations and one virtual channel for monitoring a control station, sales office, and substation.

例えば中継局サーバ60が操作箇所である制御所Aおよび営業所Bに仮想チャンネルを使用して監視パケットを送信する場合は、例えばパケット内に制御所Aおよび営業所B用である旨のフラグを立てるなどの制御を行い、制御所Aおよび営業所Bはそのフラグを見て自分向けのパケットであると判定してその監視パケットを取り込むなどの動作を行う。全箇所向けも同様に予め定めたフラグなどのパターンを持たせることで可能である。   For example, when the relay station server 60 transmits a monitoring packet using the virtual channel to the control station A and the sales office B which are the operation locations, for example, a flag indicating that the relay station server 60 is for the control station A and the sales office B is included in the packet. The control office A and the sales office B look at the flag, determine that the packet is for them, and perform operations such as capturing the monitoring packet. Similarly, it is possible to provide a pattern such as a predetermined flag for all locations.

または、仮想チャンネルを使用して互いに制御所Aと営業所Bにリンクを張った上で監視パケットの送受信を行うことも可能である。図10では、リンクを張るのではなく定めた箇所にのみ監視パケットを送信する例である。但しこの例の場合は、全ての送り先である制御所、営業所、初変電所に届くが、宛先として指定した箇所がそのデータを取得するという形式である。また、図10では、指令箇所、中継箇所、操作箇所#1と#2と中継局から構成され、指令箇所、中継箇所、操作箇所#1および#2から状態を通知する監視パケットを受信し、中継局が受信した監視パケットにより各箇所の状態をまとめて指令箇所、中継箇所、操作箇所#1および#2に状態の通知を行う監視パケットを送信している例である。   Alternatively, the monitoring packet can be transmitted and received after a link is established between the control office A and the sales office B using a virtual channel. FIG. 10 shows an example in which a monitoring packet is transmitted only to a predetermined place instead of establishing a link. However, in this example, all destinations are sent to the control station, sales office, and first substation, but the location designated as the destination acquires the data. Also, in FIG. 10, the monitoring location is composed of the command location, the relay location, the operation location # 1 and # 2, and the relay station, and receives a monitoring packet for notifying the state from the command location, the relay location, the operation location # 1 and # 2, In this example, the monitoring packet received by the relay station is sent to the command location, the relay location, and the operation locations # 1 and # 2 to monitor the status of each location.

まず、指令箇所、中継箇所、操作箇所#1は自分の状態である、例えば停止中、調整中、稼動中などの状態を監視パケットに設定して中継局に送信する(A101)。この送信のトリガーは、定期的な通信でも良いし、状態変化があった時のみ行われても良いし、またシーケンスチャートには記載が無いが、中継局からのポーリングに対する応答であっても良い。   First, the command location, the relay location, and the operation location # 1 are their own states, for example, the states such as stop, adjustment, and operation are set in the monitoring packet and transmitted to the relay station (A101). This transmission trigger may be periodic communication, may be performed only when there is a change in state, or may be a response to polling from the relay station, although not described in the sequence chart. .

中継局は受信した監視パケットより状態を抽出し、対応する箇所の状態を保存している図8に示す箇所状態管理DB641を更新し(A102)、受信した応答パケットを送信する。指令箇所、中継箇所、操作箇所#2からも同様にA104〜A107で示すような通信手順が行われる。次に例えば周期的に、もしくは何らかのイベント発生をトリガーとして更新された状態を状態の通知を行う監視パケットにて指令箇所、中継箇所、操作箇所#1および#2に送信する。これにより指令箇所、中継箇所、操作箇所#1および#2は互いの状態を知ることが可能となる。   The relay station extracts the state from the received monitoring packet, updates the location state management DB 641 shown in FIG. 8 storing the corresponding location state (A102), and transmits the received response packet. Communication procedures as indicated by A104 to A107 are similarly performed from the command location, the relay location, and the operation location # 2. Next, for example, the state updated periodically or triggered by the occurrence of some event is transmitted to the command location, the relay location, and the operation locations # 1 and # 2 in a monitoring packet that notifies the status. As a result, the command location, the relay location, and the operation locations # 1 and # 2 can know the state of each other.

上記指令箇所、中継箇所、操作箇所#1および#2は、例えば全ての制御所、営業所、発変電所などである。   The command location, the relay location, and the operation locations # 1 and # 2 are, for example, all control stations, sales offices, power substations, and the like.

[3. 指令制御のパターン]
図11は、指令箇所同一で、各制御ルートスイッチが変更された時の指令制御パターンを示している。図中、指令箇所は営業所であり本図において指令箇所の変更は無い。また、操作箇所2としては営業所と制御所、バックアップ箇所および発変電所および機側盤がある。この例のように発変電所内の配電盤もしくは機側盤が操作箇所2になり操作を行うことができる。
[3. Command control pattern]
FIG. 11 shows a command control pattern when the command route is the same and each control route switch is changed. In the figure, the command location is a sales office, and there is no change in the command location in this figure. The operation location 2 includes a sales office and a control office, a backup location, a power substation, and a machine side panel. As in this example, the switchboard or the machine side panel in the power substation becomes the operation location 2 and can be operated.

図中記載されていないが、操作箇所サーバ20からエリア内機器50の間は図9に示すように常に中継局サーバ60を経由する。よって図11中の(1)〜(8A)の全てにおいて、C(操作指令)と記載がある部分には中継局が介在しており、操作箇所サーバ20からの作業内容の指示は常に中継局サーバ60を介してエリア内機器50に送信されるものである。   Although not shown in the figure, between the operation location server 20 and the in-area device 50 always passes through the relay server 60 as shown in FIG. Therefore, in all of (1) to (8A) in FIG. 11, a relay station is interposed in the portion where C (operation command) is described, and the work content instruction from the operation location server 20 is always relay station. It is transmitted to the in-area device 50 via the server 60.

また、図11中で記載されているスイッチ群であるSW01〜SW04は制御ルートスイッチの例である。図11中のSW01〜SW04の状態は(1)の状態を示しており、この場合は発変電所の機側盤のスイッチSW01および配電盤のSW02、バックアップ箇所のスイッチSW03、制御所のスイッチSW04はオフになっており、営業所のスイッチSW04のみがオン状態になっており、エリア内機器50の制御は営業所が行うことを示している。また、営業所は指令箇所を兼ねている。(2)では、営業所および制御所のスイッチSW04は制御所がオン状態になっており、営業所は指令箇所としてのみ機能し、エリア内機器50の制御は制御所が行うことを示している。   Further, SW01 to SW04, which are the switch groups described in FIG. 11, are examples of control route switches. The state of SW01 to SW04 in FIG. 11 indicates the state of (1). In this case, the switch SW01 on the machine side panel of the substation and the switchboard SW02, the switch SW03 at the backup point, and the switch SW04 at the control station are It is off, and only the switch SW04 of the sales office is in the on state, indicating that the sales office performs control of the in-area device 50. The sales office also serves as a command location. In (2), the switch SW04 of the sales office and the control office is in the ON state, the sales office functions only as a command location, and the control office performs control of the equipment 50 in the area. .

以下に制御ルートが変更になる場合の(1)〜(8A)までの説明を行う。
(1)操作箇所は営業所であり、営業所からの操作指令(A111)によりエリア内機器50を直接操作する。この操作とは図9で示した内容と同様である。
(2)営業所および制御所のスイッチSW04の制御所側をオン状態にしており、操作箇所は制御所である。指令箇所は営業所なので営業所から電話にて制御所に連絡を取り(A112)、その後は制御所からの操作指令によりエリア内機器50の操作を行う(A113)。
(3)バックアップ箇所のSW03がオン状態になっており、バックアップ拠点が操作箇所になっている。制御の指令は指令箇所である営業所からバックアップ箇所に電話で連絡があり、(A114)、バックアップ箇所から指令によりエリア内機器50の制御を行う(A115)。
The following describes (1) to (8A) when the control route is changed.
(1) The operation location is a sales office, and the in-area device 50 is directly operated by an operation command (A111) from the sales office. This operation is the same as that shown in FIG.
(2) The control station side of the switch SW04 of the sales office and the control office is turned on, and the operation location is the control office. Since the command location is a sales office, the business office contacts the control office by telephone (A112), and thereafter, the in-area device 50 is operated by an operation command from the control office (A113).
(3) The backup location SW03 is on, and the backup location is the operation location. A control command is sent from the sales office, which is the command location, to the backup location by telephone (A114), and the in-area device 50 is controlled by the command from the backup location (A115).

(4)発変電所が操作箇所になる場合である。この場合、発変電所の機側盤のスイッチSW01がオフ状態、監視制御装置のスイッチSW02がオン状態になっていて監視制御装置が操作箇所として動作している状態を示す。本図ではエリア内機器50が1箇所しか記載されていないが発変電所が自分のエリア内機器50を操作するか別のエリア内機器50を制御することを意味している。この形態においても、指令箇所である営業所から電話で監視制御装置が設置されている発変電所に連絡があり(A116)、監視制御装置から対象のエリア内機器50に操作指令を行う(A117)。この場合も、制御はまず中継局を通ってから中継局から操作指令が監視制御装置もしくは機側盤に届くものである。
(4A)発変電所の監視制御装置のスイッチSW02がオフ状態のなっており、機側盤のスイッチSW01がオン状態になっていて機側盤が操作箇所になっている状態を示している。操作指令は機側盤から行われる(A118)。この場合も操作指令は中継局を介してエリア内機器50に通知される。
(4) This is a case where the substation is the operation location. In this case, the switch SW01 on the machine side panel of the power generation substation is in the off state, and the switch SW02 of the monitoring control device is in the on state, and the monitoring control device is operating as the operation location. Although only one in-area device 50 is shown in the figure, this means that the substation operates the own in-area device 50 or controls another in-area device 50. Also in this embodiment, the sales office that is the command location contacts the power generation / substation where the monitoring control device is installed by telephone (A116), and the monitoring control device issues an operation command to the target area device 50 (A117). ). Also in this case, the control is such that the operation command first reaches the supervisory control device or the machine side panel from the relay station after passing through the relay station.
(4A) The switch SW02 of the monitoring and control device of the power substation is in the OFF state, the switch SW01 of the machine side panel is in the ON state, and the machine side panel is in the operating position. The operation command is issued from the machine side panel (A118). Also in this case, the operation command is notified to the in-area device 50 through the relay station.

上記(1)〜(4A)では、中継箇所を介していない例である。
(5)指令箇所から電話による中継箇所を介してバックアップ箇所から指令を行う例であり、まず指令箇所である営業所から電話で中継箇所に連絡を行い(A119)、さらに中継箇所は電話でバックアップ箇所に連絡を行い(A11A)、バックアップ箇所はエリア内機器50に操作指令を行い操作する(A11B)。本(4)は上記(3)において中継箇所を経由する例となっている。
(6)上記(4)において中継箇所を経由する例である。異なるのは指令箇所である営業所から電話で中継箇所に連絡があり、さらに中継箇所から監視制御装置が設置されている発変電所に電話連絡があり、作業が行われるところである。
(7)上記(6)において2つ目の中継箇所としてバックアップ箇所を利用する例である。
(8)上記(6)において中継箇所としてバックアップ箇所を利用する例である。
The above (1) to (4A) are examples that do not go through a relay location.
(5) This is an example in which a command is issued from the backup location via the relay location by telephone from the command location. First, the sales location that is the command location is contacted by telephone (A119), and the relay location is backed up by telephone. The location is contacted (A11A), and the backup location is operated by giving an operation command to the in-area device 50 (A11B). The book (4) is an example via the relay location in the above (3).
(6) This is an example of passing through a relay location in (4) above. The difference lies in the fact that there is a telephone contact from the sales office that is the command location to the relay location, and further there is a telephone contact from the relay location to the power substation where the monitoring and control device is installed.
(7) This is an example of using a backup location as the second relay location in (6) above.
(8) In this example (6), a backup location is used as a relay location.

[4. 情報の登録]
図12は、電力系統運用監視制御システム1にて操作箇所サーバ20における情報の登録を行う「情報登録ルーチン」の動作の処理手順を示すフローチャートである。本動作は情報登録手段233が行う動作である。利用者の情報・宛先情報・閾値情報、作業機材特定ファイルなどの情報の登録は、操作箇所サーバ20の入力部25および表示部26に接続されているキーボードや画面を用いて直接登録を行う。
[4. Registration of information]
FIG. 12 is a flowchart showing a processing procedure of an “information registration routine” for registering information in the operation location server 20 in the power system operation monitoring control system 1. This operation is performed by the information registration unit 233. Registration of information such as user information / destination information / threshold information, work equipment specifying file, etc. is performed directly using a keyboard or a screen connected to the input unit 25 and the display unit 26 of the operation location server 20.

図示していないシリアル回線などを用いてパソコンを端末として使用して接続するか、社内のLAN(Local Area Network)や通信ネットワーク4を介して外部からネットワーク越しに接続してログインして設定を行ったりすることも可能である。ネットワークを経由して情報の設定を行う場合は、セキュリティを強化してIDおよびパスワードの送信およびデータの送受信情報を暗号化を行うことが望ましい。以下、操作箇所サーバ20に直接つながっているキーボードを用いて登録を行う場合の処理手順について図12を用いて説明する。   Connect using a personal computer as a terminal using a serial line (not shown), or connect to the network via an in-house LAN (Local Area Network) or communication network 4 and log in to make settings It is also possible to do. When setting information via a network, it is desirable to enhance security to encrypt ID and password transmission and data transmission / reception information. Hereinafter, a processing procedure in the case of performing registration using a keyboard directly connected to the operation location server 20 will be described with reference to FIG.

まず、キーボードを操作して本電力系統運用監視制御システム1(実際はケーブル位置情報管理サーバ2に接続される)に対してログイン要求を行う(S121b)。操作箇所サーバ2はログイン要求を受信し(S121a)、システムへログインするためのIDとパスワードの要求を行う(S122a)。ID/パスワードの要求は表示部16を介してモニタ画面などに表示され(S122b)、操作者が入力したID/パスワードの内容が操作箇所サーバ20に通知され(S123b)、操作箇所サーバ2は情報を受信する(S123a)。   First, a login request is made to the power system operation monitoring control system 1 (actually connected to the cable position information management server 2) by operating the keyboard (S121b). The operation location server 2 receives the login request (S121a), and requests an ID and password for logging in to the system (S122a). The request for the ID / password is displayed on the monitor screen or the like via the display unit 16 (S122b), the contents of the ID / password input by the operator are notified to the operation location server 20 (S123b), and the operation location server 2 receives information. Is received (S123a).

操作箇所サーバ2は、利用者情報DB241内の利用者IDとパスワード情報を取得し、受信したID/パスワードと合致しているかを判定する(S124a)。ID/パスワードが合致しない場合は、ステップS122aに戻り再度上記処理を繰り返す。ID/パスワードが合致すると操作箇所サーバ20は、作業の選択画面などを送信する(S125a)。本画面にて各種情報の登録を選択することができる。   The operation location server 2 acquires the user ID and password information in the user information DB 241 and determines whether they match the received ID / password (S124a). If the ID / password does not match, the process returns to step S122a and the above process is repeated again. When the ID / password matches, the operation location server 20 transmits a work selection screen or the like (S125a). Registration of various information can be selected on this screen.

操作者のモニタ画面には受信した選択画面が表示され(S124b)、操作者が選択した内容として業務執行権スケジュール表、操作票71などの情報の登録作業を選択したことが通知される(S125b)。要求を受信した(S126a)情報登録手段133は、前述の業務執行権スケジュール表、操作票71に関連する情報などの入力画面を作成し、表示部16を通して操作者が扱っている画面に表示させる(S127a)。   The received selection screen is displayed on the monitor screen of the operator (S124b), and it is notified that the registration work of information such as the business execution right schedule table and the operation slip 71 has been selected as the content selected by the operator (S125b). ). Upon receiving the request (S126a), the information registration unit 133 creates an input screen for information related to the business execution right schedule table and the operation slip 71, and displays the input screen on the screen handled by the operator through the display unit 16. (S127a).

操作者は画面(S126b)を見ながら業務執行権スケジュール表、操作票71に関連する情報などをキーボードで入力する。入力された情報は入力部15を介して情報登録手段233に通知される(S127b)。情報登録手段233は、入力された(S128a)業務執行権スケジュール表、操作票71に関連する情報などを、それぞれ、業務執行権スケジュール表72、操作票DB242に登録する(S129a)。次に情報登録手段133は、入力を継続するか終了するかを選択する画面を作成して画面に表示する(S12Aa)。   While viewing the screen (S126b), the operator inputs information related to the business execution right schedule table, operation slip 71, and the like using the keyboard. The input information is notified to the information registration means 233 via the input unit 15 (S127b). The information registration means 233 registers the information related to the entered business execution right schedule table and operation slip 71 in the business execution right schedule table 72 and operation slip DB 242 (S129a). Next, the information registration unit 133 creates a screen for selecting whether to continue or end the input and displays it on the screen (S12Aa).

表示された画面を見て(S128b)、操作者が選択した内容が入力部15より情報登録手段233に通知される(S129b、S12Ba)。受信した内容を判定(S12Ca)して、終了が選択された場合は本ルーチンを終了する。継続が選択された場合(S12Caのnoのルート)は、ステップS122aに戻り、処理終了が選択されるまで上記動作を繰り返す。   Looking at the displayed screen (S128b), the content selected by the operator is notified from the input unit 15 to the information registration means 233 (S129b, S12Ba). The received content is determined (S12Ca), and if the end is selected, this routine ends. When continuation is selected (no route of S12Ca), the process returns to step S122a and the above operation is repeated until the end of the process is selected.

なお、本実施の形態においてはステップS12Aaにて入力を終了するか継続するかを判定するような構成になっているが、継続して行わなければならないような登録内容の時は上記のS12Aa〜12Caに記載のステップの動作は行わず直ちにステップS127aに戻って継続して入力情報を打ち込む画面を送信する動作を行う。また、入力する情報の登録が済んだ場合は、別の画面に遷移するなどその他の手順が行われても良い。   In the present embodiment, it is configured to determine whether to end or continue the input in step S12Aa. However, in the case of registration contents that must be continuously performed, the above S12Aa to S12Aa are used. The operation described in 12Ca is not performed, and the operation immediately returns to step S127a to continue to transmit a screen for inputting input information. In addition, when registration of input information is completed, other procedures such as transition to another screen may be performed.

[5. オフライン業務での操作票の作成]
図13は、オフライン業務にて操作票71を作成する際のフローチャートを示す。本実施の形態ではオフライン業務での操作票71の作成は実際の操作が、例えば1〜2週間前に行われるとするとまず、作成している操作票の作成日であるか判定する(S131)し、作成日で無い場合は処理を終了する。作成日の場合は、運用ルールと業務執行権スケジュール表、制御所状態管理テーブルより操作票71に必要な指令箇所、中継箇所、操作箇所を決定し、対象の機器などの電力操作を行う操作票71を作成する(S132)。
[5. Creating operation slips for offline work]
FIG. 13 shows a flowchart when creating the operation slip 71 in the off-line work. In the present embodiment, the creation of the operation slip 71 in the off-line operation is first determined if the actual operation is performed, for example, one to two weeks ago, or not, the creation date of the operation slip being created (S131). If it is not the creation date, the process ends. In the case of the creation date, an operation slip that determines the command location, relay location, and operation location required for the operation slip 71 from the operation rules, the business execution right schedule table, and the control center state management table, and performs the power operation of the target device, etc. 71 is created (S132).

次に、全ての操作票71の作成が終了したかどうかを判定し(S133)、終了していない場合は、次の対象操作を指定(S134)してステップS132へ戻り全ての操作票71の作成が終了するまで上記処理を繰り返す。全ての操作票71の作成が終了した場合(S133のyesのルート)は、作成した操作票71を保存し(S135)、操作箇所になりうる制御所、営業所、発変電所などに作成したこと通知し(S136)処理を終了する。上記処理手順にて日々の操作票71が作成され必要な操作箇所などに通知される。   Next, it is determined whether or not the creation of all operation slips 71 has been completed (S133). If not completed, the next target operation is designated (S134) and the process returns to step S132 to return all operation slips 71. The above process is repeated until the creation is completed. When the creation of all operation slips 71 is completed (yes route in S133), the created operation slip 71 is saved (S135) and created in a control station, sales office, substation, etc. that can be the operation location. (S136) and the process is terminated. A daily operation slip 71 is created by the above processing procedure and notified to necessary operation locations.

なお、業務が自動化され1〜2週間より以前に操作票71の作成が早期に行われる場合においても日付をチェックするステップS131において「2週間前」から「1日前」などのように日付を変更するだけで対応可能である。   Note that even when the operation is automated and the operation slip 71 is created earlier than 1 to 2 weeks, the date is changed from “2 weeks ago” to “1 day ago” in step S131 for checking the date. Just do it.

[6. オンライン業務での操作票の修正]
図14は、動作中の操作箇所2に何らかの障害が発生した場合、もしくは人的に操作箇所の変更を行いたくなった時に強制的に操作箇所を変更する際のシーケンスチャートおよび動作のフローチャートを示す。中継局サーバ60と操作箇所サーバ20は例えば定期的に通信するか、もしくは、何か発生した時に通信を行うなどで通信を行うことで中継局サーバ60は操作箇所サーバ20の監視を行っているものとする。
[6. Correction of operation slip in online business]
FIG. 14 shows a sequence chart and an operation flowchart when the operation location is forcibly changed when a failure occurs in the operation location 2 during operation or when it is desired to change the operation location manually. . The relay station server 60 and the operation location server 20 communicate with each other by, for example, periodically communicating or performing communication when something happens, for example, so that the relay station server 60 monitors the operation location server 20. Shall.

図14において制御所Aは図示していないがあるエリア内機器50の1次局としての操作箇所2であり、制御所Bは同じエリア内機器50の2次局であるとする。制御局Aは定期通信として制御情報を通知する(S141a)。中継局サーバ60は上記定期通信を受信する(S141c)とその内容をチェック(S142c)する。受信した制御情報内に制御所Aの障害情報が存在するかを判定し(S143c)、障害を発見しなかった場合は、何もせず(S147c)処理を終了する。   In FIG. 14, it is assumed that the control station A is an operation point 2 as a primary station of the in-area device 50 (not shown), and the control station B is a secondary station of the same in-area device 50. The control station A notifies the control information as regular communication (S141a). When the relay station server 60 receives the regular communication (S141c), it checks the content (S142c). It is determined whether or not the failure information of the control center A exists in the received control information (S143c). If no failure is found, nothing is done (S147c) and the process is terminated.

制御所Aに障害を発見した場合は、発見した障害情報を他の操作箇所サーバ20などに通知するために制御所Aが障害であることを記載した図6に示す監視パケットを作成する(S144c)。次に操作箇所状態管理DB641に制御所Aが障害状態であることを登録することで内容を更新し(S145c)、作成した監視パケットを仮想チャンネルを用いて他の制御所、営業所、発変電所などに通知する(S146c)。   When a failure is detected in the control station A, a monitoring packet shown in FIG. 6 is created to indicate that the control station A has a failure in order to notify the detected failure information to the other operation location server 20 (S144c). ). Next, the contents are updated by registering that the control station A is in a fault state in the operation location state management DB 641 (S145c), and the created monitoring packet is transmitted to another control station, sales office, power generation / transformation using a virtual channel. (S146c).

送信された監視パケットは制御所Aおよび制御所Bおよび図示していないその他の制御所、営業所、発変電所などにて受信される(S142a、S141b)。制御所Bは受信した制御パケットを参照し、自分が2次局になっている1次局の障害が発生しているかを判定する(S142b)。障害発生を検出したとしても自分が2次局で無い限りは何もせずに処理を終了する(S142bのnoのルート)。   The transmitted monitoring packet is received at the control station A and the control station B, and other control stations, sales offices, substations, etc. (not shown) (S142a, S141b). The control station B refers to the received control packet and determines whether a failure has occurred in the primary station that is the secondary station (S142b). Even if the occurrence of a failure is detected, the process is terminated without doing anything unless it is a secondary station (no route in S142b).

自分が2次局であるエリア内機器50の1次局が障害であることを検出した場合は、まず指定の宛先に自分が操作箇所として担当することの可否を予め指定された宛先に通知して回答を待つ(S143b)。指定の宛先からの回答を判定し(S144b)、OKの回答を得なかった場合(S144bのnoのルート)は、何もせずに処理を終了する。OKの場合は(S144bのyesのルート)、制御権の剥奪を行うことに同意したものとし、制御権ルートスイッチパケット内に、自分を対象のエリア内機器50の執行権者とし、障害を発生した制御所を執行権無しに設定して(S145b)、制御権ルートスイッチを含んだ監視パケットを中継局サーバ60に送信する(S146b)。   When it is detected that the primary station of the in-area device 50 that is the secondary station is a failure, first, the designated destination is notified of whether or not it can be handled as the operation location. And wait for an answer (S143b). An answer from the designated destination is determined (S144b), and if no OK answer is obtained (no route in S144b), the process ends without doing anything. In the case of OK (yes route in S144b), it is assumed that the user has agreed to deprive of the control right, and in the control right route switch packet, he / she becomes the execution right holder of the target in-area device 50 and a failure occurs. The control station is set to have no execution right (S145b), and a monitoring packet including the control right route switch is transmitted to the relay station server 60 (S146b).

次に制御ルートスイッチを含んだ監視パケットを受信(S148c)した中継局サーバ60は、対応する操作票71の操作箇所を2次局として登録されている箇所である制御所Bに変更し(S149c)、操作票71を修正したことを関連のある箇所に通知する監視パケットを作成する(S14Ac)。受信した制御ルートスイッチを含んだ監視パケットおよびステップS14Acで作成した監視パケットを仮想チャンネルを用いて制御所A、B、その他の制御所、営業所、発変電所などに送信する(S14Bc)。上記制御所A、B、その他の制御所、営業所、発変電所などは受信した(S143a、S147b)制御ルートスイッチを含んだ監視パケットにより制御所Aに障害が発生し、対象のエリア内機器50の操作箇所が制御所Bに移ったことを理解することになる。   Next, the relay station server 60 that receives the monitoring packet including the control route switch (S148c) changes the operation location of the corresponding operation slip 71 to the control location B that is registered as a secondary station (S149c). ), A monitoring packet for notifying the relevant location that the operation slip 71 has been modified is created (S14Ac). The received monitoring packet including the control route switch and the monitoring packet created in step S14Ac are transmitted to the control stations A and B, other control stations, sales offices, and substations using the virtual channel (S14Bc). The above control stations A and B, other control stations, sales offices, power substations, etc. (S143a, S147b) have failed in the control station A due to the monitoring packet including the control route switch, and the devices in the target area It will be understood that 50 operation points have moved to the control station B.

上述の手順によりエリア内機器50の操作箇所になっている制御所などに障害が発生した場合は、中継局が障害の発生を検出し、仮想チャンネルを使用して障害情報を含んだ制御パケットを送信することで2次局である箇所が権限の委譲を行って良いかを予め指定された宛先の承認を求め、その回答が委譲を行っても良い場合は、制御権ルートスイッチパケットを用いて権限の書替えを行い、作業中の操作票71に記載の操作箇所を修正して関連する箇所に通知するので、作業を継続して行うことが可能となる。   If a failure occurs at a control station or the like that is the operation location of the in-area device 50 by the above procedure, the relay station detects the occurrence of the failure and uses the virtual channel to send a control packet including failure information. If the part that is the secondary station can send the authorization by delegating the authority specified in advance, and if the answer may be delegated, use the control right root switch packet Since the authority is rewritten and the operation part described in the operation slip 71 being worked is corrected and the relevant part is notified, the work can be continued.

図14においては、操作箇所に障害が発生した場合について記載しているが、指令箇所、中継箇所に変更が有り、その変更内容が監視パケットで判明できる場合、例えば指令箇所もしくは中継箇所の障害の発見などの場合は図14と同様な手順で処理することが可能である。または、システムの管理者などが、手動で指令箇所、中継箇所、操作箇所の変更などを行いたい場合は、図14で示した監視パケットによる「障害」の検出だけではなく、例えば手動で変更を行いたい旨の制御情報を載せ、操作箇所でその内容を理解し自動的に操作票71の修正を行うことも可能である。   FIG. 14 shows a case where a failure occurs in the operation location. However, if there is a change in the command location and the relay location, and the change contents can be identified by the monitoring packet, for example, the failure of the command location or the relay location. In the case of discovery or the like, it is possible to process in the same procedure as in FIG. Or, if the system administrator etc. wants to manually change the command location, relay location, operation location, etc., not only the “failure” detection by the monitoring packet shown in FIG. It is also possible to put control information indicating that the operation is desired, understand the contents at the operation location, and automatically correct the operation slip 71.

さらに、上記例においては、中継局サーバ60が操作票71の修正を行い関連する箇所に通知しているが、操作箇所サーバ20が自己の障害を検出した場合は、自己の障害を検出した操作箇所サーバ20において制御ルートスイッチの修正を行うことも可能である。同様に操作票71の修正も自己の障害を検出した操作箇所サーバ20もしくは1次局の障害を検出した2次局である操作箇所サーバ20が行い中継局サーバ60に通知するということも可能である。   Further, in the above example, the relay station server 60 corrects the operation slip 71 and notifies the relevant location, but if the operation location server 20 detects its own failure, the operation that has detected its own failure. It is also possible to correct the control route switch in the location server 20. Similarly, the operation slip 71 can be corrected by the operation location server 20 that has detected its own failure or the operation location server 20 that is the secondary station that has detected the failure of the primary station and notifies the relay station server 60 of it. is there.

[7. 操作票実行時の処理]
図15は、操作箇所サーバ20が操作票71をもとに作業を処理する動作の処理手順を示すフローチャートである。本動作は、操作票実行手段533が行う動作であり、以下図15を用いて処理を説明する。
[7. Processing during operation slip execution]
FIG. 15 is a flowchart illustrating a processing procedure of an operation in which the operation location server 20 processes a work based on the operation slip 71. This operation is an operation performed by the operation form execution unit 533, and the processing will be described below with reference to FIG.

まず、対応のエリアを制御しているのが自分であるか制御ルートスイッチを参照して確認する(S151)。制御ルートスイッチの内容は中継局より、定期的にもしくは変更が有った時に通知される。自分がエリアの制御権を有する操作箇所で無い場合は、操作票71の読み込み作業などを停止し処理を終了する(S159)。この処理により障害が有った場合もしくは何らかの理由で操作箇所を変更する場合、現状の処理を停止することができる。現状の操作箇所が自分で障害を検知することができる場合は、自ら操作を停止することも可能である。   First, it is checked by referring to the control route switch whether or not it is controlling the corresponding area (S151). The contents of the control route switch are notified from the relay station periodically or when there is a change. If it is not the operation location where the user has the right to control the area, the operation of reading the operation slip 71 is stopped and the process is terminated (S159). If there is a failure due to this processing, or if the operation location is changed for some reason, the current processing can be stopped. If the current operation location can detect a failure by itself, the operation can be stopped by itself.

操作箇所に変更が無かった場合は、操作票71に登録された手順を実行する(S152)。実行結果に問題が無いか判定し(S153)、問題ない場合は「実行OK」をバッファに出力し(S154)、問題が有った場合は、「実行NG」をバッファに出力し(S155)、バッファの内容を結果として出力する(S156)。出力結果は中継局サーバ60に送信されるが、この出力結果がOKであれば対応する操作票71に記載されている作業に「済」を書き込む。出力結果がNGである場合は、別途対応することが可能である。   If the operation location has not been changed, the procedure registered in the operation slip 71 is executed (S152). It is determined whether there is no problem in the execution result (S153). If there is no problem, “execution OK” is output to the buffer (S154). If there is a problem, “execution NG” is output to the buffer (S155). The contents of the buffer are output as a result (S156). The output result is transmitted to the relay station server 60. If this output result is OK, “completed” is written in the work described in the corresponding operation slip 71. If the output result is NG, it can be dealt with separately.

次に操作票71に登録されている全ての作業を終了したかを判定し(S157)、終了していない場合は次の操作を指定してステップS151に戻り上記処理を繰り返す。終了した場合は(S153のyesのルート)、処理を終了する。上記処理により操作票71に登録されている作業を一つずつ順序良く作業し、その結果を中継局に通知し、中継局サーバ60がその結果を関連ある箇所に転送することで、2次局が1次局が行った動作とその結果を知ることが可能となる。
本発明による第1の実施の形態は以上のように構成され動作する。
Next, it is determined whether or not all the operations registered in the operation slip 71 have been completed (S157). If not completed, the next operation is designated, and the process returns to step S151 to repeat the above processing. If completed (yes route in S153), the process ends. The work registered in the operation slip 71 by the above processing is performed one by one in order, the result is notified to the relay station, and the relay station server 60 transfers the result to the relevant location, thereby allowing the secondary station It is possible to know the operation performed by the primary station and its result.
The first embodiment of the present invention is configured and operates as described above.

本発明によれば、電力系統の機器に実際に作業指示を与える操作箇所サーバ20とエリア内機器50の間に中継局6を設け、中継局サーバ60にて指令箇所、中継箇所、操作箇所になりうる制御所、営業所、発変電所などを監視し、エリア内機器50を制御する操作箇所サーバ20に制御の優先権を与えた業務遂行権スケジュール72を基にして、さらにエリア内機器50を制御する制御権を制御ルートスイッチにて管理することで、操作箇所サーバ20に障害が発生したり、何らかの理由で操作箇所2を変更したりしたいといった要望に柔軟に対応できる電力系統の機器の運用管理を行うことができる。   According to the present invention, the relay station 6 is provided between the operation location server 20 that actually gives a work instruction to the power system device and the in-area device 50, and the relay station server 60 provides a command location, a relay location, and an operation location. Based on the business execution right schedule 72 that gives control priority to the operation location server 20 that monitors possible control stations, sales offices, substations, etc. and controls the in-area devices 50, the in-area devices 50 By managing the control right to control the operation route with the control route switch, the failure of the operation location server 20 or the change of the operation location 2 for some reason can be flexibly responded to the request of the equipment of the power system. Operation management can be performed.

次に第2の実施の形態について以下に説明する。図16は、本発明の第2の実施の形態に係わる中継局サーバ2の機能ブロック図を示している。第1の実施の形態と比較して、中央演算処理手段63内に、障害を検出した際に予め定めた宛先に通知を行う障害通知手段637が存在し、記憶部64内に障害を検出した際に通知する宛先を保存する通知宛先データベース(DB)642が存在することが異なる。   Next, a second embodiment will be described below. FIG. 16 shows a functional block diagram of the relay station server 2 according to the second embodiment of the present invention. Compared to the first embodiment, there is a failure notification unit 637 for notifying a predetermined destination when a failure is detected in the central processing unit 63, and the failure is detected in the storage unit 64. However, there is a notification destination database (DB) 642 for storing a destination to be notified at the time.

図17は、監視結果通知または障害を検出した時に通知する宛先を保存する通知宛先DB642のデータ構成例である。通知先として、通知先の氏名、電話/FAX/電子メール/インターネット利用などの通知方法、および通知先の電話番号/FAX番号/電子メールなどの通知する宛先が通知先ごとに保存されている。   FIG. 17 is a data configuration example of the notification destination DB 642 that stores a destination to be notified when a monitoring result notification or a failure is detected. As a notification destination, a notification destination name, a notification method such as telephone / FAX / email / Internet use, and a notification destination such as a notification destination telephone number / FAX number / email are stored for each notification destination.

第2の実施の形態における電力系統運用監視制御システム1は以上のように構成され、以下に第2の実施の形態と異なる部分のみその動作をフローチャートなどを用いて説明する。   The power system operation monitoring control system 1 in the second embodiment is configured as described above, and only the operation different from that of the second embodiment will be described below using a flowchart and the like.

[8. 障害検出の通知]
図18は、電力系統運用監視制御システム1にて箇所に障害を検出した時に動作する
「障害通知ルーチン」の動作の処理手順を示すフローチャートであり、本動作は障害通知手段637が行う動作である。以下図18を用いて処理を説明する。まず、図17に示す通知宛先DB642を参照し、通知先と通知方法、通知宛先を取得し(S181)、通知方法により分岐する(S182)。
[8. Failure detection notification]
FIG. 18 is a flowchart showing the processing procedure of the “failure notification routine” that operates when a failure is detected at a location in the power system operation monitoring control system 1, and this operation is performed by the failure notification means 637. . Hereinafter, the processing will be described with reference to FIG. First, referring to the notification destination DB 642 shown in FIG. 17, the notification destination, the notification method, and the notification destination are acquired (S181), and the process branches according to the notification method (S182).

電子メールにより通知する場合は、障害発生状況を知らせるメールを作成し、メールのボディに設定し、宛先は取得したメールの宛先を設定する。(S183)。次に作成したメールを送信し(S184)、ステップS18Cに進む。FAXにより通知する場合は、障害発生状況をファイルとして電子的に作成し出力し(S185)、宛先に電話してFAXプロトコルにて送信する(S186)ことによって通知し、ステップS18Cへ進む。   When notifying by e-mail, an e-mail notifying the failure occurrence status is created and set in the body of the e-mail, and the destination of the acquired e-mail is set as the destination. (S183). Next, the created mail is transmitted (S184), and the process proceeds to step S18C. When notifying by FAX, the failure occurrence status is electronically created and output as a file (S185), notified by calling the destination and transmitting by FAX protocol (S186), and proceeds to step S18C.

電話により通知する場合は、障害発生状況を知らせる音声ファイルを作成し(S187)、取得した宛先に電話して、相手先が応答した時に音声ファイル再生し(S188)、ステップS18Cへ進む。   In the case of notification by telephone, a voice file is generated to notify the failure occurrence status (S187), the acquired destination is called, the voice file is played back when the other party answers (S188), and the process proceeds to step S18C.

インターネット利用の場合は、まず障害発生状況を知らせるファイルを作成し(S189)、作成したファイルを特定のプロトコルで参照できる特定の場所に置き(S18A)、特定の場所に置いたことを特定の手段、例えば電子メールなどにて通知する(S18B)。特定のプロトコルがHTTP(HyperText Transfer Protocol)通知の場合は、外部から参照できるサーバなどのHTTPにてアクセス可能な場所にファイルを置き、その場所を示すURL(Uniform Resource Locator)を電子メールを用いて通知する。   In the case of using the Internet, first, a file notifying the failure occurrence state is created (S189), the created file is placed in a specific place where it can be referred to by a specific protocol (S18A), and a specific means that the file is placed in a specific place. For example, notification is made by e-mail (S18B). When the specific protocol is HTTP (HyperText Transfer Protocol) notification, a file is placed in a location accessible by HTTP, such as a server that can be referred to from the outside, and a URL (Uniform Resource Locator) indicating the location is sent using e-mail Notice.

次にステップ18Cでは全ての宛先の処理が終了したかを判定し、終了していない場合は次の宛先を指定して(S18D)、ステップS181に戻り、全ての登録されている宛先の処理が終了するまで上記動作を繰り返す。全ての宛先の処理が終了した場合は(S18Cのyesルート)、本ルーチンの処理を終了する。このような手順で障害発生状況を予め定めた宛先に通知することができる。本実施の形態ではメールのボディに稼動状況の結果を記載することにしているが、稼動状況を表すファイルを作成し、安全を確保するために例えば暗号化などを行った上で送信し、受け取る側で復号化して受信するという行い方でも良い。
本発明による第2の実施の形態は以上のように構成され動作する。
Next, in step 18C, it is determined whether or not the processing for all destinations has been completed. If not, the next destination is designated (S18D), and the process returns to step S181 to process all registered destinations. The above operation is repeated until the end. If all destinations have been processed (yes route of S18C), the process of this routine is ended. In such a procedure, the failure occurrence status can be notified to a predetermined destination. In this embodiment, the result of the operation status is described in the body of the mail. However, a file representing the operation status is created, and for example, encryption is performed to ensure the safety, and then transmitted and received. The method of decoding and receiving on the side may also be used.
The second embodiment of the present invention is configured and operates as described above.

本実施の形態によれば、障害発生を検出した際に自動的に予め登録している宛先に通知することができるので、障害に素早くに対応することが可能となる。   According to the present embodiment, when a failure occurrence is detected, it is possible to automatically notify a destination registered in advance, so that it is possible to quickly cope with the failure.

本発明の第1の実施の形態に係わる電力系統運用監視制御システムの全体機器構成図である。1 is an overall device configuration diagram of a power system operation monitoring control system according to a first embodiment of the present invention. 本発明の第1の実施の形態に係わる操作票の作成・修正・実行などの流れを説明する図である。It is a figure explaining the flow of creation, correction, execution, etc. of the operation slip concerning the 1st Embodiment of this invention. 本発明の第1の実施の形態に係わる電力系統運用監視制御システムを構成する操作箇所サーバ、エリア内機器、中継局サーバの機能ブロック図である。It is a functional block diagram of the operation location server, the in-area device, and the relay station server that constitute the power system operation monitoring control system according to the first embodiment of the present invention. 図2の業務執行権スケジュール表のデータ構成例である。It is a data structural example of the business execution right schedule table | surface of FIG. 図2の操作票のデータ構成例である。It is a data structural example of the operation slip of FIG. 本発明の第1の実施の形態に係わる監視パケットのデータ構成例である。It is a data structural example of the monitoring packet concerning the 1st Embodiment of this invention. 図2の制御権ルートスイッチのデータ構成例である。3 is a data configuration example of a control right root switch of FIG. 2. 図2の箇所状態管理DBのデータ構成例である。It is a data structural example of the location state management DB of FIG. 本発明の第1の実施の形態に係わる制御パケットのシーケンスチャートである。It is a sequence chart of the control packet concerning the 1st Embodiment of this invention. 本発明の第1の実施の形態に係わる監視パケットのシーケンスチャートである。It is the sequence chart of the monitoring packet concerning the 1st Embodiment of this invention. 本発明の第1の実施の形態に係わる、指令箇所同一で、各制御ルートスイッチが変更された時の指令制御パターンである。It is a command control pattern when each control route switch is changed in the same command location according to the first embodiment of the present invention. 図2の情報登録手段が行う動作の処理手順を示すフローチャートである。It is a flowchart which shows the process sequence of the operation | movement which the information registration means of FIG. 2 performs. 本発明の第1の実施の形態に係わる、オフライン業務にて操作票を作成する際のフローチャートである。It is a flowchart at the time of creating the operation slip in the offline work according to the first embodiment of the present invention. 本発明の第1の実施の形態に係わる、障害発生時のシーケンスチャートである。It is a sequence chart at the time of the failure occurrence according to the first embodiment of the present invention. 本発明の第1の実施の形態に係わる、操作票実行時の処理を示すフローチャートである。It is a flowchart which shows the process at the time of operation slip execution concerning the 1st Embodiment of this invention. 本発明の第2の実施の形態に係わる、中継局サーバの機能ブロック図である。It is a functional block diagram of a relay station server concerning the 2nd Embodiment of this invention. 図16の通知宛先DBのデータ構成例である。It is an example of a data structure of notification destination DB of FIG. 図16の障害通知手段が行う動作の処理手順を示すフローチャートである。It is a flowchart which shows the process sequence of the operation | movement which the failure notification means of FIG. 16 performs. 図2の業務執行権スケジュール表のデータ構成例である。It is a data structural example of the business execution right schedule table | surface of FIG.

符号の説明Explanation of symbols

1 電力系統運用監視制御システム
2 操作箇所
4 通信ネットワーク
5 エリア
6 中継局
20 操作箇所サーバ
50 エリア内機器
60 中継局サーバ
22、52、62 送受信部
23、53、63 中央演算処理部
24、64 記憶部
25、55、65 入力部
26、56、66 表示部
71 操作票
72 業務執行権スケジュール表
231、531送受信処理手段
232、532 入出力処理手段
233、533 情報登録手段
234 1次局障害判定手段
241 利用者情報(データベース)DB
242 操作票(データベース)DB
533 操作票実行手段
534 実行結果通知手段
542 操作票(データベース)DB
634 箇所監視手段
635 制御ルートスイッチ判定手段
636 指令中継手段
637 障害通知手段
641 箇所状態管理(データベース)DB
642 通知宛先(データベース)DB
DESCRIPTION OF SYMBOLS 1 Power system operation | use monitoring control system 2 Operation location 4 Communication network 5 Area 6 Relay station 20 Operation location server 50 Area equipment 60 Relay station server 22, 52, 62 Transmission / reception part 23, 53, 63 Central processing part 24, 64 Storage Units 25, 55, 65 Input units 26, 56, 66 Display unit 71 Operation slip 72 Business execution schedule table 231, 531 Transmission / reception processing means 232, 532 Input / output processing means 233, 533 Information registration means 234 Primary station failure determination means 241 User information (database) DB
242 Operation slip (database) DB
533 Operation form execution means 534 Execution result notification means 542 Operation form (database) DB
634 Location monitoring unit 635 Control route switch determination unit 636 Command relay unit 637 Failure notification unit 641 Location state management (database) DB
642 Notification destination (database) DB

Claims (9)

発変電所・ダムなどの機器制御を操作手順に従って実行することにより電力系統の運用を行う電力系統運用監視制御システムであって、
作業の操作指令を順序に従って記載している操作票データに従って指令を順番に予め定められたエリア内の機器に対して実行するとともに、実行した前記操作指令の結果を中継局サーバに対して通知する操作票実行手段と、
エリア内の機器の制御を行う操作箇所の優先順位を時系列に特定する業務執行権スケジュールデータを監視し、自箇所が第2の優先順位になっている場合に、エリア内の第1の優先順位の箇所に障害が発生しているかどうかを前記エリア内機器の障害などの機器の状態を有する監視パケットを参照して判定し、第1の優先順位の箇所の障害を検出した場合は、予め定めた宛先に通知を行い、前記通知を行った宛先からの指示が有った場合、もしくは通信回線などの故障で承諾が取れないが、あらかじめ定められたルールに適用した場合は、第1の優先順位の箇所の制御権を剥奪し、自箇所に制御権を付与するように前記エリア内機器の制御を行う箇所を特定する制御ルートスイッチの内容を書き換え、書き換えた前記制御ルートスイッチの内容を前記中継局サーバに送信する1次局障害判定手段と、を備えた操作箇所サーバと、
前記エリア内の操作箇所、操作に関して指令を行う指令箇所、指令の中継を行う中継箇所などの機器の動作状況を監視する箇所監視手段と、
前記監視した結果を監視パケットとして関連する箇所に通信ネットワークを介して通知する監視結果送信手段と、
前記制御ルートスイッチの内容を前記制御ルートスイッチを有する箇所から受信し、前記制御ルートスイッチの内容に変化が有るか判定し、変化を検出した場合は、前記制御ルートスイッチの変更内容を関連のある箇所に通知し、前記検出した変更内容を反映させて操作票データを修正し、修正を行ったことを第1の優先順位にある操作箇所を含む関係のある箇所に通知する制御ルートスイッチ判定手段と、
前記操作箇所サーバからの操作指令を前記エリア内機器に中継し、前記エリア内機器からの受信する前記操作指令の結果などを関連のある箇所に中継する指令中継手段と、
を備えた前記中継局サーバ
を備えたことを特徴とする電力系統運用監視制御システム。
A power system operation monitoring and control system that operates a power system by executing control of equipment such as substations and dams according to operation procedures,
In accordance with the operation sheet data describing the operation instructions for the work in accordance with the order, the instructions are sequentially executed on the devices in the predetermined area, and the result of the executed operation instructions is notified to the relay station server . Operation sheet execution means;
The business execution right schedule data that specifies the priority of the operation locations that control the devices in the area in time series is monitored, and if the location has the second priority, the first priority in the area Whether or not a failure has occurred at the place of order is determined by referring to a monitoring packet having a device state such as a failure of the device in the area, and when a failure at the place of the first priority is detected, When a notification is given to a predetermined destination and there is an instruction from the destination that has made the notification, or a consent cannot be obtained due to a failure of a communication line or the like, but when applied to a predetermined rule, the first Rewrite the contents of the control route switch that identifies the location to control the devices in the area so that the control right of the priority order is deprived, and the control right is granted to the local location, and the inside of the rewritten control root switch An operation portion server with a primary station failure judging means for transmitting to the relay station server,
Location monitoring means for monitoring the operation status of the equipment such as the operation location in the area, the command location for commanding the operation, and the relay location for relaying the command,
A monitoring result transmitting means for notifying the related result as a monitoring packet via a communication network;
The content of the control route switch is received from the location having the control route switch, it is determined whether there is a change in the content of the control route switch, and when the change is detected, the change content of the control route switch is related Control route switch determination means for notifying the location, correcting the operation form data by reflecting the detected change contents, and notifying the relevant location including the operation location at the first priority level. When,
A command relay means for relaying an operation command from the operation location server to the device in the area, and relaying a result of the operation command received from the device in the area to a related location;
Wherein the relay station server with,
A power system operation monitoring control system characterized by comprising:
前記中継局サーバは、被制御所、制御所、および中継所のいずれかに設置されることを特徴とする請求項1に記載の電力系統運用監視制御システム。 The power system operation monitoring control system according to claim 1, wherein the relay station server is installed in any one of a controlled station, a control station, and a relay station. 前記監視結果や制御ルートスイッチなどの制御情報を送受信する専用の制御用チャンネルを有することを特徴とする請求項1または記載の電力系統運用監視制御システム。 The power system operation monitoring control system according to claim 1 or 2 , further comprising a dedicated control channel for transmitting and receiving control information such as the monitoring result and a control route switch. 前記制御ルートスイッチの変更通知は変更元から行われ、その変更内容は、中継局サーバの状態検出機能よって、関連する制御装置へ該制御装置が監視制御を行う機器の監視制御伝送用フォーマットに則して通知することを特徴とする請求項1ないし3のいずれか一に記載の電力運用監視制御システム。 The change notification of the control route switch is made from the change source, and the contents of the change comply with the monitoring control transmission format of the equipment that the control device performs the monitoring control to the related control device by the state detection function of the relay station server. The power operation monitoring control system according to any one of claims 1 to 3, wherein the power operation monitoring control system is notified. 前記中継局サーバは、修正した前記操作票データを作業を行う操作箇所サーバに送信する機能を有することを特徴とする請求項1ないし4のいずれか一に記載の電力系統運用監視制御システム。 The power system operation monitoring control system according to any one of claims 1 to 4 , wherein the relay station server has a function of transmitting the modified operation form data to an operation location server that performs the work. 前記1次局の障害発生を検出した2次局である箇所は、前記指示に従い、管理対象の前記エリア内の機器に対する操作票データを参照し、既に操作を行った手順以降の手順より操作指令を行うことを特徴とする請求項1ないし5のいずれか一に記載の電力系統運用監視制御システム。 The location that is the secondary station that detected the failure of the primary station refers to the operation form data for the devices in the area to be managed according to the instruction, and the operation command from the procedure after the already operated procedure. The power system operation monitoring control system according to any one of claims 1 to 5 , wherein: 前記監視結果の通知は、監視したごとに、または監視した際に障害が発見された時のみに行うことを特徴とする請求項1ないし6のいずれか一に記載の電力系統運用監視制御システム。 The power system operation monitoring and control system according to any one of claims 1 to 6 , wherein the notification of the monitoring result is performed every time monitoring is performed or only when a failure is detected during monitoring. 発変電所・ダムなどの機器制御を操作手順に従って制御する操作箇所サーバと、前記操作箇所サーバと関連ある箇所間において制御情報または監視情報の中継を行う中継局サーバを備えて電力系統の運用を行う電力系統運用監視制御方法であって、
前記操作箇所サーバは、作業の操作指令を順序に従って記載している操作票データに従って指令を順番に予め定められたエリア内の機器に対して実行するとともに、実行した前記操作指令の結果を前記中継局サーバに対して通知する操作票実行ステップと、
前記エリア内の機器の制御を行う操作箇所の優先順位を時系列に特定する業務執行権スケジュールデータを監視し、自箇所が第2の優先順位になっている場合に、前記エリア内の第1の優先順位の箇所に障害が発生しているかどうかを前記エリア内機器の障害などの機器の状態を有する監視パケットを参照して判定し、第1の優先順位の箇所の障害を検出した場合は、予め定めた宛先に通知を行い、前記通知を行った宛先からの指示が有った場合、もしくは通信回線などの故障で承諾が取れないが、あらかじめ定められたルールに適用した場合は、第1の優先順位の箇所の制御権を剥奪し、自箇所に制御権を付与するように前記エリア内機器の制御を行う箇所を特定する制御ルートスイッチの内容を書き換え、書き換えた前記制御ルートスイッチの内容を前記中継局サーバに送信する1次局障害判定ステップと実行し
前記中継局サーバは、前記エリア内の操作箇所、操作に関して指令を行う指令箇所、指令の中継を行う中継箇所などの機器の動作状況を監視する箇所監視ステップと、
前記監視した結果を監視パケットとして関連する箇所に通信ネットワークを介して通知する監視結果送信ステップと、
前記制御ルートスイッチの内容を前記制御ルートスイッチを有する箇所から受信し、前記制御ルートスイッチの内容に変化が有るか判定し、変化を検出した場合は、前記制御ルートスイッチの変更内容を関連のある箇所に通知し、前記検出した変更内容を反映させて操作票データを修正し、修正を行ったことを第1の優先順位にある操作箇所を含む関係のある箇所に通知する制御ルートスイッチ判定ステップと、
前記操作箇所サーバからの操作指令を前記エリア内機器に中継し、前記エリア内機器からの受信する前記操作指令の結果などを関連のある箇所に中継する指令中継ステップと、
実行することを特徴とする電力系統運用監視制御方法。
Operate the power system with an operation location server that controls equipment such as substations and dams according to operation procedures, and a relay station server that relays control information or monitoring information between locations related to the operation location server A power system operation monitoring control method to be performed,
The operation location server is configured to run to the device in an area predetermined in order to command according to the operation form data describing the order of the operation command of the work, the relay the results of the operation command has been executed Operation slip execution step to notify the station server ;
Monitoring the executive authority schedule data identifying the time series the priority of the operation portion for controlling the equipment of the area, when the own position is in the second priority, the first of the area When a failure has occurred at a location of the first priority, it is determined by referring to a monitoring packet having a device status such as a failure of the device in the area, and a failure at the location of the first priority is detected When a notification is given to a predetermined destination and there is an instruction from the destination that made the notification, or the communication line or the like is not acceptable, but when applied to a predetermined rule, The control route switch that specifies the location for controlling the device in the area is rewritten so that the control right of the priority order of 1 is deprived, and the control right is given to the local location, and the rewritten control route switch is rewritten. Perform primary station and the fault determination step of transmitting to the relay station server contents Ji,
The relay station server , a location monitoring step for monitoring the operation status of equipment such as an operation location in the area, a command location for commanding the operation, a relay location for relaying the command, and the like,
A monitoring result transmission step of notifying the monitored result as a monitoring packet to a relevant location via a communication network;
The content of the control route switch is received from the location having the control route switch, it is determined whether there is a change in the content of the control route switch, and when the change is detected, the change content of the control route switch is related Control route switch determination step of notifying the location, correcting the operation form data reflecting the detected change, and notifying the relevant location including the operation location having the first priority that the correction has been made When,
A command relay step of relaying an operation command from the operation location server to the device in the area, and relaying a result of the operation command received from the device in the area to a related location;
The power system operation monitoring control method characterized by performing this .
前記中継局サーバは、前記制御ルートスイッチ判定ステップにおいて、修正した前記操作票を作業を行う操作箇所サーバに送信することを特徴とする請求項に記載の電力系統運用監視制御方法。 The relay station server, in the control route switch determining step, modified power system operational monitoring control method according to claim 8 wherein the operation form, characterized by a Turkey be transmitted to the operation location server for work.
JP2006303419A 2006-11-08 2006-11-08 Power system operation monitoring control system and method Active JP4916283B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006303419A JP4916283B2 (en) 2006-11-08 2006-11-08 Power system operation monitoring control system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006303419A JP4916283B2 (en) 2006-11-08 2006-11-08 Power system operation monitoring control system and method

Publications (2)

Publication Number Publication Date
JP2008123064A JP2008123064A (en) 2008-05-29
JP4916283B2 true JP4916283B2 (en) 2012-04-11

Family

ID=39507785

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006303419A Active JP4916283B2 (en) 2006-11-08 2006-11-08 Power system operation monitoring control system and method

Country Status (1)

Country Link
JP (1) JP4916283B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109474065A (en) * 2018-01-31 2019-03-15 国网浙江省电力公司湖州供电公司 A kind of anti-misoperation system and method for secondary device

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5431380B2 (en) * 2011-02-04 2014-03-05 中国電力株式会社 Power system supervisory control system
WO2014033943A1 (en) * 2012-09-03 2014-03-06 中国電力株式会社 Backup device, backup system and backup method
EP2713462B1 (en) * 2012-09-28 2017-02-01 Enrichment Technology Company Ltd. Energy storage system and module communication
CN109214639B (en) * 2018-06-27 2023-11-14 中国南方电网有限责任公司 Intelligent generation method and equipment for power grid dispatching operation ticket

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05219664A (en) * 1992-01-31 1993-08-27 Hitachi Ltd Monitor-control system for power distribution system
JP2903445B2 (en) * 1992-03-26 1999-06-07 関西電力 株式会社 Substation driving support equipment
JPH09138702A (en) * 1995-11-14 1997-05-27 Toshiba Corp System monitoring device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109474065A (en) * 2018-01-31 2019-03-15 国网浙江省电力公司湖州供电公司 A kind of anti-misoperation system and method for secondary device

Also Published As

Publication number Publication date
JP2008123064A (en) 2008-05-29

Similar Documents

Publication Publication Date Title
CN106586753B (en) A kind of elevator faults report intelligent processing system and method for repairment
JP5102060B2 (en) COMMUNICATION SYSTEM, POWER SUPPLY MONITORING / CONTROL SYSTEM USING THE SAME, AND METHOD FOR UPDATING FIRMWARE IN COMMUNICATION SYSTEM
TWI485567B (en) Relay communication system and access management device
JP4916283B2 (en) Power system operation monitoring control system and method
CN101854647A (en) Method for remotely monitoring and managing mobile agent server (MAS) through short message interface
JP5185173B2 (en) Automatic alarm notification device, automatic alarm notification system, and automatic alarm notification method
CN107995051A (en) Secondary equipment of intelligent converting station visualized O&M module information interactive system and method
CN102801644A (en) Method and device for blocking mail behavior and gateway
US20060264241A1 (en) Base station log collection device, method for collecting logs of base station and computer program product
JP6999056B2 (en) Message management device and message management method
KR100965157B1 (en) Realtime server management solution
CN102215272B (en) Method and system for emergency switching
JP2006174563A (en) Power interruption information automatic transmission system, program, and automatic transmission method of power interruption information
KR100904089B1 (en) Control System for Switching a Automatic Circuit and Method thereof
JP2009098757A (en) Security supervisory control system
JP2014060636A (en) Communication interface conversion device
JP2011150588A (en) Management system
JP2008077475A (en) Server client system and communication state delivery server
JP2007096859A (en) Communication relay device and communication relay method
JP6671625B1 (en) Automatic transfer system for telephone transfer settings and automatic switch program for telephone transfer settings
CN100512151C (en) A legal monitoring method for WAN communication network
JP5119127B2 (en) Switch and maintenance operation method of switch
JP3676908B2 (en) Building management apparatus and management method thereof
JP4382028B2 (en) Communication system and communication method thereof
KR100645509B1 (en) Apparatus and method for remote message monitoring of exchanging system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090908

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20111003

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20111025

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20111219

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120117

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120124

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150203

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4916283

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150203

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250