JP4427670B2 - Anchor bolt construction equipment - Google Patents

Anchor bolt construction equipment Download PDF

Info

Publication number
JP4427670B2
JP4427670B2 JP2003003989A JP2003003989A JP4427670B2 JP 4427670 B2 JP4427670 B2 JP 4427670B2 JP 2003003989 A JP2003003989 A JP 2003003989A JP 2003003989 A JP2003003989 A JP 2003003989A JP 4427670 B2 JP4427670 B2 JP 4427670B2
Authority
JP
Japan
Prior art keywords
wire rope
winch
base
sheave
crawler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003003989A
Other languages
Japanese (ja)
Other versions
JP2004218210A (en
Inventor
浩之 中田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nittoc Constructions Co Ltd
Original Assignee
Nittoc Constructions Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nittoc Constructions Co Ltd filed Critical Nittoc Constructions Co Ltd
Priority to JP2003003989A priority Critical patent/JP4427670B2/en
Publication of JP2004218210A publication Critical patent/JP2004218210A/en
Application granted granted Critical
Publication of JP4427670B2 publication Critical patent/JP4427670B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【発明が属する技術分野】
本発明は、軟弱な法面地山を補強するためのアンカーボルト施工装置に関するものである。
【0002】
【従来の技術】
従来、急勾配の法面地山を任意間隔毎に削孔してこれらにアンカーボルトをその頭部を地表に表出させて挿入すると共に、隙間にセメントミルク等の硬化材を注入して固めた後、地山表面にネットを敷設して各アンカーボルトに係留支持し、この状態で地山表面にファイバーコンクリートを吹き付けることにより、軟弱な法面地山を補強する施工方法が実施されている。
【0003】
この主たる施工現場は、地盤が極めて緩く、また国立公園に指定されている地域等で、斜面全体に広がっている樹木のほとんどを伐採できないため、急勾配の法面地山を削孔してアンカーボルトを施工する装置としては、法面に単管足場を設置してこれにドリル装置を載せて施工し、順次単管足場を解体して樹木を避けながら上下左右に移動設置しながら施工を進行している。
【0004】
一方従来、急勾配の法面地山を削孔してアンカーボルトを施工する削孔装置として、クロラーにドリル装置を俯仰および旋回自在に設置して、このクローラーをウィンチで巻き上げるワイヤーロープで上方に直線的に引き上げながら削孔してアンカーボルトを施工し、頂端部まで施工したらウィンチの位置を横にずらして順次同様に施工するようにした施工装置が知られている。
【0005】
【発明が解決しようとする課題】
従来のように法面に単管足場を設置してこれにドリル装置を載せて施工する施工装置では、ドリル装置の移動の度に単管足場を解体移動し、再組立しなければならないため、その取り扱いに多くの時間と労力を要し、それだけ工期が長くなって工費も嵩むという難点があった。
【0006】
また、ドリル装置を載せたクローラーをワイヤーロープで上方に直線的に引き上げる施工機械などでは、樹木を伐採できない現場等では樹木等の撤去できない不動物体が機械の移動の妨げになって使用することが不可能である。
【0007】
【課題を解決するための手段】
本発明は、ドリル装置を載せたクローラーを施工現場の斜面上方からワイヤーロープで引き上げると共に、左右の樹木、アンカーピン、ロックボルト等の被連結部材に連結支持した横支持ワイヤーロープをウインチにより引っ張って左右方向にもクローラーを容易に方向転換して移動できるようにし、狭い樹木等の不動物体間をぬって蛇行移動可能としたことを最も主要な特徴とする。
【0008】
【発明の実施の形態】
樹木等の不動物体を避けながら移動可能とするという目的を、横支持ワイヤーロープをウインチで巻き上げることでクローラーを左右方向にも引っ張ってクローラーを横移動することで実現した。
【0009】
【実施例】
図1および図2はこの発明に係るアンカーボルト施工装置の一態様を示したもので、クローラー1に旋回自在に設置した基台2上には、回動台3がその前端部を基台2の前端部に設けたブラケット4に水平の枢軸5により回動自在に枢着され、回動台3の後端部と基台2の後端部間にはパワーシリンダ6がその後端と伸縮ロッド6’の先端部において枢着されている。
【0010】
回動台3の前部上にはブラケット7が取付けられ、これに削孔機8のガイドポール9に設けたブラケット10が水平の枢軸11により枢着され、回動台3とガイドポール9の中間部間にはパワーシリンダ12がその後端と伸縮ロッド12’の先端部において枢着されている。
【0011】
削孔機8は、そのガイドポール8上にドリルヘッド13を前後に進退自在に移動するためのスライダー14がスライド自在に取付けられ、このスラーダー14はガイドポール8に基端を取付けたパワーシリンダ15により前後にスライドするようになっている。
【0012】
ガイドポールの先端にはドリルヘッド13の先端に取付けたウオータースイベル16に後端をクランプしたドリルパイプ17の前部を回転自在にクランプするパワークランプ18が取付けられている。
【0013】
図2および図3に示すように、基台2上にはその後端部にウインチ19が設けられ、また前端部には左右にシーブ20a,20bが、また中間部にシーブ20cがそれぞれ回転自在に取付けられ、これにウインチ19に巻き上げられた横支持ワイヤーロープ21を巻き掛けるようになっており、横支持ワイヤーロープ21はウインチ19とシーブ20a,20bとの間に設けた三点支持ローラー22に摺動自在に支持されるようになっている。
【0014】
今この横支持ワイヤーロープ21を一方のシーブ20a(図3の右側)に巻き掛けてその端部を施工現場の樹木、アンカーピン、ロックボルト等の被連結部材Wに連結固定し、この状態で、ウインチ19により横支持ワイヤーロープ21を巻き上げると、クローラー1は基台2と共に、横方向(右横)に移動することになる。
【0015】
横支持ワイヤーロープ21を図3の左側のシーブ20bに巻き掛けたときには、上記同様の操作を行うと、クローラー1は基台2と共に、横方向(左横)に移動することになる。
【0016】
また、ウインチ19とシーブ20a,20b間の基台2には図5に示すように、横支持ワイヤーロープ21が通過する付近に垂直の枢軸23を中心とする円弧型のガイド穴24がクローラー1の左右方向に長く形成され、これに枢軸23を支点として水平回転自在に取付けたアーム25の先端に上向きに突設したボルト26が挿通され、このボルト26をガイド穴に沿って移動させ、その上方への突出部が横支持ワイヤーロープ21に接触してこれを図示の実線で示すように屈曲させる位置において、締付ナット27により締め付け固定することにより、ウインチ19でこの屈曲した横支持ワイヤーロープ21を巻き上げるとき、この屈曲部を真線(図示の二点鎖線)にしようとする方向(矢印で示す)に力を作用させる結果、基台2はこの力を受けてクローラー1を横方向に微小移動することにできる。
【0017】
なお、ガイド穴24は円弧型でなく、左右方向に長い直線状でこれに沿ってボルト26が横移動可能としたものであってもよい。
【0018】
基台2の先端には引き上げワイヤーロープ28が連結され、この引き上げワイヤーロープ28は施工現場の斜面にある所用数の樹木、アンカーピン、ロックボルト等の被連結部材Wに回転自在に取付けたシーブ29に巻き掛け、斜面頂部または地上部に設けた引き上げウインチ30により巻き上げることにより、クローラー1を上方に移動するようになっている。
【0019】
また、クローラー1には補助ワイヤーロープ28’を連結して適当な樹木等の被連結部材Wに支持させる。
【0020】
以上の構成において、アンカーボルトの施工に際しては図2に示すように、施工現場の斜面においてパワーシリンダ6を伸長作動して回動台3を上向きに回動し、さらにパワーシリンダ12を伸長作動して削孔機8を斜面に対して垂直ないしほぼ垂直をなすように回動する。
【0021】
この状態でドリルヘッド13を回転駆動してウオータースイベル16を介してドリルロッド17を回転しながら、パワーシリンダ15によりスライダー14を介してドリルヘッド13を前方に押し出して掘進する。
【0022】
1本のドリルロッド17が地中に貫入された後その後端部に2本目のドリルロッド17を連結し、その後端部をスイベル16に連結して上記同様に掘進し、さらに必要に応じてさらにドリルロッド17を継ぎ足して所要深度まで掘進する。
【0023】
掘進後、地中に貫入したドリルロッド17内にアンカーボルトを挿入し、さらにセメントミルク等の固化材を充填しながらドリルヘッド13を後退させることにより、ドリルロッド17を順次引き上げる。
【0024】
次に、基台1を右または左に旋回させ、クローラー1を若干引き上げて、既にアンカー施工した部分から所用間隔離れた横の地点において、上記同様にアンカー施工を行い、さらに基台1を反対側に旋回して同様にアンカー施工して中央と左右の3点に連続してアンカー施工を行う。
【0025】
その後は、順次クローラー1を上方に所定距離引き上げながら順次同様にアンカー施工を連続する。
【0026】
この引き上げの際に樹木等の撤去できない不動物体が邪魔になるときには、上記したようにウインチ19により横支持ワイヤーロープ21を巻き上げることにより、クローラー1を基台2と共に、横方向(右横)に移動し、また横移動の微調節を要するときは上記したように、ボルト26をガイド穴に沿って移動させ、横支持ワイヤーロープ21を屈曲させた状態でウインチ19により巻き上げてクローラー1を基台2と共に、横方向に微小移動させる。
【0027】
図8はこの発明に係るアンカーボルト施工装置の他の態様を示したもので、クローラー1に基台2がその前端部においてパワーシリンダ31により回動可能に取付けられ、この基台2に横向きに複数のH型のガイドレール32が取付けられ、このガイドレール32のフランジ内面に係合させた車輪33を取付けた作業台34がこのガイドレール32に沿って左右方向に移動可能に設置されている。
【0028】
作業台34には、パワーシリンダ35によってガイドレール36に沿って前後に進退する移動台37が設けられ、これに取付けたブラケット38と、削孔機8のガイドポール9に設けたブラケット39が水平の枢軸40により枢着され、移動台36とガイドポール9の中間部間にはパワーシリンダ41がその後端と伸縮ロッド41’の先端部において枢着されている。
【0029】
このアンカーボルト施工装置においては、削孔機8の作業台34と共にクローラー1の左右方向に横移動できるため、クローラー1を一定位置に固定したままアンカー施工を横方向に任意間隔毎に連続して行うことが可能となる。
【0030】
なお、この発明に用いるクローラー1として、左右のキャタピラをその間に設置したパワーシリンダにより広狭調節可能なものを用いることによって、左右のキャタピラを狭めて狭い樹木の間を通過可能とすることが望ましい。
【0031】
【発明の効果】
以上の通りこの発明によれば、ドリル装置を載せたクローラーを施工現場の斜面上方からワイヤーロープで引き上げると共に、左右の樹木に連結支持した横支持ワイヤーロープをウインチで巻き上げることにより、クローラーを左右方向にも容易に方向転換して移動可能となり、その結果樹木の伐採ができない施工現場等において狭い樹木等の不動物体の間をぬってクローラーを蛇行移動することが可能となる。
【0032】
削孔機を設置した基台を旋回させ、また基台上に横移動自在に設置した作業台を左右方向に移動ることにより、任意間隔で複数の箇所のアンカー施工を連続し行うことができる。
【0033】
ボルトをガイド穴に沿って移動させ、その上方への突出部が横支持ワイヤーロープに接触させてこれを屈曲させ、この状態で締付ナットにより締め付け固定することにより、ウインチでこの屈曲した横支持ワイヤーロープを巻き上げることにより、クローラーを横方向に微小移動することにできる。
【図面の簡単な説明】
【図1】この発明に用いるアンカー施工装置の一態様を示す施工前の状態の側面図である。
【図2】この発明に用いるアンカー施工装置の一態様を示す施工状態の側面図である。
【図3】この発明に用いるアンカー施工装置における基台部分の概要を示す平面図である。
【図4】この発明に用いるアンカー施工装置における基台部分の概要を示す側面図である。
【図5】この発明に用いるアンカー施工装置におけるクローラーの横微小移動装置の概要を示す平面図である。
【図6】この発明のクローラー引き上げ構造の一例を示す側面図である。
【図7】この発明のクローラー引き上げ構造の他の例を示す側面図である。
【図8】この発明に用いるアンカー施工装置の他の態様を示す施工状態の側面図である。
【符号の説明】
1 クローラー
2 基台
3 回動台
4 ブラケット
5 枢軸
6 パワーシリンダ
6’ 伸縮ロッド
7 ブラケット
8 削孔機
9 ガイドポール
10 ブラケット
11 枢軸
12 パワーシリンダ
12’ 伸縮ロッド
13 ドリルヘッド
14 スライダー
15 パワーシリンダ
16 ウオータースイベル
17 ドリルパイプ
18 パワークランプ
19 ウインチ
20a シーブ
20b シーブ
20c シーブ
21 横支持ワイヤーロープ
22 三点支持ローラー
23 枢軸
24 ガイド穴
25 アーム
26 ボルト
27 締付ナット
28 引き上げワイヤーロープ
28’ 補助ワイヤーロープ
29 シーブ
30 ウインチ
31 パワーシリンダ
32 ガイドレール
33 車輪
34 作業台
35 パワーシリンダ
36 ガイドレール
37 移動台
38 ブラケット
39 ブラケット
40 枢軸
41 パワーシリンダ
41’ 伸縮ロッド
[0001]
[Technical field to which the invention belongs]
The present invention relates to an anchor bolt construction apparatus for reinforcing a weak slope ground.
[0002]
[Prior art]
Conventionally, steep slope slopes are drilled at arbitrary intervals and anchor bolts are inserted with these heads exposed on the ground surface, and hardened materials such as cement milk are injected into the gaps and hardened. After that, a construction method has been implemented in which a net is laid on the ground surface and moored and supported by each anchor bolt, and fiber concrete is sprayed onto the ground surface in this state to reinforce the weak slope ground. .
[0003]
This main construction site is extremely loose, and in areas designated as national parks, most of the trees spreading throughout the slope cannot be cut down. As a device for installing bolts, a single pipe scaffolding is installed on the slope, and a drill device is placed on it, and then the single pipe scaffolding is dismantled sequentially and moving up and down and left and right while avoiding trees is doing.
[0004]
On the other hand, conventionally, as a drilling device that drills steep slopes and installs anchor bolts, a drill device is installed on the chlorer so that it can be lifted and swung freely, and this crawler is wound up by a wire rope that winds up with a winch A construction apparatus is known in which holes are drilled while being pulled up linearly, anchor bolts are constructed, and when construction is performed up to the top end, the position of the winch is shifted laterally and construction is performed sequentially in the same manner.
[0005]
[Problems to be solved by the invention]
In the construction equipment that installs a single pipe scaffold on the slope and places a drill device on it as in the past, the single pipe scaffold must be disassembled and reassembled each time the drill device moves, It takes a lot of time and labor to handle it, and there is a problem that the construction period becomes longer and the construction cost increases.
[0006]
In addition, in construction machinery that pulls up the crawler with a drill device linearly upward with a wire rope, inanimate objects such as trees that cannot be removed at sites where trees cannot be cut may interfere with the movement of the machinery. Impossible.
[0007]
[Means for Solving the Problems]
In the present invention, the crawler on which the drill device is mounted is pulled up with a wire rope from above the slope of the construction site, and the lateral support wire rope connected and supported to the connected members such as left and right trees, anchor pins, and lock bolts is pulled by the winch. The main feature is that the crawler can be easily moved in the left-right direction by changing its direction and can move between inanimate bodies such as narrow trees.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
The purpose of enabling movement while avoiding non-animal bodies such as trees was realized by moving the crawler horizontally by pulling the crawler in the left-right direction by winding the lateral support wire rope with a winch.
[0009]
【Example】
1 and 2 show an embodiment of an anchor bolt construction apparatus according to the present invention. On a base 2 that is pivotably installed on a crawler 1, a rotary base 3 has a front end portion of the base 2 The power cylinder 6 is pivotally attached to a bracket 4 provided at the front end of the base 4 by a horizontal pivot 5 so that the power cylinder 6 is located between the rear end of the turntable 3 and the rear end of the base 2 and the telescopic rod. It is pivotally attached at the tip of 6 '.
[0010]
A bracket 7 is mounted on the front part of the turntable 3, and a bracket 10 provided on the guide pole 9 of the drilling machine 8 is pivotally attached to the turntable 8 by a horizontal pivot 11, and the turntable 3 and the guide pole 9 are connected to each other. Between the intermediate portions, a power cylinder 12 is pivotally attached at the rear end thereof and the distal end portion of the telescopic rod 12 ′.
[0011]
In the drilling machine 8, a slider 14 is slidably mounted on the guide pole 8 so as to move the drill head 13 back and forth. The slurder 14 is a power cylinder 15 having a base end attached to the guide pole 8. It is designed to slide back and forth.
[0012]
At the tip of the guide pole, a power clamp 18 is attached to a water swivel 16 attached to the tip of the drill head 13 so as to rotatably clamp the front portion of the drill pipe 17 whose rear end is clamped.
[0013]
As shown in FIGS. 2 and 3, a winch 19 is provided at the rear end portion on the base 2, and the sheaves 20a and 20b are horizontally rotated at the front end portion, and the sheave 20c is rotatable at the intermediate portion. A horizontal support wire rope 21 wound around the winch 19 is wound around this, and the horizontal support wire rope 21 is attached to a three-point support roller 22 provided between the winch 19 and the sheaves 20a and 20b. It is slidably supported.
[0014]
Now, this lateral support wire rope 21 is wrapped around one sheave 20a (right side in FIG. 3), and its end is connected and fixed to a connected member W such as a tree, anchor pin, lock bolt, etc. at the construction site. When the horizontal support wire rope 21 is wound up by the winch 19, the crawler 1 moves in the horizontal direction (right side) together with the base 2.
[0015]
When the horizontal support wire rope 21 is wound around the left sheave 20b in FIG. 3, the crawler 1 moves in the horizontal direction (left side) together with the base 2 when the same operation is performed.
[0016]
Further, as shown in FIG. 5, the base 2 between the winch 19 and the sheaves 20 a and 20 b has an arcuate guide hole 24 centered on the vertical pivot 23 in the vicinity where the lateral support wire rope 21 passes. A bolt 26 projecting upward is inserted into the tip of an arm 25 which is formed to be long in the left-right direction and mounted on the pivot 23 as a fulcrum to be horizontally rotatable. The bolt 26 is moved along the guide hole, At the position where the upward protrusion comes into contact with the lateral support wire rope 21 and bends it as shown by the solid line in the figure, the lateral support wire rope is bent by the winch 19 by being fastened and fixed by the tightening nut 27. When the roll 21 is rolled up, a force is applied in a direction (indicated by an arrow) in which the bent portion is to be a straight line (two-dot chain line in the drawing). Receiving and can be finely moved crawler 1 in the transverse direction.
[0017]
The guide hole 24 may not be an arc shape, but may be a straight line that is long in the left-right direction, and the bolt 26 can be moved laterally along this.
[0018]
A pull-up wire rope 28 is connected to the tip of the base 2, and the pull-up wire rope 28 is rotatably attached to a member W to be connected such as a number of trees, anchor pins, lock bolts, etc. on the slope of the construction site. The crawler 1 is moved upward by being wound around 29 and wound up by a lifting winch 30 provided on the top of the slope or on the ground.
[0019]
Further, an auxiliary wire rope 28 'is connected to the crawler 1 and supported by a connected member W such as an appropriate tree.
[0020]
In the above construction, as shown in FIG. 2, when the anchor bolt is constructed, the power cylinder 6 is extended on the slope of the construction site to rotate the turntable 3 upward, and the power cylinder 12 is further extended. Thus, the hole drilling machine 8 is rotated so as to be perpendicular or almost perpendicular to the slope.
[0021]
In this state, the drill head 13 is driven to rotate and the drill rod 17 is rotated via the water swivel 16, while the power cylinder 15 pushes the drill head 13 forward via the slider 14 to dig.
[0022]
After one drill rod 17 has penetrated into the ground, the second drill rod 17 is connected to the rear end portion thereof, the rear end portion is connected to the swivel 16 and dug in the same manner as described above, and further if necessary. Drilling to the required depth by adding the drill rod 17.
[0023]
After excavation, the anchor rod is inserted into the drill rod 17 penetrating into the ground, and the drill head 13 is retracted while being filled with a solidified material such as cement milk, whereby the drill rod 17 is sequentially pulled up.
[0024]
Next, the base 1 is turned to the right or left, the crawler 1 is slightly lifted, and the anchor construction is performed in the same manner as described above at a lateral point away from the already anchored portion, and the base 1 is further reversed. Turn to the side and perform anchoring in the same way, and then perform anchoring continuously at the center and three points on the left and right.
[0025]
After that, the anchor construction is successively performed in the same manner while sequentially raising the crawler 1 upward by a predetermined distance.
[0026]
When an inanimate object such as a tree that cannot be removed becomes a hindrance during this pulling up, the side support wire rope 21 is wound up by the winch 19 as described above, whereby the crawler 1 and the base 2 are moved in the lateral direction (right side). When it is necessary to move or to finely adjust the lateral movement, as described above, the bolt 26 is moved along the guide hole, and the lateral support wire rope 21 is bent and wound up by the winch 19 to mount the crawler 1 on the base. 2 and a slight movement in the lateral direction.
[0027]
FIG. 8 shows another aspect of the anchor bolt construction apparatus according to the present invention. A base 2 is attached to a crawler 1 so as to be rotatable by a power cylinder 31 at a front end portion thereof, and is horizontally mounted on the base 2. A plurality of H-shaped guide rails 32 are attached, and a work table 34 to which a wheel 33 engaged with the flange inner surface of the guide rails 32 is attached is movably installed along the guide rails 32 in the left-right direction. .
[0028]
The work table 34 is provided with a moving table 37 that moves back and forth along the guide rail 36 by a power cylinder 35, and a bracket 38 attached thereto and a bracket 39 provided on the guide pole 9 of the drilling machine 8 are horizontally mounted. The power cylinder 41 is pivotally mounted at the rear end thereof and at the distal end portion of the telescopic rod 41 ′ between the movable table 36 and the intermediate portion of the guide pole 9.
[0029]
In this anchor bolt construction apparatus, since the crawler 1 can be laterally moved together with the work table 34 of the hole drilling machine 8, the anchor construction is continuously performed at an arbitrary interval in the lateral direction while the crawler 1 is fixed at a fixed position. Can be done.
[0030]
In addition, as the crawler 1 used in the present invention, it is desirable that the left and right caterpillars be narrowed so that the crawlers 1 can pass between narrow trees by using a power cylinder in which the left and right caterpillars are arranged therebetween.
[0031]
【The invention's effect】
As described above, according to the present invention, the crawler loaded with the drill device is pulled up from above the slope of the construction site with the wire rope, and the crawler is moved in the left-right direction by winding the lateral support wire rope connected to the left and right trees with the winch. In addition, the crawler can be moved meandering between inanimate bodies such as narrow trees at construction sites where the trees cannot be cut down.
[0032]
By rotating the base on which the drilling machine is installed and moving the work table installed on the base in a lateral direction, anchor construction at multiple locations can be performed continuously at any interval. .
[0033]
By moving the bolt along the guide hole, the upward projecting part is brought into contact with the lateral support wire rope and bent, and in this state, it is tightened and fixed with a tightening nut. By winding up the wire rope, the crawler can be moved minutely in the lateral direction.
[Brief description of the drawings]
FIG. 1 is a side view of a state before construction showing an embodiment of an anchor construction apparatus used in the present invention.
FIG. 2 is a side view of a construction state showing one aspect of an anchor construction apparatus used in the present invention.
FIG. 3 is a plan view showing an outline of a base portion in the anchor construction apparatus used in the present invention.
FIG. 4 is a side view showing an outline of a base portion in the anchor construction apparatus used in the present invention.
FIG. 5 is a plan view showing an outline of a crawler horizontal minute moving device in the anchor construction device used in the present invention.
FIG. 6 is a side view showing an example of a crawler pulling structure according to the present invention.
FIG. 7 is a side view showing another example of the crawler pulling structure according to the present invention.
FIG. 8 is a side view of the construction state showing another aspect of the anchor construction apparatus used in the present invention.
[Explanation of symbols]
1 Crawler 2 Base 3 Pivot 4 Bracket 5 Pivot 6 Power Cylinder 6 ′ Telescopic Rod 7 Bracket 8 Drilling Machine 9 Guide Pole 10 Bracket 11 Pivot 12 Power Cylinder 12 ′ Telescopic Rod 13 Drill Head 14 Slider 15 Power Cylinder 16 Water Swivel 17 Drill pipe 18 Power clamp 19 Winch 20a Sheave 20b Sheave 20c Sheave 21 Lateral support wire rope 22 Three-point support roller 23 Axis 24 Guide hole 25 Arm 26 Bolt 27 Tightening nut 28 Pull-up wire rope 28 'Auxiliary wire rope 29 Sheave 30 Winch 31 Power cylinder 32 Guide rail 33 Wheel 34 Work table 35 Power cylinder 36 Guide rail 37 Moving table 38 Bracket 39 Bracket 40 Axis 41 Power cylinder 41 '' Telescopic rod

Claims (3)

クローラーに旋回自在に設置した基台上に回動自在に削孔機を設置し、前記基台上にウインチを設け、前記ウインチの前方の左右にシーブをそれぞれ回転自在に取付け、前記シーブに前記ウインチに巻き上げられた横支持ワイヤーロープを巻き掛け、前記横支持ワイヤーロープを一方のシーブに巻き掛けてその端部をクローラーの左右方向に位置する施工現場の樹木等の被連結部材に連結固定し、前記横支持ワイヤーロープを前記ウインチにより巻き上げ可能とすると共に、前記基台の先端には引き上げワイヤーロープを連結し、前記引き上げワイヤーロープを引き上げウインチにより巻き上げ可能としてなることを特徴とするアンカーボルト施工装置。A drilling machine is rotatably installed on a base that is pivotally installed on a crawler, a winch is provided on the base, and sheaves are attached to the left and right of the winch in a freely rotating manner, and the sheave is attached to the sheave. Wrap the horizontal support wire rope wound up on the winch, wrap the horizontal support wire rope around one sheave, and connect and fix the end to the connected member such as trees at the construction site located in the left and right direction of the crawler An anchor bolt construction characterized in that the lateral support wire rope can be wound up by the winch, and a lifting wire rope is connected to the tip of the base, and the lifting wire rope can be wound up by the lifting winch. apparatus. クローラーの基台上に横向きにガイドレールを設置し、前記ガイドレールに沿って左右に移動可能な作業台車を設置し、前記作業台に回動自在に削孔機を設置し、前記基台上にウインチを設け、前記ウインチの前方の左右にシーブをそれぞれ回転自在に取付け、前記シーブに前記ウインチに巻き上げられた横支持ワイヤーロープを巻き掛け、前記横支持ワイヤーロープを一方のシーブに巻き掛けてその端部をクローラーの左右方向に位置する施工現場の樹木等の被連結部材に連結固定し、前記横支持ワイヤーロープを前記ウインチにより巻き上げ可能とすると共に、前記基台の先端には引き上げワイヤーロープを連結し、前記引き上げワイヤーロープを引き上げウインチにより巻き上げ可能としてなることを特徴とするアンカーボルト施工装置。A guide rail is installed horizontally on the crawler base, a work cart that can be moved to the left and right along the guide rail, a drilling machine is installed on the work base, and a drilling machine is installed on the base. A winch is provided on the front side of the winch, and a sheave is rotatably attached to each side of the winch. A horizontal support wire rope wound around the winch is wound around the sheave, and the horizontal support wire rope is wound around one sheave. The end portion is connected and fixed to a member to be connected such as a tree on the construction site located in the left-right direction of the crawler, and the horizontal support wire rope can be wound up by the winch, and a pull-up wire rope at the tip of the base , And the lifting wire rope can be wound up by a lifting winch. . クローラーに設置した基台上に回動自在に削孔機を設置し、前記基台上にウインチを設け、前記ウインチの前方の左右にシーブをそれぞれ回転自在に取付け、前記シーブに前記ウインチに巻き上げられた横支持ワイヤーロープを巻き掛け、前記横支持ワイヤーロープを一方のシーブに巻き掛けてその端部をクローラーの左右方向に位置する施工現場の樹木等の被連結部材に連結固定し、前記横支持ワイヤーロープを前記ウインチにより巻き上げ可能とすると共に、前記基台の先端には引き上げワイヤーロープを連結し、前記引き上げワイヤーロープを引き上げウインチにより巻き上げ可能とし、前記ウインチとシーブ間の基台における横支持ワイヤーロープが通過する部分の付近に、ガイド穴をクローラーの左右方向に長く形成し、前記ガイド穴に沿ってボルトを移動可能に、かつ締め付けナットにより締め付け固定可能に挿通し、前記ガイド穴から突出する前記ボルトの突出部が前記横支持ワイヤーロープに接触可能としてなることを特徴とするアンカーボルト施工装置。A drilling machine is installed on the base installed on the crawler, and a winch is provided on the base. A sheave is rotatably mounted on the left and right of the winch, and the winch is wound around the sheave. wound a horizontal supporting wire rope that is, the horizontal supporting wire rope wound around the one sheave connected and fixed to the connecting member of the trees or the like construction site located its end in the lateral direction of the crawler, the lateral A support wire rope can be wound up by the winch , a pulling wire rope is connected to the tip of the base, and the pulling wire rope can be wound up by the pulling winch, and is laterally supported at the base between the winch and the sheave. In the vicinity of the part where the wire rope passes, a guide hole is formed long in the left-right direction of the crawler. An anchor bolt characterized in that a bolt can be moved along a hole and can be fastened and fixed by a tightening nut, and a protruding portion of the bolt protruding from the guide hole can come into contact with the lateral support wire rope. Construction equipment.
JP2003003989A 2003-01-10 2003-01-10 Anchor bolt construction equipment Expired - Fee Related JP4427670B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003003989A JP4427670B2 (en) 2003-01-10 2003-01-10 Anchor bolt construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003003989A JP4427670B2 (en) 2003-01-10 2003-01-10 Anchor bolt construction equipment

Publications (2)

Publication Number Publication Date
JP2004218210A JP2004218210A (en) 2004-08-05
JP4427670B2 true JP4427670B2 (en) 2010-03-10

Family

ID=32895093

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003003989A Expired - Fee Related JP4427670B2 (en) 2003-01-10 2003-01-10 Anchor bolt construction equipment

Country Status (1)

Country Link
JP (1) JP4427670B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020052351A1 (en) * 2018-09-12 2020-03-19 徐州徐工基础工程机械有限公司 Horizontal directional drilling rig

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5276842B2 (en) * 2007-12-28 2013-08-28 株式会社大林組 Free sliding drill
CN101881138B (en) * 2010-06-30 2014-07-16 煤炭科学研究总院重庆研究院 Coal mine full hydraulic traverse crawler drill
CN201835747U (en) * 2010-07-27 2011-05-18 河南送变电建设公司 Drilling machine with screw anchor
JP5430524B2 (en) * 2010-09-15 2014-03-05 俊仁 岡本 Drilling device
JP5822701B2 (en) * 2011-12-07 2015-11-24 岡本 俊仁 Slope working vehicle
JP6901822B2 (en) * 2015-12-21 2021-07-14 岡本 俊仁 Slope work equipment
CN115853440B (en) * 2022-12-02 2023-10-13 中建八局第三建设有限公司 Drilling platform for road slope construction

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0733682B2 (en) * 1990-09-12 1995-04-12 俊仁 岡本 Slope processing method and slope processing machine
JP2888505B2 (en) * 1992-02-07 1999-05-10 岡本 俊仁 Work trolley
JP2000123784A (en) * 1998-10-15 2000-04-28 Hitachi Ltd Quadrupole mass spectrometer
JP3499478B2 (en) * 1999-10-28 2004-02-23 俊仁 岡本 Slope work vehicle
JP3463987B2 (en) * 2000-02-28 2003-11-05 株式会社ダイリン Drilling method and device for sloped ground

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020052351A1 (en) * 2018-09-12 2020-03-19 徐州徐工基础工程机械有限公司 Horizontal directional drilling rig

Also Published As

Publication number Publication date
JP2004218210A (en) 2004-08-05

Similar Documents

Publication Publication Date Title
JP4427670B2 (en) Anchor bolt construction equipment
US4697959A (en) Method and apparatus for installing an in-ground support footing around an upstanding elongate object
JP3204989U (en) Temporary utility pole installation collection device
US4144867A (en) Concrete pile-cutting machine
FR2545150A1 (en) Tunnel or gallery anchoring bolt setting mechanism
JP3057490B2 (en) Slope concrete paving equipment
BG61312B1 (en) Equipment for driving foundations mainlly designed for pylons
US4925159A (en) Vertical power pulling device
JP2987346B2 (en) Wire type cutting machine and cutting method using the same
JP3823298B2 (en) Slope drilling equipment
JP3481665B2 (en) Laying concrete blocks
JP3135214B2 (en) Drilling method of anchor embedding hole for concrete slope reinforcement and anchor embedding hole drilling device therefor
US6814161B1 (en) Stakedown assembly for a horizontal directional drill
JPH08338006A (en) Pier for construction work in tunnel
JP2709913B2 (en) Drilling machine
JP4828050B2 (en) Removal method and machine for removing underground pole poles
JP2004132117A (en) Boring method for sloped surface
SU1735561A1 (en) Drilling method and relevant device
JPH0624468Y2 (en) Drilling device for anchors on sloping ground
JPH108868A (en) Leader attachment for civil engineering and construction machine
JP2001003362A (en) Pull-out device for underground buried pile
JP4061477B2 (en) Pile continuous pulling method by aerial movement of pile puller and aerial mobile pile puller
JP3129537B2 (en) Vertical hole drilling rig
JPH1088993A (en) Lock bolt driver
JP3933476B2 (en) Flexible long body guiding support

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051212

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070425

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070626

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20071120

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080121

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080321

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20080326

A912 Removal of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20080530

R155 Notification before disposition of declining of application

Free format text: JAPANESE INTERMEDIATE CODE: R155

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20091124

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121225

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees