JP5431380B2 - Power system supervisory control system - Google Patents

Power system supervisory control system Download PDF

Info

Publication number
JP5431380B2
JP5431380B2 JP2011022282A JP2011022282A JP5431380B2 JP 5431380 B2 JP5431380 B2 JP 5431380B2 JP 2011022282 A JP2011022282 A JP 2011022282A JP 2011022282 A JP2011022282 A JP 2011022282A JP 5431380 B2 JP5431380 B2 JP 5431380B2
Authority
JP
Japan
Prior art keywords
control
monitoring
equipment
slip
operation slip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2011022282A
Other languages
Japanese (ja)
Other versions
JP2012165505A (en
Inventor
智之 槙野
孝行 石通
英二 山根
修 木河
宏行 青梨
浩 木織
幸正 土江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2011022282A priority Critical patent/JP5431380B2/en
Publication of JP2012165505A publication Critical patent/JP2012165505A/en
Application granted granted Critical
Publication of JP5431380B2 publication Critical patent/JP5431380B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/30State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Description

この発明は、電力系統を監視制御する監視制御設備が、制御所ごとに配設された電力系統の監視制御システムに関する。   The present invention relates to a power system monitoring control system in which a monitoring control facility for monitoring and controlling a power system is provided for each control station.

監視制御設備は、例えば、遮断器や開閉器などの各電力設備の状態や各設備の電流値や電圧値などを、遠隔監視制御装置を介して制御所監視制御装置(計算機システム)に取り込み、遠隔監視制御装置を介して制御所監視制御装置で各設備を制御するものである。この制御所監視制御装置のディスプレイには、系統図画面が表示され、各設備の位置情報に基づいて、系統図上に各設備のシンボルを配置した画面を表示するようになっている。また、制御所監視制御装置は、電力系統構成を変更などするための操作手順を示す操作票を、所定の条件下で作成する機能を有している(例えば、特許文献1参照。)。そして、作成された操作票に基づいて、制御所監視制御装置の支援を受けて各設備を遠隔操作するものである。   For example, the monitoring and control equipment captures the state of each power equipment such as a circuit breaker and a switch, and the current value and voltage value of each equipment into a control station monitoring and control device (computer system) via a remote monitoring and control device. Each facility is controlled by the control station monitoring control device via the remote monitoring control device. A system diagram screen is displayed on the display of the control station monitoring and control device, and a screen in which symbols of each facility are arranged on the system diagram is displayed based on position information of each facility. Moreover, the control center monitoring control apparatus has a function of creating an operation slip indicating an operation procedure for changing the power system configuration under a predetermined condition (for example, see Patent Document 1). Based on the created operation slip, each facility is remotely operated with the support of the control center monitoring and control device.

このような監視制御設備が制御所ごとに配設され、各監視制御設備は独立して機能している。すなわち、制御所ごとに管轄・所管する電力系統が定められ、その電力系統ごとに監視制御設備が配設されている。そして、各監視制御設備において、各設備を特定するコード(設備コード)を定義してデータベースに記憶し、この設備コードを使用して操作票の作成などを行っている。   Such supervisory control equipment is arranged for each control station, and each supervisory control equipment functions independently. In other words, a power system that has jurisdiction and jurisdiction is determined for each control station, and a monitoring control facility is provided for each power system. In each monitoring and control facility, a code (equipment code) for identifying each facility is defined and stored in a database, and an operation slip is created using the facility code.

特開2010−273516号公報JP 2010-273516 A

ところで、複数の制御所間にわたって電力設備を操作する場合、各制御所の監視制御設備で操作票を作成している。この際、隣接・連係する制御所の操作手順を確認するために、双方の制御所で隣接する制御所の操作手順も含めて、操作票を作成している。このため、一部の操作手順を二重で作成しなければならず、多大な労力と時間とを要していた。   By the way, when operating the power equipment between a plurality of control stations, an operation slip is created by the monitoring control equipment of each control station. At this time, in order to confirm the operation procedure of the adjacent and linked control stations, operation sheets including the operation procedures of the adjacent control stations are created at both control stations. For this reason, some operation procedures had to be created twice, which required a great deal of labor and time.

また、制御所で作成した操作票を他の制御所に電子的に送る機能を備えていないため、操作票を隣接する制御所などにFAXで送信するのみで、受信した制御所では、送信された操作票・操作手順を利用することはできず、操作手順を確認するのみであった。さらに、操作票を電子的に送る機能を備えたとしても、設備コードが制御所・監視制御設備ごとに定義、記憶されているため、他の制御所で作成された操作票を利用・引用することができなかった。   Also, since there is no function to electronically send operation slips created at the control station to other control stations, the operation slip is only sent to the adjacent control station by FAX, and is sent at the received control station. The operation slip / operation procedure cannot be used, and only the operation procedure is confirmed. Furthermore, even if it has a function to send operation slips electronically, equipment codes are defined and stored for each control station / monitoring control facility, so use / quote operation slips created at other control stations. I couldn't.

そこでこの発明は、複数の制御所にわたる操作票などを容易に作成することが可能な電力系統の監視制御システムを提供することを目的とする。   Therefore, an object of the present invention is to provide a power system monitoring and control system capable of easily creating operation slips and the like over a plurality of control stations.

上記課題を解決するために、請求項1に記載の発明は、電力系統を監視制御する監視制御設備が、制御所ごとに配設された電力系統の監視制御システムであって、すべての前記監視制御設備が読み取り可能で、前記電力系統の各設備の属性を記憶した設備属性記憶手段と、前記各監視制御設備に、入力された指示に基づいて、前記各設備の操作手順を示す操作票を作成する操作票作成手段と、前記操作票作成手段で作成された操作票を、他の監視制御設備に送信する操作票送信手段と、を備え、前記操作票作成手段は、前記設備属性記憶手段に記憶された属性に基づいて、他の監視制御設備から受信した操作票を編集可能となっており、前記操作票送信手段は、前記操作票作成手段で作成された操作票と、予め記憶された前記各監視制御設備が監視制御する電力系統エリアとに基づいて、操作票を送信すべき前記他の監視制御設備を割り出す、ことを特徴とする。 In order to solve the above-mentioned problem, the invention according to claim 1 is a power system monitoring control system in which a monitoring control facility for monitoring and controlling a power system is provided for each control station. An equipment attribute storage means that can read the control equipment and stores the attributes of each equipment of the power system, and an operation slip indicating an operation procedure of each equipment based on an instruction input to each monitoring control equipment. An operation slip creating means for creating, and an operation slip transmitting means for transmitting the operation slip created by the operation slip creating means to other monitoring and control equipment, wherein the operation slip creating means is the equipment attribute storage means. The operation slip received from other monitoring and control equipment can be edited based on the attribute stored in the operation slip, and the operation slip transmission means is pre-stored with the operation slip created by the operation slip creation means. Each monitoring and control facility Based on the power system area for monitoring control, determine the other monitoring control facility to transmit an operation form, characterized in that.

この発明によれば、例えば、ある制御所の監視制御設備Aにおいて、操作票作成手段によって操作票が作成され、その操作票が、操作票送信手段によって他の制御所の監視制御設備Bに送信されたとする。この場合、他の監視制御設備Bにおいて、監視制御設備Aから受信した操作票を編集しながら、操作票作成手段で自制御所の操作票を作成することが可能となる。この際、双方の監視制御設備A、Bが読み取り可能な設備属性記憶手段のデータ・情報、つまり一元化された各設備の属性(設備コード)に基づいて、監視制御設備Aからの操作票を編集・引用するため、監視制御設備Aで作成された操作票をそのまま利用することができる。   According to the present invention, for example, in the monitoring control facility A of a certain control station, the operation slip is created by the operation slip creating means, and the operation slip is transmitted to the monitoring control equipment B of another control station by the operation slip transmitting means. Suppose that In this case, in another monitoring control facility B, it is possible to create an operation slip for the own control station by the operation slip creating means while editing the operation slip received from the monitoring control facility A. At this time, based on the data / information in the equipment attribute storage means that can be read by both of the monitoring control equipment A and B, that is, the attribute (equipment code) of each equipment unified, the operation slip from the monitoring control equipment A is edited. -To quote, the operation slip created by the monitoring control facility A can be used as it is.

また、操作票作成手段で操作票が作成されると、その操作票と各監視制御設備の電力系統エリアとに基づいて、操作票を送信すべき関連・連系する監視制御設備が割り出される。すなわち、作成された操作票に含まれる設備の電力系統エリアを監視制御する、自制御所以外の監視制御設備が割り出され、割り出された監視制御設備に対して操作票が送信される。 Also , when the operation slip is created by the operation slip creation means, the related and linked monitoring and control equipment to which the operation slip is to be transmitted is determined based on the operation slip and the power system area of each monitoring and control facility. . That is, a monitoring control facility other than its own control station that monitors and controls the power system area of the facility included in the created operation slip is determined, and the operation slip is transmitted to the determined monitoring control facility.

請求項1の発明によれば、他の監視制御設備で作成された操作票を編集しながら、自己の監視制御設備で操作票を作成することが可能となるため、複数の制御所にわたる操作票などを容易に作成することが可能となる。すなわち、隣接する制御所間で、お互いに重複する操作票を作成する必要がなく、また、他の制御所が作成した同等、類似の操作票を流用可能なため、操作票の作成に要する労力や時間を著しく軽減でき、操作票の作成業務が高効率化する。さらに、操作票を重複作成する必要がなく、また、他の制御所が作成した操作票を編集・引用可能で、しかも、一元化された各設備の属性に基づいて操作票を作成・編集するため、操作対象の設備を間違うなどの作成ミスを防止、削減することができる。   According to the first aspect of the present invention, it is possible to create an operation slip with its own monitoring control equipment while editing an operation slip created with another monitoring control equipment. Etc. can be easily created. In other words, it is not necessary to create operation slips that overlap each other between adjacent control stations, and equivalent and similar operation slips created by other control stations can be diverted. And time can be significantly reduced, and the creation of operation slips is highly efficient. In addition, there is no need to create duplicate operation slips, operation slips created by other control stations can be edited and quoted, and operation slips can be created and edited based on the centralized attributes of each facility. It is possible to prevent or reduce creation mistakes such as mistaken operation target equipment.

また、自制御所で操作票が作成された場合に、操作票を送信すべき関連・連系する制御所の監視制御設備が自動で割り出され、操作票が送信されるため、関連・連系する制御所に対して、確実かつ漏れなく操作票を送信することができる。これにより、関連・連系する制御所に対して操作票の確認、利用を促進することが可能となる。
In addition , when an operation slip is created at its own control station, the monitoring / control equipment of the related / linked control station to which the operation slip is to be sent is automatically determined and the operation slip is transmitted. The operation slip can be transmitted reliably and without omission to the control station. As a result, it is possible to promote confirmation and use of operation slips for related / linked control stations.

この発明の実施の形態に係る電力系統の監視制御システムを示す構成図である。It is a block diagram which shows the monitoring control system of the electric power grid | system which concerns on embodiment of this invention. 図1のシステムの支援タスクのメインメニュ画面を示す図である。It is a figure which shows the main menu screen of the assistance task of the system of FIG. 図1のシステムの操作支援登録タスクの操作票ヘッダ画面を示す図である。It is a figure which shows the operation slip header screen of the operation assistance registration task of the system of FIG. 図1のシステムの操作支援登録タスクの操作票手順画面を示す図である。It is a figure which shows the operation slip procedure screen of the operation assistance registration task of the system of FIG. 図1のシステムの操作支援登録タスクの引用ダイアログを示す図である。It is a figure which shows the quote dialog of the operation assistance registration task of the system of FIG. 図1のシステムの操作支援登録タスクにおいて、受信した操作票の操作手順例を示す図である。It is a figure which shows the example of an operation procedure of the received operation slip in the operation assistance registration task of the system of FIG. 図2のメインメニュ画面後の「補助業務2」の画面を示す図である。It is a figure which shows the screen of the "auxiliary work 2" after the main menu screen of FIG. 図1のシステムの操作支援登録タスクの処理の一例を示すフローチャートである。It is a flowchart which shows an example of a process of the operation assistance registration task of the system of FIG. 従来の操作票作成状況を示す図である。It is a figure which shows the conventional operation form creation situation. 図1のシステムによる操作票作成状況を示す図である。It is a figure which shows the operation slip preparation condition by the system of FIG.

以下、この発明を図示の実施の形態に基づいて説明する。   The present invention will be described below based on the illustrated embodiments.

図1は、この発明の実施の形態に係る電力系統の監視制御システム(以下、「監視制御システム」という)1を示す構成図である。この監視制御システム1は、電力系統・電力設備を監視制御する監視制御設備5が、制御所C1〜Cnごとに配設されたシステムであり、通信網NWを介して各監視制御設備5が相互に通信可能に接続されているとともに、統合サーバ(メンテナンスサーバ)2と各監視制御設備5とが通信可能に接続されている。ここで、制御所C1〜Cnごとに管轄・所管する電力系統エリアが予め定められ、その電力系統エリアごとに監視制御設備5が配設されている。   FIG. 1 is a configuration diagram showing a power system monitoring control system (hereinafter referred to as a “monitoring control system”) 1 according to an embodiment of the present invention. This supervisory control system 1 is a system in which supervisory control equipment 5 for monitoring and controlling the power system / power equipment is arranged for each of the control stations C1 to Cn, and each supervisory control equipment 5 is mutually connected via the communication network NW. The integrated server (maintenance server) 2 and each monitoring control facility 5 are communicably connected to each other. Here, a power system area that has jurisdiction and jurisdiction is determined in advance for each of the control stations C1 to Cn, and a monitoring control facility 5 is provided for each power system area.

統合サーバ2は、電力系統全体における全設備の設備属性データを管理、記憶するサーバであり、設備属性データを管理するデータ管理部21と、設備属性データを記憶する統合データベース(設備属性記憶手段)22とを備えている。そして、後述するようにして、各監視制御設備5から送信された設備属性データを統合して、全制御所C1〜Cnにおける単一の統合データベース22を構築し、さらに、統合データベース22内の設備属性データを関連・連系する監視制御設備5に送信する。このようにして、すべての監視制御設備5が、一元化された設備属性データを読み取り、使用可能となっている。   The integrated server 2 is a server that manages and stores equipment attribute data of all equipment in the entire power system, and includes a data management unit 21 that manages equipment attribute data, and an integrated database (equipment attribute storage means) that stores equipment attribute data. 22. Then, as will be described later, the equipment attribute data transmitted from each monitoring control equipment 5 is integrated to construct a single integrated database 22 in all the control stations C1 to Cn. The attribute data is transmitted to the associated monitoring / control equipment 5. In this way, all the monitoring and control equipment 5 can read and use the unified equipment attribute data.

ここで、設備の設備属性データ・属性には、設備を識別する要素番号・設備コードに対応して、その設備を所管する制御所C1〜Cnの識別情報や、設備の種別、設備が開閉器・断路器の場合には、開閉能力、給電番号、遮断電流等の性能・容量、インターロック対象、復旧手順などが含まれる。また、この実施の形態では、統合データベース22内の設備属性データを関連・連系する監視制御設備5に送信しているが、各監視制御設備5が直接統合サーバ2・統合データベース22にアクセスすることで、一元化された設備属性データを読み取り、使用可能としてもよい。   Here, in the equipment attribute data / attribute of the equipment, the identification information of the control stations C1 to Cn having jurisdiction over the equipment corresponding to the element number / equipment code for identifying the equipment, the type of equipment, and the equipment are the switch. -In the case of a disconnector, it includes switching capacity, power supply number, performance / capacity such as breaking current, interlock target, recovery procedure, etc. Further, in this embodiment, the equipment attribute data in the integrated database 22 is transmitted to the related and linked monitoring control equipment 5, but each monitoring control equipment 5 directly accesses the integrated server 2 and the integrated database 22. Thus, the unified equipment attribute data may be read and used.

各監視制御設備5は、制御所監視制御装置(監視制御システム)3と遠隔監視制御装置4とを備え、制御所監視制御装置3と遠隔監視制御装置4とは、通信自在に接続されている。遠隔監視制御装置4は、監視制御対象であるすべての設備と通信自在に接続され、各設備の状態・状況や各設備を通過する電流値や電圧値などを受信して、監視情報として制御所監視制御装置3に伝送するとともに、制御所監視制御装置3から伝送された制御指令に基づいて、各設備を制御・操作するものである。ここで、図1では、制御所監視制御装置3の下位に遠隔監視制御装置4が図示されているが、各遠隔監視制御装置4は、通信網NWを介して直接通信可能となっている。   Each monitoring control facility 5 includes a control center monitoring control device (monitoring control system) 3 and a remote monitoring control device 4, and the control center monitoring control device 3 and the remote monitoring control device 4 are connected to be able to communicate with each other. . The remote monitoring and control device 4 is connected to all the equipment to be monitored and controlled in a communicable manner, receives the state / status of each equipment, the current value and the voltage value passing through each equipment, etc., as control information. While transmitting to the monitoring control apparatus 3, based on the control command transmitted from the control center monitoring control apparatus 3, each facility is controlled and operated. Here, in FIG. 1, the remote monitoring control device 4 is illustrated below the control station monitoring control device 3, but each remote monitoring control device 4 can directly communicate via the communication network NW.

制御所監視制御装置3は、遠隔監視制御装置4からの監視情報を記憶したり、必要に応じて制御所監視制御装置3に制御指令を伝送して、各設備を制御・操作したりするものである。ここで、各制御所C1〜Cnの制御所監視制御装置3は同等の構成であるため、主として、第1の制御所C1の制御所監視制御装置3を例(主体)にして、以下説明する。   The control center monitoring control device 3 stores monitoring information from the remote monitoring control device 4, or transmits control commands to the control center monitoring control device 3 as necessary to control and operate each facility. It is. Here, since the control station monitoring control devices 3 of the control stations C1 to Cn have the same configuration, the control station monitoring control device 3 of the first control station C1 will be mainly described below as an example (main body). .

制御所監視制御装置3は、主として、入力部31と、表示部32と、通信部33と、設備データベース34と、操作票データベース35と、支援タスク(操作票送信手段を含む)36と、これらを管理、制御などする中央処理部37とを備えている。また、図示していないが、監視情報を記憶する監視情報データベースを備えている。   The control station monitoring and control device 3 mainly includes an input unit 31, a display unit 32, a communication unit 33, an equipment database 34, an operation form database 35, a support task (including an operation form transmission means) 36, and the like. And a central processing unit 37 for managing, controlling, and the like. Moreover, although not shown in figure, the monitoring information database which memorize | stores monitoring information is provided.

入力部31は、後述する設備属性の変更データや支援タスク36への指示情報などを入力する入力装置であり、表示部32は、監視情報や支援タスク36による支援画面などを表示する表示装置であり、複数のモニタから構成されている。また、通信部33は、通信網NWを介して他の制御所C2〜Cnの制御所監視制御装置3や統合サーバ2と通信したり、遠隔監視制御装置4と通信したりするための通信装置である。   The input unit 31 is an input device for inputting facility attribute change data and instruction information for the support task 36, which will be described later, and the display unit 32 is a display device for displaying monitoring information, a support screen by the support task 36, and the like. Yes, it consists of multiple monitors. The communication unit 33 communicates with the control station monitoring control device 3 and the integrated server 2 of the other control stations C2 to Cn via the communication network NW, and communicates with the remote monitoring control device 4. It is.

設備データベース34は、自制御所C1で使用する設備属性データが記憶され、自制御所C1が所管する設備の設備属性データのみならず、他の制御所C2〜Cnが所管するが自制御所C1でも使用する設備の設備属性データも記憶されている。また、設備の更新・更改や新設、交換などに応じて、設備属性データが更新されるようになっている。   The equipment database 34 stores equipment attribute data used at the self-control station C1, and not only the equipment attribute data of the equipment controlled by the self-control station C1, but also other control stations C2 to Cn are controlled by the self-control station C1. However, the equipment attribute data of the equipment to be used is also stored. In addition, the equipment attribute data is updated according to equipment update / renewal, new establishment, replacement, and the like.

具体的には、例えば第1の制御所C1において、属性に変更が発生した設備の変更データを入力部31で入力すると、自制御所C1の設備データベース34が変更されるとともに、変更データが統合サーバ2に送信される。次に、統合サーバ2のデータ管理部21によって、変更データに基づいて統合データベース22の該当する設備の設備属性データが変更されるとともに、関連・連系する制御所監視制御装置3に対して変更データが送信される。これを受けて、関連・連系する制御所監視制御装置3において、変更データに基づいて設備データベース34の該当する設備の設備属性データが変更される。   Specifically, for example, in the first control station C1, when the change data of the equipment whose attribute has changed is input through the input unit 31, the equipment database 34 of the own control station C1 is changed and the change data is integrated. Sent to the server 2. Next, the data management unit 21 of the integrated server 2 changes the equipment attribute data of the corresponding equipment in the integrated database 22 based on the changed data, and changes the related / linked control station monitoring control device 3. Data is sent. In response to this, in the related / linked control center monitoring control device 3, the equipment attribute data of the corresponding equipment in the equipment database 34 is changed based on the changed data.

ここで、関連・連系する制御所監視制御装置3とは、当該設備を所管する、あるいは設備属性データを使用する制御所監視制御装置3(監視制御設備5)を意味するが、設備ごとに、設備を所管する制御所C1〜Cnの識別情報と、設備を操作・使用する制御所C1〜Cnの識別情報とを記憶したテーブル・メモリを統合サーバ2に備えている。そして、このテーブルを参照することで、関連・連系する制御所監視制御装置3に対して変更データが送信される。また、統合データベース22および設備データベース34を変更する前に、変更を行った制御所C1〜Cnにおいて変更データに基づく動作確認試験が行われ、正常な動作が確認された後に、統合データベース22および設備データベース34への変更が確定されるようになっている。   Here, the related / linked control station monitoring control device 3 means the control station monitoring control device 3 (monitoring control facility 5) which has jurisdiction over the equipment or uses equipment attribute data. The integrated server 2 includes a table memory that stores identification information of the control stations C1 to Cn having jurisdiction over the facilities and identification information of the control stations C1 to Cn that operate and use the facilities. Then, by referring to this table, the change data is transmitted to the related / connected control station monitoring control device 3. Further, before changing the integrated database 22 and the equipment database 34, an operation check test based on the changed data is performed in the changed control stations C1 to Cn, and after the normal operation is confirmed, the integrated database 22 and the equipment database 34 are installed. Changes to the database 34 are confirmed.

このようにして、各制御所C1〜Cnの設備データベース34に、統一された設備属性データが記憶され、各監視制御設備5において間接的に、統合データベース22の一元化された設備属性データが読み取り、使用可能となっている。また、各制御所監視制御装置3の表示部32には、各設備の位置情報に基づいて、系統図上に各設備のシンボルを配置した画面が表示されたり、後述する支援タスク36においても各設備がシンボル表示されたりする。この際、設備の要素番号に基づいて設備をシンボル表示するが、要素番号を含む設備属性データが統一、一元化され、かつ各制御所監視制御装置3が使用可能なため、各制御所監視制御装置3において、自制御所C1〜Cnが所管する設備以外の設備についても、適正にシンボル表示することができるものである。   In this way, the unified equipment attribute data is stored in the equipment database 34 of each control station C1 to Cn, and the unified equipment attribute data 22 is read indirectly in each monitoring control equipment 5, It can be used. In addition, on the display unit 32 of each control station monitoring and control device 3, a screen in which symbols of each facility are arranged on the system diagram is displayed based on the position information of each facility, and each support task 36 described later also displays each screen. Equipment is symbolized. At this time, the facility is symbolized based on the element number of the facility, but the facility attribute data including the element number is unified and unified, and each control station monitoring control device 3 can be used. In FIG. 3, the symbols other than the facilities managed by the self-control stations C1 to Cn can be appropriately displayed as symbols.

操作票データベース35は、後述する操作支援登録タスク361で作成された操作票や、他の制御所C2〜Cnの監視制御設備5から受信した操作票などを記憶するデータベースである。また、この操作票データベース35内の操作票は、後述するようにして、操作支援登録タスク361などで読み出せるようになっている。   The operation slip database 35 is a database for storing operation slips created by an operation support registration task 361 described later, operation slips received from the monitoring control equipment 5 of other control stations C2 to Cn, and the like. In addition, the operation slip in the operation slip database 35 can be read by the operation support registration task 361 or the like as described later.

支援タスク36は、各設備を監視、操作するためのプログラム・ソフトウエアであり、主として、各設備の操作手順を示す操作票を作成する操作支援登録タスク(操作票作成手段)361と、作成された操作票に基づいて各設備の遠隔操作を支援する操作支援実行タスク362とを備えている。すなわち、支援タスク36が起動されると、図2に示すようなメインメニュが表示部32に表示され、操作支援登録タスク361と操作支援実行タスク362とが選択自在となる。   The support task 36 is program software for monitoring and operating each facility, and is mainly created as an operation support registration task (operation sheet creating means) 361 for creating an operation sheet indicating an operation procedure of each facility. And an operation support execution task 362 for supporting remote operation of each facility based on the operation slip. That is, when the support task 36 is activated, a main menu as shown in FIG. 2 is displayed on the display unit 32, and the operation support registration task 361 and the operation support execution task 362 can be selected.

操作支援登録タスク361は、入力部31で入力された指示、情報に基づいて、操作票を作成するプログラムであり、作成した操作票を、関連・連系する他の制御所C2〜Cnの制御所監視制御装置3に送信する機能を備えている。さらに、統合データベース22つまり設備データベース34に記憶された設備属性データに基づいて、他の制御所C2〜Cnの制御所監視制御装置3から受信した操作票を編集・引用可能な機能を備えている。   The operation support registration task 361 is a program for creating an operation slip on the basis of instructions and information input by the input unit 31. The created operation slip is used to control other control stations C2 to Cn that are related / linked. A function of transmitting to the site monitoring control device 3 is provided. Furthermore, based on the equipment attribute data stored in the integrated database 22, that is, the equipment database 34, it has a function capable of editing / quoting operation slips received from the control station monitoring control devices 3 of other control stations C2 to Cn. .

具体的には、自制御所C1の操作票を作成する場合に、メインメニュ中の操作支援登録タスク361の「新規作成」P1が選択されると、図3に示すような操作票ヘッダ画面を表示部32に表示する。そして、この操作票ヘッダ画面の各項目に従って、入力部31で情報が入力されることで、操作票のヘッダ部・表紙を作成する(図8のステップS1)。   Specifically, when creating an operation slip for the self-control station C1, when “new creation” P1 of the operation support registration task 361 in the main menu is selected, an operation slip header screen as shown in FIG. 3 is displayed. Displayed on the display unit 32. Then, according to each item on the operation slip header screen, information is input by the input unit 31 to create a header portion / cover of the operation slip (step S1 in FIG. 8).

続いて、操作票ヘッダ画面中のツールバー(図示せず)の「手順」が選択されると、図4に示すような操作票手順画面を表示部32に表示する(同ステップS2)。そして、他の操作票を引用、参照しないで独自に操作票を作成する場合(同ステップS3で「N」の場合)、画面中のツールバー(図示せず)の「挿入」が選択され、画面中の各項目に従って、入力部31で順次・時系列に各設備に対する操作内容などが入力されることで、操作手順・操作票を作成する(同ステップS4)。   Subsequently, when “Procedure” on a toolbar (not shown) in the operation form header screen is selected, an operation form procedure screen as shown in FIG. 4 is displayed on the display unit 32 (step S2). When an operation slip is created independently without quoting or referring to another operation slip (in the case of “N” in step S3), “Insert” on a toolbar (not shown) in the screen is selected, and the screen In accordance with each item therein, the operation procedure and operation slips are created by inputting the operation contents for each facility sequentially and in time series by the input unit 31 (step S4).

一方、他の操作票を引用、参照して操作票を作成する場合(同ステップS3で「Y」の場合)、つまり連係機能で操作票を作成する場合、画面中のツールバーの「引用」が選択されると、図5に示すような引用ダイアログを表示部32に表示する(同ステップS5)。そして、ダイアログ中の「他操作票」P2が選択されると、過去に作成した操作票の件名一覧を、操作票データベース35から読み出して表示部32に表示し、ダイアログ中の「標準操作票」P3が選択されると、予め登録されている標準的・典型的な操作票の件名一覧を、操作票データベース35から読み出して表示部32に表示する。さらに、ダイアログ中の「受信操作票」P4が選択されると、他の制御所C2〜Cnの監視制御設備5から受信した操作票の件名一覧を、操作票データベース35から読み出して表示部32に表示する(同ステップS6)。ここで、それぞれの件名一覧は、操作票手順画面を表示しているモニタとは異なるモニタ(隣接するモニタ)に表示するようになっている。   On the other hand, when an operation form is created by quoting and referring to another operation form (“Y” in step S3), that is, when creating an operation form with the linkage function, “quotation” on the toolbar in the screen is displayed. When selected, a quote dialog as shown in FIG. 5 is displayed on the display unit 32 (step S5). Then, when “other operation slip” P2 in the dialog is selected, a list of subject names of operation slips created in the past is read from the operation slip database 35 and displayed on the display unit 32, and “standard operation slip” in the dialog is displayed. When P3 is selected, a list of standard / typical operation slip subject names registered in advance is read from the operation slip database 35 and displayed on the display unit 32. Furthermore, when “Receiving operation slip” P4 in the dialog is selected, a list of operation slip subjects received from the monitoring control equipment 5 of other control stations C2 to Cn is read from the operation slip database 35 and displayed on the display unit 32. Displayed (step S6). Here, each subject list is displayed on a monitor (adjacent monitor) different from the monitor displaying the operation slip procedure screen.

次に、件名一覧から引用したい操作票が選択されると、選択された操作票を操作票データベース35から読み出して、同モニタに表示する(同ステップS7)。例えば、他の制御所C2〜Cnから受信した操作票の件名一覧(受信操作票件名一覧)から、特定の操作票が選択されると、図6に示すように、選択された操作票の操作手順を表示する。このようにして、操作票データベース35内の操作票が読み出せるようになっている。   Next, when the operation slip to be cited is selected from the subject list, the selected operation slip is read from the operation slip database 35 and displayed on the monitor (step S7). For example, when a specific operation slip is selected from a list of operation slip subjects (received operation slip subject name list) received from other control stations C2 to Cn, as shown in FIG. 6, the operation of the selected operation slip is performed. Display the procedure. In this way, the operation slip in the operation slip database 35 can be read.

そして、この操作票のなかから、引用、参照したい操作手順が、ひとつあるいは複数選択されると、選択された操作手順を操作票手順画面(図4)中の操作手順項目内に挿入・複写する(同ステップS8)。例えば、図6における範囲P5の操作手順が選択されると、選択された操作手順を作成中の操作票に挿入する。   When one or a plurality of operation procedures to be cited or referred to are selected from the operation slip, the selected operation procedure is inserted / copied into the operation procedure item in the operation slip procedure screen (FIG. 4). (Step S8). For example, when the operation procedure in the range P5 in FIG. 6 is selected, the selected operation procedure is inserted into the operation slip being created.

このような独自作成、入力および引用などを繰り返すことにより(同ステップS9で「Y」まで繰り返し)、目的の操作票を作成し、作成した操作票を操作票データベース35に記憶する(同ステップS10)ものである。   By repeating such original creation, input, and citation (repeating up to “Y” in step S9), a target operation slip is created, and the created operation slip is stored in the operation slip database 35 (step S10). )

このようにして作成された操作票を関連・連系する監視制御設備5に送信する場合、支援タスク36のメインメニュ(図2)中の「補助業務2」P6が選択されると、図7に示すように、「送受信操作票」(受信操作票管理エリア)を含む画面を表示部32に表示する。そして、「送受信操作票」の「送信(連係)」P7が選択されると、作成した操作票を関連・連系する監視制御設備5に電子データ・ファイルとして送信する。   When the operation slip created in this way is transmitted to the monitoring / control equipment 5 that is related / linked, when the “auxiliary task 2” P6 in the main menu (FIG. 2) of the support task 36 is selected, FIG. As shown, a screen including a “transmission / reception operation slip” (reception operation slip management area) is displayed on the display unit 32. When “Transmission (linkage)” P7 of “Transmission / reception operation slip” is selected, the created operation slip is transmitted as an electronic data file to the monitoring / control equipment 5 associated / linked.

ここで、関連・連系する監視制御設備5は、作成された操作票と、予め記憶された各制御所C1〜Cn(各監視制御設備5)が監視制御する電力系統エリアとに基づいて割り出す。すなわち、各制御所C1〜Cnが監視制御する電力系統エリア(所管エリア)が予め設定、記憶され、作成された操作票の操作手順のなかに、他の制御所C2〜Cnの所管エリア内の設備を操作する手順があるか否かを検索し、存在する場合にその制御所C2〜Cnを割り出すものである。   Here, the related and linked monitoring control equipment 5 is determined based on the created operation slip and the power system area that is monitored and controlled by each of the control stations C1 to Cn (each monitoring control equipment 5) stored in advance. . That is, the power system area (supervised area) monitored and controlled by each of the control stations C1 to Cn is preset, stored, and in the operation procedure of the created operation slip, Whether there is a procedure for operating the facility is searched, and if it exists, the control stations C2 to Cn are determined.

また、操作票を送信するタイミングは、操作支援登録タスク361で操作票が作成された直後でもよいし、作成後いつでも送信できるようになっている。すなわち、操作票データベース35に記憶されている操作票から送信する操作票を選択し、任意の制御所C2〜Cnの監視制御設備5を選択することで、任意の操作票を任意の監視制御設備5に対して、いつでも送信できるようになっている。さらに、図7の「送受信操作票」において、例えば「照会」を選択することで、他の制御所C2〜Cnから受信した操作票をいつでも照会、参照できるようになっている。   Further, the timing for transmitting the operation slip may be immediately after the operation slip is created by the operation support registration task 361, or can be sent anytime after the creation. That is, by selecting an operation slip to be transmitted from the operation slips stored in the operation slip database 35 and selecting the monitoring control equipment 5 of any control station C2 to Cn, the arbitrary operation slip is changed to any monitoring control equipment. 5 can be sent at any time. Furthermore, in the “transmission / reception operation slip” of FIG. 7, for example, by selecting “inquiry”, the operation slip received from the other control stations C2 to Cn can be inquired and referred to at any time.

このような構成の監視制御システム1によれば、他の制御所C2〜Cnの監視制御設備5で作成された操作票を引用・編集しながら、自制御所C1の監視制御設備5で操作票を作成することが可能となるため、複数の制御所C1〜Cnにわたる操作票などを容易に作成することが可能となる。すなわち、例えば隣接する制御所C2が所管する設備も操作対象とする場合、従来は図9に示すように、自制御所C1の制御所監視制御装置101において、自制御所C1および隣接する制御所C2の操作票を作成するのみならず、隣接する制御所C2の制御所監視制御装置102においても、自制御所C2および隣接する制御所C1の操作票を作成しなければならなかった。しかも、それぞれの制御所C1、C2で独自のデータベース101a,102aを構築しているため、他の制御所C2、C1で作成した操作票を利用・引用することができなかった。   According to the monitoring control system 1 having such a configuration, the operation slip is created by the monitoring control facility 5 of the own control station C1 while quoting and editing the operation slip created by the monitoring control facility 5 of the other control stations C2 to Cn. Therefore, it is possible to easily create an operation sheet that covers a plurality of control stations C1 to Cn. That is, for example, when an equipment controlled by an adjacent control center C2 is also an operation target, conventionally, as shown in FIG. 9, in the control station monitoring control device 101 of the own control station C1, the own control station C1 and the adjacent control station Not only the operation sheet for C2 but also the control station monitoring and control device 102 of the adjacent control station C2 had to generate operation sheets for the own control station C2 and the adjacent control station C1. In addition, because the respective control stations C1 and C2 have their own databases 101a and 102a, the operation slips created at the other control stations C2 and C1 cannot be used / quoted.

これに対して本システム1では、図10に示すように、自制御所C1の制御所監視制御装置3において、自制御所C1および隣接する制御所C2の操作票を作成し、作成した操作票を隣接する制御所C2の制御所監視制御装置3に送信すれば、隣接する制御所C2において、受信した操作票を引用、利用して操作票を作成することができる。このように、隣接する制御所C1、C2間で、お互いに重複する操作票、操作手順を作成する必要がなく、また、他の制御所C2〜Cnが作成した同等、類似の操作票を流用可能なため、操作票の作成に要する労力や時間を著しく軽減でき、操作票の作成業務が高効率化する。さらに、操作票を重複作成する必要がなく、また、他の制御所C2〜Cnが作成した操作票を編集・引用可能で、しかも、一元化された各設備の設備属性データに基づいて操作票を作成・編集するため、操作対象の設備を間違うなどの作成ミスを防止、削減することができる。   On the other hand, in the present system 1, as shown in FIG. 10, in the control station monitoring and control device 3 of the own control station C1, an operation sheet for the own control station C1 and the adjacent control station C2 is created, and the created operation sheet is created. Is transmitted to the control station monitoring control device 3 of the adjacent control station C2, the operation sheet can be created by quoting and using the received operation sheet at the adjacent control station C2. Thus, it is not necessary to create operation sheets and operation procedures that overlap each other between the adjacent control stations C1 and C2, and equivalent and similar operation sheets created by other control stations C2 to Cn are used. Since it is possible, the labor and time required for creating operation slips can be significantly reduced, and the operation slip creation work becomes highly efficient. Furthermore, there is no need to create duplicate operation sheets, and operation sheets created by other control stations C2 to Cn can be edited / quoted, and operation sheets can be created based on the unified equipment attribute data of each facility. Because it is created / edited, it is possible to prevent or reduce creation errors such as wrong equipment to be operated.

また、自制御所C1で操作票が作成された場合に、操作票を送信すべき関連・連系する制御所C2〜Cnの監視制御設備5が自動で割り出され、操作票が送信されるため、関連・連系する制御所C2〜Cnに対して、確実かつ漏れなく操作票を送信することができる。これにより、関連・連系する制御所C2〜Cnに対して操作票の確認、利用を促進することが可能となる。   In addition, when an operation slip is created at the self-control station C1, the monitoring control equipment 5 of the related / linked control stations C2 to Cn to which the operation slip is to be transmitted is automatically determined, and the operation slip is transmitted. Therefore, it is possible to transmit the operation slip reliably and without omission to the related / linked control stations C2 to Cn. Thereby, it becomes possible to promote the confirmation and use of the operation slip to the related / linked control stations C2 to Cn.

以上、この発明の実施の形態について説明したが、具体的な構成は、上記の実施の形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計の変更等があっても、この発明に含まれる。例えば、上記の実施の形態では、監視制御設備5を別体の制御所監視制御装置3と遠隔監視制御装置4とから構成しているが、制御所監視制御装置3と遠隔監視制御装置4とを一体的に構成してもよい。また、支援タスク36で割り出した監視制御設備5に操作票を送信しているが、オペレータの判断などによる任意の監視制御設備5に対して、操作票を送信するようにしてもよい。さらに、支援タスク36が操作票送信手段を備えているが、操作支援登録タスク361において、作成した操作票を関連・連系する監視制御設備5に送信するようにしてもよい。また、「送信(連係)」P7が選択された場合に、操作票を関連・連系する監視制御設備5に送信しているが、「送信(連係)」P7の選択を待たずに、操作票が作成された後に、関連・連系する監視制御設備5に自動的に送信するようにしてもよい。   Although the embodiment of the present invention has been described above, the specific configuration is not limited to the above embodiment, and even if there is a design change or the like without departing from the gist of the present invention, Included in the invention. For example, in the above embodiment, the monitoring control facility 5 is composed of the separate control station monitoring control device 3 and the remote monitoring control device 4, but the control station monitoring control device 3, the remote monitoring control device 4, May be configured integrally. Further, although the operation slip is transmitted to the monitoring control facility 5 determined by the support task 36, the operation slip may be transmitted to an arbitrary monitoring control facility 5 based on an operator's judgment. Furthermore, although the support task 36 includes an operation slip transmission unit, the operation support registration task 361 may transmit the created operation slip to the related and linked monitoring control equipment 5. In addition, when “Send (Linkage)” P7 is selected, the operation slip is sent to the related / linked monitoring control equipment 5, but without waiting for the selection of “Send (Link)” P7, After the vote is created, it may be automatically transmitted to the related / linked monitoring / control equipment 5.

1 監視制御システム
2 統合サーバ
21 データ管理部
22 統合データベース(設備属性記憶手段)
3 制御所監視制御装置
31 入力部
32 表示部
33 通信部
34 設備データベース
35 操作票データベース
36 支援タスク(操作票送信手段を含む)
361 操作支援登録タスク(操作票作成手段)
362 操作支援実行タスク
4 遠隔監視制御装置
5 監視制御設備
C1〜Cn 制御所
NW 通信網
DESCRIPTION OF SYMBOLS 1 Monitoring control system 2 Integrated server 21 Data management part 22 Integrated database (equipment attribute storage means)
3 control station monitoring control device 31 input unit 32 display unit 33 communication unit 34 equipment database 35 operation form database 36 support task (including operation form transmission means)
361 Operation support registration task (operation form creation means)
362 Operation support execution task 4 Remote monitoring and control device 5 Monitoring and control equipment C1 to Cn Control station NW Communication network

Claims (1)

電力系統を監視制御する監視制御設備が、制御所ごとに配設された電力系統の監視制御システムであって、
すべての前記監視制御設備が読み取り可能で、前記電力系統の各設備の属性を記憶した設備属性記憶手段と、
前記各監視制御設備に、
入力された指示に基づいて、前記各設備の操作手順を示す操作票を作成する操作票作成手段と、
前記操作票作成手段で作成された操作票を、他の監視制御設備に送信する操作票送信手段と、を備え、
前記操作票作成手段は、前記設備属性記憶手段に記憶された属性に基づいて、他の監視制御設備から受信した操作票を編集可能となっており、
前記操作票送信手段は、前記操作票作成手段で作成された操作票と、予め記憶された前記各監視制御設備が監視制御する電力系統エリアとに基づいて、操作票を送信すべき前記他の監視制御設備を割り出す、
ことを特徴とする電力系統の監視制御システム。
The monitoring and control equipment for monitoring and controlling the power system is a power system monitoring and control system arranged for each control station,
All the monitoring and control equipment is readable, and equipment attribute storage means for storing attributes of each equipment of the power system;
For each monitoring and control facility,
Based on the input instruction, an operation form creating means for creating an operation form indicating the operation procedure of each facility,
An operation slip transmitting means for transmitting the operation slip created by the operation slip creating means to other monitoring and control equipment,
The operation slip creation means can edit the operation slip received from other monitoring and control equipment based on the attribute stored in the equipment attribute storage means ,
The operation slip transmission unit is configured to transmit the operation slip based on the operation slip created by the operation slip creation means and the power system area monitored and controlled by each of the monitoring control facilities stored in advance. Determine the monitoring and control equipment,
A monitoring control system for an electric power system characterized by that.
JP2011022282A 2011-02-04 2011-02-04 Power system supervisory control system Active JP5431380B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011022282A JP5431380B2 (en) 2011-02-04 2011-02-04 Power system supervisory control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011022282A JP5431380B2 (en) 2011-02-04 2011-02-04 Power system supervisory control system

Publications (2)

Publication Number Publication Date
JP2012165505A JP2012165505A (en) 2012-08-30
JP5431380B2 true JP5431380B2 (en) 2014-03-05

Family

ID=46844330

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011022282A Active JP5431380B2 (en) 2011-02-04 2011-02-04 Power system supervisory control system

Country Status (1)

Country Link
JP (1) JP5431380B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6756986B2 (en) * 2017-05-19 2020-09-16 東京電力ホールディングス株式会社 Data generator

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3824507B2 (en) * 2001-07-13 2006-09-20 三菱電機株式会社 Power system monitoring and control system
JP4916283B2 (en) * 2006-11-08 2012-04-11 中国電力株式会社 Power system operation monitoring control system and method
JP5008437B2 (en) * 2007-03-28 2012-08-22 中国電力株式会社 System work support system

Also Published As

Publication number Publication date
JP2012165505A (en) 2012-08-30

Similar Documents

Publication Publication Date Title
CN1899774B (en) Robot system and robot controller
CN105635108A (en) Firewall with application packet classifier
CN103003765A (en) Monitoring control system for electrical power equipment
JP4386927B2 (en) Monitoring control system and position switching method in monitoring control system
JP5431380B2 (en) Power system supervisory control system
KR20100131181A (en) Trouble recovery system using standard operating procedure and method thereof
JP6675044B2 (en) Monitoring and control system
JP5267839B2 (en) Distant monitoring and control device simulation device and power system monitoring and control system
JP6675043B2 (en) Monitoring and control system
JP5008437B2 (en) System work support system
JP5814753B2 (en) Power system monitoring and control system
JP5420575B2 (en) Supervisory control system
JP4722016B2 (en) Operation support system
JP6351646B2 (en) Equipment management system
JP2005295701A (en) Power distribution automation system and power interruption work management method
US20060224251A1 (en) Duplex system and method of switching control right in duplex system
JP2004357369A (en) Power system monitoring controller, its method, and program for power system supervisory control
JP7250536B2 (en) Image distribution system and server device
JP5528932B2 (en) Communication management system
JP2017220052A (en) Information provision system utilizing recognition code
JP2004070586A (en) Manufacturing/inspection device operation system
JP2007272382A (en) Process control system
JP6638441B2 (en) Monitoring and control system
JP6587395B2 (en) Construction management system and information processing apparatus
JP2021026595A (en) Device management system and search method thereof

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130605

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130611

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130730

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131203

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131204

R150 Certificate of patent or registration of utility model

Ref document number: 5431380

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250