JP4517233B2 - Ready-made concrete pile, manufacturing method of ready-made concrete pile, foundation pile structure - Google Patents
Ready-made concrete pile, manufacturing method of ready-made concrete pile, foundation pile structure Download PDFInfo
- Publication number
- JP4517233B2 JP4517233B2 JP2004278538A JP2004278538A JP4517233B2 JP 4517233 B2 JP4517233 B2 JP 4517233B2 JP 2004278538 A JP2004278538 A JP 2004278538A JP 2004278538 A JP2004278538 A JP 2004278538A JP 4517233 B2 JP4517233 B2 JP 4517233B2
- Authority
- JP
- Japan
- Prior art keywords
- pile
- ready
- concrete
- steel pipe
- protrusion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000004567 concrete Substances 0.000 title claims description 76
- 238000004519 manufacturing process Methods 0.000 title description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 74
- 239000010959 steel Substances 0.000 claims description 74
- 238000009412 basement excavation Methods 0.000 claims description 37
- 239000007788 liquid Substances 0.000 claims description 12
- 238000000465 moulding Methods 0.000 claims description 7
- 238000002347 injection Methods 0.000 claims description 6
- 239000007924 injection Substances 0.000 claims description 6
- 230000015572 biosynthetic process Effects 0.000 claims description 4
- 238000005056 compaction Methods 0.000 claims description 2
- 238000007596 consolidation process Methods 0.000 description 10
- 238000005553 drilling Methods 0.000 description 10
- 239000000463 material Substances 0.000 description 10
- 239000004568 cement Substances 0.000 description 8
- 238000010008 shearing Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 4
- 238000005452 bending Methods 0.000 description 3
- 125000004122 cyclic group Chemical group 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000002093 peripheral effect Effects 0.000 description 3
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 2
- 239000011372 high-strength concrete Substances 0.000 description 2
- 238000004898 kneading Methods 0.000 description 2
- 239000008267 milk Substances 0.000 description 2
- 210000004080 milk Anatomy 0.000 description 2
- 235000013336 milk Nutrition 0.000 description 2
- 238000002156 mixing Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 230000000644 propagated effect Effects 0.000 description 2
- 238000003756 stirring Methods 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 239000011398 Portland cement Substances 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 239000011400 blast furnace cement Substances 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000834 fixative Substances 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000011513 prestressed concrete Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000000377 silicon dioxide Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Description
この発明は、コンクリート杭の外周を鋼管で覆ったいわゆるSC杭に関する既製コンクリート杭、既製コンクリート杭の製造方法、既製コンクリート杭を杭穴内に埋設した基礎杭構造に関する。 The present invention relates to a ready-made concrete pile related to a so-called SC pile in which the outer periphery of the concrete pile is covered with a steel pipe, a manufacturing method of the ready-made concrete pile, and a foundation pile structure in which the ready-made concrete pile is embedded in a pile hole.
従来、コンクリートの外周を鋼管で覆ったいわゆるSC杭は、鉄筋コンクリート杭(RC杭)、プレストレスコンクリート杭(PC杭)に対して、主に曲げ耐力を強化した既製杭であった。従って、多数の既製杭を接合して埋設する連結杭では、主に地上付近に配置して使用していた。従って、一般的なアイデアとしては、単に表面積を増やして地盤との摩擦力を増やすために、SC杭に節を形成する試みはなされていたが、当然、製品化には至っていなかった。 Conventionally, so-called SC piles in which the outer periphery of concrete is covered with steel pipes are ready-made piles mainly strengthening bending strength against reinforced concrete piles (RC piles) and prestressed concrete piles (PC piles). Therefore, in the connection pile which joins and embeds many ready-made piles, it has mainly been arranged and used near the ground. Therefore, as a general idea, attempts have been made to form a node in the SC pile in order to simply increase the surface area and increase the frictional force with the ground, but naturally it has not been commercialized.
鋼管杭において、内部側から局部拡径して外周に複数の筒状突起を形成する発明が提案されている(特許文献1、特許文献2)。この発明において、流動性固化剤で内張りして、SC杭と類似した構造とする旨の提案も成されているが、突起部の厚みが薄くなり、強度が低下する問題点があった。
(1)引用文献1(特開2000−129671)の問題点
節杭は一般に、軟弱地盤等の支持力の小さい地盤で、利用する軽い建造物の荷重に適した基礎杭に使用される。
従って、本来、既製杭の全長に突起が形成されている節杭に期待されるものは、周辺地盤との付着力であり、既製杭の外面の表面積を増やして、既製杭の軸部での摩擦力として利用されている程度である。
従って、強度のある地盤に造成される基礎杭のように、根固め部において、突起面によるせん断力を充分に生かすことが配慮されておらず、具体的に高支持力(耐力)基礎杭として実用化されていないのが実体である。
(1) Problems of Cited Document 1 (Japanese Patent Laid-Open No. 2000-129671) In general, a joint pile is a ground having a small supporting force such as a soft ground, and is used as a foundation pile suitable for a load of a light building to be used.
Therefore, what is originally expected for the joint piles with protrusions formed on the entire length of the ready-made piles is the adhesive force with the surrounding ground, increasing the surface area of the outer surface of the ready-made piles, It is a grade used as a frictional force.
Therefore, unlike foundation piles built on strong ground, it is not considered to make full use of the shearing force due to the projection surface at the root consolidation part, specifically as foundation piles with high bearing capacity (strength) The substance is not put into practical use.
(2)引用文献2(特開2000−45274)の問題点
本発明は、鋼管を加工・成形し、剛製突起(例えば節状突起)を形成し、内側にコンクリートを内張りにした外殻鋼管コンクリート杭であり、前記突起を杭下端部に形成して、この既製杭の下端部の突起を拡底根固め部に設置し、大きな鉛直支持力が得られるとされている。
しかし、この突起により、高い荷重伝搬耐力を確保するには、突起内部のコンクリート部において、高圧縮力が必要で、この突起は既製杭と一貫の管理された工場生産が必要である。
このため、施工現場毎の地盤特性及びその建造物への耐力等に適合し、所要支持力に対応した寸法、形状の突起付き既製杭を準備・供給するための融通性が劣る。
また、肉厚の均一な突起への加工制御が難しく耐力の向上、安定性に難があり、かつ鋼管より肉厚が厚い突起の形成が難しかった。
(2) Problems of Cited Document 2 (Japanese Patent Laid-Open No. 2000-45274) The present invention is an outer shell steel pipe in which a steel pipe is processed and formed to form a rigid projection (for example, a node-like projection) and concrete is lined inside. It is a concrete pile, and the protrusion is formed at the lower end portion of the pile, and the protrusion at the lower end portion of the ready-made pile is installed at the widened root solidifying portion, thereby obtaining a large vertical support force.
However, in order to secure a high load propagation resistance with this protrusion, a high compressive force is required in the concrete portion inside the protrusion, and this protrusion requires factory production that is consistent with the ready-made pile.
For this reason, the flexibility for preparing and supplying ready-made piles with protrusions having dimensions and shapes corresponding to the ground characteristics at each construction site and the proof strength of the building, etc., corresponding to the required support force is inferior.
In addition, it is difficult to control the processing of the protrusions having a uniform thickness, and it is difficult to improve the yield strength and stability, and it is difficult to form protrusions that are thicker than the steel pipe.
(3)課題
また、出願人は、下端部に環状突起を有する支持杭を、高強度の根固め液を充填した杭穴の根固め部内に設置して、従来の2倍程度の支持力を発揮させる工法を提案し(特許3531099号)、多くの施工実績をあげている。この場合、根固め部では従来に無い大きな支持力を発揮できたが、根固め部に下杭を埋設して得た支持力に見合った、高い曲げ強度等を有する高強度の上杭を採用する際には、通常、大径杭を連結し補強しているが、外径を大きくせず、上杭の外径を下杭と同程度とする場合には、上杭に外周を鋼管で被覆したSC杭(高曲げ強度を有する)を採用する必要があった。
(3) Problem In addition, the applicant installs a support pile having an annular projection at the lower end in the root consolidation portion of a pile hole filled with a high-strength root consolidation liquid, and has about twice the conventional support force. Proposed construction method (Patent No. 3531099) and has made many construction results. In this case, we could demonstrate unprecedented large support force in the root consolidation part, but we adopted a high strength upper pile with high bending strength etc. commensurate with the support force obtained by burying the lower pile in the root consolidation part Normally, large piles are connected and reinforced, but if the outer diameter is not increased and the upper pile has the same outer diameter as the lower pile, the outer periphery of the upper pile is made of steel pipe. It was necessary to employ a coated SC pile (having high bending strength).
また、根固め部用の下杭として、コンクリート杭を使用し、上杭としてSC杭を連結した基礎杭で引抜力が作用した場合、下杭は杭材自身の引抜力が小さく、上杭のSC杭の高引抜力耐力が生かせなかった。 In addition, when a concrete pile is used as the lower pile for the root consolidation part and a pulling force acts on the foundation pile connected with the SC pile as the upper pile, the lower pile has a small pulling force of the pile material itself, The high pullout strength of SC pile could not be utilized.
このように上杭をSC杭とする場合、連結杭全体としてみれば、下杭もSC杭として共に同一外径で構造を揃えることにより、より安定した鉛直支持力及び引抜力にバランスの取れた高耐力が期待できる。従って、環状リブを有して、根固め部内で支持地盤に向けて、有効にせん断力を伝搬させることができるSC杭を提案することが求められている。 In this way, when the upper pile is an SC pile, the lower pile can be balanced with a more stable vertical support force and pull-out force by aligning the structure with the same outer diameter as the SC pile. High yield strength can be expected. Therefore, it is required to propose an SC pile having an annular rib and capable of effectively transmitting a shearing force toward the supporting ground within the rooting portion.
以上のような大枠の課題に鑑みて、この発明は、突起付き既製杭を埋設する根固め部の高支持力に見合う、バランスが取れた高耐力既製杭を実現することにある。
(a) 根固め部の高軸力に見合う杭構造。
(b) 根固め部の高引抜き力に見合う杭構造。
(c) 高支持力(せん断力)に耐える節部形状。
(d) 高支持力を発現できる節部取付け位置。
(e) 汎用性のある突起付き既製杭。
(f) 施工地盤毎の地盤特性、及び、建造構造物毎の所要耐力に柔軟に対応できる汎用性のある既製杭。
(g) SC杭の生産工場で、安定供給できる生産体制。
In view of the problems of the large frame as described above, it is an object of the present invention to realize a balanced high-strength ready-made pile that is commensurate with the high supporting force of the root-sealed portion in which the ready-made pile with protrusions is embedded.
(a) Pile structure commensurate with the high axial force of the root consolidation part.
(b) Pile structure that matches the high pulling force of the root consolidation part.
(c) Nodal shape that can withstand high bearing capacity (shearing force).
(d) Node mounting position where high bearing capacity can be developed.
(e) Versatile ready-made piles with protrusions.
(f) A versatile ready-made pile that can flexibly respond to the ground characteristics for each construction ground and the required proof stress for each building structure.
(g) A production system that can provide a stable supply at the SC pile production plant.
然るにこの発明は、筒状のコンクリート製の基体の外周を鋼管で被覆した既製杭で、鋼管の外面に鋼材からなり、少なくとも下面に、放射方向に向けて上向きに傾斜した傾斜面を有する突起を形成して既製コンクリート杭を構成したので、前記問題点を解決した。 However, the present invention is a ready-made pile in which the outer periphery of a cylindrical concrete base is covered with a steel pipe, and the outer surface of the steel pipe is made of a steel material, and at least a lower surface has a protrusion having an inclined surface inclined upward in the radial direction. Since the prefabricated concrete pile was formed, the above problems were solved.
即ちこの発明は、外面に、鋼材からなる突起を別部材で形成した鋼管の内にコンクリートを注入して遠心成形して形成した既製杭を下杭として、鋼管の内にコンクリートを注入して遠心成形して形成した既製杭を上杭として、連結杭を構成し、前記突起のうち少なくとも最下端に位置する突起は、少なくとも下面に、放射方向に向けて上向きに傾斜した傾斜面を形成したことを特徴とする既製コンクリート杭である。 That is, according to the present invention, on the outer surface, a concrete pile is formed by injecting concrete into a steel pipe in which a protrusion made of steel is formed as a separate member and centrifugally formed. forming a ready-made pile formed by molding as above pile, form a concatenated pile, the projection is projection located in at least the lowermost end of the lower surface even without low, an inclined surface inclined upward toward the radial direction This is a ready-made concrete pile.
また、他の発明は、外面に、鋼材からなる突起を別部材で形成した鋼管の内にコンクリートを注入して遠心成形して形成した既製杭を下杭として、鋼管の内にコンクリートを注入して遠心成形して形成した既製杭を上杭として、連結杭を構成し、前記突起は、少なくとも下面に、放射方向に向けて上向きに傾斜した傾斜面を形成したことを特徴とする既製コンクリート杭である。 Another invention is to inject concrete into a steel pipe, using a pre-made pile formed by injecting concrete into a steel pipe with a protrusion made of steel as a separate member and centrifugally forming it as a lower pile. ready-made as the upper pile prefabricated pile formed by centrifugal molding, a concatenated pile, the projection is that even without low on the lower surface, characterized in that the formation of the inclined surface inclined upward toward the radial direction Te It is a concrete pile.
また、他の発明は、外面に、鋼材からなる突起を別部材で形成した鋼管の内に、コンクリートを注入して遠心成形して形成した既製杭を下杭として、鋼管の内にコンクリートを注入して遠心成形して形成した既製杭を上杭として、連結杭を構成して、掘削孔内に、前記連結杭からなる既製コンクリート杭を埋設した基礎杭構造であって、前記既製コンクリート杭は下端部に、少なくとも1つの突起部を形成してあり、前記掘削孔の下端部に形成した根固め部内に、前記既製コンクリート杭の突起部を少なくとも1つ配置してなり、前記突起部は、前記根固め部内で支持地盤に向けて、斜め下方へのせん断力の伝搬を可能にする傾斜下面を有する構造とし、前記掘削孔に杭周固定液を注入し、前記突起を形成した部分の前記杭周固定液の注入量を、前記突起を形成しないストレート部分の注入量の2倍としたことを特徴とする基礎杭構造である。 In addition, another invention injects concrete into the steel pipe, using the pre-made pile formed by centrifugal molding by injecting concrete into a steel pipe formed with a steel protrusion on the outer surface as a lower pile. The foundation pile structure in which the ready-made pile formed by centrifugal molding is used as the upper pile, the connected pile is configured, and the ready-made concrete pile made of the connected pile is embedded in the excavation hole, and the ready-made concrete pile is At least one projection is formed at the lower end, and at least one projection of the ready-made concrete pile is disposed in the rooting portion formed at the lower end of the excavation hole , towards the supporting ground in front Symbol roots compaction portion, a structure having an inclined lower surface that allows the propagation of shear force obliquely downward, the drilling hole injecting Kuishu fixative, part of the formation of the projections Injection amount of the stake fixing liquid A foundation pile structure, characterized in that it has twice the injection amount of the straight portion not forming the protrusion.
前記における「コンクリート」とは、セメントを主成分にした水硬性材料である。従って、粗骨材の有無を問わずモルタルなども含み、所定の強度を有すれば骨材の有無も問わない。 The “concrete” in the above is a hydraulic material mainly composed of cement. Therefore, mortar is included regardless of the presence or absence of coarse aggregate, and the presence or absence of aggregate is not limited as long as it has a predetermined strength.
(1) 筒状のコンクリート製の基体の外周を鋼管で被覆したいわゆるSC杭で、鋼管の外周に鋼材から成る突起を形成し、所定の突起の下斜面を形成したので、SC杭の曲げ耐力、鉛直支持力を維持したまま、掘削孔の拡大球根部に突起を配置すれば、鉛直荷重を受けた際に、拡大球根部内で、支持地盤に向けてせん断力の有効な伝搬がなされ、大きな鉛直荷重に対して、抗することができる。 (1) A so-called SC pile with the outer periphery of a cylindrical concrete base covered with a steel pipe, and a protrusion made of steel material was formed on the outer periphery of the steel pipe, and the lower slope of the predetermined protrusion was formed. If a projection is placed on the enlarged bulb part of the borehole while maintaining the vertical bearing force, effective propagation of shearing force toward the supporting ground will occur in the enlarged bulb part when a vertical load is applied. Can withstand vertical loads.
(2) コンクリート製の基体に鋼管を被覆し、鋼管の外面に鋼材による突起を適正寸法で、適正な位置に配置して固着できるので、PC杭を使用した高支持力基礎杭構造と同等な高支持力を発現させることができる。同時に、杭材としても従来の根固め球根部用のコンクリート製の既製杭に比較して5倍以上の高引抜き力も可能となるので、拡大球根部での高引抜き力の利用が可能となった。 (2) Since the concrete base is covered with a steel pipe and the protrusions of the steel material are placed on the outer surface of the steel pipe in the proper dimensions and in the proper position, they are equivalent to the high bearing capacity foundation pile structure using PC piles. High bearing capacity can be expressed. At the same time, as the pile material, it is possible to use more than 5 times higher pulling force than the conventional concrete piles for root-tightening bulbs, so it is possible to use the high pulling force in the enlarged bulbs. .
(3) また、鋼材からなる突起であるので、鋼管の外面の任意位置に容易に取り付けられるので、地盤特性、建造物所要耐力、求める支持力、拡大球根部の形状等に応じた適切な位置・大きさで突起を形成できる効果がある。従って、求められる条件に適合させた既製杭が容易に供給出来るようになった。即ち、通常のSC杭に所定の形状寸法の突起を、固定することにより、容易に所望要求に対応することもできる。 (3) Since it is a projection made of steel, it can be easily attached to any position on the outer surface of the steel pipe, so it is suitable for the ground characteristics, the required strength of the building, the required supporting force, the shape of the enlarged bulb, etc. -There is an effect that a protrusion can be formed in a size. Therefore, ready-made piles adapted to the required conditions can be easily supplied. That is, it is possible to easily meet a desired requirement by fixing a projection having a predetermined shape and dimension to a normal SC pile.
また、鋼管の外面に、別の鋼材による突起を後付するので、均一な肉厚の突起が形成され各耐力が安定する。更に、鋼管より厚い肉厚の突起が容易に形成できるため、所要の高耐力基礎への対応が可能となる。 In addition, since a projection made of another steel material is retrofitted on the outer surface of the steel pipe, a projection having a uniform thickness is formed and each proof stress is stabilized. Furthermore, since a thicker projection than the steel pipe can be easily formed, it is possible to cope with a required high strength foundation.
(1) 鋼管5の下端部に、鋼材からなる突起形成部材10を溶接固定して、突起形成部材10と鋼管5の外面6とで、閉鎖空間41を形成する。
(1) The
突起形成部材10は、断面形状が横向き台形状で、リング状の垂直部(台形の上底にあたる位置)11の上縁11aから鋼管5の外面6側(中心側)に向けて上昇するように上斜面12が形成され、垂直部11の下縁11bから鋼管5の外面6側(中心側)に向けて下降する下斜面13が形成される(即ち、下斜面13は、放射方向に向けて上向きに傾斜して形成される)。上斜面12の内周縁12a、下斜面13の内周縁13aが鋼管5の外面6に当接して、当接線で溶接する(図3(b))。尚、溶接によらず、上下斜面12、13の端にフランジ等を形成して、ボルトなどにより固定することもできる(図示していない)。
The
突起形成部材10は、鋼管5の外面6に設置される環状の部材であるが、取付に際しては、直径方向で2分割された半円状の突起形成部材片を組合わせて使用することもできる(図示していない)。上斜面12と下斜面13とは、垂直部11の中心を通る水平線に対して、対称に形成されている。
The
(2) 続いて、通常のSC杭を製造する為の手順に従って、杭成型用の遠心成形機内に、鋼管5を設置する(図示していない)。
(2) Then, according to the procedure for manufacturing a normal SC pile, the
(3) 通常のSC杭を製造する為の手順に従って、鋼管5内にコンクリートを注入して、遠心成形し、脱型・養生して、通常のSC杭を得る。即ち、コンクリート本体部(内径D2)1の外周に、鋼管(外径D1、厚さt0)5が被覆された構造である。
(3) According to the procedure for manufacturing a normal SC pile, concrete is poured into the
(4)以上のようにして、この発明の既製コンクリート杭15を構成する(図3、図5(c))。
(4) The ready-made
例えば、既製コンクリート杭15、突起形成部材10は、例えば、以下の数値とする。
・既製コンクリート杭15(下杭35)
軸部径(鋼管の外径)D0=600mm
環状突起17部分の径D1=750mm
杭底から最下端の環状突起までの長さL2= 500mm
杭底から2番目の環状突起までの長さL3=1500mm
各環状突起17の上下方向の間隔L4=1000mm
鋼管の厚さt0=6mm
鋼管の外径D1=600mm
鋼管+コンクリート部の肉厚D4=90mm
・突起形成部材10 水平と上斜面12との成す角θ1=45°
水平と下斜面12との成す角θ2=45°
鋼管5の外面6から垂直部11までの
放射方向の長さ(突起の高さ)D3=75mm
鋼材の厚さt1=9mm(SKK400材)
垂直部11の高さL6=75mm
上斜面12の高さL7=75mm
下斜面13の高さL8=75mm
For example, the ready-made
-Ready-made concrete pile 15 (lower pile 35)
Shaft diameter (outer diameter of steel pipe) D 0 = 600 mm
Diameter D 1 of the
Length from the bottom of the pile to the lowermost annular projection L 2 = 500 mm
The
Interval L 4 in the vertical direction of each
Steel pipe thickness t 0 = 6 mm
Steel pipe outer diameter D 1 = 600 mm
Steel pipe + concrete part thickness D 4 = 90 mm
Angle θ 2 = 45 ° between horizontal and
From the outer surface 6 of the
Radial length (projection height) D 3 = 75 mm
Steel thickness t 1 = 9 mm (SKK400 material)
Height L 6 of the
The height of the
(5)以上のような寸法で形成した場合、鋼管5と環状突起17(突起形成部材10)との接合部における溶接部の断面積33929mm2で、溶接部の応力79.7N/mm2が可能で、一箇所の環状突起で2704kNを負担できるので、基礎杭として、短期支持力7510kN程度(安全率1.70)を発揮できる。
(5) when formed in dimensions such as described above, in the
(6)ここで、既製コンクリート杭15を拡大球根部33を有する掘削孔31内に納める場合に、せん断力が有効に伝搬するようにする場合、例えば、以下のような寸法・形状で掘削孔を形成して、所定位置に、既製コンクリート杭15を納めることが望ましい(図3(a))。
・掘削孔31
軸部32の掘削径D10=780mm
拡大球根部33の掘削径D11=1100mm
拡大球根部33の長さL11=2500mm
拡大球根部33の底34から
既製コンクリート杭15の下面16の距離L12=500mm
拡大球根部33の上端34aから
下側に位置する環状突起17までの距離L13=500mm
(6) Here, when the ready-made
・
Drilling diameter D 10 of the
Excavation diameter D 11 = 1100 mm of the
Length L 11 of the expanded
From the bottom 34 of the
Distance L 12 = 500 mm of the
From the
Distance to the
(7)他の構成 (7) Other configurations
(a) 前記において、突起形成部材10は、(鋼管5から膨出させて形成するのではなく)鋼管5とは別部材で形成するので、所望でかつ均一な厚さで形成することができる。また、鋼管5の厚さt0によらず、求める各耐力に応じて、適宜厚さt1を設定することができる。
(a) In the above, since the
(b) 前記における角度θ1、θ2は、垂直荷重又は引抜力が作用した場合の拡大球根部(根固め部)内でのせん断力の伝搬角度が、30〜45°程度であるので、それを考慮して、せん断力の伝搬先が上下斜面12、13から放射状に近い角度で発生するように、30〜45°で適宜選択して設定することが望ましい。
(b) Since the angles θ 1 and θ 2 in the above are about 30 to 45 ° in the propagation angle of the shearing force in the enlarged bulb portion (root consolidation portion) when a vertical load or a pulling force is applied, In view of this, it is desirable to select and set as appropriate at 30 to 45 degrees so that the propagation destination of the shear force is generated from the upper and
(c) また、通常、既製コンクリート杭15の下面16付近には突起を形成しないが、杭底付近に、突起形成部材10を固定して環状突起17を形成したな場合にも、下斜面13の傾斜角度は維持されることが望ましい。例えば、杭の底面を水平にした場合、杭の埋設及び移送時等で、環状突起17が変形し易くかつ荷重伝搬耐力面からも安定性が良くない。
(c) Usually, no projection is formed near the
(d) また、前記において、突起形成部材10は、鋼管5の外面6との間に閉鎖空間41を形成して、閉鎖空間41内を中空としたが、突起形成部材10に開口(注入口)を形成しておき、閉鎖空間17内にコンクリート本体部1と同程度の高強度のコンクリートを充填することもできる(図示していない)。また、高強度のコンクリート以外のそれほど強度が大きくないコンクリート類を充填することもできる。閉鎖空間41内に各種コンクリートを充填した場合、荷重負荷の伝搬をスムーズにさせ、荷重負荷で変形しない強度の形状とすることができるので望ましく、汎用性を向上させることができる。
(d) In the above description, the
但し、突起形成部材10に開口(注入口)を形成して、各種コンクリート類を充填する作業は効率的でなく、また固化するコンクリートの品質を維持することも困難であるので、必要な強度や剛性をより強化する場合には、閉鎖空間41内を中空に保った状態で、突起形成部材10自身で、必要な強度や剛性を発揮できるように、突起形成部材10自体の厚さや大きさを確保することが、強度を確実に確保するために望ましい。もちろん、突起形成部材10自身を鋼材ブロックとすることも可能である。
However, the operation of forming an opening (injection port) in the
(e) また、前記において、突起形成部材10は2つ設けたが、拡大球根部付きの掘削孔内に、既製コンクリート杭15を埋設した場合、拡大球根部内に少なくとも1つの環状突起17が配置されていれば、高耐力が実現するが(図示していない)。例えば、確実性及び所要耐力により複数とし、3つ(図5(b))、4つ(図4(a))、5つ(図5(e))、6つ(図5(a)(d))固定することもできる。
(e) In the above description, the two
(f) また、前記において、鋼管5は上端7と下端8とを同一口径としたが、上端7側を大径DTで形成することもできる(図4(b)、図5(b)(d)(e))。例えば、上側の外径DTの鋼管5の内側に、小径の鋼管5を嵌挿して構成する。また、この場合、外径が変化する段差部分43に突起形成部材10を固定することもできる(図4(b)、図5(b)(d))。
(f) In the above description, the
(g) また、前記において、突起形成部材10、10の間隔L4は、応力が集中せずに、かつ拡大球根部33に設置した際にせん断力が重ならず、せん断力が有効に伝搬できるように、等間隔となるように設定する。この場合、突起形成部材10は鋼管5とは別部材で形成したので、求める支持力の大きさや拡大球根部の性状により、最適な位置を選択して取り付けできる。
(g) In the above description, the distance L 4 between the
尚、拡大球根部に配置されない突起形成部材10は、必要な外表面積を確保できるように、適宜配置されれば目的を達せられる。
Note that the
図面に基づいて、この発明の実施例を説明する。 Embodiments of the present invention will be described with reference to the drawings.
[1]既製コンクリート杭の構成 [1] Composition of ready-made concrete piles
(1)この発明の既製コンクリート杭15は、コンクリート本体部(長さL1、内径D2)の外周の全長に亘り、厚さt0の鋼管(外径D1)で被覆し、鋼管5の外面6で下端8から、長さL2、L3の位置に、厚さt1の鋼材からなる突起形成部材10、10を溶接固定して、構成する(図3(b))。ここでは、鋼管5の全長に亘り、等間隔L4で、4つの突起形成部材10を固定してある(図4(a))。
(1) The ready-made
突起形成部材10は、垂直部11とその上下に上斜面12、下斜面13を夫々形成したリング状で、全体で環状突起17を構成する。突起形成部材10は、中央部が最も大径で外周が垂直状の垂直部11を有し、垂直部11の上端11aから、中心(内周縁)に向けて斜め上方に向かい小径となる上斜面12を有し、垂直部11の下端11bから、中心(内周縁)に向けて斜め下方に向けて小径となる下斜面13を有する。
The
上斜面12と下斜面13とは、垂直部11の中心を通る水平面に対して、対称に形成されている。
The
[2]基礎杭構造50
[2]
次に、既製コンクリート杭を使用したこの発明の基礎杭構造について説明する。 Next, the foundation pile structure of this invention which uses a ready-made concrete pile is demonstrated.
(1)下杭35は、前記同様の構造で、コンクリート本体部1の外周を鋼管5で被覆し、突起形成部材10を固定し、環状突起17、17を4つ形成した既製コンクリート杭15(軸部外径D0、内径D2、突起部外径D1)である。また、上杭36は、下杭35と同一軸部外径D1、内径D2でで、コンクリート本体部1の外周を鋼管5で覆ったストレート状(環状突起17が無い)の既製コンクリート杭(従来のいわゆるSC杭)である(図1、図3)。
(1) The
(2)この発明で使用する掘削ロッド20は、ロッド本体21の下端部に、螺旋羽根25を取り付けた中間ロッド24を連結し、更にその下に掘削ヘッド26を連結して構成する。ロッド本体21は撹拌バー22、22と練付ドラム23、23を取付けてある。掘削ヘッド26は、下端に固定掘削刃28、28を有するヘッド本体27に、下端に掘削刃30、30を有する掘削腕29、29を揺動自在に取り付けて構成する(図2)。
(2) The
(3)杭打ち機のオーガー駆動装置に掘削ロッド20を取付け、地上39の所定位置で、掘削ヘッド26先端から適宜掘削液を注入しながら、孔内を撹拌し、泥土を孔壁に練り付けながら掘削孔31の軸部32の掘削を行う。所定の深度まで、正回転で掘削後、掘削ロッド20を上下に反復し、充分に撹拌し、孔壁を練り付けして掘削孔31を築造する(図1(a))。
(3) Attach the excavating
(4)掘削ロッド20を逆転して掘削腕29、29を他側に揺動して、掘削孔31先端から所定長さの区間まで、掘削径を大径とし、掘削孔31に拡大球根部(根固め部)33を掘削する。次にこの範囲に根固め液45(水セメント比=60%のセメントミルク、4週圧縮強度=20N/mm2、掘削体積の所定量分)を注入し掘削泥土と置換及び撹拌混合して、根固め液が充填された拡大球根部3を築造する(図1(b))。
(4) The
根固め液45の配合は、例えば、掘削する口径に応じて、例えば、以下のような数値を採用する。ここで、セメントは、通常は普通ポルトランドセメントを使用するが、必要に応じて早強セメント、高炉セメント、シリカセメント等を使用することもできる。
(5)掘削孔31の先端部から杭周固定液46(水セメント比=60%のセメントミルク、4週圧縮強度=20N/mm2)を所定量注入し、掘削孔31内を混合撹拌しながら掘削ロッド20を引き上げる(図1(d))。
(5) Pile circumference fixing liquid 46 (water cement ratio = 60% cement milk, 4 weeks compressive strength = 20 N / mm 2 ) is injected from the tip of the
また、杭周固定液46の配合は、掘削径に応じて、以下の数値を採用する。この際、注入量は、上下杭35、36の体積を考慮した量とし、突起形成部材10を固定して環状突起17を形成した部分では孔内体積の2割、環状突起17を有しないストレート部分では孔内体積の1割を夫々標準とする。
(6)下杭35(既製コンクリート杭15)を掘削孔31内に、自重であるいは回転させながら沈設し、所定深さまで沈設した状態で地上39で保持して、下杭35に上杭36を接合し、連結杭とし、保持を解いて、引き続いて連結杭(上杭36+下杭35)を沈設する(図1(e))。
(6) The lower pile 35 (the ready-made concrete pile 15) is set in the
(7)最後に、圧入または回転沈設して、連結杭(上杭36+下杭35)を所定深度に設置する(図1(f))。この場合、下杭の2つの環状突起17、17が拡大球根部33内に配置される(図1(f)、図4(a))。
(7) Finally, it press-fits or rotationally sinks and installs the connection pile (
(8)以上のようにして、この発明の基礎杭構造50を構成する(図1(f))。
ここで、
・既製コンクリート杭15(下杭35)
軸部径D0=600mm
環状突起17部分の径D1=750mm
杭底16から最下端の環状突起17までの長さL2= 500mm
杭底16から2番目の環状突起17までの長さL3=1500mm
各環状突起17の上下方向の間隔L4=1000mm
・掘削孔31
軸部32の掘削径D10=780mm
拡大球根部33の掘削径D11=1100mm
拡大球根部33の長さL11=2500mm
拡大球根部33の底34から
既製コンクリート杭15の底16までの距離L12=500mm
拡大球根部33の上端34aから
下側に位置する環状突起17までの距離L13=500mm
上側に位置する環状突起17までの距離L14=500mm
(8) The
here,
-Ready-made concrete pile 15 (lower pile 35)
Shaft diameter D 0 = 600 mm
Diameter D 1 of the
Length L 2 = 500 mm from the pile bottom 16 to the lowermost
Length L 3 from the pile bottom 16 to the second
Interval L 4 in the vertical direction of each
・
Drilling diameter D 10 of the
Excavation diameter D 11 = 1100 mm of the
Length L 11 of the expanded
From the bottom 34 of the
Distance L 12 = 500 mm to the bottom 16 of the ready-made
From the
Distance to the
Distance to the
[4]試験例 [4] Test example
(1)地盤特性・杭長・杭構成等
下杭35 この発明の既製コンクリート杭15 図4(a)
杭長さL1=5m
環状突起17の数 4
上杭36 SC杭
杭長44m
鋼管の外径D1=600mm
先端部地盤 土質 砂、N値32.5
(1) Ground characteristics, pile length, pile configuration, etc.
Pile length L 1 = 5m
Number of annular protrusions 4
Pile length 44m
Steel pipe outer diameter D 1 = 600 mm
Tip ground Soil Sand, N value 32.5
(2)掘削孔31
拡大球根部33
長さL11=2500mm
径D11=1100mm
杭下長L12=500mm
節部・球根上端間幅L13=500mm
(2)
The
Diameter D 11 = 1100mm
Pile under length L 12 = 500mm
Width between node and bulb top L 13 = 500mm
(3)掘削孔31
軸部32 (深さ約42m)
掘削径D10=780mm
(3)
Shaft 32 (depth 42m)
Drilling diameter D 10 = 780 mm
(4)根固め液45、杭周固定液46は前記実施例と同様である。
(4) The
(5)載荷試験結果
最大荷重時7492kNとなり、下杭をPC杭として、同様の掘削孔31に埋設した場合と同様な高支持力を発揮した。
(5) Loading test result It became 7492 kN at the time of the maximum load, and demonstrated the same high bearing force as the case where it was embed | buried in the
(5)杭材の引抜き強度:
コンクリート杭(φ600):57t/本(A種)、×2(C種)・・・従来
SC杭(φ600、t=12mm)、480t/本、240t/本(t=6mm)
従来のコンクリート杭に対し、約5倍以上の増強可能。
(5) Peeling strength of pile material:
Concrete pile (φ600): 57t / piece (A type), × 2 (C type) ... Conventional SC pile (φ600, t = 12mm), 480t / piece, 240t / piece (t = 6mm)
More than 5 times the capacity of conventional concrete piles.
[4]他の実施例 [4] Other embodiments
(1) 前記実施例において、上杭、中杭及び下杭とからなり、下杭35を環状突起17を有するこの発明の既製コンクリート杭15とし、上杭36及び中杭37を通常のSC杭としたが(図6(c))、下杭35に、環状突起17を有するこの発明の既製コンクリート杭15を使用すれば、連結杭の構成は任意である。
(1) In the said Example, it consists of an upper pile, a middle pile, and a lower pile, the
例えば、下杭35、中杭37、上杭36の組合せで連結杭を構成し(図6、図7)、下杭35、中杭37、上杭36の総に、環状突起17を有するこの発明の既製コンクリート杭15を使用する(図6(a))、下杭35、中杭37を環状突起17を有するこの発明の既製コンクリート杭15を使用し、上杭36をSC杭とすることもできる(図6(b))。
For example, a connection pile is comprised by the combination of the
また、上下で外径が異なるように段差部43を形成した中杭37を使用して、下杭35と上杭36で、外径が異なる杭を使用することもできる(図6(d)(e))。
Moreover, it is also possible to use a pile having different outer diameters in the
1 コンクリート本体部
5 鋼管
6 鋼管の外面
7 鋼管の上端
8 鋼管の下端
10 突起形成部材
11 垂直部
12 上斜面
13 下斜面
15 既製コンクリート杭
16 既製コンクリート杭の下面
17 環状突起
20 掘削ロッド
21 ロッド本体
24 中間ロッド
26 掘削ヘッド
27 ヘッド本体
28 固定掘削刃
29 掘削腕
30 掘削刃
31 掘削孔
32 掘削孔の軸部
33 掘削孔の拡大球根部
34 拡大球根部の下端
34a 拡大球根部の上端
35 下杭
36 上杭
37 中杭
39 地上
41 閉鎖空間
45 根固め液
46 杭周固定液
50 基礎杭構造
DESCRIPTION OF SYMBOLS 1
Claims (3)
前記突起のうち少なくとも最下端に位置する突起は、少なくとも下面に、放射方向に向けて上向きに傾斜した傾斜面を形成したことを特徴とする既製コンクリート杭。 On the outer surface, it was formed by injecting concrete into the steel pipe and centrifugally forming it as a lower pile, using a precast pile formed by injecting concrete into a steel pipe formed with a separate member with a steel projection The ready-made pile is the upper pile, and the connected pile is configured.
Projections, even without least on the lower surface, prefabricated concrete piles, characterized in that the formation of the inclined surface inclined upward toward the radial direction positioned on at least the lowermost end of the projection.
前記突起は、少なくとも下面に、放射方向に向けて上向きに傾斜した傾斜面を形成したことを特徴とする既製コンクリート杭。 On the outer surface, it was formed by injecting concrete into the steel pipe and forming it by centrifugal molding by injecting concrete into the steel pipe formed with a separate member with steel protrusions and forming it by centrifugal molding. The ready-made pile is the upper pile, and the connected pile is configured.
The projections, even without least on the lower surface, prefabricated concrete piles, characterized in that the formation of the inclined surface inclined upward toward the radial direction.
掘削孔内に、前記連結杭からなる既製コンクリート杭を埋設した基礎杭構造であって、
前記既製コンクリート杭は下端部に、少なくとも1つの突起部を形成してあり、前記掘削孔の下端部に形成した根固め部内に、前記既製コンクリート杭の突起部を少なくとも1つ配置してなり、前記突起部は、前記根固め部内で支持地盤に向けて、斜め下方へのせん断力の伝搬を可能にする傾斜下面を有する構造とし、
前記掘削孔に杭周固定液を注入し、前記突起を形成した部分の前記杭周固定液の注入量を、前記突起を形成しないストレート部分の注入量の2倍としたことを特徴とする基礎杭構造。 On the outer surface, it was formed by injecting concrete into the steel pipe and centrifugally forming it as a lower pile, using a precast pile formed by injecting concrete into a steel pipe formed with a separate member with a steel projection The ready-made pile is the upper pile, and the connected pile is configured.
In the excavation hole, a foundation pile structure in which a ready-made concrete pile made of the connecting pile is embedded ,
The ready-made concrete pile is formed with at least one protrusion at the lower end, and at least one protrusion of the ready-made concrete pile is disposed in the rooting portion formed at the lower end of the excavation hole, the protrusion of the previous SL toward the supporting ground roots compaction portion, a structure having an inclined lower surface that allows the propagation of shear force obliquely downward,
Pile circumference fixing liquid is injected into the excavation hole, and the injection amount of the pile periphery fixing liquid in the portion where the protrusion is formed is double the injection amount of the straight portion where the protrusion is not formed. Pile structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004278538A JP4517233B2 (en) | 2004-09-24 | 2004-09-24 | Ready-made concrete pile, manufacturing method of ready-made concrete pile, foundation pile structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004278538A JP4517233B2 (en) | 2004-09-24 | 2004-09-24 | Ready-made concrete pile, manufacturing method of ready-made concrete pile, foundation pile structure |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2006090051A JP2006090051A (en) | 2006-04-06 |
JP4517233B2 true JP4517233B2 (en) | 2010-08-04 |
Family
ID=36231288
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2004278538A Expired - Lifetime JP4517233B2 (en) | 2004-09-24 | 2004-09-24 | Ready-made concrete pile, manufacturing method of ready-made concrete pile, foundation pile structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4517233B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6610183B2 (en) * | 2015-11-10 | 2019-11-27 | ジャパンパイル株式会社 | Ready-made pile |
JP7007544B2 (en) * | 2016-10-13 | 2022-01-24 | ジャパンパイル株式会社 | Knot piles and joint piles |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002097635A (en) * | 1999-08-31 | 2002-04-02 | Mitani Sekisan Co Ltd | Method for burying ready-made pile, structure of foundation pile, and ready-made pile |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5451210A (en) * | 1977-09-30 | 1979-04-21 | Nippon Concrete Ind Co Ltd | Preparation of prestress steel pipe concrete pile |
JPS57209325A (en) * | 1982-05-21 | 1982-12-22 | Norihiro Umezawa | Concrete-steel pipe composite pile |
JP3719795B2 (en) * | 1996-11-12 | 2005-11-24 | 株式会社ジオトップ | Composite joint pile and manufacturing method thereof |
-
2004
- 2004-09-24 JP JP2004278538A patent/JP4517233B2/en not_active Expired - Lifetime
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002097635A (en) * | 1999-08-31 | 2002-04-02 | Mitani Sekisan Co Ltd | Method for burying ready-made pile, structure of foundation pile, and ready-made pile |
Also Published As
Publication number | Publication date |
---|---|
JP2006090051A (en) | 2006-04-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5265500B2 (en) | Pile digging method, foundation pile structure | |
JP4984308B2 (en) | Ready-made pile | |
CN113174988A (en) | Double-wall concrete open caisson structure and construction method | |
JP4154487B2 (en) | Foundation pile construction method, foundation pile | |
JP4517233B2 (en) | Ready-made concrete pile, manufacturing method of ready-made concrete pile, foundation pile structure | |
JP4724879B2 (en) | Foundation pile structure | |
JP5456627B2 (en) | Connection structure and method of connection between pile and steel column | |
JP5648085B2 (en) | How to build a pile | |
JP4724878B2 (en) | Foundation pile structure | |
JP5634036B2 (en) | Method for constructing retaining wall, method for constructing pile, retaining wall, pile | |
JP2003064664A (en) | Method for creating composite pile of soil cement | |
JP4378752B2 (en) | Ready-made piles for large-diameter ready-made concrete pile foundations | |
JP4724873B2 (en) | Ready-made pile | |
JP5606727B2 (en) | Foundation pile | |
JP2008075336A (en) | Construction method for precast pile | |
JP2001098544A (en) | Precast pipe and foundation pile structure | |
CN206279522U (en) | Ground-connecting-wall steel reinforcement cage | |
JP6462298B2 (en) | Foundation pile structure | |
JP4054903B2 (en) | Method of burying ready-made piles, foundation pile structure and ready-made piles | |
JP2000154540A (en) | Bored pile, its work execution method, work execution device, and existing pile for bored pile | |
JP2020029703A (en) | Pile body and construction method of pile | |
JP2003227133A (en) | Foundation pile and method for constructing the same | |
JP2004238927A (en) | Joint structure of prefabricated pile and column, and its axial force transmission member | |
JP6553101B2 (en) | Ground improvement stirring device | |
JP2005098108A5 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20070608 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20090528 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20090609 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20090810 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20100330 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20100430 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130528 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 4517233 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140528 Year of fee payment: 4 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |